<?xml-stylesheet type="text/css" href="uslm.css"?><statuteCompilation xmlns="http://schemas.gpo.gov/xml/uslm" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:gpo="http://www.gpo.gov/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://schemas.gpo.gov/xml/uslm https://www.govinfo.gov/schemas/xml/uslm/uslm-2.0.10.xsd" xml:lang="en" style="-uslm-dtd:statute">
    <meta style="-uslm-dtd:compilation-act-form">
        <dc:title>Three Kids Mine Remediation and Reclamation Act</dc:title>
        <citableAs>Public Law 113–135</citableAs>
        <citableAsShortTitle>Three Kids Mine Remediation and Reclamation Act</citableAsShortTitle>
        <docNumber>135</docNumber>
        <currentThroughPublicLaw>113–135</currentThroughPublicLaw>
        <dc:type>Statute Compilation</dc:type>
        <dc:creator>United States House of Representatives</dc:creator>
        <dc:creator>Office of the Legislative Counsel</dc:creator>
        <dc:format>text/xml</dc:format>
        <dc:language>EN</dc:language>
        <dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
        <processedBy>GPO Statute Compilations USLM converter, version 20210527.1</processedBy>
        <processedDate>2021-10-15</processedDate>
        <containsShortTitle>Three Kids Mine Remediation and Reclamation Act</containsShortTitle>
        <property role="fileId">11029</property>
        <congress>113</congress>
        <approvedDate>2014-07-25</approvedDate>
    </meta>
    <preface style="-uslm-dtd:compilation-act-form">
        <property style="-uslm-dtd:comp-short-title" role="compShortTitle">Three Kids Mine Remediation and Reclamation Act</property>
        <citationNote style="-uslm-dtd:public-law">[(<citableAs>Public Law 113–135</citableAs>)]</citationNote>
        <editionNote style="-uslm-dtd:updated-through-note">[This law has not been amended]</editionNote>
        <explanationNote style="-uslm-dtd:explanatory-note"><b>[</b>Currency: This publication is a compilation of the text of Public Law 113-135. It was last amended by the public law listed in the As Amended Through note above and below at the bottom of each page of the pdf version and reflects current law through the date of the enactment of the public law listed at https://www.govinfo.gov/app/collection/comps/<b>]</b></explanationNote>
        <explanationNote style="-uslm-dtd:explanatory-note"><b>[</b>Note: While this publication does  not represent an official version of any Federal statute, substantial efforts have been made to ensure the accuracy of its contents. The official version of Federal law is found in the United States Statutes at Large and in the United States Code. The legal effect to be given to the Statutes at Large and the United States Code is established by statute (1 U.S.C. 112, 204).<b>]</b></explanationNote>
    </preface>
    <main style="-uslm-dtd:legis-body"><longTitle><docTitle style="-uslm-dtd:legis-type">AN ACT</docTitle><officialTitle style="-uslm-dtd:official-title">To provide for the conveyance of certain Federal land in Clark County, Nevada, for the environmental remediation and reclamation of the Three Kids Mine Project Site, and for other purposes.</officialTitle></longTitle><enactingFormula style="-uslm-dtd:enacting-clause">Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,</enactingFormula>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/135/s1" styleType="OLC">
            <num style="-uslm-dtd:enum" value="1">SECTION 1. </num><heading style="-uslm-dtd:header">SHORT TITLE. </heading>
            <content style="-uslm-dtd:text" class="block">This Act may be cited as the “<shortTitle style="-uslm-dtd:quote">Three Kids Mine Remediation and Reclamation Act</shortTitle>”.</content>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/135/s2" styleType="OLC" role="definitions">
            <num style="-uslm-dtd:enum" value="2">SEC. 2. </num><heading style="-uslm-dtd:header">DEFINITIONS. </heading>
            <chapeau style="-uslm-dtd:text" class="block">In this Act:</chapeau>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s2/1" styleType="OLC">
                <num style="-uslm-dtd:enum" value="1">(1) </num><heading style="-uslm-dtd:header">Federal land.—</heading><content style="-uslm-dtd:text">The term “<term style="-uslm-dtd:quote">Federal land</term>” means the approximately 948 acres of Bureau of Reclamation and Bureau of Land Management land within the Three Kids Mine Project Site, as depicted on the map.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s2/2" styleType="OLC">
                <num style="-uslm-dtd:enum" value="2">(2) </num><heading style="-uslm-dtd:header">Hazardous substance; pollutant or contaminant; remedy.—</heading><content style="-uslm-dtd:text">The terms “<term style="-uslm-dtd:quote">hazardous substance</term>”, “<term style="-uslm-dtd:quote">pollutant or contaminant</term>”, and “<term style="-uslm-dtd:quote">remedy</term>” have the meanings given those terms in section 101 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601).</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s2/3" styleType="OLC">
                <num style="-uslm-dtd:enum" value="3">(3) </num><heading style="-uslm-dtd:header">Henderson redevelopment agency.—</heading><content style="-uslm-dtd:text">The term “<term style="-uslm-dtd:quote">Henderson Redevelopment Agency</term>” means the redevelopment agency of the City of Henderson, Nevada, established and authorized to transact business and exercise the powers of the agency in accordance with the Nevada Community Redevelopment Law (Nev. Rev. Stat. 279.382 to 279.685).</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s2/4" styleType="OLC">
