<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/css" href="uslm.css"?><statuteCompilation xmlns="http://schemas.gpo.gov/xml/uslm" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:gpo="http://www.gpo.gov/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://schemas.gpo.gov/xml/uslm https://www.govinfo.gov/schemas/xml/uslm/uslm-2.0.10.xsd" xml:lang="en" style="-uslm-dtd:statute">
    <meta style="-uslm-dtd:compilation-act-form">
        <dc:title>Hydropower Regulatory Efficiency Act of 2013</dc:title>
        <citableAs>Public Law 113–23</citableAs>
        <citableAsShortTitle>Hydropower Regulatory Efficiency Act of 2013</citableAsShortTitle>
        <docNumber>23</docNumber>
        <currentThroughPublicLaw>113–23</currentThroughPublicLaw>
        <dc:type>Statute Compilation</dc:type>
        <dc:creator>United States House of Representatives</dc:creator>
        <dc:creator>Office of the Legislative Counsel</dc:creator>
        <dc:format>text/xml</dc:format>
        <dc:language>EN</dc:language>
        <dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
        <processedBy>GPO Statute Compilations USLM converter, version 20210527.1</processedBy>
        <processedDate>2021-10-15</processedDate>
        <containsShortTitle>Hydropower Regulatory Efficiency Act of 2013</containsShortTitle>
        <property role="fileId">10542</property>
        <congress>113</congress>
        <approvedDate>2013-08-09</approvedDate>
    </meta>
    <preface style="-uslm-dtd:compilation-act-form">
        <property style="-uslm-dtd:comp-short-title" role="compShortTitle">Hydropower Regulatory Efficiency Act of 2013</property>
        <citationNote style="-uslm-dtd:public-law">[(<citableAs>Public Law 113–23</citableAs>)]</citationNote>
        <editionNote style="-uslm-dtd:updated-through-note">[This law has not been amended]</editionNote>
        <explanationNote style="-uslm-dtd:explanatory-note"><b>[</b>Currency: This publication is a compilation of the text of Public Law 113-23. It was last amended by the public law listed in the As Amended Through note above and below at the bottom of each page of the pdf version and reflects current law through the date of the enactment of the public law listed at https://www.govinfo.gov/app/collection/comps/<b>]</b></explanationNote>
        <explanationNote style="-uslm-dtd:explanatory-note"><b>[</b>Note: While this publication does  not represent an official version of any Federal statute, substantial efforts have been made to ensure the accuracy of its contents. The official version of Federal law is found in the United States Statutes at Large and in the United States Code. The legal effect to be given to the Statutes at Large and the United States Code is established by statute (1 U.S.C. 112, 204).<b>]</b></explanationNote>
    </preface>
    <main style="-uslm-dtd:legis-body"><longTitle><docTitle style="-uslm-dtd:legis-type">AN ACT</docTitle><officialTitle style="-uslm-dtd:official-title">To improve hydropower, and for other purposes.</officialTitle></longTitle><enactingFormula style="-uslm-dtd:enacting-clause">Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,</enactingFormula>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/23/s1" styleType="OLC">
            <num style="-uslm-dtd:enum" value="1">SECTION 1. </num><heading style="-uslm-dtd:header">SHORT TITLE; TABLE OF CONTENTS. </heading>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s1/a" styleType="OLC">
                <num style="-uslm-dtd:enum" value="a">(a) </num><heading style="-uslm-dtd:header">Short Title.—</heading><content style="-uslm-dtd:text">This Act may be cited as the “<shortTitle style="-uslm-dtd:quote"><inline style="-uslm-dtd:short-title">Hydropower Regulatory Efficiency Act of 2013</inline></shortTitle>”.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s1/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><heading style="-uslm-dtd:header">Table of Contents.—</heading><content style="-uslm-dtd:text">The table of contents of this Act is as follows:<toc style="-uslm-dtd:toc">
                <referenceItem style="-uslm-dtd:toc-entry" role="section"><designator>Sec. 1.</designator><label> Short title; table of contents.</label></referenceItem>
                <referenceItem style="-uslm-dtd:toc-entry" role="section"><designator>Sec. 2.</designator><label> Findings.</label></referenceItem>
                <referenceItem style="-uslm-dtd:toc-entry" role="section"><designator>Sec. 3.</designator><label> Promoting small hydroelectric power projects.</label></referenceItem>
                <referenceItem style="-uslm-dtd:toc-entry" role="section"><designator>Sec. 4.</designator><label> Promoting conduit hydropower projects.</label></referenceItem>
                <referenceItem style="-uslm-dtd:toc-entry" role="section"><designator>Sec. 5.</designator><label> FERC authority to extend preliminary permit periods.</label></referenceItem>
                <referenceItem style="-uslm-dtd:toc-entry" role="section"><designator>Sec. 6.</designator><label> Promoting hydropower development at nonpowered dams and closed loop pumped storage projects.</label></referenceItem>
                <referenceItem style="-uslm-dtd:toc-entry" role="section"><designator>Sec. 7.</designator><label> DOE study of pumped storage and potential hydropower from conduits.</label></referenceItem></toc></content>
            </subsection>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/23/s2" styleType="OLC">
