[Title 40 CFR ]
[Code of Federal Regulations (annual edition) - July 1, 2019 Edition]
[From the U.S. Government Publishing Office]
[[Page i]]
Title 40
Protection of Environment
________________________
Part 63 (Sec. 63.8980 to end of part 63)
Revised as of July 1, 2019
Containing a codification of documents of general
applicability and future effect
As of July 1, 2019
Published by the Office of the Federal Register
National Archives and Records Administration as a
Special Edition of the Federal Register
[[Page ii]]
U.S. GOVERNMENT OFFICIAL EDITION NOTICE
Legal Status and Use of Seals and Logos
The seal of the National Archives and Records Administration
(NARA) authenticates the Code of Federal Regulations (CFR) as
the official codification of Federal regulations established
under the Federal Register Act. Under the provisions of 44
U.S.C. 1507, the contents of the CFR, a special edition of the
Federal Register, shall be judicially noticed. The CFR is
prima facie evidence of the original documents published in
the Federal Register (44 U.S.C. 1510).
It is prohibited to use NARA's official seal and the stylized Code
of Federal Regulations logo on any republication of this
material without the express, written permission of the
Archivist of the United States or the Archivist's designee.
Any person using NARA's official seals and logos in a manner
inconsistent with the provisions of 36 CFR part 1200 is
subject to the penalties specified in 18 U.S.C. 506, 701, and
1017.
Use of ISBN Prefix
This is the Official U.S. Government edition of this publication
and is herein identified to certify its authenticity. Use of
the 0-16 ISBN prefix is for U.S. Government Publishing Office
Official Editions only. The Superintendent of Documents of the
U.S. Government Publishing Office requests that any reprinted
edition clearly be labeled as a copy of the authentic work
with a new ISBN.
U . S . G O V E R N M E N T P U B L I S H I N G O F F I C E
------------------------------------------------------------------
U.S. Superintendent of Documents Washington, DC
20402-0001
http://bookstore.gpo.gov
Phone: toll-free (866) 512-1800; DC area (202) 512-1800
[[Page iii]]
Table of Contents
Page
Explanation................................................. v
Title 40:
Chapter I--Environmental Protection Agency
(Continued) 3
Finding Aids:
Table of CFR Titles and Chapters........................ 957
Alphabetical List of Agencies Appearing in the CFR...... 977
List of CFR Sections Affected........................... 987
[[Page iv]]
----------------------------
Cite this Code: CFR
To cite the regulations in
this volume use title,
part and section number.
Thus, 40 CFR 63.8980
refers to title 40, part
63, section 8980.
----------------------------
[[Page v]]
EXPLANATION
The Code of Federal Regulations is a codification of the general and
permanent rules published in the Federal Register by the Executive
departments and agencies of the Federal Government. The Code is divided
into 50 titles which represent broad areas subject to Federal
regulation. Each title is divided into chapters which usually bear the
name of the issuing agency. Each chapter is further subdivided into
parts covering specific regulatory areas.
Each volume of the Code is revised at least once each calendar year
and issued on a quarterly basis approximately as follows:
Title 1 through Title 16.................................as of January 1
Title 17 through Title 27..................................as of April 1
Title 28 through Title 41...................................as of July 1
Title 42 through Title 50................................as of October 1
The appropriate revision date is printed on the cover of each
volume.
LEGAL STATUS
The contents of the Federal Register are required to be judicially
noticed (44 U.S.C. 1507). The Code of Federal Regulations is prima facie
evidence of the text of the original documents (44 U.S.C. 1510).
HOW TO USE THE CODE OF FEDERAL REGULATIONS
The Code of Federal Regulations is kept up to date by the individual
issues of the Federal Register. These two publications must be used
together to determine the latest version of any given rule.
To determine whether a Code volume has been amended since its
revision date (in this case, July 1, 2019), consult the ``List of CFR
Sections Affected (LSA),'' which is issued monthly, and the ``Cumulative
List of Parts Affected,'' which appears in the Reader Aids section of
the daily Federal Register. These two lists will identify the Federal
Register page number of the latest amendment of any given rule.
EFFECTIVE AND EXPIRATION DATES
Each volume of the Code contains amendments published in the Federal
Register since the last revision of that volume of the Code. Source
citations for the regulations are referred to by volume number and page
number of the Federal Register and date of publication. Publication
dates and effective dates are usually not the same and care must be
exercised by the user in determining the actual effective date. In
instances where the effective date is beyond the cut-off date for the
Code a note has been inserted to reflect the future effective date. In
those instances where a regulation published in the Federal Register
states a date certain for expiration, an appropriate note will be
inserted following the text.
OMB CONTROL NUMBERS
The Paperwork Reduction Act of 1980 (Pub. L. 96-511) requires
Federal agencies to display an OMB control number with their information
collection request.
[[Page vi]]
Many agencies have begun publishing numerous OMB control numbers as
amendments to existing regulations in the CFR. These OMB numbers are
placed as close as possible to the applicable recordkeeping or reporting
requirements.
PAST PROVISIONS OF THE CODE
Provisions of the Code that are no longer in force and effect as of
the revision date stated on the cover of each volume are not carried.
Code users may find the text of provisions in effect on any given date
in the past by using the appropriate List of CFR Sections Affected
(LSA). For the convenience of the reader, a ``List of CFR Sections
Affected'' is published at the end of each CFR volume. For changes to
the Code prior to the LSA listings at the end of the volume, consult
previous annual editions of the LSA. For changes to the Code prior to
2001, consult the List of CFR Sections Affected compilations, published
for 1949-1963, 1964-1972, 1973-1985, and 1986-2000.
``[RESERVED]'' TERMINOLOGY
The term ``[Reserved]'' is used as a place holder within the Code of
Federal Regulations. An agency may add regulatory information at a
``[Reserved]'' location at any time. Occasionally ``[Reserved]'' is used
editorially to indicate that a portion of the CFR was left vacant and
not accidentally dropped due to a printing or computer error.
INCORPORATION BY REFERENCE
What is incorporation by reference? Incorporation by reference was
established by statute and allows Federal agencies to meet the
requirement to publish regulations in the Federal Register by referring
to materials already published elsewhere. For an incorporation to be
valid, the Director of the Federal Register must approve it. The legal
effect of incorporation by reference is that the material is treated as
if it were published in full in the Federal Register (5 U.S.C. 552(a)).
This material, like any other properly issued regulation, has the force
of law.
What is a proper incorporation by reference? The Director of the
Federal Register will approve an incorporation by reference only when
the requirements of 1 CFR part 51 are met. Some of the elements on which
approval is based are:
(a) The incorporation will substantially reduce the volume of
material published in the Federal Register.
(b) The matter incorporated is in fact available to the extent
necessary to afford fairness and uniformity in the administrative
process.
(c) The incorporating document is drafted and submitted for
publication in accordance with 1 CFR part 51.
What if the material incorporated by reference cannot be found? If
you have any problem locating or obtaining a copy of material listed as
an approved incorporation by reference, please contact the agency that
issued the regulation containing that incorporation. If, after
contacting the agency, you find the material is not available, please
notify the Director of the Federal Register, National Archives and
Records Administration, 8601 Adelphi Road, College Park, MD 20740-6001,
or call 202-741-6010.
CFR INDEXES AND TABULAR GUIDES
A subject index to the Code of Federal Regulations is contained in a
separate volume, revised annually as of January 1, entitled CFR Index
and Finding Aids. This volume contains the Parallel Table of Authorities
and Rules. A list of CFR titles, chapters, subchapters, and parts and an
alphabetical list of agencies publishing in the CFR are also included in
this volume.
[[Page vii]]
An index to the text of ``Title 3--The President'' is carried within
that volume.
The Federal Register Index is issued monthly in cumulative form.
This index is based on a consolidation of the ``Contents'' entries in
the daily Federal Register.
A List of CFR Sections Affected (LSA) is published monthly, keyed to
the revision dates of the 50 CFR titles.
REPUBLICATION OF MATERIAL
There are no restrictions on the republication of material appearing
in the Code of Federal Regulations.
INQUIRIES
For a legal interpretation or explanation of any regulation in this
volume, contact the issuing agency. The issuing agency's name appears at
the top of odd-numbered pages.
For inquiries concerning CFR reference assistance, call 202-741-6000
or write to the Director, Office of the Federal Register, National
Archives and Records Administration, 8601 Adelphi Road, College Park, MD
20740-6001 or e-mail [email protected].
SALES
The Government Publishing Office (GPO) processes all sales and
distribution of the CFR. For payment by credit card, call toll-free,
866-512-1800, or DC area, 202-512-1800, M-F 8 a.m. to 4 p.m. e.s.t. or
fax your order to 202-512-2104, 24 hours a day. For payment by check,
write to: US Government Publishing Office - New Orders, P.O. Box 979050,
St. Louis, MO 63197-9000.
ELECTRONIC SERVICES
The full text of the Code of Federal Regulations, the LSA (List of
CFR Sections Affected), The United States Government Manual, the Federal
Register, Public Laws, Public Papers of the Presidents of the United
States, Compilation of Presidential Documents and the Privacy Act
Compilation are available in electronic format via www.govinfo.gov. For
more information, contact the GPO Customer Contact Center, U.S.
Government Publishing Office. Phone 202-512-1800, or 866-512-1800 (toll-
free). E-mail, [email protected].
The Office of the Federal Register also offers a free service on the
National Archives and Records Administration's (NARA) World Wide Web
site for public law numbers, Federal Register finding aids, and related
information. Connect to NARA's web site at www.archives.gov/federal-
register.
The e-CFR is a regularly updated, unofficial editorial compilation
of CFR material and Federal Register amendments, produced by the Office
of the Federal Register and the Government Publishing Office. It is
available at www.ecfr.gov.
Oliver A. Potts,
Director,
Office of the Federal Register
July 1, 2019
[[Page ix]]
THIS TITLE
Title 40--Protection of Environment is composed of thirty-seven
volumes. The parts in these volumes are arranged in the following order:
Parts 1-49, parts 50-51, part 52 (52.01-52.1018), part 52 (52.1019-
52.2019), part 52 (52.2020-end of part 52), parts 53-59, part 60 (60.1-
60.499), part 60 (60.500-end of part 60, sections), part 60
(Appendices), parts 61-62, part 63 (63.1-63.599), part 63 (63.600-
63.1199), part 63 (63.1200-63.1439), part 63 (63.1440-63.6175), part 63
(63.6580-63.8830), part 63 (63.8980-end of part 63), parts 64-71, parts
72-79, part 80, part 81, parts 82-86, parts 87-95, parts 96-99, parts
100-135, parts 136-149, parts 150-189, parts 190-259, parts 260-265,
parts 266-299, parts 300-399, parts 400-424, parts 425-699, parts 700-
722, parts 723-789, parts 790-999, parts 1000-1059, and part 1060 to
end. The contents of these volumes represent all current regulations
codified under this title of the CFR as of July 1, 2019.
Chapter I--Environmental Protection Agency appears in all thirty-
seven volumes. OMB control numbers for title 40 appear in Sec. 9.1 of
this chapter.
Chapters IV-VIII--Regulations issued by the Environmental Protection
Agency and Department of Justice, Council on Environmental Quality,
Chemical Safety and Hazard Investigation Board, Environmental Protection
Agency and Department of Defense; Uniform National Discharge Standards
for Vessels of the Armed Forces, and the Gulf Coast Ecosystem
Restoration Council appear in volume thirty seven.
For this volume, Robert J. Sheehan, III was Chief Editor. The Code
of Federal Regulations publication program is under the direction of
John Hyrum Martinez, assisted by Stephen J. Frattini.
[[Page 1]]
TITLE 40--PROTECTION OF ENVIRONMENT
(This book contains part 63, Sec. 63.8980 to end of part 63)
--------------------------------------------------------------------
Part
chapter i--Environmental Protection Agency (Continued)...... 63
[[Page 3]]
CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
--------------------------------------------------------------------
Editorial Note: Nomenclature changes to chapter I appear at 65 FR
47324, 47325, Aug. 2, 2000.
SUBCHAPTER C--AIR PROGRAMS (CONTINUED)
Part Page
63 National emission standards for hazardous
air pollutants for source categories
(Continued)............................. 5
[[Page 5]]
SUBCHAPTER C_AIR PROGRAMS (CONTINUED)
PART 63_NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR
SOURCE CATEGORIES (CONTINUED)--Table of Contents
Subpart NNNNN_National Emission Standards for Hazardous Air Pollutants:
Hydrochloric Acid Production
What This Subpart Covers
Sec.
63.8980 What is the purpose of this subpart?
63.8985 Am I subject to this subpart?
63.8990 What parts of my plant does this subpart cover?
63.8995 When do I have to comply with this subpart?
Emission Limitations and Work Practice Standards
63.9000 What emission limitations and work practice standards must I
meet?
General Compliance Requirements
63.9005 What are my general requirements for complying with this
subpart?
Testing and Initial Compliance Requirements
63.9010 By what date must I conduct performance tests?
63.9015 When must I conduct subsequent performance tests?
63.9020 What performance tests and other procedures must I use?
63.9025 What are my monitoring installation, operation, and maintenance
requirements?
63.9030 How do I demonstrate initial compliance with the emission
limitations and work practice standards?
Continuous Compliance Requirements
63.9035 How do I monitor and collect data to demonstrate continuous
compliance?
63.9040 How do I demonstrate continuous compliance with the emission
limitations and work practice standards?
Notifications, Reports, and Records
63.9045 What notifications must I submit and when?
63.9050 What reports must I submit and when?
63.9055 What records must I keep?
63.9060 In what form and how long must I keep my records?
Other Requirements and Information
63.9065 What parts of the General Provisions apply to me?
63.9070 Who implements and enforces this subpart?
63.9075 What definitions apply to this subpart?
Table 1 to Subpart NNNNN of Part 63--Emission Limits and Work Practice
Standards
Table 2 to Subpart NNNNN of Part 63--Operating Limits
Table 3 to Subpart NNNNN of Part 63--Performance Test Requirements for
HCl Production Affected Sources
Table 4 to Subpart NNNNN of Part 63--Initial Compliance with Emission
Limitations and Work Practice Standards
Table 5 to Subpart NNNNN of Part 63--Continuous Compliance with Emission
Limitations and Work Practice Standards
Table 6 to Subpart NNNNN of Part 63--Requirements for Reports
Table 7 to Subpart NNNNN of Part 63--Applicability of General Provisions
to Subpart NNNNN
Subpart OOOOO [Reserved]
Subpart PPPPP_National Emission Standards for Hazardous Air Pollutants
for Engine Test Cells/Stands
What This Subpart Covers
63.9280 What is the purpose of subpart PPPPP?
63.9285 Am I subject to this subpart?
63.9290 What parts of my plant does this subpart cover?
63.9295 When do I have to comply with this subpart?
Emission Limitations
63.9300 What emission limitation must I meet?
63.9301 What are my options for meeting the emission limits?
63.9302 What operating limits must I meet?
General Compliance Requirements
63.9305 What are my general requirements for complying with this
subpart?
63.9306 What are my continuous parameter monitoring system (CPMS)
installation, operation, and maintenance requirements?
63.9307 What are my continuous emissions monitoring system installation,
operation, and maintenance requirements?
[[Page 6]]
Testing and Initial Compliance Requirements
63.9310 By what date must I conduct the initial compliance
demonstrations?
63.9320 What procedures must I use?
63.9321 What are the general requirements for performance tests?
63.9322 How do I determine the emission capture system efficiency?
63.9323 How do I determine the add-on control device emission
destruction or removal efficiency?
63.9324 How do I establish the emission capture system and add-on
control device operating limits during the performance test?
63.9330 How do I demonstrate initial compliance with the emission
limitation?
Continuous Compliance Requirements
63.9335 How do I monitor and collect data to demonstrate continuous
compliance?
63.9340 How do I demonstrate continuous compliance with the emission
limitation?
Notifications, Reports, and Records
63.9345 What notifications must I submit and when?
63.9350 What reports must I submit and when?
63.9355 What records must I keep?
63.9360 In what form and how long must I keep my records?
Other Requirements and Information
63.9365 What parts of the General Provisions apply to me?
63.9370 Who implements and enforces this subpart?
63.9375 What definitions apply to this subpart?
Table 1 to Subpart PPPPP of Part 63--Emission Limitations
Table 2 to Subpart PPPPP of Part 63--Operating Limits
Table 3 to Subpart PPPPP of Part 63--Requirements for Initial Compliance
Demonstrations
Table 4 to Subpart PPPPP of Part 63--Initial Compliance with Emission
Limitations
Table 5 to Subpart PPPPP of Part 63--Continuous Compliance with Emission
Limitations
Table 6 to Subpart PPPPP of Part 63--Requirements for Reports
Table 7 to Subpart PPPPP of Part 63--Applicability of General Provisions
to Subpart PPPPP
Subpart QQQQQ_National Emission Standards for Hazardous Air Pollutants
for Friction Materials Manufacturing Facilities
What This Subpart Covers
63.9480 What is the purpose of this subpart?
63.9485 Am I subject to this subpart?
63.9490 What parts of my plant does this subpart cover?
63.9495 When do I have to comply with this subpart?
Emission Limitations
63.9500 What emission limitations must I meet?
General Compliance Requirements
63.9505 What are my general requirements for complying with this
subpart?
Initial Compliance Demonstration Requirements
63.9510 By what date must I conduct my initial compliance demonstration?
63.9515 How do I demonstrate initial compliance with the emission
limitation that applies to me?
63.9520 What procedures must I use to demonstrate initial compliance?
63.9525 What are the installation, operation, and maintenance
requirements for my weight measurement device?
Continuous Compliance Requirements
63.9530 How do I demonstrate continuous compliance with the emission
limitation that applies to me?
Notifications, Reports, and Records
63.9535 What notifications must I submit and when?
63.9540 What reports must I submit and when?
63.9545 What records must I keep?
63.9550 In what form and how long must I keep my records?
Other Requirements and Information
63.9555 What parts of the General Provisions apply to me?
63.9560 Who implements and enforces this subpart?
63.9565 What definitions apply to this subpart?
63.9570 How do I apply for alternative compliance requirements?
63.9571-63.9579 [Reserved]
[[Page 7]]
Table 1 to Subpart QQQQQ of Part 63--Applicability of General Provisions
to Subpart QQQQQ
Subpart RRRRR_National Emission Standards for Hazardous Air Pollutants:
Taconite Iron Ore Processing
What This Subpart Covers
63.9580 What is the purpose of this subpart?
63.9581 Am I subject to this subpart?
63.9582 What parts of my plant does this subpart cover?
63.9583 When do I have to comply with this subpart?
Emission Limitations and Work Practice Standards
63.9590 What emission limitations must I meet?
63.9591 What work practice standards must I meet?
Operation and Maintenance Requirements
63.9600 What are my operation and maintenance requirements?
General Compliance Requirements
63.9610 What are my general requirements for complying with this
subpart?
Initial Compliance Requirements
63.9620 On which units and by what date must I conduct performance tests
or other initial compliance demonstrations?
63.9621 What test methods and other procedures must I use to demonstrate
initial compliance with the emission limits for particulate
matter?
63.9622 What test methods and other procedures must I use to establish
and demonstrate initial compliance with the operating limits?
63.9623 How do I demonstrate initial compliance with the emission
limitations that apply to me?
63.9624 How do I demonstrate initial compliance with the work practice
standards that apply to me?
63.9625 How do I demonstrate initial compliance with the operation and
maintenance requirements that apply to me?
Continuous Compliance Requirements
63.9630 When must I conduct subsequent performance tests?
63.9631 What are my monitoring requirements?
63.9632 What are the installation, operation, and maintenance
requirements for my monitoring equipment?
63.9633 How do I monitor and collect data to demonstrate continuous
compliance?
63.9634 How do I demonstrate continuous compliance with the emission
limitations that apply to me?
63.9635 How do I demonstrate continuous compliance with the work
practice standards that apply to me?
63.9636 How do I demonstrate continuous compliance with the operation
and maintenance requirements that apply to me?
63.9637 What other requirements must I meet to demonstrate continuous
compliance?
Notifications, Reports, and Records
63.9640 What notifications must I submit and when?
63.9641 What reports must I submit and when?
63.9642 What records must I keep?
63.9643 In what form and how long must I keep my records?
Other Requirements and Information
63.9650 What parts of the General Provisions apply to me?
63.9651 Who implements and enforces this subpart?
63.9652 What definitions apply to this subpart?
Table 1 to Subpart RRRRR of Part 63--Emission Limits
Table 2 to Subpart RRRRR of Part 63--Applicability of General Provisions
to Subpart RRRRR of Part 63
Subpart SSSSS_National Emission Standards for Hazardous Air Pollutants
for Refractory Products Manufacturing
What This Subpart Covers
63.9780 What is the purpose of this subpart?
63.9782 Am I subject to this subpart?
63.9784 What parts of my plant does this subpart cover?
63.9786 When do I have to comply with this subpart?
Emission Limitations and Work Practice Standards
63.9788 What emission limits, operating limits, and work practice
standards must I meet?
63.9790 What are my options for meeting the emission limits?
General Compliance Requirements
63.9792 What are my general requirements for complying with this
subpart?
63.9794 What do I need to know about operation, maintenance, and
monitoring plans?
[[Page 8]]
Testing and Initial Compliance Requirements
63.9796 By what date must I conduct performance tests?
63.9798 When must I conduct subsequent performance tests?
63.9800 How do I conduct performance tests and establish operating
limits?
63.9802 How do I develop an emissions profile?
63.9804 What are my monitoring system installation, operation, and
maintenance requirements?
63.9806 How do I demonstrate initial compliance with the emission
limits, operating limits, and work practice standards?
Continuous Compliance Requirements
63.9808 How do I monitor and collect data to demonstrate continuous
compliance?
63.9810 How do I demonstrate continuous compliance with the emission
limits, operating limits, and work practice standards?
Notifications, Reports, and Records
63.9812 What notifications must I submit and when?
63.9814 What reports must I submit and when?
63.9816 What records must I keep?
63.9818 In what form and how long must I keep my records?
Other Requirements and Information
63.9820 What parts of the General Provisions apply to me?
63.9822 Who implements and enforces this subpart?
63.9824 What definitions apply to this subpart?
Table 1 to Subpart SSSSS of Part 63--Emission Limits
Table 2 to Subpart SSSSS of Part 63--Operating Limits
Table 3 to Subpart SSSSS of Part 63--Work Practice Standards
Table 4 to Subpart SSSSS of Part 63--Requirements for Performance Tests
Table 5 to Subpart SSSSS of Part 63--Initial Compliance with Emission
Limits
Table 6 to Subpart SSSSS of Part 63--Initial Compliance with Work
Practice Standards
Table 7 to Subpart SSSSS of Part 63--Continuous Compliance with Emission
Limits
Table 8 to Subpart SSSSS of Part 63--Continuous Compliance with
Operating Limits
Table 9 to Subpart SSSSS of Part 63--Continuous Compliance with Work
Practice Standards
Table 10 to Subpart SSSSS of Part 63--Requirements for Reports
Table 11 to Subpart SSSSS of Part 63--Applicability of General
Provisions to Subpart SSSSS
Subpart TTTTT_National Emissions Standards for Hazardous Air Pollutants
for Primary Magnesium Refining
What This Subpart Covers
63.9880 What is the purpose of this subpart?
63.9881 Am I subject to this subpart?
63.9882 What parts of my plant does this subpart cover?
63.9883 When do I have to comply with this subpart?
Emission Limitations and Work Practice Standards
63.9890 What emission limitations must I meet?
63.9891 What work practice standards must I meet for my fugitive dust
sources?
Operation and Maintenance Requirements
63.9900 What are my operation and maintenance requirements?
General Compliance Requirements
63.9910 What are my general requirements for complying with this
subpart?
Initial Compliance Requirements
63.9911 By what date must I conduct performance tests or other initial
compliance demonstrations?
63.9912 When must I conduct subsequent performance tests?
63.9913 What test methods and other procedures must I use to demonstrate
initial compliance with the emission limits for particulate
matter and PM10?
63.9914 What test methods and other procedures must I use to demonstrate
initial compliance with chlorine and hydrochloric acid
emission limits?
63.9915 What test methods and other procedures must I use to demonstrate
initial compliance with dioxin/furan emission limits?
63.9916 What test methods and other procedures must I use to establish
and demonstrate initial compliance with the operating limits?
63.9917 How do I demonstrate initial compliance with the emission
limitations and work practice standards that apply to me?
63.9918 How do I demonstrate initial compliance with the operation and
maintenance requirements that apply to me?
Continuous Compliance Requirements
63.9920 What are my monitoring requirements?
[[Page 9]]
63.9921 What are the installation, operation, and maintenance
requirements for my monitors?
63.9922 How do I monitor and collect data to demonstrate continuous
compliance?
63.9923 How do I demonstrate continuous compliance with the emission
limitations and work practice standards that apply to me?
63.9924 How do I demonstrate continuous compliance with the operation
and maintenance requirements that apply to me?
63.9925 What other requirements must I meet to demonstrate continuous
compliance?
Notifications, Reports, and Records
63.9930 What notifications must I submit and when?
63.9931 What reports must I submit and when?
63.9932 What records must I keep?
63.9933 In what form and how long must I keep my records?
Other Requirements and Information
63.9940 What parts of the General Provisions apply to me?
63.9941 Who implements and enforces this subpart?
63.9942 What definitions apply to this subpart?
Table 1 to Subpart TTTTT of Part 63--Emission Limits
Table 2 to Subpart TTTTT of Part 63--Toxic Equivalency Factors
Table 3 to Subpart TTTTT of Part 63--Initial Compliance with Emission
Limits
Table 4 to Subpart TTTTT of Part 63--Continuous Compliance with Emission
Limits
Table 5 to Subpart TTTTT of Part 63--Applicability of General Provisions
to Subpart TTTTT of Part 63
Subpart UUUUU_National Emission Standards for Hazardous Air Pollutants:
Coal- and Oil-Fired Electric Utility Steam Generating Units
What This Subpart Covers
63.9980 What is the purpose of this subpart?
63.9981 Am I subject to this subpart?
63.9982 What is the affected source of this subpart?
63.9983 Are any fossil fuel-fired electric generating units not subject
to this subpart?
63.9984 When do I have to comply with this subpart?
63.9985 What is a new EGU?
Emission Limitations and Work Practice Standards
63.9990 What are the subcategories of EGUs?
63.9991 What emission limitations, work practice standards, and
operating limits must I meet?
General Compliance Requirements
63.10000 What are my general requirements for complying with this
subpart?
63.10001 [Reserved]
Testing and Initial Compliance Requirements
63.10005 What are my initial compliance requirements and by what date
must I conduct them?
63.10006 When must I conduct subsequent performance tests or tune-ups?
63.10007 What methods and other procedures must I use for the
performance tests?
63.10008 [Reserved]
63.10009 May I use emissions averaging to comply with this subpart?
63.10010 What are my monitoring, installation, operation, and
maintenance requirements?
63.10011 How do I demonstrate initial compliance with the emission
limitations and work practice standards?
Continuous Compliance Requirements
63.10020 How do I monitor and collect data to demonstrate continuous
compliance?
63.10021 How do I demonstrate continuous compliance with the emission
limitations, operating limits, and work practice standards?
63.10022 How do I demonstrate continuous compliance under the emissions
averaging provision?
63.10023 How do I establish my PM CPMS operating limit and determine
compliance with it?
Notifications, Reports, and Records
63.10030 What notifications must I submit and when?
63.10031 What reports must I submit and when?
63.10032 What records must I keep?
63.10033 In what form and how long must I keep my records?
Other Requirements and Information
63.10040 What parts of the General Provisions apply to me?
63.10041 Who implements and enforces this subpart?
63.10042 What definitions apply to this subpart?
Table 1 to Subpart UUUUU of Part 63--Emission Limits for New or
Reconstructed EGUs
Table 2 to Subpart UUUUU of Part 63--Emission Limits for Existing EGUs
Table 3 to Subpart UUUUU of Part 63--Work Practice Standards
[[Page 10]]
Table 4 to Subpart UUUUU of Part 63--Operating Limits for EGUs
Table 5 to Subpart UUUUU of Part 63--Performance Testing Requirements
Table 6 to Subpart UUUUU of Part 63--Establishing PM CPMS Operating
Limits
Table 7 to Subpart UUUUU of Part 63--Demonstrating Continuous Compliance
Table 8 to Subpart UUUUU of Part 63--Reporting Requirements
Table 9 to Subpart UUUUU of Part 63--Applicability of General Provisions
to Subpart UUUUU
Appendix A to Subpart UUUUU of Part 63--Hg Monitoring Provisions
Appendix B to Subpart UUUUU of Part 63--HCl and HF Monitoring Provisions
Subpart VVVVV [Reserved]
Subpart WWWWW_National Emission Standards for Hospital Ethylene Oxide
Sterilizers
Applicability and Compliance Dates
63.10382 Am I subject to this subpart?
63.10384 What are my compliance dates?
Standards
63.10390 What management practice standards must I meet?
Initial Compliance Requirements
63.10400 How do I demonstrate initial compliance?
63.10402 By what date must I demonstrate initial compliance?
Monitoring--Continuous Compliance Requirements
63.10420 How do I demonstrate continuous compliance with the management
practice requirements?
Notifications, Reports, and Records
63.10430 What notifications must I submit and by when?
63.10432 What records must I keep?
63.10434 In what form and for how long must I keep my records?
Other Requirements and Information
63.10440 What parts of the General Provisions apply to me?
63.10442 Who implements and enforces this subpart?
63.10446 Do title V permitting requirements apply to area sources
subject to this subpart?
63.10448 What definitions apply to this subpart?
Table 1 to Subpart WWWWW of Part 63--Applicability of General Provisions
to Subpart WWWWW
Subpart XXXXX [Reserved]
Subpart YYYYY_National Emission Standards for Hazardous Air Pollutants
for Area Sources: Electric Arc Furnace Steelmaking Facilities
Applicability and Compliance Dates
63.10680 Am I subject to this subpart?
63.10681 What are my compliance dates?
Standards and Compliance Requirements
63.10685 What are the requirements for the control of contaminants from
scrap?
63.10686 What are the requirements for electric arc furnaces and argon-
oxygen decarburization vessels?
Other Information and Requirements
63.10690 What parts of the General Provisions apply to this subpart??
63.10691 Who implements and enforces this subpart?
63.10692 What definitions apply to this subpart?
Table 1 to Subpart YYYYY of Part 63--Applicability of General Provisions
to Subpart YYYYY
Subpart ZZZZZ_National Emission Standards for Hazardous Air Pollutants
for Iron and Steel Foundries Area Sources
Applicability and Compliance Dates
63.10880 Am I subject to this subpart?
63.10881 What are my compliance dates?
Pollution Prevention Management Practices for New and Existing Affected
Sources
63.10885 What are my management practices for metallic scrap and mercury
switches?
63.10886 What are my management practices for binder formulations?
Requirements for New and Existing Affected Sources Classified as Small
Foundries
63.10890 What are my management practices and compliance requirements?
Requirements for New and Existing Affected Sources Classified as Large
Foundries
63.10895 What are my standards and management practices?
63.10896 What are my operation and maintenance requirements?
63.10897 What are my monitoring requirements?
63.10898 What are my performance test requirements?
63.10899 What are my recordkeeping and reporting requirements?
[[Page 11]]
63.10900 What parts of the General Provisions apply to my large foundry?
Other Requirements and Information
63.10905 Who implements and enforces this subpart?
63.10906 What definitions apply to this subpart?
Table 1 to Subpart ZZZZZ of Part 63--Performance Test Requirements for
New and Existing Affected Sources Classified as Large
Foundries
Table 2 to Subpart ZZZZZ of Part 63--Procedures for Establishing
Operating Limits for New Affected Sources Classified as Large
Foundries
Table 3 to Subpart ZZZZZ of Part 63--Applicability of General Provisions
to New and Existing Affected Sources Classified as Large
Foundries
Table 4 to Subpart ZZZZZ of Part 63--Compliance Certifications for New
and Existing Affected Sources Classified as Large Iron and
Steel Foundries
Subpart AAAAAA [Reserved]
Subpart BBBBBB_National Emission Standards for Hazardous Air Pollutants
for Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants,
and Pipeline Facilities
What This Subpart Covers
63.11080 What is the purpose of this subpart?
63.11081 Am I subject to the requirements in this subpart?
63.11082 What parts of my affected source does this subpart cover?
63.11083 When do I have to comply with this subpart?
Emission Limitations and Management Practices
63.11085 What are my general duties to minimize emissions?
63.11086 What requirements must I meet if my facility is a bulk gasoline
plant?
63.11087 What requirements must I meet for gasoline storage tanks if my
facility is a bulk gasoline terminal, pipeline breakout
station, or pipeline pumping station?
63.11088 What requirements must I meet for gasoline loading racks if my
facility is a bulk gasoline terminal, pipeline breakout
station, or pipeline pumping station?
63.11089 What requirements must I meet for equipment leak inspections if
my facility is a bulk gasoline terminal, pipeline breakout
station, or pipeline pumping station?
Testing and Monitoring Requirements
63.11092 What testing and monitoring requirements must I meet?
Notification, Records, and Reports
63.11093 What notifications must I submit and when?
63.11094 What are my recordkeeping requirements?
63.11095 What are my reporting requirements?
Other Requirements and Information
63.11098 What parts of the General Provisions apply to me?
63.11099 Who implements and enforces this subpart?
63.11100 What definitions apply to this subpart?
Table 1 to Subpart BBBBBB of Part 63--Applicability Criteria, Emission
Limits, and Management Practices for Storage Tanks
Table 2 to Subpart BBBBBB of Part 63--Applicability Criteria, Emission
Limits, and Management Practices for Loading Racks
Table 3 to Subpart BBBBBB of Part 63--Applicability of General
Provisions
Subpart CCCCCC_National Emission Standards for Hazardous Air Pollutants
for Source Category: Gasoline Dispensing Facilities
What This Subpart Covers
63.11110 What is the purpose of this subpart?
63.11111 Am I subject to the requirements in this subpart?
63.11112 What parts of my affected source does this subpart cover?
63.11113 When do I have to comply with this subpart?
Emission Limitations and Management Practices
63.11115 What are my general duties to minimize emissions?
63.11116 Requirements for facilities with monthly throughput of less
than 10,000 gallons of gasoline.
63.11117 Requirements for facilities with monthly throughput of 10,000
gallons of gasoline or more.
63.11118 Requirements for facilities with monthly throughput of 100,000
gallons of gasoline or more.
Testing and Monitoring Requirements
63.11120 What testing and monitoring requirements must I meet?
Notification, Records, and Reports
63.11124 What notifications must I submit and when?
63.11125 What are my recordkeeping requirements?
63.11126 What are my reporting requirements?
[[Page 12]]
Other Requirements and Information
63.11130 What parts of the General Provisions apply to me?
63.11131 Who implements and enforces this subpart?
63.11132 What definitions apply to this subpart?
Table 1 to Subpart CCCCCC of Part 63--Applicability Criteria and
Management Practices for Gasoline Dispensing Facilities with
Monthly Throughput of 100,000 Gallons of Gasoline or More
Table 2 to Subpart CCCCCC of Part 63--Applicability Criteria and
Management Practices for Gasoline Cargo Tanks Unloading at
Gasoline Dispensing Facilities with Monthly Throughput of
100,000 Gallons of Gasoline or More
Table 3 to Subpart CCCCCC of Part 63--Applicability of General
Provisions
Subpart DDDDDD_National Emission Standards for Hazardous Air Pollutants
for Polyvinyl Chloride and Copolymers Production Area Sources
Applicability and Compliance Dates
63.11140 Am I subject to this subpart?
63.11141 What are my compliance dates?
Standards and Compliance Requirements
63.11142 What are the standards and compliance requirements for new and
existing sources?
Other Requirements and Information
63.11143 What General Provisions apply to this subpart?
63.11144 What definitions apply to this subpart?
63.11145 Who implements and enforces this subpart?
Table 1 to Subpart DDDDDD of Part 63--Emission Limits and Standards for
Existing Affected Sources
Table 2 to Subpart DDDDDD of Part 63--Emission Limits and Standards for
New Affected Sources
Subpart EEEEEE_National Emission Standards for Hazardous Air Pollutants
for Primary Copper Smelting Area Sources
Applicability and Compliance Dates
63.11146 What are the applicability provisions and compliance dates?
Standards and Compliance Requirements
63.11147 What are the standards and compliance requirements for existing
sources not using batch copper converters?
63.11148 What are the standards and compliance requirements for existing
sources using batch copper converters?
63.11149 What are the standards and compliance requirements for new
sources?
Other Requirements and Information
63.11150 What General Provisions apply to this subpart?
63.11151 What definitions apply to this subpart?
63.11152 Who implements and enforces this subpart?
Table 1 to Subpart EEEEEE of Part 63--Applicability of General
Provisions to Subpart EEEEEE
Subpart FFFFFF_National Emission Standards for Hazardous Air Pollutants
for Secondary Copper Smelting Area Sources
Applicability and Compliance Dates
63.11153 Am I subject to this subpart?
63.11154 What are my compliance dates?
Standards and Compliance Requirements
63.11155 What are the standards and compliance requirements for new
sources?
63.11156 [Reserved]
Other Requirements and Information
63.11157 What General Provisions apply to this subpart?
63.11158 What definitions apply to this subpart?
63.11159 Who implements and enforces this subpart?
Table 1 to Subpart FFFFFF of Part 63--Applicability of General
Provisions to Subpart FFFFFF
Subpart GGGGGG_National Emission Standards for Hazardous Air Pollutants
for Primary Nonferrous Metals Area Sources_Zinc, Cadmium, and Beryllium
Applicability and Compliance Dates
63.11160 Am I subject to this subpart?
63.11161 What are my compliance dates?
Primary Zinc Production Facilities
63.11162 What are the standards and compliance requirements for existing
sources?
63.11163 What are the standards and compliance requirements for new
sources?
63.11164 What General Provisions apply to primary zinc production
facilities?
Primary Beryllium Production Facilities
63.11165 What are the standards and compliance requirements for new and
existing sources?
63.11166 What General Provisions apply to primary beryllium production
facilities?
[[Page 13]]
Other Requirements and Information
63.11167 What definitions apply to this subpart?
63.11168 Who implements and enforces this subpart?
Table 1 to Subpart GGGGGG of Part 63--Applicability of General
Provisions to Primary Zinc Production Area Sources
Subpart HHHHHH_National Emission Standards for Hazardous Air Pollutants:
Paint Stripping and Miscellaneous Surface Coating Operations at Area
Sources
What This Subpart Covers
63.11169 What is the purpose of this subpart?
63.11170 Am I subject to this subpart?
63.11171 How do I know if my source is considered a new source or an
existing source?
General Compliance Requirements
63.11172 When do I have to comply with this subpart?
63.11173 What are my general requirements for complying with this
subpart?
63.11174 What parts of the General Provisions apply to me?
Notifications, Reports, and Records
63.11175 What notifications must I submit?
63.11176 What reports must I submit?
63.11177 What records must I keep?
63.11178 In what form and for how long must I keep my records?
Other Requirements and Information
63.11179 Who implements and enforces this subpart?
63.11180 What definitions do I need to know?
Table 1 to Subpart HHHHHH of Part 63--Applicability of General
Provisions to Subpart HHHHHH of Part 63
Subpart IIIIII [Reserved]
Subpart JJJJJJ_National Emission Standards for Hazardous Air Pollutants
for Industrial, Commercial, and Institutional Boilers Area Sources
What This Subpart Covers
63.11193 Am I subject to this subpart?
63.11194 What is the affected source of this subpart?
63.11195 Are any boilers not subject to this subpart?
63.11196 What are my compliance dates?
Emission Limits, Work Practice Standards, Emission Reduction Measures,
and Management Practices
63.11200 What are the subcategories of boilers?
63.11201 What standards must I meet?
General Compliance Requirements
63.11205 What are my general requirements for complying with this
subpart?
Initial Compliance Requirements
63.11210 What are my initial compliance requirements and by what date
must I conduct them?
63.11211 How do I demonstrate initial compliance with the emission
limits?
63.11212 What stack tests and procedures must I use for the performance
tests?
63.11213 What fuel analyses and procedures must I use for the
performance tests?
63.11214 How do I demonstrate initial compliance with the work practice
standard, emission reduction measures, and management
practice?
Continuous Compliance Requirements
63.11220 When must I conduct subsequent performance tests or fuel
analyses?
63.11221 Is there a minimum amount of monitoring data I must obtain?
63.11222 How do I demonstrate continuous compliance with the emission
limits?
63.11223 How do I demonstrate continuous compliance with the work
practice and management practice standards?
63.11224 What are my monitoring, installation, operation, and
maintenance requirements?
63.11225 What are my notification, reporting, and recordkeeping
requirements?
63.11226 [Reserved]
Other Requirements and Information
63.11235 What parts of the General Provisions apply to me?
63.11236 Who implements and enforces this subpart?
63.11237 What definitions apply to this subpart?
Table 1 to Subpart JJJJJJ of Part 63--Emission Limits
Table 2 to Subpart JJJJJJ of Part 63--Work Practice Standards, Emission
Reduction Measures, and Management Practices
Table 3 to Subpart JJJJJJ of Part 63--Operating Limits for Boilers With
Emission Limits
Table 4 to Subpart JJJJJJ of Part 63--Performance (Stack) Testing
Requirements
Table 5 to Subpart JJJJJJ of Part 63--Fuel Analysis Requirements
[[Page 14]]
Table 6 to Subpart JJJJJJ of Part 63--Establishing Operating Limit
Table 7 to Subpart JJJJJJ of Part 63--Demonstrating Continuous
Compliance
Table 8 to Subpart JJJJJJ of Part 63--Applicability of General
Provisions to Subpart JJJJJJ
Subpart KKKKKK [Reserved]
Subpart LLLLLL_National Emission Standards for Hazardous Air Pollutants
for Acrylic and Modacrylic Fibers Production Area Sources
Applicability and Compliance Dates
63.11393 Am I subject to this subpart?
63.11394 What are my compliance dates?
Standards and Compliance Requirements
63.11395 What are the standards and compliance requirements for existing
sources?
63.11396 What are the standards and compliance requirements for new
sources?
Other Requirements and Information
63.11397 What General Provisions apply to this subpart?
63.11398 What definitions apply to this subpart?
63.11399 Who implements and enforces this subpart?
Table 1 to Subpart LLLLLL of Part 63--Applicability of General
Provisions to Subpart LLLLLL
Subpart MMMMMM_National Emission Standards for Hazardous Air Pollutants
for Carbon Black Production Area Sources
Applicability and Compliance Dates
63.11400 Am I subject to this subpart?
63.11401 What are my compliance dates?
Standards and Compliance Requirements
63.11402 What are the standards and compliance requirements for new and
existing sources?
63.11403 [Reserved]
Other Requirements and Information
63.11404 What General Provisions apply to this subpart?
63.11405 What definitions apply to this subpart?
63.11406 Who implements and enforces this subpart?
Subpart NNNNNN_National Emission Standards for Hazardous Air Pollutants
for Chemical Manufacturing Area Sources: Chromium Compounds
Applicability and Compliance Dates
63.11407 Am I subject to this subpart?
63.11408 What are my compliance dates?
Standards and Compliance Requirements
63.11409 What are the standards?
63.11410 What are the compliance requirements?
Other Requirements and Information
63.11411 What General Provisions apply to this subpart?
63.11412 What definitions apply to this subpart?
63.11413 Who implements and enforces this subpart?
Table 1 to Subpart NNNNNN of Part 63--HAP Emissions Units
Table 2 to Subpart NNNNNN of Part 63--Applicability of General
Provisions to Subpart NNNNNN
Subpart OOOOOO_National Emission Standards for Hazardous Air Pollutants
for Flexible Polyurethane Foam Production and Fabrication Area Sources
Applicability and Compliance Dates
63.11414 Am I subject to this subpart?
63.11415 What are my compliance dates?
Standards and Compliance Requirements
63.11416 What are the standards for new and existing sources?
63.11417 What are the compliance requirements for new and existing
sources?
Other Requirements and Information
63.11418 What General Provisions apply to this subpart?
63.11419 What definitions apply to this subpart?
63.11420 Who implements and enforces this subpart?
Table 1 to Subpart OOOOOO of Part 63--Applicability of General
Provisions to Subpart OOOOOO
Subpart PPPPPP_National Emission Standards for Hazardous Air Pollutants
for Lead Acid Battery Manufacturing Area Sources
Applicability and Compliance Dates
63.11421 Am I subject to this subpart?
[[Page 15]]
63.11422 What are my compliance dates?
Standards and Compliance Requirements
63.11423 What are the standards and compliance requirements for new and
existing sources?
63.11424 [Reserved]
Other Requirements and Information
63.11425 What General Provisions apply to this subpart?
63.11426 What definitions apply to this subpart?
63.11427 Who implements and enforces this subpart?
Table 1 to Subpart PPPPPPP of Part 63--Applicability of General
Provisions to Subpart PPPPPP
Subpart QQQQQQ_National Emission Standards for Hazardous Air Pollutants
for Wood Preserving Area Sources
Applicability and Compliance Dates
63.11428 Am I subject to this subpart?
63.11429 What are my compliance dates?
Standards
63.11430 What are the standards?
63.11431 [Reserved]
Other Requirements and Information
63.11432 What General Provisions apply to this subpart?
63.11433 What definitions apply to this subpart?
63.11434 Who implements and enforces this subpart?
Table 1 to Subpart QQQQQQ of Part 63--Applicability of General
Provisions of Subpart QQQQQQ
Subpart RRRRRR_National Emission Standards for Hazardous Air Pollutants
for Clay Ceramics Manufacturing Area Sources
Applicability and Compliance Dates
63.11435 Am I subject to this subpart?
63.11436 What parts of my plant does this subpart cover?
63.11437 What are my compliance dates?
Standards, Compliance, and Monitoring Requirements
63.11438 What are the standards for new and existing sources?
63.11439 What are the initial compliance demonstration requirements for
new and existing sources?
63.11440 What are the monitoring requirements for new and existing
sources?
63.11441 What are the notification requirements?
63.11442 What are the recordkeeping requirements?
Other Requirements and Information
63.11443 What General Provisions apply to this subpart?
63.11444 What definitions apply to this subpart?
63.11445 Who implements and enforces this subpart?
63.11446-63.11447 [Reserved]
Table 1 to Subpart RRRRRR of Part 63--Applicability of General
Provisions to Subpart RRRRRR
Subpart SSSSSS_National Emission Standards for Hazardous Air Pollutants
for Glass Manufacturing Area Sources
Applicability and Compliance Dates
63.11448 Am I subject to this subpart?
63.11449 What parts of my plant does this subpart cover?
63.11450 What are my compliance dates?
Standards, Compliance, and Monitoring Requirements
63.11451 What are the standards for new and existing sources?
63.11452 What are the performance test requirements for new and existing
sources?
63.11453 What are the initial compliance demonstration requirements for
new and existing sources?
63.11454 What are the monitoring requirements for new and existing
sources?
63.11455 What are the continuous compliance requirements for new and
existing sources?
Notifications and Records
63.11456 What are the notification requirements?
63.11457 What are the recordkeeping requirements?
Other Requirements and Information
63.11458 What General Provisions apply to this subpart?
63.11459 What definitions apply to this subpart?
63.11460 Who implements and enforces this subpart?
63.11461 [Reserved]
Table 1 to Subpart SSSSSS of Part 63--Emission Limits
[[Page 16]]
Table 2 to Subpart SSSSSS of Part 63--Applicability of General
Provisions to Subpart SSSSSS
Subpart TTTTTT_National Emission Standards for Hazardous Air Pollutants
for Secondary Nonferrous Metals Processing Area Sources
Applicability and Compliance Dates
63.11462 Am I subject to this subpart?
63.11463 What parts of my plant does this subpart cover?
63.11464 What are my compliance dates?
Standards, Compliance, and Monitoring Requirements
63.11465 What are the standards for new and existing sources?
63.11466 What are the performance test requirements for new and existing
sources?
63.11467 What are the initial compliance demonstration requirements for
new and existing sources?
63.11468 What are the monitoring requirements for new and existing
sources?
63.11469 What are the notification requirements?
63.11470 What are the recordkeeping requirements?
Other Requirements and Information
63.11471 What General Provisions apply to this subpart?
63.11472 What definitions apply to this subpart?
63.11473 Who implements and enforces this subpart?
63.11474 [Reserved]
Table 1 to Subpart TTTTTT of Part 63--Applicability of General
Provisions to Subpart TTTTTT
Subpart UUUUUU [Reserved]
Subpart VVVVVV_National Emission Standards for Hazardous Air Pollutants
for Chemical Manufacturing Area Sources
Applicability and Compliance Dates
63.11494 What are the applicability requirements and compliance dates?
Standards and Compliance Requirements
63.11495 What are the management practices and other requirements?
63.11496 What are the standards and compliance requirements for process
vents?
63.11497 What are the standards and compliance requirements for storage
tanks?
63.11498 What are the standards and compliance requirements for
wastewater systems?
63.11499 What are the standards and compliance requirements for heat
exchange systems?
63.11500 What compliance options do I have if part of my plant is
subject to both this subpart and another Federal standard?
63.11501 What are the notification, recordkeeping, and reporting
requirements, and how may I assert an affirmative defense for
violation of emission standards during malfunction?
Other Requirements and Information
63.11502 What definitions apply to this subpart?
63.11503 Who implements and enforces this subpart?
Table 1 to Subpart VVVVVV of Part 63--Hazardous Air Pollutants Used to
Determine Applicability of Chemical Manufacturing Operations
Table 2 to Subpart VVVVVV of Part 63--Emission Limits and Compliance
Requirements for Batch Process Vents
Table 3 to Subpart VVVVVV of Part 63--Emission Limits and Compliance
Requirements for Continuous Process Vents
Table 4 to Subpart VVVVVV of Part 63--Emission Limits and Compliance
Requirements for Metal HAP Process Vents
Table 5 to Subpart VVVVVV of Part 63--Emission Limits and Compliance
Requirements for Storage Tanks
Table 6 to Subpart VVVVVV of Part 63--Emission Limits and Compliance
Requirements for Wastewater Systems
Table 7 to subpart VVVVVV of Part 63--Partially Soluble HAP
Table 8 to Subpart VVVVVV of Part 63--Emission Limits and Compliance
Requirements for Heat Exchange Systems
Table 9 to Subpart VVVVVV of Part 63--Applicability of General
Provisions to Subpart VVVVVV
Subpart WWWWWW_National Emission Standards for Hazardous Air Pollutants:
Area Source Standards for Plating and Polishing Operations
Applicability and Compliance Dates
63.11504 Am I subject to this subpart?
63.11505 What parts of my plant does this subpart cover?
63.11506 What are my compliance dates?
Standards and Compliance Requirements
63.11507 What are my standards and management practices?
63.11508 What are my compliance requirements?
63.11509 What are my notification, reporting, and recordkeeping
requirements?
[[Page 17]]
Other Requirements and Information
63.11510 What General Provisions apply to this subpart?
63.11511 What definitions apply to this subpart?
63.11512 Who implements and enforces this subpart?
63.11513 [Reserved]
Table 1 to Subpart WWWWWW of Part 63--Applicability of General
Provisions to Plating and Polishing Area Sources
Subpart XXXXXX_National Emission Standards for Hazardous Air Pollutants
Area Source Standards for Nine Metal Fabrication and Finishing Source
Categories
Applicability and Compliance Dates
63.11514 Am I subject to this subpart?
63.11515 What are my compliance dates?
Standards and Compliance Requirements
63.11516 What are my standards and management practices?
63.11517 What are my monitoring requirements?
63.11518 [Reserved]
63.11519 What are my notification, recordkeeping, and reporting
requirements?
63.11520 [Reserved]
Other Requirements and Information
63.11521 Who implements and enforces this subpart?
63.11522 What definitions apply to this subpart?
63.11523 What General Provisions apply to this subpart?
Table 1 to Subpart XXXXXX of Part 63--Description of Source Categories
Affected by This Subpart
Table 2 to Subpart XXXXXX of Part 63--Applicability of General
Provisions to Metal Fabrication or Finishing Area Sources
Subpart YYYYYY_National Emission Standards for Hazardous Air Pollutants
for Area Sources: Ferroalloys Production Facilities
Applicability and Compliance Dates
63.11524 Am I subject to this subpart?
63.11525 What are my compliance dates?
Standards, Monitoring, and Compliance Requirements
63.11526 What are the standards for new and existing ferroalloys
production facilities?
63.11527 What are the monitoring requirements for new and existing
sources?
63.11528 What are the performance test and compliance requirements for
new and existing sources?
63.11529 What are the notification, reporting, and recordkeeping
requirements?
Other Requirements and Information
63.11530 What parts of the General Provisions apply to my facility?
63.11531 Who implements and enforces this subpart?
63.11532 What definitions apply to this subpart?
63.11533-63.11543 [Reserved]
Table 1 to Subpart YYYYYY of Part 63--Applicability of General
Provisions to Subpart YYYYYY
Subpart ZZZZZZ_National Emission Standards for Hazardous Air Pollutants:
Area Source Standards for Aluminum, Copper, and Other Nonferrous
Foundries
Applicability and Compliance Dates
63.11544 Am I subject to this subpart?
63.11545 What are my compliance dates?
Standards and Compliance Requirements
63.11550 What are my standards and management practices?
63.11551 What are my initial compliance requirements?
63.11552 What are my monitoring requirements?
63.11553 What are my notification, reporting, and recordkeeping
requirements?
Other Requirements and Information
63.11555 What General Provisions apply to this subpart?
63.11556 What definitions apply to this subpart?
63.11557 Who implements and enforces this subpart?
63.11558 [Reserved]
Table 1 to Subpart ZZZZZZ of Part 63--Applicability of General
Provisions to Aluminum, Copper, and Other Nonferrous Foundries
Area Sources
Subpart AAAAAAA_National Emission Standards for Hazardous Air Pollutants
for Area Sources: Asphalt Processing and Asphalt Roofing Manufacturing
Applicability and Compliance Dates
63.11559 Am I Subject to this subpart?
63.11560 What are my compliance dates?
Standards and Compliance Requirements
63.11561 What are my standards and management practices?
63.11562 What are my initial compliance requirements?
[[Page 18]]
63.11563 What are my monitoring requirements?
63.11564 What are my notification, recordkeeping, and reporting
requirements?
Other Requirements and Information
63.11565 What general provisions sections apply to this subpart?
63.11566 What definitions apply to this subpart?
63.11567 Who implements and enforces this subpart?
Table 1 to Subpart AAAAAAA of Part 63--Emission Limits for Asphalt
Processing (Refining) Operations
Table 2 to Subpart AAAAAAA of Part 63--Emission Limits for Asphalt
Roofing Manufacturing (Coating) Operations
Table 3 to Subpart AAAAAAA of Part 63--Test Methods
Table 4 to Subpart AAAAAAA of Part 63--Operating Limits
Table 5 to Subpart AAAAAAA of Part 63--Applicability of General
Provisions to Subpart AAAAAAA
Subpart BBBBBBB_National Emission Standards for Hazardous Air Pollutants
for Area Sources: Chemical Preparations Industry
Applicability and Compliance Dates
63.11579 Am I subject to this subpart?
63.11580 What are my compliance dates?
Standards and Compliance Requirements
63.11581 What are my standards?
63.11582 What are my compliance requirements?
63.11583 What are my monitoring requirements?
63.11584 What are my initial and continuous compliance management
practice requirements?
63.11585 What are my notification, recordkeeping, and reporting
requirements?
Other Requirements and Information
63.11586 Who implements and enforces this subpart?
63.11587 What General Provisions sections apply to this subpart?
63.11588 What definitions apply to this subpart?
Table 1 to Subpart BBBBBBB of Part 63--Emission Reduction and PM
Concentration Requirements
Table 2 to Subpart BBBBBBB of Part 63--Initial Compliance Demonstration
Methods With the Emission Reduction and PM Concentration
Requirements in Table 1
Table 3 to Subpart BBBBBBB of Part 63--Test Methods
Table 4 to Subpart BBBBBBB of Part 63--Continuous Compliance
Demonstration Methods With the Emission Reduction and PM
Concentration Requirements in Table 1
Table 5 to Subpart BBBBBBB of Part 63--Reporting Requirements
Table 6 to Subpart BBBBBBB of Part 63--General Provisions
Subpart CCCCCCC_National Emission Standards for Hazardous Air Pollutants
for Area Sources: Paints and Allied Products Manufacturing
Applicability and Compliance Dates
63.11599 Am I subject to this subpart?
63.11600 What are my compliance dates?
Standards, Monitoring, and Compliance Requirements
63.11601 What are the standards for new and existing paints and allied
products manufacturing facilities?
63.11602 What are the performance test and compliance requirements for
new and existing sources?
63.11603 What are the notification, reporting, and recordkeeping
requirements?
63.11604 [Reserved]
Other Requirements and Information
63.11605 What General Provisions apply to this subpart?
63.11606 Who implements and enforces this subpart?
63.11607 What definitions apply to this subpart?
63.11608-63.11618 [Reserved]
Table 1 to Subpart CCCCCCC of Part 63--Applicability of General
Provisions to Subpart CCCCCCC
Subpart DDDDDDD_National Emission Standards for Hazardous Air Pollutants
for Area Sources: Prepared Feeds Manufacturing
Applicability and Compliance Dates
63.11619 Am I subject to this subpart?
63.11620 What are my compliance dates?
Standards, Monitoring, and Compliance Requirements
63.11621 What are the standards for new and existing prepared feeds
manufacturing facilities?
63.11622 What are the monitoring requirements for new and existing
sources?
63.11623 What are the testing requirements?
63.11624 What are the notification, reporting, and recordkeeping
requirements?
[[Page 19]]
Other Requirements and Information
63.11625 What parts of the General Provisions apply to my facility?
63.11626 Who implements and enforces this subpart?
63.11627 What definitions apply to this subpart?
63.11628-63.11638 [Reserved]
Table 1 to Subpart DDDDDDD of Part 63--Applicability of General
Provisions to Prepared Feeds Manufacturing Area Sources
Subpart EEEEEEE_National Emission Standards for Hazardous Air
Pollutants: Gold Mine Ore Processing and Production Area Source Category
Applicability and Compliance Dates
63.11640 Am I subject to this subpart?
63.11641 What are my compliance dates?
Standards and Compliance Requirements
63.11645 What are my mercury emission standards?
63.11646 What are my compliance requirements?
63.11647 What are my monitoring requirements?
63.11648 What are my notification, reporting, and recordkeeping
requirements?
Other Requirements and Information
63.11650 What General Provisions apply to this subpart?
63.11651 What definitions apply to this subpart?
63.11652 Who implements and enforces this subpart?
63.11653 [Reserved]
Table 1 to Subpart EEEEEEE of Part 63--Applicability of General
Provisions to Subpart EEEEEEE
Subparts FFFFFFF-GGGGGGG [Reserved]
Subpart HHHHHHH_National Emission Standards for Hazardous Air Pollutant
Emissions for Polyvinyl Chloride and Copolymers Production
What This Subpart Covers
63.11860 What is the purpose of this subpart?
63.11865 Am I subject to the requirements in this subpart?
63.11870 What is the affected source of this subpart?
63.11871 What is the relationship to 40 CFR part 61, subpart F?
63.11872 What is the relationship to other subparts in this part?
63.11875 When must I comply with this subpart?
Emission Limits, Operating Limits and Work Practice Standards
63.11880 What emission limits, operating limits and standards must I
meet?
General Compliance Requirements
63.11885 What parts of the General Provisions apply to me?
63.11890 What are my additional general requirements for complying with
this subpart?
63.11895 How do I assert an affirmative defense for exceedance of
emission standard during malfunction?
63.11896 What am I required to do if I make a process change at my
affected source?
Testing and Compliance Requirements
63.11900 By what date must I conduct initial performance testing and
monitoring, establish any applicable operating limits and
demonstrate initial compliance with my emission limits and
work practice standards?
63.11905 When must I conduct subsequent performance testing and
monitoring to demonstrate continuous compliance?
63.11910 What are my initial and continuous compliance requirements for
storage vessels?
63.11915 What are my compliance requirements for equipment leaks?
63.11920 What are my initial and continuous compliance requirements for
heat exchange systems?
63.11925 What are my initial and continuous compliance requirements for
process vents?
63.11930 What requirements must I meet for closed vent systems?
63.11935 What CEMS and CPMS requirements must I meet to demonstrate
initial and continuous compliance with the emission standards
for process vents?
63.11940 What continuous monitoring requirements must I meet for control
devices required to install CPMS to meet the emission limits
for process vents?
63.11945 What performance testing requirements must I meet for process
vents?
63.11950 What emissions calculations must I use for an emission profile?
63.11955 What are my initial and continuous compliance requirements for
other emission sources?
63.11956 What are my compliance requirements for ambient monitoring?
63.11960 What are my initial and continuous compliance requirements for
stripped resin?
63.11965 What are my general compliance requirements for wastewater?
63.11970 What are my initial compliance requirements for process
wastewater?
[[Page 20]]
63.11975 What are my continuous compliance requirements for process
wastewater?
63.11980 What are the test methods and calculation procedures for
process wastewater?
Notifications, Reports and Records
63.11985 What notifications and reports must I submit and when?
63.11990 What records must I keep?
63.11995 In what form and how long must I keep my records?
63.12000 Who implements and enforces this subpart?
Definitions
63.12005 What definitions apply to this subpart?
63.12006-63.12099 [Reserved]
Table 1 to Subpart HHHHHHH of Part 63--Emission Limits and Standards for
Existing Affected Sources
Table 2 to Subpart HHHHHHH of Part 63--Emission Limits and Standards for
New Affected Sources
Table 3 to Subpart HHHHHHH of Part 63--Summary of Control Requirements
for Storage Vessels at New and Existing Sources
Table 4 to Subpart HHHHHHH of Part 63--Applicability of the General
Provisions to Part 63
Table 5 to Subpart HHHHHHH of Part 63--Operating Parameters, Operating
Limits and Data Monitoring, Recording and Compliance
Frequencies for Process Vents
Table 6 to Subpart HHHHHHH of Part 63--Toxic Equivalency Factors
Table 7 to Subpart HHHHHHH of Part 63--Calibration and Accuracy
Requirements for Continuous Parameter Monitoring Systems
Table 8 to Subpart HHHHHHH of Part 63--Methods and Procedures for
Conducting Performance Tests for Process Vents
Table 9 to Subpart HHHHHHH of Part 63--Procedures for Conducting
Sampling of Resin and Process Wastewater
Table 10 to Subpart HHHHHHH of Part 63--HAP Subject to the Stripped
Resin and Process Wastewater Provisions at New and Existing
Sources
Appendix A to Part 63--Test Methods
Appendix B to Part 63--Sources Defined for Early Reduction Provisions
Appendix C to Part 63--Determination of the Fraction Biodegraded
(Fbio) in a Biological Treatment Unit
Appendix D to Part 63--Alternative Validation Procedure for EPA Waste
and Wastewater Methods
Appendix E to Part 63--Monitoring Procedure for Nonthoroughly Mixed Open
Biological Treatment Systems at Kraft Pulp Mills Under Unsafe
Sampling Conditions
Authority: 42 U.S.C. 7401 et seq.
Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.
Subpart NNNNN_National Emission Standards for Hazardous Air Pollutants:
Hydrochloric Acid Production
Source: 68 FR 19090, Apr. 17, 2003, unless otherwise noted.
What This Subpart Covers
Sec. 63.8980 What is the purpose of this subpart?
This subpart establishes national emission standards for hazardous
air pollutants (NESHAP) and work practice standards for hazardous air
pollutants (HAP) emitted from hydrochloric acid (HCl) production. This
subpart also establishes requirements to demonstrate initial and
continuous compliance with the emission limitations and work practice
standards.
Sec. 63.8985 Am I subject to this subpart?
(a) You are subject to this subpart if you own or operate an HCl
production facility that produces a liquid HCl product at a
concentration of 30 weight percent or greater during its normal
operations and is located at, or is part of, a major source of HAP. This
does not include HCl production facilities that only produce
occasionally liquid HCl product at a concentration of 30 weight percent
or greater.
(1) An HCl production facility is the collection of unit operations
and equipment associated with the production of liquid HCl product. The
HCl production facility begins at the point where a gaseous stream
containing HCl enters the HCl production unit. The HCl production
facility includes all HCl storage tanks that contain liquid HCl product
that is produced in the HCl production unit, with the exceptions noted
in paragraph (a)(2) of this section. The HCl production facility also
includes all HCl transfer operations that load HCl product produced in
the HCl production unit into a tank truck, rail
[[Page 21]]
car, ship, or barge, along with the piping and other equipment in HCl
service used to transfer liquid HCl product from the HCl production unit
to the HCl storage tanks and/or HCl transfer operations. The HCl
production facility ends at the point that the liquid HCl product
produced in the HCl production unit is loaded into a tank truck, rail
car, ship, or barge, at the point the HCl product enters another process
on the plant site, or at the point the HCl product leaves the plant site
via pipeline.
(2) Storage tanks that are dedicated feedstock tanks for another
process and storage tanks that store HCl dedicated for use in wastewater
treatment are not considered part of an HCl production facility.
(3) A major source of HAP emissions is any stationary source or
group of stationary sources within a contiguous area under common
control that emits or has the potential to emit any single HAP at a rate
of 9.07 megagrams (10 tons) or more per year or any combination of HAP
at a rate of 22.68 megagrams (25 tons) or more per year.
(b) An HCl production facility is not subject to this subpart if it
is also subject to NESHAP under one of the subparts listed in paragraphs
(b)(1) through (5) of this section.
(1) 40 CFR part 63, subpart S, National Emission Standards for
Hazardous Air Pollutants from the Pulp and Paper Industry.
(2) 40 CFR part 63, subpart CCC, National Emission Standards for
Hazardous Air Pollutants for Steel Pickling--HCl Process Facilities and
Hydrochloric Acid Regeneration Plants.
(3) 40 CFR part 63, subpart MMM, National Emission Standards for
Hazardous Air Pollutants for Pesticide Active Ingredient Production.
(4) 40 CFR part 63, section 63.994, subpart SS, National Emission
Standards for Closed Vent Systems, Control Devices, Recovery Devices and
Routing to a Fuel Gas System or a Process.
(5) 40 CFR part 63, subpart GGG, National Emission Standards for
Pharmaceuticals Production.
(c) An HCl production facility is not subject to this subpart if it
is located following the incineration of chlorinated waste gas streams,
waste liquids, or solid wastes, and the emissions from the HCl
production facility are subject to section 63.113(c), subpart G,
National Emission Standards for Organic Hazardous Air Pollutants from
the Synthetic Organic Chemical Manufacturing Industry for Process Vents,
Storage Vessels, Transfer Operations, and Wastewater.
(d) An HCl production facility is not subject to this subpart if it
produces HCl through the direct synthesis of hydrogen and chlorine and
is part of a chlor-alkali facility.
(e) An HCl production facility is not subject to this subpart if it
is a research and development facility.
(f) An HCl production facility is not subject to this subpart if all
of the gaseous streams containing HCl and chlorine (Cl2) from
HCl process vents, HCl storage tanks, and HCl transfer operations are
recycled or routed to another process prior to being discharged to the
atmosphere.
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]
Sec. 63.8990 What parts of my plant does this subpart cover?
(a) This subpart applies to each new, reconstructed, or existing
affected source at an HCl production facility.
(b) The affected source is the group of one or more HCl production
facilities at a plant site that are subject to this subpart, and all
associated wastewater operations, which contain the collection of
emission streams listed in paragraphs (b)(1) through (5) of this
section.
(1) Each emission stream from an HCl process vent.
(2) Each emission stream from an HCl storage tank.
(3) Each emission stream from an HCl transfer operation.
(4) Each emission stream resulting from leaks from equipment in HCl
service.
(5) Each emission stream from HCl wastewater operations. There are
no emission limitations or other requirements in this subpart that apply
to HCl wastewater operations.
(c) An affected source is a new affected source if you commenced
construction of the affected source after September 18, 2001 and you met
the applicability criteria of Sec. 63.8985 at the time you commenced
construction.
[[Page 22]]
(d) An affected source is reconstructed if you meet the criteria as
defined in Sec. 63.2.
(e) An affected source is existing if it is not new or
reconstructed.
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]
Sec. 63.8995 When do I have to comply with this subpart?
(a) If you have a new or reconstructed affected source, you must
comply with this subpart according to paragraphs (a)(1) or (2) of this
section.
(1) If you start up your affected source before April 17, 2003, you
must comply with the emission limitations and work practice standards in
this subpart no later than April 17, 2003.
(2) If you start up your affected source after April 17, 2003, you
must comply with the emission limitations and work practice standards in
this subpart upon startup of your affected source.
(b) If you have an existing affected source, you must comply with
the emission limitations and work practice standards no later than 3
years after April 17, 2003.
(c) If you have an area source that increases its emissions or its
potential to emit such that it becomes a major source of HAP, the
provisions in paragraphs (c)(1) and (2) of this section apply.
(1) Any portion of the existing facility that is a new affected
source or a new reconstructed source must be in compliance with this
subpart upon startup.
(2) All other parts of the source must be in compliance with this
subpart no later than the date 3 years after the area source becomes a
major source.
(d) You must meet the notification requirements in Sec. 63.9045
according to the schedule in Sec. 63.9045 and in subpart A of this
part. Some of the notifications must be submitted before you are
required to comply with the emission limitations in this subpart.
Emission Limitations and Work Practice Standards
Sec. 63.9000 What emission limitations and work practice standards
must I meet?
(a) With the exceptions noted in paragraphs (c) and (d) of this
section, you must meet the applicable emission limit and work practice
standard in table 1 to this subpart for each emission stream listed
under Sec. 63.8990(b)(1) through (4) that is part of your affected
source.
(b) With the exceptions noted in paragraph (c) of this section, you
must meet the applicable operating limit in Table 2 to this subpart for
each emission stream listed under Sec. 63.8990(b)(1) through (3) that
is part of your affected source.
(c) The emission streams listed in paragraphs (c)(1) through (4) of
this section are exempt from the emission limitations, work practice
standards, and all other requirements of this subpart.
(1) Emission streams from HCl storage tanks that never store liquid
HCl product with a concentration of 30 weight percent or greater.
(2) Emission streams from HCl transfer operations that never load
liquid HCl product with a concentration of 30 weight percent or greater.
(3) Emission streams from HCl wastewater operations.
(4) Emission streams from HCl process vents, HCl storage tanks, and
HCl transfer operations that are also subject to 40 CFR part 63, subpart
EEE, National Emission Standards for Hazardous Air Pollutants for
Hazardous Waste Combustors, or 40 CFR 266.107, subpart H, Burning of
Hazardous Waste in Boilers and Industrial Furnaces.
(d) The emission limits for HCl storage tanks in table 1 to this
subpart do not apply during periods of planned routine maintenance of
HCl storage tank control devices. Periods of planned routine maintenance
of each HCl storage tank control device, during which the control device
does not meet the emission limits specified in table 1 to this subpart,
shall not exceed 240 hours per year.
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]
[[Page 23]]
General Compliance Requirements
Sec. 63.9005 What are my general requirements for complying with
this subpart?
(a) You must be in compliance with the emission limitations and work
practice standards in this subpart at all times, except during periods
of startup, shutdown, and malfunction.
(b) You must always operate and maintain your affected source,
including air pollution control and monitoring equipment, according to
the provisions in Sec. 63.6(e)(1)(i).
(c) You must develop a written startup, shutdown, and malfunction
plan according to the provisions in Sec. 63.6(e)(3).
(d) All monitoring equipment shall be installed, calibrated,
maintained, and operated according to manufacturer's specifications or
other written procedures that provide adequate assurance that the
equipment would reasonably be expected to monitor accurately. For each
monitoring system required in this section, you must develop, implement,
and submit to the Administrator a site-specific monitoring plan that
addresses the installation requirements in paragraphs (d)(1) through (3)
of this section, the ongoing procedures in paragraphs (d)(4) through (6)
of this section, and the requirements in Sec. 63.9025, as applicable.
You must submit the plan with your Notification of Compliance Status.
Upon request of the Administrator, you must promptly correct any
deficiencies in a site-specific monitoring plan and submit the revised
plan.
(1) Installation of the continuous monitoring system (CMS) sampling
probe or other interface at a measurement location relative to each
affected process unit such that the measurement is representative of
control of the exhaust emissions (e.g., on or downstream of the last
control device).
(2) Performance and equipment specifications for the sample
interface, the pollutant concentration or parametric signal analyzer,
and the data collection and reduction system.
(3) Performance evaluation procedures and acceptance criteria (e.g.,
calibrations).
(4) Ongoing operation and maintenance (O&M) procedures in accordance
with the general requirements of Sec. Sec. 63.8(c)(1), (3), (4)(ii),
(7), and (8), and 63.9025.
(5) Ongoing data quality assurance procedures in accordance with the
general requirements of Sec. 63.8(d).
(6) Ongoing recordkeeping and reporting procedures in accordance
with the general requirements of Sec. 63.10(c) and (e)(1) and (2)(i).
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 20470, Apr. 20, 2006]
Testing and Initial Compliance Requirements
Sec. 63.9010 By what date must I conduct performance tests?
(a) If you have a new or reconstructed affected source, you must
conduct performance tests within 180 calendar days after the compliance
date that is specified for your source in Sec. 63.8995(a) and according
to the provisions in Sec. 63.7(a)(2).
(b) If you have an existing affected source, you must conduct
performance tests within 180 calendar days after the compliance date
that is specified for your existing affected source in Sec. 63.8995(b)
and according to the provisions in Sec. 63.7(a)(2).
(c) If you commenced construction or reconstruction between
September 18, 2001 and April 17, 2003, you must demonstrate initial
compliance with either the proposed emission limitation or the
promulgated emission limitation no later than 180 calendar days after
April 17, 2003 or within 180 calendar days after startup of the source,
whichever is later, according to Sec. 63.7(a)(2)(ix).
Sec. 63.9015 When must I conduct subsequent performance tests?
(a) You must conduct all applicable performance tests according to
the procedures in Sec. 63.9020 on the earlier of your title V operating
permit renewal or within 5 years of issuance of your title V permit. For
emission points meeting the outlet concentration limits in table 1 to
this subpart without the use of a control device, all applicable
performance tests must also be conducted whenever process changes are
made that could reasonably be expected to increase the outlet
concentration. Examples of process
[[Page 24]]
changes include, but are not limited to, changes in production capacity,
production rate, feedstock type, or catalyst type, or whenever there is
replacement, removal, or addition of recovery equipment. For purposes of
this paragraph, process changes do not include: process upsets and
unintentional, temporary process changes.
(b) You must report the results of subsequent performance tests
within 60 days after the completion of the test. This report should also
verify that the operating limits for your affected source have not
changed or provide documentation of revised operating limits established
as specified in Table 2 to this subpart. The reports for all subsequent
performance tests should include all applicable information required in
Sec. 63.9050.
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]
Sec. 63.9020 What performance tests and other procedures must I use?
(a) You must conduct each performance test in Table 3 to this
subpart that applies to you as directed in paragraphs (a)(1) through (4)
of this section, except as noted in paragraphs (b) and (c) of this
section.
(1) You must develop a site-specific test plan according to Sec.
63.7(c)(2) and conduct each performance test according to the site-
specific test plan.
(2) You must conduct each performance test under representative
conditions according to the requirements in Sec. 63.7(e)(1) and under
the specific conditions that this subpart specifies in Table 3.
(3) You may not conduct performance tests during periods of startup,
shutdown, or malfunction, as specified in Sec. 63.7(e)(1).
(4) You must conduct at least three separate test runs for each
performance test required in this section, as specified in Sec.
63.7(e)(3). Each test run must last at least 1 hour.
(b) If you are complying with a percent reduction emission
limitation, you must determine the percent reduction in accordance with
paragraphs (b)(1) and (2) of this section.
(1) Calculate the mass rate of either HCl or chlorine using
Equations 1 and 2 of this section:
[GRAPHIC] [TIFF OMITTED] TR17AP03.000
where:
Ci, Co = Concentration of HCl or Cl2 in
the gas stream at the inlet and outlet of the control
device(s), respectively, dry basis, parts per million by
volume.
Ei, Eo = Mass rate of HCl or Cl2 at the
inlet and outlet of the control device(s), respectively, dry
basis, kilogram per hour.
Mi, Mo = Molecular weight of HCl or Cl2
at the inlet and outlet of the control device(s),
respectively, gram/gram-mole.
Qi, Qo = Flow rate of gas stream at the inlet and
outlet of the control device(s), respectively, dry standard
cubic meter per minute.
K2 = Constant, 2.494 x 10-6 (parts per
million)-1 (gram-mole per standard cubic meter)
(kilogram/gram) (minute/hour), where standard temperature
(gram-mole per standard cubic meter) is 20 [deg]C.
(2) Calculate the percent reduction of HCl or Cl2 using
Equation 3 of this section:
[GRAPHIC] [TIFF OMITTED] TR17AP03.001
where:
R = Control efficiency of control device(s).
Ei = Mass rate of HCl or Cl2 to the inlet to the
control device(s), kilograms per hour.
Eo = Mass rate of HCl or Cl2 at the outlet of the
control device(s), kilograms per hour.
(c) You may prepare a design evaluation in lieu of conducting a
performance test for HCl storage tanks and HCl transfer operations that
are not routed to a control device that also controls HCl process vent
emissions or any other continuous vent stream. The design evaluation
shall include documentation demonstrating that the control technique
being used achieves the required control efficiency when a liquid HCl
product with a concentration of 30 weight percent or greater is being
loaded into the storage tank, or a tank truck, rail car, ship, or barge.
(1) If you use a caustic scrubber control device or a water scrubber
control device, the design evaluation shall address the vent stream
composition, constituent concentrations, liquid-to-vapor ratio,
scrubbing liquid flow rate and concentration, temperature, and
[[Page 25]]
the reaction kinetics of the constituents with the scrubbing liquid. The
design evaluation shall establish the design exhaust vent concentration
level and shall include the additional information in paragraphs
(c)(1)(i) and (ii) of this section for trays and a packed column
scrubber.
(i) Type and total number of theoretical and actual trays.
(ii) Type and total surface area of packing for entire column and
for individual packed sections, if the column contains more than one
packed section.
(2) If you use any other control device, the design evaluation shall
address the composition and HAP concentration of the vent stream
immediately preceding the control device, as well as other parameters
necessary to demonstrate that the control technique being used achieves
the required control efficiency when a liquid HCl product with a
concentration of 30 weight percent or greater is being loaded into the
storage tank, or a tank truck, rail car, ship, or barge.
(d) You are not required to conduct a performance test for an
emission point for which a performance test was conducted within the
previous 5-year period, using the same test methods specified in this
section and for which either no deliberate process changes have been
made since the test, or the owner or operator can demonstrate that the
results of the performance test, with or without adjustments, reliably
demonstrate compliance despite process changes. The operating limits
reported under the previous performance test shall be sufficient to meet
the monitoring requirements in this subpart.
(e) You must establish all operating limits with which you will
demonstrate continuous compliance with the applicable emission limits in
Table 1 to this subpart as described in paragraphs (e)(1) through (3) of
this section.
(1) If you use a caustic scrubber control device or water scrubber
control device and you conduct a performance test, you must establish
operating limits according to paragraphs (e)(1)(i) and (ii) of this
section. If a series of control devices are used, you must establish
separate operating limits for each device.
(i) You must establish the minimum value as the operating limit for
scrubber inlet liquid or recirculating liquid flow rate, as appropriate.
The minimum value shall be based on the scrubber inlet liquid or
recirculating liquid flow rate, as appropriate, values measured during
the performance test.
(ii) You must establish the minimum and maximum values as the
operating limits for scrubber effluent pH. The minimum and maximum
values shall be based on the scrubber effluent pH values measured during
the performance test.
(2) If you use any other control device and you conduct a
performance test, you must establish operating limits according to your
site-specific test plan submitted in accordance with Sec.
63.7(c)(2)(i). The operating limits shall be based on the operating
parameter values measured during the performance test. If a series of
control devices are used, you must establish separate operating limits
for each device.
(3) If you do not conduct a performance test for a HCl storage tank
or HCl transfer operation, you must use engineering assessments and/or
manufacturer's recommendations to establish the operating limits
specified in paragraphs (e)(1)(i) and (ii), or (e)(2), of this section.
(4) As needed in applicability determinations, you must use ASTM
E224 to determine the HCl concentration in liquid products.
Sec. 63.9025 What are my monitoring installation, operation,
and maintenance requirements?
(a) For each operating parameter that you are required by Sec.
63.9020(e) to monitor, you must install, operate, and maintain each CMS
according to the requirements in paragraphs (a)(1) through (6) of this
section.
(1) You must operate your CMS and collect data at all times the
process is operating.
(2) You must collect data from at least four equally spaced periods
each hour.
(3) For at least 75 percent of the operating hours in a 24-hour
period, you must have valid data (as defined in your site-specific
monitoring plan) for
[[Page 26]]
at least 4 equally spaced periods each hour.
(4) For each hour that you have valid data from at least four
equally spaced periods, you must calculate the hourly average value
using all valid data or, where data are collected from an automated CMS,
using at least one measured value per minute if measured more frequently
than once per minute.
(5) You must calculate the daily average using all of the hourly
averages calculated according to paragraph (a)(4) of this section for
the 24-hour period.
(6) You must record the results for each inspection, calibration,
and validation check as specified in your site-specific monitoring plan.
(b) For scrubber control devices, you may request approval, in
accordance with Sec. 63.8(f), to monitor parameters other than those
specified in Sec. 63.9020(e). In accordance with Sec. 63.8(f), you
must submit a monitoring plan to the Administrator and the plan must
meet the requirements in paragraphs (a) and (b)(1) through (3) of this
section. You must conduct monitoring in accordance with the plan
submitted to the Administrator unless comments received from the
Administrator require an alternate monitoring scheme.
(1) Identify the operating parameter to be monitored to ensure that
the control or capture efficiency measured during the initial compliance
test is maintained.
(2) Discuss why this parameter is appropriate for demonstrating
ongoing compliance.
(3) Identify the specific monitoring procedures.
(c) For any other control device, you must ensure that the CMS is
operated according to a monitoring plan submitted to the Administrator
as required by Sec. 63.8(f). The monitoring plan must meet the
requirements in paragraphs (a) and (c)(1) through (3) of this section.
You must conduct monitoring in accordance with the plan submitted to the
Administrator, as amended, unless comments received from the
Administrator require an alternate monitoring scheme.
(1) Identify the operating parameter to be monitored to ensure that
the control or capture efficiency measured during the initial compliance
test is maintained.
(2) Discuss why this parameter is appropriate for demonstrating
ongoing compliance.
(3) Identify the specific monitoring procedures.
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]
Sec. 63.9030 How do I demonstrate initial compliance with the
emission limitations and work practice standards?
(a) You must demonstrate initial compliance with each emission limit
and work practice standard that applies to you according to Table 4 to
this subpart.
(b) You must establish each site-specific operating limit in Table 2
to this subpart that applies to you according to the requirements in
Sec. 63.9020 and Table 3 to this subpart.
(c) You must submit the Notification of Compliance Status containing
the results of the initial compliance demonstration according to the
requirements in Sec. 63.9045(e).
Continuous Compliance Requirements
Sec. 63.9035 How do I monitor and collect data to demonstrate
continuous compliance?
(a) You must monitor and collect data according to this section.
(b) If you use a caustic scrubber or a water scrubber/absorber to
meet the emission limits in Table 1 to this subpart, you must keep the
records specified in paragraphs (b)(1) and (2) of this section to
support your compliance demonstration.
(1) Records of daily average scrubber inlet liquid or recirculating
liquid flow rate, as appropriate.
(2) Records of the daily average scrubber effluent pH.
(c) If you use any other control device to meet the emission limits
in Table 1 to this subpart, you must keep records of the operating
parameter values identified in your monitoring plan in Sec. 63.9025(c)
to support your compliance demonstration.
(d) Except for monitor malfunctions, associated repairs, and
required quality assurance or control activities (including, as
applicable, calibration checks
[[Page 27]]
and required zero and span adjustments), you must monitor continuously
(or collect data at all required intervals) at all times that the
affected source is operating. This includes periods of startup,
shutdown, or malfunction when the affected source is operating. A
monitoring malfunction includes, but is not limited to, any sudden,
infrequent, not reasonably preventable failure of the monitoring
equipment to provide valid data. Monitoring failures that are caused in
part by poor maintenance or careless operation are not malfunctions.
(e) You may not use data recorded during monitoring malfunctions,
associated repairs, and required quality assurance or control activities
in data averages and calculations used to report emission or operating
levels, nor may such data be used in fulfilling a minimum data
availability requirement, if applicable. You must use all the data
collected during all other periods in assessing the operation of the
control device and associated control system.
Sec. 63.9040 How do I demonstrate continuous compliance with the
emission limitations and work practice standards?
(a) You must demonstrate continuous compliance with each emission
limit and work practice standard in Table 1 to this subpart that applies
to you according to Table 4 to this subpart.
(b) You must demonstrate continuous compliance with each operating
limit in Table 2 of this subpart that applies to you according to Tables
4 and 5 to this subpart.
(c) You must report each instance in which you did not meet an
emission limit, work practice standard or operating limit in Table 1 or
2 to this subpart, respectively, that applies to you. This includes
periods of startup, shutdown, and malfunction. These instances are
deviations from the emission limitations in this subpart. These
deviations must be reported according to the requirements in Sec.
63.9050.
(d) [Reserved]
(e) Consistent with Sec. Sec. 63.6(e) and 63.7(e)(1), deviations
that occur during a period of startup, shutdown, or malfunction are not
violations if you demonstrate to the Administrator's satisfaction that
you were operating in accordance with Sec. 63.6(e)(1). The
Administrator will determine whether deviations that occur during a
period of startup, shutdown, or malfunction are violations, according to
the provisions in Sec. 63.6(e).
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 20470, Apr. 20, 2006]
Notifications, Reports, and Records
Sec. 63.9045 What notifications must I submit and when?
(a) You must submit all of the notifications in Sec. Sec. 63.7(b)
and (c), 63.8(f)(4) and (6), and 63.9 (b) through (h) that apply to you
by the dates specified.
(b) As specified in Sec. 63.9(b)(2), if you start up your affected
source before April 17, 2003, you must submit an Initial Notification
not later than 120 calendar days after April 17, 2003.
(c) As specified in Sec. 63.9(b)(4), if you start up your new or
reconstructed affected source on or after April 17, 2003, you must
submit the application for construction or reconstruction required by
Sec. 63.9(b)(1)(iii) in lieu of the initial notification.
(d) You must submit a notification of intent to conduct a
performance test at least 60 calendar days before the performance test
is scheduled to begin, as required in Sec. 63.7(b)(1).
(e) [Reserved]
(f) You must submit the Notification of Compliance Status, including
the performance test results, within 240 calendar days after the
applicable compliance dates specified in Sec. 63.8995.
(g) The Notification of Compliance Status must also include the
information in paragraphs (g)(1) through (2) of this section that
applies to you.
(1) Each operating parameter value averaged over the full period of
the performance test (for example, average pH).
(2) Each operating parameter range within which HAP emissions are
reduced to the level corresponding to meeting the applicable emission
limits in Table 1 to this subpart.
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]
[[Page 28]]
Sec. 63.9050 What reports must I submit and when?
(a) You must submit each report in Table 6 to this subpart that
applies to you.
(b) Unless the Administrator has approved a different schedule for
submission of reports under Sec. 63.10(a), you must submit each report
according to paragraphs (b)(1) through (5) of this section.
(1) The first compliance report must cover the period beginning on
the compliance date that is specified for your affected source in Sec.
63.8995 and ending on June 30 or December 31, whichever date is the
first date following the end of the first calendar half after the
compliance date that is specified for your source in Sec. 63.8995
(i.e., June 30, 2006, for sources existing on April 17, 2006).
(2) The first compliance report must be postmarked or delivered no
later than July 31 or January 31, whichever date follows the end of the
first calendar half after the compliance date that is specified for your
affected source in Sec. 63.8995 (i.e., July 31, 2006, for sources
existing on April 17, 2006).
(3) Each subsequent compliance report must cover the semiannual
reporting period from January 1 through June 30 or the semiannual
reporting period from July 1 through December 31.
(4) Each subsequent compliance report must be postmarked or
delivered no later than July 31 or January 31, whichever date is the
first date following the end of the semiannual reporting period.
(5) For each affected source that is subject to permitting
regulations pursuant to 40 CFR part 70 or 71, and if the permitting
authority has established dates for submitting semiannual reports
pursuant to 40 CFR 70.6 (a)(3)(iii)(A) or 71.6 (a)(3)(iii)(A), you may
submit the first and subsequent compliance reports according to the
dates the permitting authority has established instead of according to
the dates in paragraphs (b)(1) through (4) of this section.
(c) The compliance report must contain the following information in
paragraphs (c)(1) through (10) of this section.
(1) Company name and address.
(2) Statement by a responsible official with that official's name,
title, and signature, certifying the truth, accuracy, and completeness
of the content of the report.
(3) Date of report and beginning and ending dates of the reporting
period.
(4) If you had a startup, shutdown, or malfunction during the
reporting period and you took actions consistent with your startup,
shutdown, and malfunction plan, the compliance report must include the
information in Sec. 63.10(d)(5)(i).
(5) If there are no deviations from any emission limitations that
apply to you, a statement that there were no deviations from the
emission limitations during the reporting period.
(6) If there were no periods during which the CMS was out-of-control
in accordance with the monitoring plan, a statement that there were no
periods during which the CMS was out-of-control during the reporting
period.
(7) Verification that you continue to use the equipment LDAR plan
and information that explains any periods when the procedures in the
plan were not followed and the corrective actions were not taken.
