<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRGRANULE xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <FDSYS>
    <CFRTITLE>46</CFRTITLE>
    <CFRTITLETEXT>Shipping</CFRTITLETEXT>
    <VOL>2</VOL>
    <DATE>2013-10-01</DATE>
    <ORIGINALDATE>2013-10-01</ORIGINALDATE>
    <COVERONLY>false</COVERONLY>
    <TITLE>Inspection and tests (modifies HG-500 through HG-540).</TITLE>
    <GRANULENUM>53.10-3</GRANULENUM>
    <HEADING>Section 53.10-3</HEADING>
    <ANCESTORS>
      <PARENT HEADING="Title 46" SEQ="4">Shipping</PARENT>
      <PARENT HEADING="CHAPTER I" SEQ="3">COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED)</PARENT>
      <PARENT HEADING="SUBCHAPTER F" SEQ="2">MARINE ENGINEERING</PARENT>
      <PARENT HEADING="PART 53" SEQ="1">HEATING BOILERS</PARENT>
      <PARENT HEADING="Subpart 53.10" SEQ="0">Tests, Inspection, Stamping, and Reporting (Article 5)</PARENT>
    </ANCESTORS>
  </FDSYS>
  <SECTION>
    <SECTNO>§ 53.10-3</SECTNO>
    <SUBJECT>Inspection and tests (modifies HG-500 through HG-540).</SUBJECT>
    <P>(a) The inspections required by HG-500 through HG-540 must be performed by the “Authorized Inspector” as defined in HG-515 of section IV of the ASME Boiler and Pressure Vessel Code (incorporated by reference; see 46 CFR 53.01-1). The Authorized Inspector shall hold a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors. After installation, heating boilers must be inspected for compliance with this part by a marine inspector.</P>
    <P>(b) Automatically controlled boilers must be subjected to the operating tests prescribed in part 63 of this subchapter.</P>
    <P>(c) All heating boilers must have the operation of their pressure relieving devices checked after the final installation.</P>
    <CITA>[CGD 81-79, 50 FR 9436, Mar. 8, 1985, as amended by USCG-2003-16630, 73 FR 65164, Oct. 31, 2008]</CITA>
  </SECTION>