            <num style="-uslm-dtd:enum" value="2">SEC. 2. </num><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t16/s791">16 U.S.C. 791 note</ref><b>]</b> </editorialNote><heading style="-uslm-dtd:header">FINDINGS. </heading>
            <chapeau style="-uslm-dtd:text" class="block">Congress finds that—</chapeau>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s2/1" styleType="OLC">
                <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">the hydropower industry currently employs approximately 300,000 workers across the United States;</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s2/2" styleType="OLC">
                <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">hydropower is the largest source of clean, renewable electricity in the United States;</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s2/3" styleType="OLC">
                <num style="-uslm-dtd:enum" value="3">(3) </num><chapeau style="-uslm-dtd:text">as of the date of enactment of this Act, hydropower resources, including pumped storage facilities, provide—</chapeau>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s2/3/A" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">nearly 7 percent of the electricity generated in the United States; and</content>
                </subparagraph>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s2/3/B" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">approximately 100,000 megawatts of electric capacity in the United States;</content>
                </subparagraph>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s2/4" styleType="OLC">
                <num style="-uslm-dtd:enum" value="4">(4) </num><content style="-uslm-dtd:text">only 3 percent of the 80,000 dams in the United States generate electricity, so there is substantial potential for adding hydropower generation to nonpowered dams; and</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s2/5" styleType="OLC">
                <num style="-uslm-dtd:enum" value="5">(5) </num><content style="-uslm-dtd:text">according to one study, by utilizing currently untapped resources, the United States could add approximately 60,000 megawatts of new hydropower capacity by 2025, which could create 700,000 new jobs over the next 13 years.</content>
            </paragraph>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/23/s3" styleType="OLC">
            <num style="-uslm-dtd:enum" value="3">SEC. 3. </num><heading style="-uslm-dtd:header">PROMOTING SMALL HYDROELECTRIC POWER PROJECTS. </heading>
            <content style="-uslm-dtd:text" class="block">Subsection (d) of section 405 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2705) is amended by striking “<quotedText style="-uslm-dtd:quote">5,000</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">10,000</quotedText>”.</content>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/23/s4" styleType="OLC">
            <num style="-uslm-dtd:enum" value="4">SEC. 4. </num><heading style="-uslm-dtd:header">PROMOTING CONDUIT HYDROPOWER PROJECTS. </heading>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s4/a" styleType="OLC">
                <num style="-uslm-dtd:enum" value="a">(a) </num><heading style="-uslm-dtd:header">Applicability of, and Exemption From, Licensing Requirements.—</heading><chapeau style="-uslm-dtd:text">Section 30 of the Federal Power Act (16 U.S.C. 823a) is amended—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s4/a/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">by striking subsections (a) and (b) and inserting the following:<quotedContent style="-uslm-dtd:quoted-block">
                    <subsection style="-uslm-dtd:subsection" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="a">“(a)</num><paragraph style="-uslm-dtd:paragraph" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">A qualifying conduit hydropower facility shall not be required to be licensed under this part.</content></paragraph>
                        <paragraph style="-uslm-dtd:paragraph" styleType="OLC" class="leftIndentDecrease1">
                            <num style="-uslm-dtd:enum" value="2">“(2)</num><subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">Any person, State, or municipality proposing to construct a qualifying conduit hydropower facility shall file with the Commission a notice of intent to construct such facility. The notice shall include sufficient information to demonstrate that the facility meets the qualifying criteria.</content></subparagraph>
                            <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                                <num style="-uslm-dtd:enum" value="B">“(B) </num><chapeau style="-uslm-dtd:text">Not later than 15 days after receipt of a notice of intent filed under subparagraph (A), the Commission shall—</chapeau>
                                <clause style="-uslm-dtd:clause" styleType="OLC">
                                    <num style="-uslm-dtd:enum" value="i">“(i) </num><content style="-uslm-dtd:text">make an initial determination as to whether the facility meets the qualifying criteria; and</content>
                                </clause>
                                <clause style="-uslm-dtd:clause" styleType="OLC">
                                    <num style="-uslm-dtd:enum" value="ii">“(ii) </num><content style="-uslm-dtd:text">if the Commission makes an initial determination, pursuant to clause (i), that the facility meets the qualifying criteria, publish public notice of the notice of intent filed under subparagraph (A).</content>