(8) If you did not make revisions to your site-specific monitoring
plan and/or LDAR plan during the reporting period, a statement that you
did not make any revisions to your site-specific monitoring plan and/or
LDAR plan during the reporting period. If you made revisions to your
site-specific monitoring plan and/or LDAR plan during the reporting
period, a copy of the revised plan.
(9) If you meet the outlet concentration limit in table 1 to this
subpart without the use of a control device for any emission point,
verification that you have not made any process changes that could
reasonably be expected to increase the outlet concentration since your
most recent performance test for that emission point.
(10) The information specified in paragraphs (c)(10)(i) and (ii) of
this section for those planned routine maintenance operations that
caused or may cause an HCl storage tank control device not to meet the
emission limits in table 1 to this subpart, as applicable.
[[Page 29]]
(i) A description of the planned routine maintenance that was
performed for each HCl storage tank control device during the reporting
period. This description shall include the type of maintenance performed
and the total number of hours during the reporting period that the HCl
storage tank control device did not meet the emission limits in table 1
to this subpart, as applicable, due to planned routine maintenance.
(ii) A description of the planned routine maintenance that is
anticipated to be performed for each HCl storage tank control device
during the next reporting period. This description shall include the
type of maintenance necessary, planned frequency of maintenance, and
lengths of maintenance periods.
(d) For each deviation from an emission limitation occurring at an
affected source where you are using a CMS to comply with the emission
limitation in this subpart, you must include the information in
paragraphs (c)(1) through (6) of this section and the following
information in paragraphs (d)(1) through (9) of this section. This
includes periods of startup, shutdown, and malfunction.
(1) The date and time that each malfunction started and stopped.
(2) The date and time that each CMS was inoperative, except for zero
(low-level) and high-level checks.
(3) The date, time, and duration that each CMS was out-of-control,
including the information in Sec. 63.8(c)(8).
(4) The date and time that each deviation started and stopped, and
whether each deviation occurred during a period of startup, shutdown, or
malfunction or during another period.
(5) A summary of the total duration of the deviation during the
reporting period and the total duration as a percent of the total source
operating time during that reporting period.
(6) A breakdown of the total duration of the deviations during the
reporting period into those that are due to startup, shutdown, control
equipment problems, process problems, other known causes, and other
unknown causes.
(7) A summary of the total duration of CMS downtime during the
reporting period, and the total duration of CMS downtime as a percent of
the total source operating time during that reporting period.
(8) A brief description of the process units.
(9) A description of any changes in CMS, processes, or controls
since the last reporting period.
(e) Each affected source that has obtained a title V operating
permit pursuant to 40 CFR part 70 or 71 must report all deviations as
defined in this subpart in the semiannual monitoring report required by
40 CFR 70.6(a)(3)(iii)(A) or 71.6(a)(3)(iii)(A). If an affected source
submits a compliance report pursuant to Table 6 to this subpart along
with, or as part of, the semiannual monitoring report required by 40 CFR
70.6(a)(3)(iii)(A) or 71.6(a)(3)(iii)(A), and the compliance report
includes all required information concerning deviations from any
emission limitation in this subpart, submission of the compliance report
shall be deemed to satisfy any obligation to report the same deviations
in the semiannual monitoring report. However, submission of a compliance
report shall not otherwise affect any obligation the affected source may
have to report deviations from permit requirements to the permit
authority.
(f) For each startup, shutdown, or malfunction during the reporting
period that is not consistent with your startup, shutdown, and
malfunction plan you must submit an immediate startup, shutdown and
malfunction report. Unless the Administrator has approved a different
schedule for submission of reports under Sec. 63.10(a), you must submit
each report according to paragraphs (f)(1) and (2) of this section.
(1) An initial report containing a description of the actions taken
for the event must be submitted by fax or telephone within 2 working
days after starting actions inconsistent with the plan.
(2) A follow-up report containing the information listed in Sec.
63.10(d)(5)(ii) must be submitted within 7 working days after the end of
the event unless you have made alternative reporting arrangements with
the permitting authority.
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]
[[Page 30]]
Sec. 63.9055 What records must I keep?
(a) You must keep a copy of each notification and report that you
submitted to comply with this subpart, including all documentation
supporting any Initial Notification or Notification of Compliance Status
that you submitted, as required in Sec. 63.10(b)(2)(xiv).
(b) You must also keep the following records specified in paragraphs
(b)(1) through (5) of this section.
(1) The records in Sec. 63.6(e)(3)(iii) through (v) related to
startup, shutdown, and malfunction.
(2) Records of performance tests as required in Sec.
63.10(b)(2)(viii).
(3) Records of operating parameter values that are consistent with
your monitoring plan.
(4) Records of the date and time that each deviation started and
stopped and whether the deviation occurred during a period of startup,
shutdown, or malfunction or during another period.
(5) Copies of the current versions of the site-specific monitoring
plan and the equipment LDAR plan. You also must submit copies of these
plans and any revisions or updates to the Administrator for comment only
(not for approval).
(6) Records of the planned routine maintenance performed on each HCl
storage tank control device including the duration of each time the
control device does not meet the emission limits in table 1 to this
subpart, as applicable, due to planned routine maintenance. Such a
record shall include the information specified in paragraphs (b)(6)(i)
and (ii) of this section.
(i) The first time of day and date the emission limits in table 1 to
this subpart, as applicable, were not met at the beginning of the
planned routine maintenance, and
(ii) The first time of day and date the emission limits in table 1
to this subpart, as applicable, were met at the conclusion of the
planned routine maintenance.
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17746, Apr. 7, 2006]
Sec. 63.9060 In what form and how long must I keep my records?
(a) Your records must be in a form suitable and readily available
for expeditious inspection and review, according to Sec. 63.10(b)(1).
(b) As specified in Sec. 63.10(b)(1), you must keep each record for
5 years following the date of each occurrence, measurement, maintenance,
corrective action, report, or record.
(c) You must keep each record on site, or readily accessible from on
site through a computer or other means, for at least 2 years after the
date of each occurrence, measurement, maintenance, corrective action,
report, or record, according to Sec. 63.10(b)(1). You can keep the
records off site for the remaining 3 years. Records may be maintained in
hard copy or computer-readable format including, but not limited to, on
paper, microfilm, hard disk drive, floppy disk, compact disk, magnetic
tape, or microfiche.
(d) You must keep each previous (i.e., superseded) version of the
site-specific monitoring plan and the LDAR plan for a period of 5 years
after revision of the plan. If, at any time after adoption of a site-
specific monitoring plan or an LDAR plan, your affected source ceases
operation or is otherwise no longer subject to the provisions of this
subpart, you must retain a copy of the most recent plan for 5 years from
the date your source ceases operation or is no longer subject to this
subpart.
Other Requirements and Information
Sec. 63.9065 What parts of the General Provisions apply to me?
(a) Table 7 to this subpart shows which parts of the General
Provisions in Sec. Sec. 63.1 through 63.15 apply to you.
Sec. 63.9070 Who implements and enforces this subpart?
(a) This subpart can be implemented and enforced by us, the U.S.
EPA, or a delegated authority such as your State, local, or tribal
agency. If the U.S. EPA Administrator has delegated authority to your
State, local, or tribal agency, then that agency, as well as U.S. EPA,
has the authority to implement and enforce this subpart. You should
contact your U.S. EPA Regional Office to find out if this subpart is
delegated to your State, local, or tribal agency.
[[Page 31]]
(b) In delegating implementation and enforcement authority of this
subpart to a State, local, or tribal agency under section 40 CFR part
63, subpart E, the authorities contained in paragraph (c) of this
section are retained by the Administrator of U.S. EPA and are not
transferred to the State, local, or tribal agency.
(c) The authorities in paragraphs (c)(1) through (4) of this section
that cannot be delegated to State, local, or tribal agencies are as
follows.
(1) Approval of alternatives to requirements in Sec. Sec. 63.8980,
63.8985, 63.8990, 63.8995, and 63.9000.
(2) Approval of major changes to test methods under Sec.
63.7(e)(2)(ii) and (f) and as defined in Sec. 63.90.
(3) Approval of major changes to monitoring under Sec. 63.8(f) and
as defined in Sec. 63.90.
(4) Approval of major changes to recordkeeping and reporting under
Sec. 63.10(f) and as defined in Sec. 63.90.
Sec. 63.9075 What definitions apply to this subpart?
Terms used in this subpart are defined in the Clean Air Act in 40
CFR 63.2 and in this section as follows:
Caustic scrubber control device means any add-on device that mixes
an aqueous stream or slurry containing a caustic substance with the
exhaust gases from an HCl process vent, HCl storage tank, or HCl
transfer operation to control emissions of HCl and/or Cl2.
Chlor-alkali facility means a facility where chlorine and sodium or
potassium hydroxide are produced as co-products and hydrogen is produced
as a by-product in an electrolytic process using either mercury cells,
diaphragm cells, or membrane cells.
Continuous monitoring system, for purposes of the final rule, means
liquid flow monitoring devices that meet the performance specifications
given in Sec. 63.9025(a); or pH monitoring devices that meet the
performance specifications given in Sec. 63.9025(a); or other control
devices as mentioned in 63.9025(a) and (b) or Sec. 63.9025(a) and (c).
Control device means an add-on device used to reduce HCl and/or
Cl2 emissions from an HCl process vent, HCl storage tank, or
HCl transfer operation at an HCl production facility. An HCl production
unit is not a control device.
Deviation means any instance in which an affected source subject to
this subpart, or an owner or operator of such a source:
(1) Fails to meet any requirement or obligation established by this
subpart, including but not limited to any emission limitation or work
practice standard;
(2) Fails to meet any term or condition that is adopted to implement
an applicable requirement in this subpart and that is included in the
operating permit for any affected source required to obtain such a
permit; or
(3) Fails to meet any emission limitation or work practice standard
in this subpart during startup, shutdown, or malfunction, regardless of
whether or not such failure is permitted by this subpart.
Emission limitation means any emission limit or operating limit.
Emission stream means a gaseous stream from an HCl process vent, an
HCl storage tank, an HCl transfer operation, leaking equipment in HCl
service, or HCl wastewater operations that is discharged to the
atmosphere. Gaseous streams from HCl process vents, HCl storage tanks,
and HCl transfer operations that are routed to another process or
recycled for reaction or other use (i.e., for pH control) of the HCl
and/or Cl2 are not emission streams. Gaseous streams from HCl
transfer operations that are vapor balanced to an HCl storage tank
subject to this subpart are not emission streams.
Equipment in HCl service means each pump, compressor, agitator,
pressure relief device, sampling connection system, open-ended valve or
line, valve, connector, and instrumentation system in an HCl production
facility that contains 30 weight percent or greater of liquid HCl or 5
weight percent or greater of gaseous HCl at any time.
HCl process vent means the point of discharge to the atmosphere, or
point of entry into a control device, of a gaseous stream that
originates from an HCl production unit. The following points of
discharge are not HCl process vents:
[[Page 32]]
(1) A leak from equipment in HCl service subject to this subpart.
(2) An exit from a control device used to comply with this subpart.
(3) An HCl storage tank vent or HCl transfer operation vent subject
to this subpart.
(4) A HCl wastewater operation vent subject to this subpart.
(5) A point of discharge from a relief valve.
(6) A point of discharge from an analyzer.
HCl production facility is defined in Sec. 63.8985(a)(1).
HCl production unit means an absorber or other vessel in which a
liquid HCl product is manufactured by absorbing gaseous HCl into either
water or an aqueous HCl solution.
HCl storage tank means a tank or other vessel that is used to store
liquid HCl product. Tanks or vessels permanently attached to motor
vehicles (such as trucks, railcars, barges, or ships) are not HCl
storage tanks.
HCl transfer operation means the loading, into a tank truck,
railcar, ship, or barge, of liquid HCl from a transfer (or loading) rack
(as defined in this section) for which the predominant use is liquid
HCl. The predominant use of a transfer (or loading) rack is the material
that is loaded by the transfer (or loading) rack in the greatest amount.
HCl wastewater operation means an operation that handles and
processes water containing HCl that is discarded from an HCl production
facility.
Plant site means all contiguous or adjoining property that is under
common control, including properties that are separated only by a road
or other public right-of-way. Common control includes properties that
are owned, leased, or operated by the same entity, parent entity,
subsidiary, or any combination thereof.
Research and development facility means laboratory and pilot plant
operations whose primary purpose is to conduct research and development
into new processes and products, where the operations are under close
supervision of technically trained personnel, and the operations are not
engaged in the manufacture of products for commercial sale, except in a
de minimis manner.
Responsible official means responsible official as defined in 40 CFR
70.2 of this chapter.
Transfer (or loading) rack means the collection of loading arms and
loading hoses, at a single loading rack, that are used to fill tank
trucks, railcars, ships, and/or barges. Transfer rack includes the
associated pumps, meters, shutoff valves, relief valves, and other
piping and valves.
Vapor balanced means connected to a piping system that is designed
to collect vapors displaced from tank trucks, rail cars, ships, or
barges during loading, and to route the collected vapors to the storage
vessel from which the liquid being loaded originated, or to another
storage vessel connected by a common header.
Vent means the point of discharge to the atmosphere or to a control
device from either an HCl process vent, an HCl storage tank, or an HCl
transfer operation.
Water scrubber control device means any add-on device that mixes an
aqueous stream not containing a caustic substance with the exhaust gases
from an HCl process vent, HCl storage tank, or HCl transfer operation to
control emissions of HCl and/or Cl2.
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17746, Apr. 7, 2006]
Sec. Table 1 to Subpart NNNNN of Part 63--Emission Limits and Work
Practice Standards
As stated in Sec. 63.9000(a), you must comply with the following
emission limits and work practice standards for each emission stream
that is part of an affected source.
------------------------------------------------------------------------
You must meet the following
For each . . . emission limit and work practice
standard
------------------------------------------------------------------------
1. Emission stream from an HCl a. Reduce HCl emissions by 99
process vent at an existing source. percent or greater or achieve an
outlet concentration of 20 ppm by
volume or less; and
[[Page 33]]
b. Reduce Cl2 emissions by 99
percent or greater or achieve an
outlet concentration of 100 ppm by
volume or less.
2. Emission stream from an HCl Reduce HCl emissions by 99 percent
storge tank at an existing source. or greater or achieve an outlet
concentration of 120 ppm by volume
or less.
3. Emission stream from an HCl Reduce HCl emissions by 99 percent
transfer operation at an existing or greater or achieve an outlet
source. concentration of 120 ppm by volume
or less.
4. Emission stream from leaking a. Prepare and operate at all times
equipment in HCl service at according to an equipment LDAR
existing and new sources. plan that describes in detail the
measures that will be put in place
to detect leaks and repair them in
a timely fashion; and
b. Submit the plan to the
Administrator for comment only
with your Notification of
Compliance Status; and
c. You may incorporate by reference
in such plan existing manuals that
describe the measures in place to
control leaking equipment
emissions required as part of
other federally enforceable
requirements, provided that all
manuals that are incorporated by
reference are submitted to the
Administrator.
5. Emission stream from an HCl a. Reduce HCl emissions by 99.4
process vent at a new source. percent or greater or achieve an
outlet concentration of 12 ppm by
volume or less; and
b. Reduce Cl2 emissions by 99.8
percent or greater or achieve an
outlet concentration of 20 ppm by
volume or less.
6. Emission stream from an HCl Reduce HCl emissions by 99.9
storage tank at a new source. percent or greater or achieve an
outlet concentration of 12 ppm by
volume or less.
7. Emission stream from an HCl Reduce HCl emissions by 99 percent
transfer operation at a new source. or greater or achieve an outlet
concentration of 120 ppm by volume
or less.
------------------------------------------------------------------------
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17746, Apr. 7, 2006]
Sec. Table 2 to Subpart NNNNN of Part 63--Operating Limits
As stated in Sec. 63.9000(b), you must comply with the following
operating limits for each emission stream that is part of an affected
source that is vented to a control device.
------------------------------------------------------------------------
For each . . . You must . . .
------------------------------------------------------------------------
1. Caustic scrubber or water scrubber/ a. Maintain the daily average
absorber. scrubber inlet liquid or
recirculating liquid flow
rate, as appropriate, above
the operating limit; and
b. Maintain the daily average
scrubber effluent pH within
the operating limits; or
c. Instead of a. and b.,
maintain your operating
parameter(s) within the
operating limits established
according to your monitoring
plan established under Sec.
63.8(f).
------------------------------------------------------------------------
2. Other type of control device to Maintain your operating
which HCl emissions are ducted. parameter(s) within the limits
established during the
performance test and according
to your monitoring plan.
------------------------------------------------------------------------
Sec. Table 3 to Subpart NNNNN of Part 63--Performance Test Requirements
for HCl Production Affected Sources
As stated in Sec. 63.9020, you must comply with the following
requirements for performance tests for HCl production for each affected
source.
------------------------------------------------------------------------
For each HCl process vent and
each HCl storage tank and HCl
transfer operation for which Additional
you are conducting a Using . . . Information . . .
performance test, you must . .
.
------------------------------------------------------------------------
1. Select sampling port a. Method 1 or 1A i. If complying with
location(s) and the number of in appendix A to a percent reduction
traverse points. 40 CFR part 60 emission limitation,
of this chapter. sampling sites must
located at the inlet
and outlet of the
control device prior
to any releases to
the atmosphere (or,
if a series of
control devices are
used, at the inlet
of the first control
device and at the
outlet of the final
control device prior
to any releases to
the atmosphere); or
[[Page 34]]
ii. If complying with
an outlet
concentration
emission limitation,
the sampling site
must be located at
the outlet of the
final control device
and prior to any
releases to the
atmosphere or, if no
control device is
used, prior to any
releases to the
atmosphere.
2. Determine velocity and Method 2, 2A, 2C,
volumetric flow rate. 2D, 2F, or 2G in
appendix A to 40
CFR part 60 of
this chapter.
3. Determine gas molecular a. Not applicable i. Assume a molecular
weight. weight of 29 (after
moisture correction)
for calculation
purposes.
4. Measure moisture content of Method 4 in
the stack gas. appendix A to 40
CFR part 60 of
this chapter.
5. Measure HCl concentration a. Method 26A in i. An owner or
and Cl2 concentration from appendix A to 40 operator may be
HCl process vents. CFR part 60 of exempted from
this chapter. measuring the Cl2
concentration from
an HCl process vent
provided that a
demonstration that
Cl2 is not likely to
be present in the
stream is submitted
as part of the site-
specific test plan
required by Sec.
63.9020(a)(2). This
demonstration may be
based on process
knowledge,
engineering
judgment, or
previous test
results.
6. Establish operating limits
with which you will
demonstrate continuous
compliance with the emission
limits in Table 1 to this
subpart, in accordance with
Sec. 63.9020(e)(1) or (2).
------------------------------------------------------------------------
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17747, Apr. 7, 2006]
Sec. Table 4 to Subpart NNNNN of Part 63--Initial Compliance With
Emission Limitations and Work Practice Standards
As stated in Sec. 63.9030, you must comply with the following
requirements to demonstrate initial compliance with the applicable
emission limits for each affected source vented to a control device and
each work practice standard.
------------------------------------------------------------------------
For the following
emission limit or You have
For each . . . work practice demonstrated initial
standard . . . compliance if . . .
------------------------------------------------------------------------
1. HCl process vent and each a. In Table 1 to i. The average
HCl storage tank and HCl this subpart. percent reduction
transfer operation for of HCl and Cl2 (if
which you are conducting a applicable),
performance test. measured over the
period of the
performance test
conducted according
to Table 3 of this
subpart and
determined in
accordance with
Sec. 63.9020(b),
is greater than or
equal to the
applicable percent
reduction emission
limitation
specified in Table
1 of this subpart;
or
ii. The average HCl
and Cl2 (if
applicable)
concentration,
measured over the
period of the
performance test
conducted according
to Table 3 of this
subpart, is less
than or equal to
the applicable
concentration
emission limitation
specified in Table
1 of this subpart.
------------------------------------------------------------------------
2. HCl storage tank and HCl a. In Table 1 to i. The percent
transfer operation for this subpart. reduction of HCl,
which you are preparing a demonstrated by a
design evaluation in lieu design evaluation
of conducting a performance prepared in
test. accordance with
Sec. 63.9020(c),
is greater than or
equal to the
applicable percent
reduction emission
limitation
specified in Table
1 of this subpart;
or
[[Page 35]]
ii. The HCl
concentration,
demonstrated by a
design evaluation
prepared in
accordance with
Sec. 63.9020(c),
is less than or
equal to the
applicable
concentration
emission limitation
specified in Table
1 of this subpart.
------------------------------------------------------------------------
3. Leaking equipment........ a. In Table 1 to i. You certify in
this subpart. your Notification
of Compliance
Status that you
have developed and
implemented your
LDAR plan and
submitted it to the
Administrator for
comment only.
------------------------------------------------------------------------
Sec. Table 5 to Subpart NNNNN of Part 63--Continuous Compliance With
Emission Limitations and Work Practice Standards
As stated in Sec. 63.9040, you must comply with the following
requirements to demonstrate continuous compliance with the applicable
emission limitations for each affected source vented to a control device
and each work practice standard.
------------------------------------------------------------------------
For the following
emission
limitation and You must demonstrate
For each . . . work practice continuous compliance
standard . . . by . . .
------------------------------------------------------------------------
1. Affected source using a a. In Tables 1 i. Collecting the
caustic scrubber or water and 2 to this scrubber inlet
scrubber/adsorber. subpart. liquid or
recirculating liquid
flow rate, as
appropriate, and
effluent pH
monitoring data
according to Sec.
63.9025, consistent
with your monitoring
plan; and
ii. Reducing the data
to 1-hour and daily
block averages
according to the
requirements in Sec.
63.9025; and
iii. Maintaining the
daily average
scrubber inlet
liquid or
recirculating liquid
flow rate, as
appropriate, above
the operating limit;
and
iv. Maintaining the
daily average
scrubber effluent pH
within the operating
limits.
2. Affected source using any a. In Tables 1 i. Conducting
other control device. and 2 to this monitoring according
subpart. to your monitoring
plan established
under Sec. 63.8(f)
in accordance with
Sec. 63.9025(c);
and
ii. Collecting the
parameter data
according to your
monitoring plan
established under
Sec. 63.8(f); and
iii. Reducing the
data to 1-hour and
daily block averages
according to the
requirements in Sec.
63.9025; and
iv. Maintaining the
daily average
parameter values
within the operating
limits established
according to your
monitoring plan
established under
Sec. 63.8(f).
3. Affected source using no a. In Tables 1 i. Verifying that you
control device. and 2 to this have not made any
subpart.. process changes that
could reasonably be
expected to change
the outlet
concentration since
your most recent
performance test for
an emission point.
4. Leaking equipment affected a. In Table 1 to i. Verifying that you
source. this subpart. continue to use a
LDAR plan; and
ii. Reporting any
instances where you
deviated from the
plan and the
corrective actions
taken.
------------------------------------------------------------------------
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17747, Apr. 7, 2006]
Sec. Table 6 to Subpart NNNNN of Part 63--Requirements for Reports
As stated in Sec. 63.9050(a), you must submit a compliance report
that includes the information in Sec. 63.9050(c) through (e) as well as
the information in the following table. You must also submit startup,
shutdown, and malfunction (SSM) reports according to the requirements in
Sec. 63.9050(f) and the following:
[[Page 36]]
------------------------------------------------------------------------
Then you must submit a report
If. . . or statement that:
------------------------------------------------------------------------
1. There are no deviations from any There were no deviations from
emission limitations that apply to you. any emission limitations that
apply to you during the
reporting period.
------------------------------------------------------------------------
2. There were no periods during which There were no periods during
the operating parameter monitoring which the CMS were out-of-
systems were out-of-control in control during the reporting
accordance with the monitoring plan. period.
------------------------------------------------------------------------
3. There was a deviation from any Contains the information in
emission limitation during the Sec. 63.9050(d).
reporting period.
------------------------------------------------------------------------
4. There were periods during which the Contains the information in
operating parameter monitoring systems Sec. 63.9050(d).
were out-of-control in accordance with
the monitoring plan.
------------------------------------------------------------------------
5. There was a SSM during the reporting Contains the information in
period that is not consistent with Sec. 63.9050(f).
your SSM plan.
------------------------------------------------------------------------
6. There were periods when the Contains the information in
procedures in the LDAR plan were not Sec. 63.9050(c)(7).
followed.
------------------------------------------------------------------------
Sec. Table 7 to Subpart NNNNN of Part 63--Applicability of General
Provisions to Subpart NNNNN
As stated in Sec. 63.9065, you must comply with the applicable
General Provisions requirements according to the following:
------------------------------------------------------------------------
Applies to
Citation Requirement subpart NNNNN Explanation
------------------------------------------------------------------------
Sec. 63.1...... Initial applicability Yes.
determination;
applicability after
standard
established; permit
requirements;
extensions;
notifications.
Sec. 63.2...... Definitions.......... Yes.......... Additional
definitions
are found in
Sec.
63.9075.
Sec. 63.3...... Units and Yes.
abbreviations.
Sec. 63.4...... Prohibited Yes.
activities;
compliance date;
circumvention,
severability.
Sec. 63.5...... Construction/ Yes.
reconstruction
applicability;
applications;
approvals.
Sec. 63.6(a)... Compliance with Yes.
standards and
maintenance
requirements-
applicability.
Sec. 63.6(b)(1)- Compliance dates for Yes.......... Sec. 63.8995
(4). new or reconstructed specifies
sources. compliance
dates.
Sec. 63.6(b)(5) Notification if Yes.
commenced
construction or
reconstruction after
proposal.
Sec. 63.6(b)(6) [Reserved]........... Yes.
Sec. 63.6(b)(7) Compliance dates for Yes.......... Sec. 63.8995
new or reconstructed specifies
area sources that compliance
become major. dates.
Sec. 63.6(c)(1)- Compliance dates for Yes.......... Sec. 63.8995
(2). existing sources. specifies
compliance
dates.
Sec. 63.6(c)(3)- [Reserved]........... Yes.
(4).
Sec. 63.6(c)(5) Compliance dates for Yes.......... Sec. 63.8995
existing area specifies
sources that become compliance
major. dates.
Sec. 63.6(d)... [Reserved]........... Yes.
Sec. 63.6(e)(1)- Operation and Yes.
(2). maintenance
requirements.
Sec. 63.6(e)(3) SSM plans............ Yes.
Sec. 63.6(f)(1) Compliance except Yes.
during SSM.
Sec. 63.6(f)(2)- Methods for Yes.
(3). determining
compliance.
Sec. 63.6(g)... Use of an alternative Yes.
non-opacity emission
standard.
Sec. 63.6(h)... Compliance with No........... Subpart NNNNN
opacity/visible does not
emission standards. specify
opacity or
visible
emission
standards.
Sec. 63.6(i)... Extension of Yes.
compliance with
emission standards.
Sec. 63.6(j)... Presidential Yes.
compliance exemption.
Sec. 63.7(a)(1)- Performance test Yes.......... Except for
(2). dates. existing
affected
sources as
specified in
Sec.
63.9010(b).
Sec. 63.7(a)(3) Administrator's Clean Yes.
Air Act section 114
authority to require
a performance test.
Sec. 63.7(b)... Notification of Yes.
performance test and
rescheduling.
Sec. 63.7(c)... Quality assurance Yes.
program and site-
specific test plans.
Sec. 63.7(d)... Performance testing Yes.
facilities.
Sec. 63.7(e)(1) Conditions for Yes.
conducting
performance tests.
[[Page 37]]
Sec. 63.7(f)... Use of an alternative Yes.
test method.
Sec. 63.7(g)... Performance test data Yes.
analysis,
recordkeeping, and
reporting.
Sec. 63.7(h)... Waiver of performance Yes.
tests.
Sec. 63.8(a)(1)- Applicability of Yes.......... Additional
(3). monitoring monitoring
requirements. requirements
are found in
Sec.
63.9005(d) and
63.9035.
63.8(a)(4)....... Monitoring with No........... Subpart NNNNN
flares. does not refer
directly or
indirectly to
Sec. 63.11.
Sec. 63.8(b)... Conduct of monitoring Yes.
and procedures when
there are multiple
effluents and
multiple monitoring
systems.
Sec. 63.8(c)(1)- Continuous monitoring Yes.......... Applies as
(3). system O&M. modified by
Sec.
63.9005(d).
Sec. 63.8(c)(4) Continuous monitoring Yes.......... Applies as
system requirements modified by
during breakdown, Sec.
out-of-control, 63.9005(d).
repair, maintenance,
and high-level
calibration drifts.
Sec. 63.8(c)(5) Continuous opacity No........... Subpart NNNNN
monitoring system does not have
(COMS) minimum opacity or
procedures. visible
emission
standards.
Sec. 63.8(c)(6) Zero and high level Yes.......... Applies as
calibration checks. modified by
Sec.
63.9005(d).
Sec. 63.8(c)(7)- Out-of-control Yes.
(8). periods, including
reporting.
Sec. 63.8(d)- Quality control No........... Applies as
(e). program and CMS modified by
performance Sec.
evaluation. 63.9005(d).
Sec. 63.8(f)(1)- Use of an alternative Yes.
(5). monitoring method.
Sec. 63.8(f)(6) Alternative to No........... Only applies to
relative accuracy sources that
test. use continuous
emissions
monitoring
systems
(CEMS).
Sec. 63.8(g)... Data reduction....... Yes.......... Applies as
modified by
Sec.
63.9005(d).
Sec. 63.9(a)... Notification Yes.
requirements--applic
ability.
Sec. 63.9(b)... Initial notifications Yes.......... Except Sec.
63.9045(c)
requires new
or
reconstructed
affected
sources to
submit the
application
for
construction
or
reconstruction
required by
Sec.
63.9(b)(1)(iii
) in lieu of
the initial
notification.
Sec. 63.9(c)... Request for Yes.
compliance extension.
Sec. 63.9(d)... Notification that a Yes.
new source is
subject to special
compliance
requirements.
Sec. 63.9(e)... Notification of Yes.
performance test.
Sec. 63.9(f)... Notification of No........... Subpart NNNNN
visible emissions/ does not have
opacity test. opacity or
visible
emission
standards.
Sec. 63.9(g)(1) Additional CMS Yes.
notifications--date
of CMS performance
evaluation.
Sec. 63.9(g)(2) Use of COMS data..... No........... Subpart NNNNN
does not
require the
use of COMS.
Sec. 63.9(g)(3) Alternative to No........... Applies only to
relative accuracy sources with
testing. CEMS.
Sec. 63.9(h)... Notification of Yes.......... Except the
compliance status. submission
date specified
in Sec.
63.9(h)(2)(ii)
is superseded
by the date
specified in
Sec.
63.9045(f).
Sec. 63.9(i)... Adjustment of Yes.
submittal deadlines.
Sec. 63.9(j)... Change in previous Yes.
information.
Sec. 63.10(a).. Recordkeeping/ Yes.
reporting
applicability.
Sec. General recordkeeping Yes.......... Sec. Sec.
63.10(b)(1). requirements. 63.9055 and
63.9060
specify
additional
recordkeeping
requirements.
Sec. Records related to Yes.
63.10(b)(2)(i)-( SSM periods and CMS.
xi).
Sec. Records when under Yes.
63.10(b)(2)(xii). waiver.
Sec. Records when using No........... Applies only to
63.10(b)(2)(xiii alternative to sources with
). relative accuracy CEMS.
test.
Sec. All documentation Yes.
63.10(b)(2)(xiv). supporting initial
notification and
notification of
compliance status.
Sec. Recordkeeping Yes. ...............
63.10(b)(3). requirements for
applicability
determinations.
[[Page 38]]
Sec. 63.10(c).. Additional Yes.......... Applies as
recordkeeping modified by
requirements for Sec. 63.9005
sources with CMS. (d).
Sec. General reporting Yes.......... Sec. 63.9050
63.10(d)(1). requirements. specifies
additional
reporting
requirements.
Sec. Performance test Yes.......... Sec.
63.10(d)(2). results. 63.9045(f)
specifies
submission
date.
Sec. Opacity or visible No........... Subpart NNNNN
63.10(d)(3). emissions does not
observations. specify
opacity or
visible
emission
standards.
Sec. Progress reports for Yes.
63.10(d)(4). sources with
compliance
extensions.
Sec. SSM reports.......... Yes.
63.10(d)(5).
Sec. Additional CMS Yes.......... Applies as
63.10(e)(1). reports--general. modified by
Sec.
63.9005(d).
Sec. Results of CMS Yes.......... Applies as
63.10(e)(2)(i). performance modified by
evaluations. Sec.
63.9005(d).
Sec. Results of COMS No........... Subpart NNNNN
63.10(e)(2). performance does not
evaluations. require the
use of COMS.
Sec. Excess emissions/CMS Yes.
63.10(e)(3). performance reports.
Sec. Continuous opacity No........... Subpart NNNNN
63.10(e)(4). monitoring system does not
data reports. require the
use of COMS.
Sec. 63.10(f).. Recordkeeping/ Yes.
reporting waiver.
Sec. 63.11..... Control device No........... Facilities
requirements--applic subject to
ability. subpart NNNNN
do not use
flares as
control
devices.
Sec. 63.12..... State authority and Yes.......... Sec. 63.9070
delegations. lists those
sections of
subparts NNNNN
and A that are
not delegated.
Sec. 63.13..... Addresses............ Yes.
Sec. 63.14..... Incorporation by Yes.......... Subpart NNNNN
reference. does not
incorporate
any material
by reference.
Sec. 63.15..... Availability of Yes.
information/
confidentiality.
------------------------------------------------------------------------
[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17748, Apr. 7, 2006]
Subpart OOOOO [Reserved]
Subpart PPPPP_National Emission Standards for Hazardous Air Pollutants
for Engine Test Cells/Stands
Source: 68 FR 28785, May 27, 2003, unless otherwise noted.
What This Subpart Covers
Sec. 63.9280 What is the purpose of subpart PPPPP?
This subpart PPPPP establishes national emission standards for
hazardous air pollutants (NESHAP) for engine test cells/stands located
at major sources of hazardous air pollutants (HAP) emissions. This
subpart also establishes requirements to demonstrate initial and
continuous compliance with the emission limitations contained in this
NESHAP.
Sec. 63.9285 Am I subject to this subpart?
You are subject to this subpart if you own or operate an engine test
cell/stand that is located at a major source of HAP emissions.
(a) An engine test cell/stand is any apparatus used for testing
uninstalled stationary or uninstalled mobile (motive) engines.
(b) An uninstalled engine is an engine that is not installed in, or
an integrated part of, the final product.
(c) A major source of HAP emissions is a plant site that emits or
has the potential to emit any single HAP at a rate of 10 tons (9.07
megagrams) or more per year or any combination of HAP at a rate of 25
tons (22.68 megagrams) or more per year.
Sec. 63.9290 What parts of my plant does this subpart cover?
This subpart applies to each new, reconstructed, or existing
affected source.
[[Page 39]]
(a) Affected source. An affected source is the collection of all
equipment and activities associated with engine test cells/stands used
for testing uninstalled stationary or uninstalled mobile (motive)
engines located at a major source of HAP emissions.
(1) Existing affected source. An affected source is existing if you
commenced construction or reconstruction of the affected source on or
before May 14, 2002. A change in ownership of an existing affected
source does not make that affected source a new or reconstructed
affected source.
(2) New affected source. An affected source is new if you commenced
construction of the affected source after May 14, 2002.
(3) Reconstructed affected source. An affected source is
reconstructed if you meet the definition of reconstruction in Sec. 63.2
of subpart A of this part and reconstruction is commenced after May 14,
2002. Changes made to an existing affected source primarily for the
purpose of complying with revisions to engine testing requirements under
40 CFR parts 80, 86, 89, 90, 91, or 92 are not considered a modification
or reconstruction. In addition, passive measurement and control
instrumentation and electronics are not included as part of any affected
source reconstruction evaluation.
(b) Existing affected sources do not have to meet the requirements
of this subpart and of subpart A of this part.
(c) Any portion of a new or reconstructed affected source located at
a major source that is used exclusively for testing internal combustion
engines with rated power of less than 25 horsepower (hp) (19
kilowatts(kW)) does not have to meet the requirements of this subpart
and of subpart A of this part except for the initial notification
requirements of Sec. 63.9345(b).
(d) Any portion of a new or reconstructed affected source located at
a major source that meets any of the criteria specified in paragraphs
(d)(1) through (4) of this section does not have to meet the
requirements of this subpart and of subpart A of this part.
(1) Any portion of the affected source used exclusively for testing
combustion turbine engines.
(2) Any portion of the affected source used exclusively for testing
rocket engines.
(3) Any portion of the affected source used in research and teaching
activities at facilities that are not engaged in the development of
engines or engine test services for commercial purposes.
(4) Any portion of the affected source operated to test or evaluate
fuels (such as knock engines), transmissions, or electronics.
Sec. 63.9295 When do I have to comply with this subpart?
(a) Affected sources. (1) If you start up your new or reconstructed
affected source before May 27, 2003, you must comply with the emission
limitations in this subpart no later than May 27, 2003.
(2) If you start up your new or reconstructed affected source on or
after May 27, 2003, you must comply with the emission limitations in
this subpart upon startup.
(b) Area sources that become major sources. If your new or
reconstructed affected source is located at an area source that
increases its emissions or its potential to emit such that it becomes a
major source of HAP, your new or reconstructed affected source must be
in compliance with this subpart when the area source becomes a major
source.
(c) You must meet the notification requirements in Sec. 63.9345 and
in 40 CFR part 63, subpart A.
Emission Limitations
Sec. 63.9300 What emission limitations must I meet?
For each new or reconstructed affected source that is used in whole
or in part for testing internal combustion engines with rated power of
25 hp (19 kW) or more and that is located at a major source, you must
comply with the emission limitations in Table 1 to this subpart. (Tables
are found at the end of this subpart.)
Sec. 63.9301 What are my options for meeting the emission limits?
You may use either a continuous parameter monitoring system (CPMS)
or
[[Page 40]]
a continuous emission monitoring system (CEMS) to demonstrate compliance
with the emission limitations. Continuous monitoring systems must meet
the requirements in Sec. 63.9306 (CPMS) and Sec. 63.9307 (CEMS).
Sec. 63.9302 What operating limits must I meet?
(a) For any new or reconstructed affected source on which you use
add-on controls, you must meet the operating limits specified in Table 2
to this subpart. These operating limits must be established during the
performance test according to the requirements in Sec. 63.9324. You
must meet the operating limits at all times after you establish them.
(b) If you use an add-on control device other than those listed in
Table 2 to this subpart, or wish to monitor an alternative parameter and
comply with a different operating limit, you must apply to the
Administrator for approval of alternative monitoring under Sec.
63.8(f).
General Compliane Requirements
Sec. 63.9305 What are my general requirements for complying with
this subpart?
(a) You must be in compliance with the emission limitation that
applies to you at all times, except during periods of startup, shutdown,
or malfunction (SSM) of your control device or associated monitoring
equipment.
(b) If you must comply with the emission limitation, you must
operate and maintain your engine test cell/stand, air pollution control
equipment, and monitoring equipment in a manner consistent with good air
pollution control practices for minimizing emissions at all times.
(c) You must develop a written SSM plan (SSMP) for emission control
devices and associated monitoring equipment according to the provisions
in Sec. 63.6(e)(3). The plan will apply only to emission control
devices, and not to engine test cells/stands.
[68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]
Sec. 63.9306 What are my continuous parameter monitoring system
(CPMS) installation, operation, and maintenance requirements?
(a) General. You must install, operate, and maintain each CPMS
specified in paragraphs (c) and (d) of this section according to
paragraphs (a)(1) through (7) of this section. You must install,
operate, and maintain each CPMS specified in paragraph (b) of this
section according to paragraphs (a)(3) through (5) of this section.
(1) The CPMS must complete a minimum of one cycle of operation for
each successive 15-minute period. You must have a minimum of four
equally spaced successive cycles of CPMS operation in 1 hour.
(2) You must determine the average of all recorded readings for each
successive 3-hour period of the emission capture system and add-on
control device operation.
(3) You must record the results of each inspection, calibration, and
validation check of the CPMS.
(4) You must maintain the CPMS at all times and have available
necessary parts for routine repairs of the monitoring equipment.
(5) You must operate the CPMS and collect emission capture system
and add-on control device parameter data at all times that an engine
test cell/stand is operating, except during monitoring malfunctions,
associated repairs, and required quality assurance or control activities
(including, if applicable, calibration checks and required zero and span
adjustments).
(6) You must not use emission capture system or add-on control
device parameter data recorded during monitoring malfunctions,
associated repairs, out-of-control periods, or required quality
assurance or control activities when calculating data averages. You must
use all the data collected during all other periods in calculating the
data averages for determining compliance with the emission capture
system and add-on control device operating limits.
(7) A monitoring malfunction is any sudden, infrequent, not
reasonably preventable failure of the CPMS to provide valid data.
Monitoring failures
[[Page 41]]
that are caused in part by poor maintenance or careless operation are
not malfunctions. Any period for which the monitoring system is out-of-
control and data are not available for required calculations is a
deviation from the monitoring requirements.
(b) Capture system bypass line. You must meet the requirements of
paragraphs (b)(1) and (2) of this section for each emission capture
system that contains bypass lines that could divert emissions away from
the add-on control device to the atmosphere.
(1) You must monitor or secure the valve or closure mechanism
controlling the bypass line in a nondiverting position in such a way
that the valve or closure mechanism cannot be opened without creating a
record that the valve was opened. The method used to monitor or secure
the valve or closure mechanism must meet one of the requirements
specified in paragraphs (b)(1)(i) through (iv) of this section.
(i) Flow control position indicator. Install, calibrate, maintain,
and operate according to the manufacturer's specifications a flow
control position indicator that takes a reading at least once every 15
minutes and provides a record indicating whether the emissions are
directed to the add-on control device or diverted from the add-on
control device. The time of occurrence and flow control position must be
recorded, as well as every time the flow direction is changed. The flow
control position indicator must be installed at the entrance to any
bypass line that could divert the emissions away from the add-on control
device to the atmosphere.
(ii) Car-seal or lock-and-key valve closures. Secure any bypass line
valve in the closed position with a car-seal or a lock-and-key type
configuration. You must visually inspect the seal or closure mechanism
at least once every month to ensure that the valve is maintained in the
closed position, and the emissions are not diverted away from the add-on
control device to the atmosphere.
(iii) Valve closure monitoring. Ensure that any bypass line valve is
in the closed (nondiverting) position through monitoring of valve
position at least once every 15 minutes. You must inspect the monitoring
system at least once every month to verify that the monitor will
indicate valve position.
(iv) Automatic shutdown system. Use an automatic shutdown system in
which the engine testing operation is stopped when flow is diverted by
the bypass line away from the add-on control device to the atmosphere
when an engine test cell/stand is operating. You must inspect the
automatic shutdown system at least once every month to verify that it
will detect diversions of flow and shut down the engine test cell/stand
in operation.
(2) If any bypass line is opened, you must include a description of
why the bypass line was opened and the length of time it remained open
in the semiannual compliance reports required in Sec. 63.9350.
(c) Thermal oxidizers and catalytic oxidizers. If you are using a
thermal oxidizer or catalytic oxidizer as an add-on control device, you
must comply with the requirements in paragraphs (c)(1) through (3) of
this section.
(1) For a thermal oxidizer, install a gas temperature monitor in the
firebox of the thermal oxidizer or in the duct immediately downstream of
the firebox before any substantial heat exchange occurs.
(2) For a catalytic oxidizer, you must install a gas temperature
monitor in the gas stream immediately before the catalyst bed, and if
you established operating limits according to Sec. 63.9324(b)(1) and
(2), also install a gas temperature monitor in the gas stream
immediately after the catalyst bed.
(i) If you establish operating limits according to Sec.
63.9324(b)(1) and (2), then you must install the gas temperature
monitors both upstream and downstream of the catalyst bed. The
temperature monitors must be in the gas stream immediately before and
after the catalyst bed to measure the temperature difference across the
bed.
(ii) If you establish operating limits according to Sec.
63.9324(b)(3) and (4), then you must install a gas temperature monitor
upstream of the catalyst bed. The temperature monitor must be in the gas
stream immediately before the catalyst bed to measure the temperature.
(3) For all thermal oxidizers and catalytic oxidizers, you must meet
the
[[Page 42]]
requirements in paragraphs (a) and (c)(3)(i) through (vii) of this
section for each gas temperature monitoring device.
(i) Locate the temperature sensor in a position that provides a
representative temperature.
(ii) Use a temperature sensor with a measurement sensitivity of 4
degrees Fahrenheit or 0.75 percent of the temperature value, whichever
is larger.
(iii) Shield the temperature sensor system from electromagnetic
interference and chemical contaminants.
(iv) If a gas temperature chart recorder is used, it must have a
measurement sensitivity in the minor division of at least 20 degrees
Fahrenheit.
(v) Perform an electronic calibration at least semiannually
according to the procedures in the manufacturer's owner's manual.
Following the electronic calibration, you must conduct a temperature
sensor validation check in which a second or redundant temperature
sensor placed near the process temperature sensor must yield a reading
within 30 degrees Fahrenheit of the process temperature sensor reading.
(vi) Conduct calibration and validation checks anytime the sensor
exceeds the manufacturer's specified maximum operating temperature range
or install a new temperature sensor.
(vii) At least monthly, inspect components for integrity and
electrical connections for continuity, oxidation, and galvanic
corrosion.
(d) Emission capture systems. The capture system monitoring system
must comply with the applicable requirements in paragraphs (d)(1) and
(2) of this section.
(1) For each flow measurement device, you must meet the requirements
in paragraphs (a) and (d)(1)(i) through (iv) of this section.
(i) Locate a flow sensor in a position that provides a
representative flow measurement in the duct from each capture device in
the emission capture system to the add-on control device.
(ii) Reduce swirling flow or abnormal velocity distributions due to
upstream and downstream disturbances.
(iii) Conduct a flow sensor calibration check at least semiannually.
(iv) At least monthly, inspect components for integrity, electrical
connections for continuity, and mechanical connections for leakage.
(2) For each pressure drop measurement device, you must comply with
the requirements in paragraphs (a) and (d)(2)(i) through (vi) of this
section.
(i) Locate the pressure sensor(s) in or as close to a position that
provides a representative measurement of the pressure drop across each
opening you are monitoring.
(ii) Minimize or eliminate pulsating pressure, vibration, and
internal and external corrosion.
(iii) Check pressure tap pluggage daily.
(iv) Using an inclined manometer with a measurement sensitivity of
0.0002 inch water, check gauge calibration quarterly and transducer
calibration monthly.
(v) Conduct calibration checks any time the sensor exceeds the
manufacturer's specified maximum operating pressure range or install a
new pressure sensor.
(vi) At least monthly, inspect components for integrity, electrical
connections for continuity, and mechanical connections for leakage.
Sec. 63.9307 What are my continuous emissions monitoring system
installation, operation, and maintenance requirements?
(a) You must install, operate, and maintain each CEMS to monitor
carbon monoxide (CO) or total hydrocarbons (THC) and oxygen
(O2) at the outlet of the exhaust system of the engine test
cell/stand or at the outlet of the emission control device.
(b) To comply with the CO or THC percent reduction emission
limitation, you may install, operate, and maintain a CEMS to monitor CO
or THC and O2 at both the inlet and the outlet of the
emission control device.
(c) To comply with either emission limitations, the CEMS must be
installed and operated according to the requirements described in
paragraphs (c)(1) through (4) of this section.
(1) You must install, operate, and maintain each CEMS according to
the applicable Performance Specification (PS) of 40 CFR part 60,
appendix B (PS-3 or PS-4A).
(2) You must conduct a performance evaluation of each CEMS according
to
[[Page 43]]
the requirements in 40 CFR 63.8 and according to PS-3 of 40 CFR part 60,
appendix B, using Reference Method 3A or 3B for the O2 CEMS,
and according to PS-4A of 40 CFR part 60, appendix B, using Reference
Method 10 or 10B for the CO CEMS. If the fuel used in the engines being
tested is natural gas, you may use ASTM D 6522-00, Standard Test Method
for Determination of Nitrogen Oxides, Carbon Monoxide and Oxygen
Concentrations in Emissions from Natural Gas Fired Reciprocating
Engines, Combustion Turbines, Boilers, and Process Heaters Using
Portable Analyzers (incorporated by reference, see Sec. 63.14). As an
alternative to Method 3B, you may use ANSI/ASME PTC 19.10-1981, ``Flue
and Exhaust Gas Analyses [Part 10, Instruments and Apparatus],''
(incorporated by reference, see Sec. 63.14).
(3) As specified in Sec. 63.8(c)(4)(ii), each CEMS must complete a
minimum of one cycle of operation (sampling, analyzing, and data
recording) for each successive 15-minute period. You must have at least
two data points, each representing a different 15-minute period within
the same hour, to have a valid hour of data.
(4) All CEMS data must be reduced as specified in Sec. 63.8(g)(2)
and recorded as CO concentration in parts per million by volume, dry
basis (ppmvd), corrected to 15 percent O2 content.
(d) If you have CEMS that are subject to paragraph (a) or (b) of
this section, you must properly maintain and operate the monitors
continuously according to the requirements described in paragraphs
(d)(1) and (2) of this section.
(1) Proper maintenance. You must maintain the monitoring equipment
at all times that the engine test cell/stand is operating, including but
not limited to, maintaining necessary parts for routine repairs of the
monitoring equipment.
(2) Continued operation. You must operate your CEMS according to
paragraphs (d)(2)(i) and (ii) of this section.
(i) You must conduct all monitoring in continuous operation at all
times that the engine test cell/stand is operating, except for, as
applicable, monitoring malfunctions, associated repairs, and required
quality assurance or control activities (including, as applicable,
calibration drift checks and required zero and high-level adjustments).
Quality assurance or control activities must be performed according to
procedure 1 of 40 CFR part 60, appendix F.
(ii) Data recorded during monitoring malfunctions, associated
repairs, out-of-control periods, and required quality assurance or
control activities must not be used for purposes of calculating data
averages. You must use all of the data collected from all other periods
in assessing compliance. A monitoring malfunction is any sudden,
infrequent, not reasonably preventable failure of the monitoring
equipment to provide valid data. Monitoring failures that are caused in
part by poor maintenance or careless operation are not malfunctions. Any
period for which the monitoring system is out-of-control and data are
not available for required calculations constitutes a deviation from the
monitoring requirements.
Testing and Initial Compliance Requirements
Sec. 63.9310 By what date must I conduct the initial compliance
demonstrations?
You must conduct the initial compliance demonstrations that apply to
you in Table 3 to this subpart within 180 calendar days after the
compliance date that is specified for your new or reconstructed affected
source in Sec. 63.9295 and according to the provisions in Sec.
63.7(a)(2).
Sec. 63.9320 What procedures must I use?
(a) You must conduct each initial compliance demonstration that
applies to you in Table 3 to this subpart.
(b) You must conduct an initial performance evaluation of each
capture and control system according to Sec. Sec. 63.9321, 63.9322,
63.9323 and 63.9324, and each CEMS according to the requirements in 40
CFR 63.8 and according to the applicable Performance Specification of 40
CFR part 60, appendix B (PS-3 or PS-4A).
(c) The initial demonstration of compliance with the carbon monoxide
(CO) or total hydrocarbon (THC) concentration limitation consists of the
first 4-
[[Page 44]]
hour rolling average CO or THC concentration recorded after completion
of the CEMS performance evaluation. You must correct the CO or THC
concentration at the outlet of the engine test cell/stand or the
emission control device to a dry basis and to 15 percent O2
content according to Equation 1 of this section:
[GRAPHIC] [TIFF OMITTED] TR27MY03.002
Where:
Cc = concentration of CO or THC, corrected to 15 percent
oxygen, ppmvd
Cunc = total uncorrected concentration of CO or THC, ppmvd
%O2d = concentration of oxygen measured in gas stream, dry
basis, percent by volume.
(d) The initial demonstration of compliance with the CO or THC
percent reduction emission limitation consists of the first 4-hour
rolling average percent reduction in CO or THC recorded after completion
of the performance evaluation of the capture/control system and/or CEMS.
You must complete the actions described in paragraphs (d)(1) through (2)
of this section.
(1) Correct the CO or THC concentrations at the inlet and outlet of
the emission control device to a dry basis and to 15 percent
O2 content using Equation 1 of this section.
(2) Calculate the percent reduction in CO or THC using Equation 2 of
this section:
[GRAPHIC] [TIFF OMITTED] TR27MY03.003
Where:
R = percent reduction in CO or THC
Ci = corrected CO or THC concentration at inlet of the
emission control device
Co = corrected CO or THC concentration at the outlet of the
emission control device.
Sec. 63.9321 What are the general requirements for performance tests?
(a) You must conduct each performance test required by Sec. 63.9310
according to the requirements in Sec. 63.7(e)(1) and under the
conditions in this section unless you obtain a waiver of the performance
test according to the provisions in Sec. 63.7(h).
(1) Representative engine testing conditions. You must conduct the
performance test under representative operating conditions for the test
cell/stand. Operations during periods of SSM, and during periods of
nonoperation do not constitute representative conditions. You must
record the process information that is necessary to document operating
conditions during the test and explain why the conditions represent
normal operation.
(2) Representative emission capture system and add-on control device
operating conditions. You must conduct the performance test when the
emission capture system and add-on control device are operating at a
representative flow rate, and the add-on control device is operating at
a representative inlet concentration. You must record information that
is necessary to document emission capture system and add-on control
device operating conditions during the test and explain why the
conditions represent normal operation.
(b) You must conduct each performance test of an emission capture
system according to the requirements in Sec. 63.9322. You must conduct
each performance test of an add-on control device according to the
requirements in Sec. 63.9323.
Sec. 63.9322 How do I determine the emission capture system
efficiency?
You must use the procedures and test methods in this section to
determine capture efficiency as part of the performance test required by
Sec. 63.9310.
(a) Assuming 100 percent capture efficiency. You may assume the
capture system efficiency is 100 percent if both conditions in
paragraphs (a)(1) and (2) of this section are met:
(1) The capture system meets the criteria in Method 204 of appendix
M to 40 CFR part 51 for a potential to emit (PTE) and directs all the
exhaust gases from the enclosure to an add-on control device.
(2) All engine test operations creating exhaust gases for which the
test is applicable are conducted within the capture system.
(b) Measuring capture efficiency. If the capture system does not
meet the criteria in paragraphs (a)(1) and (2) of this section, then you
must use one of the
[[Page 45]]
two protocols described in paragraphs (c) and (d) of this section to
measure capture efficiency. The capture efficiency measurements use
total volatile hydrocarbon (TVH) capture efficiency as a surrogate for
organic HAP capture efficiency. For the protocol in paragraph (c) of
this section, the capture efficiency measurement must consist of three
test runs. Each test run must be at least 3 hours in duration or the
length of a production run, whichever is longer, up to 8 hours. For the
purposes of this test, a production run means the time required for a
single engine test to go from the beginning to the end.
(c) Gas-to-gas protocol using a temporary total enclosure or a
building enclosure. The gas-to-gas protocol compares the mass of TVH
emissions captured by the emission capture system to the mass of TVH
emissions not captured. Use a temporary total enclosure or a building
enclosure and the procedures in paragraphs (c)(1) through (5) of this
section to measure emission capture system efficiency using the gas-to-
gas protocol.
(1) Either use a building enclosure or construct an enclosure around
the engine test cell/stand and all areas where emissions from the engine
testing subsequently occur. The enclosure must meet the applicable
definition of a temporary total enclosure or building enclosure in
Method 204 of appendix M to 40 CFR part 51.
(2) Use Method 204B or 204C of appendix M to 40 CFR part 51 to
measure the total mass, kg, of TVH emissions captured by the emission
capture system during each capture efficiency test run as measured at
the inlet to the add-on control device. To make the measurement,
substitute TVH for each occurrence of the term VOC in the methods.
(i) The sampling points for the Method 204B or 204C of appendix M to
40 CFR part 51 measurement must be upstream from the add-on control
device and must represent total emissions routed from the capture system
and entering the add-on control device.
(ii) If multiple emission streams from the capture system enter the
add-on control device without a single common duct, then the emissions
entering the add-on control device must be simultaneously measured in
each duct, and the total emissions entering the add-on control device
must be determined.
(3) Use Method 204D or 204E of appendix M to 40 CFR part 51 to
measure the total mass, kg, of TVH emissions that are not captured by
the emission capture system; they are measured as they exit the
temporary total enclosure or building enclosure during each capture
efficiency test run. To make the measurement, substitute TVH for each
occurrence of the term VOC in the methods.
(i) Use Method 204D of appendix M to 40 CFR part 51 if the enclosure
is a temporary total enclosure.
(ii) Use Method 204E of appendix M to 40 CFR part 51 if the
enclosure is a building enclosure. During the capture efficiency
measurement, all organic compound emitting operations inside the
building enclosure, other than the engine test cell/stand operation for
which capture efficiency is being determined, must be shut down, but all
fans and blowers must be operating normally.
(4) For each capture efficiency test run, determine the percent
capture efficiency of the emission capture system using Equation 1 of
this section:
[GRAPHIC] [TIFF OMITTED] TR27MY03.004
Where:
CE = capture efficiency of the emission capture system vented to the
add-on control device, percent
TVHcaptured = total mass of TVH captured by the emission
capture system as measured at the inlet to the add-on control
device during the emission capture efficiency
[[Page 46]]
test run, kg, determined according to paragraph (c)(2) of this
section
TVHuncaptured = total mass of TVH that is not captured by the
emission capture system and that exits from the temporary
total enclosure or building enclosure during the capture
efficiency test run, kg, determined according to paragraph
(c)(3) of this section.
(5) Determine the capture efficiency the emission capture system as
the average of the capture efficiencies measured in the three test runs.
(d) Alternative capture efficiency protocol. As an alternative to
the procedure specified in paragraph (c) of this section, you may
determine capture efficiency using any other capture efficiency protocol
and test methods that satisfy the criteria of either the data quality
objective or lower control limit approach as described in appendix A to
subpart KK of this part.
Sec. 63.9323 How do I determine the add-on control device emission
destruction or removal efficiency?
You must use the procedures and test methods in this section to
determine the add-on control device emission destruction or removal
efficiency as part of the performance test required by Sec. 63.9310.
You must conduct three test runs as specified in Sec. 63.7(e)(3), and
each test run must last at least 1 hour.
(a) For all types of add-on control devices, use the test methods
specified in paragraphs (a)(1) through (5) of this section.
(1) Use Method 1 or 1A of appendix A to 40 CFR part 60, as
appropriate, to select sampling sites and velocity traverse points.
(2) Use Method 2, 2A, 2C, 2D, 2F, or 2G of appendix A to 40 CFR part
60, as appropriate, to measure gas volumetric flow rate.
(3) Use Method 3, 3A, or 3B of appendix A to 40 CFR part 60, as
appropriate, for gas analysis to determine dry molecular weight. The
ANSI/ASME PTC 19.10-1981 Part 10 is an acceptable alternative to Method
3B (incorporated by reference, see Sec. 63.14).
(4) Use Method 4 of appendix A to 40 CFR part 60, to determine stack
gas moisture.
(5) Methods for determining gas volumetric flow rate, dry molecular
weight, and stack gas moisture must be performed, as applicable, during
each test run.
(b) Measure total gaseous organic mass emissions as carbon at the
inlet and outlet of the add-on control device simultaneously, using
either Method 25 or 25A of appendix A to 40 CFR part 60, as specified in
paragraphs (b)(1) through (3) of this section. You must use the same
method for both the inlet and outlet measurements.
(1) Use Method 25 of appendix A to 40 CFR part 60 if the add-on
control device is an oxidizer, and you expect the total gaseous organic
concentration as carbon to be more than 50 parts per million at the
control device outlet.
(2) Use Method 25A of appendix A to 40 CFR part 60 if the add-on
control device is an oxidizer, and you expect the total gaseous organic
concentration as carbon to be 50 ppm or less at the control device
outlet.
(c) For each test run, determine the total gaseous organic emissions
mass flow rates for the inlet and the outlet of the add-on control
device, using Equation 1 of this section. If there is more than one
inlet or outlet to the add-on control device, you must calculate the
total gaseous organic mass flow rate using Equation 1 of this section
for each inlet and each outlet and then total all of the inlet emissions
and total all of the outlet emissions.
[GRAPHIC] [TIFF OMITTED] TR27MY03.005
Where:
Mf = total gaseous organic emissions mass flow rate, kg/hour
(kg/h)
Cc = concentration of organic compounds as carbon in the vent
gas, as determined by Method 25 or Method 25A, parts per
million by volume (ppmv), dry basis
Qsd = volumetric flow rate of gases entering or exiting the
add-on control device, as determined by Method 2, 2A, 2C, 2D,
2F,
[[Page 47]]
or 2G, dry standard cubic meters/hour (dscm/h)
0.0416 = conversion factor for molar volume, kg-moles per cubic meter
(mol/m\3\) (@ 293 Kelvin [K] and 760 millimeters of mercury
[mmHg]).
(d) For each test run, determine the add-on control device organic
emissions destruction or removal efficiency, using Equation 2 of this
section:
[GRAPHIC] [TIFF OMITTED] TR27MY03.006
Where:
DRE = organic emissions destruction or removal efficiency of the add-on
control device, percent
Mfi = total gaseous organic emissions mass flow rate at the
inlet(s) to the add-on control device, using Equation 1 of
this section, kg/h
Mfo = total gaseous organic emissions mass flow rate at the
outlet(s) of the add-on control device, using Equation 1 of
this section, kg/h.
(e) Determine the emission destruction or removal efficiency of the
add-on control device as the average of the efficiencies determined in
the three test runs and calculated in Equation 2 of this section.
Sec. 63.9324 How do I establish the emission capture system and
add-on control device operating limits during the performance test?
During the performance test required by Sec. 63.9310, you must
establish the operating limits required by Sec. 63.9302 according to
this section, unless you have received approval for alternative
monitoring and operating limits under Sec. 63.8(f) as specified in
Sec. 63.9302.
(a) Thermal oxidizers. If your add-on control device is a thermal
oxidizer, establish the operating limits according to paragraphs (a)(1)
and (2) of this section.
(1) During the performance test, you must monitor and record the
combustion temperature at least once every 15 minutes during each of the
three test runs. You must monitor the temperature in the firebox of the
thermal oxidizer or immediately downstream of the firebox before any
substantial heat exchange occurs.
(2) Use the data collected during the performance test to calculate
and record the average combustion temperature maintained during the
performance test. This average combustion temperature is the minimum
operating limit for your thermal oxidizer.
(b) Catalytic oxidizers. If your add-on control device is a
catalytic oxidizer, establish the operating limits according to either
paragraphs (b)(1) and (2) or paragraphs (b)(3) and (4) of this section.
(1) During the performance test, you must monitor and record the
temperature just before the catalyst bed and the temperature difference
across the catalyst bed at least once every 15 minutes during each of
the three test runs.
(2) Use the data collected during the performance test to calculate
and record the average temperature just before the catalyst bed and the
average temperature difference across the catalyst bed maintained during
the performance test. These are the minimum operating limits for your
catalytic oxidizer.
(3) As an alternative to monitoring the temperature difference
across the catalyst bed, you may monitor the temperature at the inlet to
the catalyst bed and implement a site-specific inspection and
maintenance plan for your catalytic oxidizer as specified in paragraph
(b)(4) of this section. During the performance test, you must monitor
and record the temperature just before the catalyst bed at least once
every 15 minutes during each of the three test runs. Use the data
collected during the performance test to calculate and record the
average temperature just before the catalyst bed during the performance
test. This is the minimum operating limit for your catalytic oxidizer.
(4) You must develop and implement an inspection and maintenance
plan for your catalytic oxidizer(s) for which you elect to monitor
according to paragraph (b)(3) of this section. The plan must address, at
a minimum, the elements specified in paragraphs (b)(4)(i) through (iii)
of this section.
(i) Annual sampling and analysis of the catalyst activity (i.e.,
conversion
[[Page 48]]
efficiency) following the manufacturer's or catalyst supplier's
recommended procedures.
(ii) Monthly inspection of the oxidizer system, including the burner
assembly and fuel supply lines for problems and, as necessary, adjust
the equipment to assure proper air-to-fuel mixtures.
(iii) Annual internal and monthly external visual inspection of the
catalyst bed to check for channeling, abrasion, and settling. If
problems are found, you must take corrective action consistent with the
manufacturer's recommendation and conduct a new performance test to
determine destruction efficiency according to Sec. 63.9323.
(c) Emission capture system. For each capture device that is not
part of a PTE that meets the criteria of Sec. 63.9322(a), establish an
operating limit for either the gas volumetric flow rate or duct static
pressure, as specified in paragraphs (c)(1) and (2) of this section. The
operating limit for a PTE is specified in Table 3 to this subpart.
(1) During the capture efficiency determination required by Sec.
63.9310, you must monitor and record either the gas volumetric flow rate
or the duct static pressure for each separate capture device in your
emission capture system at least once every 15 minutes during each of
the three test runs at a point in the duct between the capture device
and the add-on control device inlet.
(2) Calculate and record the average gas volumetric flow rate or
duct static pressure for the three test runs for each capture device.
This average gas volumetric flow rate or duct static pressure is the
minimum operating limit for that specific capture device.
Sec. 63.9330 How do I demonstrate initial compliance with the
emission limitation?
(a) You must demonstrate initial compliance with the emission
limitation that applies to you according to Table 3 to this subpart.
(b) You must submit the Notification of Compliance Status containing
results of the initial compliance demonstration according to the
requirements in Sec. 63.9345(c).
Continuous Compliance Requirements
Sec. 63.9335 How do I monitor and collect data to demonstrate
continuous compliance?
(a) Except for monitor malfunctions, associated repairs, and
required quality assurance or quality control activities (including, as
applicable, calibration drift checks and required zero and high-level
adjustments of the monitoring system), you must conduct all monitoring
in continuous operation at all times the engine test cell/stand is
operating.
(b) Do not use data recorded during monitor malfunctions, associated
repairs, and required quality assurance or quality control activities
for meeting the requirements of this subpart, including data averages
and calculations. You must use all the data collected during all other
periods in assessing the performance of the emission control device or
in assessing emissions from the new or reconstructed affected source.
Sec. 63.9340 How do I demonstrate continuous compliance with the
emission limitations?
(a) You must demonstrate continuous compliance with the emission
limitation in Table 1 to this subpart that applies to you according to
methods specified in Table 5 to this subpart.
(b) You must report each instance in paragraphs (b)(1) and (2) of
this section. These instances are deviations from the emission
limitation in this subpart and must be reported according to the
requirements in Sec. 63.9350.
(1) You must report each instance in which you did not meet the
emission limitation that applies to you.
(2) You must report each instance in which you did not meet the
requirements in Table 7 to this subpart that apply to you.
(c) Startups, shutdowns, and malfunctions. (1) Consistent with
Sec. Sec. 63.6(e) and 63.7(e)(1), deviations that occur during a period
of SSM of control devices and associated monitoring equipment are not
violations if you demonstrate to the Administrator's satisfaction that
you were operating in accordance with Sec. 63.6(e)(1).
[[Page 49]]
(2) The Administrator will determine whether deviations that occur
during a period of SSM of control devices and associated monitoring
equipment are violations, according to the provisions in Sec. 63.6(e).
[68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]
Notifications, Reports, and Records
Sec. 63.9345 What notifications must I submit and when?
(a) You must submit all of the notifications in Sec. Sec. 63.8(e),
63.8(f)(4) and (6), and 63.9(b), (g)(1), (g)(2) and (h) that apply to
you by the dates specified.
(b) If you own or operate a new or reconstructed test cell/stand
used for testing internal combustion engines, you are required to submit
an Initial Notification as specified in paragraphs (b)(1) through (3) of
this section.
(1) As specified in Sec. 63.9(b)(2), if you start up your new or
reconstructed affected source before the effective date of this subpart,
you must submit an Initial Notification not later than 120 calendar days
after May 27, 2003.
(2) As specified in Sec. 63.9(b), if you start up your new or
reconstructed affected source on or after the effective date of this
subpart, you must submit an Initial Notification not later than 120
calendar days after you become subject to this subpart.
(3) If you are required to submit an Initial Notification but are
otherwise not affected by the requirements of this subpart, in
accordance with Sec. 63.9290(c), your notification should include the
information in Sec. 63.9(b)(2)(i) through (v) and a statement that your
new or reconstructed engine test cell/stand has no additional
requirements and explain the basis of the exclusion (for example, that
the test cell/stand is used exclusively for testing internal combustion
engines with rated power of less than 25 hp (19 kW)).
(c) If you are required to comply with the emission limitations in
Table 1 to this subpart, you must submit a Notification of Compliance
Status according to Sec. 63.9(h)(2)(ii). For each initial compliance
demonstration with the emission limitation, you must submit the
Notification of Compliance Status before the close of business on the
30th calendar day following the completion of the initial compliance
demonstration.
(d) You must submit a notification of initial performance evaluation
of your CEMS or performance testing of your control device at least 60
calendar days before the performance testing/evaluation is scheduled to
begin as required in Sec. 63.8(e)(2).
Sec. 63.9350 What reports must I submit and when?
(a) If you own or operate a new or reconstructed affected source
that must meet the emission limitation, you must submit a semiannual
compliance report according to Table 6 to this subpart by the applicable
dates specified in paragraphs (a)(1) through (6) of this section, unless
the Administrator has approved a different schedule.
(1) The first semiannual compliance report must cover the period
beginning on the compliance date specified in Sec. 63.9295 and ending
on June 30 or December 31, whichever date is the first date following
the end of the first calendar half after the compliance date specified
in Sec. 63.9295.
(2) The first semiannual compliance report must be postmarked or
delivered no later than July 31 or January 31, whichever date follows
the end of the first calendar half after the compliance date that is
specified in Sec. 63.9295.
(3) Each subsequent semiannual compliance report must cover the
semiannual reporting period from January 1 through June 30 or the
semiannual reporting period from July 1 through December 31.
(4) Each subsequent semiannual compliance report must be postmarked
or delivered no later than July 31 or January 31, whichever date is the
first date following the end of the semiannual reporting period.
(5) For each new or reconstructed engine test cell/stand that is
subject to permitting regulations pursuant to 40 CFR part 70 or 71, and
if the permitting authority has established the date for submitting
semiannual reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR
71.6(a)(3)(iii)(A), you may submit
[[Page 50]]
the first and subsequent compliance reports according to the dates the
permitting authority has established instead of according to the dates
in paragraphs (a)(1) through (4) of this section.
(6) If you had an SSM of a control device or associated monitoring
equipment during the reporting period and you took actions consistent
with your SSMP, the compliance report must include the information in
paragraphs Sec. 63.10(d)(5)(i).
(b) If there is no deviation from the applicable emission limitation
and the CEMS or CPMS was not out-of-control, according to Sec.
63.8(c)(7), the semiannual compliance report must contain the
information described in paragraphs (b)(1) through (4) of this section.
(1) Company name and address.
(2) Statement by a responsible official, with that official's name,
title, and signature, certifying the truth, accuracy, and completeness
of the content of the report.
(3) Date of report and beginning and ending dates of the reporting
period.
(4) A statement that no deviation from the emission limit occurred
during the reporting period and that no CEMS or CPMS was out-of-control,
according to Sec. 63.8(c)(7).
(c) For each deviation from an emission limit, the semiannual
compliance report must include the information in paragraphs (b)(1)
through (3) of this section and the information included in paragraphs
(c)(1) through (4) of this section.
(1) The date and time that each deviation started and stopped.
(2) The total operating time of each new or reconstructed engine
test cell/stand during the reporting period.
(3) A summary of the total duration of the deviation during the
reporting period (recorded in 4-hour periods), and the total duration as
a percent of the total operating time during that reporting period.
(4) A breakdown of the total duration of the deviations during the
reporting period into those that are due to control equipment problems,
process problems, other known causes, and other unknown causes.
(d) For each CEMS or CPMS deviation, the semiannual compliance
report must include the information in paragraphs (b)(1) through (3) of
this section and the information included in paragraphs (d)(1) through
(10) of this section.
(1) The date and time that each CEMS or CPMS was inoperative except
for zero (low-level) and high-level checks.
(2) The date and time that each CEMS or CPMS was out-of-control
including the information in Sec. 63.8(c)(8).
(3) A summary of the total duration of CEMS or CPMS downtime during
the reporting period (reported in 4-hour periods), and the total
duration of CEMS or CPMS downtime as a percent of the total engine test
cell/stand operating time during that reporting period.
(4) A breakdown of the total duration of CEMS or CPMS downtime
during the reporting period into periods that are due to monitoring
equipment malfunctions, nonmonitoring equipment malfunctions, quality
assurance/quality control calibrations, other known causes and other
unknown causes.
(5) The monitoring equipment manufacturer(s) and model number(s) of
each monitor.
(6) The date of the latest CEMS or CPMS certification or audit.
(7) The date and time period of each deviation from an operating
limit in Table 2 to this subpart; date and time period of any bypass of
the add-on control device; and whether each deviation occurred during a
period of SSM or during another period.
(8) A summary of the total duration of each deviation from an
operating limit in Table 2 to this subpart, each bypass of the add-on
control device during the semiannual reporting period, and the total
duration as a percent of the total source operating time during that
semiannual reporting period.
(9) A breakdown of the total duration of the deviations from the
operating limits in Table 2 to this subpart and bypasses of the add-on
control device during the semiannual reporting period by identifying
deviations due to startup, shutdown, control equipment problems, process
problems, other known causes, and other unknown causes.
(10) A description of any changes in CEMS, CPMS, or controls since
the last reporting period.
[[Page 51]]
(e) If you had an SSM of a control device or associated monitoring
equipment during the semiannual reporting period that was not consistent
with your SSMP, you must submit an immediate SSM report according to the
requirements in Sec. 63.10(d)(5)(ii).
Sec. 63.9355 What records must I keep?
(a) You must keep the records as described in paragraphs (a)(1)
through (5) of this section.
(1) A copy of each notification and report that you submitted to
comply with this subpart, including all documentation supporting any
Initial Notification or Notification of Compliance Status that you
submitted, according to the requirements in Sec. 63.10(b)(2)(xiv).
(2) Records of performance evaluations as required in Sec.
63.10(b)(2)(viii).
(3) Records of the occurrence and duration of each malfunction of
the air pollution control equipment, if applicable, as required in Sec.
63.10(b)(2)(ii).
(4) Records of all maintenance on the air pollution control
equipment, if applicable, as required in Sec. 63.10(b)(iii).
(5) The calculation of the mass of organic HAP emission reduction by
emission capture systems and add-on control devices.
(b) For each CPMS, you must keep the records as described in
paragraphs (b)(1) through (7) of this section.
(1) For each deviation, a record of whether the deviation occurred
during a period of SSM of the control device and associated monitoring
equipment.
(2) The records in Sec. 63.6(e)(3)(iii) through (v) related to SSM.
(3) The records required to show continuous compliance with each
operating limit specified in Table 2 to this subpart that applies to
you.
(4) For each capture system that is a PTE, the data and
documentation you used to support a determination that the capture
system meets the criteria in Method 204 of appendix M to 40 CFR part 51
for a PTE and has a capture efficiency of 100 percent, as specified in
Sec. 63.9322(a).
(5) For each capture system that is not a PTE, the data and
documentation you used to determine capture efficiency according to the
requirements specified in Sec. Sec. 63.9321 and 63.9322(b) through (e),
including the records specified in paragraphs (b)(5)(i) and (ii) of this
section that apply to you.
(i) Records for a gas-to-gas protocol using a temporary total
enclosure or a building enclosure. Records of the mass of TVH emissions
captured by the emission capture system as measured by Method 204B or C
of appendix M to 40 CFR part 51 at the inlet to the add-on control
device, including a copy of the test report. Records of the mass of TVH
emissions not captured by the capture system that exited the temporary
total enclosure or building enclosure during each capture efficiency
test run as measured by Method 204D or E of appendix M to 40 CFR part
51, including a copy of the test report. Records documenting that the
enclosure used for the capture efficiency test met the criteria in
Method 204 of appendix M to 40 CFR part 51 for either a temporary total
enclosure or a building enclosure.
(ii) Records for an alternative protocol. Records needed to document
a capture efficiency determination using an alternative method or
protocol as specified in Sec. 63.9322(e), if applicable.
(6) The records specified in paragraphs (b)(6)(i) and (ii) of this
section for each add-on control device organic HAP destruction or
removal efficiency determination as specified in Sec. 63.9323.
(i) Records of each add-on control device performance test conducted
according to Sec. Sec. 63.9321, 63.9322, and 63.9323.
(ii) Records of the engine testing conditions during the add-on
control device performance test showing that the performance test was
conducted under representative operating conditions.
(7) Records of the data and calculations you used to establish the
emission capture and add-on control device operating limits as specified
in Sec. 63.9324 and to document compliance with the operating limits as
specified in Table 2 to this subpart.
(c) For each CEMS, you must keep the records as described in
paragraphs (c)(1) through (4) of this section.
(1) Records described in Sec. 63.10(b)(2)(vi) through (xi).
(2) Previous (i.e., superceded) versions of the performance
evaluation plan as required in Sec. 63.8(d)(3).
[[Page 52]]
(3) Request for alternatives to the relative accuracy test for CEMS
as required in Sec. 63.8(f)(6)(i), if applicable.
(4) The records in Sec. 63.6(e)(3)(iii) through (v) related to SSM
of the control device and associated monitoring equipment.
(d) You must keep the records required in Table 5 to this subpart to
show continuous compliance with each emission limitation that applies to
you.
Sec. 63.9360 In what form and how long must I keep my records?
(a) You must maintain all applicable records in such a manner that
they can be readily accessed and are suitable for inspection according
to Sec. 63.10(b)(1).
(b) As specified in Sec. 63.10(b)(1), you must keep each records
for 5 years following the date of each occurrence, measurement,
maintenance, corrective action, report, or record.
(c) You must retain your records of the most recent 2 years on site,
or your records must be accessible on site. Your records of the
remaining 3 years may be retained off site.
Other Requirements and Information
Sec. 63.9365 What parts of the General Provisions apply to me?
Table 7 to this subpart shows which parts of the General Provisions
in Sec. Sec. 63.1 through 63.15 apply to you.
Sec. 63.9370 Who implements and enforces this subpart?
(a) This subpart can be implemented and enforced by us, the U.S.
EPA, or a delegated authority such as your State, local, or tribal
agency. If the U.S. EPA Administrator has delegated authority to your
State, local, or tribal agency, then that agency, in addition to the
U.S. EPA, has the authority to implement and enforce this subpart. You
should contact your U.S. EPA Regional Office to find out if
implementation and enforcement of this subpart is delegated to your
State, local, or tribal agency.
(b) In delegating implementation and enforcement authority of this
subpart to a State, local, or tribal agency under section 40 CFR part
63, subpart E, the authorities contained in paragraph (c) of this
section are retained by the Administrator of U.S. EPA and are not
transferred to the State, local, or tribal agency.
(c) The authorities that cannot be delegated to State, local, or
tribal agencies are described in paragraphs (c)(1) through (4) of this
section.
(1) Approval of alternatives to the emission limitations in Sec.
63.9300 under Sec. 63.6(g).
(2) Approval of major changes to test methods under Sec.
63.7(e)(2)(ii) and (f) and as defined in Sec. 63.90.
(3) Approval of major changes to monitoring under Sec. 63.8(f) and
as defined in Sec. 63.90.
(4) Approval of major changes to recordkeeping and reporting under
Sec. 63.10(f) and as defined in Sec. 63.90.
Sec. 63.9375 What definitions apply to this subpart?
Terms used in this subpart are defined in the CAA; in 40 CFR 63.2,
and in this section:
CAA means the Clean Air Act (42 U.S.C. 7401 et seq., as amended by
Public Law 101-549, 104 Statute 2399).
Area source means any stationary source of HAP that is not a major
source as defined in this part.
Combustion turbine engine means a device in which air is compressed
in a compressor, enters a combustion chamber, and is compressed further
by the combustion of fuel injected into the combustion chamber. The hot
compressed combustion gases then expand over a series of curved vanes or
blades arranged on a central spindle that rotates.
Deviation means any instance in which an affected source subject to
this subpart, or an owner or operator of such a source:
(1) Fails to meet any requirement or obligation established by this
subpart, including but not limited to any emission limitations;
(2) Fails to meet any term or condition that is adopted to implement
an applicable requirement in this subpart and that is included in the
operating permit for any affected source required to obtain such a
permit; or
[[Page 53]]
(3) Fails to meet any emission limitation in this subpart during
malfunction, regardless or whether or not such failure is permitted by
this subpart.
Engine means any internal combustion engine, any combustion turbine
engine, or any rocket engine.
Engine Test Cell/Stand means any apparatus used for testing
uninstalled stationary or uninstalled mobile (motive) engines.
Hazardous Air Pollutant (HAP) means any air pollutant listed in or
pursuant to section 112(b) of the CAA.
Internal combustion engine means a device in which air enters a
combustion chamber, is mixed with fuel, compressed in the chamber, and
combusted. Fuel may enter the combustion chamber with the air or be
injected into the combustion chamber. Expansion of the hot combustion
gases in the chamber rotates a shaft, either through a reciprocating or
rotary action. For purposes of this subpart, this definition does not
include combustion turbine engines.
Major source, as used in this subpart, shall have the same meaning
as in Sec. 63.2.
Malfunction means any sudden, infrequent, and not reasonably
preventable failure of air pollution control equipment, process
equipment, or a process to operate in a normal or usual manner which
causes, or has the potential to cause, the emission limitations in an
applicable standard to be exceeded. Failures that are caused in part by
poor maintenance or careless operation are not malfunctions.
Rated power means the maximum power output of an engine in use.
Potential to emit means the maximum capacity of a stationary source
to emit a pollutant under its physical and operational design. Any
physical or operational limitation on the capacity of the stationary
source to emit a pollutant, including air pollution control equipment
and restrictions on hours of operation or on the type or amount of
material combusted, stored, or processed, shall be treated as part of
its design if the limitation or the effect it would have on emissions is
federally enforceable.
Responsible official means responsible official as defined by 40 CFR
70.2.
Rocket engine means a device consisting of a combustion chamber in
which materials referred to as propellants, which provide both the fuel
and the oxygen for combustion, are burned. Combustion gases escape
through a nozzle, providing thrust.
Uninstalled engine means an engine not installed in, or an
integrated part of, the final product.
[68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]
Sec. Table 1 to Subpart PPPPP of Part 63--Emission Limitations
You must comply with the emission limits that apply to your affected
source in the following table as required by Sec. 63.9300.
------------------------------------------------------------------------
For each new or reconstructed affected
source located at a major source You must meet one of the
facility that is used in whole or in following emission limitations:
part for testing . . .
------------------------------------------------------------------------
1. internal combustion engines with a. limit the concentration of
rated power of 25 hp (19 kW) or more. CO or THC to 20 ppmvd or less
(corrected to 15 percent O2
content); or
b. achieve a reduction in CO or
THC of 96 percent or more
between the inlet and outlet
concentrations (corrected to
15 percent O2 content) of the
emission control device.
------------------------------------------------------------------------
Sec. Table 2 to Subpart PPPPP of Part 63--Operating Limits
If you are required to comply with operating limits in Sec.
63.9302, you must comply with the applicable operating limits in the
following table:
[[Page 54]]
------------------------------------------------------------------------
and you must
demonstrate
For the following device . . You must meet the continuous
. following operating compliance with the
limit . . . operating limit by .
. .
------------------------------------------------------------------------
1. Thermal oxidizer......... a. The average i. Collecting the
combustion combustion
temperature in any temperature data
3-hour period must according to Sec.
not fall below the 63.9306(c);
combustion ii. Reducing the
temperature limit data to 3-hour
established block averages; and
according to Sec. iii. Maintaining the
63.9324(a). 3-hour average
combustion
temperature at or
above the
temperature limit.
------------------------------------------------------------------------
2. Catalytic oxidizer....... a. The average i. Collecting the
temperature temperature data
measured just according to Sec.
before the catalyst 63.9306(c);
bed in any 3-hour ii. Reducing the
period must not data to 3-hour
fall below the block averages; and
limit established iii. Maintaining the
according to Sec. 3-hour average
63.9324(b). temperature before
the catalyst bed at
or above the
temperature limit.
b. Either ensure i. Either collecting
that the average the temperature
temperature data according to
difference across Sec. 63.9306(c),
the catalyst bed in reducing the data
any 3-hour period to 3-hour block
does not fall below averages, and
the temperature maintaining the 3-
difference limit hour average
established temperature
according to Sec. difference at or
63.9324(b)(2) or above the
develop and temperature
implement an difference limit;
inspection and or
maintenance plan ii. Complying with
according to Sec. the inspection and
63.9324(b)(3) and maintenance plan
(4). developed according
to Sec.
63.9324(b)(3) and
(4).
------------------------------------------------------------------------
3. Emission capture system a. The direction of i. Collecting the
that is a PTE according to the air flow at all direction of air
Sec. 63.9322(a). times must be into flow; and either
the enclosure; and the facial velocity
either of air through all
natural draft
openings according
to Sec.
63.9306(d)(1) or
the pressure drop
across the
enclosure according
to Sec.
63.9306(d)(2); and
ii. Maintaining the
facial velocity of
air flow through
all natural draft
openings or the
pressure drop at or
above the facial
velocity limit or
pressure drop
limit, and
maintaining the
direction of air
flow into the
enclosure at all
times.
b. The average Follow the
facial velocity of requirements in 3ai
air through all and ii of this
natural draft table.
openings in the
enclosure must be
at least 200 feet
per minute; or
c. The pressure drop Follow the
across the requirements in 3ai
enclosure must be and ii of this
at least 0.007 inch table.
H2O, as established
in Method 204 of
appendix M to 40
CFR part 51.
------------------------------------------------------------------------
4. Emission capture system a. The average gas i. Collecting the
that is not a PTE according volumetric flow gas volumetric flow
to Sec. 63.9322(a). rate or duct static rate or duct static
pressure in each pressure for each
duct between a capture device
capture device and according to Sec.
add-on control 63.9306(d);
device inlet in any ii. Reducing the
3-hour period must data to 3-hour
not fall below the block averages; and
average volumetric iii. Maintaining the
flow rate or duct 3-hour average gas
static pressure volumetric flow
limit established rate or duct static
for that capture pressure for each
device according capture device at
Sec. 63.9306(d). or above the gas
volumetric flow
rate or duct static
pressure limit.
------------------------------------------------------------------------
Sec. Table 3 to Subpart PPPPP of Part 63--Requirements for Initial
Compliance Demonstrations
As stated in Sec. 63.9321, you must demonstrate initial compliance
with each emission limitation that applies to you according to the
following table:
[[Page 55]]
----------------------------------------------------------------------------------------------------------------
According to the
For each new or reconstructed You must . . . Using . . . following requirements
affected source complying with . . . . . .
----------------------------------------------------------------------------------------------------------------
1. The CO or THC outlet concentration a. Demonstrate CO or i. EPA Methods 3A and You must demonstrate
emission limitation. THC emissions are 20 10 of appendix A to 40 that the outlet
ppmvd or less. CFR part 60 for CO concentration of CO or
measurement or EPA THC emissions from the
Method 25A of appendix test cell/stand or
A to 40 CFR part 60 emission control
for THC measurement; device is 20 ppmvd or
or less, corrected to 15
percent O2 content,
using the first 4-hour
rolling average after
a successful
performance
evaluation.
ii. A CEMS for CO or This demonstration is
THC and O2 at the conducted immediately
outlet of the engine following a successful
test cell/stand or performance evaluation
emission control of the CEMS as
device. required in Sec.
63.9320(b). The
demonstration consists
of the first 4-hour
rolling average of
measurements. The CO
or THC concentration
must be corrected to
15 percent O2 content,
dry basis using
Equation 1 in Sec.
63.9320.
----------------------------------------------------------------------------------------------------------------
2. The CO or THC percent reduction a. Demonstrate a i. You must conduct an You must demonstrate
emission limitation. reduction in CO or THC initial performance that the reduction in
of 96 percent or more. test to determine the CO or THC emissions is
capture and control at least 96 percent
efficiencies of the using the first 4-hour
equipment and to rolling average after
establish operating a successful
limits to be achieved performance
on a continuous basis; evaluation. Your inlet
or and outlet
measurements must be
on a dry basis and
corrected to 15
percent O2 content.
ii. A CEMS for CO or This demonstration is
THC and O2 at both the conducted immediately
inlet and outlet of following a successful
the emission control performance evaluation
device. of the CEMS as
required in Sec.
63.9320(b). The
demonstration consists
of the first 4-hour
rolling average of
measurements. The
inlet and outlet CO or
THC concentrations
must be corrected to
15 percent O2 content
using Equation 1 in
Sec. 63.9320. The
reduction in CO or THC
is calculated using
Equation 2 in Sec.
63.9320.
----------------------------------------------------------------------------------------------------------------
Sec. Table 4 to Subpart PPPPP of Part 63--Initial Compliance With
Emission Limitations
As stated in Sec. 63.9330, you must demonstrate initial compliance
with each emission limitation that applies to you according to the
following table:
------------------------------------------------------------------------
You have demonstrated initial
For the . . . compliance if . . .
------------------------------------------------------------------------
1. CO or THC concentration emission The first 4-hour rolling
limitation. average CO or THC
concentration is 20 ppmvd or
less, corrected to 15 percent
O2 content.
------------------------------------------------------------------------
2. CO or THC percent reduction emission The first 4-hour rolling
limitation. average reduction in CO or THC
is 96 percent or more, dry
basis, corrected to 15 percent
O2 content.
------------------------------------------------------------------------
[[Page 56]]
Sec. Table 5 to Subpart PPPPP of Part 63--Continuous Compliance With
Emission Limitations
As stated in Sec. 63.9340, you must demonstrate continuous
compliance with each emission limitation that applies to you according
to the following table:
------------------------------------------------------------------------
For the . . . You must . . . By . . .
