                          RESCISSION PROPOSALS

    Under the provisions of the Impoundment Control Act of 1974 (Public 
Law 93-344), whenever the President proposes a rescission of enacted 
appropriations, a special message must be sent to the Congress giving 
details of the proposals. Included below are related budget schedules 
and narrative explanations of proposals submitted in a special message 
before this budget was transmitted.

                        Department of Agriculture

      COOPERATIVE STATE RESEARCH, EDUCATION, AND EXTENSION SERVICE

                        Buildings and Facilities

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 12-1501-5-1-352      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
10.00 Total obligations.................                     -12
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
22.00 New budget authority (gross)......                     -12
23.95 New obligations...................                      12
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-8).........................                     -12
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                 -11
73.10 New obligations...................                     -12
73.20 Total outlays (gross).............                       1           1
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                     -11         -10
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.93 Outlays from current balances.....                      -1          -1
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                      -1          -1
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                     -12
90.00 Outlays...........................                      -1          -1
---------------------------------------------------------------------------

    This proposal reflects savings from reducing Federal government 
support for research facility construction projects earmarked for 
specific universities. These projects were not selected based on a 
competitive, peer-review process, but rather generally were selected to 
address local rather than national priorities. Projects to be completed 
in 1996 would not be affected.

                                

                     Department of Defense--Military

                               PROCUREMENT

                       Aircraft Procurement, Army

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 21-2031-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
00.01 Aircraft..........................                     -15          -3
00.02 Modification of aircraft..........                     -90         -18
                                           ---------   ---------  ----------

10.00   Total obligations (object class 
          31.0).........................                    -105         -21
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                 -35
22.00 New budget authority (gross)......                    -140
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                    -140         -35
23.95 New obligations...................                     105          21
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                     -35         -14
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-11)........................                    -140
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                 -78
73.10 New obligations...................                    -105         -21
73.20 Total outlays (gross).............                      27          43
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                     -78         -56
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                     -27
86.93 Outlays from current balances.....                                 -43
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                     -27         -43
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                    -140
90.00 Outlays...........................                     -27         -43
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

                 (amount for procurement actions programmed)
----------------------------------------------------------------------------
Identification code 21-2031-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0701  Aircraft..........................                     -19
0702  Modification of aircraft..........                    -121
                                           ---------   ---------  ----------

0893    Total budget plan...............                    -140
---------------------------------------------------------------------------

    This proposal would rescind appropriations for procurement of Kiowa 
Warrior aircraft. Additional Kiowa Warrior aircraft are not required to 
meet early deployment requirements.

                                

                     Procurement of Ammunition, Army

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 21-2034-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
00.01 Ammunition........................                      -7          -1
00.02 Ammunition production base support                     -33          -4
                                           ---------   ---------  ----------

10.00   Total obligations (object class 
          26.0).........................                     -40          -5
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                  -7
22.00 New budget authority (gross)......                     -47
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                     -47          -7
23.95 New obligations...................                      40           5
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                      -7          -2
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-12)........................                     -47
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                 -23
                                                                 
[[Page 1120]]

73.10 New obligations...................                     -40          -5
73.20 Total outlays (gross).............                      17           9
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                     -23         -19
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                     -17
86.93 Outlays from current balances.....                                  -9
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                     -17          -9
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                     -47
90.00 Outlays...........................                     -17          -9
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

                 (amount for procurement actions programmed)
----------------------------------------------------------------------------
Identification code 21-2034-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0701  Ammunition........................                      -8
0702  Ammunition production base support                     -39
                                           ---------   ---------  ----------

0893    Total budget plan...............                     -47
---------------------------------------------------------------------------

    This proposal would rescind appropriations for the ARMS Initiative 
and Provision of Industrial Facilities. Additional resources are not 
required at this time to achieve the objectives of these programs.