                                </clause>
                            </subparagraph>
                            <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC" class="leftIndentDecrease1">
                                <num style="-uslm-dtd:enum" value="C">“(C) </num><chapeau style="-uslm-dtd:text">If, not later than 45 days after the date of publication of the public notice described in subparagraph (B)(ii)—</chapeau>
                                <clause style="-uslm-dtd:clause" styleType="OLC">
                                    <num style="-uslm-dtd:enum" value="i">“(i) </num><content style="-uslm-dtd:text">an entity contests whether the facility meets the qualifying criteria, the Commission shall promptly issue a written determination as to whether the facility meets such criteria; or</content>
                                </clause>
                                <clause style="-uslm-dtd:clause" styleType="OLC">
                                    <num style="-uslm-dtd:enum" value="ii">“(ii) </num><content style="-uslm-dtd:text">no entity contests whether the facility meets the qualifying criteria, the facility shall be deemed to meet such criteria.</content>
                                </clause>
                            </subparagraph>
                        </paragraph>
                        <paragraph style="-uslm-dtd:paragraph" styleType="OLC" class="leftIndentDecrease1">
                            <num style="-uslm-dtd:enum" value="3">“(3) </num><chapeau style="-uslm-dtd:text">For purposes of this section:</chapeau>
                            <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="A">“(A) </num><content style="-uslm-dtd:text">The term ‘<quotedText style="-uslm-dtd:quote">conduit</quotedText>’ means any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.</content>
                            </subparagraph>
                            <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="B">“(B) </num><content style="-uslm-dtd:text">The term ‘<quotedText style="-uslm-dtd:quote">qualifying conduit hydropower facility</quotedText>’ means a facility (not including any dam or other impoundment) that is determined or deemed under paragraph (2)(C) to meet the qualifying criteria.</content>
                            </subparagraph>
                            <subparagraph style="-uslm-dtd:subparagraph" styleType="OLC">
                                <num style="-uslm-dtd:enum" value="C">“(C) </num><chapeau style="-uslm-dtd:text">The term ‘<quotedText style="-uslm-dtd:quote">qualifying criteria</quotedText>’ means, with respect to a facility—</chapeau>
                                <clause style="-uslm-dtd:clause" styleType="OLC">
                                    <num style="-uslm-dtd:enum" value="i">“(i) </num><content style="-uslm-dtd:text">the facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit;</content>
                                </clause>
                                <clause style="-uslm-dtd:clause" styleType="OLC">
                                    <num style="-uslm-dtd:enum" value="ii">“(ii) </num><content style="-uslm-dtd:text">the facility has an installed capacity that does not exceed 5 megawatts; and</content>
                                </clause>
                                <clause style="-uslm-dtd:clause" styleType="OLC">
                                    <num style="-uslm-dtd:enum" value="iii">“(iii) </num><content style="-uslm-dtd:text">on or before the date of enactment of the Hydropower Regulatory Efficiency Act of 2013, the facility is not licensed under, or exempted from the license requirements contained in, this part.</content>
                                </clause>
                            </subparagraph>
                        </paragraph>
                    </subsection>
                    <subsection style="-uslm-dtd:subsection" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="b">“(b) </num><chapeau style="-uslm-dtd:text">Subject to subsection (c), the Commission may grant an exemption in whole or in part from the requirements of this part, including any license requirements contained in this part, to any facility (not including any dam or other impoundment) constructed, operated, or maintained for the generation of electric power which the Commission determines, by rule or order—</chapeau>
                        <paragraph style="-uslm-dtd:paragraph" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="1">“(1) </num><content style="-uslm-dtd:text">utilizes for such generation only the hydroelectric potential of a conduit; and</content>
                        </paragraph>
                        <paragraph style="-uslm-dtd:paragraph" styleType="OLC">
                            <num style="-uslm-dtd:enum" value="2">“(2) </num><content style="-uslm-dtd:text">has an installed capacity that does not exceed 40 megawatts.”</content>
                        </paragraph>
                    </subsection></quotedContent>;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s4/a/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">in subsection (c), by striking “<quotedText style="-uslm-dtd:quote">subsection (a)</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">subsection (b)</quotedText>”; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s4/a/3" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">in subsection (d), by striking “<quotedText style="-uslm-dtd:quote">subsection (a)</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">subsection (b)</quotedText>”.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s4/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><heading style="-uslm-dtd:header">Conforming Amendment.—</heading><content style="-uslm-dtd:text">Subsection (d) of section 405 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2705), as amended, is further amended by striking “<quotedText style="-uslm-dtd:quote">subsection (a) of such section 30</quotedText>” and inserting “<quotedText style="-uslm-dtd:quote">subsection (b) of such section 30</quotedText>”.</content>
