<?xml-stylesheet type="text/css" href="uslm.css"?><statuteCompilation xmlns="http://schemas.gpo.gov/xml/uslm" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:gpo="http://www.gpo.gov/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://schemas.gpo.gov/xml/uslm https://www.govinfo.gov/schemas/xml/uslm/uslm-2.0.10.xsd" xml:lang="en" style="-uslm-dtd:statute">
    <meta style="-uslm-dtd:compilation-act-form">
        <dc:title>Hoover Power Allocation Act of 2011</dc:title>
        <citableAs>Public Law 112–72</citableAs>
        <citableAsShortTitle>Hoover Power Allocation Act of 2011</citableAsShortTitle>
        <docNumber>72</docNumber>
        <currentThroughPublicLaw>112–72</currentThroughPublicLaw>
        <dc:type>Statute Compilation</dc:type>
        <dc:creator>United States House of Representatives</dc:creator>
        <dc:creator>Office of the Legislative Counsel</dc:creator>
        <dc:format>text/xml</dc:format>
        <dc:language>EN</dc:language>
        <dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
        <processedBy>GPO Statute Compilations USLM converter, version 20210527.1</processedBy>
        <processedDate>2021-10-15</processedDate>
        <containsShortTitle>Hoover Power Allocation Act of 2011</containsShortTitle>
        <property role="fileId">9774</property>
        <congress>112</congress>
        <approvedDate>2011-12-20</approvedDate>
    </meta>
    <preface style="-uslm-dtd:compilation-act-form">
        <property style="-uslm-dtd:comp-short-title" role="compShortTitle">Hoover Power Allocation Act of 2011</property>
        <citationNote style="-uslm-dtd:public-law">[(<citableAs>Public Law 112–72</citableAs>)]</citationNote>
        <editionNote style="-uslm-dtd:updated-through-note">[This law has not been amended]</editionNote>
        <explanationNote style="-uslm-dtd:explanatory-note"><b>[</b>Currency: This publication is a compilation of the text of Public Law 112-72. It was last amended by the public law listed in the As Amended Through note above and below at the bottom of each page of the pdf version and reflects current law through the date of the enactment of the public law listed at https://www.govinfo.gov/app/collection/comps/<b>]</b></explanationNote>
        <explanationNote style="-uslm-dtd:explanatory-note"><b>[</b>Note: While this publication does  not represent an official version of any Federal statute, substantial efforts have been made to ensure the accuracy of its contents. The official version of Federal law is found in the United States Statutes at Large and in the United States Code. The legal effect to be given to the Statutes at Large and the United States Code is established by statute (1 U.S.C. 112, 204).<b>]</b></explanationNote>
    </preface>
    <main style="-uslm-dtd:legis-body"><longTitle><docTitle style="-uslm-dtd:legis-type">AN ACT</docTitle><officialTitle style="-uslm-dtd:official-title">To further allocate and expand the availability of hydroelectric power generated at Hoover Dam, and for other purposes.</officialTitle></longTitle><enactingFormula style="-uslm-dtd:enacting-clause">Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,</enactingFormula>
        <section style="-uslm-dtd:section" identifier="/us/sComp/112/72/s1" styleType="OLC">
            <num style="-uslm-dtd:enum" value="1">SECTION 1. </num><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t43/s619">43 U.S.C. 619 note</ref><b>]</b> </editorialNote><heading style="-uslm-dtd:header">SHORT TITLE. </heading>
            <content style="-uslm-dtd:text" class="block">This Act may be cited as the “<shortTitle style="-uslm-dtd:quote"><inline style="-uslm-dtd:short-title">Hoover Power Allocation Act of 2011</inline></shortTitle>”.</content>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/112/72/s2" styleType="OLC">
            <num style="-uslm-dtd:enum" value="2">SEC. 2. </num><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t43/s619a">43 U.S.C. 619a</ref><b>]</b> </editorialNote><heading style="-uslm-dtd:header">ALLOCATION OF CONTRACTS FOR POWER. </heading>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/a" styleType="OLC">
                <num style="-uslm-dtd:enum" value="a">(a) </num><heading style="-uslm-dtd:header">Schedule A Power.—</heading><chapeau style="-uslm-dtd:text">Section 105(a)(1)(A) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(a)(1)(A)) is amended—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/a/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">renewal</quotedText>”;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/a/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">June 1, 1987</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">October 1, 2017</quotedText>”; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/a/3" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">by striking Schedule A and inserting the following:<quotedContent style="-uslm-dtd:quoted-block"><foreign id="warning-d3307896e56" note="processing mode: unknown" role="passthroughContent"><compsdtd:table xmlns:compsdtd="http://schemas.gpo.gov/xml/comps-dtd" line-rules="all-gen" rule-weights="4.4.4.4.4.17" blank-lines-before="0" blank-lines-after="0"><compsdtd:ttitle>``Schedule A</compsdtd:ttitle><compsdtd:tdesc>Long-term Schedule A contingent capacity and associated firm energy for offers of contracts to Boulder Canyon project