                                

                         Other Procurement, Army

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 21-2035-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
10.00 Total obligations (object class 
        31.0)...........................                      -5          -1
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                  -1
22.00 New budget authority (gross)......                      -6
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                      -6          -1
23.95 New obligations...................                       5           1
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                      -1
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-13)........................                      -6
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                  -4
73.10 New obligations...................                      -5          -1
73.20 Total outlays (gross).............                       1           2
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                      -4          -2
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                      -1
86.93 Outlays from current balances.....                                  -2
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                      -1          -2
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                      -6
90.00 Outlays...........................                      -1          -2
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

                 (amount for procurement actions programmed)
----------------------------------------------------------------------------
Identification code 21-2035-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0702  Communications and electronics 
        equipment.......................                      -6
---------------------------------------------------------------------------

    This proposal would rescind appropriations for Automatic Data 
Processing Equipment (ADPE). ADPE projected requirements will be met 
without these funds.

                                

                    Shipbuilding and Conversion, Navy

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 17-1611-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
10.00 Total obligations (object class 
        31.0)...........................                      -6          -1
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                  -3
22.00 New budget authority (gross)......                      -9
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                      -9          -3
23.95 New obligations...................                       6           1
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                      -3          -2
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-14)........................                      -9
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                  -5
73.10 New obligations...................                      -6          -1
73.20 Total outlays (gross).............                       1           2
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                      -5          -5
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                      -1
86.93 Outlays from current balances.....                                  -2
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                      -1          -2
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                      -9
90.00 Outlays...........................                                  -2
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

                 (amount for procurement actions programmed)
----------------------------------------------------------------------------
Identification code 17-1611-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0705  Auxiliaries, craft, and prior-year 
        program costs...................                      -9
---------------------------------------------------------------------------

    This proposal would rescind appropriations for procurement of Fast 
Patrol Craft. The current inventory of patrol craft meets projected 
requirements.

                                

                        Procurement, Marine Corps

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 17-1109-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
10.00 Total obligations (object class 
        31.0)...........................                      -8          -2
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                  -2
22.00 New budget authority (gross)......                     -10
                                           ---------   ---------  ----------
                                                                  
[[Page 1121]]

23.90   Total budgetary resources 
          available for obligation......                     -10          -2
23.95 New obligations...................                       8           2
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                      -2
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-15)........................                     -10
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                  -6
73.10 New obligations...................                      -8          -2
73.20 Total outlays (gross).............                       2           3
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                      -6          -5
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                      -2
86.93 Outlays from current balances.....                                  -3
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                      -2          -3
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                     -10
90.00 Outlays...........................                      -2          -3
---------------------------------------------------------------------------

    This proposal would rescind appropriations for procurement of 81 mm 
high-explosive (HE) ammunition. The current inventory of this ammunition 
meets projected requirements.

                                

                     Missile Procurement, Air Force

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 57-3020-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
00.02 Other missiles....................                     -46         -10
00.05 Other support.....................                    -198         -49
                                           ---------   ---------  ----------

10.00   Total obligations (object class 
          31.0).........................                    -244         -59
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: Uninvested 
        balance.........................                                 -66
22.00 New budget authority (gross)......                    -310
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                    -310         -82
23.95 New obligations...................                     244          59
24.40 Unobligated balance available, end 
        of year: Uninvested balance.....                     -66          -8
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.36 Unobligated balance rescission 
        proposal (R96-1)................                    -310
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                -102
73.10 New obligations...................                    -244         -59
73.20 Total outlays (gross).............                     142         104
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                    -102         -57
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                    -142
86.93 Outlays from current balances.....                                -104
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                    -142        -104
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                    -310
90.00 Outlays...........................                    -142        -104
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

                 (amount for procurement actions programmed)
----------------------------------------------------------------------------
Identification code 57-3020-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0705  Other support.....................        -310
---------------------------------------------------------------------------

    These funds are excess to requirements.