            </subsection>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/23/s5" styleType="OLC">
            <num style="-uslm-dtd:enum" value="5">SEC. 5. </num><heading style="-uslm-dtd:header">FERC AUTHORITY TO EXTEND PRELIMINARY PERMIT PERIODS. </heading>
            <chapeau style="-uslm-dtd:text" class="block">Section 5 of the Federal Power Act (16 U.S.C. 798) is amended—</chapeau>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s5/1" styleType="OLC">
                <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">by designating the first, second, and third sentences as subsections (a), (c), and (d), respectively; and</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s5/2" styleType="OLC">
                <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">by inserting after subsection (a) (as so designated) the following:<quotedContent style="-uslm-dtd:quoted-block">
                <subsection style="-uslm-dtd:subsection" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="b">“(b) </num><content style="-uslm-dtd:text">The Commission may extend the period of a preliminary permit once for not more than 2 additional years beyond the 3 years permitted by subsection (a) if the Commission finds that the permittee has carried out activities under such permit in good faith and with reasonable diligence.”</content>
                </subsection></quotedContent>.</content>
            </paragraph>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/23/s6" styleType="OLC">
            <num style="-uslm-dtd:enum" value="6">SEC. 6. </num><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t16/s797">16 U.S.C. 797 note</ref><b>]</b> </editorialNote><heading style="-uslm-dtd:header">PROMOTING HYDROPOWER DEVELOPMENT AT NONPOWERED DAMS AND CLOSED LOOP PUMPED STORAGE PROJECTS. </heading>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s6/a" styleType="OLC">
                <num style="-uslm-dtd:enum" value="a">(a) </num><heading style="-uslm-dtd:header">In General.—</heading><content style="-uslm-dtd:text">To improve the regulatory process and reduce delays and costs for hydropower development at nonpowered dams and closed loop pumped storage projects, the Federal Energy Regulatory Commission (referred to in this section as the “<quotedText style="-uslm-dtd:quote">Commission</quotedText>”) shall investigate the feasibility of the issuance of a license for hydropower development at nonpowered dams and closed loop pumped storage projects in a 2-year period (referred to in this section as a “<quotedText style="-uslm-dtd:quote">2-year process</quotedText>”). Such a 2-year process shall include any prefiling licensing process of the Commission.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s6/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><heading style="-uslm-dtd:header">Workshops and Pilots.—</heading><chapeau style="-uslm-dtd:text">The Commission shall—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s6/b/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">not later than 60 days after the date of enactment of this Act, hold an initial workshop to solicit public comment and recommendations on how to implement a 2-year process;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s6/b/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">develop criteria for identifying projects featuring hydropower development at nonpowered dams and closed loop pumped storage projects that may be appropriate for licensing within a 2-year process;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s6/b/3" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">not later than 180 days after the date of enactment of this Act, develop and implement pilot projects to test a 2-year process, if practicable; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s6/b/4" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="4">(4) </num><content style="-uslm-dtd:text">not later than 3 years after the date of implementation of the final pilot project testing a 2-year process, hold a final workshop to solicit public comment on the effectiveness of each tested 2-year process.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s6/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><heading style="-uslm-dtd:header">Memorandum of Understanding.—</heading><content style="-uslm-dtd:text">The Commission shall, to the extent practicable, enter into a memorandum of understanding with any applicable Federal or State agency to implement a pilot project described in subsection (b).</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s6/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><heading style="-uslm-dtd:header">Reports.—</heading>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s6/d/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><heading style="-uslm-dtd:header">Pilot projects not implemented.—</heading><chapeau style="-uslm-dtd:text">If the Commission determines that no pilot project described in subsection (b) is practicable because no 2-year process is practicable, not later than 240 days after the date of enactment of this Act, the Commission shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s6/d/1/A" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">describes the public comments received as part of the initial workshop held under subsection (b)(1); and</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s6/d/1/B" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">identifies the process, legal, environmental, economic, and other issues that justify the determination of the Commission that no 2-year process is practicable, with recommendations on how Congress may address or remedy the identified issues.</content>