contractors</compsdtd:tdesc><compsdtd:tgroup cols="5" no-carding="1" ttitle-size="9" thead-tbody-ldg-size="9.8.8"><compsdtd:colspec colname="col1" coldef="txt" min-data-value="50" /><compsdtd:colspec colname="col2" coldef="fig" min-data-value="9" /><compsdtd:colspec colname="col3" coldef="fig" min-data-value="9" /><compsdtd:colspec colname="col4" coldef="fig" min-data-value="9" /><compsdtd:colspec colname="col5" coldef="fig" min-data-value="12" /><compsdtd:thead><compsdtd:row><compsdtd:entry morerows="1" align="center" colname="col1">Contractor</compsdtd:entry><compsdtd:entry morerows="1" align="center" colname="col2">Contingent capacity (kW)</compsdtd:entry><compsdtd:entry namest="col3" nameend="col5" align="center" colname="col3">Firm energy (thousands of kWh)</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry align="center" colname="col3">Summer</compsdtd:entry><compsdtd:entry align="center" colname="col4">Winter</compsdtd:entry><compsdtd:entry align="center" colname="col5">Total</compsdtd:entry></compsdtd:row></compsdtd:thead><compsdtd:tbody><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Metropolitan Water District of Southern California</compsdtd:entry><compsdtd:entry colname="col2">249,948</compsdtd:entry><compsdtd:entry colname="col3">859,163</compsdtd:entry><compsdtd:entry colname="col4">368,212</compsdtd:entry><compsdtd:entry colname="col5"> 1,227,375</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Los Angeles</compsdtd:entry><compsdtd:entry colname="col2">495,732</compsdtd:entry><compsdtd:entry colname="col3">464,108</compsdtd:entry><compsdtd:entry colname="col4">199,175</compsdtd:entry><compsdtd:entry colname="col5">663,283</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Southern California Edison Company</compsdtd:entry><compsdtd:entry colname="col2">280,245</compsdtd:entry><compsdtd:entry colname="col3">166,712</compsdtd:entry><compsdtd:entry colname="col4">71,448</compsdtd:entry><compsdtd:entry colname="col5">238,160</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Glendale</compsdtd:entry><compsdtd:entry colname="col2">18,178</compsdtd:entry><compsdtd:entry colname="col3">45,028</compsdtd:entry><compsdtd:entry colname="col4">19,297</compsdtd:entry><compsdtd:entry colname="col5">64,325</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Pasadena</compsdtd:entry><compsdtd:entry colname="col2">11,108</compsdtd:entry><compsdtd:entry colname="col3">38,622</compsdtd:entry><compsdtd:entry colname="col4">16,553</compsdtd:entry><compsdtd:entry colname="col5">55,175</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Burbank</compsdtd:entry><compsdtd:entry colname="col2">5,176</compsdtd:entry><compsdtd:entry colname="col3">14,070</compsdtd:entry><compsdtd:entry colname="col4">6,030</compsdtd:entry><compsdtd:entry colname="col5">20,100</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Arizona Power Authority</compsdtd:entry><compsdtd:entry colname="col2">190,869</compsdtd:entry><compsdtd:entry colname="col3">429,582</compsdtd:entry><compsdtd:entry colname="col4">184,107</compsdtd:entry><compsdtd:entry colname="col5">613,689</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Colorado River Commission of Nevada</compsdtd:entry><compsdtd:entry colname="col2">190,869</compsdtd:entry><compsdtd:entry colname="col3">429,582</compsdtd:entry><compsdtd:entry colname="col4">184,107</compsdtd:entry><compsdtd:entry colname="col5">613,689</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry rowsep="0" leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">United States, for Boulder City</compsdtd:entry><compsdtd:entry rowsep="1" colname="col2">20,198</compsdtd:entry><compsdtd:entry rowsep="1" colname="col3">53,200</compsdtd:entry><compsdtd:entry rowsep="1" colname="col4">22,800</compsdtd:entry><compsdtd:entry rowsep="1" colname="col5">76,000</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Totals</compsdtd:entry><compsdtd:entry colname="col2">1,462,323</compsdtd:entry><compsdtd:entry colname="col3">2,500,067</compsdtd:entry><compsdtd:entry colname="col4">1,071,729</compsdtd:entry><compsdtd:entry colname="col5">3,571,796''.</compsdtd:entry></compsdtd:row></compsdtd:tbody></compsdtd:tgroup></compsdtd:table></foreign></quotedContent>
</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><heading style="-uslm-dtd:header">Schedule B Power.—</heading><content style="-uslm-dtd:text">Section 105(a)(1)(B) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(a)(1)(B)) is amended to read as follows:<quotedContent style="-uslm-dtd:quoted-block">
                <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease2">