------------------------------------------------------------------------
1. CO or THC concentration a. Demonstrate CO or i. Collecting the
emission limitation. THC emissions are CPMS data according
20 ppmvd or less to Sec.
over each 4-hour 63.9306(a),
rolling averaging reducing the
period. measurements to 1-
hour averages; or
ii. Collecting the
CEMS data according
to Sec.
63.9307(a),
reducing the
measurements to 1-
hour averages,
correcting them to
15 percent O2
content, dry basis,
according to Sec.
63.9320;
------------------------------------------------------------------------
2. CO or THC percent a. Demonstrate a i. Collecting the
reduction emission reduction in CO or CPMS data according
limitation. THC of 96 percent to Sec.
or more over each 4- 63.9306(a),
hour rolling reducing the
averaging period. measurements to 1-
hour averages; or
ii. Collecting the
CEMS data according
to Sec.
63.9307(b),
reducing the
measurements to 1-
hour averages,
correcting them to
15 percent O2
content, dry basis,
calculating the CO
or THC percent
reduction according
to Sec. 63.9320.
------------------------------------------------------------------------
Sec. Table 6 to Subpart PPPPP of Part 63--Requirements for Reports
As stated in Sec. 63.9350, you must submit each report that applies
to you according to the following table:
------------------------------------------------------------------------
If you own or operate a new
or reconstructed affected
source that must comply with The report must You must submit the
emission limitations, you contain . . . report . . .
must submit a . . .
------------------------------------------------------------------------
1. Compliance report........ a. If there are no Semiannually,
deviations from the according to the
emission requirements in
limitations that Sec. 63.9350.
apply to you, a
statement that
there were no
deviations from the
emission
limitations during
the reporting
period.
b. If there were no Semiannually,
periods during according to the
which the CEMS or requirements in
CPMS were out of Sec. 63.9350.
control as
specified in Sec.
63.8(c)(7), a
statement that
there were no
periods during
which the CEMS or
CPMS was out of
control during the
reporting period.
c. If you have a Semiannually,
deviation from any according to the
emission limitation requirements in
during the Sec. 63.9350.
reporting period,
the report must
contain the
information in Sec.
63.9350(c).
d. If there were Semiannually,
periods during according to the
which the CEMS or requirements in
CPMS were out of Sec. 63.9350.
control, as
specified in Sec.
63.8(c)(7), that
report must contain
the information in
Sec. 63.9350(d).
e. If you had an SSM Semiannually,
of a control device according to the
or associated requirements in
monitoring Sec. 63.9350.
equipment during
the reporting
period, the report
must include the
information in Sec.
63.10(d)(5)(i).
------------------------------------------------------------------------
Sec. Table 7 to Subpart PPPPP of Part 63--Applicability of General
Provisions to Subpart PPPPP
As stated in 63.9365, you must comply with the General Provisions in
Sec. Sec. 63.1 through 63.15 that apply to you according to the
following table:
[[Page 57]]
----------------------------------------------------------------------------------------------------------------
Applies to subpart
Citation Subject Brief description PPPPP
----------------------------------------------------------------------------------------------------------------
Sec. 63.1(a)(1).................... Applicability.......... General applicability Yes. Additional terms
of the General defined in Sec.
Provisions. 63.9375.
Sec. 63.1(a)(2)-(4)................ Applicability.......... Applicability of source Yes.
categories.
Sec. 63.1(a)(5).................... [Reserved].............
Sec. 63.1(a)(6)-(7)................ Applicability.......... Contact for source Yes.
category information;
extension of
compliance through
early reduction.
Sec. 63.1(a)(8).................... Applicability.......... Establishment of State No. Refers to State
rules or programs. programs.
Sec. 63.1(a)(9).................... [Reserved].............
Sec. 63.1(a)(10)-(14).............. Applicability.......... Explanation of time Yes.
periods, postmark
deadlines.
Sec. 63.1(b)(1).................... Applicability.......... Initial applicability.. Yes. Subpart PPPPP
clarifies
applicability at Sec.
63.9285.
Sec. 63.1(b)(2).................... Applicability.......... Title V operating Yes. All major affected
permit-reference to sources are required
part 70. to obtain a Title V
permit.
Sec. 63.1(b)(3).................... Applicability.......... Record of applicability Yes.
determination.
Sec. 63.1(c)(1).................... Applicability.......... Applicability after Yes. Subpart PPPPP
standards are set. clarifies the
applicability of each
paragraph of subpart A
to sources subject to
subpart PPPPP.
Sec. 63.1(c)(2).................... Applicability.......... Title V permit No. Area sources are
requirement for area not subject to subpart
sources. PPPPP.
Sec. 63.1(c)(3).................... [Reserved].............
Sec. 63.1(c)(4).................... Applicability.......... Extension of compliance No. Existing sources
for existing sources. are not covered by the
substantive control
requirements of
subpart PPPPP.
Sec. 63.1(c)(5).................... Applicability.......... Notification Yes.
requirements for an
area source becoming a
major source.
Sec. 63.1(d)....................... [Reserved].............
Sec. 63.1(e)....................... Applicability.......... Applicability of permit Yes.
program before a
relevant standard has
been set.
Sec. 63.2.......................... Definitions............ Definitions for Part 63 Yes. Additional
standards. definitions are
specified in Sec.
63.9375.
Sec. 63.3.......................... Units and Abbreviations Units and abbreviations Yes.
for Part 63 standards.
Sec. 63.4.......................... Prohibited Activities.. Prohibited activities; Yes.
compliance date;
circumvention,
severability.
Sec. 63.5(a)....................... Construction/ Construction and Yes.
Reconstruction. reconstruction--applic
ability.
Sec. 63.5(b)(1).................... Construction/ Requirements upon Yes.
Reconstruction. construction or
reconstruction.
Sec. 63.5(b)(2).................... [Reserved].
Sec. 63.5(b)(3).................... Construction/ Approval of Yes.
Reconstruction. construction.
Sec. 63.5(b)(4).................... Construction/ Notification of Yes.
Reconstruction. construction.
Sec. 63.5(b)(5).................... Construction/ Compliance............. Yes.
Reconstruction.
Sec. 63.5(b)(6).................... Construction/ Addition of equipment.. Yes.
Reconstruction.
Sec. 63.5(c)....................... [Reserved]
Sec. 63.5(d)....................... Construction/ Application for Yes.
Reconstruction. construction
reconstruction.
Sec. 63.5(e)....................... Construction/ Approval of Yes.
Reconstruction. construction or
reconstruction.
Sec. 63.5(f)....................... Construction/ Approval of Yes.
Reconstruction. construction or
reconstruction based
on prior State review.
Sec. 63.6(a)....................... Applicability.......... Applicability of Yes.
standards and
monitoring
requirements.
Sec. 63.6(b)(1)-(2)................ Compliance Dates for Standards apply at Yes.
New and Reconstructed effective date; 3
Sources. years after effective
date; upon startup; 10
years after
construction or
reconstruction
commences for 112(f).
[[Page 58]]
Sec. 63.6(b)(3).................... Compliance Dates for Compliance dates for No. Compliance is
New and Reconstructed sources constructed or required by startup or
Sources. reconstructed before effective date.
effective date.
Sec. 63.6(b)(4).................... Compliance Dates for Compliance dates for Yes.
New and Reconstructed sources also subject
Sources. to Sec. 112(f)
standards.
Sec. 63.6(b)(5).................... Compliance Dates for Notification........... Yes.
New and Reconstructed
Sources.
Sec. 63.6(b)(6).................... [Reserved].
Sec. 63.6(b)(7).................... Compliance Dates for Compliance dates for Yes.
New and Reconstructed new and reconstructed
Sources. area sources that
become major.
Sec. 63.6(c)(1)-(2)................ Compliance Dates for Effective date No. Existing sources
Existing Sources. establishes compliance are not covered by the
date. substantive control
requirements of
subpart PPPPP.
Sec. 63.6(c)(3)-(4)................ [Reserved].
Sec. 63.6(c)(5).................... Compliance Dates for Compliance dates for Yes. If the area source
Existing Sources. existing area sources become a major source
that becomes major. by addition or
reconstruction, the
added or reconstructed
portion will be
subject to subpart
PPPPP.
Sec. 63.6(d)....................... [Reserved].
Sec. 63.6(e)(1)-(2)................ Operation and Operation and Yes. Except that you
Maintenance maintenance. are not required to
Requirements. have an SSMP for
control devices and
associated monitoring
equipment.
Sec. 63.6(e)(3).................... SSMP................... 1. Requirement for SSM Yes. You must develop
and SSMP. an SSMP for each
2. Content of SSMP..... control device and
associated monitoring
equipment.
Sec. 63.6(f)(1).................... Compliance Except You must comply with Yes, but you must
During SSM. emission standards at comply with emission
all times except standards at all times
during SSM of control except during SSM of
devices or associated control devices and
monitoring equipment. associated monitoring
equipment only.
Sec. 63.6(f)(2)-(3)................ Methods for Determining Compliance based on Yes.
Compliance. performance test,
operation and
maintenance plans,
records, inspection.
Sec. 63.6(g)(1)-(3)................ Alternative Standard... Procedures for getting Yes.
an alternative
standard.
Sec. 63.6(h)....................... Opacity/Visible Requirements for No. Subpart PPPPP does
Emission (VE) opacity/VE standards. not establish opacity/
Standards. VE standards and does
not require continuous
opacity monitoring
systems (COMS).
Sec. 63.6(i)(1)-(14)............... Compliance Extension... Procedures and criteria No. Compliance
for Administrator to extension provisions
grant compliance apply to existing
extension. sources, which do not
have emission
limitations in subpart
PPPPP.
Sec. 63.6(j)....................... Presidential Compliance President may exempt Yes.
Exemption. source category from
requirement to comply
with rule.
Sec. 63.7(a)(1)-(2)................ Performance Test Dates. Dates for conducting Yes.
initial performance
testing and other
compliance
demonstrations: Must
conduct within 180
days after first
subject to rule.
Sec. 63.7(a)(3).................... Section 114 Authority.. Administrator may Yes.
require a performance
test under CAA Section
114 at any time.
Sec. 63.7(b)(1).................... Notification Must notify Yes.
Performance Test. Administrator 60 days
before the test.
[[Page 59]]
Sec. 63.7(b)(2).................... Notification of If have to reschedule Yes.
Rescheduling. performance test, must
notify Administrator 5
days before schedule
date of rescheduled
date.
Sec. 63.7(c)....................... Quality Assurance/Test 1. Requirement to Yes.
Plan. submit site-specific
test plan 60 days
before the test or on
date Administrator
agrees with.
2. Test plan approval Yes.
procedures.
3. Performance audit Yes.
requirements.
4. Internal and Yes.
external QA procedures
for testing.
Sec. 63.7(d)....................... Testing Facilities..... Requirements for Yes.
testing facilities.
Sec. 63.7(e)(1).................... Conditions for Performance tests must Yes.
Conducting Performance be conducted under
Tests. representative
conditions; cannot
conduct performance
tests during SSM; not
a violation to exceed
standard during SSM.
Sec. 63.7(e)(2).................... Conditions for Must conduct according Yes.
Conducting Performance to rule and EPA test
Tests. methods unless
Administrator approves
alternative.
Sec. 63.7(e)(3).................... Test Run Duration...... 1. Must have three test Yes.
runs of at least 1
hour each.
2. Compliance is based Yes.
on arithmetic mean of
three runs.
3. Conditions when data Yes.
from an additional
test run can be used.
Sec. 63.7(e)(4).................... Other Performance Administrator may Yes.
Testing. require other testing
under section 114 of
the CAA.
Sec. 63.7(f)....................... Alternative Test Method Procedures by which Yes.
Administrator can
grant approval to use
an alternative test
method.
Sec. 63.7(g)....................... Performance Test Data 1. Must include raw Yes.
Analysis. data in performance
test report.
2. Must submit Yes.
performance test data
60 days after end of
test with the
Notification of
Compliance Status.
3. Keep data for 5 Yes.
years.
Sec. 63.7(h)....................... Waiver of Tests........ Procedures for Yes.
Administrator to waive
performance test.
Sec. 63.8(a)(1).................... Applicability of Subject to all Yes. Subpart PPPPP
Monitoring monitoring contains specific
Requirements. requirements in requirements for
standard. monitoring at Sec.
63.9325.
Sec. 63.8(a)(2).................... Performance Performance Yes.
Specifications. Specifications in
appendix B of part 60
apply.
Sec. 63.8(a)(3).................... [Reserved]
Sec. 63.8(a)(4).................... Monitoring with Flares. Unless your rule says No. Subpart PPPPP does
otherwise, the not have monitoring
requirements for requirements for
flares in 63.11 apply. flares.
Sec. 63.8(b)(1).................... Monitoring............. Must conduct monitoring Yes.
according to standard
unless Administrator
approves alternative.
Sec. 63.8(b)(2)-(3)................ Multiple Effluents and 1. Specific Yes.
Multiple Monitoring requirements for
Systems. installing monitoring
systems.
[[Page 60]]
2. Must install on each Yes.
effluent before it is
combined and before it
is released to the
atmosphere unless
Administrator approves
otherwise.
3. If more than one Yes.
monitoring system on
an emission point,
must report all
monitoring system
results, unless one
monitoring system is a
backup.
Sec. 63.8(c)(1).................... Monitoring System Maintain monitoring Yes.
Operation and system in a manner
Maintenance. consistent with good
air pollution control
practices.
Sec. 63.8(c)(1)(i)................. Routine and predictable 1. Keep parts for Yes.
CMS malfunctions. routine repairs of CMS
readily available.
2. Reporting
requirements for SSM
when action is
described in SSMP.
3. Reporting Yes.
requirements for SSM
when action is
described in SSMP.
Sec. 63.8(c)(1)(ii)................ SSM of CMS Not in SSMP. Reporting requirements Yes.
for SSM of CMS when
action is not
described in SSMP.
Sec. 63.8(c)(1)(iii)............... Compliance with 1. How Administrator Yes.
Operation and determines if source
Maintenance complying with
Requirements. operation and
maintenance
requirements.
2. Review of source O&M
procedures, records,
manufacturer's
instructions and
recommendations, and
inspection.
Sec. 63.8(c)(2)-(3)................ Monitoring System 1. Must install to get Yes.
Installation. representative
emission of parameter
measurements.
2. Must verify Yes.
operational status
before or at
performance test.
Sec. 63.8(c)(4).................... Continuous Monitoring 1. CMS must be No. Follow specific
System (CMS) operating except requirements in Sec.
Requirements. during breakdown, out 63.9335(a) and (b) of
of control, repair, subpart PPPPP.
maintenance, and high-
level calibration
drifts.
2. COMS must have a No. Follow specific
minimum of one cycle requirements in Sec.
of sampling and 63.9335(a) and (b) of
analysis for each subpart PPPP.
successive 10-second
period and one cycle
of data recording for
each successive 6-
minute period.
3. CEMS must have a No. Follow specific
minimum of one cycle requirements in Sec.
of operation for each 63.9335(a) and (b) of
successive 15-minute subpart PPPPP.
period.
Sec. 63.8(c)(5).................... COMS Minimum Procedures COMS minimum procedures No. Subpart PPPPP does
not have opacity/VE
standards.
Sec. 63.8(c)(6)-(8)................ CMS Requirements....... Zero and high-level Yes. Except that PPPP
calibration check does not require COMS.
requirements, out-of-
control periods.
Sec. 63.8(d)....................... CMS Quality Control.... 1. Requirements for CMS Yes.
quality control,
including calibration,
etc.
2. Must keep quality Yes.
control plan on record
for 5 years. Keep old
versions for 5 years
after revisions.
Sec. 63.8(e)....................... CMS Performance Notification, Yes. Except for Sec.
Evaluation. performance evaluation 63.8(e)(5)(ii), which
test plan, reports. applies to COMS.
[[Page 61]]
Sec. 63.8(f)(1)-(5)................ Alternative Monitoring Procedures for Yes.
Method. Administrator to
approve alternative
monitoring.
Sec. 63.8(f)(6).................... Alternative to Relative Procedures for Yes.
Accuracy Test. Administrator to
approve alternative
relative accuracy
tests for CEMS.
Sec. 63.8(g)....................... Data Reduction......... 1. COMS 6-minute Yes. Except that
averages calculated provisions for COMS
over at least 36 are not applicable.
evenly spaced data Averaging periods for
points. demonstrating
2. CEMS 1-hour averages compliance are
computed over at least specified at Sec.
4 equally spaced data 63.9340.
points.
Sec. 63.8(g)(5).................... Data Reduction......... Data that cannot be No. Specific language
used in computing is located at Sec.
averages for CEMS and 63.9335(a).
COMS.
Sec. 63.9(a)....................... Notification Applicability and State Yes.
Requirements. delegation.
Sec. 63.9(b)(1)-(5)................ Initial Notifications.. 1. Submit notification Yes.
subject 120 days after
effective date.
2. Notification of Yes.
intent to construct/
reconstruct;
notification of
commencement of
construct/
reconstruct;
notification of
startup.
3. Contents of each.... Yes.
Sec. 63.9(c)....................... Request for Compliance Can request if cannot No. Compliance
Extension. comply by date or if extensions do not
installed BACT/LAER. apply to new or
reconstructed sources.
Sec. 63.9(d)....................... Notification of Special For sources that Yes.
Compliance commence construction
Requirements for New between proposal and
Source. promulgation and want
to comply 3 years
after effective date.
Sec. 63.9(e)....................... Notification of Notify Administrator 60 No. Subpart PPPPP does
Performance Test. days prior. not require
performance testing.
Sec. 63.9(f)....................... Notification of Opacity/ Notify Administrator 30 No. Subpart PPPPP does
VE Test. days prior. not have opacity/VE
standards.
Sec. 63.9(g)(1).................... Additional Notification of Yes.
Notifications when performance evaluation.
Using CMS.
Sec. 63.9(g)(2).................... Additional Notification of use of No. Subpart PPPPP does
Notifications when COMS data. not contain opacity or
Using CMS. VE standards.
Sec. 63.9(g)(3).................... Additional Notification that Yes. If alternative is
Notifications when exceeded criterion for in use.
Using CMS. relative accuracy.
Sec. 63.9(h)(1)-(6)................ Notification of 1. Contents............ Yes.
Compliance Status.
2. Due 60 days after Yes.
end of performance
test or other
compliance
demonstration, except
for opacity/VE, which
are due 30 days after.
3. When to submit to Yes.
Federal vs. State
authority.
Sec. 63.9(i)....................... Adjustment of Submittal Procedures for Yes.
Deadlines. Administrator to
approve change in when
notifications must be
submitted.
Sec. 63.9(j)....................... Change in Previous Must submit within 15 Yes.
Information. days after the change.
Sec. 63.10(a)...................... Recordkeeping/Reporting 1. Applies to all, Yes.
unless compliance
extension.
2. When to submit to Yes.
Federal vs. State
authority.
3. Procedures for Yes.
owners of more than
one source.
Sec. 63.10(b)(1)................... Recordkeeping/Reporting 1. General requirements Yes.
2. Keep all records Yes.
readily available.
3. Keep for 5 years.... Yes.
Sec. 63.10(b)(2)(i)-(v)............ Records Related to SSM. 1. Occurrence of each Yes.
of operation (process
equipment).
[[Page 62]]
2. Occurrence of each Yes.
malfunction of air
pollution equipment.
3. Maintenance on air Yes.
pollution control
equipment.
4. Actions during SSM.. Yes.
5. All information Yes.
necessary to
demonstrate
conformance with the
SSMP.
Sec. 63.10(b)(2)(vi)-(xi).......... CMS Records............ Malfunctions, Yes.
inoperative, out of
control.
Sec. 63.10(b)(2)(xii).............. Records................ Records when under Yes.
waiver.
Sec. 63.10(b)(2)(xiii)............. Records................ Records when using Yes.
alternative to
relative accuracy test.
Sec. 63.10(b)(2)(xiv).............. Records................ All documentation Yes.
supporting initial
notification and
notification of
compliance status.
Sec. 63.10(b)(3)................... Records................ Applicability Yes.
determinations.
Sec. 63.10(c)(1)-(6), (9)-(15)..... Records................ Additional records for Yes.
CEMS.
Sec. 63.10(c)(7)-(8)............... Records................ Records of excess No. Specific language
emissions and is located at Sec.
parameter monitoring 63.9355 of subpart
exceedances for CMS. PPPPP.
Sec. 63.10(d)(1)................... General Reporting Requirement to report.. Yes.
Requirements.
Sec. 63.10(d)(2)................... Report of Performance When to submit to Yes.
Test Results. Federal or State
authority.
Sec. 63.10(d)(3)................... Reporting Opacity or VE What to report and when No. Subpart PPPPP does
Observations. not have opacity/VE
standards.
Sec. 63.10(d)(4)................... Progress Reports....... Must submit progress No. Compliance
reports on schedule if extensions do not
under compliance apply to new or
extension. reconstructed sources.
Sec. 63.10(d)(5)................... SSM Reports............ Contents and submission Yes.
Sec. 63.10(e)(1) and (2)(i)........ Additional CMS Reports. Additional CMS reports. Yes.
Sec. 63.10(e)(2)(ii)............... Additional CMS Reports. COMS-related report.... No. Subpart PPPPP does
not require COMS.
Sec. 63.10(e)(3)................... Additional CMS Reports. Excess emissions and No. Specific language
parameter exceedances is located in Sec.
reports. 63.9350 of subpart
PPPPP.
Sec. 63.10(e)(4)................... Additional CMS Reports. Reporting COMS data.... No. Subpart PPPPP does
not require COMS.
Sec. 63.10(f)...................... Waiver for Procedures for Yes.
Recordkeeping/ Administrator to waive.
Reporting.
Sec. 63.11......................... Control Device Requirements for flares No. Subpart PPPPP does
Requirements. not specify use of
flares for compliance.
Sec. 63.12......................... State Authority and State authority to Yes.
Delegations. enforce standards.
Sec. 63.13......................... Addresses of State Air Addresses where Yes.
Pollution Control reports,
Offices and EPA notifications, and
Regional Offices. requests are sent.
Sec. 63.14......................... Incorporations by Test methods Yes. ASTM D 6522-00 and
Reference. incorporated by ANSI/ASME PTC 19.10-
reference. 1981 (incorporated by
reference-See Sec.
63.14).
Sec. 63.15......................... Availability of Public and confidential Yes.
Information and information.
Confidentiality.
----------------------------------------------------------------------------------------------------------------
[68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]
Subpart QQQQQ_National Emission Standards for Hazardous Air Pollutants
for Friction Materials Manufacturing Facilities
Source: 67 FR 64506, Oct. 18, 2002, unless otherwise noted.
What This Subpart Covers
Sec. 63.9480 What is the purpose of this subpart?
This subpart establishes national emission standards for hazardous
air pollutants (NESHAP) for friction materials manufacturing facilities
that use
[[Page 63]]
a solvent-based process. This subpart also establishes requirements to
demonstrate initial and continuous compliance with all applicable
emission limitations in this subpart.
Sec. 63.9485 Am I subject to this subpart?
(a) You are subject to this subpart if you own or operate a friction
materials manufacturing facility (as defined in Sec. 63.9565) that is
(or is part of) a major source of hazardous air pollutants (HAP)
emissions on the first compliance date that applies to you, as specified
in Sec. 63.9495. Your friction materials manufacturing facility is a
major source of HAP if it emits or has the potential to emit any single
HAP at a rate of 9.07 megagrams (10 tons) or more per year or any
combination of HAP at a rate of 22.68 megagrams (25 tons) or more per
year.
(b) The requirements in this subpart do not apply to research and
development facilities, as defined in section 112(c)(7) of the Clean Air
Act.
Sec. 63.9490 What parts of my plant does this subpart cover?
(a) This subpart applies to each new, reconstructed, or existing
affected source at your friction materials manufacturing facility.
(b) The affected source covered by this subpart is each new,
reconstructed, or existing solvent mixer (as defined in Sec. 63.9565)
at your friction materials manufacturing facility.
(c) A solvent mixer at your friction materials manufacturing
facility is new if you commence construction of the solvent mixer after
October 18, 2002. An affected source is reconstructed if it meets the
definition of ``reconstruction'' in Sec. 63.2, and reconstruction is
commenced after October 18, 2002.
(d) A solvent mixer at your friction materials manufacturing
facility is existing if it is not new or reconstructed.
Sec. 63.9495 When do I have to comply with this subpart?
(a) If you have an existing solvent mixer, you must comply with each
of the requirements for existing sources no later than October 18, 2005,
except as otherwise specified at this section and Sec. Sec. 63.9505,
63.9530, 63.9540, 63.9545, and Table 1 to this subpart.
(b) If you have a new or reconstructed solvent mixer for which
construction or reconstruction commenced after October 18, 2002, but
before May 4, 2018, you must comply with the requirements for new and
reconstructed sources upon initial startup, except as otherwise
specified at this section and Sec. Sec. 63.9505, 63.9530, 63.9540,
63.9545, and Table 1 to this subpart.
(c) If your friction materials manufacturing facility is an area
source that increases its emissions or its potential to emit such that
it becomes a (or part of a) major source of HAP emissions, then
paragraphs (c)(1) and (2) of this section apply.
(1) For any portion of the area source that becomes a new or
reconstructed affected source, you must comply with the requirements for
new and reconstructed sources upon startup or no later than October 18,
2002, whichever is later.
(2) For any portion of the area source that becomes an existing
affected source, you must comply with the requirements for existing
sources no later than 1 year after the area source becomes a major
source or no later than October 18, 2005, whichever is later.
(d) You must meet the notification and schedule requirements in
Sec. 63.9535. Several of the notifications must be submitted before the
compliance date for your affected source.
(e) Solvent mixers constructed or reconstructed after May 3, 2018,
must be in compliance with this subpart at startup or by February 8,
2019, whichever is later.
[67 FR 64506, Oct. 18, 2002, as amended at 84 FR 2750, Feb. 8, 2019]
Emission Limitations
Sec. 63.9500 What emission limitations must I meet?
(a) For each new, reconstructed, or existing large solvent mixer at
your friction materials manufacturing facility, you must limit HAP
solvent emissions to the atmosphere to no more than 30 percent of that
which would otherwise be emitted in the absence of
[[Page 64]]
solvent recovery and/or solvent substitution, based on a 7-day block
average.
(b) For each new, reconstructed, or existing small solvent mixer at
your friction materials manufacturing facility, you must limit HAP
solvent emissions to the atmosphere to no more than 15 percent of that
which would otherwise be emitted in the absence of solvent recovery and/
or solvent substitution, based on a 7-day block average.
General Compliance Requirements
Sec. 63.9505 What are my general requirements for complying with this subpart?
(a) Before August 7, 2019, for each existing source and each new or
reconstructed source for which construction or reconstruction commenced
after October 18, 2002, but before May 4, 2018, you must be in
compliance with the emission limitations in this subpart at all times,
except during periods of startup, shutdown, or malfunction. On and after
August 7, 2019, for each such source you must be in compliance with the
emission limitations in this subpart at all times. For new and
reconstructed sources for which construction or reconstruction commenced
after May 3, 2018, you must be in compliance with the emissions
limitations in this subpart at all times.
(b) Before August 7, 2019, for each existing source, and for each
new or reconstructed source for which construction or reconstruction
commenced after October 18, 2002, but before May 4, 2018, you must
always operate and maintain your affected source, including air
pollution control and monitoring equipment, according to the provisions
in Sec. 63.6(e)(1)(i). On and after August 7, 2019 for each such
source, and after February 8, 2019 for new and reconstructed sources for
which construction or reconstruction commenced after May 3, 2018, at all
times you must operate and maintain any affected source, including
associated air pollution control equipment and monitoring equipment, in
a manner consistent with safety and good air pollution control practices
for minimizing emissions. The general duty to minimize emissions does
not require you to make any further efforts to reduce emissions if
levels required by the applicable standard have been achieved.
Determination of whether a source is operating in compliance with
operation and maintenance requirements will be based on information
available to the Administrator which may include, but is not limited to,
monitoring results, review of operation and maintenance procedures,
review of operation and maintenance records, and inspection of the
source.
(c) Before August 7, 2019, for each existing source, and for each
new or reconstructed source for which construction commenced after
October 18, 2002, but before May 4, 2018, you must develop a written
startup, shutdown, and malfunction plan according to the provisions in
Sec. 63.6(e)(3). For each such source, a startup, shutdown, and
malfunction plan is not required on and after August 7, 2019. No
startup, shutdown, and malfunction plan is required for any new or
reconstructed source for which construction or reconstruction commenced
after May 3, 2018.
[84 FR 2750, Feb. 8, 2019]
Initial Compliance Demonstration Requirements
Sec. 63.9510 By what date must I conduct my initial compliance
demonstration?
(a) If you use a solvent recovery system and/or solvent
substitution, you must conduct your initial compliance demonstration
within 7 calendar days after the compliance date that is specified for
your source in Sec. 63.9495.
(b) If you use a control technique other than a solvent recovery
system and/or solvent substitution, you must comply with the provisions
in Sec. 63.9570.
Sec. 63.9515 How do I demonstrate initial compliance with the
emission limitation that applies to me?
(a) You have demonstrated initial compliance for each new,
reconstructed, or existing large solvent mixer subject to the emission
limitation in Sec. 63.9500(a) if the HAP solvent discharged to the
atmosphere during the first 7 days after the compliance date, determined
according to the provisions in Sec. 63.9520, does not exceed a 7-day
block average of 30 percent of that which would otherwise be emitted in
[[Page 65]]
the absence of solvent recovery and/or solvent substitution.
(b) You have demonstrated initial compliance for each new,
reconstructed, or existing small solvent mixer subject to the emission
limitation in Sec. 63.9500(b) if the HAP solvent discharged to the
atmosphere during the first 7 days after the compliance date, determined
according to the provisions in Sec. 63.9520, does not exceed a 7-day
block average of 15 percent of that which would otherwise be emitted in
the absence of solvent recovery and/or solvent substitution.
(c) You must submit a notification of compliance status containing
the results of the initial compliance demonstration according to Sec.
63.9535(e).
Sec. 63.9520 What procedures must I use to demonstrate initial
compliance?
(a) If you use a solvent recovery system, you must use the
procedures in paragraphs (a)(1) through (8) of this section to
demonstrate initial compliance with the emission limitations in Sec.
63.9500(a) and (b).
(1) Record the date and time of each mix batch.
(2) Record the identity of each mix batch using a unique batch ID,
as defined in Sec. 63.9565.
(3) Measure and record the weight of HAP solvent loaded into the
solvent mixer for each mix batch.
(4) Measure and record the weight of HAP solvent recovered for each
mix batch.
(5) If you use a solvent recovery system, you must determine the
percent of HAP solvent discharged to the atmosphere for each mix batch
according to Equation 1 of this section as follows:
(Eq. 1)
[GRAPHIC] [TIFF OMITTED] TR18OC02.002
Where:
Pb = Percent of HAP solvent discharged to the atmosphere for
each mix batch, percent;
Srec = Weight of HAP solvent recovered for each mix batch,
lb;
Smix = Weight of HAP solvent loaded into the solvent mixer
for each mix batch, lb.
(6) If you use solvent substitution for a mix batch, you must record
the use of a non-HAP material as a substitute for a HAP solvent for that
mix batch and assign a value of 0 percent to the percent of HAP solvent
discharged to the atmosphere for that mix batch (Pb).
(7) Determine the 7-day block average percent of HAP solvent
discharged to the atmosphere according to Equation 2 of this section as
follows:
[GRAPHIC] [TIFF OMITTED] TR18OC02.003
Where:
%P7 = 7-day block average percent of HAP solvent discharged
to the atmosphere, percent;
i = mix batch;
n = number of mix batches in 7-day block average.
(8) Have valid data for at least 90 percent of the mix batches over
the 7-day averaging period.
(b) If you use a control technique other than a solvent recovery
system and/or solvent substitution, you may apply to EPA for approval to
use an alternative method of demonstrating compliance with the emission
limitations for solvent mixers in Sec. 63.9500(a) and (b), as provided
in Sec. 63.9570.
Sec. 63.9525 What are the installation, operation, and maintenance
requirements for my weight measurement device?
(a) If you use a solvent recovery system, you must install, operate,
and maintain a weight measurement device to measure the weight of HAP
solvent loaded into the solvent mixer and the weight of HAP solvent
recovered for each mix batch.
(b) For each weight measurement device required by this section, you
must develop and submit for approval a site-specific monitoring plan
that addresses the requirements of paragraphs (b)(1) through (6) of this
section:
(1) Procedures for installing the weight measurement device;
(2) The minimum accuracy of the weight measurement device in pounds
and as a percent of the average weight of solvent to be loaded into the
solvent mixer;
(3) Site-specific procedures for how the measurements will be made;
[[Page 66]]
(4) How the measurement data will be recorded, reduced, and stored;
(5) Procedures and acceptance criteria for calibration of the weight
measurement device; and
(6) How the measurement device will be maintained, including a
routine maintenance schedule and spare parts inventory list.
(c) The site-specific monitoring plan required in paragraph (b) of
this section must include, at a minimum, the requirements of paragraphs
(c)(1) through (3) of this section:
(1) The weight measurement device must have a minimum accuracy of
0.05 kilograms (0.1 pounds)
or 1 percent of the average weight of solvent to
be loaded into the solvent mixer, whichever is greater.
(2) An initial multi-point calibration of the weight measurement
device must be made using 5 points spanning the expected range of weight
measurements before the weight measurement device can be used. The
manufacturer's calibration results can be used to meet this requirement.
(3) Once per day, an accuracy audit must be made using a single
Class F calibration weight that corresponds to 20 to 80 percent of the
average weight of solvent to be loaded into the solvent mixer. If the
weight measurement device cannot reproduce the value of the calibration
weight within 0.05 kilograms (0.1 pounds) or
1 percent of the average weight of solvent to be
loaded into the solvent mixer, whichever is greater, the scale must be
recalibrated before being used again. The recalibration must be
performed with at least five Class F calibration weights spanning the
expected range of weight measurements.
(d) You must operate and maintain the weight measurement device
according to the site-specific monitoring plan.
(e) You must maintain records of all maintenance activities,
calibrations, and calibration audits.
Continuous Compliance Requirements
Sec. 63.9530 How do I demonstrate continuous compliance with the
emission limitation that applies to me?
(a) If you use a solvent recovery system and/or solvent
substitution, you must demonstrate continuous compliance with the
emission limitations for solvent mixers in Sec. 63.9500(a) and (b)
according to the provisions in paragraphs (a)(1) through (3) of this
section.
(1) For existing sources and for new or reconstructed sources for
which construction or reconstruction commenced after October 18, 2002,
but before May 4, 2018, before August 7, 2019, except for during
malfunctions of your weight measurement device and associated repairs,
you must collect and record the information required in Sec.
63.9520(a)(1) through (8) at all times that the affected source is
operating and record all information needed to document conformance with
these requirements. On and after August 7, 2019 for such sources, and
after February 8, 2019 for new or reconstructed sources that commenced
construction after May 3, 2018, you must collect and record the
information required in Sec. 63.9520(a)(1) through (8) at all times
that the affected source is operating and record all information needed
to document conformance with these requirements.
(2) For new, reconstructed, or existing large solvent mixers,
maintain the 7-day block average percent of HAP solvent discharged to
the atmosphere at or below 30 percent of that which would otherwise be
emitted in the absence of solvent recovery and/or solvent substitution.
(3) For new, reconstructed, or existing small solvent mixers,
maintain the 7-day block average percent of HAP solvent discharged to
the atmosphere at or below 15 percent of that which would otherwise be
emitted in the absence of solvent recovery and/or solvent substitution.
(b) If you use a control technique other than a solvent recovery
system and/or solvent substitution, you must demonstrate continuous
compliance with the emission limitations for solvent mixers in Sec.
63.9500(a) and (b) according to the provisions in Sec. 63.9570.
(c) You must report each instance in which you did not meet the
emission limitations for solvent mixers in Sec. 63.9500(a) and (b).
This includes periods of startup, shutdown, or malfunction. These
instances are deviations from the emission limitations in this
[[Page 67]]
subpart. These deviations must be reported according to the requirements
in Sec. 63.9540.
(d) [Reserved]
(e) For existing sources and for new or reconstructed sources which
commenced construction or reconstruction after October 18, 2002, but
before May 4, 2018, before August 7, 2019, consistent with Sec. Sec.
63.6(e) and 63.7(e)(1), deviations that occur during a period of
startup, shutdown, or malfunction are not violations if you demonstrate
to the Administrator's satisfaction that you were operating in
accordance with Sec. 63.6(e)(1). The Administrator will determine
whether deviations that occur during a period of startup, shutdown, or
malfunction are violations, according to the provisions in Sec.
63.6(e). On and after August 7, 2019 for such sources, and after
February 8, 2019 for new or reconstructed sources which commence
construction or reconstruction after May 3, 2018, all deviations are
considered violations.
[67 FR 64506, Oct. 18, 2002, as amended at 71 FR 20470, Apr. 20, 2006;
84 FR 2751, Feb. 8, 2019]
Notifications, Reports, and Records
Sec. 63.9535 What notifications must I submit and when?
(a) You must submit all of the notifications in Sec. Sec.
63.8(f)(4) and 63.9(b), (c), (d), and (h) that apply to you by the
specified dates.
(b) If you use a control technique other than a solvent recovery
system and/or solvent substitution, you must comply with the provisions
in Sec. 63.9570.
(c) As specified in Sec. 63.9(b)(2), if you start up your affected
source before October 18, 2002, you must submit your initial
notification no later than 120 calendar days after October 18, 2002.
(d) As specified in Sec. 63.9(b)(3), if you start up your new
affected source on or after October 18, 2002, you must submit your
initial notification no later than 120 calendar days after you become
subject to this subpart.
(e) You must submit a notification of compliance status according to
Sec. 63.9(h)(2)(ii). You must submit the notification of compliance
status before the close of business on the 30th calendar day following
the completion of the initial compliance demonstration.
Sec. 63.9540 What reports must I submit and when?
(a) Unless the Administrator has approved a different schedule, you
must submit each semiannual compliance report according to the
requirements in paragraphs (a)(1) through (5) of this section.
(1) The first compliance report must cover the period beginning on
the compliance date that is specified for your affected source in Sec.
63.9495 and ending on June 30 or December 31, whichever date comes first
after the compliance date that is specified for your source in Sec.
63.9495.
(2) The first compliance report must be postmarked or delivered no
later than July 31 or January 31, whichever date comes first after your
first compliance report is due.
(3) Each subsequent compliance report must cover the semiannual
reporting period from January 1 through June 30 or the semiannual
reporting period from July 1 through December 31.
(4) Each subsequent compliance report must be postmarked or
delivered no later than July 31 or January 31, whichever date comes
first after the end of the semiannual reporting period.
(5) For each affected source that is subject to permitting
regulations pursuant to 40 CFR part 70 or 71 of this chapter, and if the
permitting authority has established dates for submitting semiannual
reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR
71.6(a)(3)(iii)(A) of this chapter, you may submit the first and
subsequent compliance reports according to the dates the permitting
authority has established instead of according to the dates in
paragraphs (a)(1) through (4) of this section.
(b) Each compliance report must include the information in
paragraphs (b)(1) through (3) of this section, and if applicable,
paragraphs (b)(4) through (6) of this section.
(1) Company name and address.
(2) Statement by a responsible official, with the official's name,
title, and
[[Page 68]]
signature, certifying that, based on information and belief formed after
reasonable inquiry, the statements and information in the report are
true, accurate, and complete.
(3) Date of report and beginning and ending dates of the reporting
period.
(4) For existing sources and for new or reconstructed sources for
which construction or reconstruction commenced after October 18, 2002,
but before May 4, 2018, before August 7, 2019, if you had a startup,
shutdown, or malfunction during the reporting period and you took
actions consistent with your startup, shutdown, and malfunction plan,
the compliance report must include the information in Sec.
63.10(d)(5)(i). A startup, shutdown, and malfunction plan is not
required for such sources on and after August 7, 2019.
(5) If there were no deviations from the emission limitations for
solvent mixers in Sec. 63.9500(a) and (b), a statement that there were
no deviations from the emission limitations during the reporting period.
(6) If there were no periods during which a monitoring system was
out-of-control as specified in Sec. 63.8(c)(7), a statement that there
were no periods during which a monitoring system was out-of-control
during the reporting period.
(c) For each deviation from an emission limitation occurring at an
affected source, you must include the information in paragraphs (b)(1)
through (4) and (c)(1) and (2) of this section. This includes periods of
startup, shutdown, or malfunction.
(1) The total operating time of each affected source during the
reporting period.
(2) For existing sources and for new or reconstructed sources which
commenced construction or reconstruction after October 18, 2002, but
before May 4, 2018, before August 7, 2019, information on the number,
duration, and cause of deviations (including unknown cause, if
applicable), as applicable, and the corrective action taken. On and
after August 7, 2019 for such sources, and after February 8, 2019 for
new or reconstructed sources which commenced construction or
reconstruction after May 3, 2018, information on the number of
deviations to meet an emission limitation. For each instance, include
the date, time, duration, and cause of deviations (including unknown
cause, if applicable), as applicable, a list of the affected source or
equipment, an estimate of the quantity of each regulated pollutant
emitted over any emission limit, and a description of the method used to
estimate the emissions, and the corrective action taken.
(d) For existing sources and for new or reconstructed sources which
commenced construction or reconstruction after October 18, 2002, but
before May 4, 2018, before August 7, 2019, if you had a startup,
shutdown, or malfunction during the semiannual reporting period that was
not consistent with your startup, shutdown, and malfunction plan, you
must submit an immediate startup, shutdown, and malfunction report
according to the requirements in Sec. 63.10(d)(5)(ii). An immediate
startup, shutdown, and malfunction report is not required for such
sources on and after August 7, 2019.
(e) If you have obtained a title V operating permit for an affected
source pursuant to 40 CFR part 70 or 71 of this chapter, you must report
all deviations as defined in this subpart in the semiannual monitoring
report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR
71.6(a)(3)(iii)(A) of this chapter. If you submit a compliance report
for an affected source along with, or as part of, the semiannual
monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR
71.6(a)(3)(iii)(A) of this chapter, and the compliance report includes
all the required information concerning deviations from any emission
limitation in this subpart, then submission of the compliance report
satisfies any obligation to report the same deviations in the semiannual
monitoring report. However, submission of a compliance report does not
otherwise affect any obligation you may have to report deviations from
permit requirements to your permitting authority.
[67 FR 64506, Oct. 18, 2002, as amended at 84 FR 2751, Feb. 8, 2019]
Sec. 63.9545 What records must I keep?
(a) You must keep the records in paragraphs (a)(1) and (2) of this
section that apply to you.
[[Page 69]]
(1) A copy of each notification and report that you submitted to
comply with this subpart, including all documentation supporting any
initial notification or notification of compliance status that you
submitted, according to the requirements in Sec. 63.10(b)(2)(xiv).
(2) For existing sources and for new or reconstructed sources which
commenced construction or reconstruction after October 18, 2002, but
before May 4, 2018, before August 7, 2019, the records in Sec.
63.6(e)(3)(iii) through (v) related to startup, shutdown, or
malfunction. For such sources, it is not required to keep records in
Sec. 63.6(e)(3)(iii) through (v) related to startup, shutdown, or
malfunction on and after August 7, 2019.
(3) After February 8, 2019 for new or reconstructed sources which
commenced construction or reconstruction after May 3, 2018, and on and
after August 7, 2019 for all other affected sources, in the event that
an affected unit fails to meet an applicable standard, record the number
of deviations. For each deviation, record the date, time and duration of
each deviation.
(i) For each deviation, record and retain cause of deviations
(including unknown cause, if applicable), a list of the affected source
or equipment, an estimate of the quantity of each regulated pollutant
emitted over any emission limit, and a description of the method used to
estimate the emissions.
(ii) Record actions taken to minimize emissions in accordance with
Sec. 63.9505, and any corrective actions taken to return the affected
unit to its normal or usual manner of operation.
(b) You must keep the records required in Sec. 63.9525 to show
proper operation and maintenance of the weight measurement device.
(c) You must keep the records required in Sec. 63.9530 to show
continuous compliance with the emission limitations for solvent mixers
in Sec. 63.9500(a) and (b).
[67 FR 64506, Oct. 18, 2002, as amended at 84 FR 2751, Feb. 8, 2019]
Sec. 63.9550 In what form and how long must I keep my records?
(a) You must keep your records in a form suitable and readily
available for expeditious review, according to Sec. 63.10(b)(1).
(b) As specified in Sec. 63.10(b)(1), you must keep each record for
5 years following the date of each occurrence, measurement, maintenance,
corrective action, report, or record.
(c) You must keep each record on site for at least 2 years after the
date of each occurrence, measurement, maintenance, corrective action,
report, or record, according to Sec. 63.10(b)(1). You can keep the
records offsite for the remaining 3 years.
Other Requirements and Information
Sec. 63.9555 What parts of the General Provisions apply to me?
Table 1 to this subpart shows which parts of the General Provisions
in Sec. Sec. 63.1 through 63.15 apply to you.
Sec. 63.9560 Who implements and enforces this subpart?
(a) This subpart can be implemented and enforced by the U.S. EPA, or
a delegated authority such as your State, local, or tribal agency. If
the U.S. EPA Administrator has delegated authority to your State, local,
or tribal agency, then that agency, in addition to the U.S. EPA, has the
authority to implement and enforce this subpart. You should contact your
U.S. EPA Regional Office to find out if this subpart is delegated to
your State, local, or tribal agency.
(b) In delegating implementation and enforcement authority of this
subpart to a State, local, or tribal agency under 40 CFR part 63,
subpart E, the authorities contained in paragraphs (c)(1) through (4) of
this section are retained by the Administrator of the U.S. EPA and are
not transferred to the State, local, or tribal agency.
(c) The authorities that cannot be delegated to State, local or
tribal agencies are as follows:
(1) Approval of alternatives to the emission limitations in Sec.
63.9500(a) and (b) under Sec. 63.6(g).
(2) Approval of major alternatives to test methods under Sec.
63.7(e)(2)(ii) and (f) and as defined in Sec. 63.90.
(3) Approval of major alternatives to monitoring under Sec. 63.8(f)
and as defined in Sec. 63.90.
[[Page 70]]
(4) Approval of major alternatives to recordkeeping and reporting
under Sec. 63.10(f) and as defined in Sec. 63.90.
Sec. 63.9565 What definitions apply to this subpart?
Terms used in this subpart are defined in the Clean Air Act, in
Sec. 63.2, and in this section as follows:
Batch ID means a unique identifier used to differentiate each
individual mix batch.
Deviation means any instance in which an affected source subject to
this subpart, or an owner or operator of such a source:
(1) Fails to meet any requirement or obligation established by this
subpart, including, but not limited to, any emission limitation
(including any operating limit);
(2) Fails to meet any term or condition that is adopted to implement
an applicable requirement in this subpart and that is included in the
operating permit for any affected source required to obtain such a
permit; or
(3) Fails to meet any emission limitation (including any operating
limit) in this subpart during startup, shutdown, or malfunction,
regardless of whether or not such failure is permitted by this subpart.
Friction ingredients means any of the components used in the
manufacture of friction materials, excluding the HAP solvent. Friction
ingredients include, but are not limited to, reinforcement materials,
property modifiers, resins, and other additives.
Friction materials manufacturing facility means a facility that
manufactures friction materials using a solvent-based process. Friction
materials are used in the manufacture of products used to accelerate or
decelerate objects. Products that use friction materials include, but
are not limited to, disc brake pucks, disc brake pads, brake linings,
brake shoes, brake segments, brake blocks, brake discs, clutch facings,
and clutches.
HAP solvent means a solvent that contains 10 percent or more of any
one HAP, as listed in section 112(b) of the Clean Air Act, or any
combination of HAP that is added to a solvent mixer. Examples include
hexane, toluene, and trichloroethylene.
Initial startup means the first time that equipment is put into
operation. Initial startup does not include operation solely for testing
equipment. Initial startup does not include subsequent startups (as
defined in this section) following malfunction or shutdowns or following
changes in product or between batch operations.
Large solvent mixer means a solvent mixer with a design capacity
greater than or equal to 2,000 pounds, including friction ingredients
and HAP solvent.
Mix batch means each batch of friction materials manufactured in a
solvent mixer.
Responsible official means responsible official as defined in Sec.
63.2.
7-day block average means an averaging technique for a weekly
compliance determination where the calculated values for percent HAP
solvent discharged to the atmosphere are averaged together for all mix
batches (for which there are valid data) in a 7-day block period
according to the equation provided in Sec. 63.9520(a)(6).
Small solvent mixer means a solvent mixer with a design capacity
less than 2,000 pounds, including friction ingredients and HAP solvent.
Solvent mixer means a mixer used in the friction materials
manufacturing process in which HAP solvent is used as one of the
ingredients in at least one batch during a semiannual reporting period.
Trace amounts of HAP solvents in resins or other friction ingredients do
not qualify mixers as solvent mixers.
Solvent recovery system means equipment used for the purpose of
recovering the HAP solvent from the exhaust stream. An example of a
solvent recovery system is a condenser.
Solvent substitution means substitution of a non-HAP material for a
HAP solvent.
Startup means bringing equipment online and starting the production
process.
Startup, shutdown, and malfunction plan means a plan developed
according to the provisions of Sec. 63.6(e)(3).
Sec. 63.9570 How do I apply for alternative compliance requirements?
(a) If you use a control technique other than a solvent recovery
system
[[Page 71]]
and/or solvent substitution, you may request approval to use an
alternative method of demonstrating compliance with the emission
limitations in Sec. 63.9500(a) and (b) according to the procedures in
this section.
(b) You can request approval to use an alternative method of
demonstrating compliance in the initial notification for existing
sources, the notification of construction or reconstruction for new
sources, or at any time.
(c) You must submit a description of the proposed testing,
monitoring, recordkeeping, and reporting that will be used and the
proposed basis for demonstrating compliance.
(1) If you have not previously performed testing, you must submit a
proposed test plan. If you are seeking permission to use an alternative
method of compliance based on previously performed testing, you must
submit the results of testing, a description of the procedures followed
in testing, and a description of pertinent conditions during testing.
(2) You must submit a monitoring plan that includes a description of
the control technique, test results verifying the performance of the
control technique, the appropriate operating parameters that will be
monitored, and the frequency of measuring and recording to establish
continuous compliance with the emission limitations in Sec. 63.9500(a)
and (b). You must also include the proposed performance specifications
and quality assurance procedures for the monitors. The monitoring plan
is subject to the Administrator's approval. You must install, calibrate,
operate, and maintain the monitors in accordance with the monitoring
plan approved by the Administrator.
(d) Use of the alternative method of demonstrating compliance must
not begin until approval is granted by the Administrator.
Sec. Sec. 63.9571-63.9579 [Reserved]
Sec. Table 1 to Subpart QQQQQ of Part 63--Applicability of General
Provisions to Subpart QQQQQ
As required in Sec. 63.9505, you must comply with each applicable
General Provisions requirement according to the following table:
----------------------------------------------------------------------------------------------------------------
Citation Subject Applies to subpart QQQQQ? Explanation
----------------------------------------------------------------------------------------------------------------
Sec. 63.1....................... Applicability........... Yes......................
Sec. 63.2....................... Definitions............. Yes......................
Sec. 63.3....................... Units and Abbreviations. Yes......................
Sec. 63.4....................... Prohibited Activities... Yes......................
Sec. 63.5....................... Construction/ Yes......................
Reconstruction.
Sec. 63.6(a)-(c), (i)-(j)....... Compliance with Yes......................
Standards and
Maintenance
Requirements.
Sec. 63.6(d).................... [Reserved]..............
Sec. 63.6(e)(1)(i)-(ii)......... SSM Operation and No, for new or Subpart QQQQQ requires
Maintenance reconstructed sources affected units to meet
Requirements. which commenced emissions standards at
construction or all times. See Sec.
reconstruction after May 63.9505 for general
3, 2018. Yes, for all duty requirement.
other affected sources
before August 7, 2019,
and No thereafter.
Sec. 63.6(e)(1)(iii), (e)(2).... Operation and Yes......................
Maintenance.
Sec. 63.6(e)(3)................. SSM Plan Requirements... No, for new or Subpart QQQQQ requires
reconstructed sources affected units to meet
which commenced emissions standards at
construction or all times.
reconstruction after May
3, 2018. Yes, for all
other affected sources
before August 7, 2019,
and No thereafter.
[[Page 72]]
Sec. 63.6(f)(1)................. SSM Exemption........... No, for new or Subpart QQQQQ requires
reconstructed sources affected units to meet
which commenced emissions standards at
construction or all times.
reconstruction after May
3, 2018. Yes, for all
other affected sources
before August 7, 2019,
and No thereafter.
Sec. 63.6(f)(2)-(3)............. Compliance with Yes......................
Nonopacity Emission
Standards.
Sec. 63.6(g).................... Use of an Alternative No....................... Subpart QQQQQ contains
Nonopacity Emission no work practice
Standard. standards.
Sec. 63.6(h).................... Compliance with Opacity No....................... Subpart QQQQQ contains
and Visible Emission no opacity or VE
Standards. limits.
Sec. 63.7(a)(1)-(2)............. Applicability and No....................... Subpart QQQQQ includes
Performance Test Dates. dates for initial
compliance
demonstrations.
Sec. 63.7(a)(3), (b)-(h)........ Performance Testing No....................... Subpart QQQQQ does not
Requirements. require performance
tests.
Sec. 63.8(a)(1)-(2)............. Applicability and Yes......................
Relevant Standards for
CMS.
Sec. 63.8(a)(3)................. [Reserved]..............
Sec. 63.8(a)(4)................. Additional Monitoring No....................... Subpart QQQQQ does not
Requirements for require flares.
Control Devices in Sec.
63.11.
Sec. 63.8(b).................... Conduct of Monitoring... Yes......................
Sec. 63.8(c)(1)(i), (iii)....... Continuous Monitoring No, for new or
System (CMS) SSM reconstructed sources
Requirements. which commenced
construction or
reconstruction after May
3, 2018. Yes, for all
other affected sources
before August 7, 2019,
and No thereafter..
Sec. 63.8(c)(1)(ii), (c)(2), CMS Repairs, Operating Yes......................
(c)(3). Parameters, and
Performance Tests.
Sec. 63.8(c)(4)................. Continuous Monitoring No....................... Subpart QQQQQ does not
System (CMS) require CMS.
Requirements.
Sec. 63.8(c)(5)................. Continuous Opacity No....................... Subpart QQQQQ does not
Monitoring System require COMS.
(COMS) Minimum
Procedures.
Sec. 63.8(c)(6)................. Zero and High Level No....................... Subpart QQQQQ specifies
Calibration Check calibration
Requirements. requirements.
Sec. 63.8(c)(7)-(8)............. Out-of-Control Periods.. No....................... Subpart QQQQQ specifies
out-of-control periods
and reporting
requirements.
Sec. 63.8(d).................... CMS Quality Control..... No....................... Subpart QQQQQ requires
a monitoring plan that
specifies CMS quality
control procedures.
Sec. 63.8(e).................... CMS Performance No....................... Subpart QQQQQ does not
Evaluation. require CMS
performance
evaluations.
Sec. 63.8(f)(1)-(5)............. Alternative Monitoring Yes......................
Procedure.
Sec. 63.8(f)(6)................. Relative Accuracy Test No....................... Subpart QQQQQ does not
Audit (RATA) require continuous
Alternative. emissions monitoring
systems (CEMS).
Sec. 63.8(g)(1)-(5)............. Data Reduction.......... No....................... Subpart QQQQQ specifies
data reduction
requirements.
Sec. 63.9(a)-(d), (h)-(j)....... Notification Yes...................... Except that subpart
Requirements. QQQQQ does not require
performance tests or
CMS performance
evaluations.
Sec. 63.9(e).................... Notification of No....................... Subpart QQQQQ does not
Performance Test. require performance
tests.
Sec. 63.9(f).................... Notification of VE/ No....................... Subpart QQQQQ contains
Opacity Test. no opacity or VE
limits.
Sec. 63.9(g).................... Additional Notifications No....................... Subpart QQQQQ does not
When Using CMS. require CMS
performance
evaluations.
Sec. 63.10(a), (b)(1), (d)(1), Recordkeeping and Yes......................
(d)(4), (e)(3), (f). Reporting Requirements.
[[Page 73]]
Sec. 63.10(b)(2)(i), (ii), (iv), Recordkeeping for No, for new or See Sec. 63.9545 for
(v). Startup, Shutdown and reconstructed sources recordkeeping
Malfunction. which commenced requirements.
construction or
reconstruction after May
3, 2018. Yes, for all
other affected sources
before August 7, 2019,
and No thereafter.
Sec. 63.10(b)(2)(iii), (vi)- Owner/Operator Yes......................
(xiv). Recordkeeping
Requirements.
Sec. 63.10(c)(1)-(6), (9)-(15).. Additional Records for No....................... Subpart QQQQQ specifies
CMS. record requirements.
Sec. 63.10(c)(7)-(8)............ Records of Excess No....................... Subpart QQQQQ specifies
Emissions and Parameter record requirements.
Monitoring Exceedances
for CMS.
Sec. 63.10(d)(2)................ Reporting Results of No....................... Subpart QQQQQ does not
Performance Tests. require performance
tests.
Sec. 63.10(d)(3)................ Reporting Opacity or VE No....................... Subpart QQQQQ contains
Observations. no opacity or VE
limits.
Sec. 63.10(d)(5)................ SSM reports............. No, for new or See Sec. 63.9540 for
reconstructed sources malfunction reporting
which commenced requirements.
construction or
reconstruction after May
3, 2018. Yes, for all
other affected sources
before August 7, 2019,
and No thereafter.
Sec. 63.10(e)(1)-(2)............ Additional CMS Reports.. No....................... Subpart QQQQQ does not
require CMS.
Sec. 63.10(e)(4)................ Reporting COMS Data..... No....................... Subpart QQQQQ does not
require COMS.
Sec. 63.11...................... Control Device No....................... Subpart QQQQQ does not
Requirements. require flares.
Sec. Sec. 63.12-63.15.......... Delegation, Addresses, Yes......................
Incorporation by
Reference Availability
of Information.
----------------------------------------------------------------------------------------------------------------
[67 FR 64506, Oct. 18, 2002, as amended at 84 FR 2752, Feb. 8, 2019]
Subpart RRRRR_National Emission Standards for Hazardous Air Pollutants:
Taconite Iron Ore Processing
Source: 68 FR 61888, Oct. 30, 2003, unless otherwise noted.
What This Subpart Covers
Sec. 63.9580 What is the purpose of this subpart?
This subpart establishes national emission standards for hazardous
air pollutants (NESHAP) for taconite iron ore processing. This subpart
also establishes requirements to demonstrate initial and continuous
compliance with all applicable emission limitations (emission limits and
operating limits), work practice standards, and operation and
maintenance requirements in this subpart.
Sec. 63.9581 Am I subject to this subpart?
You are subject to this subpart if you own or operate a taconite
iron ore processing plant that is (or is part of) a major source of
hazardous air pollutant (HAP) emissions on the first compliance date
that applies to you. Your taconite iron ore processing plant is a major
source of HAP if it emits or has the potential to emit any single HAP at
a rate of 10 tons or more per year or any combination of HAP at a rate
of 25 tons or more per year.
Sec. 63.9582 What parts of my plant does this subpart cover?
(a) This subpart applies to each new and existing affected source at
your taconite iron ore processing plant.
[[Page 74]]
(b) The affected sources are each new or existing ore crushing and
handling operation, ore dryer, indurating furnace, and finished pellet
handling operation at your taconite iron ore processing plant, as
defined in Sec. 63.9652.
(c) This subpart covers emissions from ore crushing and handling
emission units, ore dryer stacks, indurating furnace stacks, finished
pellet handling emission units, and fugitive dust emissions.
(d) An ore crushing and handling operation, ore dryer, indurating
furnace, or finished pellet handling operation at your taconite iron ore
processing plant is existing if you commenced construction or
reconstruction of the affected source before December 18, 2002.
(e) An ore crushing and handling operation, ore dryer, indurating
furnace, or finished pellet handling operation at your taconite iron ore
processing plant is new if you commence construction or reconstruction
of the affected source on or after December 18, 2002. An affected source
is reconstructed if it meets the definition of reconstruction in Sec.
63.2.
Sec. 63.9583 When do I have to comply with this subpart?
(a) If you have an existing affected source, you must comply with
each emission limitation, work practice standard, and operation and
maintenance requirement in this subpart that applies to you no later
than October 30, 2006.
(b) If you have a new affected source and its initial startup date
is on or before October 30, 2003, you must comply with each emission
limitation, work practice standard, and operation and maintenance
requirement in this subpart that applies to you by October 30, 2003.
(c) If you have a new affected source and its initial startup date
is after October 30, 2003, you must comply with each emission
limitation, work practice standard, and operation and maintenance
requirement in this subpart that applies to you upon initial startup.
(d) If your taconite iron ore processing plant is an area source
that becomes a major source of HAP, the compliance dates in paragraphs
(d)(1) and (2) of this section apply to you.
(1) Any portion of the taconite iron ore processing plant that is a
new affected source or a new reconstructed source must be in compliance
with this subpart upon startup.
(2) All other parts of the taconite iron ore processing plant must
be in compliance with this subpart no later than 3 years after the plant
becomes a major source.
(e) You must meet the notification and schedule requirements in
Sec. 63.9640. Several of these notifications must be submitted before
the compliance date for your affected source.
Emission Limitations and Work Practice Standards
Sec. 63.9590 What emission limitations must I meet?
(a) You must meet each emission limit in Table 1 to this subpart
that applies to you.
(b) You must meet each operating limit for control devices in
paragraphs (b)(1) through (5) of this section that applies to you.
(1) Except as provided in paragraph (b)(2) of this section, for each
wet scrubber applied to meet any particulate matter emission limit in
Table 1 to this subpart, you must maintain the daily average pressure
drop and daily average scrubber water flow rate at or above the minimum
levels established during the initial performance test.
(2) For each dynamic wet scrubber applied to meet any particulate
matter emission limit in Table 1 to this subpart, you must maintain the
daily average scrubber water flow rate and either the daily average fan
amperage (a surrogate for fan speed as revolutions per minute) or the
daily average pressure drop at or above the minimum levels established
during the initial performance test.
(3) For each dry electrostatic precipitator applied to meet any
particulate matter emission limit in Table 1 to this subpart, you must
meet the operating limits in paragraph (b)(3)(i) or (ii) of this
section.
(i) Maintain the 6-minute average opacity of emissions exiting the
control device stack at or below the level
[[Page 75]]
established during the initial performance test.
(ii) Maintain the daily average secondary voltage and daily average
secondary current for each field at or above the minimum levels
established during the initial performance test.
(4) For each wet electrostatic precipitator applied to meet any
particulate matter emission limit in Table 1 to this subpart, you must
meet the operating limits in paragraphs (b)(4)(i) through (iii) of this
section.
(i) Maintain the daily average secondary voltage for each field at
or above the minimum levels established during the initial performance
test.
(ii) Maintain the daily average stack outlet temperature at or below
the maximum levels established during the initial performance test.
(iii) Maintain the daily average water flow rate at or above the
minimum levels established during the initial performance test.
(5) If you use any air pollution control device other than a
baghouse, wet scrubber, dynamic scrubber, dry electrostatic
precipitator, or wet electrostatic precipitator, you must submit a site-
specific monitoring plan in accordance with Sec. 63.9631(f).
(c) You may petition the Administrator for approval of alternatives
to the monitoring requirements in paragraphs (b)(1) through (4) of this
section as allowed under Sec. 63.8(f) and as defined in Sec. 63.90.
Sec. 63.9591 What work practice standards must I meet?
(a) You must prepare, and at all times operate according to, a
fugitive dust emissions control plan that describes in detail the
measures that will be put in place to control fugitive dust emissions
from the locations listed in paragraphs (a)(1) through (6) of this
section.
(1) Stockpiles (includes, but is not limited to, stockpiles of
uncrushed ore, crushed ore, or finished pellets);
(2) Material transfer points;
(3) Plant roadways;
(4) Tailings basin;
(5) Pellet loading areas; and
(6) Yard areas.
(b) A copy of your fugitive dust emissions control plan must be
submitted for approval to the Administrator on or before the applicable
compliance date for the affected source as specified in Sec. 63.9583.
The requirement for the plant to operate according to the fugitive dust
emissions control plan must be incorporated by reference in the
operating permit for the plant that is issued by the designated
permitting authority under 40 CFR part 70 or 40 CFR part 71.
(c) You can use an existing fugitive dust emissions control plan
provided it meets the requirements in paragraphs (c)(1) through (3) of
this section.
(1) The plan satisfies the requirements of paragraph (a) of this
section.
(2) The plan describes the current measures to control fugitive dust
emission sources.
(3) The plan has been approved as part of a State implementation
plan or title V permit.
(d) You must maintain a current copy of the fugitive dust emissions
control plan onsite, and it must be available for inspection upon
request. You must keep the plan for the life of the affected source or
until the affected source is no longer subject to the requirements of
this subpart.
Operation and Maintenance Requirements
Sec. 63.9600 What are my operation and maintenance requirements?
(a) As required by Sec. 63.6(e)(1)(i), you must always operate and
maintain your affected source, including air pollution control and
monitoring equipment, in a manner consistent with good air pollution
control practices for minimizing emissions at least to the levels
required by this subpart.
(b) You must prepare, and at all times operate according to, a
written operation and maintenance plan for each control device applied
to meet any particulate matter emission limit in Table 1 to this subpart
and to meet the requirement of each indurating furnace subject to good
combustion practices (GCP). Each site-specific operation and maintenance
plan must be submitted to the Administrator on or before the compliance
date that is specified in Sec. 63.9583 for your affected
[[Page 76]]
source. The plan you submit must explain why the chosen practices (i.e.,
quantified objectives) are effective in performing corrective actions or
GCP in minimizing the formation of formaldehyde (and other products of
incomplete combustion). The Administrator will review the adequacy of
the site-specific practices and objectives you will follow and the
records you will keep to demonstrate compliance with your Plan. If the
Administrator determines that any portion of your operation and
maintenance plan is not adequate, we can reject those portions of the
plan, and request that you provide additional information addressing the
relevant issues. In the interim of this process, you will continue to
follow your current site-specific practices and objectives, as
submitted, until your revisions are accepted as adequate by the
Administrator. You must maintain a current copy of the operation and
maintenance plan onsite, and it must be available for inspection upon
request. You must keep the plan for the life of the affected source or
until the affected source is no longer subject to the requirements of
this subpart. Each operation and maintenance plan must address the
elements in paragraphs (b)(1) through (4) of this section.
(1) Preventative maintenance for each control device, including a
preventative maintenance schedule that is consistent with the
manufacturer's instructions for routine and long-term maintenance.
(2) Corrective action procedures for bag leak detection systems. In
the event a bag leak detection system alarm is triggered, you must
initiate corrective action to determine the cause of the alarm within 1
hour of the alarm, initiate corrective action to correct the cause of
the problem within 24 hours of the alarm, and complete the corrective
action as soon as practicable. Corrective actions may include, but are
not limited to, the actions listed in paragraphs (b)(2)(i) through (vi)
of this section.
(i) Inspecting the baghouse for air leaks, torn or broken bags or
filter media, or any other condition that may cause an increase in
emissions.
(ii) Sealing off defective bags or filter media.
(iii) Replacing defective bags or filter media or otherwise
repairing the control device.
(iv) Sealing off a defective baghouse compartment.
(v) Cleaning the bag leak detection system probe, or otherwise
repairing the bag leak detection system.
(vi) Adjusting the process operation producing the particulate
emissions.
(3) Corrective action procedures for continuous parameter monitoring
systems (CPMS) for all air pollution control devices except for
baghouses. In the event you exceed an established operating limit for an
air pollution control device except for a baghouse, you must initiate
corrective action to determine the cause of the operating limit
exceedance and complete the corrective action within 10 calendar days.
The corrective action procedures you take must be consistent with the
installation, operation, and maintenance procedures listed in your site-
specific CPMS monitoring plan in accordance with Sec. 63.9632(b).
(4) Good combustion practices for indurating furnaces. You must
identify and implement a set of site-specific GCP for each type of
indurating furnace at your plant. These GCP should correspond to your
standard operating procedures for maintaining the proper and efficient
combustion within each indurating furnace. Good combustion practices
include, but are not limited to, the elements listed in paragraphs
(b)(4)(i) through (v) of this section.
(i) Proper operating conditions for each indurating furnace (e.g.,
minimum combustion temperature, maximum carbon monoxide concentration in
the furnace exhaust gases, burner alignment, or proper fuel-air
distribution/mixing).
(ii) Routine inspection and preventative maintenance and
corresponding schedules of each indurating furnace.
(iii) Performance analyses of each indurating furnace.
(iv) Keeping applicable operator logs.
(v) Keeping applicable records to document compliance with each
element.
[[Page 77]]
General Compliance Requirements
Sec. 63.9610 What are my general requirements for complying
with this subpart?
(a) You must be in compliance with the requirements in paragraphs
(a)(1) through (6) in this section at all times, except during periods
of startup, shutdown, and malfunction. The terms startup, shutdown, and
malfunction are defined in Sec. 63.2.
(1) The emission limitations in Sec. 63.9590.
(2) The work practice standards in Sec. 63.9591.
(3) The operation and maintenance requirements in Sec. 63.9600.
(4) The notification requirements in Sec. 63.9640.
(5) The reporting requirements in Sec. 63.9641.
(6) The recordkeeping requirements in Sec. 63.9642.
(b) During the period between the compliance date specified for your
affected source in Sec. 63.9583 and the date upon which continuous
monitoring systems have been installed and certified and any applicable
operating limits have been set, you must maintain a log detailing the
operation and maintenance of the process and emissions control
equipment. This includes the daily monitoring and recordkeeping of air
pollution control device operating parameters as specified in Sec.
63.9590(b).
(c) You must develop a written startup, shutdown, and malfunction
plan according to the provisions in Sec. 63.6(e)(3).
[68 FR 61888, Oct. 30, 2003, as amended at 71 FR 20470, Apr. 20, 2006]
Initial Compliance Requirements
Sec. 63.9620 On which units and by what date must I conduct
performance tests or other initial compliance demonstrations?
(a) For each ore crushing and handling affected source, you must
demonstrate initial compliance with the emission limits in Table 1 to
this subpart by conducting an initial performance test for particulate
matter as specified in paragraphs (a)(1) and (2) of this section.
(1) Except as provided in paragraph (e) of this section, an initial
performance test must be performed on all stacks associated with ore
crushing and handling.
(2) Initial performance tests must be completed no later than 180
calendar days after the compliance date specified in Sec. 63.9583.
Performance tests conducted between October 30, 2003 and no later than
180 days after the corresponding compliance date can be used for initial
compliance demonstration, provided the tests meet the initial
performance testing requirements of this subpart.
(b) For each indurating furnace affected source, you must
demonstrate initial compliance with the emission limits in Table 1 to
this subpart by conducting an initial performance test for particulate
matter as specified in paragraphs (b)(1) and (2) of this section.
(1) An initial performance test must be performed on all stacks
associated with each indurating furnace.
(2) Initial performance tests must be completed no later than 180
calendar days after the compliance date specified in Sec. 63.9583.
Performance tests conducted between October 30, 2003 and no later than
180 days after the corresponding compliance date can be used for initial
compliance demonstration, provided the tests meet the initial
performance testing requirements of this subpart. For indurating
furnaces with multiple stacks, the performance tests for all stacks must
be completed within a reasonable period of time, such that the
indurating furnace operating characteristics remain representative for
the duration of the stack tests.
(c) For each finished pellet handling affected source, you must
demonstrate initial compliance with the emission limits in Table 1 to
this subpart by conducting an initial performance test for particulate
matter as specified in paragraphs (c)(1) and (2) of this section.
(1) Except as provided in paragraph (e) of this section, an initial
performance test must be performed on all stacks associated with
finished pellet handling.
(2) Initial performance tests must be completed no later than 180
calendar days after the compliance date specified in Sec. 63.9583.
Performance tests conducted between October 30, 2003 and no
[[Page 78]]
later than 180 days after the corresponding compliance date can be used
for initial compliance demonstration, provided the tests meet the
initial compliance testing requirements of this subpart.
(d) For each ore dryer affected source, you must demonstrate initial
compliance with the emission limits in Table 1 to this subpart by
conducting an initial performance test for particulate matter as
specified in paragraphs (d)(1) and (2) of this section.
(1) An initial performance test must be performed on all stacks
associated with each ore dryer.
(2) Initial performance tests must be completed no later than 180
calendar days after the compliance date specified in Sec. 63.9583.
Performance tests conducted between October 30, 2003 and no later than
180 days after the corresponding compliance date can be used for initial
compliance demonstration, provided the tests meet the initial compliance
testing requirements of this subpart. For ore dryers with multiple
stacks, the performance tests for all stacks must be completed within a
reasonable period of time, such that the ore dryer operating
characteristics remain representative for the duration of the stack
tests.
(e) For ore crushing and handling affected sources and finished
pellet handling affected sources, in lieu of conducting initial
performance tests for particulate matter on all stacks, you may elect to
group a maximum of six similar emission units together and conduct an
initial compliance test on one representative emission unit within each
group of similar emission units. The determination of whether emission
units are similar must meet the criteria in paragraph (f) of this
section. If you decide to test representative emission units, you must
prepare and submit a testing plan as described in paragraph (g) of this
section.
(f) If you elect to test representative emission units as provided
in paragraph (e) of this section, the units that are grouped together as
similar units must meet the criteria in paragraphs (f)(1) through (3) of
this section.
(1) All emission units within a group must be of the same process
type (e.g., primary crushers, secondary crushers, tertiary crushers,
fine crushers, ore conveyors, ore bins, ore screens, grate feed, pellet
loadout, hearth layer, cooling stacks, pellet conveyor, and pellet
screens). You cannot group emission units from different process types
together for the purposes of this section.
(2) All emission units within a group must also have the same type
of air pollution control device (e.g., wet scrubbers, dynamic wet
scrubbers, rotoclones, multiclones, wet and dry electrostatic
precipitators, and baghouses). You cannot group emission units with
different air pollution control device types together for the purposes
of this section.
(3) The site-specific operating limits established for the emission
unit selected as representative of a group of similar emission units
will be used as the operating limit for each emission unit within the
group. The operating limit established for the representative unit must
be met by each emission unit within the group.
(g) If you plan to conduct initial performance tests on
representative emission units within an ore crushing and handling
affected source or a finished pellet handling affected source, you must
submit a testing plan for initial performance tests. This testing plan
must be submitted to the Administrator or delegated authority no later
than 90 days prior to the first scheduled initial performance test. The
testing plan must contain the information specified in paragraphs (g)(1)
through (3) of this section.
(1) A list of all emission units. This list must clearly identify
all emission units that have been grouped together as similar emission
units. Within each group of emission units, you must identify the
emission unit that will be the representative unit for that group and
subject to initial performance testing.
(2) A list of the process type and type of air pollution control
device on each emission unit.
(3) A schedule indicating when you will conduct an initial
performance test for particulate matter for each representative emission
unit.
(h) For each work practice standard and operation and maintenance
requirement that applies to you where initial compliance is not
demonstrated
[[Page 79]]
using a performance test, you must demonstrate initial compliance within
30 calendar days after the compliance date that is specified for your
affected source in Sec. 63.9583.
(i) If you commenced construction or reconstruction of an affected
source between December 18, 2002 and October 30, 2003 , you must
demonstrate initial compliance with either the proposed emission limit
or the promulgated emission limit no later than 180 calendar days after
October 30, 2003 or no later than 180 calendar days after startup of the
source, whichever is later, according to Sec. 63.7(a)(2)(ix).
(j) If you commenced construction or reconstruction of an affected
source between December 18, 2002 and October 30, 2003, and you chose to
comply with the proposed emission limit when demonstrating initial
compliance, you must conduct a second performance test to demonstrate
compliance with the promulgated emission limit by 3 years and 180
calendar days after October 30, 2003, or after startup of the source,
whichever is later, according to Sec. 63.7(a)(2)(ix).
Sec. 63.9621 What test methods and other procedures must I use to
demonstrate initial compliance with the emission limits for
particulate matter?
(a) You must conduct each performance test that applies to your
affected source according to the requirements in Sec. 63.7(e)(1) and
paragraphs (b) and (c) of this section.
(b) For each ore crushing and handling affected source and each
finished pellet handling affected source, you must determine compliance
with the applicable emission limit for particulate matter in Table 1 to
this subpart by following the test methods and procedures in paragraphs
(b)(1) through (3) of this section.
(1) Except as provided in Sec. 63.9620(e), determine the
concentration of particulate matter in the stack gas for each emission
unit according to the test methods in appendix A to part 60 of this
chapter. The applicable test methods are listed in paragraphs (b)(1)(i)
through (v) of this section.
(i) Method 1 or 1A to select sampling port locations and the number
of traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere.
(ii) Method 2, 2A, 2C, 2D, 2F, or 2G, as applicable, to determine
the volumetric flow rate of the stack gas.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 5, 5D, or 17 to determine the concentration of
particulate matter.
(2) Each Method 5, 5D, or 17 performance test must consist of three
separate runs. Each run must be conducted for a minimum of 2 hours. The
average particulate matter concentration from the three runs will be
used to determine compliance, as shown in Equation 1 of this section.
[GRAPHIC] [TIFF OMITTED] TR30OC03.000
Where:
Ci = Average particulate matter concentration for emission
unit, grains per dry standard cubic foot, (gr/dscf);
C1 = Particulate matter concentration for run 1 corresponding
to emission unit, gr/dscf;
C2 = Particulate matter concentration for run 2 corresponding
to emission unit, gr/dscf; and
C3 = Particulate matter concentration for run 3 corresponding
to emission unit, gr/dscf.
(3) For each ore crushing and handling affected source and each
finished pellet handling affected source, you must determine the flow-
weighted mean concentration of particulate matter emissions from all
emission units in each affected source following the procedure in
paragraph (b)(3)(i) or (ii) of this section.
(i) If an initial performance test is conducted on all emission
units within an affected source, calculate the flow-weighted mean
concentration of particulate matter emissions from the affected source
using Equation 2 of this section.
[[Page 80]]
[GRAPHIC] [TIFF OMITTED] TR30OC03.001
Where:
Ca = Flow-weighted mean concentration of particulate matter
for all emission units within affected source, (gr/dscf);
Ci = Average particulate matter concentration measured during
the performance test from emission unit ``i'' in affected
source, as determined using Equation 1 of this section, gr/
dscf;
Qi = Average volumetric flow rate of stack gas measured
during the performance test from emission unit ``i'' in
affected source, dscf/hr; and
n = Number of emission units in affected source.
(ii) If you are grouping similar emission units together in
accordance with Sec. 63.9620(e), you must follow the procedures in
paragraphs (b)(3)(ii)(A) through (C) of this section.
(A) Assign the average particulate matter concentration measured
from the representative unit, as determined from Equation 1 of this
section, to each emission unit within the corresponding group of similar
units.
(B) Establish the maximum operating volumetric flow rate of exhaust
gas from each emission unit within each group of similar units.
(C) Using the data from paragraphs (b)(3)(ii)(A) and (B) of this
section, calculate the flow-weighted mean concentration of particulate
matter emissions from the affected source using Equation 3 of this
section.
[GRAPHIC] [TIFF OMITTED] TR30OC03.002
Where:
Ca = Flow-weighted mean concentration of particulate matter
for all emission units within affected source, gr/dscf;
Ck = Average particulate matter concentration measured during
the performance test from the representative emission unit in
group ``k'' of affected source ``a,'' as determined using
Equation 1 of this section, gr/dscf;
Qk = Sum of the maximum operating volumetric flow rates of
stack gas from all similar emission units within group ``k''
of affected source, dscf/hr; and
m = Number of similar emission unit groups in affected source.
(c) For each ore dryer affected source and each indurating furnace
affected source, you must determine compliance with the applicable
emission limit for particulate matter in Table 1 to this subpart by
following the test methods and procedures in paragraphs (c)(1) through
(3) of this section.
(1) Determine the concentration of particulate matter for each stack
according to the test methods in 40 CFR part 60, appendix A. The
applicable test methods are listed in paragraphs (c)(1)(i) through (v)
of this section.
(i) Method 1 or 1A to select sampling port locations and the number
of traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere.
(ii) Method 2, 2A, 2C, 2D, 2F, or 2G, as applicable, to determine
the volumetric flow rate of the stack gas.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 5, 5D, or 17 to determine the concentration of
particulate matter.
(2) Each Method 5, 5D, or 17 performance test must consist of three
separate runs. Each run must be conducted for a minimum of 2 hours. The
average particulate matter concentration from the three runs will be
used to determine compliance, as shown in Equation 1 of this section.
(3) For each ore dryer and each indurating furnace with multiple
stacks, calculate the flow-weighted mean concentration of particulate
matter emissions using Equation 4 of this section.
[GRAPHIC] [TIFF OMITTED] TR30OC03.003
Where:
[[Page 81]]
Cb = Flow-weighted mean concentration of particulate matter
for all stacks associated with affected source, gr/dscf;
Cj = Average particulate matter concentration measured during
the performance test from stack ``j'' in affected source, as
determined using Equation 1 of this section, gr/dscf;
Qj = Average volumetric flow rate of stack gas measured
during the performance test from stack ``j'' in affected
source, dscf/hr;
n = Number of stacks associated with affected source.
Sec. 63.9622 What test methods and other procedures must I use
to establish and demonstrate initial compliance with the operating
limits?
(a) For wet scrubbers subject to performance testing in Sec.
63.9620 and operating limits for pressure drop and scrubber water flow
rate in Sec. 63.9590(b)(1), you must establish site-specific operating
limits according to the procedures in paragraphs (a)(1) through (3) of
this section.
(1) Using the CPMS required in Sec. 63.9631(b), measure and record
the pressure drop and scrubber water flow rate every 15 minutes during
each run of the particulate matter performance test.
(2) Calculate and record the average pressure drop and scrubber
water flow rate for each individual test run. Your operating limits are
established as the lowest average pressure drop and the lowest average
scrubber water flow rate corresponding to any of the three test runs.
(3) If a rod-deck venturi scrubber is applied to an indurating
furnace to meet any particulate matter emission limit in Table 1 to this
subpart, you may establish a lower average pressure drop operating limit
by using historical average pressure drop data from a certified
performance test completed on or after December 18, 2002 instead of
using the average pressure drop value determined during the initial
performance test, as specified in paragraph (a)(2) of this section. If
historical average pressure drop data are used to establish an operating
limit (i.e., using data from a certified performance test conducted
prior to the promulgation date of the final rule), then the average
particulate matter concentration corresponding to the historical
performance test must be at or below the applicable indurating furnace
emission limit, as listed in Table 1 to this subpart.
(b) For dynamic wet scrubbers subject to performance testing in
Sec. 63.9620 and operating limits for scrubber water flow rate and
either fan amperage or pressure drop in Sec. 63.9590(b)(2), you must
establish site-specific operating limits according to the procedures in
paragraphs (b)(1) and (2) of this section.
(1) Using the CPMS required in Sec. 63.9631(b), measure and record
the scrubber water flow rate and either the fan amperage or pressure
drop every 15 minutes during each run of the particulate matter
performance test.
(2) Calculate and record the average scrubber water flow rate and
either the average fan amperage or average pressure drop for each
individual test run. Your operating limits are established as the lowest
average scrubber water flow rate and either the lowest average fan
amperage or pressure drop value corresponding to any of the three test
runs.
(c) For a dry electrostatic precipitator subject to performance
testing in Sec. 63.9620 and operating limits in Sec. 63.9590(b)(3),
you must establish a site-specific operating limit according to the
procedures in paragraphs (c)(1) or (2) of this section.
(1) If the operating limit for your dry electrostatic precipitator
is a 6-minute average opacity of emissions value, then you must follow
the requirements in paragraphs (c)(1)(i) through (iii) of this section.
(i) Using the continuous opacity monitoring system (COMS) required
in Sec. 63.9631(d)(1), measure and record the opacity of emissions from
each control device stack during the particulate matter performance
test.
(ii) Compute and record the 6-minute opacity averages from 24 or
more data points equally spaced over each 6-minute period (e.g., at 15-
second intervals) during the test runs.
(iii) Using the opacity measurements from a performance test that
meets the emission limit, determine the opacity value corresponding to
the 99 percent upper confidence level of a normal distribution of the 6-
minute opacity averages.
[[Page 82]]
(2) If the operating limit for your dry electrostatic precipitator
is the daily average secondary voltage and daily average secondary
current for each field, then you must follow the requirements in
paragraphs (c)(2)(i) and (ii) of this section.
(i) Using the CPMS required in Sec. 63.9631(d)(2), measure and
record the secondary voltage and secondary current for each dry
electrostatic precipitator field every 15 minutes during each run of the
particulate matter performance test.
(ii) Calculate and record the average secondary voltage and
secondary current for each dry electrostatic precipitator field for each
individual test run. Your operating limits are established as the lowest
average secondary voltage and secondary current value for each dry
electrostatic precipitator field corresponding to any of the three test
runs.
(d) For a wet electrostatic precipitator subject to performance
testing in Sec. 63.9620 and operating limit in Sec. 63.9590(b)(4), you
must establish a site-specific operating limit according to the
procedures in paragraphs (d)(1) and (2) of this section.
(1) Using the CPMS required in Sec. 63.9631(e), measure and record
the parametric values in paragraphs (d)(1)(i) through (iii) of this
section for each wet electrostatic precipitator field every 15 minutes
during each run of the particulate matter performance test.
(i) Secondary voltage;
(ii) Water flow rate; and
(iii) Stack outlet temperature.
(2) For each individual test run, calculate and record the average
value for each operating parameter in paragraphs (d)(1)(i) through (iii)
of this section for each wet electrostatic precipitator field. Your
operating limits are established as the lowest average value for each
operating parameter corresponding to any of the three test runs.
(e) If you use an air pollution control device other than a wet
scrubber, dynamic wet scrubber, dry electrostatic precipitator, wet
electrostatic precipitator, or baghouse, and it is subject to
performance testing in Sec. 63.9620, you must submit a site-specific
monitoring plan in accordance with Sec. 63.9631(f). The site-specific
monitoring plan must include the site-specific procedures for
demonstrating initial and continuous compliance with the corresponding
operating limits.
(f) You may change the operating limits for any air pollution
control device as long as you meet the requirements in paragraphs (f)(1)
through (3) of this section.
(1) Submit a written notification to the Administrator of your
request to conduct a new performance test to revise the operating limit.
(2) Conduct a performance test to demonstrate compliance with the
applicable emission limitation in Table 1 to this subpart.
(3) Establish revised operating limits according to the applicable
procedures in paragraphs (a) through (e) of this section.
Sec. 63.9623 How do I demonstrate initial compliance with the
emission limitations that apply to me?
(a) For each affected source subject to an emission limit in Table 1
to this subpart, you must demonstrate initial compliance by meeting the
emission limit requirements in paragraphs (a)(1) through (4) of this
section.
(1) For ore crushing and handling, the flow-weighted mean
concentration of particulate matter, determined according to the
procedures in Sec. Sec. 63.9620(a) and 63.9621(b), must not exceed the
emission limits in Table 1 to this subpart.
(2) For indurating furnaces, the flow-weighted mean concentration of
particulate matter, determined according to the procedures in Sec. Sec.
63.9620(b) and 63.9621(c), must not exceed the emission limits in Table
1 to this subpart.
(3) For finished pellet handling, the flow-weighted mean
concentration of particulate matter, determined according to the
procedures in Sec. Sec. 63.9620(c) and 63.9621(b), must not exceed the
emission limits in Table 1 to this subpart.
(4) For ore dryers, the flow-weighted mean concentration of
particulate matter, determined according to the procedures in Sec. Sec.
63.9620(d) and 63.9621(c), must not exceed the emission limits in Table
1 to this subpart.
[[Page 83]]
(b) For each affected source subject to an emission limit in Table 1
to this subpart, you must demonstrate initial compliance by meeting the
operating limit requirements in paragraphs (b)(1) through (5) of this
section.
(1) For each wet scrubber subject to performance testing in Sec.
63.9620 and operating limits for pressure drop and scrubber water flow
rate in Sec. 63.9590(b)(1), you have established appropriate site-
specific operating limits and have a record of the pressure drop and
scrubber water flow rate measured during the performance test in
accordance with Sec. 63.9622(a).
(2) For each dynamic wet scrubber subject to performance testing in
Sec. 63.9620 and operating limits for scrubber water flow rate and
either fan amperage or pressure drop in Sec. 63.9590(b)(2), you have
established appropriate site-specific operating limits and have a record
of the scrubber water flow rate and either the fan amperage or pressure
drop value, measured during the performance test in accordance with
Sec. 63.9622(b).
(3) For each dry electrostatic precipitator subject to performance
testing in Sec. 63.9620 and one of the operating limits in Sec.
63.9590(b)(3), you must meet the requirements in paragraph (b)(3)(i) or
(ii) of this section.
(i) If you are subject to the operating limit for opacity in Sec.
63.9590(b)(3)(i), you have established appropriate site-specific
operating limits and have a record of the opacity measured during the
performance test in accordance with Sec. 63.9622(c)(1).
(ii) If you are subject to the operating limit for secondary voltage
and secondary current in Sec. 63.9590(b)(3)(ii), you have established
appropriate site-specific operating limits and have a record of the
secondary voltage and secondary current measured during the performance
test in accordance with Sec. 63.9622(c)(2).
(4) For each wet electrostatic precipitator subject to performance
testing in Sec. 63.9620 and operating limits for secondary voltage,
water flow rate, and stack outlet temperature in Sec. 63.9590(b)(4),
you have established appropriate site-specific operating limits and have
a record of the secondary voltage, water flow rate, and stack outlet
temperature measured during the performance test in accordance with
Sec. 63.9622(d).
(5) For other air pollution control devices subject to performance
testing in Sec. 63.9620 and operating limits in accordance with Sec.
