[Congressional Record Volume 163, Number 127 (Thursday, July 27, 2017)]
[Senate]
[Page S4535]
From the Congressional Record Online through the Government Publishing Office [www.gpo.gov]

  SA 561. Mr. HATCH submitted an amendment intended to be proposed by 
him to the bill H.R. 2810, to authorize appropriations for fiscal year 
2018 for military activities of the Department of Defense, for military 
construction, and for defense activities of the Department of Energy, 
to prescribe military personnel strengths for such fiscal year, and for 
other purposes; which was ordered to lie on the table; as follows:

       At the appropriate place, insert the following:

     SEC. ___. ROBOTIC SERVICING OF GEOSYNCHRONOUS SATELLITES 
                   DEVELOPMENT PROGRAM ACCOUNTABILITY MATRICES.

       (a) Submission of Matrices.--Concurrent with the submission 
     of the budget of the President to Congress under section 
     1105(a) of title 31, United States Code, for fiscal year 
     2019, the Director of the Defense Advanced Research Projects 
     Agency shall submit to the congressional defense committees 
     and the Comptroller General of the United States the matrices 
     described in subsection (b) relating to the Robotic Servicing 
     of Geosynchronous Satellites program.
       (b) Matrices Described.--The matrices described in this 
     subsection are the following:
       (1) Development goals.--A matrix that identifies, in six-
     month increments, key milestones, development events, and 
     specific performance goals for the Robotic Servicing of 
     Geosynchronous Satellites program, which shall be subdivided, 
     at a minimum, according to the following:
       (A) Technology readiness levels of major components and key 
     demonstration events.
       (B) Design maturity.
       (C) Software maturity.
       (D) Manufacturing readiness levels for critical 
     manufacturing operations and key demonstration events.
       (E) Manufacturing operations.
       (F) System verification and key flight test events.
       (G) Reliability.
       (2) Total cost.--A matrix expressing, in six-month 
     increments, the total cost to the Department of Defense and 
     all relevant United States Government agencies cost position 
     for the payload, operations software, payload integration, 
     and launch for the Robotic Servicing of Geosynchronous 
     Satellites program.
       (3) Spacecraft cots.--A matrix expressing, in six-month 
     increments, the total cost for Robotic Servicing of 
     Geosynchronous Satellites program spacecraft and relevant 
     subsystem completion, which shall be phased over the entire 
     development period and subdivided according to the costs of 
     the following:
       (A) Spacecraft.
       (B) Payload.
       (C) Mission systems.
       (D) Vehicle software.
       (E) Systems engineering.
       (F) Program management.
       (G) System test and evaluation.
       (H) Support and training systems.
       (I) Contract fee.
       (J) Engineering changes.
       (K) Direct mission support.
       (L) Launch.
       (M) Government testing.
       (c) Semiannual Update of Matrices.--
       (1) In general.--The Director shall submit to the 
     congressional defense committees and the Comptroller General 
     of the United States updates to the matrices described in 
     subsection (b)--
       (A) not later than 180 days after the date on which the 
     Director submits the matrices required by subsection (a);
       (B) concurrent with the submission of the budget of the 
     President to Congress under section 1105(a) of title 31, 
     United States Code, for fiscal year 2020 and each fiscal year 
     thereafter; and
       (C) not later than 180 days after each such submission.
       (2) Elements.--Each update submitted under paragraph (1) 
     shall detail progress made toward the goals identified in the 
     matrix described in subsection (b)(1) and provide updated 
     cost estimates.
       (3) Treatment of initial matrices as baseline.--The 
     matrices submitted pursuant to subsection (a) shall be 
     treated as the baseline for the full research, development, 
     test, and evaluation of the Robotic Servicing of 
     Geosynchronous Satellites program and through its launch and 
     demonstration for purposes of the updates submitted pursuant 
     to paragraph (1).
       (d) Assessment by Comptroller General of the United 
     States.--Not later than the date that is 45 days after the 
     date on which the Comptroller General of the United States 
     receives an update to a matrix under subsection (c)(1), the 
     Comptroller General shall review the sufficiency of the 
     matrix and submit to the congressional defense committees an 
     assessment of the matrix and an identification of cost, 
     schedule, or performance trends in the matrix.
       (e) Secretary of Defense Approval.--Following the 
     demonstration of the Robotic Servicing of Geosynchronous 
     Satellites spacecraft and its transition to a commercial 
     partner of the Defense Advanced Research Projects Agency, the 
     Secretary of Defense shall approve each commercial operation 
     of the spacecraft after--
       (1) taking into account--
       (A) available fuel for possible national security mission 
     requirements;
       (B) orbitology relative to possible national security 
     mission requirements; and
       (C) compliance with the Presidential Decision Directive on 
     National Space Policy; and
       (2) certifying to the congressional defense committees 
     that--
       (A) any commercial use does not conflict with possible 
     national security requirements; and
       (B) the requirements of this subsection have been met.
       (f) Secretary of Defense Study.--Concurrent with the 
     submission of the budget of the President to Congress under 
     section 1105(a) of title 31, United States Code, for fiscal 
     year 2019, the Secretary of Defense shall submit to the 
     congressional defense committees a report on the technology 
     transfer of the robotic payload, operations software, and 
     corresponding systems of the Robotic Servicing of 
     Geosynchronous Satellites program to qualified satellite 
     manufacturers and satellite operators to increase the on-
     orbit highly advanced space robotics capabilities of entities 
     organized under the laws of the United States and available 
     to the Department of Defense.
                                 ______