                    <num style="-uslm-dtd:enum" value="B">“(B) </num><content style="-uslm-dtd:text">To each existing contractor for power generated at Hoover Dam, a contract, for delivery commencing October 1, 2017, of the amount of contingent capacity and firm energy specified for that contractor in the following table:<foreign id="warning-d3307896e203" note="processing mode: unknown" role="passthroughContent"><compsdtd:table xmlns:compsdtd="http://schemas.gpo.gov/xml/comps-dtd" line-rules="all-gen" rule-weights="4.4.4.4.4.17" blank-lines-before="0" blank-lines-after="0"><compsdtd:ttitle>``Schedule B</compsdtd:ttitle><compsdtd:tdesc>Long-term Schedule B contingent capacity and associated firm energy for offers of contracts to Boulder Canyon project contractors</compsdtd:tdesc><compsdtd:tgroup cols="5" no-carding="1" ttitle-size="9" thead-tbody-ldg-size="9.8.8"><compsdtd:colspec colname="col1" coldef="txt" min-data-value="50" /><compsdtd:colspec colname="col2" coldef="fig" min-data-value="9" /><compsdtd:colspec colname="col3" coldef="fig" min-data-value="9" /><compsdtd:colspec colname="col4" coldef="fig" min-data-value="9" /><compsdtd:colspec colname="col5" coldef="fig" min-data-value="12" /><compsdtd:thead><compsdtd:row><compsdtd:entry morerows="1" align="center" colname="col1">Contractor</compsdtd:entry><compsdtd:entry morerows="1" align="center" colname="col2">Contingent capacity (kW)</compsdtd:entry><compsdtd:entry namest="col3" nameend="col5" align="center" colname="col3">Firm energy (thousands of kWh)</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry align="center" colname="col3">Summer</compsdtd:entry><compsdtd:entry align="center" colname="col4">Winter</compsdtd:entry><compsdtd:entry align="center" colname="col5">Total</compsdtd:entry></compsdtd:row></compsdtd:thead><compsdtd:tbody><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1"> City of Glendale</compsdtd:entry><compsdtd:entry colname="col2">2,020</compsdtd:entry><compsdtd:entry colname="col3">2,749</compsdtd:entry><compsdtd:entry colname="col4">1,194</compsdtd:entry><compsdtd:entry colname="col5">3,943</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Pasadena</compsdtd:entry><compsdtd:entry colname="col2">9,089</compsdtd:entry><compsdtd:entry colname="col3">2,399</compsdtd:entry><compsdtd:entry colname="col4">1,041</compsdtd:entry><compsdtd:entry colname="col5">3,440</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Burbank</compsdtd:entry><compsdtd:entry colname="col2">15,149</compsdtd:entry><compsdtd:entry colname="col3">3,604</compsdtd:entry><compsdtd:entry colname="col4">1,566</compsdtd:entry><compsdtd:entry colname="col5">5,170</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Anaheim</compsdtd:entry><compsdtd:entry colname="col2">40,396</compsdtd:entry><compsdtd:entry colname="col3">34,442</compsdtd:entry><compsdtd:entry colname="col4">14,958</compsdtd:entry><compsdtd:entry colname="col5">49,400</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Azusa</compsdtd:entry><compsdtd:entry colname="col2">4,039</compsdtd:entry><compsdtd:entry colname="col3">3,312</compsdtd:entry><compsdtd:entry colname="col4">1,438</compsdtd:entry><compsdtd:entry colname="col5">4,750</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Banning</compsdtd:entry><compsdtd:entry colname="col2">2,020</compsdtd:entry><compsdtd:entry colname="col3">1,324</compsdtd:entry><compsdtd:entry colname="col4">576</compsdtd:entry><compsdtd:entry colname="col5">1,900</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Colton</compsdtd:entry><compsdtd:entry colname="col2">3,030</compsdtd:entry><compsdtd:entry colname="col3">2,650</compsdtd:entry><compsdtd:entry colname="col4">1,150</compsdtd:entry><compsdtd:entry colname="col5">3,800</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Riverside</compsdtd:entry><compsdtd:entry colname="col2">30,296</compsdtd:entry><compsdtd:entry colname="col3">25,831</compsdtd:entry><compsdtd:entry colname="col4">11,219</compsdtd:entry><compsdtd:entry colname="col5">37,050</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">City of Vernon</compsdtd:entry><compsdtd:entry colname="col2">22,218</compsdtd:entry><compsdtd:entry colname="col3">18,546</compsdtd:entry><compsdtd:entry colname="col4">8,054</compsdtd:entry><compsdtd:entry colname="col5">26,600</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Arizona</compsdtd:entry><compsdtd:entry colname="col2">189,860</compsdtd:entry><compsdtd:entry colname="col3">140,600</compsdtd:entry><compsdtd:entry colname="col4">60,800</compsdtd:entry><compsdtd:entry colname="col5">201,400</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry rowsep="0" leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Nevada</compsdtd:entry><compsdtd:entry rowsep="1" colname="col2">189,860</compsdtd:entry><compsdtd:entry rowsep="1" colname="col3">273,600</compsdtd:entry><compsdtd:entry rowsep="1" colname="col4">117,800</compsdtd:entry><compsdtd:entry rowsep="1" colname="col5">391,400</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Totals</compsdtd:entry><compsdtd:entry colname="col2">507,977</compsdtd:entry><compsdtd:entry colname="col3">509,057</compsdtd:entry><compsdtd:entry colname="col4">219,796</compsdtd:entry><compsdtd:entry colname="col5">728,853''.</compsdtd:entry></compsdtd:row></compsdtd:tbody></compsdtd:tgroup></compsdtd:table></foreign></content>
                </subparagraph></quotedContent>
