[Congressional Record Volume 162, Number 16 (Wednesday, January 27, 2016)]
[Senate]
[Pages S279-S281]
From the Congressional Record Online through the Government Publishing Office [www.gpo.gov]

  SA 3021. Mr. CRAPO (for himself, Mr. Whitehouse, Mr. Risch, Mr. 
Booker, Mr. Hatch, Mr. Kirk, and Mr. Durbin) submitted an amendment 
intended to be proposed to amendment SA 2953 proposed by Ms. Murkowski 
to the bill S. 2012, to provide for the modernization of the energy 
policy of the United States, and for other purposes; as follows:

       Strike section 3501 and insert the following:

     SEC. 3501. NUCLEAR ENERGY INNOVATION CAPABILITIES.

       (a) Definitions.--In this section:
       (1) Advanced fission reactor.--The term ``advanced fission 
     reactor'' means a nuclear fission reactor with significant 
     improvements over the most recent generation of nuclear 
     reactors, including improvements such as--
       (A) inherent safety features;
       (B) lower waste yields;
       (C) greater fuel utilization;
       (D) superior reliability;
       (E) resistance to proliferation;
       (F) increased thermal efficiency; and
       (G) ability to integrate into electric and nonelectric 
     applications.
       (2) Fast neutron.--The term ``fast neutron'' means a 
     neutron with kinetic energy above 100 kiloelectron volts.
       (3) National laboratory.--
       (A) In general.--Except as provided in subparagraph (B), 
     the term ``National Laboratory'' has the meaning given the 
     term in section 2 of the Energy Policy Act of 2005 (42 U.S.C. 
     15801).
       (B) Limitation.--With respect to the Lawrence Livermore 
     National Laboratory, the Los Alamos National Laboratory, and 
     the Sandia National Laboratories, the term ``National 
     Laboratory'' means only the civilian activities of the 
     laboratory.
       (4) Neutron flux.--The term ``neutron flux'' means the 
     intensity of neutron radiation measured as a rate of flow of 
     neutrons applied over an area.
       (5) Neutron source.--The term ``neutron source'' means a 
     research machine that provides neutron irradiation services 
     for--
       (A) research on materials sciences and nuclear physics; and
       (B) testing of advanced materials, nuclear fuels, and other 
     related components for reactor systems.
       (b) Mission.--Section 951 of the Energy Policy Act of 2005 
     (42 U.S.C. 16271) is amended by striking subsection (a) and 
     inserting the following:
       ``(a) In General.--The Secretary shall conduct programs of 
     civilian nuclear research, development, demonstration, and 
     commercial application, including activities described in 
     this subtitle, that take into consideration the following 
     objectives:
       ``(1) Providing research infrastructure--
       ``(A) to promote scientific progress; and
       ``(B) to enable users from academia, the National 
     Laboratories, and the private sector to make scientific 
     discoveries relevant for nuclear, chemical, and materials 
     science engineering.
       ``(2) Maintaining nuclear energy research and development 
     programs at the National Laboratories and institutions of 
     higher education, including programs of infrastructure of 
     National Laboratories and institutions of higher education.
       ``(3) Providing the technical means to reduce the 
     likelihood of nuclear weapons proliferation.
       ``(4) Ensuring public safety.
       ``(5) Reducing the environmental impact of nuclear energy-
     related activities.
       ``(6) Supporting technology transfer from the National 
     Laboratories to the private sector.
       ``(7) Enabling the private sector to partner with the 
     National Laboratories to demonstrate novel reactor concepts 
     for the purpose of resolving technical uncertainty associated 
     with the objectives described in this subsection.''.
       (c) Sense of Congress.--It is the sense of Congress that--
       (1) nuclear energy, through fission or fusion, represents 
     the highest energy density of any known attainable source and 
     yields low air emissions;
       (2) nuclear energy is of national importance to scientific 
     progress, national security, electricity generation, heat 
     generation

[[Page S280]]

