[Congressional Record Volume 164, Number 187 (Wednesday, November 28, 2018)]
[Senate]
[Pages S7192-S7193]
From the Congressional Record Online through the Government Publishing Office [www.gpo.gov]
By Mr. DURBIN (for himself and Ms. Duckworth):
S. 3671. A bill to require the Administrator of the Environmental
Protection Agency to revise certain ethylene oxide emissions standards
under the Clean Air Act, and for other purposes; to the Committee on
Environment and Public Works.
Mr. DURBIN. Mr. President, I ask unanimous consent that the text of
the bill be printed in the Record.
There being no objection, the text of the bill was ordered to be
printed in the Record, as follows:
S. 3671
Be it enacted by the Senate and House of Representatives of
the United States of America in Congress assembled,
SECTION 1. ETHYLENE OXIDE EMISSIONS STANDARDS.
(a) In General.--Not later than 180 days after the date of
enactment of this Act, the Administrator of the Environmental
Protection Agency (referred to in this section as the
``Administrator'') shall amend--
(1) subparts O and FFFF of part 63 of title 40, Code of
Federal Regulations, to revise the standards for the emission
of ethylene oxide under those subparts based on the results
described in the report of the National Center for
Environmental Assessment of the Environmental Protection
Agency entitled ``Evaluation of the Inhalation
Carcinogenicity of Ethylene Oxide'' and dated December 2016;
and
(2) subpart O of part 63 of title 40, Code of Federal
Regulations, to apply maximum achievable control technology
(within the meaning of the Clean Air Act (42 U.S.C. 7401 et
seq.)) requirements to chamber exhaust vents.
(b) Notification.--
(1) In general.--Not later than 30 days after the
Administrator learns of a violation of the standards revised
under subsection (a), the Administrator shall notify the
public of the violation in a manner determined to be
appropriate by the Administrator.
[[Page S7193]]
(2) Failure to notify.--If the Administrator fails to
notify the public under paragraph (1) by the end of the
period described in that paragraph, the Inspector General of
the Environmental Protection Agency shall carry out an
investigation to determine--
(A) the reason or reasons for which the Administrator
failed to notify the public;
(B) the public health risks associated with the failure of
the Administrator to notify the public; and
(C) any steps the Administrator should take to ensure the
Administrator meets the requirements described in paragraph
(1) in the future.
____________________