                                

                      Other Procurement, Air Force

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 57-3080-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
10.00 Total obligations (object class 
        31.0)...........................                    -212         -53
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: Uninvested 
        balance.........................                                 -53
22.00 New budget authority (gross)......                    -265
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                    -265         -53
23.95 New obligations...................                     212          53
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                     -53
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.36 Unobligated balance rescission 
        proposal (R96-2)................                    -265
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                 -56
73.10 New obligations...................                    -212         -53
73.20 Total outlays (gross).............                     156          80
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                     -56         -29
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                    -156
86.93 Outlays from current balances.....                                 -80
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                    -156         -80
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                    -265
90.00 Outlays...........................                    -156         -80
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

                 (amount for procurement actions programmed)
----------------------------------------------------------------------------
Identification code 57-3080-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0704  Other base maintenance and support 
        equipment.......................        -265
---------------------------------------------------------------------------

    These funds are excess to requirements.

                                

                  National Guard and Reserve Equipment

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 97-0350-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
00.01 Reserve equipment.................                      -1          -1
00.02 National Guard equipment..........                      -6          -3
                                           ---------   ---------  ----------

10.00   Total obligations (object class 
          31.0).........................                      -7          -4
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                  -7
22.00 New budget authority (gross)......                     -14
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                     -14          -7
23.95 New obligations...................                       7           4
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                      -7          -3
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-16)........................                     -14
----------------------------------------------------------------------------

[[Page 1122]]


    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                  -6
73.10 New obligations...................                      -7          -4
73.20 Total outlays (gross).............                       1           4
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                      -6          -6
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                      -1
86.93 Outlays from current balances.....                                  -4
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                      -1          -4
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                     -14
90.00 Outlays...........................                      -1          -4
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

                 (amount for procurement actions programmed)
----------------------------------------------------------------------------
Identification code 97-0350-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0701  Reserve equipment.................                      -3
0702  National Guard equipment..........                     -11
                                           ---------   ---------  ----------

0893    Total budget plan...............                     -14
---------------------------------------------------------------------------

    This proposal would rescind appropriations for procurement of 
miscellaneous equipment for the Marine Corps Reserve and C-26 aircraft. 
Funding for procurement of equipment for the Marine Corps Reserve is 
provided within the appropriation Procurement, Marine Corps. The current 
inventory of executive transport aircraft exceeds projected 
requirements.

                                

               RESEARCH, DEVELOPMENT, TEST, AND EVALUATION

            Research, Development, Test, and Evaluation, Army

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 21-2040-5-1-999      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
00.01 Basic research....................                      -1
00.02 Applied research..................                      -5
00.03 Advanced technology development...                      -5
00.05 Engineering and manufacturing 
        development.....................                      -3
00.06 Management support................                     -12          -1
00.07 Operational system development....                      -2
                                           ---------   ---------  ----------

10.00   Total obligations (object class 
          25.2).........................                     -28          -1
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                  -1
22.00 New budget authority (gross)......                     -29
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                     -29          -1
23.95 New obligations...................                      28           1
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                      -1
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-4 and R96-17)..............                     -29
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                 -11
73.10 New obligations...................                     -28          -1
73.20 Total outlays (gross).............                      17          10
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                     -11          -2
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                     -17
86.93 Outlays from current balances.....                                 -10
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                     -17         -10
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                     -29
90.00 Outlays...........................                     -17         -10
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

 (amount for research, development, test and evaluation actions programmed)
----------------------------------------------------------------------------
Identification code 21-2040-5-1-999      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0701  Basic research....................                      -1
0702  Applied research..................                      -5
0703  Advanced technology development...                      -5
0705  Engineering manufacturing 
        development.....................                      -3
0706  Management support................                     -13
0707  Operational system development....                      -2
                                           ---------   ---------  ----------

0893    Total budget plan...............                     -29
---------------------------------------------------------------------------

    Funds proposed for rescission on February 23, 1996 reflect revised 
economic factors.

    Another proposal submitted to the Congress before this budget was 
transmitted would also rescind appropriations for Space Applied 
Technology, Wave Net Technology, Natural Gas Boiler Demonstration and 
Battery Maintainer System. Either no funding for these projects is 
planned after 1996 or work to achieve similar ends is funded elsewhere.