                <num style="-uslm-dtd:enum" value="4">(4) </num><heading style="-uslm-dtd:header">Map.—</heading><content style="-uslm-dtd:text">The term “<term style="-uslm-dtd:quote">map</term>” means the map entitled “<term style="-uslm-dtd:quote">Three Kids Mine Project Area</term>” and dated February 6, 2012.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s2/5" styleType="OLC">
                <num style="-uslm-dtd:enum" value="5">(5) </num><heading style="-uslm-dtd:header">Responsible party.—</heading><content style="-uslm-dtd:text">The term “<term style="-uslm-dtd:quote">Responsible Party</term>” means the private sector entity designated by the Henderson Redevelopment Agency, and approved by the State of Nevada, to complete the assessment, remediation, reclamation and redevelopment of the Three Kids Mine Project Site).</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s2/6" styleType="OLC">
                <num style="-uslm-dtd:enum" value="6">(6) </num><heading style="-uslm-dtd:header">Secretary.—</heading><content style="-uslm-dtd:text">The term “<term style="-uslm-dtd:quote">Secretary</term>” means the Secretary of the Interior.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s2/7" styleType="OLC">
                <num style="-uslm-dtd:enum" value="7">(7) </num><heading style="-uslm-dtd:header">State.—</heading><content style="-uslm-dtd:text">The term “<term style="-uslm-dtd:quote">State</term>” means the State of Nevada.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s2/8" styleType="OLC">
                <num style="-uslm-dtd:enum" value="8">(8) </num><heading style="-uslm-dtd:header">Three kids mine project site.—</heading><chapeau style="-uslm-dtd:text">The term “<term style="-uslm-dtd:quote">Three Kids Mine Project Site</term>” means the approximately 1,262 acres of land that is—</chapeau>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s2/8/A" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="A">(A) </num><chapeau style="-uslm-dtd:text">comprised of—</chapeau>
                    <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s2/8/A/i" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="i">(i) </num><content style="-uslm-dtd:text">the Federal land; and</content>
                    </clause>
                    <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s2/8/A/ii" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="ii">(ii) </num><content style="-uslm-dtd:text">the approximately 314 acres of adjacent non-Federal land; and</content>
                    </clause>
                </subparagraph>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s2/8/B" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">depicted as the “<term style="-uslm-dtd:quote">Three Kids Mine Project Site</term>” on the map.</content>
                </subparagraph>
            </paragraph>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/135/s3" styleType="OLC">
            <num style="-uslm-dtd:enum" value="3">SEC. 3. </num><heading style="-uslm-dtd:header">LAND CONVEYANCE. </heading>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/135/s3/a" styleType="OLC">
                <num style="-uslm-dtd:enum" value="a">(a) </num><heading style="-uslm-dtd:header">In General.—</heading><content style="-uslm-dtd:text">Notwithstanding sections 202 and 203 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1712, 1713), not later than 90 days after the date on which the Secretary determines that the conditions described in subsection (b) have been met, and subject to valid existing rights and applicable law, the Secretary shall convey to the Henderson Redevelopment Agency all right, title, and interest of the United States in and to the Federal land.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/135/s3/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><heading style="-uslm-dtd:header">Conditions.—</heading>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s3/b/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><heading style="-uslm-dtd:header">Appraisal; fair market value.—</heading>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s3/b/1/A" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><heading style="-uslm-dtd:header">In general.—</heading><content style="-uslm-dtd:text">As consideration for the conveyance under subsection (a), the Henderson Redevelopment Agency shall pay the fair market value of the Federal land, if any, as determined under subparagraph (B) and as adjusted under subparagraph (F).</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s3/b/1/B" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><heading style="-uslm-dtd:header">Appraisal.—</heading><chapeau style="-uslm-dtd:text">The Secretary shall determine the fair market value of the Federal land based on an appraisal—</chapeau>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/1/B/i" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="i">(i) </num><chapeau style="-uslm-dtd:text">that is conducted in accordance with nationally recognized appraisal standards, including—</chapeau>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/113/135/s3/b/1/B/i/I" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="I">(I) </num><content style="-uslm-dtd:text">the Uniform Appraisal Standards for Federal Land Acquisitions; and</content>