63.9590(b)(5), you have submitted a site-specific monitoring plan in
accordance with Sec. 63.9631(f) and have a record of the site-specific
operating limits as measured during the performance test in accordance
with Sec. 63.9622(e).
(c) For each emission limitation and operating limit that applies to
you, you must submit a notification of compliance status according to
Sec. 63.9640(e).
Sec. 63.9624 How do I demonstrate initial compliance with the work
practice standards that apply to me?
You must demonstrate initial compliance with the work practice
standards by meeting the requirements in paragraphs (a) through (c) of
this section.
(a) You must prepare a fugitive dust emissions control plan in
accordance with the requirements in Sec. 63.9591.
(b) You must submit to the Administrator the fugitive dust emissions
control plan in accordance with the requirements in Sec. 63.9591.
(c) You must implement each control practice according to the
procedures specified in your fugitive dust emissions control plan.
Sec. 63.9625 How do I demonstrate initial compliance with the
operation and maintenance requirements that apply to me?
For each air pollution control device subject to operating limits in
Sec. 63.9590(b), you have demonstrated initial compliance if you meet
all of the requirements in paragraphs (a) through (d) of this section.
(a) You have prepared the operation and maintenance plan for air
pollution control devices in accordance with Sec. 63.9600(b).
(b) You have operated each air pollution control device according to
the procedures in the operation and maintenance plan.
(c) You have submitted a notification of compliance status according
to the requirements in Sec. 63.9640(e).
[[Page 84]]
(d) You have prepared a site-specific monitoring plan in accordance
with Sec. 63.9632(b).
Continuous Compliance Requirements
Sec. 63.9630 When must I conduct subsequent performance tests?
(a) You must conduct subsequent performance tests to demonstrate
continued compliance with the ore crushing and handling emission limits
in Table 1 to this subpart according to the schedule developed by your
permitting authority and shown in your title V permit. If a title V
permit has not been issued, you must submit a testing plan and schedule,
containing the information specified in paragraph (e) of this section,
to the permitting authority for approval.
(b) You must conduct subsequent performance tests on all stacks
associated with indurating furnaces to demonstrate continued compliance
with the indurating furnace emission limits in Table 1 to this subpart
according to the schedule developed by your permitting authority and
shown in your title V permit, but no less frequent than twice per 5-year
permit term. If a title V permit has not been issued, you must submit a
testing plan and schedule, containing the information specified in
paragraph (e) of this section, to the permitting authority for approval.
For indurating furnaces with multiple stacks, the performance tests for
all stacks associated with that indurating furnace must be conducted
within a reasonable period of time, such that the indurating furnace
operating characteristics remain representative for the duration of the
stack tests.
(c) You must conduct subsequent performance tests to demonstrate
continued compliance with the finished pellet handling emission limits
in Table 1 to this subpart according to the schedule developed by your
permitting authority and shown in your title V permit. If a title V
permit has not been issued, you must submit a testing plan and schedule,
containing the information specified in paragraph (e) of this section,
to the permitting authority for approval.
(d) You must conduct subsequent performance tests on all stacks
associated with ore dryers to demonstrate continued compliance with the
ore dryer emission limits in Table 1 to this subpart according to the
schedule developed by your permitting authority and shown in your title
V permit. If a title V permit has not been issued, you must submit a
testing plan and schedule, containing the information specified in
paragraph (e) of this section, to the permitting authority for approval.
For ore dryers with multiple stacks, the performance tests for all
stacks associated with an ore dryer must be conducted within a
reasonable period of time, such that the ore dryer operating
characteristics remain representative for the duration of the stack
tests.
(e) If your plant does not have a title V permit, you must submit a
testing plan for subsequent performance tests as required in paragraphs
(a) through (d) of this section. This testing plan must be submitted to
the Administrator on or before the compliance date that is specified in
Sec. 63.9583. The testing plan must contain the information specified
in paragraphs (e)(1) and (2) of this section. You must maintain a
current copy of the testing plan onsite, and it must be available for
inspection upon request. You must keep the plan for the life of the
affected source or until the affected source is no longer subject to the
requirements of this subpart.
(1) A list of all emission units.
(2) A schedule indicating when you will conduct subsequent
performance tests for particulate matter for each of the emission units.
Sec. 63.9631 What are my monitoring requirements?
(a) For each baghouse applied to meet any particulate matter
emission limit in Table 1 to this subpart, you must install, operate,
and maintain a bag leak detection system to monitor the relative change
in particulate matter loadings according to the requirements in Sec.
63.9632(a), and conduct inspections at their specified frequencies
according to the requirements in paragraphs (a)(1) through (8) of this
section.
(1) Monitor the pressure drop across each baghouse cell each day to
ensure pressure drop is within the normal operating range.
[[Page 85]]
(2) Confirm that dust is being removed from hoppers through weekly
visual inspections or other means of ensuring the proper functioning of
removal mechanisms.
(3) Check the compressed air supply of pulse-jet baghouses each day.
(4) Monitor cleaning cycles to ensure proper operation using an
appropriate methodology.
(5) Check bag cleaning mechanisms for proper functioning through
monthly visual inspections or equivalent means.
(6) Make monthly visual checks of bag tension on reverse air and
shaker-type baghouses to ensure that bags are not kinked (kneed or bent)
or lying on their sides. You do not have to make this check for shaker-
type baghouses that have self-tensioning (spring-loaded) devices.
(7) Confirm the physical integrity of the baghouse through quarterly
visual inspections of the baghouse interior for air leaks.
(8) Inspect fans for wear, material buildup, and corrosion through
quarterly visual inspections, vibration detectors, or equivalent means.
(b) Except as provided in paragraph (c) of this section, for each
wet scrubber subject to the operating limits for pressure drop and
scrubber water flow rate in Sec. 63.9590(b)(1), you must install,
operate, and maintain a CPMS according to the requirements in Sec.
63.9632(b) through (e) and monitor the daily average pressure drop and
daily average scrubber water flow rate according to the requirements in
Sec. 63.9633.
(c) For each dynamic wet scrubber subject to the scrubber water flow
rate and either the fan amperage or pressure drop operating limits in
Sec. 63.9590(b)(2), you must install, operate, and maintain a CPMS
according to the requirements in Sec. 63.9632(b) through (e) and
monitor the daily average scrubber water flow rate and either the daily
average fan amperage or the daily average pressure drop according to the
requirements in Sec. 63.9633.
(d) For each dry electrostatic precipitator subject to the operating
limits in Sec. 63.9590(b)(3), you must follow the monitoring
requirements in paragraph (d)(1) or (2) of this section.
(1) If the operating limit you choose to monitor is the 6-minute
average opacity of emissions in accordance with Sec. 63.9590(b)(3)(i),
you must install, operate, and maintain a COMS according to the
requirements in Sec. 63.9632(f) and monitor the 6-minute average
opacity of emissions exiting each control device stack according to the
requirements in Sec. 63.9633.
(2) If the operating limit you choose to monitor is average
secondary voltage and average secondary current for each dry
electrostatic precipitator field in accordance with Sec.
63.9590(b)(3)(ii), you must install, operate, and maintain a CPMS
according to the requirements in Sec. 63.9632(b) through (e) and
monitor the daily average secondary voltage and daily average secondary
current according to the requirements in Sec. 63.9633.
(e) For each wet electrostatic precipitator subject to the operating
limits in Sec. 63.9590(b)(4), you must install, operate, and maintain a
CPMS according to the requirements in Sec. 63.9632(b) through (e) and
monitor the daily average secondary voltage, daily average stack outlet
temperature, and daily average water flow rate according to the
requirements in Sec. 63.9633.
(f) If you use any air pollution control device other than a
baghouse, wet scrubber, dry electrostatic precipitator, or wet
electrostatic precipitator, you must submit a site-specific monitoring
plan that includes the information in paragraphs (f)(1) through (4) of
this section. The monitoring plan is subject to approval by the
Administrator. You must maintain a current copy of the monitoring plan
onsite, and it must be available for inspection upon request. You must
keep the plan for the life of the affected source or until the affected
source is no longer subject to the requirements of this subpart.
(1) A description of the device.
(2) Test results collected in accordance with Sec. 63.9621
verifying the performance of the device for reducing emissions of
particulate matter to the atmosphere to the levels required by this
subpart.
(3) A copy of the operation and maintenance plan required in Sec.
63.9600(b).
[[Page 86]]
(4) Appropriate operating parameters that will be monitored to
maintain continuous compliance with the applicable emission
limitation(s).
Sec. 63.9632 What are the installation, operation, and maintenance
requirements for my monitoring equipment?
(a) For each negative pressure baghouse or positive pressure
baghouse equipped with a stack, applied to meet any particulate emission
limit in Table 1 to this subpart, you must install, operate, and
maintain a bag leak detection system according to the requirements in
paragraphs (a)(1) through (8) of this section.
(1) The system must be certified by the manufacturer to be capable
of detecting emissions of particulate matter at concentrations of 10
milligrams per actual cubic meter (0.0044 grains per actual cubic foot)
or less.
(2) The system must provide output of relative changes in
particulate matter loadings.
(3) The system must be equipped with an alarm that will sound when
an increase in relative particulate loadings is detected over the alarm
level set point established according to paragraph (a)(4) of this
section. The alarm must be located such that it can be heard by the
appropriate plant personnel.
(4) For each bag leak detection system, you must develop and submit
to the Administrator for approval, a site-specific monitoring plan that
addresses the items identified in paragraphs (a)(4)(i) through (v) of
this section. For each bag leak detection system that operates based on
the triboelectric effect, the monitoring plan shall be consistent with
the recommendations contained in the U.S. Environmental Protection
Agency (U.S. EPA) guidance document, ``Fabric Filter Bag Leak Detection
Guidance'' (EPA-454/R-98-015). This document is available on the EPA's
Technology Transfer Network at http://www.epa.gov/ttn/emc/cem/tribo.pdf
(Adobe Acrobat version) or http://www.epa.gov/ttn/emc/cem/tribo.wpd
(WordPerfect version). You must operate and maintain the bag leak
detection system according to the site-specific monitoring plan at all
times. The plan shall describe all of the items in paragraphs (a)(4)(i)
through (v) of this section.
(i) Installation of the bag leak detection system.
(ii) Initial and periodic adjustment of the bag leak detection
system including how the alarm set-point will be established.
(iii) Operation of the bag leak detection system including quality
assurance procedures.
(iv) How the bag leak detection system will be maintained including
a routine maintenance schedule and spare parts inventory list.
(v) How the bag leak detection system output shall be recorded and
stored.
(5) To make the initial adjustment of the system, establish the
baseline output by adjusting the sensitivity (range) and the averaging
period of the device. Then, establish the alarm set points and the alarm
delay time (if applicable).
(6) Following initial adjustment, do not adjust averaging period,
alarm set point, or alarm delay time, without approval from the
Administrator except as provided for in paragraph (a)(6)(i) of this
section.
(i) Once per quarter, you may adjust the sensitivity of the bag leak
detection system to account for seasonal effects, including temperature
and humidity, according to the procedures identified in the site-
specific monitoring plan required under paragraph (a)(4) of this
section.
(ii) [Reserved]
(7) Where multiple detectors are required, the system's
instrumentation and alarm may be shared among detectors.
(8) The bag leak detector sensor must be installed downstream of the
baghouse and upstream of any wet scrubber.
(b) For each CPMS required in Sec. 63.9631, you must develop and
make available for inspection upon request by the permitting authority a
site-specific monitoring plan that addresses the requirements in
paragraphs (b)(1) through (7) of this section.
(1) Installation of the CPMS sampling probe or other interface at a
measurement location relative to each
[[Page 87]]
affected emission unit such that the measurement is representative of
control of the exhaust emissions (e.g., on or downstream of the last
control device).
(2) Performance and equipment specifications for the sample
interface, the parametric signal analyzer, and the data collection and
reduction system.
(3) Performance evaluation procedures and acceptance criteria (e.g.,
calibrations).
(4) Ongoing operation and maintenance procedures in accordance with
the general requirements of Sec. 63.8(c)(1), (3), (4)(ii), (7), and
(8).
(5) Ongoing data quality assurance procedures in accordance with the
general requirements of Sec. 63.8(d).
(6) Ongoing recordkeeping and reporting procedures in accordance
with the general requirements of Sec. 63.10(c), (e)(1), and (e)(2)(i).
(7) Corrective action procedures that you will follow in the event
an air pollution control device, except for a baghouse, exceeds an
established operating limit as required in Sec. 63.9600(b)(3).
(c) Unless otherwise specified, each CPMS must meet the requirements
in paragraphs (c)(1) and (2) of this section.
(1) Each CPMS must complete a minimum of one cycle of operation for
each successive 15-minute period and must have valid data for at least
95 percent of every daily averaging period.
(2) Each CPMS must determine and record the daily average of all
recorded readings.
(d) You must conduct a performance evaluation of each CPMS in
accordance with your site-specific monitoring plan.
(e) You must operate and maintain the CPMS in continuous operation
according to the site-specific monitoring plan.
(f) For each dry electrostatic precipitator subject to the opacity
operating limit in Sec. 63.9590(b)(3)(i), you must install, operate,
and maintain each COMS according to the requirements in paragraphs
(f)(1) through (4) of this section.
(1) You must install each COMS and conduct a performance evaluation
of each COMS according to Sec. 63.8 and Performance Specification 1 in
appendix B to 40 CFR part 60.
(2) You must develop and implement a quality control program for
operating and maintaining each COMS according to Sec. 63.8. At a
minimum, the quality control program must include a daily calibration
drift assessment, quarterly performance audit, and annual zero alignment
of each COMS.
(3) You must operate and maintain each COMS according to Sec.
63.8(e) and your quality control program. You must also identify periods
the COMS is out of control, including any periods that the COMS fails to
pass a daily calibration drift assessment, quarterly performance audit,
or annual zero alignment audit.
(4) You must determine and record the 6-minute average opacity for
periods during which the COMS is not out of control.
Sec. 63.9633 How do I monitor and collect data to demonstrate
continuous compliance?
(a) Except for monitoring malfunctions, associated repairs, and
required quality assurance or control activities (including as
applicable, calibration checks and required zero and span adjustments),
you must monitor continuously (or collect data at all required
intervals) at all times an affected source is operating.
(b) You may not use data recorded during monitoring malfunctions,
associated repairs, and required quality assurance or control activities
in data averages and calculations used to report emission or operating
levels, or to fulfill a minimum data availability requirement. You must
use all the data collected during all other periods in assessing
compliance.
(c) A monitoring malfunction is any sudden, infrequent, not
reasonably preventable failure of the monitoring system to provide valid
data. Monitoring failures that are caused in part by poor maintenance or
careless operation are not considered malfunctions.
Sec. 63.9634 How do I demonstrate continuous compliance with the emission limitations that apply to me?
(a) For each affected source subject to an emission limit in Table 1
to this
[[Page 88]]
subpart, you must demonstrate continuous compliance by meeting the
requirements in paragraphs (b) through (f) of this section.
(b) For ore crushing and handling affected sources and finished
pellet handling affected sources, you must demonstrate continuous
compliance by meeting the requirements in paragraphs (b)(1) through (3)
of this section.
(1) The flow-weighted mean concentration of particulate matter for
all ore crushing and handling emission units and for all finished pellet
handling emission units must be maintained at or below the emission
limits in Table 1 to this subpart.
(2) You must conduct subsequent performance tests for emission units
in the ore crushing and handling and finished pellet handling affected
sources following the schedule in your title V permit. If a title V
permit has not been issued, you must conduct subsequent performance
tests according to a testing plan approved by the Administrator or
delegated authority.
(3) For emission units not selected for initial performance testing
and defined within a group of similar emission units in accordance with
Sec. 63.9620(e), you must calculate the daily average value of each
operating parameter for the similar air pollution control device applied
to each similar emission unit within a defined group using Equation 1 of
this section.
[GRAPHIC] [TIFF OMITTED] TR30OC03.004
Where:
Pk = Daily average operating parameter value for all emission
units within group ``k'';
Pi = Daily average parametric monitoring parameter value
corresponding to emission unit ``i'' within group ``k''; and
n = Total number of emission units within group, including emission
units that have been selected for performance tests and those
that have not been selected for performance tests.
(c) For ore dryers and indurating furnaces, you must demonstrate
continuous compliance by meeting the requirements in paragraphs (c)(1)
and (2) of this section.
(1) The flow-weighted mean concentration of particulate matter for
all stacks from the ore dryer or indurating furnace must be maintained
at or below the emission limits in Table 1 to this subpart.
(2) For ore dryers, you must conduct subsequent performance tests
following the schedule in your title V permit. For indurating furnaces,
you must conduct subsequent performance tests following the schedule in
your title V permit, but no less frequent than twice per 5-year permit
term. If a title V permit has not been issued, you must conduct
subsequent performance tests according to a testing plan approved by the
Administrator or delegated authority.
(d) For each baghouse applied to meet any particulate emission limit
in Table 1 to this subpart, you must demonstrate continuous compliance
by completing the requirements in paragraphs (d)(1) and (2) of this
section.
(1) Maintaining records of the time you initiated corrective action
in the event of a bag leak detection system alarm, the corrective
action(s) taken, and the date on which corrective action was completed.
(2) Inspecting and maintaining each baghouse according to the
requirements in Sec. 63.9631(a)(1) through (8) and recording all
information needed to document conformance with these requirements. If
you increase or decrease the sensitivity of the bag leak detection
system beyond the limits specified in your site-specific monitoring
plan, you must include a copy of the required written certification by a
responsible official in the next semiannual compliance report.
(e) Except as provided in paragraph (f) of this section, for each
wet scrubber subject to the operating limits for pressure drop and
scrubber water flow rate in Sec. 63.9590(b)(1), you must demonstrate
continuous compliance by completing the requirements of paragraphs
(e)(1) through (4) of this section.
(1) Maintaining the daily average pressure drop and daily average
scrubber water flow rate at or above the minimum levels established
during the initial or subsequent performance test.
(2) Operating and maintaining each wet scrubber CPMS according to
[[Page 89]]
Sec. 63.9632(b) and recording all information needed to document
conformance with these requirements.
(3) Collecting and reducing monitoring data for pressure drop and
scrubber water flow rate according to Sec. 63.9632(c) and recording all
information needed to document conformance with these requirements.
(4) If the daily average pressure drop or daily average scrubber
water flow rate is below the operating limits established for a
corresponding emission unit or group of similar emission units, you must
then follow the corrective action procedures in paragraph (j) of this
section.
(f) For each dynamic wet scrubber subject to the operating limits
for scrubber water flow rate and either the fan amperage or pressure
drop in Sec. 63.9590(b)(2), you must demonstrate continuous compliance
by completing the requirements of paragraphs (f)(1) through (4) of this
section.
(1) Maintaining the daily average scrubber water flow rate and
either the daily average fan amperage or the daily average pressure drop
at or above the minimum levels established during the initial or
subsequent performance test.
(2) Operating and maintaining each dynamic wet scrubber CPMS
according to Sec. 63.9632(b) and recording all information needed to
document conformance with these requirements.
(3) Collecting and reducing monitoring data for scrubber water flow
rate and either fan amperage or pressure drop according to Sec.
63.9632(c) and recording all information needed to document conformance
with these requirements.
(4) If the daily average scrubber water flow rate, daily average fan
amperage, or daily average pressure drop is below the operating limits
established for a corresponding emission unit or group of similar
emission units, you must then follow the corrective action procedures in
paragraph (j) of this section.
(g) For each dry electrostatic precipitator subject to operating
limits in Sec. 63.9590(b)(3), you must demonstrate continuous
compliance by completing the requirements of paragraph (g)(1) or (2) of
this section.
(1) If the operating limit for your dry electrostatic precipitator
is a 6-minute average opacity of emissions value, then you must follow
the requirements in paragraphs (g)(1)(i) through (iii) of this section.
(i) Maintaining the 6-minute average opacity of emissions at or
below the maximum level established during the initial or subsequent
performance test.
(ii) Operating and maintaining each COMS and reducing the COMS data
according to Sec. 63.9632(f).
(iii) If the 6-minute average opacity of emissions is above the
operating limits established for a corresponding emission unit, you must
then follow the corrective action procedures in paragraph (j) of this
section.
(2) If the operating limit for your dry electrostatic precipitator
is the daily average secondary voltage and daily average secondary
current for each field, then you must follow the requirements in
paragraphs (g)(2)(i) through (iv) of this section.
(i) Maintaining the daily average secondary voltage or daily average
secondary current for each field at or above the minimum levels
established during the initial or subsequent performance test.
(ii) Operating and maintaining each dry electrostatic precipitator
CPMS according to Sec. 63.9632(b) and recording all information needed
to document conformance with these requirements.
(iii) Collecting and reducing monitoring data for secondary voltage
or secondary current for each field according to Sec. 63.9632(c) and
recording all information needed to document conformance with these
requirements.
(iv) If the daily average secondary voltage or daily average
secondary current for each field is below the operating limits
established for a corresponding emission unit, you must then follow the
corrective action procedures in paragraph (j) of this section.
(h) For each wet electrostatic precipitator subject to the operating
limits for secondary voltage, stack outlet temperature, and water flow
rate in Sec. 63.9590(b)(4), you must demonstrate continuous compliance
by completing the requirements of paragraphs (h)(1) through (4) of this
section.
[[Page 90]]
(1) Maintaining the daily average secondary voltage, daily average
secondary current, and daily average scrubber water flow rate for each
field at or above the minimum levels established during the initial or
subsequent performance test. Maintaining the daily average stack outlet
temperature at or below the maximum levels established during the
initial or subsequent performance test.
(2) Operating and maintaining each wet electrostatic precipitator
CPMS according to Sec. 63.9632(b) and recording all information needed
to document conformance with these requirements.
(3) Collecting and reducing monitoring data for secondary voltage,
stack outlet temperature, and water flow rate according to Sec.
63.9632(c) and recording all information needed to document conformance
with these requirements.
(4) If the daily average secondary voltage, stack outlet
temperature, or water flow rate does not meet the operating limits
established for a corresponding emission unit, you must then follow the
corrective action procedures in paragraph (j) of this section.
(i) If you use an air pollution control device other than a wet
scrubber, dynamic wet scrubber, dry electrostatic precipitator, wet
electrostatic precipitator, or baghouse, you must submit a site-specific
monitoring plan in accordance with Sec. 63.9631(f). The site-specific
monitoring plan must include the site-specific procedures for
demonstrating initial and continuous compliance with the corresponding
operating limits.
(j) If the daily average operating parameter value for an emission
unit or group of similar emission units does not meet the corresponding
established operating limit, you must then follow the procedures in
paragraphs (j)(1) through (4) of this section.
(1) You must initiate and complete initial corrective action within
10 calendar days and demonstrate that the initial corrective action was
successful. During any period of corrective action, you must continue to
monitor and record all required operating parameters for equipment that
remains in operation. After 10 calendar days, measure and record the
daily average operating parameter value for the emission unit or group
of similar emission units on which corrective action was taken. After
the initial corrective action, if the daily average operating parameter
value for the emission unit or group of similar emission units meets the
operating limit established for the corresponding unit or group, then
the corrective action was successful and the emission unit or group of
similar emission units is in compliance with the established operating
limits.
(2) If the initial corrective action required in paragraph (j)(1) of
this section was not successful, then you must complete additional
corrective action within 10 calendar days and demonstrate that the
subsequent corrective action was successful. During any period of
corrective action, you must continue to monitor and record all required
operating parameters for equipment that remains in operation. After the
second set of 10 calendar days allowed to implement corrective action,
you must again measure and record the daily average operating parameter
value for the emission unit or group of similar emission units. If the
daily average operating parameter value for the emission unit or group
of similar emission units meets the operating limit established for the
corresponding unit or group, then the corrective action was successful
and the emission unit or group of similar emission units is in
compliance with the established operating limits.
(3) If the second attempt at corrective action required in paragraph
(j)(2) of this section was not successful, then you must repeat the
procedures of paragraph (j)(2) of this section until the corrective
action is successful. If the third attempt at corrective action is
unsuccessful, you must conduct another performance test in accordance
with the procedures in Sec. 63.9622(f) and report to the Administrator
as a deviation the third unsuccessful attempt at corrective action.
(4) After the third unsuccessful attempt at corrective action, you
must submit to the Administrator the written report required in
paragraph (j)(3) of this section within 5 calendar days after the third
unsuccessful attempt at corrective action. This report must notify the
Administrator that a deviation
[[Page 91]]
has occurred and document the types of corrective measures taken to
address the problem that resulted in the deviation of established
operating parameters and the resulting operating limits.
Sec. 63.9635 How do I demonstrate continuous compliance with the
work practice standards that apply to me?
(a) You must demonstrate continuous compliance with the work
practice standard requirements in Sec. 63.9591 by operating in
accordance with your fugitive dust emissions control plan at all times.
(b) You must maintain a current copy of the fugitive dust emissions
control plan required in Sec. 63.9591 onsite and it must be available
for inspection upon request. You must keep the plan for the life of the
affected source or until the affected source is no longer subject to the
requirements of this subpart.
Sec. 63.9636 How do I demonstrate continuous compliance with the
operation and maintenance requirements that apply to me?
(a) For each control device subject to an operating limit in Sec.
63.9590(b), you must demonstrate continuous compliance with the
operation and maintenance requirements in Sec. 63.9600(b) by completing
the requirements of paragraphs (a)(1) through (4) of this section.
(1) Performing preventative maintenance for each control device in
accordance with Sec. 63.9600(b)(1) and recording all information needed
to document conformance with these requirements;
(2) Initiating and completing corrective action for a bag leak
detection system alarm in accordance with Sec. 63.9600(b)(2) and
recording all information needed to document conformance with these
requirements;
(3) Initiating and completing corrective action for a CPMS when you
exceed an established operating limit for an air pollution control
device except for a baghouse in accordance with Sec. 63.9600(b)(3) and
recording all information needed to document conformance with these
requirements; and
(4) Implementing and maintaining site-specific good combustion
practices for each indurating furnace in accordance with Sec.
63.9600(b)(4) and recording all information needed to document
conformance with these requirements.
(b) You must maintain a current copy of the operation and
maintenance plan required in Sec. 63.9600(b) onsite, and it must be
available for inspection upon request. You must keep the plan for the
life of the affected source or until the affected source is no longer
subject to the requirements of this subpart.
Sec. 63.9637 What other requirements must I meet to demonstrate
continuous compliance?
(a) Deviations. You must report each instance in which you did not
meet each emission limitation in Table 1 to this subpart that applies to
you. This includes periods of startup, shutdown, and malfunction in
accordance with paragraph (b) of this section. You also must report each
instance in which you did not meet the work practice standards in Sec.
63.9591 and each instance in which you did not meet each operation and
maintenance requirement in Sec. 63.9600 that applies to you. These
instances are deviations from the emission limitations, work practice
standards, and operation and maintenance requirements in this subpart.
These deviations must be reported in accordance with the requirements in
Sec. 63.9641.
(b) Startups, shutdowns, and malfunctions. (1) Consistent with
Sec. Sec. 63.6(e) and 63.7(e)(1), deviations that occur during a period
of startup, shutdown, or malfunction are not violations if you
demonstrate to the Administrator's satisfaction that you were operating
in accordance with Sec. 63.6(e)(1).
(2) The Administrator will determine whether deviations that occur
during a period of startup, shutdown, or malfunction are violations,
according to the provisions in Sec. 63.6(e).
[68 FR 61888, Oct. 30, 2003, as amended at 71 FR 20471, Apr. 20, 2006]
Notifications, Reports, and Records
Sec. 63.9640 What notifications must I submit and when?
(a) You must submit all of the notifications in Sec. Sec. 63.7(b)
and (c), 63.8(f)(4),
[[Page 92]]
and 63.9(b) through (h) that apply to you by the specified dates.
(b) As specified in Sec. 63.9(b)(2), if you start up your affected
source before October 30, 2003, you must submit your initial
notification no later than 120 calendar days after October 30, 2003.
(c) As specified in Sec. 63.9(b)(3), if you start up your new
affected source on or after October 30, 2003, you must submit your
initial notification no later than 120 calendar days after you become
subject to this subpart.
(d) If you are required to conduct a performance test, you must
submit a notification of intent to conduct a performance test at least
60 calendar days before the performance test is scheduled to begin, as
required in Sec. 63.7(b)(1).
(e) If you are required to conduct a performance test or other
initial compliance demonstration, you must submit a notification of
compliance status according to Sec. 63.9(h)(2)(ii). The initial
notification of compliance status must be submitted by the dates
specified in paragraphs (e)(1) and (2) of this section.
(1) For each initial compliance demonstration that does not include
a performance test, you must submit the notification of compliance
status before the close of business on the 30th calendar day following
completion of the initial compliance demonstration.
(2) For each initial compliance demonstration that does include a
performance test, you must submit the notification of compliance status,
including the performance test results, before the close of business on
the 60th calendar day following the completion of the performance test
according to Sec. 63.10(d)(2).
Sec. 63.9641 What reports must I submit and when?
(a) Compliance report due dates. Unless the Administrator has
approved a different schedule, you must submit a semiannual compliance
report to your permitting authority according to the requirements in
paragraphs (a)(1) through (5) of this section.
(1) The first compliance report must cover the period beginning on
the compliance date that is specified for your affected source in Sec.
63.9583 and ending on June 30 or December 31, whichever date comes first
after the compliance date that is specified for your source in Sec.
63.9583.
(2) The first compliance report must be postmarked or delivered no
later than July 31 or January 31, whichever date comes first after your
first compliance report is due.
(3) Each subsequent compliance report must cover the semiannual
reporting period from January 1 through June 30 or the semiannual
reporting period from July 1 through December 31.
(4) Each subsequent compliance report must be postmarked or
delivered no later than July 31 or January 31, whichever date comes
first after the end of the semiannual reporting period.
(5) For each affected source that is subject to permitting
regulations pursuant to 40 CFR part 70 or 40 CFR part 71, and if the
permitting authority has established dates for submitting semiannual
reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR
71.6(a)(3)(iii)(A), you may submit the first and subsequent compliance
reports according to the dates the permitting authority has established
instead of according to the dates in paragraphs (a)(1) through (4) of
this section.
(b) Compliance report contents. Each compliance report must include
the information in paragraphs (b)(1) through (3) of this section and, as
applicable, in paragraphs (b)(4) through (8) of this section.
(1) Company name and address.
(2) Statement by a responsible official, with the official's name,
title, and signature, certifying the truth, accuracy, and completeness
of the content of the report.
(3) Date of report and beginning and ending dates of the reporting
period.
(4) If you had a startup, shutdown, or malfunction during the
reporting period and you took actions consistent with your startup,
shutdown, and malfunction plan, the compliance report must include the
information in Sec. 63.10(d)(5)(i).
(5) If there were no deviations from the continuous compliance
requirements in Sec. Sec. 63.9634 through 63.9636 that apply to you,
then provide a statement that there were no deviations from the emission
limitations, work practice
[[Page 93]]
standards, or operation and maintenance requirements during the
reporting period.
(6) If there were no periods during which a continuous monitoring
system (including a CPMS or COMS) was out-of-control as specified in
Sec. 63.8(c)(7), then provide a statement that there were no periods
during which a continuous monitoring system was out-of-control during
the reporting period.
(7) For each deviation from an emission limitation in Table 1 to
this subpart that occurs at an affected source where you are not using a
continuous monitoring system (including a CPMS or COMS) to comply with
an emission limitation in this subpart, the compliance report must
contain the information in paragraphs (b)(1) through (4) of this section
and the information in paragraphs (b)(7)(i) and (ii) of this section.
This includes periods of startup, shutdown, and malfunction.
(i) The total operating time of each affected source during the
reporting period.
(ii) Information on the number, duration, and cause of deviations
(including unknown cause) as applicable, and the corrective action
taken.
(8) For each deviation from an emission limitation occurring at an
affected source where you are using a continuous monitoring system
(including a CPMS or COMS) to comply with the emission limitation in
this subpart, you must include the information in paragraphs (b)(1)
through (4) of this section and the information in paragraphs (b)(8)(i)
through (xi) of this section. This includes periods of startup,
shutdown, and malfunction.
(i) The date and time that each malfunction started and stopped.
(ii) The date and time that each continuous monitoring system was
inoperative, except for zero (low-level) and high-level checks.
(iii) The date, time, and duration that each continuous monitoring
system was out-of-control, including the information in Sec.
63.8(c)(8).
(iv) The date and time that each deviation started and stopped, and
whether each deviation occurred during a period of startup, shutdown, or
malfunction or during another period.
(v) A summary of the total duration of the deviation during the
reporting period and the total duration as a percent of the total source
operating time during that reporting period.
(vi) A breakdown of the total duration of the deviations during the
reporting period including those that are due to startup, shutdown,
control equipment problems, process problems, other known causes, and
other unknown causes.
(vii) A summary of the total duration of continuous monitoring
system downtime during the reporting period and the total duration of
continuous monitoring system downtime as a percent of the total source
operating time during the reporting period.
(viii) A brief description of the process units.
(ix) A brief description of the continuous monitoring system.
(x) The date of the latest continuous monitoring system
certification or audit.
(xi) A description of any changes in continuous monitoring systems,
processes, or controls since the last reporting period.
(c) Immediate startup, shutdown, and malfunction report. If you had
a startup, shutdown, or malfunction during the semiannual reporting
period that was not consistent with your startup, shutdown, and
malfunction plan, you must submit an immediate startup, shutdown, and
malfunction report according to the requirements in Sec.
63.10(d)(5)(ii).
(d) Part 70 monitoring report. If you have obtained a title V
operating permit for an affected source pursuant to 40 CFR part 70 or 40
CFR part 71, you must report all deviations as defined in this subpart
in the semiannual monitoring report required by 40 CFR
70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A). If you submit a
compliance report for an affected source along with, or as part of, the
semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40
CFR 71.6(a)(3)(iii)(A), and the compliance report includes all the
required information concerning deviations from any emission limitation
or operation and
[[Page 94]]
maintenance requirement in this subpart, submission of the compliance
report satisfies any obligation to report the same deviations in the
semiannual monitoring report. However, submission of a compliance report
does not otherwise affect any obligation you may have to report
deviations from permit requirements for an affected source to your
permitting authority.
(e) Immediate corrective action report. If you had three
unsuccessful attempts of applying corrective action as described in
Sec. 63.9634(j) on an emission unit or group of emission units, then
you must submit an immediate corrective action report. Within 5 calendar
days after the third unsuccessful attempt at corrective action, you must
submit to the Administrator a written report in accordance with Sec.
63.9634(j)(3) and (4). This report must notify the Administrator that a
deviation has occurred and document the types of corrective measures
taken to address the problem that resulted in the deviation of
established operating parameters and the resulting operating limits.
Sec. 63.9642 What records must I keep?
(a) You must keep the records listed in paragraphs (a)(1) through
(3) of this section.
(1) A copy of each notification and report that you submitted to
comply with this subpart, including all documentation supporting any
initial notification or notification of compliance status that you
submitted, according to the requirements in Sec. 63.10(b)(2)(xiv).
(2) The records in Sec. 63.6(e)(3)(iii) through (v) related to
startup, shutdown, and malfunction.
(3) Records of performance tests and performance evaluations as
required in Sec. 63.10(b)(2)(viii).
(b) For each COMS, you must keep the records specified in paragraphs
(b)(1) through (4) of this section.
(1) Records described in Sec. 63.10(b)(2)(vi) through (xi).
(2) Monitoring data for COMS during a performance evaluation as
required in Sec. 63.6(h)(7)(i) and (ii).
(3) Previous (that is, superceded) versions of the performance
evaluation plan as required in Sec. 63.8(d)(3).
(4) Records of the date and time that each deviation started and
stopped, and whether the deviation occurred during a period of startup,
shutdown, or malfunction or during another period.
(c) You must keep the records required in Sec. Sec. 63.9634 through
63.9636 to show continuous compliance with each emission limitation,
work practice standard, and operation and maintenance requirement that
applies to you.
Sec. 63.9643 In what form and how long must I keep my records?
(a) Your records must be in a form suitable and readily available
for expeditious review, according to Sec. 63.10(b)(1).
(b) As specified in Sec. 63.10(b)(1), you must keep each record for
5 years following the date of each occurrence, measurement, maintenance,
corrective action, report, or record.
(c) You must keep each record on site for at least 2 years after the
date of each occurrence, measurement, maintenance, corrective action,
report, or record according to Sec. 63.10(b)(1). You can keep the
records offsite for the remaining 3 years.
Other Requirements and Information
Sec. 63.9650 What parts of the General Provisions apply to me?
Table 2 to this subpart shows which parts of the General Provisions
in Sec. Sec. 63.1 through 63.15 apply to you.
Sec. 63.9651 Who implements and enforces this subpart?
(a) This subpart can be implemented and enforced by us, the EPA, or
a delegated authority such as your State, local, or tribal agency. If
the EPA Administrator has delegated authority to your State, local, or
tribal agency, then that agency has the authority to implement and
enforce this subpart. You should contact your EPA Regional Office to
find out if this subpart is delegated to your State, local, or tribal
agency.
(b) In delegating implementation and enforcement authority of this
subpart to a State, local, or tribal agency under subpart E of this
part, the authorities contained in paragraph (c) of
[[Page 95]]
this section are retained by the Administrator of the EPA and are not
transferred to the State, local, or tribal agency.
(c) The authorities that will not be delegated to State, local, or
tribal agencies are specified in paragraphs (c)(1) through (4) of this
section.
(1) Approval of non-opacity emission limitations and work practice
standards under Sec. 63.6(h)(9) and as defined in Sec. 63.90.
(2) Approval of major alternatives to test methods under Sec.
63.7(e)(2)(ii) and (f) and as defined in Sec. 63.90.
(3) Approval of major alternatives to monitoring under Sec. 63.8(f)
and as defined in Sec. 63.90.
(4) Approval of major alternatives to recordkeeping and reporting
under Sec. 63.10(f) and as defined in Sec. 63.90.
Sec. 63.9652 What definitions apply to this subpart?
Terms used in this subpart are defined in the Clean Air Act, in
Sec. 63.2, and in this section as follows.
Affected source means each new or existing ore crushing and handling
operation, ore dryer, indurating furnace, or finished pellet handling
operation, at your taconite iron ore processing plant.
Bag leak detection system means a system that is capable of
continuously monitoring relative particulate matter (dust) loadings in
the exhaust of a baghouse to detect bag leaks and other upset
conditions. A bag leak detection system includes, but is not limited to,
an instrument that operates on triboelectric, light scattering, light
transmittance, or other effect to continuously monitor relative
particulate matter loadings.
Conveyor belt transfer point means a point in the conveying
operation where the taconite ore or taconite pellets are transferred to
or from a conveyor belt, except where the taconite ore or taconite
pellets are being transferred to a bin or stockpile.
Crusher means a machine used to crush taconite ore and includes
feeders or conveyors located immediately below the crushing surfaces.
Crushers include, but are not limited to, gyratory crushers and cone
crushers.
Deviation means any instance in which an affected source subject to
this subpart, or an owner or operator of such a source:
(1) Fails to meet any requirement or obligation established by this
subpart, including but not limited to any emission limitation (including
operating limits) or operation and maintenance requirement;
(2) Fails to meet any term or condition that is adopted to implement
an applicable requirement in this subpart and that is included in the
operating permit for any affected source required to obtain such a
permit; or
(3) Fails to meet any emission limitation in this subpart during
startup, shutdown, or malfunction, regardless of whether or not such
failure is permitted by this subpart.
Dynamic wet scrubber means an air emissions control device which
utilizes a mechanically powered fan to cause contact between the process
exhaust gas stream and the scrubbing liquid which are introduced
concurrently into the fan inlet.
Emission limitation means any emission limit, opacity limit, or
operating limit.
Finished pellet handling means the transfer of fired taconite
pellets from the indurating furnace to the finished pellet stockpiles at
the plant. Finished pellet handling includes, but is not limited to,
furnace discharge or grate discharge, and finished pellet screening,
transfer, and storage. The atmospheric pellet cooler vent stack and
gravity conveyor gallery vents designed to remove heat and water vapor
from the structure are not included as a part of the finished pellet
handling affected source.
Fugitive dust emission source means a stationary source from which
particles are discharged to the atmosphere due to wind or mechanical
inducement such as vehicle traffic. Fugitive dust sources include, but
are not limited to:
(1) Stockpiles (includes, but is not limited to, stockpiles of
uncrushed ore, crushed ore, or finished pellets);
(2) Material transfer points;
(3) Plant roadways;
(4) Tailings basins;
(5) Pellet loading areas; and
(6) Yard areas.
[[Page 96]]
Grate feed means the transfer of unfired taconite pellets from the
pelletizer into the indurating furnace.
Grate kiln indurating furnace means a furnace system that consists
of a traveling grate, a rotary kiln, and an annular cooler. The grate
kiln indurating furnace begins at the point where the grate feed
conveyor discharges the green balls onto the furnace traveling grate and
ends where the hardened pellets exit the cooler. The atmospheric pellet
cooler vent stack is not included as part of the grate kiln indurating
furnace.
Indurating means the process whereby unfired taconite pellets,
called green balls, are hardened at high temperature in an indurating
furnace. Types of indurating furnaces include straight grate indurating
furnaces and grate kiln indurating furnaces.
Ore crushing and handling means the process whereby dry taconite ore
is crushed and screened. Ore crushing and handling includes, but is not
limited to, all dry crushing operations (e.g., primary, secondary, and
tertiary crushing), dry ore conveyance and transfer points, dry ore
classification and screening, dry ore storage and stockpiling, dry
milling, dry cobbing (i.e., dry magnetic separation), and the grate
feed. Ore crushing and handling specifically excludes any operations
where the dry crushed ore is saturated with water, such as wet milling
and wet magnetic separation.
Ore dryer means a rotary dryer that repeatedly tumbles wet taconite
ore concentrate through a heated air stream to reduce the amount of
entrained moisture in the taconite ore concentrate.
Pellet cooler vent stacks means atmospheric vents in the cooler
section of the grate kiln indurating furnace that exhaust cooling air
that is not returned for recuperation. Pellet cooler vent stacks are not
to be confused with the cooler discharge stack, which is in the pellet
loadout or dumping area.
Pellet loading area means that portion of a taconite iron ore
processing plant where taconite pellets are loaded into trucks or
railcars.
Responsible official means responsible official as defined in Sec.
63.2.
Rod-deck venturi scrubber means a wet scrubber emission control
device in which the inlet air flows through a bed of parallel metal
pipes spaced apart to produce a series of parallel venturi throats.
Screen means a device for separating material according to size by
passing undersize material through one or more mesh surfaces (screens)
in series and retaining oversize material on the mesh surfaces
(screens).
Storage bin means a facility for storage (including surge bins and
hoppers) of taconite ore or taconite pellets prior to further processing
or loading.
Straight grate indurating furnace means a furnace system that
consists of a traveling grate that carries the taconite pellets through
different furnace temperature zones. In the straight grate indurating
furnace a layer of fired pellets, called the hearth layer, is placed on
the traveling grate prior to the addition of unfired pellets. The
straight grate indurating furnace begins at the point where the grate
feed conveyor discharges the green balls onto the furnace traveling
grate and ends where the hardened pellets drop off of the traveling
grate.
Taconite iron ore processing means the separation and concentration
of iron ore from taconite, a low-grade iron ore, to produce taconite
pellets.
Taconite ore means a low-grade iron ore suitable for concentration
of magnetite or hematite by fine grinding and magnetic or flotation
treatment, from which pellets containing iron can be produced.
Tailings basin means a natural or artificial impoundment in which
gangue or other refuse material resulting from the washing,
concentration or treatment of ground taconite iron ore is confined.
Wet grinding and milling means the process whereby wet taconite ore
is finely ground using rod and/or ball mills.
[[Page 97]]
Sec. Table 1 to Subpart RRRRR of Part 63--Emission Limits
As required in Sec. 63.9590(a), you must comply with each
applicable emission limit in the following table:
----------------------------------------------------------------------------------------------------------------
then you must comply with the
flow-weighted mean
concentration of particulate
matter discharged to the
If your affected source is . . . and the affected source is categorized as atmosphere from the affected
. . . source, as determined using
the procedures in Sec.
63.9621(b), such that you
must not exceed . . .
----------------------------------------------------------------------------------------------------------------
1. Ore crushing and handling emission Existing.................................. 0.008 grains per dry standard
units. cubic foot (gr/dscf).
New....................................... 0.005 gr/dscf.
2. Straight grate indurating furnace Existing.................................. 0.01 gr/dscf.
processing magnetite. New....................................... 0.006 gr/dscf.
3. Grate kiln indurating furnace Existing.................................. 0.01 gr/dscf.
processing magnetite. New....................................... 0.006 gr/dscf.
4. Grate kiln indurating furnace Existing.................................. 0.03 gr/dscf.
processing hematite. New....................................... 0.018 gr/dscf.
5. Finished pellet handling emission Existing.................................. 0.008 gr/dscf.
units. New....................................... 0.005 gr/dscf.
6. Ore dryer......................... Existing.................................. 0.052 gr/dscf.
New....................................... 0.025 gr/dscf.
----------------------------------------------------------------------------------------------------------------
Sec. Table 2 to Subpart RRRRR of Part 63--Applicability of General
Provisions to Subpart RRRRR of Part 63
As required in Sec. 63.9650, you must comply with the requirements
of the NESHAP General Provisions (40 CFR part 63, subpart A) shown in
the following table:
----------------------------------------------------------------------------------------------------------------
Citation Subject Applies to Subpart RRRRR Explanation
----------------------------------------------------------------------------------------------------------------
Sec. 63.1....................... Applicability......... Yes.
Sec. 63.2....................... Definitions........... Yes.
Sec. 63.3....................... Units and Yes.
Abbreviations.
Sec. 63.4....................... Prohibited Activities. Yes.
Sec. 63.5....................... Construction/ Yes.
Reconstruction.
Sec. 63.6(a)-(g)................ Compliance With Yes.
Standards and
Maintenance
Requirements.
Sec. 63.6(h).................... Compliance With No........................... Subpart RRRRR does
Opacity and Visible not contain opacity
Emission (VE) and VE standards.
Standards.
Sec. 63.6(i), (j)............... Extension of Yes.
Compliance and
Presidential
Compliance Extension.
Sec. 63.7(a)(1)-(2)............. Applicability and No........................... Subpart RRRRR
Performance Test specifies
Dates. performance test
applicability and
dates.
Sec. 63.7(a)(3), (b)-(h)........ Performance Testing Yes.
Requirements.
Sec. 63.8(a)(1)-(a)(3), (b), Monitoring Yes.......................... Continuous monitoring
(c)(1)-(3), (c)(5)-(8), (d), (e), Requirements. system (CMS)
(f)(1)-(5), (g)(1)-(4). requirements in Sec.
63.8(c)(5) and (6)
apply only to COMS
for dry
electrostatic
precipitators.
Sec. 63.8(a)(4)................. Additional Monitoring No........................... Subpart RRRRR does
Requirements for not require flares.
Control Devices in
Sec. 63.11.
Sec. 63.8(c)(4)................. Continuous Monitoring No........................... Subpart RRRRR
System Requirements. specifies
requirements for
operation of CMS.
Sec. 63.8(f)(6)................. Relative Accuracy Test No........................... Subpart RRRRR does
Alternative (RATA). not require
continuous emission
monitoring systems.
Sec. 63.8(g)(5)................. Data Reduction........ No........................... Subpart RRRRR
specifies data
reduction
requirements.
Sec. 63.9....................... Notification Yes.......................... Additional
Requirements. notifications for
CMS in Sec.
63.9(g) apply to
COMS for dry
electrostatic
precipitators.
[[Page 98]]
Sec. 63.10(a), (b)(1)-(2)(xii), Recordkeeping and Yes.......................... Additional records
(b)(2)(xiv), (b)(3), (c)(1)-(6), Reporting for CMS in Sec.
(c)(9)-(15), (d)(1)-(2), (d)(4)- Requirements. 63.10(c)(1)-(6), (9)-
(5), (e), (f). (15), and reports in
Sec. 63.10(d)(1)-
(2) apply only to
COMS for dry
electrostatic
precipitators.
Sec. 63.10(b)(2)(xiii).......... CMS Records for RATA No........................... Subpart RRRRR doesn't
Alternative. require continuous
emission monitoring
systems.
Sec. 63.10(c)(7)-(8)............ Records of Excess No........................... Subpart RRRRR
Emissions and specifies record
Parameter Monitoring requirements.
Exceedances for CMS.
Sec. 63.10(d)(3)................ Reporting opacity or No........................... Subpart RRRRR does
VE observations. not have opacity and
VE standards.
Sec. 63.11...................... Control Device No........................... Subpart RRRRR does
Requirements. not require flares.
Sec. 63.12...................... State Authority and Yes.
Delegations.
Sec. 63.13-Sec. 63.15......... Addresses, Yes.
Incorporation by
Reference,
Availability of
Information.
----------------------------------------------------------------------------------------------------------------
Subpart SSSSS_National Emission Standards for Hazardous Air Pollutants
for Refractory Products Manufacturing
Source: 68 FR 18747, Apr. 16, 2003, unless otherwise noted.
What This Subpart Covers
Sec. 63.9780 What is the purpose of this subpart?
This subpart establishes national emission standards for hazardous
air pollutants (NESHAP) for refractory products manufacturing
facilities. This subpart also establishes requirements to demonstrate
initial and continuous compliance with the emission limitations.
Sec. 63.9782 Am I subject to this subpart?
You are subject to this subpart if you own or operate a refractory
products manufacturing facility that is, is located at, or is part of, a
major source of hazardous air pollutant (HAP) emissions according to the
criteria in paragraphs (a) and (b) of this section.
(a) A refractory products manufacturing facility is a plant site
that manufactures refractory products (refractory bricks, refractory
shapes, monolithics, kiln furniture, crucibles, and other materials used
for lining furnaces and other high temperature process units), as
defined in Sec. 63.9824. Refractory products manufacturing facilities
typically process raw material by crushing, grinding, and screening;
mixing the processed raw materials with binders and other additives;
forming the refractory mix into shapes; and drying and firing the
shapes.
(b) A major source of HAP is a plant site that emits or has the
potential to emit any single HAP at a rate of 9.07 megagrams (10 tons)
or more per year or any combination of HAP at a rate of 22.68 megagrams
(25 tons) or more per year.
Sec. 63.9784 What parts of my plant does this subpart cover?
(a) This subpart applies to each new, reconstructed, or existing
affected source at a refractory products manufacturing facility.
(b) The existing affected sources are shape dryers, curing ovens,
and kilns that are used to manufacture refractory products that use
organic HAP; shape preheaters, pitch working tanks, defumers, and coking
ovens that are used to produce pitch-impregnated refractory products;
kilns that are used to manufacture chromium refractory products; and
kilns that are used to manufacture clay refractory products.
(c) The new or reconstructed affected sources are shape dryers,
curing ovens, and kilns that are used to manufacture refractory products
that use organic HAP; shape preheaters, pitch working tanks, defumers,
and coking ovens used to produce pitch-impregnated refractory products;
kilns that are used to
[[Page 99]]
manufacture chromium refractory products; and kilns that are used to
manufacture clay refractory products.
(d) Shape dryers, curing ovens, kilns, coking ovens, defumers, shape
preheaters, and pitch working tanks that are research and development
(R&D) process units are not subject to the requirements of this subpart.
(See definition of research and development process unit in Sec.
63.9824).
(e) A source is a new affected source if you began construction of
the affected source after June 20, 2002, and you met the applicability
criteria at the time you began construction.
(f) An affected source is reconstructed if you meet the criteria as
defined in Sec. 63.2.
(g) An affected source is existing if it is not new or
reconstructed.
Sec. 63.9786 When do I have to comply with this subpart?
(a) If you have a new or reconstructed affected source, you must
comply with this subpart according to paragraphs (a)(1) and (2) of this
section.
(1) If the initial startup of your affected source is before April
16, 2003, then you must comply with the emission limitations for new and
reconstructed sources in this subpart no later than April 16, 2003.
(2) If the initial startup of your affected source is after April
16, 2003, then you must comply with the emission limitations for new and
reconstructed sources in this subpart upon initial startup of your
affected source.
(b) If you have an existing affected source, you must comply with
the emission limitations for existing sources no later than April 17,
2006.
(c) You must be in compliance with this subpart when you conduct a
performance test on an affected source.
(d) If you have an existing area source that increases its emissions
or its potential to emit such that it becomes a major source of HAP, you
must be in compliance with this subpart according to paragraphs (d)(1)
and (2) of this section.
(1) Any portion of the existing facility that is a new affected
source or a new reconstructed source must be in compliance with this
subpart upon startup.
(2) All other parts of the existing facility must be in compliance
with this subpart by 3 years after the date the area source becomes a
major source.
(e) If you have a new area source (i.e., an area source for which
construction or reconstruction was commenced after June 20, 2002) that
increases its emissions or its potential to emit such that it becomes a
major source of HAP, you must be in compliance with this subpart upon
initial startup of your affected source as a major source.
(f) You must meet the notification requirements in Sec. 63.9812
according to the schedule in Sec. 63.9812 and in 40 CFR part 63,
subpart A. Some of the notifications must be submitted before you are
required to comply with the emission limitations in this subpart.
Emission Limitations and Work Practice Standards
Sec. 63.9788 What emission limits, operating limits, and work
practice standards must I meet?
(a) You must meet each emission limit in Table 1 to this subpart
that applies to you.
(b) You must meet each operating limit in Table 2 to this subpart
that applies to you.
(c) You must meet each work practice standard in Table 3 to this
subpart that applies to you.
Sec. 63.9790 What are my options for meeting the emission limits?
To meet the emission limits in Table 1 to this subpart, you must use
one or both of the options listed in paragraphs (a) and (b) of this
section.
(a) Emissions control system. Use an emissions capture and
collection system and an add-on air pollution control device (APCD) and
demonstrate that the resulting emissions or emissions reductions meet
the applicable emission limits in Table 1 to this subpart, and
demonstrate that the capture and collection system and APCD meet the
applicable operating limits in Table 2 to this subpart.
(b) Process changes. Use raw materials that have little or no
potential to emit HAP during the refractory products manufacturing
process or implement manufacturing process changes and
[[Page 100]]
demonstrate that the resulting emissions or emissions reductions meet
the applicable emission limits in Table 1 to this subpart without an
add-on APCD.
General Compliance Requirements
Sec. 63.9792 What are my general requirements for complying with
this subpart?
(a) You must be in compliance with the emission limitations
(including operating limits and work practice standards) in this subpart
at all times, except during periods specified in paragraphs (a)(1) and
(2) of this section.
(1) Periods of startup, shutdown, and malfunction.
(2) Periods of scheduled maintenance on a control device that is
used on an affected continuous kiln, as specified in paragraph (e) of
this section.
(b) Except as specified in paragraph (e) of this section, you must
always operate and maintain your affected source, including air
pollution control and monitoring equipment, according to the provisions
in Sec. 63.6(e)(1)(i). During the period between the compliance date
specified for your affected source in Sec. 63.9786 and the date upon
which continuous monitoring systems have been installed and validated
and any applicable operating limits have been established, you must
maintain a log detailing the operation and maintenance of the process
and emissions control equipment.
(c) You must develop a written startup, shutdown, and malfunction
plan (SSMP) according to the provisions in Sec. 63.6(e)(3).
(d) You must prepare and implement a written operation, maintenance,
and monitoring (OM&M) plan according to the requirements in Sec.
63.9794.
(e) If you own or operate an affected continuous kiln and must
perform scheduled maintenance on the control device for that kiln, you
may bypass the kiln control device and continue operating the kiln upon
approval by the Administrator, provided you satisfy the conditions
listed in paragraphs (e)(1) through (3) of this section.
(1) You must request approval from the Administrator to bypass the
control device while the scheduled maintenance is performed. You must
submit a separate request each time you plan to bypass the control
device, and your request must include the information specified in
paragraphs (e)(1)(i) through (vi) of this section.
(i) Reason for the scheduled maintenance.
(ii) Explanation for why the maintenance cannot be performed when
the kiln is shut down.
(iii) Detailed description of the maintenance activities.
(iv) Time required to complete the maintenance.
(v) How you will minimize HAP emissions from the kiln during the
period when the control device is out of service.
(vi) How you will minimize the time when the kiln is operating and
the control device is out of service for scheduled maintenance.
(2) You must minimize HAP emissions during the period when the kiln
is operating and the control device is out of service.
(3) You must minimize the time period during which the kiln is
operating and the control device is out of service.
(f) You must be in compliance with the provisions of subpart A of
this part, except as noted in Table 11 to this subpart.
[68 FR 18747, Apr. 16, 2003, as amended at 71 FR 20471, Apr. 20, 2006]
Sec. 63.9794 What do I need to know about operation, maintenance,
and monitoring plans?
(a) For each continuous parameter monitoring system (CPMS) required
by this subpart, you must develop, implement, make available for
inspection, and revise, as necessary, an OM&M plan that includes the
information in paragraphs (a)(1) through (13) of this section.
(1) A list and identification of each process and add-on APCD that
is required by this subpart to be monitored, the type of monitoring
device that will be used, and the operating parameters that will be
monitored.
(2) Specifications for the sensor, signal analyzer, and data
collection system.
(3) A monitoring schedule that specifies the frequency that the
parameter values will be determined and recorded.
[[Page 101]]
(4) The operating limits for each parameter that represent
continuous compliance with the emission limitations in Sec. 63.9788,
based on values of the monitored parameters recorded during performance
tests.
(5) Procedures for installing the CPMS at a measurement location
relative to each process unit or APCD such that measurement is
representative of control of emissions.
(6) Procedures for the proper operation and routine and long-term
maintenance of each process unit and APCD, including a maintenance and
inspection schedule that is consistent with the manufacturer's
recommendations.
(7) Procedures for the proper operation and maintenance of
monitoring equipment consistent with the requirements in Sec. Sec.
63.8(c)(1), (3), (4)(ii), (7), and (8), and 63.9804.
(8) Ongoing data quality assurance procedures in accordance with the
general requirements of Sec. 63.8(d).
(9) Procedures for evaluating the performance of each CPMS.
(10) Procedures for responding to operating parameter deviations,
including the procedures in paragraphs (a)(10)(i) through (iii) of this
section:
(i) Procedures for determining the cause of the operating parameter
deviation.
(ii) Actions for correcting the deviation and returning the
operating parameters to the allowable limits.
(iii) Procedures for recording the times that the deviation began
and ended, and when corrective actions were initiated and completed.
(11) Procedures for keeping records to document compliance and
reporting in accordance with the requirements of Sec. 63.10(c), (e)(1),
and (e)(2)(i).
(12) If you operate a kiln that is subject to the limits on the type
of fuel used, as specified in items 3 and 4 of Table 3 to subpart SSSSS,
procedures for using alternative fuels.
(13) If you operate an affected continuous kiln and you plan to take
the kiln control device out of service for scheduled maintenance, as
specified in Sec. 63.9792(e), the procedures specified in paragraphs
(a)(13)(i) and (ii) of this section.
(i) Procedures for minimizing HAP emissions from the kiln during
periods of scheduled maintenance of the kiln control device when the
kiln is operating and the control device is out of service.
(ii) Procedures for minimizing any period of scheduled maintenance
on the kiln control device when the kiln is operating and the control
device is out of service.
(b) Changes to the operating limits in your OM&M plan require a new
performance test. If you are revising an operating limit parameter
value, you must meet the requirements in paragraphs (b)(1) and (2) of
this section.
(1) Submit a Notification of Performance Test to the Administrator
as specified in Sec. 63.7(b).
(2) After completing the performance tests to demonstrate that
compliance with the emission limits can be achieved at the revised
operating limit parameter value, you must submit the performance test
results and the revised operating limits as part of the Notification of
Compliance Status required under Sec. 63.9(h).
(c) If you are revising the inspection and maintenance procedures in
your OM&M plan, you do not need to conduct a new performance test.
Testing and Initial Compliance Requirements
Sec. 63.9796 By what date must I conduct performance tests?
You must conduct performance tests within 180 calendar days after
the compliance date that is specified for your source in Sec. 63.9786
and according to the provisions in Sec. 63.7(a)(2).
Sec. 63.9798 When must I conduct subsequent performance tests?
(a) You must conduct a performance test every 5 years following the
initial performance test, as part of renewing your 40 CFR part 70 or 40
CFR part 71 operating permit.
(b) You must conduct a performance test when you want to change the
parameter value for any operating limit specified in your OM&M plan.
(c) If you own or operate a source that is subject to the emission
limits specified in items 2 through 9 of Table
[[Page 102]]
1 to this subpart, you must conduct a performance test on the source(s)
listed in paragraphs (c)(1) and (2) of this section before you start
production of any refractory product for which the organic HAP
processing rate is likely to exceed by more than 10 percent the maximum
organic HAP processing rate established during the most recent
performance test on that same source.
(1) Each affected shape dryer or curing oven that is used to process
the refractory product with the higher organic HAP processing rate.
(2) Each affected kiln that follows an affected shape dryer or
curing oven and is used to process the refractory product with the
higher organic HAP processing rate.
(d) If you own or operate a kiln that is subject to the emission
limits specified in item 5 or 9 of Table 1 to this subpart, you must
conduct a performance test on the affected kiln following any process
changes that are likely to increase organic HAP emissions from the kiln
(e.g., a decrease in the curing cycle time for a curing oven that
precedes the affected kiln in the process line).
(e) If you own or operate a clay refractory products kiln that is
subject to the emission limits specified in item 10 or 11 of Table 1 to
this subpart and is controlled with a dry limestone adsorber (DLA), you
must conduct a performance test on the affected kiln following any
change in the source of limestone used in the DLA.
Sec. 63.9800 How do I conduct performance tests and establish
operating limits?
(a) You must conduct each performance test in Table 4 to this
subpart that applies to you.
(b) Before conducting the performance test, you must install and
validate all monitoring equipment.
(c) Each performance test must be conducted according to the
requirements in Sec. 63.7 and under the specific conditions in Table 4
to this subpart.
(d) You may not conduct performance tests during periods of startup,
shutdown, or malfunction, as specified in Sec. 63.7(e)(1).
(e) You must conduct separate test runs for at least the duration
specified for each performance test required in this section, as
specified in Sec. 63.7(e)(3) and Table 4 to this subpart.
(f) For batch process sources, you must satisfy the requirements
specified in paragraphs (f)(1) through (5) of this section.
(1) You must conduct at least two test runs.
(2) Each test run must last an entire batch cycle unless you develop
an emissions profile, as specified in items 8(a)(i)(4) and 17(b)(i)(4)
of Table 4 to this subpart, or you satisfy the conditions for
terminating a test run prior to the completion of a batch cycle as
specified in item 8(a)(i)(5) of Table 4 to this subpart.
(3) Each test run must be performed over a separate batch cycle
unless you satisfy the conditions for conducting both test runs over a
single batch cycle, as described in paragraphs (f)(3)(i) and (ii) of
this section.
(i) You do not produce the product that corresponds to the maximum
organic HAP processing rate for that batch process source in consecutive
batch cycles.
(ii) To produce that product in two consecutive batch cycles would
disrupt production of other refractory products.
(4) If you want to conduct a performance test over a single batch
cycle, you must include in your Notification of Performance Test the
rationale for testing over a single batch cycle.
(5) If you are granted approval to conduct a performance test over a
single batch cycle, you must use paired sampling trains and collect two
sets of emissions data. Each set of data can be considered a separate
test run.
(g) You must use the data gathered during the performance test and
the equations in paragraphs (g)(1) through (3) of this section to
determine compliance with the emission limitations.
(1) To determine compliance with the total hydrocarbon (THC)
emission concentration limit listed in Table 1 to this subpart, you must
calculate your emission concentration corrected to 18 percent oxygen for
each test run using Equation 1 of this section:
[[Page 103]]
[GRAPHIC] [TIFF OMITTED] TR16AP03.000
Where:
C THC-C = THC concentration, corrected to 18 percent oxygen,
parts per million by volume, dry basis (ppmvd)
C THC = THC concentration (uncorrected), ppmvd
CO2 = oxygen concentration, percent.
(2) To determine compliance with any of the emission limits based on
percentage reduction across an emissions control system specified in
Table 1 to this subpart, you must calculate the percentage reduction for
each test run using Equation 2 of this section:
[GRAPHIC] [TIFF OMITTED] TR16AP03.001
Where:
PR = percentage reduction, percent
ERi = mass emissions rate of specific HAP or pollutant (THC,
HF, or HCl) entering the control device, kilograms (pounds)
per hour
ERo = mass emissions rate of specific HAP or pollutant (THC,
HF, or HCl) exiting the control device, kilograms (pounds) per
hour.
(3) To determine compliance with production-based hydrogen fluoride
(HF) and hydrogen chloride (HCl) emission limits in Table 1 to this
subpart, you must calculate your mass emissions per unit of uncalcined
clay processed for each test run using Equation 3 of this section:
[GRAPHIC] [TIFF OMITTED] TR16AP03.002
Where:
MP = mass per unit of production, kilograms of pollutant per megagram
(pounds per ton) of uncalcined clay processed
ER = mass emissions rate of specific HAP (HF or HCl) during each
performance test run, kilograms (pounds) per hour
P = average uncalcined clay processing rate for the performance test,
megagrams (tons) of uncalcined clay processed per hour.
(h) You must establish each site-specific operating limit in Table 2
to this subpart that applies to you, as specified in Table 4 to this
subpart.
(i) For each affected source that is equipped with an add-on APCD
that is not addressed in Table 2 to this subpart or that is using
process changes as a means of meeting the emission limits in Table 1 to
this subpart, you must meet the requirements in Sec. 63.8(f) and
paragraphs (i)(1) through (3) of this section.
(1) For sources subject to the THC concentration limit specified in
item 3 or 7 of Table 1 to this subpart, you must satisfy the
requirements specified in paragraphs (i)(1)(i) through (iii) of this
section.
(i) You must install a THC continuous emissions monitoring system
(CEMS) at the outlet of the control device or in the stack of the
affected source.
(ii) You must meet the requirements specified in Performance
Specification (PS) 8 of 40 CFR part 60, appendix B.
(iii) You must meet the requirements specified in Procedure 1 of 40
CFR part 60, appendix F.
(2) For sources subject to the emission limits specified in item 3,
4, 7, or 8 of Table 1 to this subpart, you must submit a request for
approval of alternative monitoring methods to the Administrator no later
than the submittal date for the Notification of Performance Test, as
specified in Sec. 63.9812(d). The request must contain the information
specified in paragraphs (i)(2)(i) through (v) of this section.
(i) Description of the alternative add-on APCD or process changes.
(ii) Type of monitoring device or method that will be used,
including the sensor type, location, inspection procedures, quality
assurance and quality control measures, and data recording device.
(iii) Operating parameters that will be monitored.
(iv) Frequency that the operating parameter values will be
determined and recorded to establish continuous compliance with the
operating limits.
(v) Averaging time.
(3) You must establish site-specific operating limits during the
performance test based on the information included in the approved
alternative monitoring methods request and, as applicable, as specified
in Table 4 to this subpart.
[[Page 104]]
Sec. 63.9802 How do I develop an emissions profile?
If you decide to develop an emissions profile for an affected batch
process source; as indicated in item 8(a)(i)(4) or 17(b)(i)(4) of Table
4 to this subpart, you must measure and record mass emissions of the
applicable pollutant throughout a complete batch cycle of the affected
batch process source according to the procedures described in paragraph
(a) or (b) of this section.
(a) If your affected batch process source is subject to the THC
concentration limit specified in item 6(a), 7(a), 8, or 9 of Table 1 to
this subpart or the THC percentage reduction limit specified in item
6(b) or 7(b) of Table 1 to this subpart, you must measure and record the
THC mass emissions rate at the inlet to the control device using the
test methods, averaging periods, and procedures specified in items 10(a)
and (b) of Table 4 to this subpart for each complete hour of the batch
process cycle.
(b) If your affected batch process source is subject to the HF and
HCl percentage reduction emission limits in item 11 of Table 1 to this
subpart, you must measure and record the HF mass emissions rate at the
inlet to the control device through a series of 1-hour test runs
according to the test method specified in item 14(a) of Table 4 to this
subpart for each complete hour of the batch process cycle.
Sec. 63.9804 What are my monitoring system installation, operation,
and maintenance requirements?
(a) You must install, operate, and maintain each CPMS required by
this subpart according to your OM&M plan and the requirements in
paragraphs (a)(1) through (15) of this section.
(1) You must satisfy all applicable requirements of performance
specifications for CPMS specified in 40 CFR part 60, appendix B, upon
promulgation of such performance specifications.
(2) You must satisfy all applicable requirements of quality
assurance (QA) procedures for CPMS specified in 40 CFR part 60, appendix
F, upon promulgation of such QA procedures.
(3) You must install each sensor of your CPMS in a location that
provides representative measurement of the appropriate parameter over
all operating conditions, taking into account the manufacturer's
guidelines.
(4) You must use a CPMS that is capable of measuring the appropriate
parameter over a range that extends from a value of at least 20 percent
less than the lowest value that you expect your CPMS to measure, to a
value of at least 20 percent greater than the highest value that you
expect your CPMS to measure.
(5) You must use a data acquisition and recording system that is
capable of recording values over the entire range specified in paragraph
(a)(4) of this section.
(6) You must use a signal conditioner, wiring, power supply, and
data acquisition and recording system that are compatible with the
output signal of the sensors used in your CPMS.
(7) You must perform an initial calibration of your CPMS based on
the procedures specified in the manufacturer's owner's manual.
(8) You must use a CPMS that is designed to complete a minimum of
one cycle of operation for each successive 15-minute period. To have a
valid hour of data, you must have at least three of four equally-spaced
data values (or at least 75 percent of the total number of values if you
collect more than four data values per hour) for that hour (not
including startup, shutdown, malfunction, or out-of-control periods).
(9) You must record valid data from at least 90 percent of the hours
during which the affected source or process operates.
(10) You must determine and record the 15-minute block averages of
all measurements, calculated after every 15 minutes of operation as the
average of the previous 15 operating minutes (not including periods of
startup, shutdown, or malfunction).
(11) You must determine and record the 3-hour block averages of all
15-minute recorded measurements, calculated after every 3 hours of
operation as the average of the previous 3 operating hours (not
including periods of startup, shutdown, or malfunction).
(12) You must record the results of each inspection, calibration,
initial validation, and accuracy audit.
[[Page 105]]
(13) At all times, you must maintain your CPMS including, but not
limited to, maintaining necessary parts for routine repairs of the CPMS.
(14) You must perform an initial validation of your CPMS under the
conditions specified in paragraphs (14)(i) and (ii) of this section.
(i) Prior to the initial performance test on the affected source for
which the CPMS is required.
(ii) Within 180 days of your replacing or relocating one or more of
the sensors of your CPMS.
(15) Except for redundant sensors, as defined in Sec. 63.9824, any
device that you use to conduct an initial validation or accuracy audit
of your CPMS must meet the accuracy requirements specified in paragraphs
(15)(i) and (ii) of this section.
(i) The device must have an accuracy that is traceable to National
Institute of Standards and Technology (NIST) standards.
(ii) The device must be at least three times as accurate as the
required accuracy for the CPMS.
(b) For each temperature CPMS that is used to monitor the combustion
chamber temperature of a thermal oxidizer or the catalyst bed inlet
temperature of a catalytic oxidizer, you must meet the requirements in
paragraphs (a) and (b)(1) through (6) of this section.
(1) Use a temperature CPMS with a minimum accuracy of 1.0 percent of the temperature value or 2.8 degrees
Celsius ([deg]C) (5 degrees Fahrenheit ([deg]F)), whichever is greater.
(2) Use a data recording system with a minimum resolution of one-
half or better of the required CPMS accuracy specified in paragraph
(b)(1) of this section.
(3) Perform an initial validation of your CPMS according to the
requirements in paragraph (3)(i) or (ii) of this section.
(i) Place the sensor of a calibrated temperature measurement device
adjacent to the sensor of your temperature CPMS in a location that is
subject to the same environment as the sensor of your temperature CPMS.
The calibrated temperature measurement device must satisfy the accuracy
requirements of paragraph (a)(15) of this section. While the process and
control device that is monitored by your CPMS are operating normally,
record concurrently and compare the temperatures measured by your
temperature CPMS and the calibrated temperature measurement device.
Using the calibrated temperature measurement device as the reference,
the temperature measured by your CPMS must be within the accuracy
specified in paragraph (b)(1) of this section.
(ii) Perform any of the initial validation methods for temperature
CPMS specified in performance specifications for CPMS established in 40
CFR part 60, appendix B.
(4) Perform an accuracy audit of your temperature CPMS at least
quarterly, according to the requirements in paragraph (b)(4)(i), (ii),
or (iii) of this section.
(i) If your temperature CPMS includes a redundant temperature
sensor, record three pairs of concurrent temperature measurements within
a 24-hour period. Each pair of concurrent measurements must consist of a
temperature measurement by each of the two temperature sensors. The
minimum time interval between any two such pairs of consecutive
temperature measurements is 1 hour. The measurements must be taken
during periods when the process and control device that is monitored by
your temperature CPMS are operating normally. Calculate the mean of the
three values for each temperature sensor. The mean values must agree
within the required overall accuracy of the CPMS, as specified in
paragraph (b)(1) of this section.
(ii) If your temperature CPMS does not include a redundant
temperature sensor, place the sensor of a calibrated temperature
measurement device adjacent to the sensor of your temperature CPMS in a
location that is subject to the same environment as the sensor of your
temperature CPMS. The calibrated temperature measurement device must
satisfy the accuracy requirements of paragraph (a)(15) of this section.
While the process and control device that is monitored by your
temperature CPMS are operating normally, record concurrently and compare
the temperatures measured by
[[Page 106]]
your CPMS and the calibrated temperature measurement device. Using the
calibrated temperature measurement device as the reference, the
temperature measured by your CPMS must be within the accuracy specified
in paragraph (b)(1) of this section.
(iii) Perform any of the accuracy audit methods for temperature CPMS
specified in QA procedures for CPMS established in 40 CFR part 60,
appendix F.
(5) Conduct an accuracy audit of your CPMS following any 24-hour
period throughout which the temperature measured by your CPMS exceeds
the manufacturer's specified maximum operating temperature range, or
install a new temperature sensor.
(6) If your CPMS is not equipped with a redundant temperature
sensor, perform at least quarterly a visual inspection of all components
of the CPMS for integrity, oxidation, and galvanic corrosion.
(c) For each pressure CPMS that is used to monitor the pressure drop
across a DLA or wet scrubber, you must meet the requirements in
paragraphs (a) and (c)(1) through (7) of this section.
(1) Use a pressure CPMS with a minimum accuracy of 5.0 percent or 0.12 kilopascals (kPa) (0.5 inches of
water column (in. w.c.)), whichever is greater.
(2) Use a data recording system with a minimum resolution of one-
half the required CPMS accuracy specified in paragraph (c)(1) of this
section, or better.
(3) Perform an initial validation of your pressure CPMS according to
the requirements in paragraph (c)(3)(i) or (ii) of this section.
(i) Place the sensor of a calibrated pressure measurement device
adjacent to the sensor of your pressure CPMS in a location that is
subject to the same environment as the sensor of your pressure CPMS. The
calibrated pressure measurement device must satisfy the accuracy
requirements of paragraph (a)(15) of this section. While the process and
control device that is monitored by your CPMS are operating normally,
record concurrently and compare the pressure measured by your CPMS and
the calibrated pressure measurement device. Using the calibrated
pressure measurement device as the reference, the pressure measured by
your CPMS must be within the accuracy specified in paragraph (c)(1) of
this section.
(ii) Perform any of the initial validation methods for pressure CPMS
specified in performance specifications for CPMS established in 40 CFR
part 60, appendix B.
(4) Perform an accuracy audit of your pressure CPMS at least
quarterly, according to the requirements in paragraph (c)(4)(i), (ii),
or (iii) of this section.
(i) If your pressure CPMS includes a redundant pressure sensor,
record three pairs of concurrent pressure measurements within a 24-hour
period. Each pair of concurrent measurements must consist of a pressure
measurement by each of the two pressure sensors. The minimum time
interval between any two such pairs of consecutive pressure measurements
is 1 hour. The measurements must be taken during periods when the
process and control device that is monitored by your CPMS are operating
normally. Calculate the mean of the three pressure measurement values
for each pressure sensor. The mean values must agree within the required
overall accuracy of the CPMS, as specified in paragraph (c)(1) of this
section.
(ii) If your pressure CPMS does not include a redundant pressure
sensor, place the sensor of a calibrated pressure measurement device
adjacent to the sensor of your pressure CPMS in a location that is
subject to the same environment as the sensor of your pressure CPMS. The
calibrated pressure measurement device must satisfy the accuracy
requirements of paragraph (a)(15) of this section. While the process and
control device that is monitored by your pressure CPMS are operating
normally, record concurrently and compare the pressure measured by your
CPMS and the calibrated pressure measurement device. Using the
calibrated pressure measurement device as the reference, the pressure
measured by your CPMS must be within the accuracy specified in paragraph
(c)(1) of this section.
[[Page 107]]
(iii) Perform any of the accuracy audit methods for pressure CPMS
specified in QA procedures for CPMS established in 40 CFR part 60,
appendix F.
(5) Conduct an accuracy audit of your CPMS following any 24-hour
period throughout which the pressure measured by your CPMS exceeds the
manufacturer's specified maximum operating pressure range, or install a
new pressure sensor.
(6) At least monthly, check all mechanical connections on your CPMS
for leakage.
(7) If your CPMS is not equipped with a redundant pressure sensor,
perform at least quarterly a visual inspection of all components of the
CPMS for integrity, oxidation, and galvanic corrosion.
(d) For each liquid flow rate CPMS that is used to monitor the
liquid flow rate in a wet scrubber, you must meet the requirements in
paragraphs (a) and (d)(1) through (7) of this section.
(1) Use a flow rate CPMS with a minimum accuracy of 5.0 percent or 1.9 liters per minute (L/min) (0.5
gallons per minute (gal/min)), whichever is greater.
(2) Use a data recording system with a minimum resolution of one-
half the required CPMS accuracy specified in paragraph (d)(1) of this
section, or better.
(3) Perform an initial validation of your CPMS according to the
requirements in paragraph (3)(i) or (ii) of this section.
(i) Use a calibrated flow rate measurement system to measure the
liquid flow rate in a location that is adjacent to the measurement
location for your flow rate CPMS and is subject to the same environment
as your flow rate CPMS. The calibrated flow rate measurement device must
satisfy the accuracy requirements of paragraph (a)(15) of this section.
While the process and control device that is monitored by your flow rate
CPMS are operating normally, record concurrently and compare the flow
rates measured by your flow rate CPMS and the calibrated flow rate
measurement device. Using the calibrated flow rate measurement device as
the reference, the flow rate measured by your CPMS must be within the
accuracy specified in paragraph (d)(1) of this section.
(ii) Perform any of the initial validation methods for liquid flow
rate CPMS specified in performance specifications for CPMS established
in 40 CFR part 60, appendix B.
(4) Perform an accuracy audit of your flow rate CPMS at least
quarterly, according to the requirements in paragraph (d)(4)(i), (ii),
or (iii) of this section.
(i) If your flow rate CPMS includes a redundant sensor, record three
pairs of concurrent flow rate measurements within a 24-hour period. Each
pair of concurrent measurements must consist of a flow rate measurement
by each of the two flow rate sensors. The minimum time interval between
any two such pairs of consecutive flow rate measurements is 1 hour. The
measurements must be taken during periods when the process and control
device that is monitored by your flow rate CPMS are operating normally.
Calculate the mean of the three flow rate measurement values for each
flow rate sensor. The mean values must agree within the required overall
accuracy of the CPMS, as specified in paragraph (d)(1) of this section.
(ii) If your flow rate CPMS does not include a redundant flow rate
sensor, place the sensor of a calibrated flow rate measurement device
adjacent to the sensor of your flow rate CPMS in a location that is
subject to the same environment as the sensor of your flow rate CPMS.
The calibrated flow rate measurement device must satisfy the accuracy
requirements of paragraph (a)(15) of this section. While the process and
control device that is monitored by your flow rate CPMS are operating
normally, record concurrently and compare the flow rate measured by your
pressure CPMS and the calibrated flow rate measurement device. Using the
calibrated flow rate measurement device as the reference, the flow rate
measured by your CPMS must be within the accuracy specified in paragraph
(d)(1) of this section.
(iii) Perform any of the accuracy audit methods for liquid flow rate
CPMS specified in QA procedures for CPMS established in 40 CFR part 60,
appendix F.
(5) Conduct an accuracy audit of your flow rate CPMS following any
24-hour
[[Page 108]]
period throughout which the flow rate measured by your CPMS exceeds the
manufacturer's specified maximum operating range, or install a new flow
rate sensor.
(6) At least monthly, check all mechanical connections on your CPMS
for leakage.
(7) If your CPMS is not equipped with a redundant flow rate sensor,
perform at least quarterly a visual inspection of all components of the
CPMS for integrity, oxidation, and galvanic corrosion.
(e) For each pH CPMS that is used to monitor the pH of a wet
scrubber liquid, you must meet the requirements in paragraphs (a) and
(e)(1) through (5) of this section.
(1) Use a pH CPMS with a minium accuracy of 0.2 pH units.
(2) Use a data recording system with a minimum resolution of 0.1 pH
units, or better.
(3) Perform an initial validation of your pH CPMS according to the
requirements in paragraph (e)(3)(i) or (ii) of this section.
(i) Perform a single-point calibration using an NIST-certified
buffer solution that is accurate to within 0.02 pH
units at 25 [deg]C (77 [deg]F). If the expected pH of the liquid that is
monitored lies in the acidic range (less than 7 pH), use a buffer
solution with a pH value of 4.00. If the expected pH of the liquid that
is monitored is neutral or lies in the basic range (equal to or greater
than 7 pH), use a buffer solution with a pH value of 10.00. Place the
electrode of your pH CPMS in the container of buffer solution. Record
the pH measured by your CPMS. Using the certified buffer solution as the
reference, the pH measured by your CPMS must be within the accuracy
specified in paragraph (e)(1) of this section.
(ii) Perform any of the initial validation methods for pH CPMS
specified in performance specifications for CPMS established in 40 CFR
part 60, appendix B.
(4) Perform an accuracy audit of your pH CPMS at least weekly,
according to the requirements in paragraph (e)(4)(i), (ii), or (iii) of
this section.
(i) If your pH CPMS includes a redundant pH sensor, record the pH
measured by each of the two pH sensors. The measurements must be taken
during periods when the process and control device that is monitored by
your pH CPMS are operating normally. The two pH values must agree within
the required overall accuracy of the CPMS, as specified in paragraph
(e)(1) of this section.
(ii) If your pH CPMS does not include a redundant pH sensor, perform
a single point calibration using an NIST-certified buffer solution that
is accurate to within 0.02 pH units at 25 [deg]C
(77 [deg]F). If the expected pH of the liquid that is monitored lies in
the acidic range (less than 7 pH), use a buffer solution with a pH value
of 4.00. If the expected pH of the liquid that is monitored is neutral
or lies in the basic range (equal to or greater than 7 pH), use a buffer
solution with a pH value of 10.00. Place the electrode of the pH CPMS in
the container of buffer solution. Record the pH measured by your CPMS.
Using the certified buffer solution as the reference, the pH measured by
your CPMS must be within the accuracy specified in paragraph (e)(1) of
this section.
(iii) Perform any of the accuracy audit methods for pH CPMS
specified in QA procedures for CPMS established in 40 CFR part 60,
appendix F.
(5) If your CPMS is not equipped with a redundant pH sensor, perform
at least monthly a visual inspection of all components of the CPMS for
integrity, oxidation, and galvanic corrosion.
(f) For each bag leak detection system, you must meet the
requirements in paragraphs (f)(1) through (11) of this section.
(1) Each triboelectric bag leak detection system must be installed,
calibrated, operated, and maintained according to the ``Fabric Filter
Bag Leak Detection Guidance'' (EPA-454/R-98-015, September 1997). That
document is available from the U.S. EPA; Office of Air Quality Planning
and Standards; Emissions, Monitoring and Analysis Division; Emission
Measurement Center (D205-02), Research Triangle Park, NC 27711. It is
also available on the Technology Transfer Network (TTN) at the following
address: http://www.epa.gov/ttn/emc/cem.html. Other types of bag leak
detection systems must be installed, operated, calibrated, and
maintained in a manner consistent
[[Page 109]]
with the manufacturer's written specifications and recommendations.
(2) The bag leak detection system must be certified by the
manufacturer to be capable of detecting particulate matter (PM)
emissions at concentrations of 10 milligrams per actual cubic meter
(0.0044 grains per actual cubic foot) or less.
(3) The bag leak detection system sensor must provide an output of
relative PM loadings.
(4) The bag leak detection system must be equipped with a device to
continuously record the output signal from the sensor.
(5) The bag leak detection system must be equipped with an alarm
system that will be engaged automatically when an increase in relative
PM emissions over a preset level is detected. The alarm must be located
where it is easily recognized by plant operating personnel.
(6) For positive pressure fabric filter systems, a bag leak detector
must be installed in each baghouse compartment or cell.
(7) For negative pressure or induced air fabric filters, the bag
leak detector must be installed downstream of the fabric filter.
(8) Where multiple detectors are required, the system's
instrumentation and alarm may be shared among detectors.
(9) The baseline output must be established by adjusting the range
and the averaging period of the device and establishing the alarm set
points and the alarm delay time according to section 5.0 of the ``Fabric
Filter Bag Leak Detection Guidance.''
(10) Following initial adjustment of the system, the owner or
operator must not adjust the sensitivity or range, averaging period,
alarm set points, or alarm delay time except as detailed in the OM&M
plan. In no case may the sensitivity be increased by more than 100
percent or decreased by more than 50 percent over a 365-day period
unless such adjustment follows a complete fabric filter inspection that
demonstrates that the fabric filter is in good operating condition. You
must record each adjustment of your bag leak detection system.
(11) Record the results of each inspection, calibration, and
validation check.
(g) For each lime feed rate measurement device that is used to
monitor the lime feed rate of a dry injection fabric filter (DIFF) or
dry lime scrubber/fabric filter (DLS/FF), or the chemical feed rate of a
wet scrubber, you must meet the requirements in paragraph (a) of this
section.
(h) For each affected source that is subject to the emission limit
specified in item 3, 4, 7, or 8 of Table 1 to this subpart, you must
satisfy the requirements of paragraphs (h)(1) through (3) of this
section.
(1) Install a THC CEMS at the outlet of the control device or in the
stack of the affected source.
(2) Meet the requirements of PS-8 of 40 CFR part 60, appendix B.
(3) Meet the requirements of Procedure 1 of 40 CFR part 60, appendix
F.
(i) Requests for approval of alternate monitoring methods must meet
the requirements in Sec. Sec. 63.9800(i)(2) and 63.8(f).
Sec. 63.9806 How do I demonstrate initial compliance with the
emission limits, operating limits, and work practice standards?
(a) You must demonstrate initial compliance with each emission limit
that applies to you according to the requirements specified in Table 5
to this subpart.
(b) You must establish each site-specific operating limit in Table 2
to this subpart that applies to you according to the requirements
specified in Sec. 63.9800 and Table 4 to this subpart.
(c) You must demonstrate initial compliance with each work practice
standard that applies to you according to the requirements specified in
Table 6 to this subpart.
(d) You must submit the Notification of Compliance Status containing
the results of the initial compliance demonstration according to the
requirements in Sec. 63.9812(e).
Continuous Compliance Requirements
Sec. 63.9808 How do I monitor and collect data to demonstrate continuous compliance?
(a) You must monitor and collect data according to this section.
[[Page 110]]
(b) At all times, you must maintain your monitoring systems
including, but not limited to, maintaining necessary parts for routine
repairs of the monitoring equipment.
(c) Except for, as applicable, monitoring system malfunctions,
associated repairs, and required quality assurance or quality control
activities, you must monitor continuously whenever your affected process
unit is operating. For purposes of calculating data averages, you must
not use data recorded during monitoring system malfunctions, associated
repairs, and required quality assurance or quality control activities.
You must use all the data collected during all other periods in
assessing compliance. A monitoring system malfunction is any sudden,
infrequent, not reasonably preventable failure of the monitoring system
to provide valid data. Monitoring system malfunctions include out of
control continuous monitoring systems (CMS), such as a CPMS. Any
averaging period for which you do not have valid monitoring data as a
result of a monitoring system malfunction and for which such data are
required constitutes a deviation, and you must notify the Administrator
in accordance with Sec. 63.9814(e). Monitoring system failures are
different from monitoring system malfunctions in that they are caused in
part by poor maintenance or careless operation. Any period for which
there is a monitoring system failure and data are not available for
required calculations constitutes a deviation and you must notify the
Administrator in accordance with Sec. 63.9814(e).
Sec. 63.9810 How do I demonstrate continuous compliance with the
emission limits, operating limits, and work practice standards?
(a) You must demonstrate continuous compliance with each emission
limit specified in Table 1 to this subpart that applies to you according
to the requirements specified in Table 7 to this subpart.
(b) You must demonstrate continuous compliance with each operating
limit specified in Table 2 to this subpart that applies to you according
to the requirements specified in Table 8 to this subpart.
(c) You must demonstrate continuous compliance with each work
practice standard specified in Table 3 to this subpart that applies to
you according to the requirements specified in Table 9 to this subpart.
(d) For each affected source that is equipped with an add-on APCD
that is not addressed in Table 2 to this subpart or that is using
process changes as a means of meeting the emission limits in Table 1 to
this subpart, you must demonstrate continuous compliance with each
emission limit in Table 1 to this subpart and each operating limit
established as required in Sec. 63.9800(i)(3) according to the methods
specified in your approved alternative monitoring methods request as
described in Sec. 63.9800(i)(2).
(e) You must report each instance in which you did not meet each
emission limit and each operating limit in this subpart that applies to
you. This includes periods of startup, shutdown, and malfunction. These
instances are deviations from the emission limitations in this subpart.