</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><heading style="-uslm-dtd:header">Schedule C Power.—</heading><chapeau style="-uslm-dtd:text">Section 105(a)(1)(C) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(a)(1)(C)) is amended—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/c/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">June 1, 1987</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">October 1, 2017</quotedText>”; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/c/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">by striking Schedule C and inserting the following:<quotedContent style="-uslm-dtd:quoted-block"><foreign id="warning-d3307896e381" note="processing mode: unknown" role="passthroughContent"><compsdtd:table xmlns:compsdtd="http://schemas.gpo.gov/xml/comps-dtd" line-rules="hor" rule-weights="4.4.4.4.0.0" blank-lines-before="0" blank-lines-after="0"><compsdtd:ttitle>``Schedule C</compsdtd:ttitle><compsdtd:tdesc>Excess Energy</compsdtd:tdesc><compsdtd:tgroup cols="2" no-carding="1" ttitle-size="9" thead-tbody-ldg-size="9.8.8"><compsdtd:colspec colname="col1" coldef="txt" min-data-value="200" /><compsdtd:colspec colname="col2" coldef="txt-no-ldr" min-data-value="100" /><compsdtd:thead><compsdtd:row><compsdtd:entry align="center" colname="col1">Priority of entitlement to excess energy</compsdtd:entry><compsdtd:entry align="center" colname="col2">State</compsdtd:entry></compsdtd:row></compsdtd:thead><compsdtd:tbody><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">First: Meeting Arizona's first priority right to delivery of excess energy which is equal in each year of operation to 200 million kilowatthours: Provided, That in the event excess energy in the amount of 200 million kilowatthours is not generated during any year of operation, Arizona shall accumulate a first right to delivery of excess energy subsequently generated in an amount not to exceed 600 million kilowatthours, inclusive of the current year's 200 million kilowatthours. Said first right of delivery shall accrue at a rate of 200 million kilowatthours per year for each year excess energy in an amount of 200 million kilowatthours is not generated, less amounts of excess energy delivered.</compsdtd:entry><compsdtd:entry colname="col2">Arizona</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Second: Meeting Hoover Dam contractual obligations under Schedule A of subsection (a)(1)(A), under Schedule B of subsection (a)(1)(B), and under Schedule D of subsection (a)(2), not exceeding 26 million kilowatthours in each year of operation.</compsdtd:entry><compsdtd:entry colname="col2">Arizona, Nevada, and California</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Third: Meeting the energy requirements of the three States, such available excess energy to be divided equally among the States.</compsdtd:entry><compsdtd:entry colname="col2">Arizona, Nevada, and California''.</compsdtd:entry></compsdtd:row></compsdtd:tbody></compsdtd:tgroup></compsdtd:table></foreign></quotedContent>
</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><heading style="-uslm-dtd:header">Schedule D Power.—</heading><chapeau style="-uslm-dtd:text">Section 105(a) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(a)) is amended—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/d/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">by redesignating paragraphs (2), (3), and (4) as paragraphs (3), (4), and (5), respectively; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/d/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">by inserting after paragraph (1) the following:<quotedContent style="-uslm-dtd:quoted-block">
                    <paragraph style="-uslm-dtd:paragraph" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="2">“(2)</num><subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">The Secretary of Energy is authorized to and shall create from the apportioned allocation of contingent capacity and firm energy adjusted from the amounts authorized in this Act in 1984 to the amounts shown in Schedule A and Schedule B, as modified by the Hoover Power Allocation Act of 2011, a resource pool equal to 5 percent of the full rated capacity of 2,074,000 kilowatts, and associated firm energy, as shown in Schedule D (referred to in this section as ‘<quotedText style="-uslm-dtd:quote">Schedule D contingent capacity and firm energy</quotedText>’):<foreign id="warning-d3307896e433" note="processing mode: unknown" role="passthroughContent"><compsdtd:table xmlns:compsdtd="http://schemas.gpo.gov/xml/comps-dtd" line-rules="all-gen" rule-weights="4.4.4.4.4.17" blank-lines-before="0" blank-lines-after="0"><compsdtd:ttitle>``Schedule D</compsdtd:ttitle><compsdtd:tdesc>Long-term Schedule D resource pool of contingent capacity and associated firm energy for new allottees</compsdtd:tdesc><compsdtd:tgroup cols="5" no-carding="1" ttitle-size="9" thead-tbody-ldg-size="9.8.8"><compsdtd:colspec colname="col1" coldef="txt" min-data-value="50" /><compsdtd:colspec colname="col2" coldef="fig" min-data-value="9" /><compsdtd:colspec colname="col3" coldef="fig" min-data-value="9" /><compsdtd:colspec colname="col4" coldef="fig" min-data-value="9" /><compsdtd:colspec colname="col5" coldef="fig" min-data-value="12" /><compsdtd:thead><compsdtd:row><compsdtd:entry morerows="1" align="center" colname="col1">State</compsdtd:entry><compsdtd:entry morerows="1" align="center" colname="col2">Contingent capacity (kW)</compsdtd:entry><compsdtd:entry namest="col3" nameend="col5" align="center" colname="col3">Firm energy (thousands of kWh)</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry align="center" colname="col3">Summer</compsdtd:entry><compsdtd:entry align="center" colname="col4">Winter</compsdtd:entry><compsdtd:entry align="center" colname="col5">Total</compsdtd:entry></compsdtd:row></compsdtd:thead><compsdtd:tbody><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">New Entities Allocated by the Secretary of Energy</compsdtd:entry><compsdtd:entry leader-modify="clr-ldr" colname="col2">69,170</compsdtd:entry><compsdtd:entry colname="col3">105,637</compsdtd:entry><compsdtd:entry colname="col4">45,376</compsdtd:entry><compsdtd:entry colname="col5">151,013</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">New Entities Allocated by State</compsdtd:entry><compsdtd:entry leader-modify="clr-ldr" colname="col2">
