Mr. DORGAN. Mr. President, I rise to discuss funding for a wind
transmission study that was included in the fiscal year 2005 Omnibus
Appropriations bill signed into law last December. As a member of the
Senate Energy and Water Appropriations Subcommittee, I appreciated the
efforts of Senators Domenici and Reid, the chairman and the ranking
member of our subcommittee, to include $500,000 for the Western Area
Power Administration, WAPA, to continue its work on the placement of
additional wind capacity in the Dakotas. They have generously provided
funding for similar work for the past two years, and I am glad these
efforts will be continued during this coming fiscal year.
North Dakota is the ``Saudi Arabia'' of wind. The Department of
Energy has long identified North Dakota as having the greatest wind
energy resource and potential for wind generation development in the
lower 48 States. During my time in the Senate, I have been pushing hard
on a number of fronts to develop our wind energy resources. For
example, I have been a strong supporter of the Renewable Portfolio
Standard, RPS, which requires utilities to produce 10 percent of their
electricity from renewable energy sources by 2020. In addition, I
believe the Federal Government should be a leader in this area and
develop a policy of purchasing electricity from renewable energy
sources.
Last February, I hosted the Fifth Annual Wind Energy Conference with
the Energy and Environmental Research Center at the University of North
Dakota to further promote this clean and limitless energy resource.
Wind energy stakeholders from around the Nation attended this
successful event, which attracted 436 people from 30 States and three
Canadian provinces. Last year, the conference included a second day of
events because of the overwhelming interest in wind energy. As a result
of the wind energy industry's growth, North Dakota's skyline and
economic future are forever changing and progressing forward. We will
be doing another conference in February 2005, which more broadly
embraces renewable energy in the Upper Midwest.
Despite my continued efforts to increase the use of wind as an energy
source, North Dakota faces many transmission challenges in moving wind
energy to other parts of the country. I have held field hearings in
North Dakota on these issues and have also supported the development of
new transmission technologies. While the Senate has wisely included
funding for the last several years for WAPA to make some progress on
these transmission problems, the fact remains that more needs to be
done. WAPA and others have done a number of general studies on this
issue and I think the next steps are clear. WAPA should use the funding
earmarked in FY2005 for an Environmental Impact Study, EIS, that would
allow transmission expansion for wind generation to be placed in North
and South Dakota and should use the remaining funds to support specific
demonstration projects in the region.
With respect to site-specific projects to support wind development
for future electric generation, I believe that WAPA should first
develop parameters for determining what constitutes a bona fide wind
project. In doing this, WAPA should ensure that projects meet the
following requirements: a minimum period of at least one year; minimum
anemometer height of at least 40 meters; multiple monitoring points
allowing calculation of wind shear; a defined system interconnection
point and wind right easements adequate for the proposed project. To
make these limited funds stretch farther, I would expect any proposed
project to include a 50-50 cost share provision. It is my hope that
WAPA will be able to support projects that will accurately determine
the transmission requirements and related costs associated with the
installation of specific wind and coal generation projects.
Following this guidance, it is my expectation that WAPA will use this
funding to make real progress on these transmission problems in the
next fiscal year, and provide wider benefits to the large region of the
U.S. served by WAPA. After all, WAPA was created to market hydropower,
a renewable energy resource. Wind is the next step.