     for industrial applications, and space exploration; and
       (3) considering the inherent complexity and regulatory 
     burden associated with nuclear energy, the Department should 
     focus civilian nuclear research and development activities of 
     the Department on programs that enable the private sector, 
     National Laboratories, and institutions of higher education 
     to carry out experiments to promote scientific progress and 
     enhance practical knowledge of nuclear engineering.
       (d) High-performance Computation and Supportive Research.--
       (1) Modeling and simulation program.--
       (A) In general.--The Secretary shall carry out a program to 
     enhance the capabilities of the United States to develop new 
     reactor technologies and related systems technologies through 
     high-performance computation modeling and simulation 
     techniques (referred to in this paragraph as the 
     ``program'').
       (B) Coordination required.--In carrying out the program, 
     the Secretary shall coordinate with relevant Federal agencies 
     through the National Strategic Computing Initiative 
     established by Executive Order 13702 (80 Fed. Reg. 46177) 
     (July 29, 2015).
       (C) Objectives.--In carrying out the program, the Secretary 
     shall take into consideration the following objectives:
       (i) Using expertise from the private sector, institutions 
     of higher education, and National Laboratories to develop 
     computational software and capabilities that prospective 
     users may access to accelerate research and development of 
     advanced fission reactor systems, nuclear fusion systems, and 
     reactor systems for space exploration.
       (ii) Developing computational tools to simulate and predict 
     nuclear phenomena that may be validated through physical 
     experimentation.
       (iii) Increasing the utility of the research infrastructure 
     of the Department by coordinating with the Advanced 
     Scientific Computing Research program of the Office of 
     Science.
       (iv) Leveraging experience from the Energy Innovation Hub 
     for Modeling and Simulation.
       (v) Ensuring that new experimental and computational tools 
     are accessible to relevant research communities, including 
     private companies engaged in nuclear energy technology 
     development.
       (2) Supportive research activities.--The Secretary shall 
     consider support for additional research activities to 
     maximize the utility of the research facilities of the 
     Department, including research--
       (A) on physical processes to simulate degradation of 
     materials and behavior of fuel forms; and
       (B) for validation of computational tools.
       (e) Versatile Neutron Source.--
       (1) Determination of mission need.--
       (A) In general.--Not later than December 31, 2016, the 
     Secretary shall determine the mission need for a versatile 
     reactor-based fast neutron source, which shall operate as a 
     national user facility (referred to in this subsection as the 
     ``user facility'').
       (B) Consultation required.--In carrying out subparagraph 
     (A), the Secretary shall consult with the private sector, 
     institutions of higher education, the National Laboratories, 
     and relevant Federal agencies to ensure that the user 
     facility will meet the research needs of the largest possible 
     majority of prospective users.
       (2) Plan for establishment.--On the determination of the 
     mission need under paragraph (1), the Secretary, as 
     expeditiously as practicable, shall submit to the Committee 
     on Energy and Natural Resources of the Senate and the 
     Committee on Science, Space, and Technology of the House of 
     Representatives a detailed plan for the establishment of the 
     user facility (referred to in this section as the ``plan'').
       (3) Deadline for establishment.--The Secretary shall make 
     every effort to complete construction of, and approve the 
     start of operations for, the user facility by December 31, 
     2025.
       (4) Facility requirements.--
       (A) Capabilities.--The Secretary shall ensure that the user 
     facility shall provide, at a minimum--
       (i) fast neutron spectrum irradiation capability; and
       (ii) capacity for upgrades to accommodate new or expanded 
     research needs.
       (B) Considerations.--In carrying out the plan, the 
     Secretary shall consider--
       (i) capabilities that support experimental high-temperature 
     testing;
       (ii) providing a source of fast neutrons--

       (I) at a neutron flux that is higher than the neutron flux 
     at which research facilities operate before establishment of 
     the user facility; and
       (II) sufficient to enable research for an optimal base of 
     prospective users;