</compsdtd:entry><compsdtd:entry leader-modify="clr-ldr" colname="col3">
</compsdtd:entry><compsdtd:entry leader-modify="clr-ldr" colname="col4">
</compsdtd:entry><compsdtd:entry leader-modify="clr-ldr" colname="col5">
</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Arizona</compsdtd:entry><compsdtd:entry leader-modify="clr-ldr" colname="col2">11,510</compsdtd:entry><compsdtd:entry colname="col3">17,580</compsdtd:entry><compsdtd:entry colname="col4">7,533</compsdtd:entry><compsdtd:entry colname="col5">25,113</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1"> California</compsdtd:entry><compsdtd:entry leader-modify="clr-ldr" colname="col2">11,510</compsdtd:entry><compsdtd:entry colname="col3">17,580</compsdtd:entry><compsdtd:entry colname="col4">7,533</compsdtd:entry><compsdtd:entry colname="col5">25,113</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry rowsep="0" leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Nevada</compsdtd:entry><compsdtd:entry rowsep="1" leader-modify="clr-ldr" colname="col2">11,510</compsdtd:entry><compsdtd:entry rowsep="1" colname="col3">17,580</compsdtd:entry><compsdtd:entry rowsep="1" colname="col4">7,533</compsdtd:entry><compsdtd:entry rowsep="1" colname="col5">25,113</compsdtd:entry></compsdtd:row><compsdtd:row><compsdtd:entry leader-modify="force-ldr" valign="bottom" stub-definition="txt-ldr" stub-hierarchy="1" colname="col1">Totals</compsdtd:entry><compsdtd:entry leader-modify="clr-ldr" colname="col2">103,700</compsdtd:entry><compsdtd:entry colname="col3">158,377</compsdtd:entry><compsdtd:entry colname="col4">67,975</compsdtd:entry><compsdtd:entry colname="col5">226,352</compsdtd:entry></compsdtd:row></compsdtd:tbody></compsdtd:tgroup></compsdtd:table></foreign></content></subparagraph>
                        <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                            <num style="-uslm-dtd:enum" value="B">“(B) </num><content style="-uslm-dtd:text">The Secretary of Energy shall offer Schedule D contingency capacity and firm energy to entities not receiving contingent capacity and firm energy under subparagraphs (A) and (B) of paragraph (1) (referred to in this section as ‘<quotedText style="-uslm-dtd:quote">new allottees</quotedText>’) for delivery commencing October 1, 2017 pursuant to this subsection. In this subsection, the term ‘<quotedText style="-uslm-dtd:quote">the marketing area for the Boulder City Area Projects</quotedText>’ shall have the same meaning as in appendix A of the Conformed General Consolidated Power Marketing Criteria or Regulations for Boulder City Area Projects published in the Federal Register on December 28, 1984 (49 Federal Register 50582 et seq.) (referred to in this section as the ‘<quotedText style="-uslm-dtd:quote">Criteria</quotedText>’).</content>
                        </subparagraph>
                        <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                            <num style="-uslm-dtd:enum" value="C">“(C)</num><clause style="-uslm-dtd:clause" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="i">(i) </num><chapeau style="-uslm-dtd:text">Within 36 months of the date of enactment of the Hoover Power Allocation Act of 2011, the Secretary of Energy shall allocate through the Western Area Power Administration (referred to in    this section as ‘<quotedText style="-uslm-dtd:quote">Western</quotedText>’), for delivery commencing October 1, 2017, for use in the marketing area for the Boulder City Area Projects 66.7 percent of the Schedule D contingent capacity and firm energy to new allottees that are located within the marketing area for the Boulder City Area Projects and that are—</chapeau>
                            <subclause style="-uslm-dtd:subclause" styleType="OLC" class="leftIndentDecrease1">
                                <num style="-uslm-dtd:enum" value="I">“(I) </num><content style="-uslm-dtd:text">eligible to enter into contracts under section 5 of the Boulder Canyon Project Act (43 U.S.C. 617d); or</content>
                            </subclause>
                            <subclause style="-uslm-dtd:subclause" styleType="OLC" class="leftIndentDecrease1">
                                <num style="-uslm-dtd:enum" value="II">“(II) </num><content style="-uslm-dtd:text">federally recognized Indian tribes.</content>
                            </subclause></clause>
                            <clause style="-uslm-dtd:clause" styleType="OLC" class="leftIndentDecrease1">
                                <num style="-uslm-dtd:enum" value="ii">“(ii) </num><content style="-uslm-dtd:text">In the case of Arizona and Nevada, Schedule D contingent capacity and firm energy for new allottees other than federally recognized Indian tribes shall be offered through the Arizona Power Authority and the Colorado River Commission of Nevada, respectively. Schedule D contingent capacity and firm energy allocated to federally recognized Indian tribes shall be contracted for directly with Western.</content>
                            </clause>
                        </subparagraph>