                                

            Research, Development, Test, and Evaluation, Navy

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 17-1319-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
00.02 Applied research..................                     -34          -1
00.03 Advanced technology development...                     -32          -3
00.04 Demonstration/validation..........                     -22          -1
00.07 Operational system development....                     -11          -1
                                           ---------   ---------  ----------

10.00   Total obligations (object class 
          25.2).........................                     -99          -6
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                  -6
22.00 New budget authority (gross)......                    -105
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                    -105          -6
23.95 New obligations...................                      99           6
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                      -6
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-5 and R96-18)..............                    -105
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                 -40
73.10 New obligations...................                     -99          -6
73.20 Total outlays (gross).............                      59          33
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                     -40         -13
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                     -59
86.93 Outlays from current balances.....                                 -33
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                     -59         -33
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                    -105
90.00 Outlays...........................                     -59         -33
---------------------------------------------------------------------------

[[Page 1123]]


                    Budget Plan (in millions of dollars)

 (amount for research, development, test, and evaluation actions programmed)
----------------------------------------------------------------------------
Identification code 17-1319-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0702  Applied research..................                     -35
0703  Advanced technology development...                     -35
0704  Demonstration/validation..........                     -23
0707  Operational system development....                     -12
                                           ---------   ---------  ----------

0893    Total budget plan...............                    -105
---------------------------------------------------------------------------

    Funds proposed for rescission on February 23, 1996 reflect revised 
economic factors.

    Another proposal submitted to the Congress before this budget was 
transmitted would also rescind appropriations for Air Systems and 
Weapons Advanced Technology (Advanced Antiradiation Guided Missile), 
Submarine Tactical Warfare Systems (Submarine Special Operations Support 
Development), and Medical Development (General Medical Development and 
Blood Storage Research). Either no funding for these projects is planned 
after 1996 or work to achieve similar ends is funded elsewhere.

                                

         Research, Development, Test, and Evaluation, Air Force

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 57-3600-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
00.01 Basic research....................                      -4
00.03 Advanced technology development...                     -28          -3
00.04 Demonstration/validation..........                     -35          -4
00.06 Management support................                     -14          -2
00.07 Operational system development....                    -256          -2
                                           ---------   ---------  ----------

10.00   Total obligations (object class 
          25.2).........................                    -337         -11
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                 -11
22.00 New budget authority (gross)......                    -348
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                    -348         -11
23.95 New obligations...................                     337          11
24.40 Unobligated balance available, end 
        of year: Uninvested balance.....                     -11
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-6 and R96-19)..............                    -103
40.36 Unobligated balance rescission 
        proposal (R96-3)................                    -245
                                           ---------   ---------  ----------

43.00   Appropriation (total)...........                    -348
                                           ---------   ---------  ----------

70.00   Total new budget authority 
          (gross).......................                    -348
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                -179
73.10 New obligations...................                    -337         -11
73.20 Total outlays (gross).............                     158         139
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                    -179         -51
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                    -158
86.93 Outlays from current balances.....                                -139
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                    -158        -139
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                    -348
90.00 Outlays...........................                    -158        -139
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

 (amount for research, development, test, and evaluation actions programmed)
----------------------------------------------------------------------------
Identification code 57-3600-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0701  Basic research....................                      -4
0703  Advanced technology development...                     -31
0704  Demonstration/validation..........                     -39
0706  Management support................                     -16
0707  Operational system development....        -245         -13
                                           ---------   ---------  ----------

0893    Total budget plan...............        -245        -103
---------------------------------------------------------------------------

    Funds proposed for rescission on February 21, 1996 are excess to 
requirements.

    Funds proposed for rescission on February 23, 1996 reflect revised 
economic factors.

    Another proposal submitted to the Congress before this budget was 
transmitted would also rescind appropriations for Metal Fatigue 
Monitoring Technology and Infrared Signature Control. No funding for 
these projects is planned after 1996. Also proposed for rescission is 
funding for Space and Missile Tracking Systems Low. Acceleration of this 
project is not needed.