       (iii) maximizing irradiation flexibility and irradiation 
     volume to accommodate as many concurrent users as possible;
       (iv) capabilities for irradiation with neutrons of a lower 
     energy spectrum;
       (v) multiple loops for fuels and materials testing in 
     different coolants; and
       (vi) additional pre-irradiation and post-irradiation 
     examination capabilities.
       (5) Coordination.--In carrying out this subsection, the 
     Secretary shall leverage the best practices of the Office of 
     Science for the management, construction, and operation of 
     national user facilities.
       (6) Report.--The Secretary shall include in the annual 
     budget request of the Department an explanation for any delay 
     in carrying out this subsection.
       (f) Enabling Nuclear Energy Innovation.--
       (1) Establishment of national nuclear innovation center.--
     The Secretary may enter into a memorandum of understanding 
     with the Chairman of the Nuclear Regulatory Commission to 
     establish a center to be known as the ``National Nuclear 
     Innovation Center'' (referred to in this subsection as the 
     ``Center'')--
       (A) to enable the testing and demonstration of reactor 
     concepts to be proposed and funded, in whole or in part, by 
     the private sector;
       (B) to establish and operate a database to store and share 
     data and knowledge on nuclear science between Federal 
     agencies and private industry; and
       (C) to establish capabilities to develop and test reactor 
     electric and nonelectric integration and energy conversion 
     systems.
       (2) Role of nrc.--In operating the Center, the Secretary 
     shall--
       (A) consult with the Nuclear Regulatory Commission on 
     safety issues; and
       (B) permit staff of the Nuclear Regulatory Commission to 
     actively observe and learn about the technology being 
     developed at the Center.
       (3) Objectives.--A reactor developed under paragraph (1)(A) 
     shall have the following objectives:
       (A) Enabling physical validation of fusion and advanced 
     fission experimental reactors at the National Laboratories or 
     other facilities of the Department.
       (B) Resolving technical uncertainty and increase practical 
     knowledge relevant to safety, resilience, security, and 
     functionality of novel reactor concepts.
       (C) Conducting general research and development to improve 
     novel reactor technologies.
       (4) Use of technical expertise.--In operating the Center, 
     the Secretary shall leverage the technical expertise of 
     relevant Federal agencies and National Laboratories--
       (A) to minimize the time required to carry out paragraph 
     (3); and
       (B) to ensure reasonable safety for individuals working at 
     the National Laboratories or other facilities of the 
     Department to carry out that paragraph.
       (5) Reporting requirement.--
       (A) In general.--Not later than 180 days after the date of 
     enactment of this Act, the Secretary, in consultation with 
     the National Laboratories, relevant Federal agencies, and 
     other stakeholders, shall submit to the Committee on Energy 
     and Natural Resources and the Committee on Environment and 
     Public Works of the Senate and the Committee on Science, 
     Space, and Technology and the Committee on Energy and 
     Commerce of the House of Representatives a report assessing 
     the capabilities of the Department to authorize, host, and 
     oversee privately proposed and funded reactors (as described 
     in paragraph (1)(A)).
       (B) Contents.--The report shall address--
       (i) the safety review and oversight capabilities of the 
     Department, including options to leverage expertise from the 
     Nuclear Regulatory Commission and the National Laboratories;
       (ii) potential sites capable of hosting the activities 
     described in paragraph (1);
       (iii) the efficacy of the available contractual mechanisms 
     of the Department to partner with the private sector and 
     other Federal agencies, including cooperative research and 
     development agreements, strategic partnership projects, and 
     agreements for commercializing technology;
       (iv) how the Federal Government and the private sector will 
     address potential intellectual property concerns;
       (v) potential cost structures relating to physical 
     security, decommissioning, liability, and other long term 
     project costs; and
       (vi) other challenges or considerations identified by the 
     Secretary.
       (g) Budget Plan.--
       (1) In general.--Not later than 1 year after the date of 
     enactment of this Act, the Secretary shall submit to the 
     Committee on Energy and Natural Resources of the Senate and 
     the Committee on Science, Space, and Technology of the House 
     of Representatives 3 alternative 10-year budget plans for 
     civilian nuclear energy research and development by the 
     Department in accordance with paragraph (2).
       (2) Description of plans.--
       (A) In general.--The 3 alternative 10-year budget plans 
     submitted under paragraph (1) shall be the following:
       (i) A plan that assumes constant annual funding at the 
     level of appropriations for fiscal year 2016 for the civilian 
     nuclear energy research and development of the Department, 
     particularly for programs critical to advanced nuclear 
     projects and development.
       (ii) A plan that assumes 2 percent annual increases to the 
     level of appropriations described in clause (i).
       (iii) A plan that uses an unconstrained budget.
       (B) Inclusions.--Each plan shall include--
       (i) a prioritized list of the programs, projects, and 
     activities of the Department that best support the 
     development, licensing, and deployment of advanced nuclear 
     energy technologies;
       (ii) realistic budget requirements for the Department to 
     carry out subsections (d), (e), and (f); and

[[Page S281]]

       (iii) the justification of the Department for continuing or 
     terminating existing civilian nuclear energy research and 
     development programs.
       (h) Nuclear Regulatory Commission Report.--Not later than 
     December 31, 2016, the Chairman of the Nuclear Regulatory 
     Commission shall submit to the Committee on Energy and 
     Natural Resources and the Committee on Environment and Public 
     Works of the Senate and the Committee on Science, Space, and 
     Technology and the Committee on Energy and Commerce of the 
     House of Representatives a report describing--
       (1) the extent to which the Nuclear Regulatory Commission 
     is capable of licensing advanced reactor designs that are 
     developed pursuant to this section by the end of the 4-year 
     period beginning on the date on which an application is 
     received under part 50 or 52 of title 10, Code of Federal 
     Regulations (or successor regulations); and
       (2) any organizational or institutional barriers the 
     Nuclear Regulatory Commission will need to overcome to be 
     able to license the advanced reactor designs that are 
     developed pursuant to this section by the end of the 4-year 
     period described in paragraph (1).
                                 ______