These deviations must be reported according to the requirements in Sec.
63.9814.
(1) [Reserved]
(2) Consistent with Sec. Sec. 63.6(e) and 63.7(e)(1), deviations
that occur during a period of startup, shutdown, or malfunction are not
violations if you demonstrate to the Administrator's satisfaction that
you were operating in accordance with Sec. 63.6(e)(1) and your OM&M
plan. The Administrator will determine whether deviations that occur
during a period of startup, shutdown, or malfunction are violations,
according to the provisions in Sec. 63.6(e).
[68 FR 18747, Apr. 16, 2003, as amended at 71 FR 20471, Apr. 20, 2006]
Notifications, Reports, and Records
Sec. 63.9812 What notifications must I submit and when?
(a) You must submit all of the notifications in Sec. Sec. 63.7(b)
and (c), 63.8(f)(4), and 63.9 (b) through (e) and (h) that apply to you
by the dates specified.
(b) As specified in Sec. 63.9(b)(2) and (3), if you start up your
affected source before April 16, 2003, you must submit an Initial
Notification not later than 120 calendar days after April 16, 2003.
[[Page 111]]
(c) As specified in Sec. 63.9(b)(3), if you start up your new or
reconstructed affected source on or after April 16, 2003, you must
submit an Initial Notification not later than 120 calendar days after
you become subject to this subpart.
(d) If you are required to conduct a performance test, you must
submit a Notification of Performance Test at least 60 calendar days
before the performance test is scheduled to begin, as required in Sec.
63.7(b)(1).
(e) If you are required to conduct a performance test, you must
submit a Notification of Compliance Status as specified in Sec. 63.9(h)
and paragraphs (e)(1) and (2) of this section.
(1) For each compliance demonstration that includes a performance
test conducted according to the requirements in Table 4 to this subpart,
you must submit the Notification of Compliance Status, including the
performance test results, before the close of business on the 60th
calendar day following the completion of the performance test, according
to Sec. 63.10(d)(2).
(2) In addition to the requirements in Sec. 63.9(h)(2)(i), you must
include the information in paragraphs (e)(2)(i) through (iv) of this
section in your Notification of Compliance Status.
(i) The operating limit parameter values established for each
affected source with supporting documentation and a description of the
procedure used to establish the values.
(ii) Design information and analysis with supporting documentation
demonstrating conformance with requirements for capture/collection
systems in Table 2 to this subpart.
(iii) A description of the methods used to comply with any
applicable work practice standard.
(iv) For each APCD that includes a fabric filter, analysis and
supporting documentation demonstrating conformance with EPA guidance and
specifications for bag leak detection systems in Sec. 63.9804(f).
(f) If you operate a clay refractory products kiln or a chromium
refractory products kiln that is subject to the work practice standard
specified in item 3 or 4 of Table 3 to this subpart, and you intend to
use a fuel other than natural gas or equivalent to fire the affected
kiln, you must submit a notification of alternative fuel use within 48
hours of the declaration of a period of natural gas curtailment or
supply interruption, as defined in Sec. 63.9824. The notification must
include the information specified in paragraphs (f)(1) through (5) of
this section.
(1) Company name and address.
(2) Identification of the affected kiln.
(3) Reason you are unable to use natural gas or equivalent fuel,
including the date when the natural gas curtailment was declared or the
natural gas supply interruption began.
(4) Type of alternative fuel that you intend to use.
(5) Dates when the alternative fuel use is expected to begin and
end.
(g) If you own or operate an affected continuous kiln and must
perform scheduled maintenance on the control device for that kiln, you
must request approval from the Administrator before bypassing the
control device, as specified in Sec. 63.9792(e). You must submit a
separate request for approval each time you plan to bypass the kiln
control device.
Sec. 63.9814 What reports must I submit and when?
(a) You must submit each report in Table 10 to this subpart that
applies to you.
(b) Unless the Administrator has approved a different schedule for
submission of reports under Sec. 63.10(a), you must submit each report
by the date in Table 10 to this subpart and as specified in paragraphs
(b)(1) through (5) of this section.
(1) The first compliance report must cover the period beginning on
the compliance date that is specified for your affected source in Sec.
63.9786 and ending on June 30 or December 31 and lasting at least 6
months but less than 12 months. For example, if your compliance date is
March 1, then the first semiannual reporting period would begin on March
1 and end on December 31.
(2) The first compliance report must be postmarked or delivered no
later than July 31 or January 31 for compliance periods ending on June
30 and December 31, respectively.
[[Page 112]]
(3) Each subsequent compliance report must cover the semiannual
reporting period from January 1 through June 30 or the semiannual
reporting period from July 1 through December 31.
(4) Each subsequent compliance report must be postmarked or
delivered no later than July 31 or January 31 for compliance periods
ending on June 30 and December 31, respectively.
(5) For each affected source that is subject to permitting
regulations pursuant to 40 CFR part 70 or 40 CFR part 71 and, if the
permitting authority has established dates for submitting semiannual
reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR
71.6(a)(3)(iii)(A), you may submit the first and subsequent compliance
reports according to the dates the permitting authority has established
instead of according to the dates in paragraphs (b)(1) through (4) of
this section. In such cases, you must notify the Administrator of this
change.
(c) The compliance report must contain the information in paragraphs
(c)(1) through (6) of this section.
(1) Company name and address.
(2) Statement by a responsible official with that official's name,
title, and signature, certifying that, based on information and belief
formed after reasonable inquiry, the statements and information in the
report are true, accurate, and complete.
(3) Date of report and beginning and ending dates of the reporting
period.
(4) If you had a startup, shutdown, or malfunction during the
reporting period, and you took actions consistent with your SSMP and
OM&M plan, the compliance report must include the information specified
in Sec. 63.10(d)(5)(i).
(5) If there are no deviations from any emission limitations
(emission limit, operating limit, or work practice standard) that apply
to you, the compliance report must include a statement that there were
no deviations from the emission limitations during the reporting period.
(6) If there were no periods during which any affected CPMS was out
of control as specified in Sec. 63.8(c)(7), the compliance report must
include a statement that there were no periods during which the CPMS was
out of control during the reporting period.
(d) For each deviation from an emission limitation (emission limit,
operating limit, or work practice standard) that occurs at an affected
source where you are not using a CPMS to comply with the emission
limitations in this subpart, the compliance report must contain the
information in paragraphs (c)(1) through (4) and (d)(1) and (2) of this
section. This includes periods of startup, shutdown, and malfunction.
(1) The compliance report must include the total operating time of
each affected source during the reporting period.
(2) The compliance report must include information on the number,
duration, and cause of deviations (including unknown cause, if
applicable) and the corrective action taken.
(e) For each deviation from an emission limitation (emission limit,
operating limit, or work practice standard) occurring at an affected
source where you are using a CPMS to comply with the emission limitation
in this subpart, the compliance report must include the information in
paragraphs (c)(1) through (4) and (e)(1) through (13) of this section.
This includes periods of startup, shutdown, and malfunction.
(1) The total operating time of each affected source during the
reporting period.
(2) The date and time that each startup, shutdown, or malfunction
started and stopped.
(3) The date, time, and duration that each CPMS was inoperative.
(4) The date, time and duration that each CPMS was out of control,
including the information in Sec. 63.8(c)(8), as required by your OM&M
plan.
(5) The date and time that each deviation from an emission
limitation (emission limit, operating limit, or work practice standard)
started and stopped, and whether each deviation occurred during a period
of startup, shutdown, or malfunction.
(6) A description of corrective action taken in response to a
deviation.
(7) A summary of the total duration of the deviations during the
reporting period and the total duration as a percentage of the total
source operating time during that reporting period.
[[Page 113]]
(8) A breakdown of the total duration of the deviations during the
reporting period into those that are due to startup, shutdown, control
equipment problems, process problems, other known causes, and other
unknown causes.
(9) A summary of the total duration of CPMS downtime during the
reporting period and the total duration of CPMS downtime as a percentage
of the total source operating time during that reporting period.
(10) A brief description of the process units.
(11) A brief description of the CPMS.
(12) The date of the latest CPMS initial validation or accuracy
audit.
(13) A description of any changes in CPMS, processes, or controls
since the last reporting period.
(f) If you have obtained a title V operating permit pursuant to 40
CFR part 70 or 40 CFR part 71, you must report all deviations as defined
in this subpart in the semiannual monitoring report required by 40 CFR
70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A). If you submit a
compliance report according to Table 10 to this subpart along with, or
as part of, the semiannual monitoring report required by 40 CFR
70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A), and the compliance
report includes all required information concerning deviations from any
emission limitation (including any operating limit), then submitting the
compliance report will satisfy any obligation to report the same
deviations in the semiannual monitoring report. However, submitting a
compliance report will not otherwise affect any obligation you may have
to report deviations from permit requirements to the permit authority.
(g) If you operate a clay refractory products kiln or a chromium
refractory products kiln that is subject to the work practice standard
specified in item 3 or 4 of Table 3 to this subpart, and you use a fuel
other than natural gas or equivalent to fire the affected kiln, you must
submit a report of alternative fuel use within 10 working days after
terminating the use of the alternative fuel. The report must include the
information in paragraphs (g)(1) through (6) of this section.
(1) Company name and address.
(2) Identification of the affected kiln.
(3) Reason for using the alternative fuel.
(4) Type of alternative fuel used to fire the affected kiln.
(5) Dates that the use of the alternative fuel started and ended.
(6) Amount of alternative fuel used.
Sec. 63.9816 What records must I keep?
(a) You must keep the records listed in paragraphs (a)(1) through
(3) of this section.
(1) A copy of each notification and report that you submitted to
comply with this subpart, including all documentation supporting any
Initial Notification or Notification of Compliance Status that you
submitted, according to the requirements in Sec. 63.10(b)(2)(xiv).
(2) The records in Sec. 63.6(e)(3)(iii) through (v) related to
startup, shutdown, and malfunction.
(3) Records of performance tests as required in Sec.
63.10(b)(2)(viii).
(b) You must keep the records required in Tables 7 through 9 to this
subpart to show continuous compliance with each emission limitation that
applies to you.
(c) You must also maintain the records listed in paragraphs (c)(1)
through (10) of this section.
(1) Records of emission data used to develop an emissions profile,
as indicated in items 8(a)(i)(4) and 17(b)(i)(4) of Table 4 to this
subpart.
(2) Records that document how you comply with any applicable work
practice standard.
(3) For each bag leak detection system, records of each alarm, the
time of the alarm, the time corrective action was initiated and
completed, and a brief description of the cause of the alarm and the
corrective action taken.
(4) For each kiln controlled with a DLA, records that document the
source of limestone used.
(5) For each deviation of an operating limit parameter value, the
date, time, and duration of the deviation, a brief explanation of the
cause of the deviation and the corrective action taken, and whether the
deviation occurred during a period of startup, shutdown, or malfunction.
(6) For each affected source, records of production rate on a
process throughput basis (either feed rate to
[[Page 114]]
the process unit or discharge rate from the process unit).
(7) Records of any approved alternative monitoring method(s) or test
procedure(s).
(8) Records of maintenance activities and inspections performed on
control devices, including all records associated with the scheduled
maintenance of continuous kiln control devices, as specified in Sec.
63.9792(e).
(9) If you operate a source that is subject to the THC emission
limits specified in item 2, 3, 6, or 7 of Table 1 to this subpart and is
controlled with a catalytic oxidizer, records of annual checks of
catalyst activity levels and subsequent corrective actions.
(10) Current copies of the SSMP and the OM&M plan, including any
revisions and records documenting conformance with those revisions.
Sec. 63.9818 In what form and how long must I keep my records?
(a) Your records must be in a form suitable and readily available
for expeditious review, according to Sec. 63.10(b)(1).
(b) As specified in Sec. 63.10(b)(1), you must keep each record for
5 years following the date of each occurrence, measurement, maintenance,
corrective action, report, or record.
(c) You must keep each record onsite for at least 2 years after the
date of each occurrence, measurement, maintenance, corrective action,
report, or record, according to Sec. 63.10(b)(1). You may keep the
records offsite for the remaining 3 years.
Other Requirements and Information
Sec. 63.9820 What parts of the General Provisions apply to me?
Table 11 to this subpart shows which parts of the General Provisions
specified in Sec. Sec. 63.1 through 63.15 apply to you.
Sec. 63.9822 Who implements and enforces this subpart?
(a) This subpart can be implemented and enforced by us, the U.S.
Environmental Protection Agency (U.S. EPA), or a delegated authority
such as your State, local, or tribal agency. If the U.S. EPA
Administrator has delegated authority to your State, local, or tribal
agency, then that agency, in addition to the U.S. EPA, has the authority
to implement and enforce this subpart. You should contact your U.S. EPA
Regional Office to find out if implementation and enforcement to this
subpart is delegated to your State, local, or tribal agency.
(b) In delegating implementation and enforcement authority to this
subpart to a State, local, or tribal agency under 40 CFR part 63,
subpart E, the authorities contained in paragraph (c) of this section
are retained by the Administrator of the U.S. EPA and are not
transferred to the State, local, or tribal agency.
(c) The authorities that cannot be delegated to State, local, or
tribal agencies are as specified in paragraphs (c)(1) through (4) of
this section.
(1) Approval of alternatives to the applicability requirements in
Sec. Sec. 63.9782 and 63.9784, the compliance date requirements in
Sec. 63.9786, and the emission limitations in Sec. 63.9788.
(2) Approval of major changes to test methods under Sec.
63.7(e)(2)(ii) and (f) and as defined in Sec. 63.90.
(3) Approval of major changes to monitoring under Sec. 63.8(f) and
as defined in Sec. 63.90.
(4) Approval of major changes to recordkeeping and reporting under
Sec. 63.10(f) and as defined in Sec. 63.90.
Sec. 63.9824 What definitions apply to this subpart?
Terms used in this subpart are defined in the Clean Air Act, in 40
CFR 63.2, the General Provisions of this part, and in this section as
follows:
Additive means a minor addition of a chemical, mineral, or metallic
substance that is added to a refractory mixture to facilitate processing
or impart specific properties to the final refractory product.
Add-on air pollution control device (APCD) means equipment installed
on a process vent that reduces the quantity of a pollutant that is
emitted to the air.
Autoclave means a vessel that is used to impregnate fired and/or
unfired refractory shapes with pitch to form pitch-impregnated
refractory products. Autoclaves also can be used as
[[Page 115]]
defumers following the impregnation process.
Bag leak detection system means an instrument that is capable of
monitoring particulate matter loadings in the exhaust of a fabric filter
in order to detect bag failures. A bag leak detection system includes,
but is not limited to, an instrument that operates on triboelectric,
light-scattering, light-transmittance, or other effects to monitor
relative PM loadings.
Basket means the metal container used to hold refractory shapes for
pitch impregnation during the shape preheating, impregnation, defuming,
and, if applicable, coking processes.
Batch process means a process in which a set of refractory shapes is
acted upon as a single unit according to a predetermined schedule,
during which none of the refractory shapes being processed are added or
removed. A batch process does not operate continuously.
Binder means a substance added to a granular material to give it
workability and green or dry strength.
Catalytic oxidizer means an add-on air pollution control device that
is designed specifically to destroy organic compounds in a process
exhaust gas stream by catalytic incineration. A catalytic oxidizer
includes a bed of catalyst media through which the process exhaust
stream passes to promote combustion and incineration at a lower
temperature than would be possible without the catalyst.
Chromium refractory product means a refractory product that contains
at least 1 percent chromium by weight.
Clay refractory product means a refractory product that contains at
least 10 percent uncalcined clay by weight prior to firing in a kiln. In
this definition, the term ``clay'' means any of the following six
classifications of clay defined by the U.S. Geologic Survey: ball clay,
bentonite, common clay and shale, fire clay, fuller's earth, and kaolin.
Coking oven means a thermal process unit that operates at a peak
temperature typically between 540[deg] and 870 [deg]C (1000[deg] and
1600 [deg]F) and is used to drive off the volatile constituents of
pitch-impregnated refractory shapes under a reducing or oxygen-deprived
atmosphere.
Continuous parameter monitoring system (CPMS) means the total
equipment that is used to measure and record temperature, pressure,
liquid flow rate, gas flow rate, or pH on a continuous basis in one or
more locations. ``Total equipment'' includes the sensor, mechanical
components, electronic components, data acquisition system, data
recording system, electrical wiring, and other components of a CPMS.
Continuous process means a process that operates continuously. In a
continuous process unit, the materials or shapes that are processed are
either continuously charged (fed) to and discharged from the process
unit, or are charged and discharged at regular time intervals without
the process unit being shut down. Continuous thermal process units, such
as tunnel kilns, generally include temperature zones that are maintained
at relatively constant temperature and through which the materials or
shapes being processed are conveyed continuously or at regular time
intervals.
Curing oven means a thermal process unit that operates at a peak
temperature typically between 90[deg] and 340 [deg]C (200[deg] and 650
[deg]F) and is used to activate a thermosetting resin, pitch, or other
binder in refractory shapes. Curing ovens also perform the same function
as shape dryers in removing the free moisture from refractory shapes.
Defumer means a process unit that is used for holding pitch-
impregnated refractory shapes as the shapes defume or cool immediately
following the impregnation process. This definition includes autoclaves
that are opened and exhausted to the atmosphere following an
impregnation cycle and used for holding pitch-impregnated refractory
shapes while the shapes defume or cool.
Deviation means any instance in which an affected source subject to
this subpart, or an owner or operator of such a source:
(1) Fails to meet any requirement or obligation established by this
subpart including, but not limited to, any emission limitation (emission
limit, operating limit, or work practice standard);
(2) Fails to meet any term or condition that is adopted to implement
an
[[Page 116]]
applicable requirement in this subpart for any affected source required
to obtain such a permit; or
(3) Fails to meet any emission limitation (emission limit, operating
limit, or work practice standard) in this subpart during startup,
shutdown, or malfunction, regardless of whether or not such failure is
permitted by this subpart.
Dry injection fabric filter (DIFF) means an add-on air pollution
control device that includes continuous injection of hydrated lime or
other sorbent into a duct or reaction chamber followed by a fabric
filter.
Dry lime scrubber/fabric filter (DLS/FF) means an add-on air
pollution control device that includes continuous injection of
humidified hydrated lime or other sorbent into a reaction chamber
followed by a fabric filter. These systems may include recirculation of
some of the sorbent.
Dry limestone adsorber (DLA) means an air pollution control device
that includes a limestone storage bin, a reaction chamber that is
essentially a packed-tower filled with limestone, and may or may not
include a peeling drum that mechanically scrapes reacted limestone to
regenerate the stone for reuse.
Emission limitation means any restriction on the emissions a process
unit may discharge.
Fabric filter means an add-on air pollution control device used to
capture particulate matter by filtering a process exhaust stream through
a filter or filter media; a fabric filter is also known as a baghouse.
Fired refractory shape means a refractory shape that has been fired
in a kiln.
HAP means any hazardous air pollutant that appears in section 112(b)
of the Clean Air Act.
Kiln means a thermal process unit that operates at a peak
temperature greater than 820 [deg]C (1500 [deg]F) and is used for firing
or sintering refractory, ceramic, or other shapes.
Kiln furniture means any refractory shape that is used to hold,
support, or position ceramic or refractory products in a kiln during the
firing process.
Maximum organic HAP processing rate means the combination of process
and refractory product formulation that has the greatest potential to
emit organic HAP. The maximum organic HAP processing rate is a function
of the organic HAP processing rate, process operating temperature, and
other process operating parameters that affect emissions of organic HAP.
(See also the definition of organic HAP processing rate.)
Organic HAP processing rate means the rate at which the mass of
organic HAP materials contained in refractory shapes are processed in an
affected thermal process unit. The organic HAP processing rate is a
function of the amount of organic HAP contained in the resins, binders,
and additives used in a refractory mix; the amounts of those resins,
binders, and additives in the refractory mix; and the rate at which the
refractory shapes formed from the refractory mix are processed in an
affected thermal process unit. For continuous process units, the organic
HAP processing rate is expressed in units of mass of organic HAP per
unit of time (e.g., pounds per hour). For batch process units, the
organic HAP processing rate is expressed in units of mass of organic HAP
per unit mass of refractory shapes processed during the batch process
cycle (e.g., pounds per ton).
Particulate matter (PM) means, for the purposes of this subpart,
emissions of particulate matter that serve as a measure of total
particulate emissions as measured by EPA Method 5 of 40 CFR part 60,
appendix A.
Peak emissions period means the period of consecutive hourly mass
emissions of the applicable pollutant that is greater than any other
period of consecutive hourly mass emissions for the same pollutant over
the course of a specified batch process cycle, as defined in paragraphs
(1) and (2) of this definition. The peak emissions period is a function
of the rate at which the temperature of the refractory shapes is
increased, the mass and loading configuration of the shapes in the
process unit, the constituents of the refractory mix, and the type of
pollutants emitted.
(1) The 3-hour peak THC emissions period is the period of 3
consecutive hours over which the sum of the hourly
[[Page 117]]
THC mass emissions rates is greater than the sum of the hourly THC mass
emissions rates for any other period of 3 consecutive hours during the
same batch process cycle.
(2) The 3-hour peak HF emissions period is the period of 3
consecutive hours over which the sum of the hourly HF mass emissions
rates is greater than the sum of the hourly HF mass emissions rates for
any other period of 3 consecutive hours during the same batch process
cycle.
Period of natural gas curtailment or supply interruption means a
period of time during which the supply of natural gas to an affected
facility is halted for reasons beyond the control of the facility. An
increase in the cost or unit price of natural gas does not constitute a
period of natural gas curtailment or supply interruption.
Pitch means the residue from the distillation of petroleum or coal
tar.
Pitch-bonded refractory product means a formed refractory product
that is manufactured using pitch as a bonding agent. Pitch-bonded
refractory products are manufactured by mixing pitch with magnesium
oxide, graphite, alumina, silicon carbide, silica, or other refractory
raw materials, and forming the mix into shapes. After forming, pitch-
bonded refractory products are cured in a curing oven and may be
subsequently fired in a kiln.
Pitch-impregnated refractory product means a refractory shape that
has been fired in a kiln, then impregnated with heated coal tar or
petroleum pitch under pressure. After impregnation, pitch-impregnated
refractory shapes may undergo the coking process in a coking oven. The
total carbon content of a pitch-impregnated refractory product is less
than 50 percent.
Pitch working tank means a tank that is used for heating pitch to
the impregnation temperature, typically between 150[deg] and 260 [deg]C
(300[deg] and 500 [deg]F); temporarily storing heated pitch between
impregnation cycles; and transferring pitch to and from the autoclave
during the impregnation step in manufacturing pitch-impregnated
refractory products.
Plant site means all contiguous or adjoining property that is under
common control, including properties that are separated only by a road
or other public right-of-way. Common control includes properties that
are owned, leased, or operated by the same entity, parent entity,
subsidiary, or any combination thereof.
Redundant sensor means a second sensor or a back-up sensor that is
integrated into a CPMS and is used to check the parameter value (e.g.,
temperature, pressure) measured by the primary sensor of the CPMS.
Refractory product means nonmetallic materials containing less than
50 percent carbon by weight and having those chemical and physical
properties that make them applicable for structures, or as components of
systems, that are exposed to environments above 538 [deg]C (1000
[deg]F). This definition includes, but is not limited to: refractory
bricks, kiln furniture, crucibles, refractory ceramic fiber, and other
materials used as linings for boilers, kilns, and other processing units
and equipment where extremes of temperature, corrosion, and abrasion
would destroy other materials.
Refractory products that use organic HAP means resin-bonded
refractory products, pitch-bonded refractory products, and other
refractory products that are produced using a substance that is an
organic HAP, that releases an organic HAP during production of the
refractory product, or that contains an organic HAP, such as methanol or
ethylene glycol.
Refractory shape means any refractory piece forming a stable mass
with specific dimensions.
Research and development process unit means any process unit whose
purpose is to conduct research and development for new processes and
products and is not engaged in the manufacture of products for
commercial sale, except in a de minimis manner.
Resin-bonded refractory product means a formed refractory product
that is manufactured using a phenolic resin or other type of
thermosetting resin as a bonding agent. Resin-bonded refractory products
are manufactured by mixing resin with alumina, magnesium oxide,
graphite, silica, zirconia, or other refractory raw materials, and
forming the mix into shapes. After forming, resin-bonded refractory
products are
[[Page 118]]
cured in a curing oven and may be subsequently fired in a kiln.
Responsible official means one of the following:
(1) For a corporation: a president, secretary, treasurer, or vice-
president of the corporation in charge of a principal business function,
or any other person who performs similar policy or decisionmaking
functions for the corporation, or a duly authorized representative of
such person if the representative is responsible for the overall
operation of one or more manufacturing, production, or operating
facilities applying for or subject to a permit and either:
(i) The facilities employ more than 250 persons or have gross annual
sales or expenditures exceeding $25 million (in second quarter 1980
dollars); or
(ii) The delegation of authority to such representatives is approved
in advance by the Administrator;
(2) For a partnership or sole proprietorship: a general partner or
the proprietor, respectively;
(3) For a municipality, State, Federal, or other public agency:
either a principal executive officer or ranking elected official. For
the purposes of this part, a principal executive officer of a Federal
agency includes the chief executive officer having responsibility for
the overall operations of a principal geographic unit of the agency
(e.g., a Regional Administrator of EPA); or
(4) For affected sources (as defined in this subpart) applying for
or subject to a title V permit: ``responsible official'' shall have the
same meaning as defined in part 70 or Federal title V regulations in
this chapter (42 U.S.C. 7661), whichever is applicable.
Shape dryer means a thermal process unit that operates at a peak
temperature typically between 40[deg] and 700 [deg]C (100[deg] and 1300
[deg]F) and is used exclusively to reduce the free moisture content of a
refractory shape. Shape dryers generally are the initial thermal process
step following the forming step in refractory products manufacturing.
(See also the definition of a curing oven.)
Shape preheater means a thermal process unit that operates at a peak
temperature typically between 180[deg] and 320 [deg]C (350[deg] and 600
[deg]F) and is used to heat fired refractory shapes prior to the
impregnation step in manufacturing pitch-impregnated refractory
products.
Thermal oxidizer means an add-on air pollution control device that
includes one or more combustion chambers and is designed specifically to
destroy organic compounds in a process exhaust gas stream by
incineration.
Uncalcined clay means clay that has not undergone thermal processing
in a calciner.
Wet scrubber means an add-on air pollution control device that
removes pollutants from a gas stream by bringing them into contact with
a liquid, typically water.
Work practice standard means any design, equipment, work practice,
or operational standard, or combination thereof, that is promulgated
pursuant to section 112(h) of the Clean Air Act.
Sec. Table 1 to Subpart SSSSS of Part 63--Emission Limits
As stated in Sec. 63.9788, you must comply with the emission limits
for affected sources in the following table:
------------------------------------------------------------------------
You must meet the following
For . . . emission limits . . .
------------------------------------------------------------------------
1. Each new or existing curing oven, As specified in items 2 through
shape dryer, and kiln that is used to 9 of this table.
process refractory products that use
organic HAP; each new or existing
coking oven and defumer that is used
to produce pitch-impregnated
refractory products; each new shape
preheater that is used to produce
pitch-impregnated refractory products;
AND each new or existing process unit
that is exhausted to a thermal or
catalytic oxidizer that also controls
emissions from an affected shape
preheater or pitch working tank.
2. Continuous process units that are a. The 3-hour block average THC
controlled with a thermal or catalytic concentration must not exceed
oxidizer. 20 parts per million by
volume, dry basis (ppmvd),
corrected to 18 percent
oxygen, at the outlet of the
control device; or
[[Page 119]]
b. The 3-hour block average THC
mass emissions rate must be
reduced by at least 95
percent.
3. Continuous process units that are a. The 3-hour block average THC
equipped with a control device other concentration must not exceed
than a thermal or catalytic oxidizer. 20 ppmvd, corrected to 18
percent oxygen, at the outlet
of the control device; or
b. The 3-hour block average THC
mass emissions rate must be
reduced by at least 95
percent.
4. Continuous process units that use The 3-hour block average THC
process changes to reduce organic HAP concentration must not exceed
emissions. 20 ppmvd, corrected to 18
percent oxygen, at the outlet
of the process gas stream.
5. Continuous kilns that are not The 3-hour block average THC
equipped with a control device. concentration must not exceed
20 ppmvd, corrected to 18
percent oxygen, at the outlet
of the process gas stream.
6. Batch process units that are a. The 2-run block average THC
controlled with a thermal or catalytic concentration for the 3-hour
oxidizer. peak emissions period must not
exceed 20 ppmvd, corrected to
18 percent oxygen, at the
outlet of the control device;
or
b. The 2-run block average THC
mass emissions rate for the 3-
hour peak emissions period
must be reduced by at least 95
percent.
7. Batch process units that are a. The 2-run block average THC
equipped with a control device other concentration for the 3-hour
than a thermal or catalytic oxidizer. peak emissions period must not
exceed 20 ppmvd, corrected to
18 percent oxygen, at the
outlet of the control device;
or
b. The 2-run block average THC
mass emissions rate for the 3-
hour peak emissions period
must be reduced by at least 95
percent.
8. Batch process units that use process The 2-run block average THC
changes to reduce organic HAP concentration for the 3-hour
emissions. peak emissions period must not
exceed 20 ppmvd, corrected to
18 percent oxygen, at the
outlet of the process gas
stream.
9. Batch process kilns that are not The 2-run block average THC
equipped with a control device. concentration for the 3-hour
peak emissions period must not
exceed 20 ppmvd, corrected to
18 percent oxygen, at the
outlet of the process gas
stream.
10. Each new continuous kiln that is a. The 3-hour block average HF
used to produce clay refractory emissions must not exceed
products. 0.019 kilograms per megagram
(kg/Mg) (0.038 pounds per ton
(lb/ton)) of uncalcined clay
processed, OR the 3-hour block
average HF mass emissions rate
must be reduced by at least 90
percent; and
b. The 3-hour block average HCl
emissions must not exceed
0.091 kg/Mg (0.18 lb/ton) of
uncalcined clay processed, OR
the 3-hour block average HCl
mass emissions rate must be
reduced by at least 30
percent.
11. Each new batch process kiln that is a. The 2-run block average HF
used to produce clay refractory mass emissions rate for the 3-
products. hour peak emissions period
must be reduced by at least 90
percent; and
b. The 2-run block average HCl
mass emissions rate for the 3-
hour peak emissions period
must be reduced by at least 30
percent.
------------------------------------------------------------------------
Sec. Table 2 to Subpart SSSSS of Part 63--Operating Limits
As stated in Sec. 63.9788, you must comply with the operating
limits for affected sources in the following table:]
------------------------------------------------------------------------
For . . . You must . . .
------------------------------------------------------------------------
1. Each affected source listed in Table a. Operate all affected sources
1 to this subpart. according to the requirements
to this subpart on and after
the date on which the initial
performance test is conducted
or required to be conducted,
whichever date is earlier; and
b. Capture emissions and vent
them through a closed system;
and
c. Operate each control device
that is required to comply
with this subpart on each
affected source during all
periods that the source is
operating, except where
specified in Sec.
63.9792(e), item 2 of this
table, and item 13 of Table 4
to this subpart; and
d. Record all operating
parameters specified in Table
8 to this subpart for the
affected source; and
e. Prepare and implement a
written OM&M plan as specified
in Sec. 63.9792(d).
[[Page 120]]
2. Each affected continuous kiln that a. Receive approval from the
is equipped with an emission control Administrator before taking
device. the control device on the
affected kiln out of service
for scheduled maintenance, as
specified in Sec.
63.9792(e); and
b. Minimize HAP emissions from
the affected kiln during all
periods of scheduled
maintenance of the kiln
control device when the kiln
is operating and the control
device is out of service; and
c. Minimize the duration of all
periods of scheduled
maintenance of the kiln
control device when the kiln
is operating and the control
device is out of service.
3. Each new or existing curing oven, Satisfy the applicable
shape dryer, and kiln that is used to operating limits specified in
process refractory products that use items 4 through 9 of this
organic HAP; each new or existing table.
coking oven and defumer that is used
to produce pitch-impregnated
refractory products; each new shape
preheater that is used to produce
pitch-impregnated refractory products;
AND each new or existing process unit
that is exhausted to a thermal or
catalytic oxidizer that also controls
emissions from an affected shape
preheater or pitch working tank.
4. Each affected continuous process Maintain the 3-hour block
unit. average organic HAP processing
rate (pounds per hour) at or
below the maximum organic HAP
processing rate established
during the most recent
performance test.
5. Continuous process units that are Maintain the 3-hour block
equipped with a thermal oxidizer. average operating temperature
in the thermal oxidizer
combustion chamber at or above
the minimum allowable
operating temperature for the
oxidizer established during
the most recent performance
test.
6. Continuous process units that are a. Maintain the 3-hour block
equipped with a catalytic oxidizer. average operating temperature
at the inlet of the catalyst
bed of the oxidizer at or
above the minimum allowable
operating temperature for the
oxidizer established during
the most recent performance
test; and
b. Check the activity level of
the catalyst at least every 12
months.
7. Each affected batch process unit.... For each batch cycle, maintain
the organic HAP processing
rate (pounds per batch) at or
below the maximum organic HAP
processing rate established
during the most recent
performance test.
8. Batch process units that are a. From the start of each batch
equipped with a thermal oxidizer. cycle until 3 hours have
passed since the process unit
reached maximum temperature,
maintain the hourly average
operating temperature in the
thermal oxidizer combustion
chamber at or above the
minimum allowable operating
temperature established for
the corresponding period
during the most recent
performance test, as
determined according to item
11 of Table 4 to this subpart;
and
b. For each subsequent hour of
the batch cycle, maintain the
hourly average operating
temperature in the thermal
oxidizer combustion chamber at
or above the minimum allowable
operating temperature
established for the
corresponding hour during the
most recent performance test,
as specified in item 13 of
Table 4 to this subpart.
9. Batch process units that are a. From the start of each batch
equipped with a catalytic oxidizer. cycle until 3 hours have
passed since the process unit
reached maximum temperature,
maintain the hourly average
operating temperature at the
inlet of the catalyst bed at
or above the minimum allowable
operating temperature
established for the
corresponding period during
the most recent performance
test, as determined according
to item 12 of Table 4 to this
subpart; and
b. For each subsequent hour of
the batch cycle, maintain the
hourly average operating
temperature at the inlet of
the catalyst bed at or above
the minimum allowable
operating temperature
established for the
corresponding hour during the
most recent performance test,
as specified in item 13 of
Table 4 to this subpart; and
c. Check the activity level of
the catalyst at least every 12
months.
10. Each new kiln that is used to Satisfy the applicable
process clay refractory products. operating limits specified in
items 11 through 13 of this
table.
11. Each affected kiln that is equipped a. Maintain the 3-hour block
with a DLA. average pressure drop across
the DLA at or above the
minimum levels established
during the most recent
performance test; and
b. Maintain free-flowing
limestone in the feed hopper,
silo, and DLA at all times;
and
[[Page 121]]
c. Maintain the limestone
feeder at or above the level
established during the most
recent performance test; and
d. Use the same grade of
limestone from the same source
as was used during the most
recent performance test and
maintain records of the source
and type of limestone used.
12. Each affected kiln that is equipped a. Initiate corrective action
with a DIFF or DLS/FF. within 1 hour of a bag leak
detection system alarm and
complete corrective actions in
accordance with the OM&M plan;
and
b. Verify at least once each 8-
hour shift that lime is free-
flowing by means of a visual
check, checking the output of
a load cell, carrier gas/lime
flow indicator, or carrier gas
pressure drop measurement
system; and
c. Record the lime feeder
setting daily to verify that
the feeder setting is at or
above the level established
during the most recent
performance test.
13. Each affected kiln that is equipped a. Maintain the 3-hour block
with a wet scrubber. average pressure drop across
the scrubber, liquid pH, and
liquid flow rate at or above
the minimum levels established
during the most recent
performance test; and
b. If chemicals are added to
the scrubber liquid, maintain
the 3-hour block average
chemical feed rate at or above
the minimum chemical feed rate
established during the most
recent performance test.
------------------------------------------------------------------------
Sec. Table 3 to Subpart SSSSS of Part 63--Work Practice Standards
As stated in Sec. 63.9788, you must comply with the work practice
standards for affected sources in the following table:
------------------------------------------------------------------------
According to one
For . . . You must . . . of the following
requirements . . .
------------------------------------------------------------------------
1. Each basket or container that a. Control POM i. At least every
is used for holding fired emissions from 10 preheating
refractory shapes in an any affected cycles, clean the
existing shape preheater and shape preheater. residual pitch
autoclave during the pitch from the surfaces
impregnation process. of the basket or
container by
abrasive blasting
prior to placing
the basket or
container in the
affected shape
preheater; or
ii. At least every
10 preheating
cycles, subject
the basket or
container to a
thermal process
cycle that meets
or exceeds the
operating
temperature and
cycle time of the
affected
preheater, AND is
conducted in a
process unit that
is exhausted to a
thermal or
catalytic
oxidizer that is
comparable to the
control device
used on an
affected defumer
or coking oven;
or
iii. Capture
emissions from
the affected
shape preheater
and vent them to
the control
device that is
used to control
emissions from an
affected defumer
or coking oven,
or to a
comparable
thermal or
catalytic
oxidizer.
2. Each new or existing pitch Control POM Capture emissions
working tank. emissions. from the affected
pitch working
tank and vent
them to the
control device
that is used to
control emissions
from an affected
defumer or coking
oven, OR to a
comparable
thermal or
catalytic
oxidizer.
3. Each new or existing chromium Minimize fuel- Use natural gas,
refractory products kiln. based HAP or equivalent, as
emissions. the kiln fuel,
except during
periods of
natural gas
curtailment or
supply
interruption, as
defined in Sec.
63.9824.
4. Each existing clay refractory Minimize fuel- Use natural gas,
products kiln. based HAP or equivalent, as
emissions. the kiln fuel,
except during
periods of
natural gas
curtailment or
supply
interruption, as
defined in Sec.
63.9824.
------------------------------------------------------------------------
[[Page 122]]
Sec. Table 4 to Subpart SSSSS to Part 63--Requirements for Performance
Tests
As stated in Sec. 63.9800, you must comply with the requirements
for performance tests for affected sources in the following table:
----------------------------------------------------------------------------------------------------------------
According to the
For . . . You must . . . Using . . . following requirements
. . .
----------------------------------------------------------------------------------------------------------------
1. Each affected source listed in a. Conduct performance i. The requirements of (1) Record the date of
Table 1 to this subpart. tests. the general provisions the test; and
in subpart A of this (2) Identify the
part and the emission source that
requirements to this is tested; and
subpart. (3) Collect and record
the corresponding
operating parameter
and emission test data
listed in this table
for each run of the
performance test; and
(4) Repeat the
performance test at
least every 5 years;
and
(5) Repeat the
performance test
before changing the
parameter value for
any operating limit
specified in your OM&M
plan; and
(6) If complying with
the THC concentration
or THC percentage
reduction limits
specified in items 2
through 9 of Table 1
to this subpart,
repeat the performance
test under the
conditions specified
in items 2.a.2. and
2.a.3. of this table;
and
(7) If complying with
the emission limits
for new clay
refractory products
kilns specified in
items 10 and 11 of
Table 1 to this
subpart, repeat the
performance test under
the conditions
specified in items
14.a.i.4. and
17.a.i.4. of this
table.
b. Select the locations i. Method 1 or 1A of 40 (1) To demonstrate
of sampling ports and CFR part 60, appendix compliance with the
the number of traverse A. percentage reduction
points. limits specified in
items 2.b., 3.b.,
6.b., 7.b., 10, and 11
of Table 1 to this
subpart, locate
sampling sites at the
inlet of the control
device and at either
the outlet of the
control device or at
the stack prior to any
releases to the
atmosphere; and
(2) To demonstrate
compliance with any
other emission limit
specified in Table 1
to this subpart,
locate all sampling
sites at the outlet of
the control device or
at the stack prior to
any releases to the
atmosphere.
c. Determine gas Method 2, 2A, 2C, 2D, Measure gas velocities
velocity and volumetric 2F, or 2G of 40 CFR and volumetric flow
flow rate. part 60, appendix A. rates at 1-hour
intervals throughout
each test run.
d. Conduct gas molecular (i) Method 3, 3A, or 3B As specified in the
weight analysis. of 40 CFR part 60, applicable test
appendix A; or method.
(ii) ASME PTC 19.10- You may use ASME PTC
1981-Part 10. 19.10-1981-Part 10
(available for
purchase from Three
Park Avenue, New York,
NY 10016-5990) as an
alternative to EPA
Method 3B.
e. Measure gas moisture Method 4 of 40 CFR part As specified in the
content. 60, appendix A. applicable test
method.
[[Page 123]]
2. Each new or existing curing oven, a. Conduct performance ....................... (1) Conduct the
shape dryer, and kiln that is used tests. performance test while
to process refractory products that the source is
use organic HAP; each new or operating at the
existing coking oven and defumer maximum organic HAP
that is used to produce pitch- processing rate, as
impregnated refractory products; defined in Sec.
each new shape preheater that is 63.9824, reasonably
used to produce pitch-impregnated expected to occur; and
refractory products; AND each new (2) Repeat the
or existing process unit that is performance test
exhausted to a thermal or catalytic before starting
oxidizer that also controls production of any
emissions from an affected shape product for which the
preheater or pitch working tank. organic HAP processing
rate is likely to
exceed the maximum
organic HAP processing
rate established
during the most recent
performance test by
more than 10 percent,
as specified in Sec.
63.9798(c); and
(3) Repeat the
performance test on
any affected
uncontrolled kiln
following process
changes (e.g., shorter
curing oven cycle
time) that could
increase organic HAP
emissions from the
affected kiln, as
specified in Sec.
63.9798(d).
b. Satisfy the
applicable requirements
listed in items 3
through 13 of this
table.
3. Each affected continuous process a. Perform a minimum of The appropriate test Each test run must be
unit. 3 test runs. methods specified in at least 1 hour in
items 1, 4, and 5 of duration.
this table.
b. Establish the i. Method 311 of 40 CFR (1) Calculate and
operating limit for the part 63, appendix A, record the organic HAP
maximum organic HAP OR material safety content of all
processing rate. data sheets (MSDS), OR refractory shapes that
product labels to are processed during
determine the mass the performance test,
fraction of organic based on the mass
HAP in each resin, fraction of organic
binder, or additive; HAP in the resins,
and binders, or additives;
the mass fraction of
each resin, binder, or
additive, in the
product; and the
process feed rate; and
ii. Product formulation (2) Calculate and
data that specify the record the organic HAP
mass fraction of each processing rate
resin, binder, and (pounds per hour) for
additive in the each test run; and
products that are
processed during the
performance test; and
iii. Process feed rate (3) Calculate and
data (tons per hour). record the maximum
organic HAP processing
rate as the average of
the organic HAP
processing rates for
the three test runs.
c. Record the operating Process data........... During each test run
temperature of the and at least once per
affected source. hour, record the
operating temperature
in the highest
temperature zone of
the affected source.
[[Page 124]]
4. Each continuous process unit that a. Measure THC i. Method 25A of 40 CFR (1) Each minute,
is subject to the THC emission concentrations at the part 60, appendix A. measure and record the
limit listed in item 2.a., 3.a., 4, outlet of the control concentrations of THC
or 5 of Table 1 to this subpart. device or in the stack. in the exhaust stream;
and
(2) Provide at least 50
1-minute measurements
for each valid hourly
average THC
concentration.
b. Measure oxygen i. Method 3A of 40 CFR (1) Each minute,
concentrations at the part 60, appendix A. measure and record the
outlet of the control concentrations of
device or in the stack. oxygen in the exhaust
stream; and
(2) Provide at least 50
1-minute measurements
for each valid hourly
average THC
concentration.
c. Determine the hourly i. Equation 1 of Sec. (1) Calculate the
average THC 63.9800(g)(1); and. hourly average THC
concentration, ii. The 1-minute THC concentration for each
corrected to 18 percent and oxygen hour of the
oxygen. concentration data. performance test as
the average of the 1-
minute THC
measurements; and
(2) Calculate the
hourly average oxygen
concentration for each
hour of the
performance test as
the average of the 1-
minute oxygen
measurements; and
(3) Correct the hourly
average THC
concentrations to 18
percent oxygen using
Equation 1 of Sec.
63.9800(g)(1).
d. Determine the 3-hour The hourly average Calculate the 3-hour
block average THC concentration of THC, block average THC
emission concentration, corrected to 18 emission
corrected to 18 percent percent oxygen, for concentration,
oxygen. each test run. corrected to 18
percent oxygen, as the
average of the hourly
average THC emission
concentrations,
corrected to 18
percent oxygen.
5. Each continuous process unit that a. Measure THC i. Method 25A of 40 CFR (1) Each minute,
is subject to the THC percentage concentrations at the part 60, appendix A. measure and record the
reduction limit listed in item 2.b. inlet and outlet of the concentrations of THC
or 3.b. of Table 1 to this subpart. control device. at the inlet and
outlet of the control
device; and
(2) Provide at least 50
1-minute measurements
for each valid hourly
average THC
concentration at the
control device inlet
and outlet.
b. Determine the hourly i. The 1-minute THC Calculate the hourly
THC mass emissions concentration data at THC mass emissions
rates at the inlet and the control device rates at the control
outlet of the control inlet and outlet; and device inlet and
device. ii. The volumetric flow outlet for each hour
rates at the control of the performance
device inlet and test.
outlet.
c. Determine the 3-hour i. The hourly THC mass (1) Calculate the
block average THC emissions rates at the hourly THC percentage
percentage reduction. inlet and outlet of reduction for each
the control device. hour of the
performance test using
Equation 2 of Sec.
63.9800(g)(1); and
(2) Calculate the 3-
hour block average THC
percentage reduction.
[[Page 125]]
6. Each continous process unit that a. Establish the i. Continuous recording (1) At least every 15
is equipped with a thermal oxidizer. operating limit for the of the output of the minutes, measure and
minimum allowable combustion chamber record the thermal
thermal oxidizer temperature oxidizer combustion
combustion chamber measurement device. chamber temperature;
temperature. and
(2) Provide at least
one measurement during
at least three 15-
minute periods per
hour of testing; and
(3) Calculate the
hourly average thermal
oxidizer combustion
chamber temperature
for each hour of the
performance test; and
(4) Calculate the
minimum allowable
combustion chamber
temperature as the
average of the
combustion chamber
temperatures for the
three test runs, minus
14 [deg]C (25 [deg]F).
7. Each continuous process unit that a. Establish the i. Continuous recording (1) At least every 15
is equipped with a catalytic operating limit for the of the output of the minutes, measure and
oxidizer. minimum allowable temperature record the temperature
temperature at the measurement device. at the inlet of the
inlet of the catalyst catalyst bed; and
bed. (2) Provide at least
one catalyst bed inlet
temperature
measurement during at
least three 15-minute
periods per hour of
testing; and
(3) Calculate the
hourly average
catalyst bed inlet
temperature for each
hour of the
performance test; and
(4) Calculate the
minimum allowable
catalyst bed inlet
temperature as the
average of the
catalyst bed inlet
temperatures for the
three test runs, minus
14 [deg]C (25 [deg]F).
8. Each affected batch process unit. a. Perform a minimum of i. The appropriate test (1) Each test run must
two test runs. methods specified in be conducted over a
items 1, 9, and 10 of separate batch cycle
this table. unless you satisfy the
requirements of Sec.
63.9800(f)(3) and (4);
and
(2) Each test run must
begin with the start
of a batch cycle,
except as specified in
item 8.a.i.4. of this
table; and
(3) Each test run must
continue until the end
of the batch cycle,
except as specified in
items 8.a.i.4. and
8.a.i.5. of this
table; and
(4) If you develop an
emissions profile, as
described in Sec.
63.9802(a), AND for
sources equipped with
a thermal or catalytic
oxidizer, you do not
reduce the oxidizer
operating temperature,
as specified in item
13 of this table, you
can limit each test
run to the 3-hour peak
THC emissions period;
and
[[Page 126]]
(5) If you do not
develop an emissions
profile, a test run
can be stopped, and
the results of that
run considered
complete, if you
measure emissions
continuously until at
least 3 hours after
the affected process
unit has reached
maximum temperature,
AND the hourly average
THC mass emissions
rate has not increased
during the 3-hour
period since maximum
process temperature
was reached, and the
hourly average
concentrations of THC
at the inlet of the
control device have
not exceeded 20 ppmvd,
corrected to 18
percent oxygen, during
the 3-hour period
since maximum process
temperature was
reached or the hourly
average THC percentage
reduction has been at
least 95 percent
during the 3-hour
period since maximum
process temperature
was reached, AND, for
sources equipped with
a thermal or catalytic
oxidizer, at least 1
hour has passed since
any reduction in the
operating temperature
of the oxidizer, as
specified in item 13
of this table.
b. Establish the i. Method 311 of 40 CFR (1) Calculate and
operating limit for the part 63, appendix A, record the organic HAP
maximum organic HAP OR MSDS, OR product content of all
processing rate. labels to determine refractory shapes that
the mass fraction of are processed during
organic HAP in each the performance test,
resin, binder, or based on the mass
additive; and fraction of HAP in the
resins, binders, or
additives; the mass
fraction of each
resin, binder, or
additive, in the
product, and the batch
weight prior to
processing; and
ii. Product formulation (2) Calculate and
data that specify the record the organic HAP
mass fraction of each processing rate
resin, binder, and (pounds per batch) for
additive in the each test run; and
products that are (3) Calculate and
processed during the record the maximum
performance test; and organic HAP processing
iii. Batch weight rate as the average of
(tons). the organic HAP
processing rates for
the two test runs.
c. Record the batch Process data........... Record the total
cycle time. elapsed time from the
start to the
completion of the
batch cycle.
d. Record the operating Process data........... Record the operating
temperature of the temperature of the
affected source. affected source at
least once every hour
from the start to the
completion of the
batch cycle.
9. Each batch process unit that is a. Measure THC i. Method 25A of 40 CFR (1) Each minute,
subject to the THC emission limit concentrations at the part 60, appendix A. measure and record the
listed in item 6.a., 7.a., 8, or 9 outlet of the control concentrations of THC
of Table 1 to this subpart. device or in the stack. in the exhaust stream;
and
(2) Provide at least 50
1-minute measurements
for each valid hourly
average THC
concentration.
[[Page 127]]
b. Measure oxygen i. Method 3A of 40 CFR (1) Each minute,
concentrations at the part 60, appendix A. measure and record the
outlet of the control concentrations of
device or in the stack. oxygen in the exhaust
stream; and
(2) Provide at least 50
1-minute measurements
for each valid hourly
average oxygen
concentration.
c. Determine the hourly i. Equation 1 of Sec. (1) Calculate the
average THC 63.9800(g)(1); and. hourly average THC
concentration, ii. The 1-minute THC concentration for each
corrected to 18 percent and oxygen hour of the
oxygen. concentration data. performance test as
the average of the 1-
minute THC
measurements; and
(2) Calculate the
hourly average oxygen
concentration for each
hour of the
performance test as
the average of the 1-
minute oxygen
measurements; and
(3) Correct the hourly
average THC
concentrations to 18
percent oxygen using
Equation 1 of Sec.
63.9800(g)(1).
d. Determine the 3-hour The hourly average THC Select the period of 3
peak THC emissions concentrations, consecutive hours over
period for each test corrected to 18 which the sum of the
run. percent oxygen. hourly average THC
concentrations,
corrected to 18
percent oxygen, is
greater than the sum
of the hourly average
THC emission
concentrations,
corrected to 18
percent oxygen, for
any other period of 3
consecutive hours
during the test run.
e. Determine the average The hourly average THC Calculate the average
THC concentration, emission of the hourly average
corrected to 18 percent concentrations, THC concentrations,
oxygen, for each test corrected to 18 corrected to 18
run. percent oxygen, for percent oxygen, for
the 3-hour peak THC the 3 hours of the
emissions period. peak emissions period
for each test run.
f. Determine the 2-run The average THC Calculate the average
block average THC concentration, of the average THC
concentration, corrected to 18 concentrations,
corrected to 18 percent percent oxygen, for corrected to 18
oxygen, for the each test run. percent oxygen, for
emission test. each run.
10. Each batch process unit that is a. Measure THC i. Method 25A of 40 CFR (1) Each minute,
subject to the THC percentage concentrations at the part 60, appendix A. measure and record the
reduction limit listed in item 6.b. inlet and outlet of the concentrations of THC
or 7.b. of Table 1 to this subpart. control device. at the control device
inlet and outlet; and
(2) Provide at least 50
1-minute measurements
for each valid hourly
average THC
concentration at the
control device inlet
and outlet.
b. Determine the hourly i. The 1-minute THC (1) Calculate the
THC mass emissions concentration data at hourly mass emissions
rates at the control the control device rates at the control
device inlet and outlet. inlet and outlet; and device inlet and
ii. The volumetric flow outlet for each hour
rates at the control of the performance
device inlet and test.
outlet.
c. Determine the 3-hour The hourly THC mass Select the period of 3
peak THC emissions emissions rates at the consecutive hours over
period for each test control device inlet. which the sum of the
run. hourly THC mass
emissions rates at the
control device inlet
is greater than the
sum of the hourly THC
mass emissions rates
at the control device
inlet for any other
period of 3
consecutive hours
during the test run.
d. Determine the average i. Equation 2 of Sec. Calculate the average
THC percentage 63.9800(g)(2); and. THC percentage
reduction for each test ii. The hourly THC mass reduction for each
run. emissions rates at the test run using
control device inlet Equation 2 of Sec.
and outlet for the 3- 63.9800(g)(2).
hour peak THC
emissions period.
[[Page 128]]
e. Determine the 2-run The average THC Calculate the average
block average THC percentage reduction of the average THC
percentage reduction for each test run. percentage reductions
for the emission test. for each test run.
11. Each batch process unit that is a. Establish the i. Continuous recording (1) At least every 15
equipped with a thermal oxidizer. operating limit for the of the output of the minutes, measure and
minimum thermal combustion chamber record the thermal
oxidizer combustion temperature oxidizer combustion
chamber temperature. measurement device. chamber temperature;
and
(2) Provide at least
one temperature
measurement during at
least three 15-minute
periods per hour of
testing; and
(3) Calculate the
hourly average
combustion chamber
temperature for each
hour of the 3-hour
peak emissions period,
as defined in item
9.d. or 10.c. of this
table, whichever
applies; and
(4) Calculate the
minimum allowable
thermal oxidizer
combustion chamber
operating temperature
as the average of the
hourly combustion
chamber temperatures
for the 3-hour peak
emissions period,
minus 14 [deg]C (25
[deg]F).
12. Each batch process unit that is a. Establish the i. Continuous recording (1) At least every 15
equipped with a catalytic oxidizer. operating limit for the of the output of the minutes, measure and
minimum temperature at temperature record the temperature
the inlet of the measurement device. at the inlet of the
catalyst bed. catalyst bed; and
(2) Provide at least
one catalyst bed inlet
temperature
measurement during at
least three 15-minute
periods per hour of
testing; and
(3) Calculate the
hourly average
catalyst bed inlet
temperature for each
hour of the 3-hour
peak emissions period,
as defined in item
9.d. or 10.c. of this
table, whichever
applies; and
(4) Calculate the
minimum allowable
catalytic oxidizer
catalyst bed inlet
temperature as the
average of the hourly
catalyst bed inlet
temperatures for the 3-
hour peak emissions
period, minus 14
[deg]C (25 [deg]F).
13. Each batch process unit that is a. During each test run, (1) The oxidizer can be
equipped with a thermal or maintain the applicable shut off or the
catalytic oxidizer. operating temperature oxidizer operating
of the oxidizer until temperature can be
emission levels allow reduced if you do not
the oxidizer to be shut use an emission
off or the operating profile to limit
temperature of the testing to the 3-hour
oxidizer to be reduced. peak emissions period,
as specified in item
8.a.i.4. of this
table; and
(2) At least 3 hours
have passed since the
affected process unit
reached maximum
temperature; and
(3) The applicable
emission limit
specified in item 6.a.
or 6.b. of Table 1 to
this subpart was met
during each of the
previous three 1-hour
periods; and
(4) The hourly average
THC mass emissions
rate did not increase
during the 3-hour
period since maximum
process temperature
was reached; and
[[Page 129]]
(5) The applicable
emission limit
specified in item 6.a.
and 6.b. of Table 1 to
this subpart was met
during each of the
four 15-minute periods
immediately following
the oxidizer
temperature reduction;
and
(6) If the applicable
emission limit
specified in item 6.a.
or 6.b. of Table 1 to
this subpart was not
met during any of the
four 15-minute periods
immediately following
the oxidizer
temperature reduction,
you must return the
oxidizer to its normal
operating temperature
as soon as possible
and maintain that
temperature for at
least 1 hour; and
(7) Continue the test
run until the
applicable emission
limit specified in
items 6.a. and 6.b. of
Table 1 to this
subpart is met for at
least four consecutive
15-minute periods that
immediately follow the
temperature reduction;
and
(8) Calculate the
hourly average
oxidizer operating
temperature for each
hour of the
performance test since
the affected process
unit reached maximum
temperature.
14. Each new continuous kiln that is a. Measure emissions of i. Method 26A of 40 CFR (1) Conduct the test
used to process clay refractory HF and HCl. part 60, appendix A; while the kiln is
products. or operating at the
ii. Method 26 of 40 CFR maximum production
part 60, appendix A; level; and
or. (2) You may use Method
iii. Method 320 of 40 26 of 40 CFR part 60,
CFR part 63, appendix appendix A, only if no
A. acid PM (e.g., HF or
HCl dissolved in water
droplets emitted by
sources controlled by
a wet scrubber) is
present; and
(3) If you use Method
320 of 40 CFR part 63,
appendix A, you must
follow the analyte
spiking procedures of
Section 13 of Method
320 unless you can
demonstrate that the
complete spiking
procedure has been
conducted at a similar
source; and
(4) Repeat the
performance test if
the affected source is
controlled with a DLA
and you change the
source of the
limestone used in the
DLA.
b. Perform a minimum of The appropriate test Each test run must be
3 test runs. methods specified in at least 1 hour in
items 1 and 14.a. of duration.
this table.
15. Each new continuous kiln that is a. Record the uncalcined i. Production data; and (1) Record the
subject to the production-based HF clay processing rate. ii. Product formulation production rate (tons
and HCl emission limits specified data that specify the per hour of fired
in items 10.a. and 10.b. of Table 1 mass fraction of product); and
to this subpart. uncalcined clay in the (2) Calculate and
products that are record the average
processed during the rate at which
performance test. uncalcined clay is
processed (tons per
hour) for each test
run; and
(3) Calculate and
record the 3-run
average uncalcined
clay processing rate
as the average of the
average uncalcined
clay processing rates
for each test run.
[[Page 130]]
b. Determine the HF mass i. Method 26A of 40 CFR Calculate the HF mass
emissions rate at the part 60, appendix A; emissions rate for
outlet of the control or each test.
device or in the stack. ii. Method 26 of 40 CFR
part 60, appendix A;
or.
iii. Method 320 of 40
CFR part 63, appendix
A.
c. Determine the 3-hour i. The HF mass (1) Calculate the
block average emissions rate for hourly production-
production-based HF each test run; and based HF emissions
emissions rate. ii. The average rate for each test run
uncalcined clay using Equation 3 of
processing rate. Sec. 63.9800(g)(3);
and
(2) Calculate the 3-
hour block average
production-based HF
emissions rate as the
average of the hourly
production-based HF
emissions rates for
each test run.
d. Determine the HCl i. Method 26A of 40 CFR Calculate the HCl mass
mass emissions rate at part 60, appendix A; emissions rate for
the outlet of the or each test run.
control device or in ii. Method 26 of 40 CFR
the stack. part 60, appendix A;
or.
iii. Method 320 of 40
CFR part 63, appendix
A.
e. Determine the 3-hour i. The HCl mass (1) Calculate the
block average emissions rate for hourly production-
production-based HCl each test run; and based HCl emissions
emissions rate. ii. The average rate for each test run
uncalcined clay using Equation 3 of
processing rate. Sec. 63.9800(g)(3);
and
(2) Calculate the 3-
hour block average
production-based HCl
emissions rate as the
average of the
production-based HCl
emissions rates for
each test run.
16. Each new continuous kiln that is a. Measure the HF mass i. Method 26A of 40 CFR Calculate the HF mass
subject to the HF and HCl emissions rates at the part 60, appendix A; emissions rates at the
percentage reduction limits inlet and outlet of the or control device inlet
specified in items 10.a. and 10.b. control device. ii. Method 26 of 40 CFR and outlet for each
of Table 1 to this subpart. part 60, appendix A; test run.
or.
iii. Method 320 of 40
CFR part 63, appendix
A.
b. Determine the 3-hour i. The HF mass (1) Calculate the
block average HF emissions rates at the hourly HF percentage
percentage reduction. inlet and outlet of reduction using
the control device for Equation 2 of Sec.
each test run 63.9800(g)(2); and
(2) Calculate the 3-
hour block average HF
percentage reduction
as the average of the
HF percentage
reductions for each
test run.
c. Measure the HCl mass i. Method 26A of 40 CFR Calculate the HCl mass
emissions rates at the part 60, appendix A; emissions rates at the
inlet and outlet of the or control device inlet
control device. ii. Method 26 of 40 CFR and outlet for each
part 60, appendix A; test run.
or.
iii. Method 320 of 40
CFR part 63, appendix
A.
d. Determine the 3-hour i. The HCl mass (1) Calculate the
block average HCl emissions rates at the hourly HCl percentage
percentage reduction. inlet and outlet of reduction using
the control device for Equation 2 of Sec.
each test run. 63.9800(g)(2); and
(2) Calculate the 3-
hour block average HCl
percentage reduction
as the average of HCl
percentage reductions
for each test run.
[[Page 131]]
17. Each new batch process kiln that a. Measure emissions of i. Method 26A of 40 CFR (1) Conduct the test
is used to process clay refractory HF and HCl at the inlet part 60, appendix A; while the kiln is
products. and outlet of the or operating at the
control device. ii. Method 26 of 40 CFR maximum production
part 60, appendix A; level; and
or. (2) You may use Method
iii. Method 320 of 40 26 of 40 CFR part 60,
CFR part 63, appendix appendix A, only if no
A. acid PM (e.g., HF or
HCl dissolved in water
droplets emitted by
sources controlled by
a wet scrubber) is
present; and
(3) If you use Method
320 of 40 CFR part 63,
you must follow the
analyte spiking
procedures of Section
13 of Method 320
unless you can
demonstrate that the
complete spiking
procedure has been
conducted at a similar
source; and
(4) Repeat the
performance test if
the affected source is
controlled with a DLA
and you change the
source of the
limestone used in the
DLA.
b. Perform a minimum of i. The appropriate test (1) Each test run must
2 test runs. methods specified in be conducted over a
items 1 and 17.a. of separate batch cycle
this table. unless you satisfy the
requirements of Sec.
63.9800(f)(3) and (4);
and
(2) Each test run must
consist of a series of
1-hour runs at the
inlet and outlet of
the control device,
beginning with the
start of a batch
cycle, except as
specified in item
17.b.i.4. of this
table; and
(3) Each test run must
continue until the end
of the batch cycle,
except as specified in
item 17.b.i.4. of this
table; and
(4) If you develop an
emissions profile, as
described in Sec.
63.9802(b), you can
limit each test run to
the 3-hour peak HF
emissions period.
c. Determine the hourly i. The appropriate test Determine the hourly
HF and HCl mass methods specified in mass HF and HCl
emissions rates at the items 1 and 17.a. of emissions rates at the
inlet and outlet of the this table. inlet and outlet of
control device. the control device for
each hour of each test
run.
d. Determine the 3-hour The hourly HF mass Select the period of 3
peak HF emissions emissions rates at the consecutive hours over
period. inlet of the control which the sum of the
device. hourly HF mass
emissions rates at the
control device inlet
is greater than the
sum of the hourly HF
mass emissions rates
at the control device
inlet for any other
period of 3
consecutive hours
during the test run.
e. Determine the 2-run i. The hourly average (1) Calculate the HF
block average HF HF emissions rates at percentage reduction
percentage reduction the inlet and outlet for each hour of the 3-
for the emissions test. of the control device. hour peak HF emissions
period using Equation
2 of Sec.
63.9800(g)(2); and
(2) Calculate the
average HF percentage
reduction for each
test run as the
average of the hourly
HF percentage
reductions for the 3-
hour peak HF emissions
period for that run;
and
[[Page 132]]
(3) Calculate the 2-run
block average HF
percentage reduction
for the emission test
as the average of the
average HF percentage
reductions for the two
test runs.
f. Determine the 2-run i. The hourly average (1) Calculate the HCl
block average HCl HCl emissions rates at percentage reduction
percentage reduction the inlet and outlet for each hour of the 3-
for the emission test. of the control device. hour peak HF emissions
period using Equation
2 Sec.
63.9800(g)(2); and
(2) Calculate the
average HCl percentage
reduction for each
test run as the
average of the hourly
HCl percentage
reductions for the 3-
hour peak HF emissions
period for that run;
and
(3) Calculate the 2-run
block average HCl
percentage reduction
for the emission test
as the average of the
average HCl percentage
reductions for the two
test runs.
18. Each new kiln that is used to a. Establish the Data from the pressure (1) At least every 15
process clay refractory products operating limit for the drop measurement minutes, measure the
and is equipped with a DLA. minimum pressure drop device during the pressure drop across
across the DLA. performance test. the DLA; and
(2) Provide at least
one pressure drop
measurement during at
least three 15-minute
periods per hour of
testing; and
(3) Calculate the
hourly average
pressure drop across
the DLA for each hour
of the performance
test; and
(4) Calculate and
record the minimum
pressure drop as the
average of the hourly
average pressure drops
across the DLA for the
two or three test
runs, whichever
applies.
b. Establish the Data from the limestone (1) Ensure that
operating limit for the feeder during the limestone in the feed
limestone feeder performance test. hopper, silo, and DLA
setting. is free-flowing at all
times during the
performance test; and
(2) Establish the
limestone feeder
setting 1 week prior
to the performance
test; and
(3) Record and maintain
the feeder setting for
the 1-week period that
precedes the
performance test and
during the performance
test.
19. Each new kiln that is used to a. Document conformance Data from the Submit analyses and
process clay refractory products with specifications and installation and supporting
and is equipped with a DIFF or DLS/ requirements of the bag calibration of the bag documentation
FF. leak detection system. leak detection system. demonstrating
conformance with EPA
guidance and
specifications for bag
leak detection systems
as part of the
Notification of
Compliance Status.
b. Establish the i. Data from the lime (1) For continuous lime
operating limit for the feeder during the injection systems,
lime feeder setting. performance test. ensure that lime in
the feed hopper or
silo is free-flowing
at all times during
the performance test;
and
(2) Record the feeder
setting for the three
test runs; and
(3) If the feed rate
setting varies during
the three test runs,
calculate and record
the average feed rate
for the two or three
test runs, whichever
applies.
[[Page 133]]
20. Each new kiln that is used to a. Establish the i. Data from the (1) At least every 15
process clay refractory products operating limit for the pressure drop minutes, measure the
and is equipped with a wet scrubber. minimum scrubber measurement device pressure drop across
pressure drop. during the performance the scrubber; and
test. (2) Provide at least
one pressure drop
measurement during at
least three 15-minute
periods per hour of
testing; and
(3) Calculate the
hourly average
pressure drop across
the scrubber for each
hour of the
performance test; and
(4) Calculate and
record the minimum
pressure drop as the
average of the hourly
average pressure drops
across the scrubber
for the two or three
test runs, whichever
applies.
b. Establish the i. Data from the pH (1) At least every 15
operating limit for the measurement device minutes, measure
minimum scrubber liquid during the performance scrubber liquid pH;
pH. test. and
(2) Provide at least
one pH measurement
during at least three
15-minute periods per
hour of testing; and
(3) Calculate the
hourly average pH
values for each hour
of the performance
test; and
(4) Calculate and
record the minimum
liquid pH as the
average of the hourly
average pH
measurements for the
two or three test
runs, whichever
applies.
c. Establish the i. Data from the flow (1) At least every 15
operating limit for the rate measurement minutes, measure the
minimum scrubber liquid device during the scrubber liquid flow
flow rate. performance test. rate; and
(2) Provide at least
one flow rate
measurement during at
least three 15-minute
periods per hour of
testing; and
(3) Calculate the
hourly average liquid
flow rate for each
hour of the
performance test; and
(4) Calculate and
record the minimum
liquid flow rate as
the average of the
hourly average liquid
flow rates for the two
or three test runs,
whichever applies.
d. If chemicals are i. Data from the (1) At least every 15
added to the scrubber chemical feed rate minutes, measure the
liquid, establish the measurement device scrubber chemical feed
operating limit for the during the performance rate; and
minimum scrubber test. (2) Provide at least
chemical feed rate. one chemical feed rate
measurement during at
least three 15-minute
periods per hour of
testing; and
(3) Calculate the
hourly average
chemical feed rate for
each hour of the
performance test; and
(4) Calculate and
record the minimum
chemical feed rate as
the average of the
hourly average
chemical feed rates
for the two or three
test runs, whichever
applies.
----------------------------------------------------------------------------------------------------------------
Sec. Table 5 to Subpart SSSSS of Part 63--Initial Compliance With
Emission Limits
As stated in Sec. 63.9806, you must show initial compliance with
the emission limits for affected sources according to the following
table:
[[Page 134]]
------------------------------------------------------------------------
You have
For . . . For the following demonstrated
emission limit . . . compliance if . . .
------------------------------------------------------------------------
1. Each affected source a. Each applicable i. Emissions
listed in Table 1 to this emission limit measured using the
subpart. listed in Table 1 test methods
to this subpart. specified in Table
4 to this subpart
satisfy the
applicable emission
limits specified in
Table 1 to this
subpart; and
ii. You establish
and have a record
of the operating
limits listed in
Table 2 to this
subpart over the
performance test
period; and
iii. You report the
results of the
performance test in
the Notification of
Compliance Status,
as specified by
Sec.
63.9812(e)(1) and
(2).
2. Each new or existing As specified in You have satisfied
curing oven, shape dryer, items 3 through 8 the applicable
and kiln that is used to of this table. requirements
process refractory products specified in items
that use organic HAP; each 3 through 8 of this
new or existing coking oven table.
and defumer that is used to
produce pitch-impregnated
refractory products; each
new shape preheater that is
used to produce pitch-
impregnated refractory
products; AND each new or
existing process unit that
is exhausted to a thermal
or catalytic oxidizer that
also controls emissions
from an affected shape
preheater or pitch working
tank.
3. Each affected continuous The average THC The 3-hour block
process unit that is concentration must average THC
subject to the THC emission not exceed 20 emission
concentration limit listed ppmvd, corrected to concentration
in item 2.a., 3.a., 4, or 5 18 percent oxygen. measured during the
of Table 1 to this subpart. performance test
using Methods 25A
and 3A is equal to
or less than 20
ppmvd, corrected to
18 percent oxygen.
4. Each affected continuous The average THC The 3-hour block
process unit that is percentage average THC
subject to the THC reduction must percentage
percentage reduction limit equal or exceed 95 reduction measured
listed in item 2.b. or 3.b. percent. during the
of Table 1 to this subpart. performance test
using Method 25A is
equal to or greater
than 95 percent.
5. Each affected batch The average THC The 2-run block
process unit that is concentration must average THC
subject to the THC emission not exceed 20 emission
concentration limit listed ppmvd, corrected to concentration for
in item 6.a., 7.a., 8, or 9 18 percent oxygen. the 3-hour peak
of Table 1 to this subpart. emissions period
measured during the
performance test
using Methods 25A
and 3A is equal to
or less than 20
ppmvd, corrected to
18 percent oxygen.
6. Each affected batch The average THC The 2-run block
process unit that is percentage average THC
subject to the THC reduction must percentage
percentage reduction limit equal or exceed 95 reduction for the 3-
listed in item 6.b. or 7.b. percent. hour peak emissions
of Table 1 to this subpart. period measured
during the
performance test
using Method 25A is
equal to or exceeds
95 percent.
7. Each affected continuous a. The average THC i. You have
or batch process unit that concentration must installed a THC
is equipped with a control not exceed 20 CEMS at the outlet
device other than a thermal ppmvd, corrected to of the control
or catalytic oxidizer and 18 percent oxygen; device or in the
is subject to the emission or stack of the
limit listed in item 3 or 7 affected source;
of Table 1 to this subpart. and
b. The average THC ii. You have
percentage satisfied the
reduction must requirements of PS-
equal or exceed 95 8 of 40 CFR part
percent. 60, appendix B.
8. Each affected continuous The average THC i. You have
or batch process unit that concentration must installed a THC
uses process changes to not exceed 20 CEMS at the outlet
reduce organic HAP ppmvd, corrected to of the control
emissions and is subject to 18 percent oxygen. device or in the
the emission limit listed stack of the
in item 4 or 8 of Table 1 affected source;
to this subpart. and
ii. You have
satisfied the
requirements of PS-
8 of 40 CFR part
60, appendix B.
9. Each new continuous kiln a. The average HF i. The 3-hour block
that is used to process emissions must not average production-
clay refractory products. exceed 0.019 kg/Mg based HF emissions
(0.038 lb/ton) of rate measured
uncalcined clay during the
processed; OR the performance test
average using one of the
uncontrolled HF methods specified
emissions must be in item 14.a.i. of
reduced by at least Table 4 to this
90 percent. subpart is equal to
or less than 0.019
kg/Mg (0.038 lb/
ton) of uncalcined
clay processed; or
ii. The 3-hour block
average HF
emissions reduction
measured during the
performance test is
equal to or greater
than 90 percent.
[[Page 135]]
b. The average HCl i. The 3-hour block
emissions must not average production-
exceed 0.091 kg/Mg based HCl emissions
(0.18 lb/ton) of rate measured
uncalcined clay during the
processed; OR the performance test
average using one of the
uncontrolled HCl methods specified
emissions must be in item 14.a.i. of
reduced by at least Table 4 to this
30 percent. subpart is equal to
or less than 0.091
kg/Mg (0.18 lb/ton)
of uncalcined clay
processed; or
ii. The 3-hour block
average HCl
emissions reduction
measured during the
performance test is
equal to or greater
than 30 percent.
10. Each new batch process a. The average The 2-run block
kiln that is used to uncontrolled HF average HF emission
process clay refractory emissions must be reduction measured
products. reduced by at least during the
90 percent. performance test is
equal to or greater
than 90 percent.
b. The average The 2-run block
uncontrolled HCl average HCl
emissions must be emissions reduction
reduced by at least measured during the
30 percent. performance test is
equal to or greater
than 30 percent.
------------------------------------------------------------------------
Sec. Table 6 to Subpart SSSSS of Part 63--Initial Compliance With Work
Practice Standards
As stated in Sec. 63.9806, you must show initial compliance with
the work practice standards for affected sources according to the
following table:
------------------------------------------------------------------------
You have
For each . . . For the following demonstrated initial
standard . . . compliance if . . .
------------------------------------------------------------------------
1. Each affected source a. Each applicable i. You have selected
listed in Table 3 to this work practice a method for
subpart. standard listed in performing each of
Table 3 to this the applicable work
subpart. practice standards
listed in Table 3
to this subpart;
and
ii. You have
included in your
Initial
Notification a
description of the
method selected for
complying with each
applicable work
practice standard,
as required by Sec.
63.9(b); and
iii. You submit a
signed statement
with the
Notification of
Compliance Status
that you have
implemented the
applicable work
practice standard
listed in Table 3
to this subpart;
and
iv. You have
described in your
OM&M plan the
method for
complying with each
applicable work
practice standard
specified in Table
3 to this subpart.
2. Each basket or container a. Control POM i. You have
that is used for holding emissions from any implemented at
fired refractory shapes in affected shape least one of the
an existing shape preheater preheater. work practice
and autoclave during the standards listed in
pitch impregnation process. item 1 of Table 3
to this subpart;
and
ii. You have
established a
system for
recording the date
and cleaning method
for each time you
clean an affected
basket or
container.
3. Each affected new or Control POM You have captured
existing pitch working tank. emissions. and vented
emissions from the
affected pitch
working tank to the
device that is used
to control
emissions from an
affected defumer or
coking oven, or to
a thermal or
catalytic oxidizer
that is comparable
to the control
device used on an
affected defumer or
coking oven.
4. Each new or existing Minimize fuel-based You use natural gas,
chromium refractory HAP emissions. or equivalent, as
products kiln. the kiln fuel.
5. Each existing clay Minimize fuel-based You use natural gas,
refractory products kiln. HAP emissions. or equivalent, as
the kiln fuel.
------------------------------------------------------------------------
[[Page 136]]
Sec. Table 7 to Subpart SSSSS of Part 63--Continuous Compliance with
Emission Limits
As stated in Sec. 63.9810, you must show continuous compliance with
the emission limits for affected sources according to the following
table:
------------------------------------------------------------------------
You must demonstrate
For the following continuous
For . . . emission limit . . . compliance by . . .
------------------------------------------------------------------------
1. Each affected source a. Each applicable i. Collecting and
listed in Table 1 to this emission limit recording the
subpart. listed in Table 1 monitoring and
to this subpart. process data listed
in Table 2
(operating limits)
to this subpart;
and
ii. Reducing the
monitoring and
process data
associated with the
operating limits
specified in Table
2 to this subpart;
and
iii. Recording the
results of any
control device
inspections; and
iv. Reporting, in
accordance with
Sec. 63.9814(e),
any deviation from
the applicable
operating limits
specified in Table
2 to this subpart.
2. Each new or existing As specified in Satisfying the
curing oven, shape dryer, items 3 though 7 of applicable
and kiln that is used to this table. requirements
process refractory products specified in items
that use organic HAP; each 3 through 7 of this
new or existing coking oven table.
and defumer that is used to
produce pitch-impregnated
refractory products; each
new shape preheater that is
used to produce pitch-
impregnated refractory
products; AND each new or
existing process unit that
is exhausted to a thermal
or catalytic oxidizer that
also controls emissions
from an affected shape
preheater or pitch working
tank.
3. Each affected process a. The average THC i. Collecting the
unit that is equipped with concentration must applicable data
a thermal or catalytic not exceed 20 measured by the
oxidizer. ppmvd, corrected to control device
18 percent oxygen; temperature
OR the average THC monitoring system,
percentage as specified in
reduction must items 5, 6, 8, and
equal or exceed 95 9 of Table 8 to
percent. this subpart; and
ii. Reducing the
applicable data
measured by the
control device
temperature
monitoring system,
as specified in
items 5, 6, 8, and
9 of Table 8 to
this subpart; and
iii. Maintaining the
average control
device operating
temperature for the
applicable
averaging period
specified in items
5, 6, 8, and 9 of
Table 2 to this
subpart at or above
the minimum
allowable operating
temperature
established during
the most recent
performance test.
4. Each affected process The average THC Operating and
unit that is equipped with concentration must maintaining a THC
a control device other than not exceed 20 CEMS at the outlet
a thermal or catalytic ppmvd, corrected to of the control
oxidizer. 18 percent oxygen; device or in the
OR the average THC stack of the
performance affected source,
reduction must according to the
equal or exceed 95 requirements of
percent. Procedure 1 of 40
CFR part 60,
appendix F.
5. Each affected process The average THC Operating and
unit that uses process concentration must maintaining a THC
changes to meet the not exceed 20 CEMS at the outlet
applicable emission limit. ppmvd, corrected to of the control
18 percent oxygen. device or in the
stack of the
affected source,
according to the
requirements of
Procedure 1 of 40
CFR part 60,
appendix F.
6. Each affected continuous The average THC Recording the
process unit. concentration must organic HAP
not exceed 20 processing rate
ppmvd, corrected to (pounds per hour)
18 percent oxygen; and the operating
OR the average THC temperature of the
percentage affected source, as
reduction must specified in items
equal or exceed 95 3.b. and 3.c. of
percent. Table 4 to this
subpart.
[[Page 137]]
7. Each affected batch The average THC Recording the
process unit. concentration must organic HAP
not exceed 20 processing rate
ppmvd, corrected to (pounds per batch);
18 percent oxygen; and process cycle
OR the average THC time for each batch
percentage cycle; and hourly
reduction must average operating
equal or exceed 95 temperature of the
percent. affected source, as
specified in items
8.b. through 8.d.
of Table 4 to this
subpart.
8. Each kiln that is used to As specified in Satisfying the
process clay refractory items 9 through 11 applicable
products. of this table. requirements
specified in items
9 through 11 of
this table.
9. Each affected kiln that a. The average HF i. Maintaining the
is equipped with a DLA. emissions must not pressure drop
exceed 0.019 kg/Mg across the DLA at
(0.038 lb/ton) of or above the
uncalcined clay minimum levels
processed, OR the established during
average the most recent
uncontrolled HF performance test;
emissions must be and
reduced by at least ii. Verifying that
90 percent; and the limestone
b. The average HCl hopper contains an
emissions must not adequate amount of
exceed 0.091 kg/Mg free-flowing
(0.18 lb/ton) of limestone by
uncalcined clay performing a daily
processed, or the visual check of the
average limestone in the
uncontrolled HCl feed hopper; and
emissions must be iii. Recording the
reduced by at least limestone feeder
30 percent. setting daily to
verify that the
feeder setting is
at or above the
level established
during the most
recent performance
test; and
iv. Using the same
grade of limestone
as was used during
the most recent
performance test
and maintaining
records of the
source and grade of
limestone.
10. Each affected kiln that a. The average HF i. Verifying at
is equipped with a DIFF or emissions must not least once each 8-
DLS/FF. exceed 0.019 kg/Mg hour shift that
(0.038 lb/ton) of lime is free-
uncalcined clay flowing by means of
processed; OR the a visual check,
average checking the output
uncontrolled HF of a load cell,
emissions must be carrier gas/lime
reduced by at least flow indicator, or
90 percent; and carrier gas
pressure drop
measurement system;
and
b. The average HCl ii. Recording feeder
emissions must not setting daily to
exceed 0.091 kg/Mg verify that the
(0.18 lb/ton) of feeder setting is
uncalcined clay at or above the
processed; OR the level established
average during the most
uncontrolled HCl recent performance
emissions must be test; and
reduced by at least
30 percent.
iii. Initiating
corrective action
within 1 hour of a
bag leak detection
system alarm AND
completing
corrective actions
in accordance with
the OM&M plan, AND
operating and
maintaining the
fabric filter such
that the alarm does
not engage for more
than 5 percent of
the total operating
time in a 6-month
block reporting
period.
11. Each affected kiln that a. The average HF i. Maintaining the
is equipped with a wet emissions must not pressure drop
scrubber. exceed 0.019 kg/Mg across the
(0.038 lb/ton) of scrubber, liquid
uncalcined clay pH, and liquid flow
processed; OR the rate at or above
average the minimum levels
uncontrolled HF established during
emissions must be the most recent
reduced by at least performance test;
90 percent; and and
b. The average HCl ii. If chemicals are
emissions must not added to the
exceed 0.091 kg/Mg scrubber liquid,
(0.18 lb/ton) of maintaining the
uncalcined clay average chemical
processed; OR the feed rate at or
average above the minimum
uncontrolled HCl chemical feed rate
emissions must be established during
reduced by at least the most recent
30 percent. performance test.
------------------------------------------------------------------------
Sec. Table 8 to Subpart SSSSS of Part 63--Continuous Compliance with
Operating Limits
As stated in Sec. 63.9810, you must show continuous compliance with
the operating limits for affected sources according to the following
table:
[[Page 138]]
------------------------------------------------------------------------
You must demonstrate
For the following continuous
For . . . operating limit . . compliance by . . .
.
------------------------------------------------------------------------
1. Each affected source a. Each applicable i. Maintaining all
listed in Table 2 to this operating limit applicable process
subpart. listed in Table 2 and control device
to this subpart. operating
parameters within
the limits
established during
the most recent
performance test;
and
ii. Conducting
annually an
inspection of all
duct work, vents,
and capture devices
to verify that no
leaks exist and
that the capture
device is operating
such that all
emissions are
properly vented to
the control device
in accordance with
the OM&M plan.
2. Each affected continuous a. The operating i. Operating the
kiln that is equipped with limits specified in control device on
a control device. items 2.a. through the affected kiln
2.c. of Table 2 to during all times
this subpart. except during
periods of approved
scheduled
maintenance, as
specified in Sec.
63.9792(e); and
ii. Minimizing HAP
emissions from the
affected kiln
during all periods
of scheduled
maintenance of the
kiln control device
when the kiln is
operating and the
control device is
out of service; and
iii. Minimizing the
duration of all
periods of
scheduled
maintenance of the
kiln control device
when the kiln is
operating and the
control device is
out of service.
3. Each new or existing As specified in Satisfying the
curing oven, shape dryer, items 4 through 9 applicable
and kiln that is used to of this table. requirements
process refractory products specified in items
that use organic HAP; each 4 through 9 of this
new or existing coking oven table.
and defumer that is used to
produce pitch-impregnated
refractory products; each
new shape preheater that is
used to produce pitch-
impregnated refractory
products; AND each new or
existing process unit that
is exhausted to a thermal
or catalytic oxidizer that
also controls emissions
from an affected shape
preheater or pitch working
tank.
4. Each affected continuous Maintain process i. Recording the
process unit. operating organic HAP
parameters within processing rate
the limits (pounds per hour);
established during and
the most recent ii. Recording the
performance test. operating
temperature of the
affected source at
least hourly; and
iii. Maintaining the
3-hour block
average organic HAP
processing rate at
or below the
maximum organic HAP
processing rate
established during
the most recent
performance test.
5. Continuous process units Maintain the 3-hour i. Measuring and
that are equipped with a block average recording the
thermal oxidizer. operating thermal oxidizer
temperature in the combustion chamber
thermal oxidizer temperature at
combustion chamber least every 15
at or above the minutes; and
minimum allowable ii. Calculating the
operating hourly average
temperature thermal oxidizer
established during combustion chamber
the most recent temperature; and
performance test. iii. Maintaining the
3-hour block
average thermal
oxidizer combustion
chamber temperature
at or above the
minimum allowable
operating
temperature
established during
the most recent
performance test;
and
iv. Reporting, in
accordance with
Sec. 63.9814(e),
any 3-hour block
average operating
temperature
measurements below
the minimum
allowable thermal
oxidizer combustion
chamber operating
temperature
established during
the most recent
performance test.
[[Page 139]]
6. Continuous process units a. Maintain the 3- i. Measuring and
that are equipped with a hour block average recording the
catalytic oxidizer. temperature at the temperature at the
inlet of the inlet of the
catalyst bed at or catalyst bed at
above the minimum least every 15
allowable catalyst minutes; and
bed inlet ii. Calculating the
temperature hourly average
established during temperature at the
the most recent inlet of the
performance test. catalyst bed; and
iii. Maintaining the
3-hour block
average temperature
at the inlet of the
catalyst bed at or
above the minimum
allowable catalyst
bed inlet
temperature
established during
the most recent
performance test;
and
iv. Reporting, in
accordance with
Sec. 63.9814(e),
any 3-hour block
average catalyst
bed inlet
temperature
measurements below
the minimum
allowable catalyst
bed inlet
temperature
established during
the most recent
performance; and
v. Checking the
activity level of
the catalyst at
least every 12
months and taking
any necessary
corrective action,
such as replacing
the catalyst, to
ensure that the
catalyst is
performing as
designed.
7. Each affected batch Maintain process i. Recording the
process unit. operating organic HAP
parameters within processing rate
the limits (pounds per batch);
established during and
the most recent ii. Recording the
performance test. hourly average
operating
temperature of the
affected source;
and
iii. Recording the
process cycle time
for each batch
cycle; and
iv. Maintaining the
organic HAP
processing rate at
or below the
maximum organic HAP
processing rate
established during
the most recent
performance test.
8. Batch process units that Maintain the hourly i. Measuring and
are equipped with a thermal average temperature recording the
oxidizer. in the thermal thermal oxidizer
oxidizer combustion combustion chamber
chamber at or above temperature at
the hourly average least every 15
temperature minutes; and
established for the ii. Calculating the
corresponding 1- hourly average
hour period of the thermal oxidizer
cycle during the combustion chamber
most recent temperature; and
performance test. iii. From the start
of each batch cycle
until 3 hours have
passed since the
process unit
reached maximum
temperature,
maintaining the
hourly average
operating
temperature in the
thermal oxidizer
combustion chamber
at or above the
minimum allowable
operating
temperature
established for the
corresponding
period during the
most recent
performance test,
as determined
according to item
11 of Table 4 to
this subpart; and
iv. For each
subsequent hour of
the batch cycle,
maintaining the
hourly average
operating
temperature in the
thermal oxidizer
combustion chamber
at or above the
minimum allowable
operating
temperature
established for the
corresponding hour
during the most
recent performance
test, as specified
in item 13 of Table
4 to this subpart;
and
v. Reporting, in
accordance with
Sec. 63.9814(e),
any temperature
measurements below
the minimum
allowable thermal
oxidizer combustion
chamber temperature
measured during the
most recent
performance test.
[[Page 140]]
9. Batch process units that Maintain the hourly i. Measuring and
are equipped with a average temperature recording
catalytic oxidizer. at the inlet of the temperatures at the
catalyst bed at or inlet of the
above the catalyst bed at
corresponding least every 15
hourly average minutes; and
temperature ii. Calculating the
established for the hourly average
corresponding 1- temperature at the
hour period of the inlet of the
cycle during the catalyst bed; and
most recent iii. From the start
performance test. of each batch cycle
until 3 hours have
passed since the
process unit
reached maximum
temperature,
maintaining the
hourly average
operating
temperature at the
inlet of the
catalyst bed at or
above the minimum
allowable bed inlet
temperature
established for the
corresponding
period during the
most recent
performance test,
as determined
according to item
12 of Table 4 to
this subpart; and
iv. For each
subsequent hour of
the batch cycle,
maintaining the
hourly average
operating
temperature at the
inlet of the
catalyst bed at or
above the minimum
allowable bed inlet
temperature
established for the
corresponding hour
during the most
recent performance
test, as specified
in item 13 of Table
4 to this subpart;
and
v. Reporting, in
accordance with
Sec. 63.9814(e),
any catalyst bed
inlet temperature
measurements below
the minimum
allowable bed inlet
temperature
measured during the
most recent
performance test;
and
vi. Checking the
activity level of
the catalyst at
least every 12
months and taking
any necessary
corrective action,
such as replacing
the catalyst, to
ensure that the
catalyst is
performing as
designed.