                        <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                            <num style="-uslm-dtd:enum" value="D">“(D) </num><chapeau style="-uslm-dtd:text">Within 1 year of the date of enactment of the Hoover Power Allocation Act of 2011, the Secretary of Energy also shall allocate, for delivery commencing October 1, 2017, for use in the marketing area for the Boulder City Area Projects 11.1 percent of the Schedule D contingent capacity and firm energy to each of—</chapeau>
                            <clause style="-uslm-dtd:clause" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="i">“(i) </num><content style="-uslm-dtd:text">the Arizona Power Authority for allocation to new allottees in the State of Arizona;</content>
                            </clause>
                            <clause style="-uslm-dtd:clause" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="ii">“(ii) </num><content style="-uslm-dtd:text">the Colorado River Commission of Nevada for allocation to new allottees in the State of Nevada; and</content>
                            </clause>
                            <clause style="-uslm-dtd:clause" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="iii">“(iii) </num><content style="-uslm-dtd:text">Western for allocation to new allottees within the State of California, provided that Western shall have 36 months to complete such allocation.</content>
                            </clause>
                        </subparagraph>
                        <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                            <num style="-uslm-dtd:enum" value="E">“(E) </num><content style="-uslm-dtd:text">Each contract offered pursuant to this subsection shall include a provision requiring the new allottee to pay a proportionate share of its State’s respective contribution (determined in accordance with each State’s applicable funding agreement) to the cost of the Lower Colorado River Multi-Species Conservation Program (as defined in section 9401 of the Omnibus Public Land Management Act of 2009 (Public Law 111-11; 123 Stat. 1327)), and to execute the Boulder Canyon Project Implementation Agreement Contract No. 95-PAO-10616 (referred to in this section as the ‘<quotedText style="-uslm-dtd:quote">Implementation Agreement</quotedText>’).</content>
                        </subparagraph>
                        <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                            <num style="-uslm-dtd:enum" value="F">“(F) </num><content style="-uslm-dtd:text">Any of the 66.7 percent of Schedule D contingent capacity and firm energy that is to be allocated by Western that is not allocated and placed under contract by October 1, 2017, shall be returned to those contractors shown in Schedule A and Schedule B in the same proportion as those contractors’ allocations of Schedule A and Schedule B contingent capacity and firm energy. Any of the 33.3 percent of Schedule D contingent capacity and firm energy that is to be distributed within the States of Arizona, Nevada, and California that is not allocated and placed under contract by October 1, 2017, shall be returned to the Schedule A and Schedule B contractors within the State in which the Schedule D contingent capacity and firm energy were to be distributed, in the same proportion as those contractors’ allocations of Schedule A and Schedule B contingent capacity and firm energy.”</content>
                        </subparagraph>
                    </paragraph></quotedContent>.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/e" styleType="OLC">
                <num style="-uslm-dtd:enum" value="e">(e) </num><heading style="-uslm-dtd:header">Total Obligations.—</heading><chapeau style="-uslm-dtd:text">Paragraph (3) of section 105(a) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(a)) (as redesignated by subsection (d)(1)) is amended—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/e/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">in the first sentence, by striking “<quotedText style="-uslm-dtd:quote">schedule A of section 105(a)(1)(A) and schedule B of section 105(a)(1)(B)</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">paragraphs (1)(A), (1)(B), and (2)</quotedText>”; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/e/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><chapeau style="-uslm-dtd:text">in the second sentence—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/112/72/s2/e/2/A" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">any</quotedText>” each place it appears and inserting “<quotedText style="-uslm-dtd:quote">each</quotedText>”;</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/112/72/s2/e/2/B" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">schedule C</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">Schedule C</quotedText>”; and</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/112/72/s2/e/2/C" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="C">(C) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">schedules A and B</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">Schedules A, B, and D</quotedText>”.</content>
                    </subparagraph>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/f" styleType="OLC">
