[Congressional Record Volume 167, Number 138 (Tuesday, August 3, 2021)]
[Senate]
[Pages S5773-S5774]
From the Congressional Record Online through the Government Publishing Office [www.gpo.gov]
SA 2426. Mr. RUBIO (for himself and Mr. Kelly) submitted an amendment
intended to be proposed to amendment SA 2137 proposed by Mr. Schumer
(for Ms. Sinema (for herself, Mr. Portman, Mr. Manchin, Mr. Cassidy,
Mrs. Shaheen, Ms. Collins, Mr. Tester, Ms. Murkowski, Mr. Warner, and
Mr. Romney)) to the bill H.R. 3684, to authorize funds for Federal-aid
highways, highway safety programs, and transit programs, and for other
purposes; which was ordered to lie on the table; as follows:
On page 2010, line 6, insert ``pursuant to section
516(b)(1)'' after ``assessment''.
On page 2010, line 11, insert ``pursuant to section
516(b)(1)'' after ``assessment''.
On page 2010, line 14, insert ``to the Administrator''
after ``appropriated''.
On page 2010, strike line 16 and insert the following:
available until expended.
``(c) Funding.--Each fiscal year, a State may reserve up to
0.5 percent of the sums allotted to the State under this
title for the fiscal year to carry out activities under
section 516(b)(1)(B).''.
On page 2014, between lines 10 and 11, insert the
following:
SEC. 502__. REPORTS TO CONGRESS.
Section 516(b)(1) of the Federal Water Pollution Control
Act (33 U.S.C. 1375(b)(1)) is amended by striking ``(B) a
detailed estimate, biennially revised, of the cost of
construction of all needed publicly owned treatment works in
all of the States and of the cost of construction of all
needed publicly owned treatment works in each of the
States;'' and inserting ``(B) a detailed estimate, biennially
revised, of the cost of construction of all planned publicly
owned treatment works in all of the States and all needed
publicly owned treatment works in all of the States, and the
cost of construction of all planned publicly owned treatment
works in each of the States and all needed publicly owned
treatment works in each of the States, which shall include
(i) the cost of construction to rehabilitate or upgrade all
existing publicly owned treatment works (excluding any pipe
or other device or system for the conveyance of wastewater),
every 20 years, including the costs to implement measures
necessary to address the resilience and sustainability of
publicly owned treatment works to manmade or natural
disasters and (ii) the cost of construction to replace 10
percent of existing publicly owned pipes and other devices
and systems for the conveyance of wastewater to such
treatment works over the 20-year period following the date of
the estimate;''.
[[Page S5774]]
______