10. Each new kiln that is As specified in Satisfying the
used to process clay items 11 through 13 applicable
refractory products. of this table. requirements
specified in items
11 through 13 of
this table.
11. Each new kiln that is a. Maintain the i. Collecting the
equipped a DLA. average pressure DLA pressure drop
drop across the DLA data, as specified
for each 3-hour in item 18.a. of
block period at or Table 4 to this
above the minimum subpart; and
pressure drop ii. Reducing the DLA
established during pressure drop data
the most recent to 1-hour and 3-
performance test. hour block
averages; and
iii. Maintaining the
3-hour block
average pressure
drop across the DLA
at or above the
minimum pressure
drop established
during the most
recent performance
test.
b. Maintain free- Verifying that the
flowing limestone limestone hopper
in the feed hopper, has an adequate
silo, and DLA. amount of free-
flowing limestone
by performing a
daily visual check
of the limestone
hopper.
c. Maintain the Recording the
limestone feeder limestone feeder
setting at or above setting at least
the level daily to verify
established during that the feeder
the most recent setting is being
performance test. maintained at or
above the level
established during
the most recent
performance test.
d. Use the same Using the same grade
grade of limestone of limestone as was
from the same used during the
source as was used most recent
during the most performance test
recent performance and maintaining
test. records of the
source and grade of
limestone.
[[Page 141]]
12. Each new kiln that is a. Initiate i. Initiating
equipped with a DIFF or DLS/ corrective action corrective action
FF. within 1 hour of a within 1 hour of a
bag leak detection bag leak detection
system alarm and system alarm and
complete corrective completing
actions in corrective actions
accordance with the in accordance with
OM&M plan; AND the OM&M plan; and
operate and ii. Operating and
maintain the fabric maintaining the
filter such that fabric filter such
the alarm does not that the alarm does
engage for more not engage for more
than 5 percent of than 5 percent of
the total operating the total operating
time in a 6-month time in a 6-month
block reporting block reporting
period. period; in
calculating this
operating time
fraction, if
inspection of the
fabric filter
demonstrates that
no corrective
action is required,
no alarm time is
counted; if
corrective action
is required, each
alarm shall be
counted as a
minimum of 1 hour;
if you take longer
than 1 hour to
initiate corrective
action, the alarm
time shall be
counted as the
actual amount of
time taken by you
to initiate
corrective action.
b. Maintain free- i. Verifying at
flowing lime in the least once each 8-
feed hopper or silo hour shift that
at all times for lime is free-
continuous flowing via a load
injection systems; cell, carrier gas/
AND maintain feeder lime flow
setting at or above indicator, carrier
the level gas pressure drop
established during measurement system,
the most recent or other system;
performance test recording all
for continuous monitor or sensor
injection systems. output, and if lime
is found not to be
free flowing,
promptly initiating
and completing
corrective actions;
and
ii. Recording the
feeder setting once
each day of
operation to verify
that the feeder
setting is being
maintained at or
above the level
established during
the most recent
performance test.
13. Each new kiln that is a. Maintain the i. Collecting the
used to process clay average pressure scrubber pressure
refractory products and is drop across the drop data, as
equipped with a wet scrubber for each 3- specified in item
scrubber. hour block period 20.a. of Table 4 to
at or above the this subpart; and
minimum pressure ii. Reducing the
drop established scrubber pressure
during the most drop data to 1-hour
recent performance and 3-hour block
test. averages; and
iii. Maintaining the
3-hour block
average scrubber
pressure drop at or
above the minimum
pressure drop
established during
the most recent
performance test.
b. Maintain the i. Collecting the
average scrubber scrubber liquid pH
liquid pH for each data, as specified
3-hour block period in item 20.b. of
at or above the Table 4 to this
minimum scrubber subpart; and
liquid pH ii. Reducing the
established during scrubber liquid pH
the most recent data to 1-hour and
performance test. 3-hour block
averages; and
iii. Maintaining the
3-hour block
average scrubber
liquid pH at or
above the minimum
scrubber liquid pH
established during
the most recent
performance test.
c. Maintain the i. Collecting the
average scrubber scrubber liquid
liquid flow rate flow rate data, as
for each 3-hour specified in item
block period at or 20.c. of Table 4 to
above the minimum this subpart; and
scrubber liquid ii. Reducing the
flow rate scrubber liquid
established during flow rate data to 1-
the most recent hour and 3-hour
performance test. block averages; and
iii. Maintaining the
3-hour block
average scrubber
liquid flow rate at
or above the
minimum scrubber
liquid flow rate
established during
the most recent
performance test.
d. If chemicals are i. Collecting the
added to the scrubber chemical
scrubber liquid, feed rate data, as
maintain the specified in item
average scrubber 20.d. of Table 4 to
chemical feed rate this subpart; and
for each 3-hour ii. Reducing the
block period at or scrubber chemical
above the minimum feed rate data to 1-
scrubber chemical hour and 3-hour
feed rate block averages; and
established during
the most recent
performance test.
[[Page 142]]
iii. Maintaining the
3-hour block
average scrubber
chemical feed rate
at or above the
minimum scrubber
chemical feed rate
established during
the most recent
performance test.
------------------------------------------------------------------------
Sec. Table 9 to Subpart SSSSS of Part 63--Continuous Compliance With
Work Practice Standards
As stated in Sec. 63.9810, you must show continuous compliance with
the work practice standards for affected sources according to the
following table:
------------------------------------------------------------------------
You must demonstrate
For the following continuous
For . . . work practice compliance by . . .
standard . . .
------------------------------------------------------------------------
1. Each affected source Each applicable work i. Performing each
listed in Table 3 to this practice applicable work
subpart. requirement listed practice standard
in Table 3 to this listed in Table 3
subpart. to this subpart;
and
ii. Maintaining
records that
document the method
and frequency for
complying with each
applicable work
practice standard
listed in Table 3
to this subpart, as
required by Sec.
Sec. 63.10(b) and
63.9816(c)(2).
2. Each basket or container Control POM i. Controlling
that is used for holding emissions from any emissions from the
fired refractory shapes in affected shape volatilization of
an existing shape preheater preheater. residual pitch by
and autoclave during the implementing one of
pitch impregnation process. the work practice
standards listed in
item 1 of Table 3
to this subpart;
and
ii. Recording the
date and cleaning
method each time
you clean an
affected basket or
container.
3. Each new or existing Control POM Capturing and
pitch working tank. emissions. venting emissions
from the affected
pitch working tank
to the control
device that is used
to control
emissions from an
affected defumer or
coking oven, or to
a thermal or
catalytic oxidizer
that is comparable
to the control
device used on an
affected defumer or
coking oven.
4. Each new or existing Minimize fuel-based i. Using natural
chromium refractory HAP emissions. gas, or equivalent,
products kiln. as the kiln fuel at
all times except
during periods of
natural gas
curtailment or
supply
interruption; and
ii. If you intend to
use an alternative
fuel, submitting a
notification of
alternative fuel
use within 48 hours
of the declaration
of a per-iod of
natural gas
curtailment or
supply
interruption, as
defined in Sec.
63.9824; and
iii. Submitting a
report of
alternative fuel
use within 10
working days after
terminating the use
of the alternative
fuel, as specified
in Sec.
63.9814(g).
5. Each existing clay Minimize fuel-based i. Using natural
refractory products kiln. HAP emissions. gas, or equivalent,
as the kiln fuel at
all times except
during periods of
natural gas
curtailment or
supply
interruption; and
ii. If you intend to
use an alternative
fuel, submitting a
notification of
alternative fuel
use within 48 hours
of the declaration
of a per-iod of
natural gas
curtailment or
supply
interruption, as
defined in Sec.
63.9824; and
iii. Submitting a
report of
alternative fuel
use within 10
working days after
terminating the use
of the alternative
fuel, as specified
in Sec.
63.9814(g).
------------------------------------------------------------------------
[[Page 143]]
Sec. Table 10 to Subpart SSSSS of Part 63--Requirements for Reports
As stated in Sec. 63.9814, you must comply with the requirements
for reports in the following table:
------------------------------------------------------------------------
The report must You must submit the
You must submit a(n) . . . contain . . . report . . .
------------------------------------------------------------------------
1. Compliance report........ The information in Semiannually
Sec. 63.9814(c) according to the
through (f). requirements in
Sec. 63.9814(a)
through (f).
2. Immediate startup, a. Actions taken for By fax or telephone
shutdown, and malfunction the event. within 2 working
report if you had a days after starting
startup, shutdown, or actions
malfunction during the inconsistent with
reporting period that is the plan.
not consistent with your
SSMP.
b. The information By letter within 7
in Sec. working days after
63.10(d)(5)(ii). the end of the
event unless you
have made
alternative
arrangements with
the permitting
authority.
3. Report of alternative The information in If you are subject
fuel use. Sec. 63.9814(g) to the work
and items 4 and 5 practice standard
of Table 9 to this specified in item 3
subpart. or 4 of Table 3 to
this subpart, and
you use an
alternative fuel in
the affected kiln,
by letter within 10
working days after
terminating the use
of the alternative
fuel.
------------------------------------------------------------------------
Sec. Table 11 to Subpart SSSSS of Part 63--Applicability of General
Provisions to Subpart SSSSS
As stated in Sec. 63.9820, you must comply with the applicable
General Provisions requirements according to the following table:
----------------------------------------------------------------------------------------------------------------
Applies to subpart
Citation Subject Brief description SSSSS
----------------------------------------------------------------------------------------------------------------
Sec. 63.1....................... Applicability............. .......................... Yes.
Sec. 63.2....................... Definitions............... .......................... Yes.
Sec. 63.3....................... Units and Abbreviations... .......................... Yes.
Sec. 63.4....................... Prohibited Activities..... Compliance date; Yes.
circumvention,
severability.
Sec. 63.5....................... Construction/ Applicability; Yes.
Reconstruction. applications; approvals.
Sec. 63.6(a).................... Applicability............. General Provisions (GP) Yes.
apply unless compliance
extension; GP apply to
area sources that become
major.
Sec. 63.6(b)(1)-(4)............. Compliance Dates for New Standards apply at Yes.
and Reconstructed Sources. effective date; 3 years
after effective date;
upon startup; 10 years
after construction or
reconstruction commences
for section 112(f).
Sec. 63.6(b)(5)................. Notification.............. .......................... Yes.
Sec. 63.6(b)(6)................. [Reserved] ....................
Sec. 63.6(b)(7)................. Compliance Dates for New Area sources that become Yes.
and Reconstructed Area major must comply with
Sources That Become Major. major source standards
immediately upon becoming
major, regardless of
whether required to
comply when they were
area sources.
Sec. 63.6(c)(1)-(2)............. Compliance Dates for Comply according to date Yes.
Existing Sources. in subpart, which must be
no later than 3 years
after effective date; for
section 112(f) standards,
comply within 90 days of
effective date unless
compliance extension.
Sec. 63.6(c)(3)-(4)............. [Reserved] ....................
Sec. 63.6(c)(5)................. Compliance Dates for Area sources that become Yes.
Existing Area Sources major must comply with
That Become Major. major source standards by
date indicated in subpart
or by equivalent time
period (for example, 3
years).
Sec. 63.6(d).................... [Reserved] ....................
Sec. 63.6(e)(1)-(2)............. Operation & Maintenance... Operate to minimize Yes.
emissions at all times;
correct malfunctions as
soon as practicable;
requirements
independently
enforceable; information
Administrator will use to
determine if operation
and maintenance
requirements were met.
[[Page 144]]
Sec. 63.6(e)(3)................. Startup, Shutdown, and .......................... Yes.
Malfunction Plan (SSMP).
Sec. 63.6(f)(1)................. Compliance Except During You must comply with Yes.
SSM. emission standards at all
times except during SSM.
Sec. 63.6(f)(2)-(3)............. Methods for Determining Compliance based on Yes.
Compliance. performance test,
operation and maintenance
plans, records,
inspection.
Sec. 63.6(g)(1)-(3)............. Alternative Standard...... Procedures for getting an Yes.
alternative standard.
Sec. 63.6(h)(1)-(9)............. Opacity/Visible Emission .......................... Not applicable.
(VE) Standards.
Sec. 63.6(i)(1)-(14)............ Compliance Extension...... Procedures and criteria Yes.
for Administrator to
grant compliance
extension.
Sec. 63.6(j).................... Presidential Compliance President may exempt Yes.
Exemption. source category.
Sec. 63.7(a)(1)-(2)............. Performance Test Dates.... Dates for conducting Yes.
initial performance
testing and other
compliance
demonstrations; must
conduct 180 days after
first subject to rule.
Sec. 63.7(a)(3)................. Section 114 Authority..... Administrator may require Yes.
a performance test under
CAA section 114 at any
time.
Sec. 63.7(b)(1)................. Notification of Must notify Administrator Yes.
Performance Test. 60 days before the test.
Sec. 63.7(b)(2)................. Notification of Must notify Administrator Yes.
Rescheduling. 5 days before scheduled
date and provide
rescheduled date.
Sec. 63.7(c).................... Quality Assurance/Test Requirements; test plan Yes.
Plan. approval procedures;
performance audit
requirements; internal
and external QA
procedures for testing.
Sec. 63.7(d).................... Testing Facilities........ .......................... Yes.
Sec. 63.7(e)(1)................. Conditions for Conducting Performance tests must be No, Sec. 63.9800
Performance Tests. conducted under specifies
representative requirements; Yes;
conditions; cannot Yes.
conduct performance tests
during SSM; not a
violation to exceed
standard during SSM.
Sec. 63.7(e)(2)................. Conditions for Conducting Must conduct according to Yes.
Performance Tests. subpart and EPA test
methods unless
Administrator approves
alternative.
Sec. 63.7(e)(3)................. Test Run Duration......... Must have three test runs Yes; Yes, except
of at least 1 hour each; where specified in
compliance is based on Sec. 63.9800 for
arithmetic mean of three batch process
runs; conditions when sources; Yes.
data from an additional
test run can be used.
Sec. 63.7(f).................... Alternative Test Method... .......................... Yes.
Sec. 63.7(g).................... Performance Test Data .......................... Yes.
Analysis.
Sec. 63.7(h).................... Waiver of Test............ .......................... Yes.
Sec. 63.8(a)(1)................. Applicability of .......................... Yes.
Monitoring Requirements.
Sec. 63.8(a)(2)................. Performance Specifications Performance Specifications Yes.
in appendix B of 40 CFR
part 60 apply.
Sec. 63.8(a)(3)................. [Reserved]
Sec. 63.8(a)(4)................. Monitoring with Flares.... .......................... Not applicable.
Sec. 63.8(b)(1)................. Monitoring................ Must conduct monitoring Yes.
according to standard
unless Administrator
approves alternative.
Sec. 63.8(b)(2)-(3)............. Multiple Effluents and Specific requirements for Yes.
Multiple Monitoring installing and reporting
Systems. on monitoring systems.
Sec. 63.8(c)(1)................. Monitoring System Maintenance consistent Yes.
Operation and Maintenance. with good air pollution
control practices.
Sec. 63.8(c)(1)(i).............. Routine and Predictable Reporting requirements for Yes.
SSM. SSM when action is
described in SSMP.
Sec. 63.8(c)(1)(ii)............. SSM not in SSMP........... Reporting requirements for Yes.
SSM when action is not
described in SSMP.
Sec. 63.8(c)(1)(iii)............ Compliance with Operation How Administrator Yes.
and Maintenance determines if source is
Requirements. complying with operation
and maintenance
requirements.
Sec. 63.8(c)(2)-(3)............. Monitoring System Must install to get Yes.
Installation. representative emission
and parameter
measurements.
Sec. 63.8(c)(4)................. CMS Requirements.......... .......................... No, Sec. 63.9808
specifies
requirements.
Sec. 63.8(c)(5)................. COMS Minimum Procedures... .......................... Not applicable.
Sec. 63.8(c)(6)................. CMS Requirements.......... .......................... Applies only to
sources required to
install and operate
a THC CEMS.
[[Page 145]]
Sec. 63.8(c)(7)(i)(A)........... CMS Requirements.......... .......................... Applies only to
sources required to
install and operate
a THC CEMS.
Sec. 63.8(c)(7)(i)(B)........... CMS Requirements.......... .......................... Applies only to
sources required to
install and operate
a THC CEMS.
Sec. 63.8(c)(7)(i)(C)........... CMS Requirements.......... .......................... Not applicable.
Sec. 63.8(c)(7)(ii)............. CMS Requirements.......... Corrective action required Yes.
when CMS is out of
control.
Sec. 63.8(c)(8)................. CMS Requirements.......... .......................... Yes.
Sec. 63.8(d).................... CMS Quality Control....... .......................... Applies only to
sources required to
install and operate
a THC CEMS.
Sec. 63.8(e).................... CMS Performance Evaluation .......................... Applies only to
sources required to
install and operate
a THC CEMS.
Sec. 63.8(f)(1)-(5)............. Alternative Monitoring .......................... Yes.
Method.
Sec. 63.8(f)(6)................. Alternative to Relative .......................... Yes.
Accuracy Test.
Sec. 63.8(g).................... Data Reduction............ .......................... Applies only to
sources required to
install and operate
a THC CEMS.
Sec. 63.9(a).................... Notification Requirements. .......................... Yes.
Sec. 63.9(b)(1)-(5)............. Initial Notifications..... .......................... Yes.
Sec. 63.9(c).................... Request for Compliance .......................... Yes.
Extension.
Sec. 63.9(d).................... Notification of Special .......................... Yes.
Compliance Requirements
for New Source.
Sec. 63.9(e).................... Notification of Notify Administrator 60 Yes.
Performance Test. days prior.
Sec. 63.9(f).................... Notification of VE/Opacity .......................... Not applicable.
Test.
Sec. 63.9(g).................... Additional Notifications .......................... Applies only to
When Using CMS. sources required to
install and operate
a THC CEMS.
Sec. 63.9(h).................... Notification of Compliance .......................... Yes.
Status.
Sec. 63.9(i).................... Adjustment of Submittal .......................... Yes.
Deadlines.
Sec. 63.9(j).................... Change in Previous .......................... Yes.
Information.
Sec. 63.10(a)................... Recordkeeping/Reporting... .......................... Yes.
Sec. 63.10(b)(1)................ Recordkeeping/Reporting... .......................... Yes.
Sec. 63.10(b)(2)(i)-(v)......... Records Related to .......................... Yes.
Startup, Shutdown, and
Malfunction.
Sec. 63.10(b)(2)(vi) and (x-xi). CMS Records............... .......................... Yes.
Sec. 63.10(b)(2)(vii)-(ix)...... Records................... Measurements to Yes.
demonstrate compliance
with emission
limitations; performance
test, performance
evaluation, and visible
emission observation
results; measurements to
determine conditions of
performance tests and
performance evaluations.
Sec. 63.10(b)(2)(xii)........... Records................... Records when under waiver. Yes.
Sec. 63.10(b)(2)(xiii).......... Records................... Records when using Not applicable.
alternative to relative
accuracy test.
Sec. 63.10(b)(2)(xiv)........... Records................... All documentation Yes.
supporting Initial
Notification and
Notification of
Compliance Status.
Sec. 63.10(b)(3)................ Records................... Applicability Yes.
Determinations.
Sec. 63.10(c)(1)-(6), (9)-(15).. Records................... Additional Records for CMS Not applicable.
Sec. 63.10(c)(7)-(8)............ Records................... Records of excess No, Sec. 63.9816
emissions and parameter specifies
monitoring exceedances requirements.
for CMS.
Sec. 63.10(d)(1)................ General Reporting Requirements for reporting Yes.
Requirements.
Sec. 63.10(d)(2)................ Report of Performance Test When to submit to Federal Yes.
Results. or State authority.
Sec. 63.10(d)(3)................ Reporting Opacity or VE .......................... Not applicable.
Observations.
Sec. 63.10(d)(4)................ Progress Reports.......... Must submit progress Yes.
reports on schedule if
under compliance
extension.
Sec. 63.10(d)(5)................ Startup, Shutdown, and Contents and submission... Yes.
Malfunction Reports.
[[Page 146]]
Sec. 63.10(e)(1)-(2)............ Additional CMS Reports.... .......................... Applies only to
sources required to
install and operate
a THC CEMS.
Sec. 63.10(e)(3)................ Reports................... .......................... No, Sec. 63.9814
specifies
requirements.
Sec. 63.10(e)(4)................ Reporting COMS data....... .......................... Not applicable.
Sec. 63.10(f)................... Waiver for Recordkeeping/ .......................... Yes.
Reporting.
Sec. 63.11...................... Flares.................... .......................... Not applicable.
Sec. 63.12...................... Delegation................ .......................... Yes.
Sec. 63.13...................... Addresses................. .......................... Yes.
Sec. 63.14...................... Incorporation by Reference .......................... Yes.
Sec. 63.15...................... Availability of .......................... Yes.
Information.
----------------------------------------------------------------------------------------------------------------
Subpart TTTTT_National Emissions Standards for Hazardous Air Pollutants
for Primary Magnesium Refining
Source: 68 FR 58620, Oct. 10, 2003, unless otherwise noted.
What This Subpart Covers
Sec. 63.9880 What is the purpose of this subpart?
This subpart establishes national emission standards for hazardous
air pollutants (NESHAP) for primary magnesium refineries. This subpart
also establishes requirements to demonstrate initial and continuous
compliance with all applicable emission limitations, work practice
standards, and operation and maintenance requirements.
Sec. 63.9881 Am I subject to this subpart?
You are subject to this subpart if you own or operate a primary
magnesium refinery that is (or is part of) a major source of hazardous
air pollutant (HAP) emissions. Your primary magnesium refinery is a
major source of HAP if it emits or has the potential to emit any single
HAP at a rate of 10 tons or more per year or any combination of HAP at a
rate of 25 tons or more per year.
Sec. 63.9882 What parts of my plant does this subpart cover?
(a) The affected sources are each new and existing primary magnesium
refining facility.
(b) This subpart covers emissions from each spray dryer stack,
magnesium chloride storage bins scrubber stack, melt/reactor system
stack, and launder off-gas system stack at your primary magnesium
refining facility. This subpart also covers fugitive dust emissions.
(c) Each primary magnesium refining facility is existing if you
commenced construction or reconstruction of the affected source before
January 22, 2003.
(d) Each primary magnesium refining facility is new if you commence
construction or reconstruction of the affected source on or after
January 22, 2003. An affected source is reconstructed if it meets the
definition of reconstruction in Sec. 63.2.
Sec. 63.9883 When do I have to comply with this subpart?
(a) If you have an existing source, you must comply with each
emission limitation, work practice standard, and operation and
maintenance requirement in this subpart that applies to you no later
than October 11, 2004.
(b) If you have a new affected source and its initial startup date
is on or before October 11, 2003, you must comply with each emission
limitation, work practice standard, and operation and maintenance
requirement in this subpart that applies to you by October 10, 2003.
(c) If you have a new affected source and its initial startup date
is after October 10, 2003, you must comply with each emission
limitation, work practice standard, and operation and maintenance
requirement in this subpart that applies to you upon initial startup.
(d) If your primary magnesium refinery is an area source that
becomes a major source of HAP, the compliance
[[Page 147]]
dates in paragraphs (d)(1) and (2) of this section apply to you:
(1) Any portion of the existing primary magnesium refinery that is a
new affected source or a new reconstructed source must be in compliance
with this subpart upon startup.
(2) All other parts of the primary magnesium refinery must be in
compliance with this subpart no later than 2 years after it becomes a
major source.
(e) You must meet the notification and schedule requirements in
Sec. 63.9930. Several of these notifications must be submitted before
the compliance date for your affected source.
Emission Limitations and Work Practice Standards
Sec. 63.9890 What emission limitations must I meet?
(a) You must meet each emission limit in Table 1 to this subpart
that applies to you.
(b) For each wet scrubber applied to meet any particulate matter,
particulate matter less than 10 microns (PM10), chlorine,
hydrochloric acid, or dioxins/furans emission limit in Table 1 to this
subpart, you must maintain the hourly average pressure drop and scrubber
liquid flow rate at or above the minimum level established during the
initial or subsequent performance test.
Sec. 63.9891 What work practice standards must I meet for my
fugitive dust sources?
(a) You must prepare and at all times operate according to a
fugitive dust emissions control plan that describes in detail the
measures that will be put in place to control fugitive dust emissions
from all unpaved roads and other unpaved operational areas.
(b) You must submit a copy of your fugitive dust emissions control
plan for approval to the Administrator on or before the applicable
compliance date for the affected source as specified in Sec. 63.9883.
The requirement to operate according to the fugitive dust emissions
control plan must be incorporated by reference in the source's operating
permit issued by the permitting authority under 40 CFR part 70 or 40 CFR
part 71.
(c) You can use an existing fugitive dust emissions control plan
provided it meets the requirements in paragraphs (c)(1) through (3) of
this section.
(1) The plan satisfies the requirements of paragraph (a) of this
section.
(2) The plan describes the current measures to control fugitive dust
emission sources.
(3) The plan has been approved as part of a State implementation
plan or title V permit.
(d) You must maintain a current copy of the fugitive dust emissions
control plan on-site and available for inspection upon request. You must
keep the plan for the life of the affected source or until the affected
source is no longer subject to the requirements of this subpart.
Operation and Maintenance Requirements
Sec. 63.9900 What are my operation and maintenance requirements?
(a) As required by Sec. 63.6(e)(1)(i), you must always operate and
maintain your affected source, including air pollution control and
monitoring equipment, in a manner consistent with good air pollution
control practices for minimizing emissions at least to the levels
required by this subpart.
(b) You must prepare and operate at all times according to a written
operation and maintenance plan for each control device subject to an
operating limit in Sec. 63.9890(b). Each plan must address preventative
maintenance for each control device, including a preventative
maintenance schedule that is consistent with the manufacturer's
instructions for routine and long-term maintenance.
(c) You must maintain a current copy of the operation and
maintenance plan required in paragraph (b) of this section on-site and
available for inspection upon request. You must keep the plan for the
life of the affected source or until the affected source is no longer
subject to the requirements of this subpart.
[[Page 148]]
General Compliance Requirements
Sec. 63.9910 What are my general requirements for complying with
this subpart?
(a) You must be in compliance with the emission limitations, work
practice standards, and operation and maintenance requirements in this
subpart at all times, except during periods of startup, shutdown, and
malfunction as defined in Sec. 63.2.
(b) You must develop a written startup, shutdown, and malfunction
plan according to the provisions in Sec. 63.6(e)(3).
[68 FR 58620, Oct. 10, 2003, as amended at 71 FR 20471, Apr. 20, 2006]
Initial Compliance Requirements
Sec. 63.9911 By what date must I conduct performance tests or other
initial compliance demonstrations?
(a) As required in Sec. 63.7(a)(2), you must conduct a performance
test to demonstrate initial compliance with each emission limit in Table
1 to this subpart that applies to you as indicated in paragraphs (a)(1)
through (3) of this section:
(1) Within 180 calendar days after the compliance date that is
specified in Sec. 63.9883 for your existing affected source;
(2) By April 7, 2004 for a new source that has an initial startup
date before October 10, 2003; or
(3) Within 180 days after initial startup for a new source that has
an initial startup date after October 10, 2003.
(b) For each operation and maintenance requirement that applies to
you where initial compliance is not demonstrated using a performance
test, you must demonstrate initial compliance within 30 calendar days
after the compliance date that is specified for your affected source in
Sec. 63.9883.
(c) If you commenced construction or reconstruction between January
22, 2003 and October 10, 2003, you must demonstrate initial compliance
with either the proposed emission limitation or the promulgated emission
limitation no later than April 7, 2004 or no later than 180 calendar
days after startup of the source, whichever is later, according to Sec.
63.7(a)(2)(ix).
(d) If you commenced construction or reconstruction between January
22, 2003 and October 10, 2003, and you chose to comply with the proposed
emission limit when demonstrating initial compliance, you must conduct a
second performance test to demonstrate compliance with the promulgated
emission limit by April 11, 2005, or after startup of the source,
whichever is later, according to Sec. 63.7(a)(2)(ix).
Sec. 63.9912 When must I conduct subsequent performance tests?
You must conduct subsequent performance tests to demonstrate
continuous compliance with all applicable emission limits in Table 1 to
this subpart no less frequently than twice (at mid-term and renewal)
during each term of your title V operating permit.
Sec. 63.9913 What test methods and other procedures must I use to
demonstrate initial compliance with the emission limits for
particulate matter and PM [bdi1][bdi0]?
(a) You must conduct each performance test that applies to your
affected source according to the requirements in Sec. 63.7(e)(1).
(b) To determine compliance with the applicable emission limits for
particulate matter in Table 1 to this subpart, you must follow the test
methods and procedures in paragraphs (b)(1) and (2) of this section.
(1) Determine the concentration of particulate matter according to
the following test methods in appendix A to 40 CFR part 60:
(i) Method 1 to select sampling port locations and the number of
traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine the volumetric flow rate of
the stack gas.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 5 or 5D, as applicable, to determine the concentration of
particulate matter.
[[Page 149]]
(vi) Method 201 or 201A, as applicable, to determine the
concentration of PM10.
(2) Collect a minimum sample volume of 60 dry standard cubic feet
(dscf) during each particulate matter or PM10 test run. Three
valid test runs are needed to comprise a performance test.
(c) Compute the mass emissions rate in pounds per hour (lbs/hr) for
each test run using Equation 1 of this section:
[GRAPHIC] [TIFF OMITTED] TR10OC03.000
Where:
Elbs/hr = Mass emissions rate of particulate matter or
PM10 (lbs/hr);
Cs = Concentration of particulate matter or PM10
in the gas stream, grains per dry standard cubic feet (gr/
dscf);
Qstd = Volumetric flow rate of stack gas, dry standard cubic
feet per minute (dscfm);
60 = Conversion factor, minutes per hour (min/hr); and
7,000 = Conversion factor, grains per pound (gr/lb).
Sec. 63.9914 What test methods and other procedures must I use to
demonstrate initial compliance with chlorine and hydrochloric acid
emission limits?
(a) You must conduct each performance test that applies to your
affected source according to the requirements in Sec. 63.7(e)(1).
(b) To determine compliance with the applicable emission limits for
chlorine and hydrochloric acid in Table 1 to this subpart, you must
follow the test methods and procedures specified in paragraphs (b)(1)
and (2) of this section.
(1) Determine the concentration of chlorine and hydrochloric acid
according to the following test methods in appendix A to 40 CFR part 60:
(i) Method 1 to select sampling port locations and the number of
traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine the volumetric flow of the
stack gas.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 26 or 26A, as applicable, to determine the concentration
of hydrochloric acid and chlorine.
(2) Collect a minimum sample of 60 dscf during each test run for
chlorine and hydrochloric acid. Three valid test runs are needed to
comprise a performance test.
(c) Compute the mass emissions rate (lbs/hr) for each test run using
Equation 1 of this section:
[GRAPHIC] [TIFF OMITTED] TR10OC03.001
Where:
Elbs/hr = Mass emissions rate of chlorine or hydrochloric
acid (lbs/hr);
Cs = Concentration of chlorine or hydrochloric acid in the
gas stream, milligrams per dry standard cubic meter (mg/dscm);
Qstd = Volumetric flow rate of stack gas (dscfm);
60 = Conversion factor (min/hr);
35.31 = Conversion factor (dscf/dscm); and
454,000 = Conversion factor (mg/lb).
Sec. 63.9915 What test methods and other procedures must I use
to demonstrate initial compliance with dioxin/furan emission
limits?
(a) You must conduct each performance test that applies to your
affected source according to the requirements in Sec. 63.7(e)(1).
(b) To determine compliance with the applicable emission limit for
dioxins/furans in Table 1 to this subpart, you must follow the test
methods and procedures specified in paragraphs (b)(1) and (2) of this
section.
(1) Determine the concentration of dioxin and furan according to the
following test methods in appendix A to 40 CFR part 60:
(i) Method 1 to select sampling port locations and the number of
traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine the volumetric flow of the
stack gas.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 23 to determine the concentration of dioxins/furans. For
each
[[Page 150]]
dioxin/furan congener measured in accordance with this paragraph (b)(v),
multiply the congener concentration by its corresponding toxic
equivalency factor specified in Table 2 of this subpart.
(2) Collect a minimum sample of 100 dscf during each test run. Three
valid test runs are needed to comprise a performance test.
Sec. 63.9916 What test methods and other procedures must I use
to establish and demonstrate initial compliance with the operating
limits?
For a wet scrubber subject to operating limits for pressure drop and
scrubber water flow rate in Sec. 63.9890(b), you must establish site-
specific operating limits according to the procedures in paragraphs (a)
and (b) of this section.
(a) Using the continuous parameter monitoring system (CPMS) required
in Sec. 63.9920, measure and record the pressure drop and scrubber
water flow rate at least every 15 minutes during each run of the
particulate matter performance test.
(b) Compute and record the average pressure drop and scrubber water
flow rate for each individual test run. Your operating limits are the
lowest average individual pressure drop and scrubber water flow rate
values in any of the three runs that meet the applicable emission limit.
Sec. 63.9917 How do I demonstrate initial compliance with the
emission limitations and work practice standards that apply to me?
(a) For each affected source subject to an emission limit in Table 1
to this subpart, you have demonstrated initial compliance if:
(1) You have met the conditions in Table 3 to this subpart; and
(2) For each wet scrubber subject to the operating limits for
pressure drop and scrubber water flow rate in Sec. 63.9890(b), you have
established appropriate site-specific operating limits and have a record
of the pressure drop and scrubber water flow rate measured during the
performance test in accordance with Sec. 63.9916.
(b) You have demonstrated initial compliance with the work practice
standards in Sec. 63.9891 if you have certified in your notification of
compliance status that:
(1) You have prepared a fugitive dust emissions control plan
according to the requirements in Sec. 63.9891 and submitted the plan
for approval; and
(2) You will operate according to the requirements in the plan.
Sec. 63.9918 How do I demonstrate initial compliance with the
operation and maintenance requirements that apply to me?
You must demonstrate initial compliance by certifying in your
notification of compliance status that you have met the requirements in
paragraphs (a) and (b) of this section.
(a) You have prepared the operation and maintenance plan according
to the requirements in Sec. 63.9910; and
(b) You will operate each control device according to the procedures
in the plan.
Continuous Compliance Requirements
Sec. 63.9920 What are my continuous monitoring requirements?
For each wet scrubber subject to the operating limits for pressure
drop and scrubber water flow rates in Sec. 63.9890(b), you must at all
times monitor the hourly average pressure drop and liquid flow rate
using a CPMS according to the requirements in Sec. 63.9921(a).
Sec. 63.9921 What are the installation, operation and maintenance
requirements for my monitors?
(a) For each wet scrubber subject to the operating limits in Sec.
63.9890(b) for pressure drop and scrubber water flow rate, you must
install, operate, and maintain each CPMS according to the requirements
in paragraphs (a)(1) and (2) of this section.
(1) For the pressure drop CPMS, you must:
(i) Locate the pressure sensor(s) in or as close to a position that
provides a representative measurement of the pressure and that minimizes
or eliminates pulsating pressure, vibration, and internal and external
corrosion.
(ii) Use a gauge with a minimum measurement sensitivity of 0.5 inch
of water or a transducer with a minimum measurement sensitivity of 1
percent of the pressure range.
[[Page 151]]
(iii) Check the pressure tap for pluggage daily.
(iv) Using a manometer, check gauge calibration quarterly and
transducer calibration monthly.
(v) Conduct calibration checks any time the sensor exceeds the
manufacturer's specified maximum operating pressure range, or install a
new pressure sensor.
(vi) At least monthly, inspect all components for integrity, all
electrical connections for continuity, and all mechanical connections
for leakage.
(2) For the scrubber water flow rate CPMS, you must:
(i) Locate the flow sensor and other necessary equipment in a
position that provides a representative flow and that reduces swirling
flow or abnormal velocity distributions due to upstream and downstream
disturbances.
(ii) Use a flow sensor with a minimum measurement sensitivity of 2
percent of the flow rate.
(iii) Conduct a flow sensor calibration check at least semiannually
according to the manufacturer's instructions.
(iv) At least monthly, inspect all components for integrity, all
electrical connections for continuity, and all mechanical connections
for leakage.
(b) You must install, operate, and maintain each CPMS for a wet
scrubber according to the requirements in paragraphs (b)(1) through (3)
of this section.
(1) Each CPMS must complete a minimum of one cycle of operation for
each successive 15-minute period.
(2) Each CPMS must have valid data for at least 95 percent of every
averaging period.
(3) Each CPMS must determine and record the hourly average of all
recorded readings.
Sec. 63.9922 How do I monitor and collect data to demonstrate
continuous compliance?
(a) Except for monitoring malfunctions, associated repairs, and
required quality assurance or control activities (including, as
applicable, calibration checks and required zero and span adjustments),
you must monitor continuously (or collect data at all required
intervals) at all times an affected source is operating.
(b) You may not use data recorded during monitoring malfunctions,
associated repairs, and required quality assurance or control activities
in data averages and calculations used to report emission or operating
levels or to fulfill a minimum data availability requirement, if
applicable. You must use all the data collected during all other periods
in assessing compliance.
(c) A monitoring malfunction is any sudden, infrequent, not
reasonably preventable failure of the monitoring to provide valid data.
Monitoring failures that are caused in part by poor maintenance or
careless operation are not malfunctions.
Sec. 63.9923 How do I demonstrate continuous compliance with the emission limitations and work practice standards that apply to me?
(a) For each affected source subject to an emission limit in Table 1
to this subpart, you must demonstrate continuous compliance according to
the requirements in Table 4 to this subpart.
(b) For each wet scrubber subject to the operating limits for
pressure drop and scrubber water flow rate in Sec. 63.9890(b), you must
demonstrate continuous compliance according to the requirements in
paragraphs (b)(1) and (2) of this section.
(1) Collecting and reducing the monitoring data according to Sec.
63.9921(b); and
(2) Maintaining the hourly average pressure drop and scrubber water
flow rate at or above the minimum level established during the initial
or subsequent performance.
(c) You must demonstrate continuous compliance with the work
practice standards in Sec. 63.9891 by operating according to the
requirements in your fugitive dust emissions control plan and recording
information needed to document conformance with the requirements.
[[Page 152]]
Sec. 63.9924 How do I demonstrate continuous compliance with the
operation and maintenance requirements that apply to me?
For each emission point subject to an emission limit in Table 1 to
this subpart, you must demonstrate continuous compliance with the
operation and maintenance requirements in Sec. 63.9900 by performing
preventive maintenance for each control device according to Sec.
63.9900(b) and recording all information needed to document conformance
with these requirements.
Sec. 63.9925 What other requirements must I meet to demonstrate
continuous compliance?
(a) Deviations. You must report each instance in which you did not
meet each emission limitation in Sec. 63.9890 or work practice standard
in Sec. 63.9891 that applies to you. This includes periods of startup,
shutdown, and malfunction. You must also report each instance in which
you did not meet each operation and maintenance requirement required in
Sec. 63.9900 that applies to you. These instances are deviations from
the emission limitations, work practice standards, and operation and
maintenance requirements in this subpart. These deviations must be
reported according to the requirements in Sec. 63.9931.
(b) Startups, shutdowns, and malfunctions. (1) Consistent with
Sec. Sec. 63.6(e) and 63.7(e)(1), deviations that occur during a period
of startup, shutdown, or malfunction are not violations if you
demonstrate to the Administrator's satisfaction that you were operating
in accordance with Sec. 63.6(e)(1).
(2) The Administrator will determine whether deviations that occur
during a period of startup, shutdown, or malfunction are violations,
according to the provisions in Sec. 63.6(e).
[68 FR 58620, Oct. 10, 2003, as amended at 71 FR 20471, Apr. 20, 2006]
Notifications, Reports, and Records
Sec. 63.9930 What notifications must I submit and when?
(a) You must submit all of the notifications in Sec. Sec. 63.7(b)
and (c), 63.8(f)(4), 63.9(b), and 63.9(h) that apply to you by the
specified dates.
(b) As specified in Sec. 63.9(b)(2), if you startup your affected
source before October 10, 2003, you must submit your initial
notification no later than February 9, 2004.
(c) As specified in Sec. 63.9(b)(3), if you start your new affected
source on or after October 10, 2003, you must submit your initial
notification no later that 120 calendar days after you become subject to
this subpart.
(d) If you are required to conduct a performance test, you must
submit a notification of intent to conduct a performance test at least
60 calendar days before the performance test is scheduled to begin as
required in Sec. 63.7(b)(1).
(e) If you are required to conduct a performance test or other
initial compliance demonstration, you must submit a notification of
compliance status according to Sec. 63.9(h)(2)(ii), and the
requirements in paragraphs (e)(1) and (2) of this section:
(1) For each initial compliance demonstration that does not include
a performance test, you must submit the notification of compliance
status before the close of business on the 30th calendar day following
completion of the initial compliance demonstration.
(2) For each initial compliance demonstration that does include a
performance test, you must submit the notification of compliance status,
including the performance test results, before the close of business on
the 60th calendar day following the completion of the performance test
according to Sec. 63.10(d)(2).
Sec. 63.9931 What reports must I submit and when?
(a) Compliance report due dates. Unless the Administrator has
approved a different schedule, you must submit a semiannual compliance
report to your permitting authority according to the requirements in
paragraphs (a) (1) through (5) of this section.
(1) The first compliance report must cover the period beginning on
the compliance date that is specified for your affected source in Sec.
63.9883 and ending on June 30 or December 31, whichever date comes after
the compliance date that is specified for your source in Sec. 63.9883.
[[Page 153]]
(2) The first compliance report must be postmarked or delivered no
later than July 31 or January 31, whichever date comes first after your
compliance report is due.
(3) Each subsequent compliance report must cover the semiannual
reporting period from January 1 through June 30 or the semiannual
reporting period from July 1 through December 31.
(4) Each subsequent compliance report must be postmarked or
delivered no later than July 31 or January 31, whichever date comes
first after the end of the semiannual reporting period.
(5) For each affected source that is subject to permitting
regulations pursuant to 40 CFR part 70 or 40 CFR part 71, and if the
permitting authority has established dates for submitting semiannual
reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR
71.6(a)(3)(iii)(A), you may submit the first and subsequent compliance
reports according to the dates the permitting authority has established
instead of according to the dates in paragraphs (a)(1) through (4) of
this section.
(b) Compliance report contents. Each compliance report must include
the information in paragraphs (b)(1) through (3) of this section and, as
applicable, paragraphs (b)(4) through (8) of this section.
(1) Company name and address.
(2) Statement by a responsible official, with that official's name,
title, and signature, certifying the truth, accuracy, and completeness
of the content of the report.
(3) Date of report and beginning and ending dates of the reporting
period.
(4) If you had a startup, shutdown, or malfunction during the
reporting period and you took actions consistent with your startup,
shutdown, and malfunction plan, the compliance report must include the
information in Sec. 63.10(d)(5)(i).
(5) If there were no deviations from the continuous compliance
requirements in Sec. Sec. 63.9923 and 63.9924 that apply to you, a
statement that there were no deviations from the emission limitations,
work practice standards, or operation and maintenance requirements
during the reporting period.
(6) If there were no periods during which a CPMS was out-of-control
as specified in Sec. 63.8(c)(7), a statement that there were no periods
during which the CPMS was out-of-control during the reporting period.
(7) For each deviation from an emission limitation in Sec. 63.9890
that occurs at an affected source where you are not using a CPMS to
comply with an emission limitation in this subpart, the compliance
report must contain the information in paragraphs (b)(1) through (4) of
this section and the information in paragraphs (b)(7)(i) and (ii) of
this section. This includes periods of startup, shutdown, and
malfunction.
(i) The total operating time of each affected source during the
reporting period.
(ii) Information on the number, duration, and cause of deviations
(including unknown cause, if applicable) as applicable and the
corrective action taken.
(8) For each deviation from an emission limitation occurring at an
affected source where you are using a CPMS to comply with the emission
limitation in this subpart, you must include the information in
paragraphs (b)(1) through (4) of this section and the information in
paragraphs (b)(8)(i) through (xi) of this section. This includes periods
of startup, shutdown, and malfunction.
(i) The date and time that each malfunction started and stopped.
(ii) The date and time that each continuous monitoring was
inoperative, except for zero (low-level) and high-level checks.
(iii) The date, time, and duration that each continuous monitoring
system was out-of-control, including the information in Sec.
63.8(c)(8).
(iv) The date and time that each deviation started and stopped, and
whether each deviation occurred during a period of startup, shutdown, or
malfunction or during another period.
(v) A summary of the total duration of the deviation during the
reporting period and the total duration as a percent of the total source
operating time during that reporting period.
(vi) A breakdown of the total duration of the deviations during the
reporting period including those that are due to startup, shutdown,
control
[[Page 154]]
equipment problems, process problems, other known causes, and other
unknown causes.
(vii) A summary of the total duration of continuous monitoring
system downtime during the reporting period and the total duration of
continuous monitoring system downtime as a percent of the total source
operating time during the reporting period.
(viii) A brief description of the process units.
(ix) A brief description of the continuous monitoring system.
(x) The date of the latest continuous monitoring system
certification or audit.
(xi) A description of any changes in continuous monitoring systems,
processes, or controls since the last reporting period.
(c) Immediate startup, shutdown, and malfunction report. If you had
a startup, shutdown, or malfunction during the semiannual reporting
period that was not consistent with your startup, shutdown, and
malfunction plan, you must submit an immediate startup, shutdown, and
malfunction report according to the requirements in Sec.
63.10(d)(5)(ii).
(d) Part 70 monitoring report. If you have obtained a title V
operating permit for an affected source pursuant to 40 CFR part 70 or 40
CFR part 71, you must report all deviations as defined in this subpart
in the semiannual monitoring report required by 40 CFR
70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A). If you submit a
compliance report for an affected source along with, or as part of, the
semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40
CFR 71.6(a)(3)(iii)(A), and the compliance report includes all the
required information concerning deviations from any emissions
limitation, work practice standards, or operation and maintenance
requirement in this subpart, submission of the compliance report
satisfies any obligation to report the same deviations in the semiannual
monitoring report. However, submission of the compliance report does not
otherwise affect any obligation you may have to report deviations from
permit requirements for an affected source to your permitting authority.
Sec. 63.9932 What records must I keep?
(a) You must keep the records as indicated in paragraphs (a)(1)
through (3) of this section:
(1) A copy of each notification and report that you submitted to
comply with this subpart, including all documentation supporting any
initial notification or notification of compliance status that you
submitted, according to the requirements in Sec. 63.10(b)(2)(xiv).
(2) The records in Sec. 63.6(e)(3)(iii) through (v) related to
startup, shutdown, and malfunction.
(3) Records of performance tests and performance evaluations as
required in Sec. 63.10(b)(2)(viii).
(b) You must keep the records required in Sec. Sec. 63.9932 and
63.9933 to show continuous compliance with each emission limitation,
work practice standard, and operating and maintenance requirement that
applies to you.
Sec. 63.9933 In what form and how long must I keep my records?
(a) Your records must be in a form suitable and readily available
for expeditious review, according to Sec. 63.10(b)(1).
(b) As specified in Sec. 63.10(b)(1), you must keep each record for
5 years following the date of each occurrence, measurement, maintenance,
corrective action, report, or record.
(c) You must keep each record on site for at least 2 years after the
date of each occurrence, measurement, maintenance, corrective action,
report, or record according to Sec. 63.10(b)(1). You can keep the
records off site for the remaining 3 years.
(d) You must keep your fugitive dust emissions control plan and your
operation and maintenance plan on-site according to the requirements in
Sec. Sec. 63.9891(d) and 63.9900(c).
Other Requirements and Information
Sec. 63.9940 What parts of the General Provisions apply to me?
Table 4 to this subpart shows which parts of the General Provisions
in Sec. Sec. 63.1 through 63.15 apply to you.
[[Page 155]]
Sec. 63.9941 Who implements and enforces this subpart?
(a) This subpart can be implemented and enforced by us, the United
States Environmental Protection Agency (U.S. EPA) or a delegated
authority such as your State, local, or tribal agency. If the EPA
Administrator has delegated authority to your State, local, or tribal
agency, then that agency has the authority to implement and enforce this
subpart. You should contact your EPA Regional Office to find out if this
subpart is delegated to your State, local, or tribal agency.
(b) In delegating implementation and enforcement authority of this
subpart to a State, local, or tribal agency under subpart E of this
part, the authorities contained in paragraph (c) of this section are
retained by the Administrator of the EPA and are not transferred to the
State, local, or tribal agency.
(c) The authorities that will not be delegated to State, local, or
tribal agencies are specified in paragraphs (c)(1) through (4) of this
section.
(1) Approval of alternatives to the non-opacity emission limitations
in Sec. 63.9890 and work practice standards in Sec. 63.9891 under
Sec. 63.6(g).
(2) Approval of major alternatives to test methods under Sec.
63.7(e)(2)(ii) and (f) and as defined in Sec. 63.90.
(3) Approval of major alternatives to monitoring under Sec. 63.8(f)
and as defined in Sec. 63.90.
(4) Approval of major alternatives to recordkeeping and reporting
under Sec. 63.10(f) and as defined in Sec. 63.90.
Sec. 63.9942 What definitions apply to this subpart?
Terms used in this subpart are defined in the Clean Air Act, in
Sec. 63.2, and in this section as follows:
Chlorine plant bypass scrubber means the wet scrubber that captures
chlorine gas during a chlorine plant shut down or failure.
Deviation means any instance in which an affected source subject to
this subpart, or an owner or operator of such a source:
(1) Fails to meet any requirement or obligation established by this
subpart, including but not limited to any emission limitation (including
operating limits) or operation and maintenance requirement;
(2) Fails to meet any term or condition that is adopted to implement
an applicable requirement in this subpart and that is included in the
operating permit for any affected source required to obtain such a
permit; or
(3) Fails to meet any emission limitation in this subpart during
startup, shutdown, or malfunction, regardless of whether or not such
failure is permitted by this subpart.
Emission limitation means any emission limit, opacity limit, or
operating limit.
Launder off-gas system means a system that collects chlorine and
hydrochloric acid fumes from collection points within the melt/reactor
system building. The system then removes particulate matter and
hydrochloric acid from the collected gases prior to discharge to the
atmosphere.
Magnesium chloride storage bins means vessels that store dried
magnesium chloride powder produced from the spray drying operation.
Melt/reactor system means a system that melts and chlorinates
dehydrated brine to produce high purity molten magnesium chloride feed
for electrolysis.
Primary magnesium refining means the production of magnesium metal
and magnesium metal alloys from natural sources of magnesium chloride
such as sea water or water from the Great Salt Lake and magnesium
bearing ores.
Responsible official means responsible official as defined in Sec.
63.2.
Spray dryer means dryers that evaporate brine to form magnesium
powder by contact with high temperature gases exhausted from gas
turbines.
Wet scrubber means a device that contacts an exhaust gas with a
liquid to remove particulate matter and acid gases from the exhaust.
Examples are packed-bed wet scrubbers and venturi scrubbers.
Work practice standard means any design, equipment, work practice,
or operational standard, or combination thereof, that is promulgated
pursuant to section 112(h) of the Clean Air Act.
[[Page 156]]
Sec. Table 1 to Subpart TTTTT of Part 63--Emission Limits
As required in Sec. 63.9890(a), you must comply with each
applicable emission limit in the following table:
------------------------------------------------------------------------
You must comply with each of the
For . . . following . . .
------------------------------------------------------------------------
1. Each spray dryer stack.... a. You must not cause to be discharged to
the atmosphere any gases that contain
particulate matter in excess of 100 lbs/
hr; and
b. You must not cause to be discharged to
the atmosphere any gases that contain
hydrochloric acid in excess of 200 lbs/
hr.
2. Each magnesium chloride a. You must not cause to be discharged to
storage bins scrubber stack. the atmosphere any gases that contain
hydrochloric acid in excess of 47.5 lbs/
hr and 0.35 gr/dscf; and
b. You must not cause to be discharged to
the atmosphere any gases that contain
PM10 in excess of 2.7 lbs/hr and 0.016
gr/dscf.
3. Each melt/reactor system a. You must not cause to be discharged to
stack. the atmosphere any gases that contain
PM10 in excess of 13.1 lbs/hr; and
b. You must not cause to be discharged to
the atmosphere any gases that contain
hydrochloric acid in excess of 7.2 lbs/
hr; and
c. You must not cause to be discharged to
the atmosphere any gases that contain
chlorine in excess of 100 lbs/hr; and
d. You must not cause to be discharged to
the atmosphere any gases that contain 36
ng TEQ/dscm corrected to 7% oxygen.
4. Each launder off-gas a. You must not cause to be discharged to
system stack. the atmosphere any gases that contain
particulate matter in excess of 37.5 lbs/
hr; and
b. You must not cause to be discharged to
the atmosphere any gases that contain
hydrochloric acid in excess of 46.0 lbs/
hr; and
c. You must not cause to be discharged to
the atmosphere any gases that contain
chlorine in excess of 26.0 lbs/hr.
------------------------------------------------------------------------
Sec. Table 2 to Subpart TTTTT of Part 63--Toxic Equivalency Factors
------------------------------------------------------------------------
Toxic
Dioxin/furan congener equivalency
factor
------------------------------------------------------------------------
2,3,7,8-tetrachlorinated dibenzo-p-dioxin.............. 1
1,2,3,7,8-pentachlorinated dibenzo-p-dioxin............ 1
1,2,3,4,7,8-hexachlorinated dibenzo-p-dioxin........... 0.1
1,2,3,7,8,9-hexachlorinated dibenzo-p-dioxin........... 0.1
1,2,3,6,7,8-hexachlorinated dibenzo-p-dioxin........... 0.1
1,2,3,4,6,7,8-heptachlorinated dibenzo-p-dioxin........ 0.01
octachlorinated dibenzo-p-dioxin....................... 0.0001
2,3,7,8-tetrachlorinated dibenzofuran.................. 0.1
2,3,4,7,8-pentachlorinated dibenzofuran................ 0.5
1,2,3,7,8-pentachlorinated dibenzofuran................ 0.05
1,2,3,4,7,8-hexachlorinated dibenzofuran............... 0.1
1,2,3,6,7,8-hexachlorinated dibenzofuran............... 0.1
1,2,3,7,8,9-hexachlorinated dibenzofuran............... 0.1
2,3,4,6,7,8-hexachlorinated dibenzofuran............... 0.1
1,2,3,4,6,7,8-heptachlorinated dibenzofuran............ 0.01
1,2,3,4,7,8,9-heptachlorinated dibenzofuran............ 0.01
octachlorinated dibenzofuran........................... 0.0001
------------------------------------------------------------------------
Sec. Table 3 to Subpart TTTTT of Part 63--Initial Compliance With
Emission Limits
As required in 63.9916, you must demonstrate initial compliance with
the emission limits according to the following table:
------------------------------------------------------------------------
You have demonstrated initial compliance
For . . . if . . .
------------------------------------------------------------------------
1. Each spray dryer stack.... a. The average mass flow of particulate
matter from the control system applied
to emissions from each spray dryer,
measured according to the performance
test procedures in Sec. 63.9913(c),
did not exceed 100 lbs/hr; and
b. The average mass flow of hydrochloric
acid from the control system applied to
emissions from each spray dryer,
determined according to the performance
test procedures in Sec. 63.9914(c),
did not exceed 200 lbs/hr.
2. Each magnesium chloride a. The average mass flow of hydrochloric
storage bin scrubber stack. acid from the control system applied to
the magnesium chloride storage bins
scrubber exhaust, measured according to
the performance test procedure in Sec.
63.9914, did not exceed 47.5 lbs/hr and
0.35 gr/dscf; and
[[Page 157]]
b. The average mass flow of PM10 from the
control system applied to the magnesium
chloride storage bins scrubber exhaust,
determined according to the performance
test procedures in Sec. 63.9913, did
not exceed 2.7 lbs/hr and 0.016 gr/dscf.
3. Each melt/reactor system a. The average mass flow of PM10 from the
stack. control system applied to the melt/
reactor system exhaust, measured
according to the performance test
procedures in Sec. 63.9913, did not
exceed 13.1 lbs/hr; and
b. The average mass flow of hydrochloric
acid from the control system applied to
the melt/reactor system exhaust,
measured according to the performance
test procedures in Sec. 63.9914, did
not exceed 7.2 lbs/hr; and
c. The average mass flow of chlorine from
the control system applied to the melt/
reactor system exhaust, measured
according to the performance test
procedures in Sec. 63.9914, did not
exceed 100 lbs/hr.
d. The average concentration of dioxins/
furans from the control system applied
to the melt/reactor system exhaust,
measured according to the performance
test procedures in Sec. 63.9915, did
not exceed 36 ng TEQ/dscm corrected to
7% oxygen.
4. Each launder off-gas a. The average mass flow of particulate
system stack. matter from the control system applied
to the launder off-gas system collection
system exhaust, measured according to
the performance test procedures in Sec.
63.9913, did not exceed 37.5 lbs/hr;
and
b. The average mass flow of hydrochloric
acid from the control system applied to
the launder off-gas system collection
system exhaust, measured according to
the performance test procedures in Sec.
63.9914, did not exceed 46.0 lbs/hr;
and
c. The average mass flow of chlorine from
the control system applied to the
launder off-gas system collection system
exhaust, measured according to the
performance test procedures in Sec.
63.9914, did not exceed 26.0 lbs/hr.
------------------------------------------------------------------------
Sec. Table 4 to Subpart TTTTT of Part 63--Continuous Compliance With
Emission Limits
As required in Sec. 63.9923, you must demonstrate continuous
compliance with the emission limits according to the following table:
------------------------------------------------------------------------
You must demonstrate continuous
For . . . compliance by . . .
------------------------------------------------------------------------
1. Each spray dryer stack.... a. Maintaining emissions of PM10 at or
below 100 lbs/hr; and
b. Maintaining emissions of hydrochloric
acid at or below 200 lbs/hr; and
c. Conducting subsequent performance
tests at least twice during each term of
your title V operating permit (at mid-
term and renewal).
2. Magnesium chloride storage a. Maintaining emissions of hydrochloric
bins scrubber stack. acid at or below 47.5 lbs/hr and 0.35 gr/
dscf; and
b. Maintaining emissions of PM10 at or
below 2.7 lbs/hr and 0.016 gr/dscf; and
c. Conducting subsequent performance
tests at least twice during each term of
your title V operating permit (at mid-
term and renewal).
3. Each melt/reactor system a. Maintaining emissions of PM10 at or
stack. below 13.1 lbs/hr; and
b. Maintaining emissions of hydrochloric
acid at or below 7.2 lbs/hr; and
c. Maintaining emissions of chlorine at
or below 100 lbs/hr; and
d. Maintaining emissions of dioxins/
furans at or below 36 ng TEQ/dscm
corrected to 7% oxygen.
e. Conducting subsequent performance test
at least twice during each term of your
title V operating permit (at mid-term
and renewal).
4. Each launder off-gas a. Maintaining emissions of particulate
system stack. matter at or below 37.5 lbs/hr; and
b. Maintaining emissions of hydrochloric
acid at or below 46.0 lbs/hr; and
c. Maintaining emissions of chlorine at
or below 26.0 lbs/hr; and
d. Conducting subsequent performance
tests at least twice during each term of
your title V operating permit (at mid-
term and renewal).
------------------------------------------------------------------------
Sec. Table 5 to Subpart TTTTT of Part 63--Applicability of General
Provisions to Subpart TTTTT of Part 63
As required in Sec. 63.9950, you must comply with the requirements
of the NESHAP General Provisions (40 CFR part 63, subpart A) shown in
the following table:
----------------------------------------------------------------------------------------------------------------
Citation Subject Applies to Subpart TTTTT Explanation
----------------------------------------------------------------------------------------------------------------
63.1............................... Applicability......... Yes.
63.2............................... Definitions........... Yes.
63.3............................... Units and Yes.
Abbreviations.
63.4............................... Prohibited Activities. Yes.
63.5............................... Construction and Yes.
Reconstruction.
[[Page 158]]
63.6(a)-(g)........................ Compliance with Yes.
Standards and
Maintenance
Requirements.
63.6(h)............................ Determining Compliance No.
with Opacity and
Visible Emission
Standards.
63.6(i)-(j)........................ Extension of Yes.
Compliance and
Presidential
Compliance Exemption.
63.7(a)(1)-(2)..................... Applicability and No Subpart TTTTT
Performance Test specifies performance
Dates. test applicability
and dates.
63.7(a)(3), (b)-(h)................ Performance Testing Yes.
Requirements.
63.8 except for (a)(4),(c)(4), and Monitoring Yes.
(f)(6). Requirements.
63.8(a)(4)......................... Additional Monitoring No......................... Subpart TTTTT does not
Requirements for require flares.
Control Devices in
Sec. 63.11.
63.8(c)(4)......................... Continuous Monitoring No......................... Subpart TTTTT
System Requirements. specifies
requirements for
operation of CMS.
63.8(f)(6)......................... Relative Accuracy Test No......................... Subpart TTTTT does not
Alternative (RATA). require continuous
emission monitoring
systems.
63.9............................... Notification Yes.
Requirements.
63.9(g)(5)......................... Data Reduction........ No......................... Subpart TTTTT
specifies data
reduction
requirements.
63.10 except for (b)(2)(xiii) and Recordkeeping and Yes.
(c)(7)-(8). Reporting
Requirements.
63.10(b)(2)(xiii).................. Continuous Monitoring No......................... Subpart TTTTT does not
System (CMS) Records require continuous
for RATA Alternative. emission monitoring
systems.
63.10(c)(7)-(8).................... Records of Excess No......................... Subpart TTTTT
Emissions and specifies
Parameter Monitoring recordkeeping
Accedences for CMS. requirements.
63.11.............................. Control Device No......................... Subpart TTTTT does not
Requirements. require flares.
63.12.............................. State Authority and Yes.
Delegations.
63.13-63.15........................ Addresses, Yes.
Incorporation by
Reference,
Availability of
Information.
----------------------------------------------------------------------------------------------------------------
Subpart UUUUU_National Emission Standards for Hazardous Air Pollutants:
Coal- and Oil-Fired Electric Utility Steam Generating Units
Source: 77 FR 9464, Feb. 16, 2012, unless otherwise noted.
What This Subpart Covers
Sec. 63.9980 What is the purpose of this subpart?
This subpart establishes national emission limitations and work
practice standards for hazardous air pollutants (HAP) emitted from coal-
and oil-fired electric utility steam generating units (EGUs) as defined
in Sec. 63.10042 of this subpart. This subpart also establishes
requirements to demonstrate initial and continuous compliance with the
emission limitations.
Sec. 63.9981 Am I subject to this subpart?
You are subject to this subpart if you own or operate a coal-fired
EGU or an oil-fired EGU as defined in Sec. 63.10042 of this subpart.
Sec. 63.9982 What is the affected source of this subpart?
(a) This subpart applies to each individual or group of two or more
new, reconstructed, or existing affected source(s) as described in
paragraphs (a)(1) and (2) of this section within a contiguous area and
under common control.
(1) The affected source of this subpart is the collection of all
existing coal- or oil-fired EGUs, as defined in Sec. 63.10042, within a
subcategory.
[[Page 159]]
(2) The affected source of this subpart is each new or reconstructed
coal- or oil-fired EGU as defined in Sec. 63.10042.
(b) An EGU is new if you commence construction of the coal- or oil-
fired EGU after May 3, 2011.
(c) An EGU is reconstructed if you meet the reconstruction criteria
as defined in Sec. 63.2, and if you commence reconstruction after May
3, 2011.
(d) An EGU is existing if it is not new or reconstructed. An
existing electric steam generating unit that meets the applicability
requirements after the effective date of this final rule due to a change
in process (e.g., fuel or utilization) is considered to be an existing
source under this subpart.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23402, Apr. 19, 2012; 78
FR 24084, Apr. 24, 2013]
Sec. 63.9983 Are any fossil fuel-fired electric generating units
not subject to this subpart?
The types of electric steam generating units listed in paragraphs
(a) through (d) of this section are not subject to this subpart.
(a) Any unit designated as a major source stationary combustion
turbine subject to subpart YYYY of this part and any unit designated as
an area source stationary combustion turbine, other than an integrated
gasification combined cycle (IGCC) unit.
(b) Any electric utility steam generating unit that is not a coal-
or oil-fired EGU and that meets the definition of a natural gas-fired
EGU in Sec. 63.10042.
(c) Any electric utility steam generating unit that has the
capability of combusting more than 25 MW of coal or oil but does not
meet the definition of a coal- or oil-fired EGU because it did not fire
sufficient coal or oil to satisfy the average annual heat input
requirement set forth in the definitions for coal-fired and oil-fired
EGUs in Sec. 63.10042. Heat input means heat derived from combustion of
fuel in an EGU and does not include the heat derived from preheated
combustion air, recirculated flue gases or exhaust gases from other
sources (such as stationary gas turbines, internal combustion engines,
and industrial boilers).
(d) Any electric steam generating unit combusting solid waste is a
solid waste incineration unit subject to standards established under
sections 129 and 111 of the Clean Air Act.
(e) Any electric utility steam generating unit that meets the
definition of a natural gas-fired EGU under this subpart and that fires
at least 10 percent biomass is an industrial boiler subject to standards
established under subpart DDDDD of this part, if it otherwise meets the
applicability provisions in that rule.
[77 FR 9464, Feb. 16, 2012, as amended at 81 FR 20180, Apr. 6, 2016]
Sec. 63.9984 When do I have to comply with this subpart?
(a) If you have a new or reconstructed EGU, you must comply with
this subpart by April 16, 2012 or upon startup of your EGU, whichever is
later, and as further provided for in Sec. 63.10005(g).
(b) If you have an existing EGU, you must comply with this subpart
no later than April 16, 2015.
(c) You must meet the notification requirements in Sec. 63.10030
according to the schedule in Sec. 63.10030 and in subpart A of this
part. Some of the notifications must be submitted before you are
required to comply with the emission limits and work practice standards
in this subpart.
(d) An electric steam generating unit that does not meet the
definition of an EGU subject to this subpart on April 16, 2012 for new
sources or April 16, 2015 for existing sources must comply with the
applicable existing source provisions of this subpart on the date such
unit meets the definition of an EGU subject to this subpart.
(e) If you own or operate an electric steam generating unit that is
exempted from this subpart under Sec. 63.9983(d), if the manner of
operating the unit changes such that the combustion of waste is
discontinued and the unit becomes a coal-fired or oil-fired EGU (as
defined in Sec. 63.10042), you must be in compliance with this subpart
on April 16, 2015 or on the effective date of the switch from waste
combustion to coal or oil combustion, whichever is later.
[[Page 160]]
(f) You must demonstrate that compliance has been achieved, by
conducting the required performance tests and other activities, no later
than 180 days after the applicable date in paragraph (a), (b), (c), (d),
or (e) of this section.
Sec. 63.9985 What is a new EGU?
(a) A new EGU is an EGU that meets any of the criteria specified in
paragraph (a)(1) through (a)(2) of this section.
(1) An EGU that commenced construction after May 3, 2011.
(2) An EGU that commenced reconstruction after May 3, 2011.
(b) [Reserved]
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23402, Apr. 19, 2012]
Emission Limitations and Work Practice Standards
Sec. 63.9990 What are the subcategories of EGUs?
(a) Coal-fired EGUs are subcategorized as defined in paragraphs
(a)(1) through (a)(2) of this section and as defined in Sec. 63.10042.
(1) EGUs designed for coal with a heating value greater than or
equal to 8,300 Btu/lb, and
(2) EGUs designed for low rank virgin coal.
(b) Oil-fired EGUs are subcategorized as noted in paragraphs (b)(1)
through (b)(4) of this section and as defined in Sec. 63.10042.
(1) Continental liquid oil-fired EGUs
(2) Non-continental liquid oil-fired EGUs,
(3) Limited-use liquid oil-fired EGUs, and
(4) EGUs designed to burn solid oil-derived fuel.
(c) IGCC units combusting either gasified coal or gasified solid
oil-derived fuel. For purposes of compliance, monitoring, recordkeeping,
and reporting requirements in this subpart, IGCC units are subject in
the same manner as coal-fired units and solid oil-derived fuel-fired
units, unless otherwise indicated.
Sec. 63.9991 What emission limitations, work practice standards,
and operating limits must I meet?
(a) You must meet the requirements in paragraphs (a)(1) and (2) of
this section. You must meet these requirements at all times.
(1) You must meet each emission limit and work practice standard in
Table 1 through 3 to this subpart that applies to your EGU, for each EGU
at your source, except as provided under Sec. 63.10009.
(2) You must meet each operating limit in Table 4 to this subpart
that applies to your EGU.
(b) As provided in Sec. 63.6(g), the Administrator may approve use
of an alternative to the work practice standards in this section.
(c) You may use the alternate SO2 limit in Tables 1 and 2
to this subpart only if your EGU:
(1) Has a system using wet or dry flue gas desulfurization
technology and an SO2 continuous emissions monitoring system
(CEMS) installed on the EGU; and
(2) At all times, you operate the wet or dry flue gas
desulfurization technology and the SO2 CEMS installed on the
EGU consistent with Sec. 63.10000(b).
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23402, Apr. 19, 2012; 81
FR 20180, Apr. 6, 2016]
General Compliance Requirements
Sec. 63.10000 What are my general requirements for complying
with this subpart?
(a) You must be in compliance with the emission limits and operating
limits in this subpart. These limits apply to you at all times except
during periods of startup and shutdown; however, for coal-fired, liquid
oil-fired, or solid oil-derived fuel-fired EGUs, you are required to
meet the work practice requirements, items 3 and 4, in Table 3 to this
subpart during periods of startup or shutdown.
(b) At all times you must operate and maintain any affected source,
including associated air pollution control equipment and monitoring
equipment, in a manner consistent with safety and good air pollution
control practices for minimizing emissions. Determination
[[Page 161]]
of whether such operation and maintenance procedures are being used will
be based on information available to the EPA Administrator which may
include, but is not limited to, monitoring results, review of operation
and maintenance procedures, review of operation and maintenance records,
and inspection of the source.
(c)(1) For coal-fired units, IGCC units, and solid oil-derived fuel-
fired units, initial performance testing is required for all pollutants,
to demonstrate compliance with the applicable emission limits.
(i) For a coal-fired or solid oil-derived fuel-fired EGU or IGCC
EGU, you may conduct initial performance testing in accordance with
Sec. 63.10005(h), to determine whether the EGU qualifies as a low
emitting EGU (LEE) for one or more applicable emission limits, except as
otherwise provided in paragraphs (c)(1)(i)(A) and (B) of this section:
(A) Except as provided in paragraph (c)(1)(i)(C) of this section,
you may not pursue the LEE option if your coal-fired, IGCC, or solid
oil-derived fuel-fired EGU is equipped with a main stack and a bypass
stack or bypass duct configuration that allows the effluent to bypass
any pollutant control device.
(B) You may not pursue the LEE option for Hg if your coal-fired,
solid oil-derived fuel-fired EGU or IGCC EGU is new.
(C) You may pursue the LEE option provided that:
(1) Your EGU's control device bypass emissions are measured in the
bypass stack or duct or your control device bypass exhaust is routed
through the EGU main stack so that emissions are measured during the
bypass event; or
(2) Except for hours during which only clean fuel is combusted, you
bypass your EGU control device only during emergency periods for no more
than a total of 2 percent of your EGU's annual operating hours; you use
clean fuels to the maximum extent possible during an emergency period;
and you prepare and submit a report describing the emergency event, its
cause, corrective action taken, and estimates of emissions released
during the emergency event. You must include these emergency emissions
along with performance test results in assessing whether your EGU
maintains LEE status.
(ii) For a qualifying LEE for Hg emissions limits, you must conduct
a 30-day performance test using Method 30B at least once every 12
calendar months to demonstrate continued LEE status.
(iii) For a qualifying LEE of any other applicable emissions limits,
you must conduct a performance test at least once every 36 calendar
months to demonstrate continued LEE status.
(iv) If your coal-fired or solid oil derived fuel-fired EGU or IGCC
EGU does not qualify as a LEE for total non-mercury HAP metals,
individual non-mercury HAP metals, or filterable particulate matter
(PM), you must demonstrate compliance through an initial performance
test and you must monitor continuous performance through either use of a
particulate matter continuous parametric monitoring system (PM CPMS), a
PM CEMS, or, for an existing EGU, compliance performance testing
repeated quarterly.
(v) If your coal-fired or solid oil-derived fuel-fired EGU does not
qualify as a LEE for hydrogen chloride (HCl), you may demonstrate
initial and continuous compliance through use of an HCl CEMS, installed
and operated in accordance with Appendix B to this subpart. As an
alternative to HCl CEMS, you may demonstrate initial and continuous
compliance by conducting an initial and periodic quarterly performance
stack test for HCl. If your EGU uses wet or dry flue gas desulfurization
technology (this includes limestone injection into a fluidized bed
combustion unit), you may apply a second alternative to HCl CEMS by
installing and operating a sulfur dioxide (SO2) CEMS
installed and operated in accordance with part 75 of this chapter to
demonstrate compliance with the applicable SO2 emissions
limit.
(vi) If your coal-fired or solid oil-derived fuel-fired EGU does not
qualify as a LEE for Hg, you must demonstrate initial and continuous
compliance through use of a Hg CEMS or a sorbent trap monitoring system,
in accordance with appendix A to this subpart.
(A) You may choose to use separate sorbent trap monitoring systems
to comply with this subpart: One sorbent
[[Page 162]]
trap monitoring system to demonstrate compliance with the numeric
mercury emissions limit during periods other than startup or shutdown
and the other sorbent trap monitoring system to report average mercury
concentration during startup periods or shutdown periods.
(B) You may choose to use one sorbent trap monitoring system to
demonstrate compliance with the mercury emissions limit at all times
(including startup periods and shutdown periods) and to report average
mercury concentration. You must follow the startup or shutdown
requirements that follow and as given in Table 3 to this subpart for
each coal-fired, liquid oil-fired, or solid oil-derived fuel-fired EGU.
(2) For liquid oil-fired EGUs, except limited use liquid oil-fired
EGUs, initial performance testing is required for all pollutants, to
demonstrate compliance with the applicable emission limits.
(i) For an existing liquid oil-fired unit, you may conduct the
performance testing in accordance with Sec. 63.10005(h), to determine
whether the unit qualifies as a LEE for one or more pollutants. For a
qualifying LEE for Hg emissions limits, you must conduct a 30-day
performance test using Method 30B at least once every 12 calendar months
to demonstrate continued LEE status. For a qualifying LEE of any other
applicable emissions limits, you must conduct a performance test at
least once every 36 calendar months to demonstrate continued LEE status.
(ii) If your liquid oil-fired unit does not qualify as a LEE for
total HAP metals (including mercury), individual metals (including
mercury), or filterable PM you must demonstrate compliance through an
initial performance test and you must monitor continuous performance
through either use of a PM CPMS, a PM CEMS, or, for an existing EGU,
performance testing conducted quarterly.
(iii) If your existing liquid oil-fired unit does not qualify as a
LEE for hydrogen chloride (HCl) or for hydrogen fluoride (HF), you may
demonstrate initial and continuous compliance through use of an HCl
CEMS, an HF CEMS, or an HCl and HF CEMS, installed and operated in
accordance with Appendix B to this rule. As an alternative to HCl CEMS,
HF CEMS, or HCl and HF CEMS, you may demonstrate initial and continuous
compliance through quarterly performance testing and parametric
monitoring for HCl and HF. If you choose to use quarterly testing and
parametric monitoring, then you must also develop a site-specific
monitoring plan that identifies the CMS you will use to ensure that the
operations of the EGU remains consistent with those during the
performance test. As another alternative, you may measure or obtain, and
keep records of, fuel moisture content; as long as fuel moisture does
not exceed 1.0 percent by weight, you need not conduct other HCl or HF
monitoring or testing.
(iv) If your unit qualifies as a limited-use liquid oil-fired as
defined in Sec. 63.10042, then you are not subject to the emission
limits in Tables 1 and 2, but you must comply with the performance tune-
up work practice requirements in Table 3.
(d)(1) If you demonstrate compliance with any applicable emissions
limit through use of a continuous monitoring system (CMS), where a CMS
includes a continuous parameter monitoring system (CPMS) as well as a
continuous emissions monitoring system (CEMS), you must develop a site-
specific monitoring plan and submit this site-specific monitoring plan,
if requested, at least 60 days before your initial performance
evaluation (where applicable) of your CMS. This requirement also applies
to you if you petition the Administrator for alternative monitoring
parameters under Sec. 63.8(f). This requirement to develop and submit a
site-specific monitoring plan does not apply to affected sources with
existing monitoring plans that apply to CEMS and CPMS prepared under
appendix B to part 60 or part 75 of this chapter, and that meet the
requirements of Sec. 63.10010. Using the process described in Sec.
63.8(f)(4), you may request approval of monitoring system quality
assurance and quality control procedures alternative to those specified
in this paragraph of this section and, if approved, include those in
your site-specific monitoring plan. The monitoring plan must address the
provisions in
[[Page 163]]
paragraphs (d)(2) through (5) of this section.
(2) The site-specific monitoring plan shall include the information
specified in paragraphs (d)(5)(i) through (d)(5)(vii) of this section.
Alternatively, the requirements of paragraphs (d)(5)(i) through
(d)(5)(vii) are considered to be met for a particular CMS or sorbent
trap monitoring system if:
(i) The CMS or sorbent trap monitoring system is installed,
certified, maintained, operated, and quality-assured either according to
part 75 of this chapter, or appendix A or B to this subpart; and
(ii) The recordkeeping and reporting requirements of part 75 of this
chapter, or appendix A or B to this subpart, that pertain to the CMS are
met.
(3) If requested by the Administrator, you must submit the
monitoring plan (or relevant portion of the plan) at least 60 days
before the initial performance evaluation of a particular CMS, except
where the CMS has already undergone a performance evaluation that meets
the requirements of Sec. 63.10010 (e.g., if the CMS was previously
certified under another program).
(4) You must operate and maintain the CMS according to the site-
specific monitoring plan.
(5) The provisions of the site-specific monitoring plan must address
the following items:
(i) Installation of the CMS or sorbent trap monitoring system
sampling probe or other interface at a measurement location relative to
each affected process unit such that the measurement is representative
of control of the exhaust emissions (e.g., on or downstream of the last
control device). See Sec. 63.10010(a) for further details. For PM CPMS
installations, follow the procedures in Sec. 63.10010(h).
(ii) Performance and equipment specifications for the sample
interface, the pollutant concentration or parametric signal analyzer,
and the data collection and reduction systems.
(iii) Schedule for conducting initial and periodic performance
evaluations.
(iv) Performance evaluation procedures and acceptance criteria
(e.g., calibrations), including the quality control program in
accordance with the general requirements of Sec. 63.8(d).
(v) On-going operation and maintenance procedures, in accordance
with the general requirements of Sec. Sec. 63.8(c)(1)(ii), (c)(3), and
(c)(4)(ii).
(vi) Conditions that define a CMS that is out of control consistent
with Sec. 63.8(c)(7)(i) and for responding to out of control periods
consistent with Sec. Sec. 63.8(c)(7)(ii) and (c)(8).
(vii) On-going recordkeeping and reporting procedures, in accordance
with the general requirements of Sec. Sec. 63.10(c), (e)(1), and
(e)(2)(i), or as specifically required under this subpart.
(e) As part of your demonstration of continuous compliance, you must
perform periodic tune-ups of your EGU(s), according to Sec.
63.10021(e).
(f) Except as provided under paragraph (n) of this section, you are
subject to the requirements of this subpart for at least 6 months
following the last date you met the definition of an EGU subject to this
subpart (e.g., 6 months after a cogeneration unit provided more than one
third of its potential electrical output capacity and more than 25
megawatts electrical output to any power distributions system for sale).
You may opt to remain subject to the provisions of this subpart beyond 6
months after the last date you met the definition of an EGU subject to
this subpart, unless your unit is a solid waste incineration unit
subject to standards under CAA section 129 (e.g., 40 CFR part 60,
subpart CCCC (New Source Performance Standards (NSPS) for Commercial and
Industrial Solid Waste Incineration Units, or subpart DDDD (Emissions
Guidelines (EG) for Existing Commercial and Industrial Solid Waste
Incineration Units). Notwithstanding the provisions of this subpart, an
EGU that starts combusting solid waste is immediately subject to
standards under CAA section 129 and the EGU remains subject to those
standards until the EGU no longer meets the definition of a solid waste
incineration unit consistent with the provisions of the applicable CAA
section 129 standards.
(g) Except as provided under paragraph (n) of this section, if your
unit no longer meets the definition of an EGU subject to this subpart
you must be in compliance with any newly applicable standards on the
date you are no
[[Page 164]]
longer subject to this subpart. The date you are no longer subject to
this subpart is a date selected by you, that must be at least 6 months
from the date that your unit last met the definition of an EGU subject
to this subpart or the date you begin combusting solid waste, consistent
with Sec. 63.9983(d). Your source must remain in compliance with this
subpart until the date you select to cease complying with this subpart
or the date you begin combusting solid waste, whichever is earlier.
(h)(1) If you own or operate an EGU that does not meet the
definition of an EGU subject to this subpart on April 16, 2015, and you
commence or recommence operations that cause you to meet the definition
of an EGU subject to this subpart, you are subject to the provisions of
this subpart, including, but not limited to, the emission limitations
and the monitoring requirements, as of the first day you meet the
definition of an EGU subject to this subpart. You must complete all
initial compliance demonstrations for this subpart applicable to your
EGU within 180 days after you commence or recommence operations that
cause you to meet the definition of an EGU subject to this subpart.
(2) You must provide 30 days prior notice of the date you intend to
commence or recommence operations that cause you to meet the definition
of an EGU subject to this subpart. The notification must identify:
(i) The name of the owner or operator of the EGU, the location of
the facility, the unit(s) that will commence or recommence operations
that will cause the unit(s) to meet the definition of an EGU subject to
this subpart, and the date of the notice;
(ii) The 40 CFR part 60, part 62, or part 63 subpart and subcategory
currently applicable to your unit(s), and the subcategory of this
subpart that will be applicable after you commence or recommence
operation that will cause the unit(s) to meet the definition of an EGU
subject to this subpart;
(iii) The date on which you became subject to the currently
applicable emission limits;
(iv) The date upon which you will commence or recommence operations
that will cause your unit to meet the definition of an EGU subject to
this subpart, consistent with paragraph (f) of this section.
(i)(1) If you own or operate an EGU subject to this subpart and
cease to operate in a manner that causes your unit to meet the
definition of an EGU subject to this subpart, you must be in compliance
with any newly applicable section 112 or 129 standards on the date you
selected consistent with paragraphs (g) and (n) of this section.
(2) You must provide 30 days prior notice of the date your EGU will
cease complying with this subpart. The notification must identify:
(i) The name of the owner or operator of the EGU(s), the location of
the facility, the EGU(s) that will cease complying with this subpart,
and the date of the notice;
(ii) The currently applicable subcategory under this subpart, and
any 40 CFR part 60, part 62, or part 63 subpart and subcategory that
will be applicable after you cease complying with this subpart;
(iii) The date on which you became subject to this subpart;
(iv) The date upon which you will cease complying with this subpart,
consistent with paragraph (g) of this section.
(j) All air pollution control equipment necessary for compliance
with any newly applicable emissions limits which apply as a result of
the cessation or commencement or recommencement of operations that cause
your EGU to meet the definition of an EGU subject to this subpart must
be installed and operational as of the date your source ceases to be or
becomes subject to this subpart.
(k) All monitoring systems necessary for compliance with any newly
applicable monitoring requirements which apply as a result of the
cessation or commencement or recommencement of operations that cause
your EGU to meet the definition of an EGU subject to this subpart must
be installed and operational as of the date your source ceases to be or
becomes subject to this subpart. All calibration and drift checks must
be performed as of the date your source ceases to be or becomes subject
to this subpart. You must also comply with provisions of
[[Page 165]]
Sec. Sec. 63.10010, 63.10020, and 63.10021 of this subpart. Relative
accuracy tests must be performed as of the performance test deadline for
PM CEMS, if applicable. Relative accuracy testing for other CEMS need
not be repeated if that testing was previously performed consistent with
CAA section 112 monitoring requirements or monitoring requirements under
this subpart.
(l) On or before the date an EGU is subject to this subpart, you
must install, certify, operate, maintain, and quality assure each
monitoring system necessary for demonstrating compliance with the work
practice standards for PM or non-mercury HAP metals during startup
periods and shutdown periods. You must collect, record, report, and
maintain data obtained from these monitoring systems during startup
periods and shutdown periods.
(m) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, on or before the date your
EGU is subject to this subpart, you must install, verify, operate,
maintain, and quality assure each monitoring system necessary for
demonstrating compliance with the work practice standards for PM or non-
mercury HAP metals controls during startup periods and shutdown periods
required to comply with Sec. 63.10020(e).
(1) You may rely on monitoring system specifications or instructions
or manufacturer's specifications when installing, verifying, operating,
maintaining, and quality assuring each monitoring system.
(2) You must collect, record, report, and maintain data obtained
from these monitoring systems during startup periods and shutdown
periods.
(n) If you have permanently converted your EGU from coal or oil to
natural gas or biomass after your compliance date (or, if applicable,
after your approved extended compliance date), as demonstrated by being
subject to a permit provision or physical limitation (including
retirement) that prevents you from operating in a manner that would
subject you to this subpart, you are no longer subject to this subpart,
notwithstanding the coal or oil usage in the previous calendar years.
The date on which you are no longer subject to this subpart is the date
on which you converted to natural gas or biomass firing; it is also the
date on which you must be in compliance with any newly applicable
standards.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23402, Apr. 19, 2012; 78
FR 24084, Apr. 24, 2013; 79 FR 68788, Nov. 19, 2014; 81 FR 20180, Apr.
6, 2016]
Sec. 63.10001 [Reserved]
Testing and Initial Compliance Requirements
Sec. 63.10005 What are my initial compliance requirements and by
what date must I conduct them?
(a) General requirements. For each of your affected EGUs, you must
demonstrate initial compliance with each applicable emissions limit in
Table 1 or 2 of this subpart through performance testing. Where two
emissions limits are specified for a particular pollutant (e.g., a heat
input-based limit in lb/MMBtu and a gross output-based limit in lb/MWh),
you may demonstrate compliance with either emission limit. For a
particular compliance demonstration, you may be required to conduct one
or more of the following activities in conjunction with performance
testing: collection of data, e.g., hourly gross output data (megawatts);
establishment of operating limits according to Sec. 63.10011 and Tables
4 and 7 to this subpart; and CMS performance evaluations. In all cases,
you must demonstrate initial compliance no later than the date in
paragraph (f) of this section for tune-up work practices for existing
EGUs; the date that compliance must be demonstrated, as given in Sec.
63.9984 for other requirements for existing EGUs; and in paragraph (g)
of this section for all requirements for new EGUs.
(1) To demonstrate initial compliance with an applicable emissions
limit in Table 1 or 2 to this subpart using stack testing, the initial
performance test generally consists of three runs at specified process
operating conditions using approved methods. If you are required to
establish operating limits (see paragraph (d) of this section and Table
4 to this subpart), you must collect all applicable parametric data
during the performance test period. Also,
[[Page 166]]
if you choose to comply with an electrical output-based emission limit,
you must collect hourly electrical load data during the test period.
(2) To demonstrate initial compliance using either a CMS that
measures HAP concentrations directly (i.e., an Hg, HCl, or HF CEMS, or a
sorbent trap monitoring system) or an SO2 or PM CEMS, the
initial performance test shall consist of 30- or, for certain coal-fired
existing EGUs that use emissions averaging for Hg, 90-boiler operating
days. If the CMS is certified prior to the compliance date (or, if
applicable, the approved extended compliance date), the test shall begin
with the first operating day on or after that date, except as otherwise
provided in paragraph (b) of this section. If the CMS is not certified
prior to the compliance date, the test shall begin with the first
operating day after certification testing is successfully completed. In
all cases, the initial 30- or 90- operating day averaging period must be
completed on or before the date that compliance must be demonstrated
(i.e., 180 days after the applicable compliance date).
(i) The CMS performance test must demonstrate compliance with the
applicable Hg, HCl, HF, PM, or SO2 emissions limit in Table 1
or 2 to this subpart.
(ii) You must collect hourly data from auxiliary monitoring systems
(i.e., stack gas flow rate, CO2, O2, or moisture,
as applicable) during the performance test period, in order to convert
the pollutant concentrations to units of the standard. If you choose to
comply with a gross output-based emission limit, you must also collect
hourly gross output data during the performance test period.
(iii) For a group of affected units that are in the same
subcategory, are subject to the same emission standards, and share a
common stack, if you elect to demonstrate compliance by monitoring
emissions at the common stack, startup and shutdown emissions (if any)
that occur during the 30-(or, if applicable, 90-) boiler operating day
performance test must either be excluded from or included in the
compliance demonstration as follows:
(A) If one of the units that shares the stack either starts up or
shuts down at a time when none of the other units is operating, you must
exclude all pollutant emission rates measured during the startup or
shutdown period, unless you are using a sorbent trap monitoring system
to measure Hg emissions and have elected to include startup and shutdown
emissions in the compliance demonstrations;
(B) If all units that are currently operating are in the startup or
shutdown mode, you must exclude all pollutant emission rates measured
during the startup or shutdown period, unless you are using a sorbent
trap monitoring system to measure Hg emissions and have elected to
include startup and shutdown emissions in the compliance demonstrations;
or
(C) If any unit starts up or shuts down at a time when another unit
is operating, and the other unit is not in the startup or shutdown mode,
you must include all pollutant emission rates measured during the
startup or shutdown period in the compliance demonstrations.