                    </subparagraph>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s6/d/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><heading style="-uslm-dtd:header">Pilot projects implemented.—</heading><chapeau style="-uslm-dtd:text">If the Commission develops and implements pilot projects involving a 2-year process, not later than 60 days after the date of completion of the final workshop held under subsection (b)(4), the Commission shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s6/d/2/A" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">describes the outcomes of the pilot projects;</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s6/d/2/B" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">describes the public comments from the final workshop on the effectiveness of each tested 2-year process; and</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s6/d/2/C" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="C">(C)</num><clause style="-uslm-dtd:clause" identifier="/us/sComp/113/23/s6/d/2/C/i" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="i">(i) </num><content style="-uslm-dtd:text">outlines how the Commission will adopt policies under existing law (including regulations) that result in a 2-year process for appropriate projects;</content></clause>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/23/s6/d/2/C/ii" styleType="OLC" class="leftIndentDecrease1">
                            <num style="-uslm-dtd:enum" value="ii">(ii) </num><content style="-uslm-dtd:text">outlines how the Commission will issue new regulations to adopt a 2-year process for appropriate projects; or</content>
                        </clause>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/113/23/s6/d/2/C/iii" styleType="OLC" class="leftIndentDecrease1">
                            <num style="-uslm-dtd:enum" value="iii">(iii) </num><content style="-uslm-dtd:text">identifies the process, legal, environmental, economic, and other issues that justify a determination of the Commission that no 2-year process is practicable, with recommendations on how Congress may address or remedy the identified issues.</content>
                        </clause>
                    </subparagraph>
                </paragraph>
            </subsection>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/113/23/s7" styleType="OLC">
            <num style="-uslm-dtd:enum" value="7">SEC. 7. </num><heading style="-uslm-dtd:header">DOE STUDY OF PUMPED STORAGE AND POTENTIAL HYDROPOWER FROM CONDUITS. </heading>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s7/a" styleType="OLC">
                <num style="-uslm-dtd:enum" value="a">(a) </num><heading style="-uslm-dtd:header">In General.—</heading><chapeau style="-uslm-dtd:text">The Secretary of Energy shall conduct a study—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s7/a/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1)</num><subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s7/a/1/A" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">of the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such existing facilities to be upgraded or retrofitted with advanced commercially available technology; and</content></subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s7/a/1/B" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">of the technical potential of existing pumped storage facilities and new advanced pumped storage facilities, to provide grid reliability benefits; and</content>
                    </subparagraph>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/113/23/s7/a/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2)</num><subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s7/a/2/A" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">to identify the range of opportunities for hydropower that may be obtained from conduits (as defined by the Secretary) in the United States; and</content></subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/113/23/s7/a/2/B" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">through case studies, to assess amounts of potential energy generation from such conduit hydropower projects.</content>
                    </subparagraph>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/113/23/s7/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><heading style="-uslm-dtd:header">Report.—</heading><content style="-uslm-dtd:text">Not later than 1 year after the date of enactment of this Act, the Secretary of Energy shall submit to the Committee    on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that describes the results of the study conducted under subsection (a), including any recommendations.</content>
            </subsection>
        </section>
    </main>
</statuteCompilation>