                <num style="-uslm-dtd:enum" value="f">(f) </num><heading style="-uslm-dtd:header">Power Marketing Criteria.—</heading><content style="-uslm-dtd:text">Paragraph (4) of section 105(a) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(a)) (as redesignated by subsection (d)(1)) is amended to read as follows:<quotedContent style="-uslm-dtd:quoted-block">
                <paragraph style="-uslm-dtd:paragraph" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="4">“(4) </num><content style="-uslm-dtd:text">Subdivision C of the Criteria shall be deemed to have been modified to conform to this section, as modified by the Hoover Power Allocation Act of 2011. The Secretary of Energy shall cause to be included in the Federal Register a notice conforming the text of the regulations to such modifications.”</content>
                </paragraph></quotedContent>.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/g" styleType="OLC">
                <num style="-uslm-dtd:enum" value="g">(g) </num><heading style="-uslm-dtd:header">Contract Terms.—</heading><chapeau style="-uslm-dtd:text">Paragraph (5) of section 105(a) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(a)) (as redesignated by subsection (d)(1)) is amended—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/g/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">by striking subparagraph (A) and inserting the following:<quotedContent style="-uslm-dtd:quoted-block">
                    <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="A">“(A) </num><content style="-uslm-dtd:text">in accordance with section 5(a) of the Boulder Canyon Project Act (43 U.S.C. 617d(a)), expire September 30, 2067;”</content>
                    </subparagraph></quotedContent>;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/g/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><chapeau style="-uslm-dtd:text">in the proviso of subparagraph (B)—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/112/72/s2/g/2/A" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">shall use</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">shall allocate</quotedText>”; and</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/112/72/s2/g/2/B" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">and</quotedText>” after the semicolon at the end;</content>
                    </subparagraph>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/g/3" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">in subparagraph (C), by striking the period at the end and inserting a semicolon; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/g/4" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="4">(4) </num><content style="-uslm-dtd:text">by adding at the end the following:<quotedContent style="-uslm-dtd:quoted-block">
                    <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="D">“(D) </num><content style="-uslm-dtd:text">authorize and require Western to collect from new allottees a pro rata share of Hoover Dam repayable advances paid for by contractors prior to October 1, 2017, and remit such amounts to the contractors that paid such advances in proportion to the amounts paid by such contractors as specified in section 6.4 of the Implementation Agreement;</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="E">“(E) </num><content style="-uslm-dtd:text">permit transactions with an independent system operator; and</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="F">“(F) </num><content style="-uslm-dtd:text">contain the same material terms included in section 5.6 of those long-term contracts for purchases from the Hoover Power Plant that were made in accordance with this Act and are in existence on the date of enactment of the Hoover Power Allocation Act of 2011.”</content>
                    </subparagraph></quotedContent>.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/h" styleType="OLC">
                <num style="-uslm-dtd:enum" value="h">(h) </num><heading style="-uslm-dtd:header">Existing Rights.—</heading><content style="-uslm-dtd:text">Section 105(b) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(b)) is amended by striking “<quotedText style="-uslm-dtd:quote">2017</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">2067</quotedText>”.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/i" styleType="OLC">
                <num style="-uslm-dtd:enum" value="i">(i) </num><heading style="-uslm-dtd:header">Offers.—</heading><content style="-uslm-dtd:text">Section 105(c) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(c)) is amended to read as follows:<quotedContent style="-uslm-dtd:quoted-block">
                <subsection style="-uslm-dtd:subsection" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="c">“(c) </num><heading style="-uslm-dtd:header">Offer of Contract to Other Entities. </heading><content style="-uslm-dtd:text">If any existing contractor fails to accept an offered contract, the Secretary of Energy shall offer the contingent capacity and firm energy thus available first to other entities in the same State listed in Schedule A and Schedule B, second to other entities listed in Schedule A and Schedule B, third to other entities in the same State which receive contingent capacity and firm energy under subsection (a)(2) of this  section, and last to other entities which receive contingent capacity and firm energy under subsection (a)(2) of this section.”</content>
                </subsection></quotedContent>.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/j" styleType="OLC">