(b) Performance testing requirements. If you choose to use
performance testing to demonstrate initial compliance with the
applicable emissions limits in Tables 1 and 2 to this subpart for your
EGUs, you must conduct the tests according to Sec. 63.10007 and Table 5
to this subpart. For the purposes of the initial compliance
demonstration, you may use test data and results from a performance test
conducted prior to the date on which compliance is required as specified
in Sec. 63.9984, provided that the following conditions are fully met:
(1) For a performance test based on stack test data, the test was
conducted no more than 12 calendar months prior to the date on which
compliance is required as specified in Sec. 63.9984;
(2) For a performance test based on data from a certified CEMS or
sorbent trap monitoring system, the test consists of all valid CMS data
recorded in the 30 boiler operating days immediately preceding that
date;
(3) The performance test was conducted in accordance with all
applicable requirements in Sec. 63.10007 and Table 5 to this subpart;
[[Page 167]]
(4) A record of all parameters needed to convert pollutant
concentrations to units of the emission standard (e.g., stack flow rate,
diluent gas concentrations, hourly gross outputs) is available for the
entire performance test period; and
(5) For each performance test based on stack test data, you certify,
and keep documentation demonstrating, that the EGU configuration,
control devices, and fuel(s) have remained consistent with conditions
since the prior performance test was conducted.
(6) For performance stack test data that are collected prior to the
date that compliance must be demonstrated and are used to demonstrate
initial compliance with applicable emissions limits, the interval for
subsequent stack tests begins on the date that compliance must be
demonstrated.
(c) Operating limits. In accordance with Sec. 63.10010 and Table 4
to this subpart, you may be required to establish operating limits using
PM CPMS and using site-specific monitoring for certain liquid oil-fired
units as part of your initial compliance demonstration.
(d) CMS requirements. If, for a particular emission or operating
limit, you are required to (or elect to) demonstrate initial compliance
using a continuous monitoring system, the CMS must pass a performance
evaluation prior to the initial compliance demonstration. If a CMS has
been previously certified under another state or federal program and is
continuing to meet the on-going quality-assurance (QA) requirements of
that program, then, provided that the certification and QA provisions of
that program meet the applicable requirements of Sec. Sec. 63.10010(b)
through (h), an additional performance evaluation of the CMS is not
required under this subpart.
(1) For an affected coal-fired, solid oil-derived fuel-fired, or
liquid oil-fired EGU, you may demonstrate initial compliance with the
applicable SO2, HCl, or HF emissions limit in Table 1 or 2 to
this subpart through use of an SO2, HCl, or HF CEMS installed
and operated in accordance with part 75 of this chapter or appendix B to
this subpart, as applicable. You may also demonstrate compliance with a
filterable PM emission limit in Table 1 or 2 to this subpart through use
of a PM CEMS installed, certified, and operated in accordance with Sec.
63.10010(i). Initial compliance is achieved if the arithmetic average of
30-boiler operating days of quality-assured CEMS data, expressed in
units of the standard (see Sec. 63.10007(e)), meets the applicable
SO2, PM, HCl, or HF emissions limit in Table 1 or 2 to this
subpart. Use Equation 19-19 of Method 19 in appendix A-7 to part 60 of
this chapter to calculate the 30-boiler operating day average emissions
rate. (Note: For this calculation, the term Ehj in Equation
19-19 must be in the same units of measure as the applicable HCl or HF
emission limit in Table 1 or 2 to this subpart).
(2) For affected coal-fired or solid oil-derived fuel-fired EGUs
that demonstrate compliance with the applicable emission limits for
total non-mercury HAP metals, individual non-mercury HAP metals, total
HAP metals, individual HAP metals, or filterable PM listed in Table 1 or
2 to this subpart using initial performance testing and continuous
monitoring with PM CPMS:
(i) You must demonstrate initial compliance no later than the
applicable date specified in Sec. 63.9984(f) for existing EGUs and in
paragraph (g) of this section for new EGUs.
(ii) You must demonstrate continuous compliance with the PM CPMS
site-specific operating limit that corresponds to the results of the
performance test demonstrating compliance with the emission limit with
which you choose to comply.
(iii) You must repeat the performance test annually for the selected
pollutant emissions limit and reassess and adjust the site-specific
operating limit in accordance with the results of the performance test.
(3) For affected EGUs that are either required to or elect to
demonstrate initial compliance with the applicable Hg emission limit in
Table 1 or 2 of this subpart using Hg CEMS or sorbent trap monitoring
systems, initial compliance must be demonstrated no later than the
applicable date specified in Sec. 63.9984(f) for existing EGUs and in
paragraph (g) of this section for new EGUs. Initial compliance is
achieved if the arithmetic average of 30- (or 90-)
[[Page 168]]
boiler operating days of quality-assured CEMS (or sorbent trap
monitoring system) data, expressed in units of the standard (see section
6.2 of appendix A to this subpart), meets the applicable Hg emission
limit in Table 1 or 2 to this subpart.
(4) For affected liquid oil-fired EGUs that demonstrate compliance
with the applicable emission limits for HCl or HF listed in Table 1 or 2
to this subpart using quarterly testing and continuous monitoring with a
CMS:
(i) You must demonstrate initial compliance no later than the
applicable date specified in Sec. 63.9984(f) for existing EGUs and in
paragraph (g) of this section for new EGUs.
(ii) You must demonstrate continuous compliance with the CMS site-
specific operating limit that corresponds to the results of the
performance test demonstrating compliance with the HCl or HF emissions
limit.
(iii) You must repeat the performance test annually for the HCl or
HF emissions limit and reassess and adjust the site-specific operating
limit in accordance with the results of the performance test.
(e) Tune-ups. All affected EGUs are subject to the work practice
standards in Table 3 of this subpart. As part of your initial compliance
demonstration, you must conduct a performance tune-up of your EGU
according to Sec. 63.10021(e).
(f) For an existing EGU without a neural network, a tune-up,
following the procedures in Sec. 63.10021(e), must occur within 6
months (180 days) after April 16, 2015. For an existing EGU with a
neural network, a tune-up must occur within 18 months (545 days) after
April 16, 2016. If a tune-up occurs prior to April 16, 2015, you must
keep records showing that the tune-up met all rule requirements.
(g) If your new or reconstructed affected source commenced
construction or reconstruction between May 3, 2011, and July 2, 2011,
you must demonstrate initial compliance with either the proposed
emission limits or the promulgated emission limits no later than 180
days after April 16, 2012 or within 180 days after startup of the
source, whichever is later, according to Sec. 63.7(a)(2)(ix).
(1) For the new or reconstructed affected source described in this
paragraph (g), if you choose to comply with the proposed emission limits
when demonstrating initial compliance, you must conduct a second
compliance demonstration for the promulgated emission limits within 3
years after April 16, 2012 or within 3 years after startup of the
affected source, whichever is later.
(2) If your new or reconstructed affected source commences
construction or reconstruction after April 16, 2012, you must
demonstrate initial compliance with the promulgated emission limits no
later than 180 days after startup of the source.
(h) Low emitting EGUs. The provisions of this paragraph (h) apply to
pollutants with emissions limits from new EGUs except Hg and to all
pollutants with emissions limits from existing EGUs. You may pursue this
compliance option unless prohibited pursuant to Sec. 63.10000(c)(1)(i).
(1) An EGU may qualify for low emitting EGU (LEE) status for Hg,
HCl, HF, filterable PM, total non-Hg HAP metals, or individual non-Hg
HAP metals (or total HAP metals or individual HAP metals, for liquid
oil-fired EGUs) if you collect performance test data that meet the
requirements of this paragraph (h), and if those data demonstrate:
(i) For all pollutants except Hg, performance test emissions results
less than 50 percent of the applicable emissions limits in Table 1 or 2
to this subpart for all required testing for 3 consecutive years; or
(ii) For Hg emissions from an existing EGU, either:
(A) Average emissions less than 10 percent of the applicable Hg
emissions limit in Table 2 to this subpart (expressed either in units of
lb/TBtu or lb/GWh); or
(B) Potential Hg mass emissions of 29.0 or fewer pounds per year and
compliance with the applicable Hg emission limit in Table 2 to this
subpart (expressed either in units of lb/TBtu or lb/GWh).
(2) For all pollutants except Hg, you must conduct all required
performance
[[Page 169]]
tests described in Sec. 63.10007 to demonstrate that a unit qualifies
for LEE status.
(i) When conducting emissions testing to demonstrate LEE status, you
must increase the minimum sample volume specified in Table 1 or 2
nominally by a factor of two.
(ii) Follow the instructions in Sec. 63.10007(e) and Table 5 to
this subpart to convert the test data to the units of the applicable
standard.
(3) For Hg, you must conduct a 30- (or 90-) boiler operating day
performance test using Method 30B in appendix A-8 to part 60 of this
chapter to determine whether a unit qualifies for LEE status. Locate the
Method 30B sampling probe tip at a point within 10 percent of the duct
area centered about the duct's centroid at a location that meets Method
1 in appendix A-1 to part 60 of this chapter and conduct at least three
nominally equal length test runs over the 30- (or 90-) boiler operating
day test period. You may use a pair of sorbent traps to sample the stack
gas for a period consistent with that given in section 5.2.1 of appendix
A to this subpart. Collect Hg emissions data continuously over the
entire test period (except when changing sorbent traps or performing
required reference method QA procedures). As an alternative to constant
rate sampling per Method 30B, you may use proportional sampling per
section 8.2.2 of Performance Specification 12 B in appendix B to part 60
of this chapter.
(i) Depending on whether you intend to assess LEE status for Hg in
terms of the lb/TBtu or lb/GWh emission limit in Table 2 to this subpart
or in terms of the annual Hg mass emissions limit of 29.0 lb/year, you
will have to collect some or all of the following data during the 30-
boiler operating day test period (see paragraph (h)(3)(iii) of this
section):
(A) Diluent gas (CO2 or O2) data, using either
Method 3A in appendix A-3 to part 60 of this chapter or a diluent gas
monitor that has been certified according to part 75 of this chapter.
(B) Stack gas flow rate data, using either Method 2, 2F, or 2G in
appendices A-1 and A-2 to part 60 of this chapter, or a flow rate
monitor that has been certified according to part 75 of this chapter.
(C) Stack gas moisture content data, using either Method 4 in
appendix A-1 to part 60 of this chapter, or a moisture monitoring system
that has been certified according to part 75 of this chapter.
Alternatively, an appropriate fuel-specific default moisture value from
Sec. 75.11(b) of this chapter may be used in the calculations or you
may petition the Administrator under Sec. 75.66 of this chapter for use
of a default moisture value for non-coal-fired units.
(D) Hourly gross output data (megawatts), from facility records.
(ii) If you use CEMS to measure CO2 (or O2)
concentration, and/or flow rate, and/or moisture, record hourly average
values of each parameter throughout the 30-boiler operating day test
period. If you opt to use EPA reference methods rather than CEMS for any
parameter, you must perform at least one representative test run on each
operating day of the test period, using the applicable reference method.
(iii) Calculate the average Hg concentration, in [micro]g/m\3\ (dry
basis), for the 30- (or 90-) boiler operating day performance test, as
the arithmetic average of all Method 30B sorbent trap results. Also
calculate, as applicable, the average values of CO2 or
O2 concentration, stack gas flow rate, stack gas moisture
content, and gross output for the test period. Then:
(A) To express the test results in units of lb/TBtu, follow the
procedures in Sec. 63.10007(e). Use the average Hg concentration and
diluent gas values in the calculations.
(B) To express the test results in units of lb/GWh, use Equations A-
3 and A-4 in section 6.2.2 of appendix A to this subpart, replacing the
hourly values ``Ch'', ``Qh'', ``Bws''
and ``(MW)h'' with the average values of these parameters
from the performance test.
(C) To calculate pounds of Hg per year, use one of the following
methods:
(1) Multiply the average lb/TBtu Hg emission rate (determined
according to paragraph (h)(3)(iii)(A) of this section) by the maximum
potential annual heat input to the unit (TBtu), which is equal to the
maximum rated unit heat input
[[Page 170]]
(TBtu/hr) times 8,760 hours. If the maximum rated heat input value is
expressed in units of MMBtu/hr, multiply it by 10 -6 to
convert it to TBtu/hr; or
(2) Multiply the average lb/GWh Hg emission rate (determined
according to paragraph (h)(3)(iii)(B) of this section) by the maximum
potential annual electricity generation (GWh), which is equal to the
maximum rated electrical output of the unit (GW) times 8,760 hours. If
the maximum rated electrical output value is expressed in units of MW,
multiply it by 10 -3 to convert it to GW; or
(3) If an EGU has a federally-enforceable permit limit on either the
annual heat input or the number of annual operating hours, you may
modify the calculations in paragraph (h)(3)(iii)(C)(1) of this section
by replacing the maximum potential annual heat input or 8,760 unit
operating hours with the permit limit on annual heat input or operating
hours (as applicable).
(4) For a group of affected units that vent to a common stack, you
may either assess LEE status for the units individually by performing a
separate emission test of each unit in the duct leading from the unit to
the common stack, or you may perform a single emission test in the
common stack. If you choose the common stack testing option, the units
in the configuration qualify for LEE status if:
(i) The emission rate measured at the common stack is less than 50
percent (10 percent for Hg) of the applicable emission limit in Table 1
or 2 to this subpart; or
(ii) For Hg from an existing EGU, the applicable Hg emission limit
in Table 2 to this subpart is met and the potential annual mass
emissions, calculated according to paragraph (h)(3)(iii) of this section
(with some modifications), are less than or equal to 29.0 pounds times
the number of units sharing the common stack. Base your calculations on
the combined heat input capacity of all units sharing the stack (i.e.,
either the combined maximum rated value or, if applicable, a lower
combined value restricted by permit conditions or operating hours).
(5) For an affected unit with a multiple stack or duct configuration
in which the exhaust stacks or ducts are downstream of all emission
control devices, you must perform a separate emission test in each stack
or duct. The unit qualifies for LEE status if:
(i) The emission rate, based on all test runs performed at all of
the stacks or ducts, is less than 50 percent (10 percent for Hg) of the
applicable emission limit in Table 1 or 2 to this subpart; or
(ii) For Hg from an existing EGU, the applicable Hg emission limit
in Table 2 to this subpart is met and the potential annual mass
emissions, calculated according to paragraph (h)(3)(iii) of this
section, are less than or equal to 29.0 pounds. Use the average Hg
emission rate from paragraph (h)(5)(i) of this section in your
calculations.
(i) Liquid-oil fuel moisture measurement. If your EGU combusts
liquid fuels, if your fuel moisture content is no greater than 1.0
percent by weight, and if you would like to demonstrate initial and
ongoing compliance with HCl and HF emissions limits, you must meet the
requirements of paragraphs (i)(1) through (5) of this section.
(1) Measure fuel moisture content of each shipment of fuel if your
fuel arrives on a batch basis; or
(2) Measure fuel moisture content daily if your fuel arrives on a
continuous basis; or
(3) Obtain and maintain a fuel moisture certification from your fuel
supplier.
(4) Use one of the following methods to determine fuel moisture
content:
(i) ASTM D95-05 (Reapproved 2010), ``Standard Test Method for Water
in Petroleum Products and Bituminous Materials by Distillation,'' or
(ii) ASTM D4006-11, ``Standard Test Method for Water in Crude Oil by
Distillation,'' including Annex A1 and Appendix A1.
(5) Use one of the following methods to obtain fuel moisture
samples:
(i) ASTM D4177-95 (Reapproved 2010), ``Standard Practice for
Automatic Sampling of Petroleum and Petroleum Products,'' including
Annexes A1 through A6 and Appendices X1 and X2, or
(ii) ASTM D4057-06 (Reapproved 2011), ``Standard Practice for Manual
Sampling of Petroleum and Petroleum Products,'' including Annex A1.
[[Page 171]]
(6) Should the moisture in your liquid fuel be more than 1.0 percent
by weight, you must
(i) Conduct HCl and HF emissions testing quarterly (and monitor
site-specific operating parameters as provided in Sec.
63.10000(c)(2)(iii) or
(ii) Use an HCl CEMS and/or HF CEMS.
(j) Startup and shutdown for coal-fired or solid oil derived-fired
units. You must follow the requirements given in Table 3 to this
subpart.
(k) You must submit a Notification of Compliance Status summarizing
the results of your initial compliance demonstration, as provided in
Sec. 63.10030.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23403, Apr. 19, 2012; 78
FR 24084, Apr. 24, 2013; 79 FR 68789, Nov. 19, 2014; 81 FR 20181, Apr.
6, 2016]
Sec. 63.10006 When must I conduct subsequent performance tests
or tune-ups?
(a) For liquid oil-fired, solid oil-derived fuel-fired and coal-
fired EGUs and IGCC units using PM CPMS to monitor continuous
performance with an applicable emission limit as provided for under
Sec. 63.10000(c), you must conduct all applicable performance tests
according to Table 5 to this subpart and Sec. 63.10007 at least every
year.
(b) For affected units meeting the LEE requirements of Sec.
63.10005(h), you must repeat the performance test once every 3 years
(once every year for Hg) according to Table 5 and Sec. 63.10007. Should
subsequent emissions testing results show the unit does not meet the LEE
eligibility requirements, LEE status is lost. If this should occur:
(1) For all pollutant emission limits except for Hg, you must
conduct emissions testing quarterly, except as otherwise provided in
Sec. 63.10021(d)(1).
(2) For Hg, you must install, certify, maintain, and operate a Hg
CEMS or a sorbent trap monitoring system in accordance with appendix A
to this subpart, within 6 calendar months of losing LEE eligibility.
Until the Hg CEMS or sorbent trap monitoring system is installed,
certified, and operating, you must conduct Hg emissions testing
quarterly, except as otherwise provided in Sec. 63.10021(d)(1). You
must have 3 calendar years of testing and CEMS or sorbent trap
monitoring system data that satisfy the LEE emissions criteria to
reestablish LEE status.
(c) Except where paragraphs (a) or (b) of this section apply, or
where you install, certify, and operate a PM CEMS to demonstrate
compliance with a filterable PM emissions limit, for liquid oil-, solid
oil-derived fuel-, coal-fired and IGCC EGUs, you must conduct all
applicable periodic emissions tests for filterable PM, individual, or
total HAP metals emissions according to Table 5 to this subpart, Sec.
63.10007, and Sec. 63.10000(c), except as otherwise provided in Sec.
63.10021(d)(1).
(d) Except where paragraph (b) of this section applies, for solid
oil-derived fuel- and coal-fired EGUs that do not use either an HCl CEMS
to monitor compliance with the HCl limit or an SO2 CEMS to
monitor compliance with the alternate equivalent SO2 emission
limit, you must conduct all applicable periodic HCl emissions tests
according to Table 5 to this subpart and Sec. 63.10007 at least
quarterly, except as otherwise provided in Sec. 63.10021(d)(1).
(e) Except where paragraph (b) of this section applies, for liquid
oil-fired EGUs without HCl CEMS, HF CEMS, or HCl and HF CEMS, you must
conduct all applicable emissions tests for HCl, HF, or HCl and HF
emissions according to Table 5 to this subpart and Sec. 63.10007 at
least quarterly, except as otherwise provided in Sec. 63.10021(d)(1),
and conduct site-specific monitoring under a plan as provided for in
Sec. 63.10000(c)(2)(iii).
(f) Time between performance tests. (1) Notwithstanding the
provisions of Sec. 63.10021(d)(1), the requirements listed in
paragraphs (g) and (h) of this section, and the requirements of
paragraph (f)(3) of this section, you must complete performance tests
for your EGU as follows:
(i) At least 45 calendar days, measured from the test's end date,
must separate performance tests conducted every quarter;
(ii) For annual testing:
(A) At least 320 calendar days, measured from the test's end date,
must separate performance tests;
(B) At least 320 calendar days, measured from the test's end date,
must separate annual sorbent trap mercury
[[Page 172]]
testing for 30-boiler operating day LEE tests;
(C) At least 230 calendar days, measured from the test's end date,
must separate annual sorbent trap mercury testing for 90-boiler
operating day LEE tests; and
(iii) At least 1,050 calendar days, measured from the test's end
date, must separate performance tests conducted every 3 years.
(2) For units demonstrating compliance through quarterly emission
testing, you must conduct a performance test in the 4th quarter of a
calendar year if your EGU has skipped performance tests in the first 3
quarters of the calendar year.
(3) If your EGU misses a performance test deadline due to being
inoperative and if 168 or more boiler operating hours occur in the next
test period, you must complete an additional performance test in that
period as follows:
(i) At least 15 calendar days must separate two performance tests
conducted in the same quarter.
(ii) At least 107 calendar days must separate two performance tests
conducted in the same calendar year.
(iii) At least 350 calendar days must separate two performance tests
conducted in the same 3 year period.
(g) If you elect to demonstrate compliance using emissions averaging
under Sec. 63.10009, you must continue to conduct performance stack
tests at the appropriate frequency given in section (c) through (f) of
this section.
(h) If a performance test on a non-mercury LEE shows emissions in
excess of 50 percent of the emission limit and if you choose to reapply
for LEE status, you must conduct performance tests at the appropriate
frequency given in section (c) through (e) of this section for that
pollutant until all performance tests over a consecutive 3-year period
show compliance with the LEE criteria.
(i) If you are required to meet an applicable tune-up work practice
standard, you must conduct a performance tune-up according to Sec.
63.10021(e).
(1) For EGUs not employing neural network combustion optimization
during normal operation, each performance tune-up specified in Sec.
63.10021(e) must be no more than 36 calendar months after the previous
performance tune-up.
(2) For EGUs employing neural network combustion optimization
systems during normal operation, each performance tune-up specified in
Sec. 63.10021(e) must be no more than 48 calendar months after the
previous performance tune-up.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23403, Apr. 19, 2012; 78
FR 24085, Apr. 24, 2013; 81 FR 20182, Apr. 6, 2016]
Sec. 63.10007 What methods and other procedures must I use for
the performance tests?
(a) Except as otherwise provided in this section, you must conduct
all required performance tests according to Sec. 63.7(d), (e), (f), and
(h). You must also develop a site-specific test plan according to the
requirements in Sec. 63.7(c).
(1) If you use CEMS (Hg, HCl, SO2, or other) to determine
compliance with a 30- (or, if applicable, 90-) boiler operating day
rolling average emission limit, you must collect quality- assured CEMS
data for all unit operating conditions, including startup and shutdown
(see Sec. 63.10011(g) and Table 3 to this subpart), except as otherwise
provided in Sec. 63.10020(b). Emission rates determined during startup
periods and shutdown periods (as defined in Sec. 63.10042) are not to
be included in the compliance determinations, except as otherwise
provided in Sec. Sec. 63.10000(c)(1)(vi)(B) and 63.10005(a)(2)(iii).
(2) If you conduct performance testing with test methods in lieu of
continuous monitoring, operate the unit at maximum normal operating load
conditions during each periodic (e.g., quarterly) performance test.
Maximum normal operating load will be generally between 90 and 110
percent of design capacity but should be representative of site specific
normal operations during each test run.
(3) For establishing operating limits with particulate matter
continuous parametric monitoring system (PM CPMS) to demonstrate
compliance with a PM or non Hg metals emissions limit, operate the unit
at maximum normal operating load conditions during the performance test
period. Maximum normal operating load will be
[[Page 173]]
generally between 90 and 110 percent of design capacity but should be
representative of site specific normal operations during each test run.
(b) You must conduct each performance test (including traditional 3-
run stack tests, 30-boiler operating day tests based on CEMS data (or
sorbent trap monitoring system data), and 30-boiler operating day Hg
emission tests for LEE qualification) according to the requirements in
Table 5 to this subpart.
(c) If you choose the filterable PM method to comply with the PM
emission limit and demonstrate continuous performance using a PM CPMS as
provided for in Sec. 63.10000(c), you must also establish an operating
limit according to Sec. 63.10011(b), Sec. 63.10023, and Tables 4 and 6
to this subpart. Should you desire to have operating limits that
correspond to loads other than maximum normal operating load, you must
conduct testing at those other loads to determine the additional
operating limits.
(d) Except for a 30-boiler operating day performance test based on
CEMS (or sorbent trap monitoring system) data, where the concept of test
runs does not apply, you must conduct a minimum of three separate test
runs for each performance test, as specified in Sec. 63.7(e)(3). Each
test run must comply with the minimum applicable sampling time or volume
specified in Table 1 or 2 to this subpart. Sections 63.10005(d) and (h),
respectively, provide special instructions for conducting performance
tests based on CEMS or sorbent trap monitoring systems, and for
conducting emission tests for LEE qualification.
(e) To use the results of performance testing to determine
compliance with the applicable emission limits in Table 1 or 2 to this
subpart, proceed as follows:
(1) Except for a 30-boiler operating day performance test based on
CEMS (or sorbent trap monitoring system) data, if measurement results
for any pollutant are reported as below the method detection level
(e.g., laboratory analytical results for one or more sample components
are below the method defined analytical detection level), you must use
the method detection level as the measured emissions level for that
pollutant in calculating compliance. The measured result for a multiple
component analysis (e.g., analytical values for multiple Method 29
fractions both for individual HAP metals and for total HAP metals) may
include a combination of method detection level data and analytical data
reported above the method detection level.
(2) If the limits are expressed in lb/MMBtu or lb/TBtu, you must use
the F-factor methodology and equations in sections 12.2 and 12.3 of EPA
Method 19 in appendix A-7 to part 60 of this chapter. In cases where an
appropriate F-factor is not listed in Table 19-2 of Method 19, you may
use F-factors from Table 1 in section 3.3.5 of appendix F to part 75 of
this chapter, or F-factors derived using the procedures in section 3.3.6
of appendix to part 75 of this chapter. Use the following factors to
convert the pollutant concentrations measured during the initial
performance tests to units of lb/scf, for use in the applicable Method
19 equations:
(i) Multiply SO2 ppm by 1.66 x 10-7;
(ii) Multiply HCl ppm by 9.43 x 10-8;
(iii) Multiply HF ppm by 5.18 x 10-8;
(iv) Multiply HAP metals concentrations (mg/dscm) by 6.24 x
10-8; and
(v) Multiply Hg concentrations ([micro]g/scm) by 6.24 x
10-11.
(3) To determine compliance with emission limits expressed in lb/MWh
or lb/GWh, you must first calculate the pollutant mass emission rate
during the performance test, in units of lb/h. For Hg, if a CEMS or
sorbent trap monitoring system is used, use Equation A-2 or A-3 in
appendix A to this subpart (as applicable). In all other cases, use an
equation that has the general form of Equation A-2 or A-3, replacing the
value of K with 1.66 x 10-7 lb/scf-ppm for SO2,
9.43 x 10-8 lb/scf-ppm for HCl (if an HCl CEMS is used), 5.18
x 10-8 lb/scf-ppm for HF (if an HF CEMS is used), or 6.24 x
10-8 lb-scm/mg-scf for HAP metals and for HCl and HF (when
performance stack testing is used), and defining Ch as the
average SO2, HCl, or HF concentration in ppm, or the average
HAP metals concentration in mg/dscm. This calculation requires stack gas
volumetric flow rate (scfh) and (in some cases) moisture content data
(see
[[Page 174]]
Sec. Sec. 63.10005(h)(3) and 63.10010). Then, if the applicable
emission limit is in units of lb/GWh, use Equation A-4 in appendix A to
this subpart to calculate the pollutant emission rate in lb/GWh. In this
calculation, define (M)h as the calculated pollutant mass
emission rate for the performance test (lb/h), and define
(MW)h as the average electrical load during the performance
test (megawatts). If the applicable emission limit is in lb/MWh rather
than lb/GWh, omit the 10\3\ term from Equation A-4 to determine the
pollutant emission rate in lb/MWh.
(f) If you elect to (or are required to) use CEMS to continuously
monitor Hg, HCl, HF, SO2, or PM emissions (or, if applicable,
sorbent trap monitoring systems to continuously collect Hg emissions
data), the following default values are available for use in the
emission rate calculations during startup periods or shutdown periods
(as defined in Sec. 63.10042). For the purposes of this subpart, these
default values are not considered to be substitute data.
(1) Diluent cap values. If you use CEMS (or, if applicable, sorbent
trap monitoring systems) to comply with a heat input-based emission rate
limit, you may use the following diluent cap values for a startup or
shutdown hour in which the measured CO2 concentration is
below the cap value or the measured O2 concentration is above
the cap value:
(i) For an IGCC EGU, you may use 1% for CO2 or 19% for
O2.
(ii) For all other EGUs, you may use 5% for CO2 or 14%
for O2.
(2) Default gross output. If you use CEMS to continuously monitor
Hg, HCl, HF, SO2, or PM emissions (or, if applicable, sorbent
trap monitoring systems to continuously collect Hg emissions data), the
following default value is available for use in the emission rate
calculations during startup periods or shutdown periods (as defined in
Sec. 63.10042). For the purposes of this subpart, this default value is
not considered to be substitute data. For a startup or shutdown hour in
which there is heat input to an affected EGU but zero gross output, you
must calculate the pollutant emission rate using a value equivalent to
5% of the maximum sustainable gross output, expressed in megawatts, as
defined in section 6.5.2.1(a)(1) of appendix A to part 75 of this
chapter. This default gross output is either the nameplate capacity of
the EGU or the highest gross output observed in at least four
representative quarters of EGU operation. For a monitored common stack,
the default gross output is used only when all EGUs are operating (i.e.,
combusting fuel) are in startup or shutdown mode, and have zero
electrical generation. Under those conditions, a default gross output
equal to 5% of the combined maximum sustainable gross output of the EGUs
that are operating but have a total of zero gross output must be used to
calculate the hourly gross output-based pollutant emissions rate.
(g) Upon request, you shall make available to the EPA Administrator
such records as may be necessary to determine whether the performance
tests have been done according to the requirements of this section.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23403, Apr. 19, 2012; 78
FR 24085, Apr. 24, 2013; 79 FR 68789, Nov. 19, 2014; 81 FR 20182, Apr.
6, 2016]
Sec. 63.10008 [Reserved]
Sec. 63.10009 May I use emissions averaging to comply with
this subpart?
(a) General eligibility. (1) You may use emissions averaging as
described in paragraph (a)(2) of this section as an alternative to
meeting the requirements of Sec. 63.9991 for filterable PM,
SO2, HF, HCl, non-Hg HAP metals, or Hg on an EGU-specific
basis if:
(i) You have more than one existing EGU in the same subcategory
located at one or more contiguous properties, belonging to a single
major industrial grouping, which are under common control of the same
person (or persons under common control); and
(ii) You use CEMS (or sorbent trap monitoring systems for
determining Hg emissions) or quarterly emissions testing for
demonstrating compliance.
(2) You may demonstrate compliance by emissions averaging among the
existing EGUs in the same subcategory, if your averaged Hg emissions for
EGUs in the ``unit designed for coal =8,300 Btu/lb''
subcategory are equal to or less than 1.2 lb/TBtu or 1.3E-2 lb/GWh
[[Page 175]]
on a 30-boiler operating day basis or if your averaged emissions of
individual, other pollutants from other subcategories of such EGUs are
equal to or less than the applicable emissions limit in Table 2 to this
subpart, according to the procedures in this section. Note that except
for the alternate Hg emissions limit from EGUs in the ``unit designed
for coal =8,300 Btu/lb'' subcategory, the averaging time for
emissions averaging for pollutants is 30 days (rolling daily) using data
from CEMS or a combination of data from CEMS and manual performance
(LEE) testing. The averaging time for emissions averaging for the
alternate Hg limit (equal to or less than 1.0 lb/TBtu or 1.1E-2 lb/GWh)
from EGUs in the ``unit designed for coal =8,300 Btu/lb''
subcategory is 90-boiler operating days (rolling daily) using data from
CEMS, sorbent trap monitoring, or a combination of monitoring data and
data from manual performance (LEE) testing. For the purposes of this
paragraph, 30- (or 90-) group boiler operating days is defined as a
period during which at least one unit in the emissions averaging group
operates on each of the 30 or 90 days. You must calculate the weighted
average emissions rate for the group in accordance with the procedures
in this paragraph using the data from all units in the group including
any that operate fewer than 30 (or 90) days during the preceding 30 (or
90) group boiler days.
(i) You may choose to have your EGU emissions averaging group meet
either the heat input basis (MMBtu or TBtu, as appropriate for the
pollutant) or gross output basis (MWh or GWh, as appropriate for the
pollutant).
(ii) You may not mix bases within your EGU emissions averaging
group.
(iii) You may use emissions averaging for affected units in
different subcategories if the units vent to the atmosphere through a
common stack (see paragraph (m) of this section).
(b) Equations. Use the following equations when performing
calculations for your EGU emissions averaging group:
(1) Group eligibility equations.
[GRAPHIC] [TIFF OMITTED] TR06AP16.001
Where:
WAERm = Maximum Weighted Average Emission Rate in terms of
lb/heat input or lb/gross output,
Hermi,j = hourly emission rate (e.g., lb/MMBtu,
lb/MWh) from CEMS or sorbent trap monitoring as determined during the
initial compliance determination from EGU j,
Rmmj = Maximum rated heat input, MMBtu/h, or maximum rated
gross output, MWh/h, for EGU j,
p = number of EGUs in emissions averaging group that rely on CEMS,
Terk = Emissions rate (lb/MMBTU or lb/MWh) as determined
during the initial compliance determination of EGU k,
Rmtk = Maximum rated heat input, MMBtu/h, or maximum rated
gross output, MWh/h, for EGU k, and
m = number of EGUs in emissions averaging group that rely on emissions
testing.
[GRAPHIC] [TIFF OMITTED] TR06AP16.002
Where:
Variables with the similar names share the descriptions for Equation
1a of this section,
Smmj = maximum steam generation, lbsteam/h or lb/
gross output, for EGU j,
Cfmj = conversion factor, calculated from the most recent
compliance test results, in
[[Page 176]]
terms units of heat output or gross output per pound of steam generated
(MMBtu/lbsteam or MWh/lbsteam) from EGU j,
Smtk = maximum steam generation, lbsteam/h or lb/
gross output, for EGU k, and
Cfmk = conversion factor, calculated from the most recent
compliance test results, in terms units of heat output or gross output
per pound of steam generated (MMBtu/lbsteam or MWh/
lbsteam) from EGU k.
(2) Weighted 30-boiler operating day rolling average emissions rate
equations for pollutants other than Hg. Use Equation 2a or 2b of this
section to calculate the 30 day rolling average emissions daily.
[GRAPHIC] [TIFF OMITTED] TR06AP16.003
Where:
Heri = hourly emission rate (e.g., lb/MMBtu, lb/MWh) from
unit i's CEMS for the preceding 30-group boiler operating days,
Rmi = hourly heat input or gross output from unit i for the
preceding 30-group boiler operating days,
p = number of EGUs in emissions averaging group that rely on CEMS or
sorbent trap monitoring,
n = number of hours that hourly rates are collected over 30-group boiler
operating days,
Teri = Emissions rate from most recent emissions test of unit
i in terms of lb/heat input or lb/gross output,
Rti = Total heat input or gross output of unit i for the
preceding 30-boiler operating days, and
m = number of EGUs in emissions averaging group that rely on emissions
testing.
[GRAPHIC] [TIFF OMITTED] TR06AP16.004
Where:
variables with similar names share the descriptions for Equation 2a of
this section,
Smi = steam generation in units of pounds from unit i that
uses CEMS for the preceding 30-group boiler operating days,
Cfmi = conversion factor, calculated from the most recent
compliance test results, in units of heat input per pound of
steam generated or gross output per pound of steam generated,
from unit i that uses CEMS from the preceding 30 group boiler
operating days,
Sti = steam generation in units of pounds from unit i that
uses emissions testing, and
Cfti = conversion factor, calculated from the most recent
compliance test results, in units of heat input per pound of
steam generated or gross output per pound of steam generated,
from unit i that uses emissions testing.
(3) Weighted 90-boiler operating day rolling average emissions rate
equations for Hg emissions from EGUs in the ``coal-fired unit not low
rank virgin coal'' subcategory. Use Equation 3a or 3b of this section to
calculate the 90-day rolling average emissions daily.
[GRAPHIC] [TIFF OMITTED] TR06AP16.005
Where:
Heri = hourly emission rate from unit i's CEMS or Hg sorbent
trap monitoring
[[Page 177]]
system for the preceding 90-group boiler operating days,
Rmi = hourly heat input or gross output from unit i for the
preceding 90-group boiler operating days,
p = number of EGUs in emissions averaging group that rely on CEMS,
n = number of hours that hourly rates are collected over the 90-group
boiler operating days,
Teri = Emissions rate from most recent emissions test of unit
i in terms of lb/heat input or lb/gross output,
Rti = Total heat input or gross output of unit i for the
preceding 90-boiler operating days, and
m = number of EGUs in emissions averaging group that rely on emissions
testing.
[GRAPHIC] [TIFF OMITTED] TR06AP16.006
Where:
variables with similar names share the descriptions for Equation 2a of
this section,
Smi = steam generation in units of pounds from unit i that
uses CEMS or a Hg sorbent trap monitoring for the preceding
90-group boiler operating days,
Cfmi = conversion factor, calculated from the most recent
compliance test results, in units of heat input per pound of
steam generated or gross output per pound of steam generated,
from unit i that uses CEMS or sorbent trap monitoring from the
preceding 90-group boiler operating days,
Sti = steam generation in units of pounds from unit i that
uses emissions testing, and
Cfti = conversion factor, calculated from the most recent
emissions test results, in units of heat input per pound of
steam generated or gross output per pound of steam generated,
from unit i that uses emissions testing.
(c) Separate stack requirements. For a group of two or more existing
EGUs in the same subcategory that each vent to a separate stack, you may
average filterable PM, SO2, HF, HCl, non-Hg HAP metals, or Hg
emissions to demonstrate compliance with the limits in Table 2 to this
subpart if you satisfy the requirements in paragraphs (d) through (j) of
this section.
(d) For each existing EGU in the averaging group:
(1) The emissions rate achieved during the initial performance test
for the HAP being averaged must not exceed the emissions level that was
being achieved 180 days after April 16, 2015, or the date on which
emissions testing done to support your emissions averaging plan is
complete (if the Administrator does not require submission and approval
of your emissions averaging plan), or the date that you begin emissions
averaging, whichever is earlier; or
(2) The control technology employed during the initial performance
test must not be less than the design efficiency of the emissions
control technology employed 180 days after April 16, 2015 or the date
that you begin emissions averaging, whichever is earlier.
(e) The weighted-average emissions rate from the existing EGUs
participating in the emissions averaging option must be in compliance
with the limits in Table 2 to this subpart at all times following the
date that you begin emissions averaging.
(f) Emissions averaging group eligibility demonstration. You must
demonstrate the ability for the EGUs included in the emissions averaging
group to demonstrate initial compliance according to paragraph (f)(1) or
(2) of this section using the maximum rated heat input or gross output
over a 30- (or 90-) boiler operating day period of each EGU and the
results of the initial performance tests. For this demonstration and
prior to preparing your emissions averaging plan, you must conduct
required emissions monitoring for 30- (or 90-) days of boiler operation
and any required manual performance testing to calculate maximum
weighted average emissions rate in accordance with this section. If,
before the start of your initial compliance demonstration, the
Administrator becomes aware that you intend to use emissions averaging
for that demonstration, or if your initial Notification of Compliance
[[Page 178]]
Status (NOCS) indicates that you intend to implement emissions averaging
at a future date, the Administrator may require you to submit your
proposed emissions averaging plan and supporting data for approval. If
the Administrator requires approval of your plan, you may not begin
using emissions averaging until the Administrator approves your plan.
(1) You must use Equation 1a in paragraph (b) of this section to
demonstrate that the maximum weighted average emissions rates of
filterable PM, HF, SO2, HCl, non-Hg HAP metals, or Hg
emissions from the existing units participating in the emissions
averaging option do not exceed the emissions limits in Table 2 to this
subpart.
(2) If you are not capable of monitoring heat input or gross output,
and the EGU generates steam for purposes other than generating
electricity, you may use Equation 1b of paragraph (b) of this section as
an alternative to using Equation 1a of paragraph (b) of this section to
demonstrate that the maximum weighted average emissions rates of
filterable PM, HF, SO2, HCl, non-Hg HAP metals, or Hg
emissions from the existing units participating in the emissions
averaging group do not exceed the emission limits in Table 2 to this
subpart.
(g) You must determine the weighted average emissions rate in units
of the applicable emissions limit on a 30 group boiler operating day
rolling average basis (or, if applicable, on a 90 group boiler operating
day rolling average basis for Hg) according to paragraphs (g)(1) and (2)
of this section. The first averaging period ends on the 30th (or, if
applicable, 90th for the alternate Hg emission limit) group boiler
operating day after the date that you begin emissions averaging.
(1) You must use Equation 2a or 3a of paragraph (b) of this section
to calculate the weighted average emissions rate using the actual heat
input or gross output for each existing unit participating in the
emissions averaging option.
(2) If you are not capable of monitoring heat input or gross output,
you may use Equation 2b or 3b of paragraph (b) of this section as an
alternative to using Equation 2a of paragraph (b) of this section to
calculate the average weighted emission rate using the actual steam
generation from the units participating in the emissions averaging
option.
(h) CEMS (or sorbent trap monitoring) use. If an EGU in your
emissions averaging group uses CEMS (or a sorbent trap monitor for Hg
emissions) to demonstrate compliance, you must use those data to
determine the 30 (or 90) group boiler operating day rolling average
emissions rate.
(i) Emissions testing. If you use manual emissions testing to
demonstrate compliance for one or more EGUs in your emissions averaging
group, you must use the results from the most recent performance test to
determine the 30 (or 90) day rolling average. You may use CEMS or
sorbent trap data in combination with data from the most recent manual
performance test in calculating the 30 (or 90) group boiler operating
day rolling average emissions rate.
(j) Emissions averaging plan. You must develop an implementation
plan for emissions averaging according to the following procedures and
requirements in paragraphs (j)(1) and (2) of this section.
(1) You must include the information contained in paragraphs
(j)(1)(i) through (v) of this section in your implementation plan for
all the emissions units included in an emissions averaging:
(i) The identification of all existing EGUs in the emissions
averaging group, including for each either the applicable HAP emission
level or the control technology installed as of 180 days after February
16, 2015, or the date on which you complete the emissions measurements
used to support your emissions averaging plan (if the Administrator does
not require submission and approval of your emissions averaging plan),
or the date that you begin emissions averaging, whichever is earlier;
and the date on which you are requesting emissions averaging to
commence;
(ii) The process weighting parameter (heat input, gross output, or
steam generated) that will be monitored for each averaging group;
[[Page 179]]
(iii) The specific control technology or pollution prevention
measure to be used for each emission EGU in the averaging group and the
date of its installation or application. If the pollution prevention
measure reduces or eliminates emissions from multiple EGUs, you must
identify each EGU;
(iv) The means of measurement (e.g., CEMS, sorbent trap monitoring,
manual performance test) of filterable PM, SO2, HF, HCl,
individual or total non-Hg HAP metals, or Hg emissions in accordance
with the requirements in Sec. 63.10007 and to be used in the emissions
averaging calculations; and
(v) A demonstration that emissions averaging can produce compliance
with each of the applicable emission limit(s) in accordance with
paragraph (b)(1) of this section.
(2) If, as described in paragraph (f) of this section, the
Administrator requests you to submit the averaging plan for review and
approval, you must receive approval before initiating emissions
averaging.
(i) The Administrator shall use following criteria in reviewing and
approving or disapproving the plan:
(A) Whether the content of the plan includes all of the information
specified in paragraph (j)(1) of this section; and
(B) Whether the plan presents information sufficient to determine
that compliance will be achieved and maintained.
(ii) The Administrator shall not approve an emissions averaging
implementation plan containing any of the following provisions:
(A) Any averaging between emissions of different pollutants or
between units located at different facilities; or
(B) The inclusion of any emissions unit other than an existing unit
in the same subcategory.
(k) Common stack requirements. For a group of two or more existing
affected units, each of which vents through a single common stack, you
may average emissions to demonstrate compliance with the limits in Table
2 to this subpart if you satisfy the requirements in paragraph (l) or
(m) of this section.
(l) For a group of two or more existing units in the same
subcategory and which vent through a common emissions control system to
a common stack that does not receive emissions from units in other
subcategories or categories, you may treat such averaging group as a
single existing unit for purposes of this subpart and comply with the
requirements of this subpart as if the group were a single unit.
(m) For all other groups of units subject to paragraph (k) of this
section, you may elect to conduct manual performance tests according to
procedures specified in Sec. 63.10007 in the common stack. If emissions
from affected units included in the emissions averaging and from other
units not included in the emissions averaging (e.g., in a different
subcategory) or other nonaffected units all vent to the common stack,
you must shut down the units not included in the emissions averaging and
the nonaffected units or vent their emissions to a different stack
during the performance test. Alternatively, you may conduct a
performance test of the combined emissions in the common stack with all
units operating and show that the combined emissions meet the most
stringent emissions limit. You may also use a CEMS or sorbent trap
monitoring to apply this latter alternative to demonstrate that the
combined emissions comply with the most stringent emissions limit on a
continuous basis.
(n) Combination requirements. The common stack of a group of two or
more existing EGUs in the same subcategory subject to paragraph (k) of
this section may be treated as a single stack for purposes of paragraph
(c) of this section and included in an emissions averaging group subject
to paragraph (c) of this section.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23403, Apr. 19, 2012; 78
FR 24085, Apr. 24, 2013; 81 FR 20183, Apr. 6, 2016]
Sec. 63.10010 What are my monitoring, installation, operation,
and maintenance requirements?
(a) Flue gases from the affected units under this subpart exhaust to
the atmosphere through a variety of different configurations, including
but not limited to individual stacks, a common stack configuration or a
main stack plus a bypass stack. For the CEMS, PM CPMS, and sorbent trap
monitoring
[[Page 180]]
systems used to provide data under this subpart, the continuous
monitoring system installation requirements for these exhaust
configurations are as follows:
(1) Single unit-single stack configurations. For an affected unit
that exhausts to the atmosphere through a single, dedicated stack, you
shall either install the required CEMS, PM CPMS, and sorbent trap
monitoring systems in the stack or at a location in the ductwork
downstream of all emissions control devices, where the pollutant and
diluents concentrations are representative of the emissions that exit to
the atmosphere.
(2) Unit utilizing common stack with other affected unit(s). When an
affected unit utilizes a common stack with one or more other affected
units, but no non-affected units, you shall either:
(i) Install the required CEMS, PM CPMS, and sorbent trap monitoring
systems in the duct leading to the common stack from each unit; or
(ii) Install the required CEMS, PM CPMS, and sorbent trap monitoring
systems in the common stack.
(3) Unit(s) utilizing common stack with non-affected unit(s). (i)
When one or more affected units shares a common stack with one or more
non-affected units, you shall either:
(A) Install the required CEMS, PM CPMS, and sorbent trap monitoring
systems in the ducts leading to the common stack from each affected
unit; or
(B) Install the required CEMS, PM CPMS, and sorbent trap monitoring
systems described in this section in the common stack and attribute all
of the emissions measured at the common stack to the affected unit(s).
(ii) If you choose the common stack monitoring option:
(A) For each hour in which valid data are obtained for all
parameters, you must calculate the pollutant emission rate and
(B) You must assign the calculated pollutant emission rate to each
unit that shares the common stack.
(4) Unit with a main stack and a bypass stack that exhausts to the
atmosphere independent of the main stack. If the exhaust configuration
of an affected unit consists of a main stack and a bypass stack, you
shall install CEMS on both the main stack and the bypass stack. If it is
not feasible to certify and quality-assure the data from a monitoring
system on the bypass stack, you shall:
(i) Route the exhaust from the bypass through the main stack and its
monitoring so that bypass emissions are measured; or
(ii) Install a CEMS only on the main stack and count hours that the
bypass stack is in use as hours of deviation from the monitoring
requirements.
(5) Unit with a common control device with multiple stack or duct
configuration. If the flue gases from an affected unit, which is
configured such that emissions are controlled with a common control
device or series of control devices, are discharged to the atmosphere
through more than one stack or are fed into a single stack through two
or more ducts, you may:
(i) Install required CEMS, PM CPMS, and sorbent trap monitoring
systems in each of the multiple stacks;
(ii) Install required CEMS, PM CPMS, and sorbent trap monitoring
systems in each of the ducts that feed into the stack;
(iii) Install required CEMS, PM CPMS, and sorbent trap monitoring
systems in one of the multiple stacks or ducts and monitor the flows and
dilution rates in all multiple stacks or ducts in order to determine
total exhaust gas flow rate and pollutant mass emissions rate in
accordance with the applicable limit; or
(iv) In the case of multiple ducts feeding into a single stack,
install CEMS, PM CPMS, and sorbent trap monitoring systems in the single
stack as described in paragraph (a)(1) of this section.
(6) Unit with multiple parallel control devices with multiple
stacks. If the flue gases from an affected unit, which is configured
such that emissions are controlled with multiple parallel control
devices or multiple series of control devices are discharged to the
atmosphere through more than one stack, you shall install the required
CEMS, PM CPMS, and sorbent trap monitoring systems described in each of
the multiple stacks. You shall calculate hourly flow-weighted average
pollutant emission rates for the unit as follows:
[[Page 181]]
(i) Calculate the pollutant emission rate at each stack or duct for
each hour in which valid data are obtained for all parameters;
(ii) Multiply each calculated hourly pollutant emission rate at each
stack or duct by the corresponding hourly stack gas flow rate at that
stack or duct;
(iii) Sum the products determined under paragraph (a)(6)(ii) of this
section; and
(iv) Divide the result obtained in paragraph (a)(6)(iii) of this
section by the total hourly stack gas flow rate for the unit, summed
across all of the stacks or ducts.
(b) If you use an oxygen (O2) or carbon dioxide
(CO2) CEMS to convert measured pollutant concentrations to
the units of the applicable emissions limit, the O2 or
CO2 concentrations shall be monitored at a location that
represents emissions to the atmosphere, i.e., at the outlet of the EGU,
downstream of all emission control devices. You must install, certify,
maintain, and operate the CEMS according to part 75 of this chapter. Use
only quality-assured O2 or CO2 data in the
emissions calculations; do not use part 75 substitute data values.
(c) If you are required to use a stack gas flow rate monitor, either
for routine operation of a sorbent trap monitoring system or to convert
pollutant concentrations to units of an electrical output-based emission
standard in Table 1 or 2 to this subpart, you must install, certify,
operate, and maintain the monitoring system and conduct on-going
quality-assurance testing of the system according to part 75 of this
chapter. Use only unadjusted, quality-assured flow rate data in the
emissions calculations. Do not apply bias adjustment factors to the flow
rate data and do not use substitute flow rate data in the calculations.
(d) If you are required to make corrections for stack gas moisture
content when converting pollutant concentrations to the units of an
emission standard in Table 1 of 2 to this subpart, you must install,
certify, operate, and maintain a moisture monitoring system in
accordance with part 75 of this chapter. Alternatively, for coal-fired
units, you may use appropriate fuel-specific default moisture values
from Sec. 75.11(b) of this chapter to estimate the moisture content of
the stack gas or you may petition the Administrator under Sec. 75.66 of
this chapter for use of a default moisture value for non-coal-fired
units. If you install and operate a moisture monitoring system, do not
use substitute moisture data in the emissions calculations.
(e) If you use an HCl and/or HF CEMS, you must install, certify,
operate, maintain, and quality-assure the data from the monitoring
system in accordance with appendix B to this subpart. Calculate and
record a 30-boiler operating day rolling average HCl or HF emission rate
in the units of the standard, updated after each new boiler operating
day. Each 30-boiler operating day rolling average emission rate is the
average of all the valid hourly HCl or HF emission rates in the
preceding 30 boiler operating days (see section 9.4 of appendix B to
this subpart).
(f)(1) If you use an SO2 CEMS, you must install the
monitor at the outlet of the EGU, downstream of all emission control
devices, and you must certify, operate, and maintain the CEMS according
to part 75 of this chapter.
(2) For on-going QA, the SO2 CEMS must meet the
applicable daily, quarterly, and semiannual or annual requirements in
sections 2.1 through 2.3 of appendix B to part 75 of this chapter, with
the following addition: You must perform the linearity checks required
in section 2.2 of appendix B to part 75 of this chapter if the
SO2 CEMS has a span value of 30 ppm or less.
(3) Calculate and record a 30-boiler operating day rolling average
SO2 emission rate in the units of the standard, updated after
each new boiler operating day. Each 30-boiler operating day rolling
average emission rate is the average of all of the valid hourly
SO2 emission rates in the 30 boiler operating day period.
(4) Use only unadjusted, quality-assured SO2
concentration values in the emissions calculations; do not apply bias
adjustment factors to the part 75 SO2 data and do not use
part 75 substitute data values. For startup or shutdown hours (as
defined in Sec. 63.10042) the default gross output and the diluent cap
are available for use in the
[[Page 182]]
hourly SO2 emission rate calculations, as described in Sec.
63.10007(f). Use a flag to identify each startup or shutdown hour and
report a special code if the diluent cap or default gross output is used
to calculate the SO2 emission rate for any of these hours.
(g) If you use a Hg CEMS or a sorbent trap monitoring system, you
must install, certify, operate, maintain and quality-assure the data
from the monitoring system in accordance with appendix A to this
subpart. You must calculate and record a 30- (or, if alternate emissions
averaging is used, 90-) boiler operating day rolling average Hg emission
rate, in units of the standard, updated after each new boiler operating
day. Each 30- (or, if alternate emissions averaging is used, 90-) boiler
operating day rolling average emission rate, calculated according to
section 6.2 of appendix A to the subpart, is the average of all of the
valid hourly Hg emission rates in the preceding 30- (or, if alternate
emissions averaging is used, a 90-) boiler operating days. Section
7.1.4.3 of appendix A to this subpart explains how to reduce sorbent
trap monitoring system data to an hourly basis.
(h) If you use a PM CPMS to demonstrate continuous compliance with
an operating limit, you must install, calibrate, maintain, and operate
the PM CPMS and record the output of the system as specified in
paragraphs (h)(1) through (5) of this section.
(1) Install, calibrate, operate, and maintain your PM CPMS according
to the procedures in your approved site-specific monitoring plan
developed in accordance with Sec. 63.10000(d), and meet the
requirements in paragraphs (h)(1)(i) through (iii) of this section.
(i) The operating principle of the PM CPMS must be based on in-stack
or extractive light scatter, light scintillation, beta attenuation, or
mass accumulation detection of the exhaust gas or representative sample.
The reportable measurement output from the PM CPMS may be expressed as
milliamps, stack concentration, or other raw data signal.
(ii) The PM CPMS must have a cycle time (i.e., period required to
complete sampling, measurement, and reporting for each measurement) no
longer than 60 minutes.
(iii) The PM CPMS must be capable, at a minimum, of detecting and
responding to particulate matter concentrations of 0.5 mg/acm.
(2) For a new unit, complete the initial PM CPMS performance
evaluation no later than October 13, 2012 or 180 days after the date of
initial startup, whichever is later. For an existing unit, complete the
initial performance evaluation no later than October 13, 2015.
(3) Collect PM CPMS hourly average output data for all boiler
operating hours except as indicated in paragraph (h)(5) of this section.
Express the PM CPMS output as milliamps, PM concentration, or other raw
data signal value.
(4) Calculate the arithmetic 30-boiler operating day rolling average
of all of the hourly average PM CPMS output collected during all
nonexempt boiler operating hours data (e.g., milliamps, PM
concentration, raw data signal).
(5) You must collect data using the PM CPMS at all times the process
unit is operating and at the intervals specified in paragraph (h)(1)(ii)
of this section, except for periods of monitoring system malfunctions,
repairs associated with monitoring system malfunctions, required
monitoring system quality assurance or quality control activities
(including, as applicable, calibration checks and required zero and span
adjustments), and any scheduled maintenance as defined in your site-
specific monitoring plan.
(6) You must use all the data collected during all boiler operating
hours in assessing the compliance with your operating limit except:
(i) Any data collected during periods of monitoring system
malfunctions, repairs associated with monitoring system malfunctions, or
required monitoring system quality assurance or quality control
activities that temporarily interrupt the measurement of output data
from the PM CPMS. You must report any monitoring system malfunctions or
out of control periods in your annual deviation reports. You must report
any monitoring system quality assurance or quality control activities
per the requirements of Sec. 63.10031(b);
[[Page 183]]
(ii) Any data collected during periods when the monitoring system is
out of control as specified in your site-specific monitoring plan,
repairs associated with periods when the monitoring system is out of
control, or required monitoring system quality assurance or quality
control activities conducted during out-of-control periods. You must
report any such periods in your annual deviation report;
(iii) Any data recorded during periods of startup or shutdown.
(7) You must record and make available upon request results of PM
CPMS system performance audits, as well as the dates and duration of
periods from when the PM CPMS is out of control until completion of the
corrective actions necessary to return the PM CPMS to operation
consistent with your site-specific monitoring plan.
(i) If you choose to comply with the PM filterable emissions limit
in lieu of metal HAP limits, you may choose to install, certify,
operate, and maintain a PM CEMS and record the output of the PM CEMS as
specified in paragraphs (i)(1) through (5) of this section. The
compliance limit will be expressed as a 30-boiler operating day rolling
average of the numerical emissions limit value applicable for your unit
in tables 1 or 2 to this subpart.
(1) Install and certify your PM CEMS according to the procedures and
requirements in Performance Specification 11--Specifications and Test
Procedures for Particulate Matter Continuous Emission Monitoring Systems
at Stationary Sources in Appendix B to part 60 of this chapter, using
Method 5 at Appendix A-3 to part 60 of this chapter and ensuring that
the front half filter temperature shall be 160[deg] 14 [deg]C (320[deg] 25 [deg]F).
The reportable measurement output from the PM CEMS must be expressed in
units of the applicable emissions limit (e.g., lb/MMBtu, lb/MWh).
(2) Operate and maintain your PM CEMS according to the procedures
and requirements in Procedure 2--Quality Assurance Requirements for
Particulate Matter Continuous Emission Monitoring Systems at Stationary
Sources in Appendix F to part 60 of this chapter.
(i) You must conduct the relative response audit (RRA) for your PM
CEMS at least once annually.
(ii) You must conduct the relative correlation audit (RCA) for your
PM CEMS at least once every 3 years.
(3) Collect PM CEMS hourly average output data for all boiler
operating hours except as indicated in paragraph (i) of this section.
(4) Calculate the arithmetic 30-boiler operating day rolling average
of all of the hourly average PM CEMS output data collected during all
nonexempt boiler operating hours.
(5) You must collect data using the PM CEMS at all times the process
unit is operating and at the intervals specified in paragraph (a) of
this section, except for periods of monitoring system malfunctions,
repairs associated with monitoring system malfunctions, and required
monitoring system quality assurance or quality control activities.
(i) You must use all the data collected during all boiler operating
hours in assessing the compliance with your operating limit except:
(A) Any data collected during periods of monitoring system
malfunctions, repairs associated with monitoring system malfunctions, or
required monitoring system quality assurance or quality control
activities that temporarily interrupt the measurement of emissions
(e.g., calibrations, certain audits). You must report any monitoring
system malfunctions or out of control periods in your annual deviation
reports. You must report any monitoring system quality assurance or
quality control activities per the requirements of Sec. 63.10031(b);
(B) Any data collected during periods when the monitoring system is
out of control as specified in your site-specific monitoring plan,
repairs associated with periods when the monitoring system is out of
control, or required monitoring system quality assurance or quality
control activities conducted during out-of-control periods. You must
report any such periods in your annual deviation report;
(C) Any data recorded during periods of startup or shutdown.
(ii) You must record and make available upon request results of PM
CEMS system performance audits, dates and
[[Page 184]]
duration of periods when the PM CEMS is out of control to completion of
the corrective actions necessary to return the PM CEMS to operation
consistent with your site-specific monitoring plan.
(j) You may choose to comply with the metal HAP emissions limits
using CEMS approved in accordance with Sec. 63.7(f) as an alternative
to the performance test method specified in this rule. If approved to
use a HAP metals CEMS, the compliance limit will be expressed as a 30-
boiler operating day rolling average of the numerical emissions limit
value applicable for your unit in tables 1 or 2. If approved, you may
choose to install, certify, operate, and maintain a HAP metals CEMS and
record the output of the HAP metals CEMS as specified in paragraphs
(j)(1) through (5) of this section.
(1)(i) Install, calibrate, operate, and maintain your HAP metals
CEMS according to your CMS quality control program, as described in
Sec. 63.8(d)(2). The reportable measurement output from the HAP metals
CEMS must be expressed in units of the applicable emissions limit (e.g.,
lb/MMBtu, lb/MWh) and in the form of a 30-boiler operating day rolling
average.
(ii) Operate and maintain your HAP metals CEMS according to the
procedures and criteria in your site specific performance evaluation and
quality control program plan required in Sec. 63.8(d).
(2) Collect HAP metals CEMS hourly average output data for all
boiler operating hours except as indicated in section (j)(4) of this
section.
(3) Calculate the arithmetic 30-boiler operating day rolling average
of all of the hourly average HAP metals CEMS output data collected
during all nonexempt boiler operating hours data.
(4) You must collect data using the HAP metals CEMS at all times the
process unit is operating and at the intervals specified in paragraph
(a) of this section, except for periods of monitoring system
malfunctions, repairs associated with monitoring system malfunctions,
and required monitoring system quality assurance or quality control
activities.
(i) You must use all the data collected during all boiler operating
hours in assessing the compliance with your emission limit except:
(A) Any data collected during periods of monitoring system
malfunctions, repairs associated with monitoring system malfunctions, or
required monitoring system quality assurance or quality control
activities that temporarily interrupt the measurement of emissions
(e.g., calibrations, certain audits). You must report any monitoring
system malfunctions or out of control periods in your annual deviation
reports. You must report any monitoring system quality assurance or
quality control activities per the requirements of Sec. 63.10031(b);
(B) Any data collected during periods when the monitoring system is
out of control as specified in your site-specific monitoring plan,
repairs associated with periods when the monitoring system is out of
control, or required monitoring system quality assurance or quality
control activities conducted during out-of-control periods. You must
report any monitoring system malfunctions or out of control periods in
your annual deviation reports. You must report any monitoring system
quality assurance or quality control activities per the requirements of
Sec. 63.10031(b);
(C) Any data recorded during periods of startup or shutdown.
(ii) You must record and make available upon request results of HAP
metals CEMS system performance audits, dates and duration of periods
when the HAP metals CEMS is out of control to completion of the
corrective actions necessary to return the HAP metals CEMS to operation
consistent with your site-specific performance evaluation and quality
control program plan.
(k) If you demonstrate compliance with the HCl and HF emission
limits for a liquid oil-fired EGU by conducting quarterly testing, you
must also develop a site-specific monitoring plan as provided for in
Sec. 63.10000(c)(2)(iii) and Table 7 to this subpart.
(l) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, you must install, verify,
operate, maintain, and quality assure each monitoring system
[[Page 185]]
necessary for demonstrating compliance with the PM or non-mercury metals
work practice standards required to comply with Sec. 63.10020(e).
(1) You shall develop a site-specific monitoring plan for PM or non-
mercury metals work practice monitoring during startup periods.
(2) You shall submit the site-specific monitoring plan upon request
by the Administrator.
(3) The provisions of the monitoring plan must address the following
items:
(i) Monitoring system installation;
(ii) Performance and equipment specifications;
(iii) Schedule for initial and periodic performance evaluations;
(iv) Performance evaluation procedures and acceptance criteria;
(v) On-going operation and maintenance procedures; and
(vi) On-going recordkeeping and reporting procedures.
(4) You may rely on monitoring system specifications or instructions
or manufacturer's specifications to address paragraphs (l)(3)(i) through
(vi) of this section.
(5) You must operate and maintain the monitoring system according to
the site-specific monitoring plan.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23404, Apr. 19, 2012; 78
FR 24086, Apr. 24, 2013; 79 FR 68789, Nov. 19, 2014; 81 FR 20185, Apr.
6, 2016]
Sec. 63.10011 How do I demonstrate initial compliance with the
emissions limits and work practice standards?
(a) You must demonstrate initial compliance with each emissions
limit that applies to you by conducting performance testing.
(b) If you are subject to an operating limit in Table 4 to this
subpart, you demonstrate initial compliance with HAP metals or
filterable PM emission limit(s) through performance stack tests and you
elect to use a PM CPMS to demonstrate continuous performance, or if, for
a liquid oil-fired EGU, and you use quarterly stack testing for HCl and
HF plus site-specific parameter monitoring to demonstrate continuous
performance, you must also establish a site-specific operating limit, in
accordance with Sec. 63.10007 and Table 6 to this subpart. You may use
only the parametric data recorded during successful performance tests
(i.e., tests that demonstrate compliance with the applicable emissions
limits) to establish an operating limit.
(c)(1) If you use CEMS or sorbent trap monitoring systems to measure
a HAP (e.g., Hg or HCl) directly, the initial performance test, shall
consist of a 30-boiler operating day (or, for certain coal-fired,
existing EGUs that use emissions averaging for Hg, a 90-boiler operating
day) rolling average emissions rate obtained with a certified CEMS or
sorbent trap system, expressed in units of the standard. If the
monitoring system is certified prior to the applicable compliance date,
the initial averaging period shall either begin with: The first boiler
operating day on or after the compliance date; or 30 (or, if applicable,
90) boiler operating days prior to that date, as described in Sec.
63.10005(b). In all cases, the initial 30- or 90-boiler operating day
averaging period must be completed on or before the date that compliance
must be demonstrated, in accordance with Sec. 63.9984(f). Initial
compliance is demonstrated if the results of the performance test meet
the applicable emission limit in Table 1 or 2 to this subpart.
(2) For an EGU that uses a CEMS to measure SO2 or PM
emissions for initial compliance, the initial performance test shall
consist of a 30-boiler operating day average emission rate obtained with
certified CEMS, expressed in units of the standard. If the monitoring
system is certified prior to the applicable compliance date, the initial
averaging period shall either begin with: The first boiler operating day
on or after the compliance date; or 30 boiler operating days prior to
that date, as described in Sec. 63.10005(b). In all cases, the initial
30- boiler operating day averaging period must be completed on or before
the date that compliance must be demonstrated, in accordance with Sec.
63.9984(f). Initial compliance is demonstrated if the results of the
performance test meet the applicable SO2 or PM emission limit
in Table 1 or 2 to this subpart.
(d) For candidate LEE units, use the results of the performance
testing described in Sec. 63.10005(h) to determine initial compliance
with the applicable
[[Page 186]]
emission limit(s) in Table 1 or 2 to this subpart and to determine
whether the unit qualifies for LEE status.
(e) You must submit a Notification of Compliance Status containing
the results of the initial compliance demonstration, in accordance with
Sec. 63.10030(e).
(f)(1) You must determine the fuel whose combustion produces the
least uncontrolled emissions, i.e., the cleanest fuel, either natural
gas or distillate oil, that is available on site or accessible nearby
for use during periods of startup or shutdown.
(2) Your cleanest fuel, either natural gas or distillate oil, for
use during periods of startup or shutdown determination may take safety
considerations into account.
(g) You must follow the startup or shutdown requirements as
established in Table 3 to this subpart for each coal-fired, liquid oil-
fired, or solid oil-derived fuel-fired EGU.
(1) You may use the diluent cap and default gross output values, as
described in Sec. 63.10007(f), during startup periods or shutdown
periods.
(2) You must operate all CMS, collect data, calculate pollutant
emission rates, and record data during startup periods or shutdown
periods.
(3) You must report the information as required in Sec. 63.10031.
(4) If you choose to use paragraph (2) of the definition of
``startup'' in Sec. 63.10042 and you find that you are unable to safely
engage and operate your particulate matter (PM) control(s) within 1 hour
of first firing of coal, residual oil, or solid oil-derived fuel, you
may choose to rely on paragraph (1) of definition of ``startup'' in
Sec. 63.10042 or you may submit a request to use an alternative non-
opacity emissions standard, as described below.
(i) As mentioned in Sec. 63.6(g)(1), your request will be published
in the Federal Register for notice and comment rulemaking. Until
promulgation in the Federal Register of the final alternative non-
opacity emission standard, you shall comply with paragraph (1) of the
definition of ``startup'' in Sec. 63.10042. You shall not implement the
alternative non-opacity emissions standard until promulgation in the
Federal Register of the final alternative non-opacity emission standard.
(ii) Your request need not address the items contained in Sec.
63.6(g)(2).
(iii) Your request shall provide evidence of a documented
manufacturer-identified safety issue.
(iv) Your request shall provide information to document that the PM
control device is adequately designed and sized to meet the PM emission
limit applicable to the EGU.
(v) In addition, your request shall contain documentation that:
(A) Your EGU is using clean fuels to the maximum extent possible,
taking into account considerations such as not compromising boiler or
control device integrity, to bring your EGU and PM control device up to
the temperature necessary to alleviate or prevent the identified safety
issues prior to the combustion of primary fuel in your EGU;
(B) You have followed explicitly your EGU manufacturer's procedures
to alleviate or prevent the identified safety issue; and
(C) You have identified with specificity the details of your EGU
manufacturer's statement of concern.
(vi) Your request shall specify the other work practice standards
you will take to limit HAP emissions during startup periods and shutdown
periods to ensure a control level consistent with the work practice
standards of the final rule.
(vii) You must comply with all other work practice requirements,
including but not limited to data collection, recordkeeping, and
reporting requirements.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23404, Apr. 19, 2012; 79
FR 68790, Nov. 19, 2014; 81 FR 20186, Apr. 6, 2016]
Continuous Compliance Requirements
Sec. 63.10020 How do I monitor and collect data to demonstrate
continuous compliance?
(a) You must monitor and collect data according to this section and
the site-specific monitoring plan required by Sec. 63.10000(d).
(b) You must operate the monitoring system and collect data at all
required intervals at all times that the affected
[[Page 187]]
EGU is operating, except for periods of monitoring system malfunctions
or out-of-control periods (see Sec. 63.8(c)(7) of this part), and
required monitoring system quality assurance or quality control
activities, including, as applicable, calibration checks and required
zero and span adjustments. You are required to affect monitoring system
repairs in response to monitoring system malfunctions and to return the
monitoring system to operation as expeditiously as practicable.
(c) You may not use data recorded during EGU startup or shutdown in
calculations used to report emissions, except as otherwise provided in
Sec. Sec. 63.10000(c)(1)(vi)(B) and 63.10005(a)(2)(iii). In addition,
data recorded during monitoring system malfunctions or monitoring system
out-of-control periods, repairs associated with monitoring system
malfunctions or monitoring system out-of-control periods, or required
monitoring system quality assurance or control activities may not be
used in calculations used to report emissions or operating levels. You
must use all of the quality-assured data collected during all other
periods in assessing the operation of the control device and associated
control system.
(d) Except for periods of monitoring system malfunctions or
monitoring system out-of-control periods, repairs associated with
monitoring system malfunctions or monitoring system out-of-control
periods, and required monitoring system quality assurance or quality
control activities including, as applicable, calibration checks and
required zero and span adjustments), failure to collect required data is
a deviation from the monitoring requirements.
(e) Additional requirements during startup periods or shutdown
periods if you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU.
(1) During each period of startup, you must record for each EGU:
(i) The date and time that clean fuels being combusted for the
purpose of startup begins;
(ii) The quantity and heat input of clean fuel for each hour of
startup;
(iii) The gross output for each hour of startup;
(iv) The date and time that non-clean fuel combustion begins; and
(v) The date and time that clean fuels being combusted for the
purpose of startup ends.
(2) During each period of shutdown, you must record for each EGU:
(i) The date and time that clean fuels being combusted for the
purpose of shutdown begins;
(ii) The quantity and heat input of clean fuel for each hour of
shutdown;
(iii) The gross output for each hour of shutdown;
(iv) The date and time that non-clean fuel combustion ends; and
(v) The date and time that clean fuels being combusted for the
purpose of shutdown ends.
(3) For PM or non-mercury HAP metals work practice monitoring during
startup periods, you must monitor and collect data according to this
section and the site-specific monitoring plan required by Sec.
63.10010(l).
(i) Except for an EGU that uses PM CEMS or PM CPMS to demonstrate
compliance with the PM emissions limit, or that has LEE status for
filterable PM or total non-Hg HAP metals for non- liquid oil-fired EGUs
(or HAP metals emissions for liquid oil-fired EGUs), or individual non-
mercury metals CEMS, you must:
(A) Record temperature and combustion air flow or calculated flow as
determined from combustion equations of post-combustion (exhaust) gas,
as well as amperage of forced draft fan(s), upstream of the filterable
PM control devices during each hour of startup.
(B) Record temperature and flow of exhaust gas, as well as amperage
of any induced draft fan(s), downstream of the filterable PM control
devices during each hour of startup.
(C) For an EGU with an electrostatic precipitator, record the number
of fields in service, as well as each field's secondary voltage and
secondary current during each hour of startup.
(D) For an EGU with a fabric filter, record the number of
compartments in service, as well as the differential pressure across the
baghouse during each hour of startup.
[[Page 188]]
(E) For an EGU with a wet scrubber needed for filterable PM control,
record the scrubber liquid to flue gas ratio and the pressure drop
across the scrubber during each hour of startup.
(ii) [Reserved]
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23404, Apr. 19, 2012; 79
FR 68790, Nov. 19, 2014; 81 FR 20187, Apr. 6, 2016]
Sec. 63.10021 How do I demonstrate continuous compliance with the
emission limitations, operating limits, and work practice standards?
(a) You must demonstrate continuous compliance with each emissions
limit, operating limit, and work practice standard in Tables 1 through 4
to this subpart that applies to you, according to the monitoring
specified in Tables 6 and 7 to this subpart and paragraphs (b) through
(g) of this section.
(b) Except as otherwise provided in Sec. 63.10020(c), if you use a
CEMS to measure SO2, PM, HCl, HF, or Hg emissions, or using a
sorbent trap monitoring system to measure Hg emissions, you must
demonstrate continuous compliance by using all quality-assured hourly
data recorded by the CEMS (or sorbent trap monitoring system) and the
other required monitoring systems (e.g., flow rate, CO2,
O2, or moisture systems) to calculate the arithmetic average
emissions rate in units of the standard on a continuous 30-boiler
operating day (or, if alternate emissions averaging is used for Hg, 90-
boiler operating day) rolling average basis, updated at the end of each
new boiler operating day. Use Equation 8 to determine the 30- (or, if
applicable, 90-) boiler operating day rolling average.
[GRAPHIC] [TIFF OMITTED] TR19AP12.002
Where:
Heri is the hourly emissions rate for hour i and n is the
number of hourly emissions rate values collected over 30- (or,
if applicable, 90-) boiler operating days.
(c) If you use a PM CPMS data to measure compliance with an
operating limit in Table 4 to this subpart, you must record the PM CPMS
output data for all periods when the process is operating and the PM
CPMS is not out-of-control. You must demonstrate continuous compliance
by using all quality-assured hourly average data collected by the PM
CPMS for all operating hours to calculate the arithmetic average
operating parameter in units of the operating limit (e.g., milliamps, PM
concentration, raw data signal) on a 30 operating day rolling average
basis, updated at the end of each new boiler operating day. Use Equation
9 to determine the 30 boiler operating day average.
[GRAPHIC] [TIFF OMITTED] TR16FE12.010
Where:
Hpvi is the hourly parameter value for hour i and n is the
number of valid hourly parameter values collected over 30
boiler operating days.
(1) For any exceedance of the 30-boiler operating day PM CPMS
average value from the established operating parameter limit for an EGU
subject to the emissions limits in Table 1 to this subpart, you must:
(i) Within 48 hours of the exceedance, visually inspect the air
pollution control device (APCD);
(ii) If the inspection of the APCD identifies the cause of the
exceedance,
[[Page 189]]
take corrective action as soon as possible, and return the PM CPMS
measurement to within the established value; and
(iii) Within 45 days of the exceedance or at the time of the annual
compliance test, whichever comes first, conduct a PM emissions
compliance test to determine compliance with the PM emissions limit and
to verify or re-establish the CPMS operating limit. You are not required
to conduct any additional testing for any exceedances that occur between
the time of the original exceedance and the PM emissions compliance test
required under this paragraph.
(2) PM CPMS exceedances of the operating limit for an EGU subject to
the emissions limits in Table 1 of this subpart leading to more than
four required performance tests in a 12-month period (rolling monthly)
constitute a separate violation of this subpart.
(d) If you use quarterly performance testing to demonstrate
compliance with one or more applicable emissions limits in Table 1 or 2
to this subpart, you
(1) May skip performance testing in those quarters during which less
than 168 boiler operating hours occur, except that a performance test
must be conducted at least once every calendar year.
(2) Must conduct the performance test as defined in Table 5 to this
subpart and calculate the results of the testing in units of the
applicable emissions standard; and
(3) Must conduct site-specific monitoring using CMS to demonstrate
compliance with the site-specific monitoring requirements in Table 7 to
this subpart pertaining to HCl and HF emissions from a liquid oil-fired
EGU to ensure compliance with the HCl and HF emission limits in Tables 1
and 2 to this subpart, in accordance with the requirements of Sec.
63.10000(c)(2)(iii). The monitoring must meet the general operating
requirements provided in Sec. 63.10020.
(e) Conduct periodic performance tune-ups of your EGU(s), as
specified in paragraphs (e)(1) through (9) of this section. For your
first tune-up, you may perform the burner inspection any time prior to
the tune-up or you may delay the first burner inspection until the next
scheduled EGU outage provided you meet the requirements of Sec.
63.10005. Subsequently, you must perform an inspection of the burner at
least once every 36 calendar months unless your EGU employs neural
network combustion optimization during normal operations in which case
you must perform an inspection of the burner and combustion controls at
least once every 48 calendar months. If your EGU is offline when a
deadline to perform the tune-up passes, you shall perform the tune-up
work practice requirements within 30 days after the re-start of the
affected unit.
(1) As applicable, inspect the burner and combustion controls, and
clean or replace any components of the burner or combustion controls as
necessary upon initiation of the work practice program and at least once
every required inspection period. Repair of a burner or combustion
control component requiring special order parts may be scheduled as
follows:
(i) Burner or combustion control component parts needing replacement
that affect the ability to optimize NOX and CO must be
installed within 3 calendar months after the burner inspection,
(ii) Burner or combustion control component parts that do not affect
the ability to optimize NOX and CO may be installed on a
schedule determined by the operator;
(2) As applicable, inspect the flame pattern and make any
adjustments to the burner or combustion controls necessary to optimize
the flame pattern. The adjustment should be consistent with the
manufacturer's specifications, if available, or in accordance with best
combustion engineering practice for that burner type;
(3) As applicable, observe the damper operations as a function of
mill and/or cyclone loadings, cyclone and pulverizer coal feeder
loadings, or other pulverizer and coal mill performance parameters,
making adjustments and effecting repair to dampers, controls, mills,
pulverizers, cyclones, and sensors;
(4) As applicable, evaluate windbox pressures and air proportions,
making adjustments and effecting repair to
[[Page 190]]
dampers, actuators, controls, and sensors;
(5) Inspect the system controlling the air-to-fuel ratio and ensure
that it is correctly calibrated and functioning properly. Such
inspection may include calibrating excess O2 probes and/or
sensors, adjusting overfire air systems, changing software parameters,
and calibrating associated actuators and dampers to ensure that the
systems are operated as designed. Any component out of calibration, in
or near failure, or in a state that is likely to negate combustion
optimization efforts prior to the next tune-up, should be corrected or
repaired as necessary;
(6) Optimize combustion to minimize generation of CO and
NOX. This optimization should be consistent with the
manufacturer's specifications, if available, or best combustion
engineering practice for the applicable burner type. NOX
optimization includes burners, overfire air controls, concentric firing
system improvements, neural network or combustion efficiency software,
control systems calibrations, adjusting combustion zone temperature
profiles, and add-on controls such as SCR and SNCR; CO optimization
includes burners, overfire air controls, concentric firing system
improvements, neural network or combustion efficiency software, control
systems calibrations, and adjusting combustion zone temperature
profiles;
(7) While operating at full load or the predominantly operated load,
measure the concentration in the effluent stream of CO and
NOX in ppm, by volume, and oxygen in volume percent, before
and after the tune-up adjustments are made (measurements may be either
on a dry or wet basis, as long as it is the same basis before and after
the adjustments are made). You may use portable CO, NOX and
O2 monitors for this measurement. EGU's employing neural
network optimization systems need only provide a single pre- and post-
tune-up value rather than continual values before and after each
optimization adjustment made by the system;
(8) Maintain on-site and submit, if requested by the Administrator,
an annual report containing the information in paragraphs (e)(1) through
(e)(9) of this section including:
(i) The concentrations of CO and NOX in the effluent
stream in ppm by volume, and oxygen in volume percent, measured before
and after an adjustment of the EGU combustion systems;
(ii) A description of any corrective actions taken as a part of the
combustion adjustment; and
(iii) The type(s) and amount(s) of fuel used over the 12 calendar
months prior to an adjustment, but only if the unit was physically and
legally capable of using more than one type of fuel during that period;
and
(9) Report the dates of the initial and subsequent tune-ups in hard
copy, as specified in Sec. 63.10031(f)(5), through June 30, 2020. On or
after July 1, 2020, report the date of all tune-ups electronically, in
accordance with Sec. 63.10031(f). The tune-up report date is the date
when tune-up requirements in paragraphs (e)(6) and (7) of this section
are completed.
(f) You must submit the reports required under Sec. 63.10031 and,
if applicable, the reports required under appendices A and B to this
subpart. The electronic reports required by appendices A and B to this
subpart must be sent to the Administrator electronically in a format
prescribed by the Administrator, as provided in Sec. 63.10031. CEMS
data (except for PM CEMS and any approved alternative monitoring using a
HAP metals CEMS) shall be submitted using EPA's Emissions Collection and
Monitoring Plan System (ECMPS) Client Tool. Other data, including PM
CEMS data, HAP metals CEMS data, and CEMS performance test detail
reports, shall be submitted in the file format generated through use of
EPA's Electronic Reporting Tool, the Compliance and Emissions Data
Reporting Interface, or alternate electronic file format, all as
provided for under Sec. 63.10031.
(g) You must report each instance in which you did not meet an
applicable emissions limit or operating limit in Tables 1 through 4 to
this subpart or failed to conduct a required tune-up. These instances
are deviations from the requirements of this subpart. These deviations
must be reported according to Sec. 63.10031.
[[Page 191]]
(h) You must follow the startup or shutdown requirements as given in
Table 3 to this subpart for each coal-fired, liquid oil-fired, or solid
oil-derived fuel-fired EGU.
(1) You may use the diluent cap and default gross output values, as
described in Sec. 63.10007(f), during startup periods or shutdown
periods.
(2) You must operate all CMS, collect data, calculate pollutant
emission rates, and record data during startup periods or shutdown
periods.
(3) You must report the information as required in Sec. 63.10031.
(4) You may choose to submit an alternative non-opacity emission
standard, in accordance with the requirements contained in Sec.
63.10011(g)(4). Until promulgation in the Federal Register of the final
alternative non-opacity emission standard, you shall comply with
paragraph (1) of the definition of ``startup'' in Sec. 63.10042.
(i) You must provide reports as specified in Sec. 63.10031
concerning activities and periods of startup and shutdown.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23404, Apr. 19, 2012; 78
FR 24086, Apr. 24, 2013; 79 FR 68791, Nov. 19, 2014; 81 FR 20187, Apr.
6, 2016; 82 FR 16739, Apr. 6, 2017; 83 FR 30883, July 2, 2018]
Sec. 63.10022 How do I demonstrate continuous compliance under
the emissions averaging provision?
(a) Following the compliance date, the owner or operator must
demonstrate compliance with this subpart on a continuous basis by
meeting the requirements of paragraphs (a)(1) through (4) of this
section.
(1) For each 30- (or 90-) day rolling average period, demonstrate
compliance with the average weighted emissions limit for the existing
units participating in the emissions averaging option as determined in
Sec. 63.10009(f) and (g);
(2) For each existing unit participating in the emissions averaging
option that is equipped with PM CPMS, maintain the average parameter
value at or below the operating limit established during the most recent
performance test;
(3) For each existing unit participating in the emissions averaging
option venting to a common stack configuration containing affected units
from other subcategories, maintain the appropriate operating limit for
each unit as specified in Table 4 to this subpart that applies.
(4) For each existing EGU participating in the emissions averaging
option, operate in accordance with the startup or shutdown work practice
requirements given in Table 3 to this subpart.
(b) Any instance where the owner or operator fails to comply with
the continuous monitoring requirements in paragraphs (a)(1) through (3)
of this section is a deviation.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23404, Apr. 19, 2012; 79
FR 68791, Nov. 19, 2014]
Sec. 63.10023 How do I establish my PM CPMS operating limit
and determine compliance with it?
(a) During the initial performance test or any such subsequent
performance test that demonstrates compliance with the filterable PM,
individual non-mercury HAP metals, or total non-mercury HAP metals limit
(or for liquid oil-fired units, individual HAP metals or total HAP
metals limit, including Hg) in Table 1 or 2, record all hourly average
output values (e.g., milliamps, stack concentration, or other raw data
signal) from the PM CPMS for the periods corresponding to the test runs
(e.g., nine 1-hour average PM CPMS output values for three 3-hour test
runs).
(b) Determine your operating limit as provided in paragraph (b)(1)
or (b)(2) of this section. You must verify an existing or establish a
new operating limit after each repeated performance test.
(1) [Reserved]
(2) Determine your operating limit as follows:
(i) If your PM performance test demonstrates your PM emissions do
not exceed 75 percent of your emissions limit, you will use the average
PM CPMS value recorded during the PM compliance test, the milliamp
equivalent of zero output from your PM CPMS, and the average PM result
of your compliance test to establish your operating limit. Calculate the
operating limit by establishing a relationship of PM CPMS signal to PM
concentration
[[Page 192]]
using the PM CPMS instrument zero, the average PM CPMS values
corresponding to the three compliance test runs, and the average PM
concentration from the Method 5 compliance test with the procedures in
(b)(2)(i)(A) through (D) of this section.
(A) Determine your PM CPMS instrument zero output with one of the
following procedures.
(1) Zero point data for in-situ instruments should be obtained by
removing the instrument from the stack and monitoring ambient air on a
test bench.
(2) Zero point data for extractive instruments should be obtained by
removing the extractive probe from the stack and drawing in clean
ambient air.
(3) The zero point can also can be obtained by performing manual
reference method measurements when the flue gas is free of PM emissions
or contains very low PM concentrations (e.g., when your process is not
operating, but the fans are operating or your source is combusting only
natural gas) and plotting these with the compliance data to find the
zero intercept.
(4) If none of the steps in paragraphs (A)(1) through (3) of this
section are possible, you must use a zero output value provided by the
manufacturer.
(B) Determine your PM CPMS instrument average (x) in milliamps, and
the average of your corresponding three PM compliance test runs (y),
using equation 10.
[GRAPHIC] [TIFF OMITTED] TR24AP13.010
Where:
Xi = the PM CPMS data points for run i of the performance
test,
Yi = the PM emissions value (in lb/MWh) for run i of the
performance test, and
n = the number of data points.
(C) With your PM CPMS instrument zero expressed in milliamps, your
three run average PM CPMS milliamp value, and your three run average PM
emissions value (in lb/MWh) from your compliance runs, determine a
relationship of PM lb/MWh per milliamp with equation 11.
[GRAPHIC] [TIFF OMITTED] TR24AP13.011
Where:
R = the relative PM lb/MWh per milliamp for your PM CPMS,
y = the three run average PM lb/MWh,
yx = the three run average milliamp output from your PM CPMS, and
z = the milliamp equivalent of your instrument zero determined from
(b)(2)(i)(A) of this section.
(D) Determine your source specific 30-day rolling average operating
limit using the PM lb/MWh per milliamp value from equation 11 in
equation 12, below. This sets your operating limit at the PM CPMS output
value corresponding to 75 percent of your emission limit.
[[Page 193]]
[GRAPHIC] [TIFF OMITTED] TR24AP13.012
Where:
OL = the operating limit for your PM CPMS on a 30-day rolling
average, in milliamps,
L = your source PM emissions limit in lb/MWh,
z = your instrument zero in milliamps, determined from (b)(2)(i)(A) of
this section, and
R = the relative PM lb/MWh per milliamp for your PM CPMS, from equation
11.
(ii) If your PM compliance test demonstrates your PM emissions
exceed 75 percent of your emissions limit, you will use the average PM
CPMS value recorded during the PM compliance test demonstrating
compliance with the PM limit to establish your operating limit.
(A) Determine your operating limit by averaging the PM CPMS milliamp
output corresponding to your three PM performance test runs that
demonstrate compliance with the emission limit using equation 13.
[GRAPHIC] [TIFF OMITTED] TR24AP13.013
Where:
Xi = the PM CPMS data points for all runs i,
n = the number of data points, and
Oh = your site specific operating limit, in milliamps.
(iii) Your PM CPMS must provide a 4-20 milliamp output and the
establishment of its relationship to manual reference method
measurements must be determined in units of milliamps.
(iv) Your PM CPMS operating range must be capable of reading PM
concentrations from zero to a level equivalent to two times your
allowable emission limit. If your PM CPMS is an auto-ranging instrument
capable of multiple scales, the primary range of the instrument must be
capable of reading PM concentration from zero to a level equivalent to
two times your allowable emission limit.
(v) During the initial performance test or any such subsequent
performance test that demonstrates compliance with the PM limit, record
and average all milliamp output values from the PM CPMS for the periods
corresponding to the compliance test runs.