                                

        Research, Development, Test, and Evaluation, Defense-Wide

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 97-0400-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
00.01 Basic research....................                      -3          -1
00.02 Applied research..................                     -18          -4
00.03 Advanced technology development...                     -31          -6
00.04 Demonstration/validation..........                     -12          -2
00.07 Operational system development....                      -1
                                           ---------   ---------  ----------

10.00   Total obligations (object class 
          25.2).........................                     -65         -13
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
21.40 Unobligated balance available, 
        start of year: For completion of 
        prior year budget plans.........                                 -13
22.00 New budget authority (gross)......                     -78
                                           ---------   ---------  ----------

23.90   Total budgetary resources 
          available for obligation......                     -78         -13
23.95 New obligations...................                      65          13
24.40 Unobligated balance available, end 
        of year: For completion of prior 
        year budget plans...............                     -13
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-7 and R96-20)..............                     -78
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.40 Unpaid obligations, start of year: 
        Obligated balance: Appropriation                                 -31
73.10 New obligations...................                     -65         -13
73.20 Total outlays (gross).............                      34          31
74.40 Unpaid obligations, end of year: 
        Obligated balance: Appropriation                     -31         -13
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                     -34
86.93 Outlays from current balances.....                                 -31
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                     -34         -31
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                     -78
90.00 Outlays...........................                     -34         -31
---------------------------------------------------------------------------

                    Budget Plan (in millions of dollars)

 (amount for research, development, test, and evaluation actions programmed)
----------------------------------------------------------------------------
Identification code 97-0400-5-1-051      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------
0701  Basic research....................                      -4
                                                                 
[[Page 1124]]

0702  Applied research..................                     -22
0703  Advanced technology development...                     -37
0704  Demonstration/validation..........                     -14
0707  Operational system development....                      -1
                                           ---------   ---------  ----------

0893    Total budget plan...............                     -78
---------------------------------------------------------------------------

    Funds proposed for rescission on February 23, 1996 reflect revised 
economic factors.

    Another proposal submitted to the Congress before this budget was 
transmitted would also rescind appropriations for Anti-Satellite (ASAT), 
Natural Language Text, Software Manager's Network, Rapid Acquisition of 
Manufactured Parts, Integrated Weapons System Data Base, Small 
Satellites, and Point Source X-ray Lithography. Either no funding for 
these projects is planned after 1996 or work to achieve similar ends is 
funded elsewhere.

                                

                     General Services Administration


                        REAL PROPERTY ACTIVITIES

                         Federal Buildings Fund

                          (Rescission Proposal)

               Program and Financing (in millions of dollars)

----------------------------------------------------------------------------
Identification code 47-4542-5-4-804      1995 actual   1996 est.   1997 est.
----------------------------------------------------------------------------

    Obligations by program activity:
10.00 Total obligations (object class 
        25.2)...........................                      -3
----------------------------------------------------------------------------

    Budgetary resources available for obligation:
22.00 New budget authority (gross)......                      -3
23.95 New obligations...................                       3
----------------------------------------------------------------------------

    New budget authority (gross), detail:
40.35 Appropriation rescission proposal 
        (R96-9).........................                      -3
----------------------------------------------------------------------------

    Change in unpaid obligations:
72.90 Unpaid obligations, start of year: 
        Obligated balance: Fund balance.                                   1
73.10 New obligations...................                      -3
73.20 Total outlays (gross).............                       2           1
74.90 Unpaid obligations, end of year: 
        Obligated balance: Fund balance: 
        Uninvested balance..............                       1
----------------------------------------------------------------------------

    Outlays (gross), detail:
86.90 Outlays from new current authority                      -2
86.93 Outlays from current balances.....                                  -1
                                           ---------   ---------  ----------

87.00   Total outlays (gross)...........                      -2          -1
----------------------------------------------------------------------------

    Net budget authority and outlays:
89.00 Budget authority..................                      -3
90.00 Outlays...........................                      -2          -1
---------------------------------------------------------------------------

    This proposal would reduce the Advance Design program within the 
Repairs and alterations activity. These resources are not required for 
this program.