                            </subclause>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/113/135/s3/b/1/B/i/II" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="II">(II) </num><content style="-uslm-dtd:text">the Uniform Standards of Professional Appraisal Practice; and</content>
                            </subclause>
                        </clause>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/1/B/ii" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="ii">(ii) </num><content style="-uslm-dtd:text">that does not take into account any existing contamination associated with historical mining on the Federal land.</content>
                        </clause>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s3/b/1/C" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="C">(C) </num><heading style="-uslm-dtd:header">Remediation and reclamation costs.—</heading>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/1/C/i" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="i">(i) </num><heading style="-uslm-dtd:header">In general.—</heading><content style="-uslm-dtd:text">The Secretary shall prepare a reasonable estimate of the costs to assess, remediate, and reclaim the Three Kids Mine Project Site.</content>
                        </clause>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/1/C/ii" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="ii">(ii) </num><heading style="-uslm-dtd:header">Considerations.—</heading><chapeau style="-uslm-dtd:text">The estimate prepared under clause (i) shall be—</chapeau>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/113/135/s3/b/1/C/ii/I" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="I">(I) </num><content style="-uslm-dtd:text">based on the results of a comprehensive Phase II environmental site assessment of the Three Kids Mine Project Site prepared by the Henderson Redevelopment Agency or a Responsible Party that has been approved by the State; and</content>
                            </subclause>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/113/135/s3/b/1/C/ii/II" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="II">(II) </num><content style="-uslm-dtd:text">prepared in accordance with the current version of the ASTM International Standard E-2137-06 (2011) entitled “<quotedText style="-uslm-dtd:quote">Standard Guide for Estimating Monetary Costs and Liabilities for Environmental Matters</quotedText>”.</content>
                            </subclause>
                        </clause>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/1/C/iii" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="iii">(iii) </num><heading style="-uslm-dtd:header">Assessment requirements.—</heading><chapeau style="-uslm-dtd:text">The Phase II environmental site assessment prepared under clause (ii)(I) shall, without limiting any additional requirements that may be required by the State, be conducted in accordance with the procedures of—</chapeau>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/113/135/s3/b/1/C/iii/I" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="I">(I) </num><content style="-uslm-dtd:text">the most recent version of ASTM International Standard E-1527-05 entitled “<quotedText style="-uslm-dtd:quote">Standard Practice for Environmental Site Assessments:  Phase I Environmental Site Assessment Process</quotedText>”; and</content>
                            </subclause>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/113/135/s3/b/1/C/iii/II" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="II">(II) </num><content style="-uslm-dtd:text">the most recent version of ASTM International Standard E-1903-11 entitled “<quotedText style="-uslm-dtd:quote">Standard Guide for Environmental Site Assessments: Phase II Environmental Site Assessment Process</quotedText>”.</content>
                            </subclause>
                        </clause>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/1/C/iv" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="iv">(iv) </num><heading style="-uslm-dtd:header">Review of certain information.—</heading>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/113/135/s3/b/1/C/iv/I" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="I">(I) </num><heading style="-uslm-dtd:header">In general.—</heading><content style="-uslm-dtd:text">The Secretary shall review and consider cost information proffered by the Henderson Redevelopment Agency, the Responsible Party, and the State in the preparation of the estimate under this subparagraph.</content>
                            </subclause>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/113/135/s3/b/1/C/iv/II" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="II">(II) </num><heading style="-uslm-dtd:header">Final determination.—</heading><content style="-uslm-dtd:text">If there is a disagreement among the Secretary, Henderson Redevelopment Agency, and the State over the reasonable estimate of costs under this subparagraph, the parties shall jointly select 1 or more experts to assist the Secretary in making the final estimate of the costs.</content>
                            </subclause>