                <num style="-uslm-dtd:enum" value="j">(j) </num><heading style="-uslm-dtd:header">Availability of Water.—</heading><content style="-uslm-dtd:text">Section 105(d) of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a(d)) is amended to read as follows:<quotedContent style="-uslm-dtd:quoted-block">
                <subsection style="-uslm-dtd:subsection" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="d">“(d) </num><heading style="-uslm-dtd:header">Water Availability. </heading><content style="-uslm-dtd:text">Except with respect to energy purchased at the request of an allottee pursuant to subsection (a)(3), the obligation of the Secretary of Energy to deliver contingent capacity and firm energy pursuant to contracts entered into pursuant to this section shall be subject to availability of the water needed to produce such contingent capacity and firm energy. In the event that water is not available to produce the contingent capacity and firm energy set forth in Schedule A, Schedule B, and Schedule D, the Secretary of Energy shall adjust the contingent capacity and firm energy offered under those Schedules in the same proportion as those contractors’ allocations of Schedule A, Schedule B, and Schedule D contingent capacity and firm energy bears to the full rated contingent capacity and firm energy obligations.”</content>
                </subsection></quotedContent>.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/k" styleType="OLC">
                <num style="-uslm-dtd:enum" value="k">(k) </num><heading style="-uslm-dtd:header">Conforming Amendments.—</heading><chapeau style="-uslm-dtd:text">Section 105 of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a) is amended—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/k/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">by striking subsections (e) and (f); and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/k/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">by redesignating subsections (g), (h), and (i) as subsections (e), (f), and (g), respectively.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/l" styleType="OLC">
                <num style="-uslm-dtd:enum" value="l">(l) </num><heading style="-uslm-dtd:header">Continued Congressional Oversight.—</heading><chapeau style="-uslm-dtd:text">Subsection (e) of section 105 of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a) (as redesignated by subsection (k)(2)) is amended—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/l/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">in the first sentence, by striking “<quotedText style="-uslm-dtd:quote">the renewal of</quotedText>”; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/l/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">in the second sentence, by striking “<quotedText style="-uslm-dtd:quote">June 1, 1987, and ending September 30, 2017</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">October 1, 2017, and ending September 30, 2067</quotedText>”.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/m" styleType="OLC">
                <num style="-uslm-dtd:enum" value="m">(m) </num><heading style="-uslm-dtd:header">Court Challenges.—</heading><content style="-uslm-dtd:text">Subsection (f)(1) of section 105 of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a) (as redesignated by subsection (k)(2)) is amended in the first sentence by striking “<quotedText style="-uslm-dtd:quote">this Act</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">the Hoover Power Allocation Act of 2011</quotedText>”.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/112/72/s2/n" styleType="OLC">
                <num style="-uslm-dtd:enum" value="n">(n) </num><heading style="-uslm-dtd:header">Reaffirmation of Congressional Declaration of Purpose.—</heading><chapeau style="-uslm-dtd:text">Subsection (g) of section 105 of the Hoover Power Plant Act of 1984 (43 U.S.C. 619a) (as redesignated by subsection (k)(2)) is amended—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/n/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">subsections (c), (g), and (h) of this section</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">this Act</quotedText>”; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/112/72/s2/n/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">by striking “<quotedText style="-uslm-dtd:quote">June 1, 1987, and ending September 30, 2017</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">October 1, 2017, and ending September 30, 2067</quotedText>”.</content>
                </paragraph>
            </subsection>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/112/72/s3" styleType="OLC">
            <num style="-uslm-dtd:enum" value="3">SEC. 3. </num><heading style="-uslm-dtd:header">PAYGO. </heading>
            <content style="-uslm-dtd:text" class="block">The budgetary effects of this Act, for the purpose of complying with the Statutory Pay-As-You-Go Act of 2010, shall be determined by reference to the latest statement titled “<quotedText style="-uslm-dtd:quote">Budgetary Effects of PAYGO Legislation</quotedText>” for this Act, submitted for printing in the Congressional Record by the Chairman of the House Budget Committee, provided that such statement has been submitted prior to the vote on passage.</content>
        </section>