(vi) For PM performance test reports used to set a PM CPMS operating
limit, the electronic submission of the test report must also include
the make and model of the PM CPMS instrument, serial number of the
instrument, analytical principle of the instrument (e.g. beta
attenuation), span of the instruments primary analytical range, milliamp
value equivalent to the instrument zero output, technique by which this
zero value was determined, and the average milliamp signal corresponding
to each PM compliance test run.
(c) You must operate and maintain your process and control equipment
such that the 30 operating day average PM CPMS output does not exceed
the operating limit determined in paragraphs (a) and (b) of this
section.
[77 FR 9464, Feb. 16, 2012, as amended at 78 FR 24086, Apr. 24, 2013; 81
FR 20187, Apr. 6, 2016]
Notification, Reports, and Records
Sec. 63.10030 What notifications must I submit and when?
(a) You must submit all of the notifications in Sec. Sec. 63.7(b)
and (c), 63.8 (e), (f)(4) and (6), and 63.9 (b) through (h) that apply
to you by the dates specified.
[[Page 194]]
(b) As specified in Sec. 63.9(b)(2), if you startup your EGU that
is an affected source before April 16, 2012, you must submit an Initial
Notification not later than 120 days after April 16, 2012.
(c) As specified in Sec. 63.9(b)(4) and (b)(5), if you startup your
new or reconstructed EGU that is an affected source on or after April
16, 2012, you must submit an Initial Notification not later than 15 days
after the actual date of startup of the EGU that is an affected source.
(d) When you are required to conduct a performance test, you must
submit a Notification of Intent to conduct a performance test at least
30 days before the performance test is scheduled to begin.
(e) When you are required to conduct an initial compliance
demonstration as specified in Sec. 63.10011(a), you must submit a
Notification of Compliance Status according to Sec. 63.9(h)(2)(ii). The
Notification of Compliance Status report must contain all the
information specified in paragraphs (e)(1) through (8) of this section,
as applicable.
(1) A description of the affected source(s), including
identification of the subcategory of the source, the design capacity of
the source, a description of the add-on controls used on the source,
description of the fuel(s) burned, including whether the fuel(s) were
determined by you or EPA through a petition process to be a non-waste
under 40 CFR 241.3, whether the fuel(s) were processed from discarded
non-hazardous secondary materials within the meaning of 40 CFR 241.3,
and justification for the selection of fuel(s) burned during the
performance test.
(2) Summary of the results of all performance tests and fuel
analyses and calculations conducted to demonstrate initial compliance
including all established operating limits.
(3) Identification of whether you plan to demonstrate compliance
with each applicable emission limit through performance testing; fuel
moisture analyses; performance testing with operating limits (e.g., use
of PM CPMS); CEMS; or a sorbent trap monitoring system.
(4) Identification of whether you plan to demonstrate compliance by
emissions averaging.
(5) A signed certification that you have met all applicable emission
limits and work practice standards.
(6) If you had a deviation from any emission limit, work practice
standard, or operating limit, you must also submit a brief description
of the deviation, the duration of the deviation, emissions point
identification, and the cause of the deviation in the Notification of
Compliance Status report.
(7) In addition to the information required in Sec. 63.9(h)(2),
your notification of compliance status must include the following:
(i) A summary of the results of the annual performance tests and
documentation of any operating limits that were reestablished during
this test, if applicable. If you are conducting stack tests once every 3
years consistent with Sec. 63.10005(h)(1)(i), the date of each stack
test conducted during the previous 3 years, a comparison of emission
level you achieved in each stack test conducted during the previous 3
years to the 50 percent emission limit threshold required in Sec.
63.10006(i), and a statement as to whether there have been any
operational changes since the last stack test that could increase
emissions.
(ii) Certifications of compliance, as applicable, and must be signed
by a responsible official stating:
(A) ``This EGU complies with the requirements in Sec. 63.10021(a)
to demonstrate continuous compliance.'' and
(B) ``No secondary materials that are solid waste were combusted in
any affected unit.''
(iii) For each of your existing EGUs, identification of each
emissions limit as specified in Table 2 to this subpart with which you
plan to comply.
(A) You may switch from a mass per heat input to a mass per gross
output limit (or vice-versa), provided that:
(1) You submit a request that identifies for each EGU or EGU
emissions averaging group involved in the proposed switch both the
current and proposed emission limit;
(2) Your request arrives to the Administrator at least 30 calendar
days prior to the date that the switch is proposed to occur;
(3) Your request demonstrates through performance stack test results
[[Page 195]]
completed within 30 days prior to your submission, compliance for each
EGU or EGU emissions averaging group with both the mass per heat input
and mass per gross output limits;
(4) You revise and submit all other applicable plans, e.g.,
monitoring and emissions averaging, with your request; and
(5) You maintain records of all information regarding your choice of
emission limits.
(B) You begin to use the revised emission limits starting in the
next reporting period, after receipt of written acknowledgement from the
Administrator of the switch.
(C) From submission of your request until start of the next
reporting period after receipt of written acknowledgement from the
Administrator of the switch, you demonstrate compliance with both the
mass per heat input and mass per gross output emission limits for each
pollutant for each EGU or EGU emissions averaging group.
(8) Identification of whether you plan to rely on paragraph (1) or
(2) of the definition of ``startup'' in Sec. 63.10042.
(i) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, you shall include a report
that identifies:
(A) The original EGU installation date;
(B) The original EGU design characteristics, including, but not
limited to, fuel mix and PM controls;
(C) Each design PM control device efficiency established during
performance testing or while operating in periods other than startup and
shutdown periods;
(D) The design PM emission rate from the EGU in terms of pounds PM
per MMBtu and pounds PM per hour established during performance testing
or while operating in periods other than startup and shutdown periods;
(E) The design time from start of fuel combustion to necessary
conditions for each PM control device startup;
(F) Each design PM control device efficiency upon startup of the PM
control device, if different from the efficiency provided in paragraph
(e)(8)(i)(C) of this section;
(G) Current EGU PM producing characteristics, including, but not
limited to, fuel mix and PM controls, if different from the
characteristics provided in paragraph (e)(8)(i)(B) of this section;
(H) Current PM control device efficiency from each PM control
device, if different from the efficiency provided in paragraph
(e)(8)(i)(C) of this section;
(I) Current PM emission rate from the EGU in terms of pounds PM per
MMBtu and pounds per hour, if different from the rate provided in
paragraph (e)(8)(i)(D) of this section;
(J) Current time from start of fuel combustion to conditions
necessary for each PM control device startup, if different from the time
provided in paragraph (e)(8)(i)(E) of this section; and
(K) Current PM control device efficiency upon startup of each PM
control device, if different from the efficiency provided in paragraph
(e)(8)(i)(H) of this section.
(ii) The report shall be prepared, signed, and sealed by a
professional engineer licensed in the state where your EGU is located.
(iii) You may switch from paragraph (1) of the definition of
``startup'' in Sec. 63.10042 to paragraph (2) of the definition of
``startup'' (or vice-versa), provided that:
(A) You submit a request that identifies for each EGU or EGU
emissions averaging group involved in the proposed switch both the
current definition of ``startup'' relied on and the proposed definition
you plan to rely on;
(B) Your request arrives to the Administrator at least 30 calendar
days prior to the date that the switch is proposed to occur;
(C) You revise and submit all other applicable plans, e.g.,
monitoring and emissions averaging, with your submission;
(D) You maintain records of all information regarding your choice of
the definition of ``startup''; and
(E) You begin to use the revised definition of ``startup'' in the
next reporting period after receipt of written acknowledgement from the
Administrator of the switch.
[[Page 196]]
(f) You must submit the notifications in Sec. 63.10000(h)(2) and
(i)(2) that may apply to you by the dates specified.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23404, Apr. 19, 2012; 78
FR 24087, Apr. 24, 2013; 79 FR 68791, Nov. 19, 2014; 81 FR 20187, Apr.
6, 2016]
Sec. 63.10031 What reports must I submit and when?
(a) You must submit each report in Table 8 to this subpart that
applies to you. If you are required to (or elect to) continuously
monitor Hg and/or HCl and/or HF emissions, you must also submit the
electronic reports required under appendix A and/or appendix B to the
subpart, at the specified frequency.
(b) Unless the Administrator has approved a different schedule for
submission of reports under Sec. 63.10(a), you must submit each report
by the date in Table 8 to this subpart and according to the requirements
in paragraphs (b)(1) through (5) of this section.
(1) The first compliance report must cover the period beginning on
the compliance date that is specified for your affected source in Sec.
63.9984 and ending on June 30 or December 31, whichever date is the
first date that occurs at least 180 days after the compliance date that
is specified for your source in Sec. 63.9984.
(2) The first compliance report must be postmarked or submitted
electronically no later than July 31 or January 31, whichever date is
the first date following the end of the first calendar half after the
compliance date that is specified for your source in Sec. 63.9984.
(3) Each subsequent compliance report must cover the semiannual
reporting period from January 1 through June 30 or the semiannual
reporting period from July 1 through December 31.
(4) Each subsequent compliance report must be postmarked or
submitted electronically no later than July 31 or January 31, whichever
date is the first date following the end of the semiannual reporting
period.
(5) For each affected source that is subject to permitting
regulations pursuant to part 70 or part 71 of this chapter, and if the
permitting authority has established dates for submitting semiannual
reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR
71.6(a)(3)(iii)(A), you may submit the first and subsequent compliance
reports according to the dates the permitting authority has established
instead of according to the dates in paragraphs (b)(1) through (4) of
this section.
(c) The compliance report must contain the information required in
paragraphs (c)(1) through (9) of this section.
(1) The information required by the summary report located in
63.10(e)(3)(vi).
(2) The total fuel use by each affected source subject to an
emission limit, for each calendar month within the semiannual reporting
period, including, but not limited to, a description of the fuel,
whether the fuel has received a non-waste determination by EPA or your
basis for concluding that the fuel is not a waste, and the total fuel
usage amount with units of measure.
(3) Indicate whether you burned new types of fuel during the
reporting period. If you did burn new types of fuel you must include the
date of the performance test where that fuel was in use.
(4) Include the date of the most recent tune-up for each EGU. The
date of the tune-up is the date the tune-up provisions specified in
Sec. 63.10021(e)(6) and (7) were completed.
(5) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, for each instance of startup
or shutdown you shall:
(i) Include the maximum clean fuel storage capacity and the maximum
hourly heat input that can be provided for each clean fuel determined
according to the requirements of Sec. 63.10032(f).
(ii) Include the information required to be monitored, collected, or
recorded according to the requirements of Sec. 63.10020(e).
(iii) If you choose to use CEMS to demonstrate compliance with
numerical limits, include hourly average CEMS values and hourly average
flow values during startup periods or shutdown periods. Use units of
milligrams per cubic meter for PM CEMS values, micrograms per cubic
meter for Hg CEMS values, and ppmv for HCl, HF, or
[[Page 197]]
SO2 CEMS values. Use units of standard cubic meters per hour
on a wet basis for flow values.
(iv) If you choose to use a separate sorbent trap measurement system
for startup or shutdown reporting periods, include hourly average
mercury concentration values in terms of micrograms per cubic meter.
(v) If you choose to use a PM CPMS, include hourly average operating
parameter values in terms of the operating limit, as well as the
operating parameter to PM correlation equation.
(6) You must report emergency bypass information annually from EGUs
with LEE status.
(7) A summary of the results of the annual performance tests and
documentation of any operating limits that were reestablished during the
test, if applicable. If you are conducting stack tests once every 3
years to maintain LEE status, consistent with Sec. 63.10006(b), the
date of each stack test conducted during the previous 3 years, a
comparison of emission level you achieved in each stack test conducted
during the previous 3 years to the 50 percent emission limit threshold
required in Sec. 63.10005(h)(1)(i), and a statement as to whether there
have been any operational changes since the last stack test that could
increase emissions.
(8) A certification.
(9) If you have a deviation from any emission limit, work practice
standard, or operating limit, you must also submit a brief description
of the deviation, the duration of the deviation, emissions point
identification, and the cause of the deviation.
(d) For each excess emissions occurring at an affected source where
you are using a CMS to comply with that emission limit or operating
limit, you must include the information required in Sec. 63.10(e)(3)(v)
in the compliance report specified in section (c).
(e) Each affected source that has obtained a Title V operating
permit pursuant to part 70 or part 71 of this chapter must report all
deviations as defined in this subpart in the semiannual monitoring
report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR
71.6(a)(3)(iii)(A). If an affected source submits a compliance report
pursuant to Table 8 to this subpart along with, or as part of, the
semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40
CFR 71.6(a)(3)(iii)(A), and the compliance report includes all required
information concerning deviations from any emission limit, operating
limit, or work practice requirement in this subpart, submission of the
compliance report satisfies any obligation to report the same deviations
in the semiannual monitoring report. Submission of a compliance report
does not otherwise affect any obligation the affected source may have to
report deviations from permit requirements to the permit authority.
(f) On or after July 1, 2020, within 60 days after the date of
completing each performance test, you must submit the performance test
reports required by this subpart to the EPA's WebFIRE database by using
the Compliance and Emissions Data Reporting Interface (CEDRI) that is
accessed through the EPA's Central Data Exchange (CDX) (https://
cdx.epa.gov). Performance test data must be submitted in the file format
generated through use of EPA's Electronic Reporting Tool (ERT) (see
https://www.epa.gov/ttn/chief/ert/index.html). Only data collected using
those test methods on the ERT website are subject to this requirement
for submitting reports electronically to WebFIRE. Owners or operators
who claim that some of the information being submitted for performance
tests is confidential business information (CBI) must submit a complete
ERT file including information claimed to be CBI on a compact disk or
other commonly used electronic storage media (including, but not limited
to, flash drives) to EPA. The electronic media must be clearly marked as
CBI and mailed to U.S. EPA/OAPQS/CORE CBI Office, Attention: WebFIRE
Administrator, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same
ERT file with the CBI omitted must be submitted to EPA via CDX as
described earlier in this paragraph. At the discretion of the delegated
authority, you must also submit these reports, including the
confidential business information, to the delegated authority in the
[[Page 198]]
format specified by the delegated authority.
(1) On or after July 1, 2020, within 60 days after the date of
completing each CEMS (SO2, PM, HCl, HF, and Hg) performance
evaluation test, as defined in Sec. 63.2 and required by this subpart,
you must submit the relative accuracy test audit (RATA) data (or, for PM
CEMS, RCA and RRA data) required by this subpart to EPA's WebFIRE
database by using CEDRI that is accessed through EPA's CDX (https://
cdx.epa.gov). The RATA data shall be submitted in the file format
generated through use of EPA's Electronic Reporting Tool (ERT) (https://
www.epa.gov/ttn/chief/ert/index.html). Only RATA data compounds listed
on the ERT website are subject to this requirement. Owners or operators
who claim that some of the information being submitted for RATAs is
confidential business information (CBI) shall submit a complete ERT file
including information claimed to be CBI on a compact disk or other
commonly used electronic storage media (including, but not limited to,
flash drives) by registered letter to EPA and the same ERT file with the
CBI omitted to EPA via CDX as described earlier in this paragraph. The
compact disk or other commonly used electronic storage media shall be
clearly marked as CBI and mailed to U.S. EPA/OAPQS/CORE CBI Office,
Attention: WebFIRE Administrator, MD C404-02, 4930 Old Page Rd., Durham,
NC 27703. At the discretion of the delegated authority, owners or
operators shall also submit these RATAs to the delegated authority in
the format specified by the delegated authority. Owners or operators
shall submit calibration error testing, drift checks, and other
information required in the performance evaluation as described in Sec.
63.2 and as required in this chapter.
(2) On or after July 1, 2020, for a PM CEMS, PM CPMS, or approved
alternative monitoring using a HAP metals CEMS, within 60 days after the
reporting periods ending on March 31st, June 30th, September 30th, and
December 31st, you must submit quarterly reports to the EPA's WebFIRE
database by using the CEDRI that is accessed through the EPA's CDX
(https://cdx.epa.gov). You must use the appropriate electronic reporting
form in CEDRI or provide an alternate electronic file consistent with
EPA's reporting form output format. For each reporting period, the
quarterly reports must include all of the calculated 30-boiler operating
day rolling average values derived from the CEMS and PM CPMS.
(3) Reports for an SO2 CEMS, a Hg CEMS or sorbent trap
monitoring system, an HCl or HF CEMS, and any supporting monitors for
such systems (such as a diluent or moisture monitor) shall be submitted
using the ECMPS Client Tool, as provided for in Appendices A and B to
this subpart and Sec. 63.10021(f).
(4) On or after July 1, 2020, submit the compliance reports required
under paragraphs (c) and (d) of this section and the notification of
compliance status required under Sec. 63.10030(e) to the EPA's WebFIRE
database by using the CEDRI that is accessed through the EPA's CDX
(https://cdx.epa.gov). You must use the appropriate electronic reporting
form in CEDRI or provide an alternate electronic file consistent with
EPA's reporting form output format.
(5) All reports required by this subpart not subject to the
requirements in paragraphs (f) introductory text and (f)(1) through (4)
of this section must be sent to the Administrator at the appropriate
address listed in Sec. 63.13. If acceptable to both the Administrator
and the owner or operator of an EGU, these reports may be submitted on
electronic media. The Administrator retains the right to require
submittal of reports subject to paragraphs (f) introductory text and
(f)(1) through (4) of this section in paper format.
(6) Prior to July 1, 2020, all reports subject to electronic
submittal in paragraphs (f) introductory text, (f)(1), (2), and (4) of
this section shall be submitted to the EPA at the frequency specified in
those paragraphs in electronic portable document format (PDF) using the
ECMPS Client Tool. Each PDF version of a submitted report must include
sufficient information to assess compliance and to demonstrate that the
testing was done properly. The following data elements must be entered
into the ECMPS Client Tool at
[[Page 199]]
the time of submission of each PDF file:
(i) The facility name, physical address, mailing address (if
different from the physical address), and county;
(ii) The ORIS code (or equivalent ID number assigned by EPA's Clean
Air Markets Division (CAMD)) and the Facility Registry System (FRS) ID;
(iii) The EGU (or EGUs) to which the report applies. Report the EGU
IDs as they appear in the CAMD Business System;
(iv) If any of the EGUs in paragraph (f)(6)(iii) of this section
share a common stack, indicate which EGUs share the stack. If emissions
data are monitored and reported at the common stack according to part 75
of this chapter, report the ID number of the common stack as it is
represented in the electronic monitoring plan required under Sec. 75.53
of this chapter;
(v) If any of the EGUs described in paragraph (f)(6)(iii) of this
section are in an averaging plan under Sec. 63.10009, indicate which
EGUs are in the plan and whether it is a 30- or 90-day averaging plan;
(vi) The identification of each emission point to which the report
applies. An ``emission point'' is a point at which source effluent is
released to the atmosphere, and is either a dedicated stack that serves
one of the EGUs identified in paragraph (f)(6)(iii) of this section or a
common stack that serves two or more of those EGUs. To identify an
emission point, associate it with the EGU or stack ID in the CAMD
Business system or the electronic monitoring plan (e.g., ``Unit 2
stack,'' ``common stack CS001,'' or ``multiple stack MS001'');
(vii) The rule citation (e.g., Sec. 63.10031(f)(1), Sec.
63.10031(f)(2), etc.) for which the report is showing compliance;
(viii) The pollutant(s) being addressed in the report;
(ix) The reporting period being covered by the report (if
applicable);
(x) The relevant test method that was performed for a performance
test (if applicable);
(xi) The date the performance test was conducted (if applicable);
and
(xii) The responsible official's name, title, and phone number.
(g) If you had a malfunction during the reporting period, the
compliance report must include the number, duration, and a brief
description for each type of malfunction which occurred during the
reporting period and which caused or may have caused any applicable
emission limitation to be exceeded.
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23404, Apr. 19, 2012; 79
FR 68791, Nov. 19, 2014; 79 FR 68799, Nov. 19, 2014; 80 FR 15514, Mar.
24, 2015; 81 FR 20188, Apr. 6, 2016; 82 FR 16739, Apr. 6, 2017; 83 FR
30883, July 2, 2018]
Sec. 63.10032 What records must I keep?
(a) You must keep records according to paragraphs (a)(1) and (2) of
this section. If you are required to (or elect to) continuously monitor
Hg and/or HCl and/or HF emissions, you must also keep the records
required under appendix A and/or appendix B to this subpart.
(1) A copy of each notification and report that you submitted to
comply with this subpart, including all documentation supporting any
Initial Notification or Notification of Compliance Status or semiannual
compliance report that you submitted, according to the requirements in
Sec. 63.10(b)(2)(xiv).
(2) Records of performance stack tests, fuel analyses, or other
compliance demonstrations and performance evaluations, as required in
Sec. 63.10(b)(2)(viii).
(b) For each CEMS and CPMS, you must keep records according to
paragraphs (b)(1) through (4) of this section.
(1) Records described in Sec. 63.10(b)(2)(vi) through (xi).
(2) Previous (i.e., superseded) versions of the performance
evaluation plan as required in Sec. 63.8(d)(3).
(3) Request for alternatives to relative accuracy test for CEMS as
required in Sec. 63.8(f)(6)(i).
(4) Records of the date and time that each deviation started and
stopped, and whether the deviation occurred during a period of startup,
shutdown, or malfunction or during another period.
(c) You must keep the records required in Table 7 to this subpart
including records of all monitoring data and calculated averages for
applicable PM CPMS operating limits to show
[[Page 200]]
continuous compliance with each emission limit and operating limit that
applies to you.
(d) For each EGU subject to an emission limit, you must also keep
the records in paragraphs (d)(1) through (3) of this section.
(1) You must keep records of monthly fuel use by each EGU, including
the type(s) of fuel and amount(s) used.
(2) If you combust non-hazardous secondary materials that have been
determined not to be solid waste pursuant to 40 CFR 241.3(b)(1), you
must keep a record which documents how the secondary material meets each
of the legitimacy criteria. If you combust a fuel that has been
processed from a discarded non-hazardous secondary material pursuant to
40 CFR 241.3(b)(2), you must keep records as to how the operations that
produced the fuel satisfies the definition of processing in 40 CFR
241.2. If the fuel received a non-waste determination pursuant to the
petition process submitted under 40 CFR 241.3(c), you must keep a record
which documents how the fuel satisfies the requirements of the petition
process.
(3) For an EGU that qualifies as an LEE under Sec. 63.10005(h), you
must keep annual records that document that your emissions in the
previous stack test(s) continue to qualify the unit for LEE status for
an applicable pollutant, and document that there was no change in source
operations including fuel composition and operation of air pollution
control equipment that would cause emissions of the pollutant to
increase within the past year.
(e) If you elect to average emissions consistent with Sec.
63.10009, you must additionally keep a copy of the emissions averaging
implementation plan required in Sec. 63.10009(g), all calculations
required under Sec. 63.10009, including daily records of heat input or
steam generation, as applicable, and monitoring records consistent with
Sec. 63.10022.
(f) Regarding startup periods or shutdown periods:
(1) Should you choose to rely on paragraph (1) of the definition of
``startup'' in Sec. 63.10042 for your EGU, you must keep records of the
occurrence and duration of each startup or shutdown.
(2) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, you must keep records of:
(i) The determination of the maximum possible clean fuel capacity
for each EGU;
(ii) The determination of the maximum possible hourly clean fuel
heat input and of the hourly clean fuel heat input for each EGU; and
(iii) The information required in Sec. 63.10020(e).
(g) You must keep records of the occurrence and duration of each
malfunction of an operation (i.e., process equipment) or the air
pollution control and monitoring equipment.
(h) You must keep records of actions taken during periods of
malfunction to minimize emissions in accordance with Sec. 63.10000(b),
including corrective actions to restore malfunctioning process and air
pollution control and monitoring equipment to its normal or usual manner
of operation.
(i) You must keep records of the type(s) and amount(s) of fuel used
during each startup or shutdown.
(j) If you elect to establish that an EGU qualifies as a limited-use
liquid oil-fired EGU, you must keep records of the type(s) and amount(s)
of fuel use in each calendar quarter to document that the capacity
factor limitation for that subcategory is met.
[77 FR 9464, Feb. 16, 2012, as amended at 79 FR 68792, Nov. 19, 2014; 81
FR 20189, Apr. 6, 2016]
Sec. 63.10033 In what form and how long must I keep my records?
(a) Your records must be in a form suitable and readily available
for expeditious review, according to Sec. 63.10(b)(1).
(b) As specified in Sec. 63.10(b)(1), you must keep each record for
5 years following the date of each occurrence, measurement, maintenance,
corrective action, report, or record.
(c) You must keep each record on site for at least 2 years after the
date of each occurrence, measurement, maintenance, corrective action,
report, or record, according to Sec. 63.10(b)(1). You can keep the
records off site for the remaining 3 years.
[[Page 201]]
Other Requirements and Information
Sec. 63.10040 What parts of the General Provisions apply to me?
Table 9 to this subpart shows which parts of the General Provisions
in Sec. Sec. 63.1 through 63.15 apply to you.
Sec. 63.10041 Who implements and enforces this subpart?
(a) This subpart can be implemented and enforced by U.S. EPA, or a
delegated authority such as your state, local, or tribal agency. If the
EPA Administrator has delegated authority to your state, local, or
tribal agency, then that agency (as well as the U.S. EPA) has the
authority to implement and enforce this subpart. You should contact your
EPA Regional Office to find out if this subpart is delegated to your
state, local, or tribal agency.
(b) In delegating implementation and enforcement authority of this
subpart to a state, local, or tribal agency under 40 CFR part 63,
subpart E, the authorities listed in paragraphs (b)(1) through (4) of
this section are retained by the EPA Administrator and are not
transferred to the state, local, or tribal agency; moreover, the U.S.
EPA retains oversight of this subpart and can take enforcement actions,
as appropriate, with respect to any failure by any person to comply with
any provision of this subpart.
(1) Approval of alternatives to the non-opacity emission limits and
work practice standards in Sec. 63.9991(a) and (b) under Sec. 63.6(g).
(2) Approval of major change to test methods in Table 5 to this
subpart under Sec. 63.7(e)(2)(ii) and (f) and as defined in Sec.
63.90, approval of minor and intermediate changes to monitoring
performance specifications/procedures in Table 5 where the monitoring
serves as the performance test method (see definition of ``test method''
in Sec. 63.2.
(3) Approval of major changes to monitoring under Sec. 63.8(f) and
as defined in Sec. 63.90.
(4) Approval of major change to recordkeeping and reporting under
Sec. 63.10(e) and as defined in Sec. 63.90.
Sec. 63.10042 What definitions apply to this subpart?
Terms used in this subpart are defined in the Clean Air Act (CAA),
in Sec. 63.2 (the General Provisions), and in this section as follows:
Affirmative defense means, in the context of an enforcement
proceeding, a response or defense put forward by a defendant, regarding
which the defendant has the burden of proof, and the merits of which are
independently and objectively evaluated in a judicial or administrative
proceeding.
Anthracite coal means solid fossil fuel classified as anthracite
coal by American Society of Testing and Materials (ASTM) Method D388-05,
``Standard Classification of Coals by Rank'' (incorporated by reference,
see Sec. 63.14).
Bituminous coal means coal that is classified as bituminous
according to ASTM Method D388-05, ``Standard Classification of Coals by
Rank'' (incorporated by reference, see Sec. 63.14).
Boiler operating day means a 24-hour period that begins at midnight
and ends the following midnight during which any fuel is combusted at
any time in the EGU, excluding startup periods or shutdown periods. It
is not necessary for the fuel to be combusted the entire 24-hour period.
Capacity factor for a liquid oil-fired EGU means the total annual
heat input from oil divided by the product of maximum hourly heat input
for the EGU, regardless of fuel, multiplied by 8,760 hours.
Clean fuel means natural gas, synthetic natural gas that meets the
specification necessary for that gas to be transported on a Federal
Energy Regulatory Commission (FERC) regulated pipeline, propane,
distillate oil, synthesis gas that has been processed through a gas
clean-up train such that it could be used in a system's combustion
turbine, or ultra-low-sulfur diesel (ULSD) oil, including those fuels
meeting the requirements of 40 CFR part 80, subpart I (``Subpart I--
Motor Vehicle Diesel Fuel; Nonroad, Locomotive, and Marine Diesel Fuel;
and ECA Marine Fuel'').
Coal means all solid fuels classifiable as anthracite, bituminous,
sub-bituminous, or lignite by ASTM Method D388-05, ``Standard
Classification of
[[Page 202]]
Coals by Rank'' (incorporated by reference, see Sec. 63.14), and coal
refuse. Synthetic fuels derived from coal for the purpose of creating
useful heat including but not limited to, coal derived gases (not
meeting the definition of natural gas), solvent-refined coal, coal-oil
mixtures, and coal-water mixtures, are considered ``coal'' for the
purposes of this subpart.
Coal-fired electric utility steam generating unit means an electric
utility steam generating unit meeting the definition of ``fossil fuel-
fired'' that burns coal for more than 10.0 percent of the average annual
heat input during the 3 previous calendar years after the compliance
date for your facility in Sec. 63.9984 or for more than 15.0 percent of
the annual heat input during any one of those calendar years. EGU owners
and operators must estimate coal, oil, and natural gas usage for the
first 3 calendar years after the applicable compliance date and they are
solely responsible for assuring compliance with this final rule or other
applicable standard based on their fuel usage projections. After the
first 3 years of compliance, EGUs are required to evaluate applicability
based on coal or oil usage from the three previous calendars years on an
annual rolling basis.
Coal refuse means waste products of coal mining, physical coal
cleaning, and coal preparation operations (e.g. culm, gob, etc.)
containing coal, matrix material, clay, and other organic and inorganic
material.
Cogeneration means a steam-generating unit that simultaneously
produces both electrical and useful thermal (or mechanical) energy from
the same primary energy source.
Cogeneration unit means a stationary, fossil fuel-fired EGU meeting
the definition of ``fossil fuel-fired'' or stationary, integrated
gasification combined cycle:
(1) Having equipment used to produce electricity and useful thermal
energy for industrial, commercial, heating, or cooling purposes through
the sequential use of energy; and
(2) Producing during the 12-month period starting on the date the
unit first produces electricity and during any calendar year after which
the unit first produces electricity:
(i) For a topping-cycle cogeneration unit,
(A) Useful thermal energy not less than 5 percent of total energy
output; and
(B) Useful power that, when added to one-half of useful thermal
energy produced, is not less than 42.5 percent of total energy input, if
useful thermal energy produced is 15 percent or more of total energy
output, or not less than 45 percent of total energy input, if useful
thermal energy produced is less than 15 percent of total energy output.
(ii) For a bottoming-cycle cogeneration unit, useful power not less
than 45 percent of total energy input.
(3) Provided that the total energy input under paragraphs (2)(i)(B)
and (2)(ii) of this definition shall equal the unit's total energy input
from all fuel except biomass if the unit is a boiler.
Combined-cycle gas stationary combustion turbine means a stationary
combustion turbine system where heat from the turbine exhaust gases is
recovered by a waste heat boiler.
Common stack means the exhaust of emissions from two or more
affected units through a single flue.
Continental liquid oil-fired subcategory means any oil-fired
electric utility steam generating unit that burns liquid oil and is
located in the continental United States.
Default electrical load means an electrical load equal to 5 percent
of the maximum sustainable electrical output (megawatts), as defined in
section 6.5.2.1(a)(1) of Appendix A to part 75 of this chapter, of an
affected EGU that is in startup or shutdown mode. For monitored common
stack configurations, the default electrical load is 5 percent of the
combined maximum sustainable electrical load of the EGUs that are in
startup or shutdown mode during an hour in which the electrical load for
all operating EGUs is zero. The default electrical load is used to
calculate the electrical output-based emission rate (lb/MWh or lb/GWh,
as applicable) for any startup or shutdown hour in which the actual
electrical load is zero. The default electrical load is not used for
EGUs required to make heat input-based emission rate (lb/MMBtu or lb/
TBtu, as applicable) calculations. For
[[Page 203]]
the purposes of this subpart, the default electrical load is not
considered to be a substitute data value.
Deviation. (1) Deviation means any instance in which an affected
source subject to this subpart, or an owner or operator of such a
source:
(i) Fails to meet any requirement or obligation established by this
subpart including, but not limited to, any emission limit, operating
limit, work practice standard, or monitoring requirement; or
(ii) Fails to meet any term or condition that is adopted to
implement an applicable requirement in this subpart and that is included
in the operating permit for any affected source required to obtain such
a permit.
(2) A deviation is not always a violation. The determination of
whether a deviation constitutes a violation of the standard is up to the
discretion of the entity responsible for enforcement of the standards.
Diluent cap means a default CO2 or O2
concentration that may be used to calculate the Hg, HCl, HF, or
SO2 emission rate (lb/MMBtu or lb/TBtu, as applicable) during
a startup or shutdown hour in which the measured CO2
concentration is below the cap value or the measured O2
concentration is above the cap value. The appropriate diluent cap values
for EGUs are presented in Sec. 63.10007(f) and in section 6.2.1.2 of
Appendix A to this subpart. For the purposes of this subpart, the
diluent cap is not considered to be a substitute data value.
Distillate oil means fuel oils, including recycled oils, that comply
with the specifications for fuel oil numbers 1 and 2, as defined by ASTM
Method D396-10, ``Standard Specification for Fuel Oils'' (incorporated
by reference, see Sec. 63.14).
Dry flue gas desulfurization technology, or dry FGD, or spray dryer
absorber (SDA), or spray dryer, or dry scrubber means an add-on air
pollution control system located downstream of the steam generating unit
that injects a dry alkaline sorbent (dry sorbent injection) or sprays an
alkaline sorbent slurry (spray dryer) to react with and neutralize acid
gases such as SO2 and HCl in the exhaust stream forming a dry
powder material. Alkaline sorbent injection systems in fluidized bed
combustors (FBC) or circulating fluidized bed (CFB) boilers are included
in this definition.
Dry sorbent injection (DSI) means an add-on air pollution control
system in which sorbent (e.g., conventional activated carbon, brominated
activated carbon, Trona, hydrated lime, sodium carbonate, etc.) is
injected into the flue gas steam upstream of a PM control device to
react with and neutralize acid gases (such as SO2 and HCl) or
Hg in the exhaust stream forming a dry powder material that may be
removed in a primary or secondary PM control device.
Electric Steam generating unit means any furnace, boiler, or other
device used for combusting fuel for the purpose of producing steam
(including fossil-fuel-fired steam generators associated with integrated
gasification combined cycle gas turbines; nuclear steam generators are
not included) for the purpose of powering a generator to produce
electricity or electricity and other thermal energy.
Electric utility steam generating unit (EGU) means a fossil fuel-
fired combustion unit of more than 25 megawatts electric (MWe) that
serves a generator that produces electricity for sale. A fossil fuel-
fired unit that cogenerates steam and electricity and supplies more than
one-third of its potential electric output capacity and more than 25 MWe
output to any utility power distribution system for sale is considered
an electric utility steam generating unit.
Emission limitation means any emissions limit, work practice
standard, or operating limit.
Excess emissions means, with respect to this subpart, results of any
required measurements outside the applicable range (e.g., emissions
limitations, parametric operating limits) that is permitted by this
subpart. The values of measurements will be in the same units and
averaging time as the values specified in this subpart for the
limitations.
Federally enforceable means all limitations and conditions that are
enforceable by the Administrator, including the requirements of 40 CFR
parts 60, 61, and 63; requirements within any
[[Page 204]]
applicable state implementation plan; and any permit requirements
established under 40 CFR 52.21 or under 40 CFR 51.18 and 40 CFR 51.24.
Flue gas desulfurization system means any add-on air pollution
control system located downstream of the steam generating unit whose
purpose or effect is to remove at least 50 percent of the SO2
in the exhaust gas stream.
Fossil fuel means natural gas, oil, coal, and any form of solid,
liquid, or gaseous fuel derived from such material.
Fossil fuel-fired means an electric utility steam generating unit
(EGU) that is capable of producing more than 25 MW of electrical output
from the combustion of fossil fuels. To be ``capable of combusting''
fossil fuels, an EGU would need to have these fuels allowed in its
operating permit and have the appropriate fuel handling facilities on-
site or otherwise available (e.g., coal handling equipment, including
coal storage area, belts and conveyers, pulverizers, etc.; oil storage
facilities). In addition, fossil fuel-fired means any EGU that fired
fossil fuels for more than 10.0 percent of the average annual heat input
during the 3 previous calendar years after the compliance date for your
facility in Sec. 63.9984 or for more than 15.0 percent of the annual
heat input during any one of those calendar years. EGU owners and
operators must estimate coal, oil, and natural gas usage for the first 3
calendar years after the applicable compliance date and they are solely
responsible for assuring compliance with this final rule or other
applicable standard based on their fuel usage projections. After the
first 3 years of compliance, EGUs are required to evaluate applicability
based on coal or oil usage from the three previous calendars years on an
annual rolling basis.
Fuel type means each category of fuels that share a common name or
classification. Examples include, but are not limited to, bituminous
coal, subbituminous coal, lignite, anthracite, biomass, and residual
oil. Individual fuel types received from different suppliers are not
considered new fuel types.
Fluidized bed boiler, or fluidized bed combustor, or circulating
fluidized boiler, or CFB means a boiler utilizing a fluidized bed
combustion process.
Fluidized bed combustion means a process where a fuel is burned in a
bed of granulated particles which are maintained in a mobile suspension
by the upward flow of air and combustion products.
Gaseous fuel includes, but is not limited to, natural gas, process
gas, landfill gas, coal derived gas, solid oil-derived gas, refinery
gas, and biogas.
Generator means a device that produces electricity.
Gross output means the gross useful work performed by the steam
generated and, for an IGCC electric utility steam generating unit, the
work performed by the stationary combustion turbines. For a unit
generating only electricity, the gross useful work performed is the
gross electrical output from the unit's turbine/generator sets. For a
cogeneration unit, the gross useful work performed is the gross
electrical output, including any such electricity used in the power
production process (which process includes, but is not limited to, any
on-site processing or treatment of fuel combusted at the unit and any
on-site emission controls), or mechanical output plus 75 percent of the
useful thermal output measured relative to ISO conditions that is not
used to generate additional electrical or mechanical output or to
enhance the performance of the unit (i.e., steam delivered to an
industrial process).
Heat input means heat derived from combustion of fuel in an EGU
(synthetic gas for an IGCC) and does not include the heat input from
preheated combustion air, recirculated flue gases, or exhaust gases from
other sources such as gas turbines, internal combustion engines, etc.
Integrated gasification combined cycle electric utility steam
generating unit or IGCC means an electric utility steam generating unit
meeting the definition of ``fossil fuel-fired'' that burns a synthetic
gas derived from coal and/or solid oil-derived fuel for more than 10.0
percent of the average annual heat input during the 3 previous calendar
years after the compliance date for your facility in Sec. 63.9984 or
for more than 15.0 percent of the annual heat
[[Page 205]]
input during any one of those calendar years in a combined-cycle gas
turbine. EGU owners and operators must estimate coal, oil, and natural
gas usage for the first 3 calendar years after the applicable compliance
date and they are solely responsible for assuring compliance with this
final rule or other applicable standard based on their fuel usage
projections. No solid coal or solid oil-derived fuel is directly burned
in the unit during operation. After the first 3 years of compliance,
EGUs are required to evaluate applicability based on coal or oil usage
from the three previous calendars years on an annual rolling basis.
ISO conditions means a temperature of 288 Kelvin, a relative
humidity of 60 percent, and a pressure of 101.3 kilopascals.
Lignite coal means coal that is classified as lignite A or B
according to ASTM Method D388-05, ``Standard Classification of Coals by
Rank'' (incorporated by reference, see Sec. 63.14).
Limited-use liquid oil-fired subcategory means an oil-fired electric
utility steam generating unit with an annual capacity factor when
burning oil of less than 8 percent of its maximum or nameplate heat
input, whichever is greater, averaged over a 24-month block contiguous
period commencing on the first of the month following the compliance
date specified in Sec. 63.9984.
Liquid fuel includes, but is not limited to, distillate oil and
residual oil.
Monitoring system malfunction or out of control period means any
sudden, infrequent, not reasonably preventable failure of the monitoring
system to provide valid data. Monitoring system failures that are caused
in part by poor maintenance or careless operation are not malfunctions.
Natural gas means a naturally occurring fluid mixture of
hydrocarbons (e.g., methane, ethane, or propane) produced in geological
formations beneath the Earth's surface that maintains a gaseous state at
standard atmospheric temperature and pressure under ordinary conditions.
Natural gas contains 20.0 grains or less of total sulfur per 100
standard cubic feet. Additionally, natural gas must either be composed
of at least 70 percent methane by volume or have a gross calorific value
between 950 and 1,100 Btu per standard cubic foot. Natural gas does not
include the following gaseous fuels: landfill gas, digester gas,
refinery gas, sour gas, blast furnace gas, coal-derived gas, producer
gas, coke oven gas, or any gaseous fuel produced in a process which
might result in highly variable sulfur content or heating value.
Natural gas-fired electric utility steam generating unit means an
electric utility steam generating unit meeting the definition of
``fossil fuel-fired'' that is not a coal-fired, oil-fired, or IGCC
electric utility steam generating unit and that burns natural gas for
more than 10.0 percent of the average annual heat input during the 3
previous calendar years after the compliance date for your facility in
Sec. 63.9984 or for more than 15.0 percent of the annual heat input
during any one of those calendar years. EGU owners and operators must
estimate coal, oil, and natural gas usage for the first 3 calendar years
after the applicable compliance date and they are solely responsible for
assuring compliance with this final rule or other applicable standard
based on their fuel usage projections.
Net-electric output means the gross electric sales to the utility
power distribution system minus purchased power on a calendar year
basis.
Neural network or neural net for purposes of this rule means an
automated boiler optimization system. A neural network typically has the
ability to process data from many inputs to develop, remember, update,
and enable algorithms for efficient boiler operation.
Non-continental area means the State of Hawaii, the Virgin Islands,
Guam, American Samoa, the Commonwealth of Puerto Rico, or the Northern
Mariana Islands.
Non-continental liquid oil-fired subcategory means any oil-fired
electric utility steam generating unit that burns liquid oil and is
located outside the continental United States.
Non-mercury (Hg) HAP metals means Antimony (Sb), Arsenic (As),
Beryllium (Be), Cadmium (Cd), Chromium (Cr), Cobalt (Co), Lead (Pb),
Manganese (Mn), Nickel (Ni), and Selenium (Se).
[[Page 206]]
Oil means crude oil or petroleum or a fuel derived from crude oil or
petroleum, including distillate and residual oil, solid oil-derived fuel
(e.g., petroleum coke) and gases derived from solid oil-derived fuels
(not meeting the definition of natural gas).
Oil-fired electric utility steam generating unit means an electric
utility steam generating unit meeting the definition of ``fossil fuel-
fired'' that is not a coal-fired electric utility steam generating unit
and that burns oil for more than 10.0 percent of the average annual heat
input during the 3 previous calendar years after the compliance date for
your facility in Sec. 63.9984 or for more than 15.0 percent of the
annual heat input during any one of those calendar years. EGU owners and
operators must estimate coal, oil, and natural gas usage for the first 3
calendar years after the applicable compliance date and they are solely
responsible for assuring compliance with this final rule or other
applicable standard based on their fuel usage projections. After the
first 3 years of compliance, EGUs are required to evaluate applicability
based on coal or oil usage from the three previous calendars years on an
annual rolling basis.
Particulate matter or PM means any finely divided solid material as
measured by the test methods specified under this subpart, or an
alternative method.
Pulverized coal (PC) boiler means an EGU in which pulverized coal is
introduced into an air stream that carries the coal to the combustion
chamber of the EGU where it is fired in suspension.
Residual oil means crude oil, and all fuel oil numbers 4, 5 and 6,
as defined by ASTM Method D396-10, ``Standard Specification for Fuel
Oils'' (incorporated by reference, see Sec. 63.14).
Responsible official means responsible official as defined in 40 CFR
70.2.
Shutdown means the period in which cessation of operation of an EGU
is initiated for any purpose. Shutdown begins when the EGU no longer
generates electricity or makes useful thermal energy (such as heat or
steam) for industrial, commercial, heating, or cooling purposes or when
no coal, liquid oil, syngas, or solid oil-derived fuel is being fired in
the EGU, whichever is earlier. Shutdown ends when the EGU no longer
generates electricity or makes useful thermal energy (such as steam or
heat) for industrial, commercial, heating, or cooling purposes, and no
fuel is being fired in the EGU. Any fraction of an hour in which
shutdown occurs constitutes a full hour of shutdown.
Startup means:
(1) Either the first-ever firing of fuel in a boiler for the purpose
of producing electricity, or the firing of fuel in a boiler after a
shutdown event for any purpose. Startup ends when any of the steam from
the boiler is used to generate electricity for sale over the grid or for
any other purpose (including on-site use). Any fraction of an hour in
which startup occurs constitutes a full hour of startup; or
(2) The period in which operation of an EGU is initiated for any
purpose. Startup begins with either the firing of any fuel in an EGU for
the purpose of producing electricity or useful thermal energy (such as
heat or steam) for industrial, commercial, heating, or cooling purposes
(other than the first-ever firing of fuel in a boiler following
construction of the boiler) or for any other purpose after a shutdown
event. Startup ends 4 hours after the EGU generates electricity that is
sold or used for any other purpose (including on site use), or 4 hours
after the EGU makes useful thermal energy (such as heat or steam) for
industrial, commercial, heating, or cooling purposes (16 U.S.C.
796(18)(A) and 18 CFR 292.202(c)), whichever is earlier. Any fraction of
an hour in which startup occurs constitutes a full hour of startup.
Stationary combustion turbine means all equipment, including but not
limited to the turbine, the fuel, air, lubrication and exhaust gas
systems, control systems (except emissions control equipment), and any
ancillary components and sub-components comprising any simple cycle
stationary combustion turbine, any regenerative/recuperative cycle
stationary combustion turbine, the combustion turbine portion of any
stationary cogeneration cycle combustion system, or the combustion
turbine portion of any stationary combined cycle steam/electric
generating system. Stationary means that the
[[Page 207]]
combustion turbine is not self propelled or intended to be propelled
while performing its function. Stationary combustion turbines do not
include turbines located at a research or laboratory facility, if
research is conducted on the turbine itself and the turbine is not being
used to power other applications at the research or laboratory facility.
Steam generating unit means any furnace, boiler, or other device
used for combusting fuel for the purpose of producing steam (including
fossil-fuel-fired steam generators associated with integrated
gasification combined cycle gas turbines; nuclear steam generators are
not included).
Stoker means a unit consisting of a mechanically operated fuel
feeding mechanism, a stationary or moving grate to support the burning
of fuel and admit undergrate air to the fuel, an overfire air system to
complete combustion, and an ash discharge system. There are two general
types of stokers: underfeed and overfeed. Overfeed stokers include mass
feed and spreader stokers.
Subbituminous coal means coal that is classified as subbituminous A,
B, or C according to ASTM Method D388-05, ``Standard Classification of
Coals by Rank'' (incorporated by reference, see Sec. 63.14).
Unit designed for coal =8,300 Btu/lb subcategory means
any coal-fired EGU that is not a coal-fired EGU in the ``unit designed
for low rank virgin coal'' subcategory.
Unit designed for low rank virgin coal subcategory means any coal-
fired EGU that is designed to burn and that is burning nonagglomerating
virgin coal having a calorific value (moist, mineral matter-free basis)
of less than 19,305 kJ/kg (8,300 Btu/lb) that is constructed and
operates at or near the mine that produces such coal.
Unit designed to burn solid oil-derived fuel subcategory means any
oil-fired EGU that burns solid oil-derived fuel.
Voluntary consensus standards or VCS mean technical standards (e.g.,
materials specifications, test methods, sampling procedures, business
practices) developed or adopted by one or more voluntary consensus
bodies. The EPA/OAQPS has by precedent only used VCS that are written in
English. Examples of VCS bodies are: American Society of Testing and
Materials (ASTM), American Society of Mechanical Engineers (ASME),
International Standards Organization (ISO), Standards Australia (AS),
British Standards (BS), Canadian Standards (CSA), European Standard (EN
or CEN) and German Engineering Standards (VDI). The types of standards
that are not considered VCS are standards developed by: the U.S. states,
e.g., California (CARB) and Texas (TCEQ); industry groups, such as
American Petroleum Institute (API), Gas Processors Association (GPA),
and Gas Research Institute (GRI); and other branches of the U.S.
government, e.g., Department of Defense (DOD) and Department of
Transportation (DOT). This does not preclude EPA from using standards
developed by groups that are not VCS bodies within an EPA rule. When
this occurs, EPA has done searches and reviews for VCS equivalent to
these non-VCS methods.
Wet flue gas desulfurization technology, or wet FGD, or wet scrubber
means any add-on air pollution control device that is located downstream
of the steam generating unit that mixes an aqueous stream or slurry with
the exhaust gases from an EGU to control emissions of PM and/or to
absorb and neutralize acid gases, such as SO2 and HCl.
Work practice standard means any design, equipment, work practice,
or operational standard, or combination thereof, which is promulgated
pursuant to CAA section 112(h).
[77 FR 9464, Feb. 16, 2012, as amended at 77 FR 23405, Apr. 19, 2012; 78
FR 24087, Apr. 24, 2013; 79 FR 68792, Nov. 19, 2014; 81 FR 20189, Apr.
6, 2016]
Sec. Table 1 to Subpart UUUUU of Part 63--Emission Limits for New or
Reconstructed EGUs
As stated in Sec. 63.9991, you must comply with the following
applicable emission limits:
[[Page 208]]
----------------------------------------------------------------------------------------------------------------
Using these
requirements, as
You must meet the appropriate (e.g.,
following emission specified sampling
If your EGU is in this subcategory . For the following limits and work volume or test run
. . pollutants . . . practice standards . . duration) and
. limitations with the
test methods in Table 5
to this Subpart . . .
----------------------------------------------------------------------------------------------------------------
1. Coal-fired unit not low rank a. Filterable 9.0E-2 lb/MWh \1\...... Collect a minimum of 4
virgin coal. particulate matter dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 6.0E-2 lb/GWh.......... Collect a minimum of 4
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-3 lb/GWh..........
Arsenic (As)........... 3.0E-3 lb/GWh..........
Beryllium (Be)......... 6.0E-4 lb/GWh..........
Cadmium (Cd)........... 4.0E-4 lb/GWh..........
Chromium (Cr).......... 7.0E-3 lb/GWh..........
Cobalt (Co)............ 2.0E-3 lb/GWh..........
Lead (Pb).............. 2.0E-2 lb/GWh..........
Manganese (Mn)......... 4.0E-3 lb/GWh..........
Nickel (Ni)............ 4.0E-2 lb/GWh..........
Selenium (Se).......... 5.0E-2 lb/GWh..........
b. Hydrogen chloride 1.0E-2 lb/MWh.......... For Method 26A at
(HCl). appendix A-8 to part
60 of this chapter,
collect a minimum of 3
dscm per run. For ASTM
D6348-03 \2\ or Method
320 at appendix A to
part 63 of this
chapter, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 1.0 lb/MWh............. SO2 CEMS.
\3\.
c. Mercury (Hg)........ 3.0E-3 lb/GWh.......... Hg CEMS or sorbent trap
monitoring system
only.
2. Coal-fired units low rank virgin a. Filterable 9.0E-2 lb/MWh \1\...... Collect a minimum of 4
coal. particulate matter dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 6.0E-2 lb/GWh.......... Collect a minimum of 4
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-3 lb/GWh..........
Arsenic (As)........... 3.0E-3 lb/GWh..........
Beryllium (Be)......... 6.0E-4 lb/GWh..........
Cadmium (Cd)........... 4.0E-4 lb/GWh..........
Chromium (Cr).......... 7.0E-3 lb/GWh..........
Cobalt (Co)............ 2.0E-3 lb/GWh..........
Lead (Pb).............. 2.0E-2 lb/GWh..........
Manganese (Mn)......... 4.0E-3 lb/GWh..........
Nickel (Ni)............ 4.0E-2 lb/GWh..........
Selenium (Se).......... 5.0E-2 lb/GWh..........
b. Hydrogen chloride 1.0E-2 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 3 dscm
per run For ASTM D6348-
03 \2\ or Method 320,
sample for a minimum
of 1 hour.
OR
Sulfur dioxide (SO2) 1.0 lb/MWh............. SO2 CEMS.
\3\.
c. Mercury (Hg)........ 4.0E-2 lb/GWh.......... Hg CEMS or sorbent trap
monitoring system
only.
3. IGCC unit......................... a. Filterable 7.0E-2 lb/MWh \4\ 9.0E- Collect a minimum of 1
particulate matter 2 lb/MWh \5\. dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 4.0E-1 lb/GWh.......... Collect a minimum of 1
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 2
dscm per run.
Antimony (Sb).......... 2.0E-2 lb/GWh..........
Arsenic (As)........... 2.0E-2 lb/GWh..........
Beryllium (Be)......... 1.0E-3 lb/GWh..........
Cadmium (Cd)........... 2.0E-3 lb/GWh..........
Chromium (Cr).......... 4.0E-2 lb/GWh..........
Cobalt (Co)............ 4.0E-3 lb/GWh..........
Lead (Pb).............. 9.0E-3 lb/GWh..........
Manganese (Mn)......... 2.0E-2 lb/GWh..........
Nickel (Ni)............ 7.0E-2 lb/GWh..........
Selenium (Se).......... 3.0E-1 lb/GWh..........
[[Page 209]]
b. Hydrogen chloride 2.0E-3 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 1 dscm
per run; for Method 26
at appendix A-8 to
part 60 of this
chapter, collect a
minimum of 120 liters
per run. For ASTM
D6348-03 \2\ or Method
320, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 4.0E-1 lb/MWh.......... SO2 CEMS.
\3\.
c. Mercury (Hg)........ 3.0E-3 lb/GWh.......... Hg CEMS or sorbent trap
monitoring system
only.
4. Liquid oil-fired unit--continental a. Filterable 3.0E-1 lb/MWh \1\...... Collect a minimum of 1
(excluding limited-use liquid oil- particulate matter dscm per run.
fired subcategory units). (PM).
OR..................... OR
Total HAP metals....... 2.0E-4 lb/MWh.......... Collect a minimum of 2
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 2
dscm per run.
Antimony (Sb).......... 1.0E-2 lb/GWh..........
Arsenic (As)........... 3.0E-3 lb/GWh..........
Beryllium (Be)......... 5.0E-4 lb/GWh..........
Cadmium (Cd)........... 2.0E-4 lb/GWh..........
Chromium (Cr).......... 2.0E-2 lb/GWh..........
Cobalt (Co)............ 3.0E-2 lb/GWh..........
Lead (Pb).............. 8.0E-3 lb/GWh..........
Manganese (Mn)......... 2.0E-2 lb/GWh..........
Nickel (Ni)............ 9.0E-2 lb/GWh..........
Selenium (Se).......... 2.0E-2 lb/GWh..........
Mercury (Hg)........... 1.0E-4 lb/GWh.......... For Method 30B at
appendix A-8 to part
60 of this chapter
sample volume
determination (Section
8.2.4), the estimated
Hg concentration
should nominally be <
\1/2\ the standard.
b. Hydrogen chloride 4.0E-4 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 3 dscm
per run. For ASTM
D6348-03 \2\ or Method
320, sample for a
minimum of 1 hour.
c. Hydrogen fluoride 4.0E-4 lb/MWh.......... For Method 26A, collect
(HF). a minimum of 3 dscm
per run. For ASTM
D6348-03 \2\ or Method
320, sample for a
minimum of 1 hour.
5. Liquid oil-fired unit--non- a. Filterable 2.0E-1 lb/MWh \1\...... Collect a minimum of 1
continental (excluding limited-use particulate matter dscm per run.
liquid oil-fired subcategory units). (PM).
OR..................... OR
Total HAP metals....... 7.0E-3 lb/MWh.......... Collect a minimum of 1
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-3 lb/GWh..........
Arsenic (As)........... 6.0E-2 lb/GWh..........
Beryllium (Be)......... 2.0E-3 lb/GWh..........
Cadmium (Cd)........... 2.0E-3 lb/GWh..........
Chromium (Cr).......... 2.0E-2 lb/GWh..........
Cobalt (Co)............ 3.0E-1 lb/GWh..........
Lead (Pb).............. 3.0E-2 lb/GWh..........
Manganese (Mn)......... 1.0E-1 lb/GWh..........
Nickel (Ni)............ 4.1E0 lb/GWh...........
Selenium (Se).......... 2.0E-2 lb/GWh..........
Mercury (Hg)........... 4.0E-4 lb/GWh.......... For Method 30B sample
volume determination
(Section 8.2.4), the
estimated Hg
concentration should
nominally be < \1/2\
the standard.
b. Hydrogen chloride 2.0E-3 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 1 dscm
per run;for Method 26,
collect a minimum of
120 liters per run.
For ASTM D6348-03 \2\
or Method 320, sample
for a minimum of 1
hour.
[[Page 210]]
c. Hydrogen fluoride 5.0E-4 lb/MWh.......... For Method 26A, collect
(HF). a minimum of 3 dscm
per run.For ASTM D6348-
03 \2\ or Method 320,
sample for a minimum
of 1 hour.
6. Solid oil-derived fuel-fired unit. a. Filterable 3.0E-2 lb/MWh \1\...... Collect a minimum of 1
particulate matter dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 6.0E-1 lb/GWh.......... Collect a minimum of 1
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-3 lb/GWh..........
Arsenic (As)........... 3.0E-3 lb/GWh..........
Beryllium (Be)......... 6.0E-4 lb/GWh..........
Cadmium (Cd)........... 7.0E-4 lb/GWh..........
Chromium (Cr).......... 6.0E-3 lb/GWh..........
Cobalt (Co)............ 2.0E-3 lb/GWh..........
Lead (Pb).............. 2.0E-2 lb/GWh..........
Manganese (Mn)......... 7.0E-3 lb/GWh..........
Nickel (Ni)............ 4.0E-2 lb/GWh..........
Selenium (Se).......... 6.0E-3 lb/GWh..........
b. Hydrogen chloride 4.0E-4 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 3 dscm
per run. For ASTM
D6348-03 \2\ or Method
320, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 1.0 lb/MWh............. SO2 CEMS.
\3\.
c. Mercury (Hg)........ 2.0E-3 lb/GWh.......... Hg CEMS or Sorbent trap
monitoring system
only.
----------------------------------------------------------------------------------------------------------------
\1\ Gross output.
\2\ Incorporated by reference, see Sec. 63.14.
\3\ You may not use the alternate SO2 limit if your EGU does not have some form of FGD system (or, in the case
of IGCC EGUs, some other acid gas removal system either upstream or downstream of the combined cycle block)
and SO2 CEMS installed.
\4\ Duct burners on syngas; gross output.
\5\ Duct burners on natural gas; gross output.
[81 FR 20190, Apr. 6, 2016]
Sec. Table 2 to Subpart UUUUU of Part 63--Emission Limits for Existing
EGUs
As stated in Sec. 63.9991, you must comply with the following
applicable emission limits: \1\
----------------------------------------------------------------------------------------------------------------
Using these
requirements, as
You must meet the appropriate (e.g.,
following emission specified sampling
If your EGU is in this subcategory . For the following limits and work volume or test run
. . pollutants . . . practice standards . . duration) and
. limitations with the
test methods in Table 5
to this Subpart . . .
----------------------------------------------------------------------------------------------------------------
1. Coal-fired unit not low rank a. Filterable 3.0E-2 lb/MMBtu or 3.0E- Collect a minimum of 1
virgin coal. particulate matter 1 lb/MWh \2\. dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 5.0E-5 lb/MMBtu or 5.0E- Collect a minimum of 1
1 lb/GWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-1 lb/TBtu or 8.0E-
3 lb/GWh.
Arsenic (As)........... 1.1E0 lb/TBtu or 2.0E-2
lb/GWh.
Beryllium (Be)......... 2.0E-1 lb/TBtu or 2.0E-
3 lb/GWh.
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 3.0E-
3 lb/GWh.
Chromium (Cr).......... 2.8E0 lb/TBtu or 3.0E-2
lb/GWh.
Cobalt (Co)............ 8.0E-1 lb/TBtu or 8.0E-
3 lb/GWh.
Lead (Pb).............. 1.2E0 lb/TBtu or 2.0E-2
lb/GWh.
[[Page 211]]
Manganese (Mn)......... 4.0E0 lb/TBtu or 5.0E-2
lb/GWh.
Nickel (Ni)............ 3.5E0 lb/TBtu or 4.0E-2
lb/GWh.
Selenium (Se).......... 5.0E0 lb/TBtu or 6.0E-2
lb/GWh.
b. Hydrogen chloride 2.0E-3 lb/MMBtu or 2.0E- For Method 26A at
(HCl). 2 lb/MWh. appendix A-8 to part
60 of this chapter,
collect a minimum of
0.75 dscm per run; for
Method 26, collect a
minimum of 120 liters
per run. For ASTM
D6348-03 \3\ or Method
320 at appendix A to
part 63 of this
chapter, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 2.0E-1 lb/MMBtu or SO2 CEMS.
\4\. 1.5E0 lb/MWh.
c. Mercury (Hg)........ 1.2E0 lb/TBtu or 1.3E-2 LEE Testing for 30 days
lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
at appendix A-8 to
part 60 of this
chapter run or Hg CEMS
or sorbent trap
monitoring system
only.
OR.....................
1.0E0 lb/TBtu or 1.1E-2 LEE Testing for 90 days
lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
run or Hg CEMS or
sorbent trap
monitoring system
only.
2. Coal-fired unit low rank virgin a. Filterable 3.0E-2 lb/MMBtu or 3.0E- Collect a minimum of 1
coal. particulate matter 1 lb/MWh \2\. dscm per run.
(PM).
OR..................... OR.....................
Total non-Hg HAP metals 5.0E-5 lb/MMBtu or 5.0E- Collect a minimum of 1
1 lb/GWh. dscm per run.
OR..................... OR.....................
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-1 lb/TBtu or 8.0E-
3 lb/GWh.
Arsenic (As)........... 1.1E0 lb/TBtu or 2.0E-2
lb/GWh.
Beryllium (Be)......... 2.0E-1 lb/TBtu or 2.0E-
3 lb/GWh.
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 3.0E-
3 lb/GWh.
Chromium (Cr).......... 2.8E0 lb/TBtu or 3.0E-2
lb/GWh.
Cobalt (Co)............ 8.0E-1 lb/TBtu or 8.0E-
3 lb/GWh.
Lead (Pb).............. 1.2E0 lb/TBtu or 2.0E-2
lb/GWh.
Manganese (Mn)......... 4.0E0 lb/TBtu or 5.0E-2
lb/GWh.
Nickel (Ni)............ 3.5E0 lb/TBtu or 4.0E-2
lb/GWh.
Selenium (Se).......... 5.0E0 lb/TBtu or 6.0E-2
lb/GWh.
[[Page 212]]
b. Hydrogen chloride 2.0E-3 lb/MMBtu or 2.0E- For Method 26A, collect
(HCl). 2 lb/MWh. a minimum of 0.75 dscm
per run; for Method 26
at appendix A-8 to
part 60 of this
chapter, collect a
minimum of 120 liters
per run. For ASTM
D6348-03 \3\ or Method
320, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 2.0E-1 lb/MMBtu or SO2 CEMS.
\4\. 1.5E0 lb/MWh.
c. Mercury (Hg)........ 4.0E0 lb/TBtu or 4.0E-2 LEE Testing for 30 days
lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
run or Hg CEMS or
sorbent trap
monitoring system
only.
3. IGCC unit......................... a. Filterable 4.0E-2 lb/MMBtu or 4.0E- Collect a minimum of 1
particulate matter 1 lb/MWh \2\. dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 6.0E-5 lb/MMBtu or 5.0E- Collect a minimum of 1
1 lb/GWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 2
dscm per run.
Antimony (Sb).......... 1.4E0 lb/TBtu or 2.0E-2
lb/GWh.
Arsenic (As)........... 1.5E0 lb/TBtu or 2.0E-2
lb/GWh.
Beryllium (Be)......... 1.0E-1 lb/TBtu or 1.0E-
3 lb/GWh.
Cadmium (Cd)........... 1.5E-1 lb/TBtu or 2.0E-
3 lb/GWh.
Chromium (Cr).......... 2.9E0 lb/TBtu or 3.0E-2
lb/GWh.
Cobalt (Co)............ 1.2E0 lb/TBtu or 2.0E-2
lb/GWh.
Lead (Pb).............. 1.9E+2 lb/TBtu or 1.8E0
lb/GWh.
Manganese (Mn)......... 2.5E0 lb/TBtu or 3.0E-2
lb/GWh.
Nickel (Ni)............ 6.5E0 lb/TBtu or 7.0E-2
lb/GWh.
Selenium (Se).......... 2.2E+1 lb/TBtu or 3.0E-
1 lb/GWh.
b. Hydrogen chloride 5.0E-4 lb/MMBtu or 5.0E- For Method 26A, collect
(HCl). 3 lb/MWh. a minimum of 1 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 1
hour.
c. Mercury (Hg)........ 2.5E0 lb/TBtu or 3.0E-2 LEE Testing for 30 days
lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
run or Hg CEMS or
sorbent trap
monitoring system
only.
4. Liquid oil-fired unit--continental a. Filterable 3.0E-2 lb/MMBtu or 3.0E- Collect a minimum of 1
(excluding limited-use liquid oil- particulate matter 1 lb/MWh \2\. dscm per run.
fired subcategory units). (PM).
OR..................... OR
[[Page 213]]
Total HAP metals....... 8.0E-4 lb/MMBtu or 8.0E- Collect a minimum of 1
3 lb/MWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 1
dscm per run.
Antimony (Sb).......... 1.3E+1 lb/TBtu or 2.0E-
1 lb/GWh.
Arsenic (As)........... 2.8E0 lb/TBtu or 3.0E-2
lb/GWh.
Beryllium (Be)......... 2.0E-1 lb/TBtu or 2.0E-
3 lb/GWh.
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 2.0E-
3 lb/GWh.
Chromium (Cr).......... 5.5E0 lb/TBtu or 6.0E-2
lb/GWh.
Cobalt (Co)............ 2.1E+1 lb/TBtu or 3.0E-
1 lb/GWh.
Lead (Pb).............. 8.1E0 lb/TBtu or 8.0E-2
lb/GWh.
Manganese (Mn)......... 2.2E+1 lb/TBtu or 3.0E-
1 lb/GWh.
Nickel (Ni)............ 1.1E+2 lb/TBtu or 1.1E0
lb/GWh.
Selenium (Se).......... 3.3E0 lb/TBtu or 4.0E-2
lb/GWh.
Mercury (Hg)........... 2.0E-1 lb/TBtu or 2.0E- For Method 30B sample
3 lb/GWh. volume determination
(Section 8.2.4), the
estimated Hg
concentration should
nominally be < \1/2\
the standard.
b. Hydrogen chloride 2.0E-3 lb/MMBtu or 1.0E- For Method 26A, collect
(HCl). 2 lb/MWh. a minimum of 1 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 1
hour.
c. Hydrogen fluoride 4.0E-4 lb/MMBtu or 4.0E- For Method 26A, collect
(HF). 3 lb/MWh. a minimum of 1 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 1
hour.
5. Liquid oil-fired unit--non- a. Filterable 3.0E-2 lb/MMBtu or 3.0E- Collect a minimum of 1
continental (excluding limited-use particulate matter 1 lb/MWh \2\. dscm per run.
liquid oil-fired subcategory units). (PM).
OR..................... OR
Total HAP metals....... 6.0E-4 lb/MMBtu or 7.0E- Collect a minimum of 1
3 lb/MWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 2
dscm per run.
Antimony (Sb).......... 2.2E0 lb/TBtu or 2.0E-2
lb/GWh.
Arsenic (As)........... 4.3E0 lb/TBtu or 8.0E-2
lb/GWh.
Beryllium (Be)......... 6.0E-1 lb/TBtu or 3.0E-
3 lb/GWh.
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 3.0E-
3 lb/GWh.
Chromium (Cr).......... 3.1E+1 lb/TBtu or 3.0E-
1 lb/GWh.
Cobalt (Co)............ 1.1E+2 lb/TBtu or 1.4E0
lb/GWh.
Lead (Pb).............. 4.9E0 lb/TBtu or 8.0E-2
lb/GWh.
Manganese (Mn)......... 2.0E+1 lb/TBtu or 3.0E-
1 lb/GWh.
[[Page 214]]
Nickel (Ni)............ 4.7E+2 lb/TBtu or 4.1E0
lb/GWh.
Selenium (Se).......... 9.8E0 lb/TBtu or 2.0E-1
lb/GWh.
Mercury (Hg)........... 4.0E-2 lb/TBtu or 4.0E- For Method 30B sample
4 lb/GWh. volume determination
(Section 8.2.4), the
estimated Hg
concentration should
nominally be < \1/2\
the standard.
b. Hydrogen chloride 2.0E-4 lb/MMBtu or 2.0E- For Method 26A, collect
(HCl). 3 lb/MWh. a minimum of 1 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 2
hours.
c. Hydrogen fluoride 6.0E-5 lb/MMBtu or 5.0E- For Method 26A, collect
(HF). 4 lb/MWh. a minimum of 3 dscm
per run. For ASTM
D6348-03 \3\ or Method
320, sample for a
minimum of 2 hours.
6. Solid oil-derived fuel-fired unit. a. Filterable 8.0E-3 lb/MMBtu or 9.0E- Collect a minimum of 1
particulate matter 2 lb/MWh \2\. dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 4.0E-5 lb/MMBtu or 6.0E- Collect a minimum of 1
1 lb/GWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-1 lb/TBtu or 7.0E-
3 lb/GWh.
Arsenic (As)........... 3.0E-1 lb/TBtu or 5.0E-
3 lb/GWh.
Beryllium (Be)......... 6.0E-2 lb/TBtu or 5.0E-
4 lb/GWh.
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 4.0E-
3 lb/GWh.
Chromium (Cr).......... 8.0E-1 lb/TBtu or 2.0E-
2 lb/GWh.
Cobalt (Co)............ 1.1E0 lb/TBtu or 2.0E-2
lb/GWh.
Lead (Pb).............. 8.0E-1 lb/TBtu or 2.0E-
2 lb/GWh.
Manganese (Mn)......... 2.3E0 lb/TBtu or 4.0E-2
lb/GWh.
Nickel (Ni)............ 9.0E0 lb/TBtu or 2.0E-1
lb/GWh.
Selenium (Se).......... 1.2E0 lb/Tbtu or 2.0E-2
lb/GWh.
b. Hydrogen chloride 5.0E-3 lb/MMBtu or 8.0E- For Method 26A, collect
(HCl). 2 lb/MWh. a minimum of 0.75 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 1
hour.
OR
Sulfur dioxide (SO2) 3.0E-1 lb/MMBtu or SO2 CEMS.
\4\. 2.0E0 lb/MWh.
c. Mercury (Hg)........ 2.0E-1 lb/TBtu or 2.0E- LEE Testing for 30 days
3 lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
run or Hg CEMS or
sorbent trap
monitoring system
only.
----------------------------------------------------------------------------------------------------------------
\1\ For LEE emissions testing for total PM, total HAP metals, individual HAP metals, HCl, and HF, the required
minimum sampling volume must be increased nominally by a factor of two.
[[Page 215]]
\2\ Gross output.
\3\ Incorporated by reference, see Sec. 63.14.
\4\ You may not use the alternate SO2 limit if your EGU does not have some form of FGD system and SO2 CEMS
installed.
[81 FR 20192, Apr. 6, 2016]
Sec. Table 3 to Subpart UUUUU of Part 63--Work Practice Standards
As stated in Sec. Sec. 63.9991, you must comply with the following
applicable work practice standards:
------------------------------------------------------------------------
If your EGU is . . . You must meet the following . . .
------------------------------------------------------------------------
1. An existing EGU................ Conduct a tune-up of the EGU burner
and combustion controls at least
each 36 calendar months, or each 48
calendar months if neural network
combustion optimization software is
employed, as specified in Sec.
63.10021(e).
2. A new or reconstructed EGU..... Conduct a tune-up of the EGU burner
and combustion controls at least
each 36 calendar months, or each 48
calendar months if neural network
combustion optimization software is
employed, as specified in Sec.
63.10021(e).
3. A coal-fired, liquid oil-fired a. You have the option of complying
(excluding limited-use liquid oil- using either of the following work
fired subcategory units), or practice standards:
solid oil-derived fuel-fired EGU (1) If you choose to comply using
during startup. paragraph (1) of the definition of
``startup'' in Sec. 63.10042, you
must operate all CMS during
startup. Startup means either the
first-ever firing of fuel in a
boiler for the purpose of producing
electricity, or the firing of fuel
in a boiler after a shutdown event
for any purpose. Startup ends when
any of the steam from the boiler is
used to generate electricity for
sale over the grid or for any other
purpose (including on site use).
For startup of a unit, you must use
clean fuels as defined in Sec.
63.10042 for ignition. Once you
convert to firing coal, residual
oil, or solid oil-derived fuel, you
must engage all of the applicable
control technologies except dry
scrubber and SCR. You must start
your dry scrubber and SCR systems,
if present, appropriately to comply
with relevant standards applicable
during normal operation. You must
comply with all applicable
emissions limits at all times
except for periods that meet the
applicable definitions of startup
and shutdown in this subpart. You
must keep records during startup
periods. You must provide reports
concerning activities and startup
periods, as specified in Sec.
63.10011(g) and Sec. 63.10021(h)
and (i).
(2) If you choose to comply using
paragraph (2) of the definition
of ``startup'' in Sec.
63.10042, you must operate all
CMS during startup. You must
also collect appropriate data,
and you must calculate the
pollutant emission rate for each
hour of startup.
For startup of an EGU, you must
use one or a combination of the
clean fuels defined in Sec.
63.10042 to the maximum extent
possible, taking into account
considerations such as boiler or
control device integrity,
throughout the startup period.
You must have sufficient clean
fuel capacity to engage and
operate your PM control device
within one hour of adding coal,
residual oil, or solid oil-
derived fuel to the unit. You
must meet the startup period
work practice requirements as
identified in Sec.
63.10020(e).
Once you start firing coal,
residual oil, or solid oil-
derived fuel, you must vent
emissions to the main stack(s).
You must comply with the
applicable emission limits
beginning with the hour after
startup ends. You must engage
and operate your particulate
matter control(s) within 1 hour
of first firing of coal,
residual oil, or solid oil-
derived fuel.
You must start all other
applicable control devices as
expeditiously as possible,
considering safety and
manufacturer/supplier
recommendations, but, in any
case, when necessary to comply
with other standards made
applicable to the EGU by a
permit limit or a rule other
than this Subpart that require
operation of the control
devices.
b. Relative to the syngas not
fired in the combustion turbine
of an IGCC EGU during startup,
you must either: (1) Flare the
syngas, or (2) route the syngas
to duct burners, which may need
to be installed, and route the
flue gas from the duct burners
to the heat recovery steam
generator.
c. If you choose to use just one
set of sorbent traps to
demonstrate compliance with the
applicable Hg emission limit,
you must comply with the limit
at all times; otherwise, you
must comply with the applicable
emission limit at all times
except for startup and shutdown
periods.
d. You must collect monitoring
data during startup periods, as
specified in Sec. 63.10020(a)
and (e). You must keep records
during startup periods, as
provided in Sec. Sec.
63.10032 and 63.10021(h). You
must provide reports concerning
activities and startup periods,
as specified in Sec. Sec.
63.10011(g), 63.10021(i), and
63.10031.
4. A coal-fired, liquid oil-fired You must operate all CMS during
(excluding limited-use liquid oil- shutdown. You must also collect
fired subcategory units), or appropriate data, and you must
solid oil-derived fuel-fired EGU calculate the pollutant emission
during shutdown. rate for each hour of shutdown for
those pollutants for which a CMS is
used.
While firing coal, residual oil, or
solid oil-derived fuel during
shutdown, you must vent emissions
to the main stack(s) and operate
all applicable control devices and
continue to operate those control
devices after the cessation of
coal, residual oil, or solid oil-
derived fuel being fed into the EGU
and for as long as possible
thereafter considering operational
and safety concerns. In any case,
you must operate your controls when
necessary to comply with other
standards made applicable to the
EGU by a permit limit or a rule
other than this Subpart and that
require operation of the control
devices.
If, in addition to the fuel used
prior to initiation of shutdown,
another fuel must be used to
support the shutdown process,
that additional fuel must be one
or a combination of the clean
fuels defined in Sec. 63.10042
and must be used to the maximum
extent possible, taking into
account considerations such as
not compromising boiler or
control device integrity.
Relative to the syngas not fired
in the combustion turbine of an
IGCC EGU during shutdown, you
must either: (1) Flare the
syngas, or (2) route the syngas
to duct burners, which may need
to be installed, and route the
flue gas from the duct burners
to the heat recovery steam
generator.
[[Page 216]]
You must comply with all
applicable emission limits at
all times except during startup
periods and shutdown periods at
which time you must meet this
work practice. You must collect
monitoring data during shutdown
periods, as specified in Sec.
63.10020(a). You must keep
records during shutdown periods,
as provided in Sec. Sec.
63.10032 and 63.10021(h). Any
fraction of an hour in which
shutdown occurs constitutes a
full hour of shutdown. You must
provide reports concerning
activities and shutdown periods,
as specified in Sec. Sec.
63.10011(g), 63.10021(i), and
63.10031.
------------------------------------------------------------------------
[81 FR 20196, Apr. 6, 2016]
Sec. Table 4 to Subpart UUUUU of Part 63--Operating Limits for EGUs
As stated in Sec. 63.9991, you must comply with the applicable
operating limits:
------------------------------------------------------------------------
If you demonstrate compliance You must meet these operating limits
using . . . . . .
------------------------------------------------------------------------
PM CPMS........................... Maintain the 30-boiler operating day
rolling average PM CPMS output
determined in accordance with the
requirements of Sec.
63.10023(b)(2) and obtained during
the most recent performance test
run demonstrating compliance with
the filterable PM, total non-
mercury HAP metals (total HAP
metals, for liquid oil-fired
units), or individual non-mercury
HAP metals (individual HAP metals
including Hg, for liquid oil-fired
units) emissions limitation(s).
------------------------------------------------------------------------
[81 FR 20197, Apr. 6, 2016]
Sec. Table 5 to Subpart UUUUU of Part 63--Performance Testing
Requirements
As stated in Sec. 63.10007, you must comply with the following
requirements for performance testing for existing, new or reconstructed
affected sources: \1\
---------------------------------------------------------------------------
\1\ Regarding emissions data collected during periods of startup or
shutdown, see Sec. Sec. 63.10020(b) and (c) and 63.10021(h).
----------------------------------------------------------------------------------------------------------------
You must perform the
following activities, as
To conduct a performance test for Using . . . applicable to your input- Using . . .\2\
the following pollutant . . . or output-based emission
limit . . .
----------------------------------------------------------------------------------------------------------------
1. Filterable Particulate matter Emissions Testing.... a. Select sampling ports Method 1 at appendix A-1
(PM). location and the number to part 60 of this
of traverse points. chapter.
b. Determine velocity and Method 2, 2A, 2C, 2F, 2G
volumetric flow-rate of or 2H at appendix A-1 or
the stack gas. A-2 to part 60 of this
chapter.
c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-2 to part 60
concentrations of the of this chapter, or ANSI/
stack gas. ASME PTC 19.10-1981.\3\
d. Measure the moisture Method 4 at appendix A-3
content of the stack gas. to part 60 of this
chapter.
e. Measure the filterable Methods 5 and 5I at
PM concentration. appendix A-3 to part 60
of this chapter.
For positive pressure
fabric filters, Method
5D at appendix A-3 to
part 60 of this chapter
for filterable PM
emissions.
Note that the Method 5 or
5I front half
temperature shall be
160[deg] 14 [deg]C
(320[deg] 25 [deg]F).
f. Convert emissions Method 19 F-factor
concentration to lb/MMBtu methodology at appendix
or lb/MWh emissions rates. A-7 to part 60 of this
chapter, or calculate
using mass emissions
rate and gross output
data (see Sec.
63.10007(e)).
OR OR
PM CEMS.............. a. Install, certify, Performance Specification
operate, and maintain the 11 at appendix B to part
PM CEMS. 60 of this chapter and
Procedure 2 at appendix
F to part 60 of this
chapter.
[[Page 217]]
b. Install, certify, Part 75 of this chapter
operate, and maintain the and Sec. 63.10010(a),
diluent gas, flow rate, (b), (c), and (d).
and/or moisture
monitoring systems.
c. Convert hourly Method 19 F-factor
emissions concentrations methodology at appendix
to 30 boiler operating A-7 to part 60 of this
day rolling average lb/ chapter, or calculate
MMBtu or lb/MWh emissions using mass emissions
rates. rate and gross output
data (see Sec.
63.10007(e)).
2. Total or individual non-Hg HAP Emissions Testing.... a. Select sampling ports Method 1 at appendix A-1
metals. location and the number to part 60 of this
of traverse points. chapter.
b. Determine velocity and Method 2, 2A, 2C, 2F, 2G
volumetric flow-rate of or 2H at appendix A-1 or
the stack gas. A-2 to part 60 of this
chapter.
c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-2 to part 60
concentrations of the of this chapter, or ANSI/
stack gas. ASME PTC 19.10-1981.\3\
d. Measure the moisture Method 4 at appendix A-3
content of the stack gas. to part 60 of this
chapter.
e. Measure the HAP metals Method 29 at appendix A-8
emissions concentrations to part 60 of this
and determine each chapter. For liquid oil-
individual HAP metals fired units, Hg is
emissions concentration, included in HAP metals
as well as the total and you may use Method
filterable HAP metals 29, Method 30B at
emissions concentration appendix A-8 to part 60
and total HAP metals of this chapter; for
emissions concentration. Method 29, you must
report the front half
and back half results
separately. When using
Method 29, report metals
matrix spike and
recovery levels.
f. Convert emissions Method 19 F-factor
concentrations methodology at appendix
(individual HAP metals, A-7 to part 60 of this
total filterable HAP chapter, or calculate
metals, and total HAP using mass emissions
metals) to lb/MMBtu or lb/ rate and gross output
MWh emissions rates. data (see Sec.
63.10007(e)).
3. Hydrogen chloride (HCl) and Emissions Testing.... a. Select sampling ports Method 1 at appendix A-1
hydrogen fluoride (HF). location and the number to part 60 of this
of traverse points. chapter.
b. Determine velocity and Method 2, 2A, 2C, 2F, 2G
volumetric flow-rate of or 2H at appendix A-1 or
the stack gas. A-2 to part 60 of this
chapter.
c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-2 to part 60
concentrations of the of this chapter, or ANSI/
stack gas. ASME PTC 19.10-1981.\3\
d. Measure the moisture Method 4 at appendix A-3
content of the stack gas. to part 60 of this
chapter.
e. Measure the HCl and HF Method 26 or Method 26A
emissions concentrations. at appendix A-8 to part
60 of this chapter or
Method 320 at appendix A
to part 63 of this
chapter or ASTM D6348-03
\3\ with
(1) the following
conditions when using
ASTM D6348-03:
(A) The test plan
preparation and
implementation in the
Annexes to ASTM D6348-
03, Sections A1 through
A8 are mandatory;
(B) For ASTM D6348-03
Annex A5 (Analyte
Spiking Technique), the
percent (%) R must be
determined for each
target analyte (see
Equation A5.5);
(C) For the ASTM D6348-03
test data to be
acceptable for a target
analyte, %R must be 70%
=R <=130%;
and
----------------------------------------------------------------------------------------------------------------
3.e.1(D) The %R value for each compound must be reported in the test
report and all field measurements corrected with the calculated %R value
for that compound using the following equation:
[[Page 218]]
[GRAPHIC] [TIFF OMITTED] TR14NO18.072
and
----------------------------------------------------------------------------------------------------------------
You must perform the
To conduct a performance test for following activities, as
the following pollutant . . . Using . . . (cont'd) applicable to your input- Using . . .\2\ (cont'd)
(cont'd) or output-based emission
limit . . . (cont'd)
----------------------------------------------------------------------------------------------------------------
(2) spiking levels
nominally no greater
than two times the level
corresponding to the
applicable emission
limit.
Method 26A must be used
if there are entrained
water droplets in the
exhaust stream.
f. Convert emissions Method 19 F-factor
concentration to lb/MMBtu methodology at appendix
or lb/MWh emissions rates. A-7 to part 60 of this
chapter, or calculate
using mass emissions
rate and gross output
data (see Sec.
63.10007(e)).
OR OR
HCl and/or HF CEMS... a. Install, certify, Appendix B of this
operate, and maintain the subpart.
HCl or HF CEMS.
b. Install, certify, Part 75 of this chapter
operate, and maintain the and Sec. 63.10010(a),
diluent gas, flow rate, (b), (c), and (d).
and/or moisture
monitoring systems.
c. Convert hourly Method 19 F-factor
emissions concentrations methodology at appendix
to 30 boiler operating A-7 to part 60 of this
day rolling average lb/ chapter, or calculate
MMBtu or lb/MWh emissions using mass emissions
rates. rate and gross output
data (see Sec.
63.10007(e)).
4. Mercury (Hg)................... Emissions Testing.... a. Select sampling ports Method 1 at appendix A-1
location and the number to part 60 of this
of traverse points. chapter or Method 30B at
Appendix A-8 for Method
30B point selection.
b. Determine velocity and Method 2, 2A, 2C, 2F, 2G
volumetric flow-rate of or 2H at appendix A-1 or
the stack gas. A-2 to part 60 of this
chapter.
c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-1 to part 60
concentrations of the of this chapter, or ANSI/
stack gas. ASME PTC 19.10-1981.\3\
d. Measure the moisture Method 4 at appendix A-3
content of the stack gas. to part 60 of this
chapter.
e. Measure the Hg emission Method 30B at appendix A-
concentration. 8 to part 60 of this
chapter, ASTM D6784,\3\
or Method 29 at appendix
A-8 to part 60 of this
chapter; for Method 29,
you must report the
front half and back half
results separately.
f. Convert emissions Method 19 F-factor
concentration to lb/TBtu methodology at appendix
or lb/GWh emission rates. A-7 to part 60 of this
chapter, or calculate
using mass emissions
rate and gross output
data (see Sec.
63.10007(e)).
OR OR
Hg CEMS.............. a. Install, certify, Sections 3.2.1 and 5.1 of
operate, and maintain the appendix A of this
CEMS. subpart.
b. Install, certify, Part 75 of this chapter
operate, and maintain the and Sec. 63.10010(a),
diluent gas, flow rate, (b), (c), and (d).
and/or moisture
monitoring systems.
c. Convert hourly Section 6 of appendix A
emissions concentrations to this subpart.
to 30 boiler operating
day rolling average lb/
TBtu or lb/GWh emissions
rates.
OR OR
Sorbent trap a. Install, certify, Sections 3.2.2 and 5.2 of
monitoring system. operate, and maintain the appendix A to this
sorbent trap monitoring subpart.
system.
b. Install, operate, and Part 75 of this chapter
maintain the diluent gas, and Sec. 63.10010(a),
flow rate, and/or (b), (c), and (d).
moisture monitoring
systems.
[[Page 219]]
c. Convert emissions Section 6 of appendix A
concentrations to 30 to this subpart.
boiler operating day
rolling average lb/TBtu
or lb/GWh emissions rates.
OR OR
LEE testing.......... a. Select sampling ports Single point located at
location and the number the 10% centroidal area
of traverse points. of the duct at a port
location per Method 1 at
appendix A-1 to part 60
of this chapter or
Method 30B at Appendix A-
8 for Method 30B point
selection.
b. Determine velocity and Method 2, 2A, 2C, 2F, 2G,
volumetric flow-rate of or 2H at appendix A-1 or
the stack gas. A-2 to part 60 of this
chapter or flow
monitoring system
certified per appendix A
of this subpart.
c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-1 to part 60
concentrations of the of this chapter, or ANSI/
stack gas. ASME PTC 19.10-1981,\3\
or diluent gas
monitoring systems
certified according to
part 75 of this chapter.
d. Measure the moisture Method 4 at appendix A-3
content of the stack gas. to part 60 of this
chapter, or moisture
monitoring systems
certified according to
part 75 of this chapter.
e. Measure the Hg emission Method 30B at appendix A-
concentration. 8 to part 60 of this
chapter; perform a 30
operating day test, with
a maximum of 10
operating days per run
(i.e., per pair of
sorbent traps) or
sorbent trap monitoring
system or Hg CEMS
certified per appendix A
of this subpart.
f. Convert emissions Method 19 F-factor
concentrations from the methodology at appendix
LEE test to lb/TBtu or lb/ A-7 to part 60 of this
GWh emissions rates. chapter, or calculate
using mass emissions
rate and gross output
data (see Sec.
63.10007(e)).
g. Convert average lb/TBtu Potential maximum annual
or lb/GWh Hg emission heat input in TBtu or
rate to lb/year, if you potential maximum
are attempting to meet electricity generated in
the 29.0 lb/year GWh.
threshold.
5. Sulfur dioxide (SO2)........... SO2 CEMS............. a. Install, certify, Part 75 of this chapter
operate, and maintain the and Sec. 63.10010(a)
CEMS. and (f).
b. Install, operate, and Part 75 of this chapter
maintain the diluent gas, and Sec. 63.10010(a),
flow rate, and/or (b), (c), and (d).
moisture monitoring
systems.
c. Convert hourly Method 19 F-factor
emissions concentrations methodology at appendix
to 30 boiler operating A-7 to part 60 of this
day rolling average lb/ chapter, or calculate
MMBtu or lb/MWh emissions using mass emissions
rates. rate and gross output
data (see Sec.
63.10007(e)).
----------------------------------------------------------------------------------------------------------------
\2\ See Tables 1 and 2 to this subpart for required sample volumes and/or sampling run times.
\3\ Incorporated by reference, see Sec. 63.14.
[83 FR 56727, Nov. 14, 2018]