                        </clause>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s3/b/1/D" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="D">(D) </num><heading style="-uslm-dtd:header">Deadline.—</heading><content style="-uslm-dtd:text">Not later than 30 days after the date of enactment of this Act, the Secretary shall begin the appraisal and cost estimates under subparagraphs (B) and (C), respectively.</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s3/b/1/E" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="E">(E) </num><heading style="-uslm-dtd:header">Appraisal costs.—</heading><content style="-uslm-dtd:text">The Henderson Redevelopment Agency or the Responsible Party shall reimburse the Secretary for the costs incurred in performing the appraisal under subparagraph (B).</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s3/b/1/F" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="F">(F) </num><heading style="-uslm-dtd:header">Adjustment.—</heading><content style="-uslm-dtd:text">The Secretary shall administratively adjust the fair market value of the Federal land, as determined under subparagraph (B), based on the estimate of remediation, and reclamation costs, as determined under subparagraph (C).</content>
                    </subparagraph>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s3/b/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><heading style="-uslm-dtd:header">Mine remediation and reclamation agreement executed.—</heading>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s3/b/2/A" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><heading style="-uslm-dtd:header">In general.—</heading><chapeau style="-uslm-dtd:text">The conveyance under subsection (a) shall be contingent on—</chapeau>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/2/A/i" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="i">(i) </num><content style="-uslm-dtd:text">the Secretary receiving from the State written notification that a mine remediation and reclamation agreement has been executed in accordance with subparagraph (B); and</content>
                        </clause>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/2/A/ii" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="ii">(ii) </num><content style="-uslm-dtd:text">the Secretary concurring, not later than 30 days after the date of receipt of the written notification under clause (i), that the requirements under subparagraph (B) have been met.</content>
                        </clause>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s3/b/2/B" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><heading style="-uslm-dtd:header">Requirements.—</heading><chapeau style="-uslm-dtd:text">The mine remediation and reclamation agreement required under subparagraph (A) shall be an enforceable consent order or agreement between the State and the Responsible Party who will be obligated to perform under the consent order or agreement administered by the State that—</chapeau>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/2/B/i" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="i">(i) </num><content style="-uslm-dtd:text">obligates the Responsible Party to perform, after the conveyance of the Federal land under this Act, the remediation and reclamation work at the Three Kids Mine Project Site necessary to ensure all remedial actions necessary to protect human health and the environment with respect to any hazardous substances,    pollutant, or contaminant will be taken, in accordance with all Federal, State, and local requirements; and</content>
                        </clause>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/135/s3/b/2/B/ii" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="ii">(ii) </num><content style="-uslm-dtd:text">contains provisions determined to be necessary by the State and the Henderson Redevelopment Agency, including financial assurance provisions to ensure the completion of the remedy.</content>
                        </clause>
                    </subparagraph>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s3/b/3" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><heading style="-uslm-dtd:header">Notification from agency.—</heading><content style="-uslm-dtd:text">As a condition of the conveyance under subsection (a), not later than 90 days after the date of execution of the mine remediation and reclamation agreement required under paragraph (2), the Secretary shall accept written notification from the Henderson Redevelopment Agency that the Henderson Redevelopment Agency is prepared to accept conveyance of the Federal land under subsection (a).</content>
                </paragraph>
            </subsection>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/135/s4" styleType="OLC">
            <num style="-uslm-dtd:enum" value="4">SEC. 4. </num><heading style="-uslm-dtd:header">WITHDRAWAL. </heading>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/135/s4/a" styleType="OLC">
                <num style="-uslm-dtd:enum" value="a">(a) </num><heading style="-uslm-dtd:header">In general.—</heading><chapeau style="-uslm-dtd:text">Subject to valid existing rights, for the 10-year period beginning on the earlier of the date of enactment of this Act or the date of the conveyance required by this Act, the Federal land is withdrawn from all forms of—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s4/a/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">entry, appropriation, operation, or disposal under the public land laws;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s4/a/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">location, entry, and patent under the mining laws; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s4/a/3" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">disposition under the mineral leasing, mineral materials, and the geothermal leasing laws.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/135/s4/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><heading style="-uslm-dtd:header">Existing Reclamation Withdrawals.—</heading><chapeau style="-uslm-dtd:text">Subject to valid existing rights, any withdrawal under the public land laws that includes all or any portion of the Federal land for which the Bureau of Reclamation has determined that the Bureau of Reclamation has no further need under applicable law is relinquished and revoked solely to the extent necessary—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s4/b/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">to exclude from the withdrawal the property that is no longer needed; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s4/b/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">to allow for the immediate conveyance of the Federal land as required under this Act.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/135/s4/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><heading style="-uslm-dtd:header">Existing Reclamation Project and Permitted Facilities.—</heading><content style="-uslm-dtd:text">Except as provided in subsection (a), nothing in this Act diminishes, hinders, or interferes with the exclusive and perpetual use by the existing rights holders for the operation, maintenance, and improvement of water conveyance infrastructure and facilities, including all necessary ingress and egress, situated on the Federal land that were constructed or permitted by the Bureau of Reclamation before the effective date of this Act.</content>
            </subsection>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/135/s5" styleType="OLC">
            <num style="-uslm-dtd:enum" value="5">SEC. 5. </num><heading style="-uslm-dtd:header">ACEC BOUNDARY ADJUSTMENT. </heading>
            <content style="-uslm-dtd:text" class="block">Notwithstanding section 203 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1713), the boundary of the River Mountains Area of Critical Environmental Concern (NVN 76884) is adjusted to exclude any portion of the Three Kids Mine Project Site consistent with the map.</content>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/135/s6" styleType="OLC">
            <num style="-uslm-dtd:enum" value="6">SEC. 6. </num><heading style="-uslm-dtd:header">RESPONSIBILITIES OF THE PARTIES. </heading>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/135/s6/a" styleType="OLC">
                <num style="-uslm-dtd:enum" value="a">(a) </num><heading style="-uslm-dtd:header">Responsibility of Parties to Mine Remediation and Reclamation Agreement.—</heading><content style="-uslm-dtd:text">On completion of the conveyance under section 3, the responsibility for complying with the mine remediation and reclamation agreement executed under section 3(b)(2) shall apply to the Responsible Party and the State of Nevada.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/135/s6/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><heading style="-uslm-dtd:header">Savings Provision.—</heading><chapeau style="-uslm-dtd:text">If the conveyance under this Act has occurred, but the terms of the agreement executed under section 3(b)(2) have not been met, nothing in this Act—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s6/b/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">affects the responsibility of the Secretary to take any additional response action necessary to protect public health and the environment from a release or the threat of a release of a hazardous substance, pollutant, or contaminant; or</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/135/s6/b/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><chapeau style="-uslm-dtd:text">unless otherwise expressly provided, modifies, limits, or otherwise affects—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s6/b/2/A" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">the application of, or obligation to comply with, any law, including any environmental or public health law; or</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/135/s6/b/2/B" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">the authority of the United States to enforce compliance with the requirements of any law or the agreement executed under section 3(b)(2).</content>
                    </subparagraph>
                </paragraph>
            </subsection>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/135/s7" styleType="OLC">
            <num style="-uslm-dtd:enum" value="7">SEC. 7. </num><heading style="-uslm-dtd:header">SOUTHERN NEVADA PUBLIC LANDS MANAGEMENT ACT. </heading>
            <content style="-uslm-dtd:text" class="block">Southern Nevada Public Land Management Act of 1998 (31 U.S.C. 6901 note; Public Law 105-263) shall not apply to land conveyed under this Act.</content>