<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-Senate" dms-id="A1" public-private="public" slc-id="S1-PAT26654-6TC-S7-NHK"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>119 S5199 IS: Guarding Ratepayers from Increased Demand-costs Savings Act of 2026</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2026-07-30</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">II</distribution-code><congress>119th CONGRESS</congress><session>2d Session</session><legis-num>S. 5199</legis-num><current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber><action><action-date date="20260730">July 30, 2026</action-date><action-desc><sponsor name-id="S359">Mr. Heinrich</sponsor> introduced the following bill; which was read twice and referred to the <committee-name committee-id="SSEG00">Committee on Energy and Natural Resources</committee-name></action-desc></action><legis-type>A BILL</legis-type><official-title>To amend the Federal Power Act to clarify the jurisdiction of the Federal Energy Regulatory Commission over the interconnection of large loads to the transmission system, to provide for standards and procedures for the interconnection of large loads, and for other purposes.</official-title></form><legis-body><section id="S1" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>Guarding Ratepayers from Increased Demand-costs Savings Act of 2026</short-title></quote> or the <quote><short-title>GRID Savings Act of 2026</short-title></quote>.</text></section><section commented="no" display-inline="no-display-inline" id="id55b5d4fa55f5447e98181cbd175a2208"><enum>2.</enum><header>Large load interconnection</header><subsection commented="no" display-inline="no-display-inline" id="id28f4bb56cfd54a31a48e2d0bdade9e09"><enum>(a)</enum><header>In general</header><text>Part II of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824">16 U.S.C. 824 et seq.</external-xref>) is amended by adding at the end the following:</text><quoted-block style="OLC" display-inline="no-display-inline" id="id43fd25171ee7414d87a53661b8acf61f"><section commented="no" display-inline="no-display-inline" id="idc139720e22b14b1dbadbddbf53f65898"><enum>224.</enum><header>Large load interconnection</header><subsection id="id396c2307aed94f63985b8710522dfcdd"><enum>(a)</enum><header>Definitions</header><text>In this section:</text><paragraph commented="no" display-inline="no-display-inline" id="id8c9dc02c751c4771b0e747e2072ef1a3"><enum>(1)</enum><header>Bulk-power system</header><text>The term <term>bulk-power system</term> has the meaning given the term in section 215(a).</text></paragraph><paragraph commented="no" display-inline="no-display-inline" id="id80c165c55b514bbaa88f274c9ee585eb"><enum>(2)</enum><header>Commission</header><text>The term <term>Commission</term> means the Federal Energy Regulatory Commission.</text></paragraph><paragraph id="id85fa7ec74c294f3ea94cacb66a9edea4"><enum>(3)</enum><header>Covered large load</header><subparagraph id="idc18a1ee001cb4622a7a191f50c942e7c"><enum>(A)</enum><header>In general</header><text>The term <term>covered large load</term> means a new or expanded nonresidential electric load, or a group of such loads under common ownership, control, or affiliation at a single site or at contiguous or adjacent sites sharing electric infrastructure (including phased development), that has an aggregate requested or projected peak electric demand of not less than 150 megawatts behind a single point of interconnection.</text></subparagraph><subparagraph id="id10f05abc0d684f16bffcc09c21f0fd6b"><enum>(B)</enum><header>Combined configurations</header><text>A load or group of loads described in subparagraph (A) shall be a covered large load without regard to whether it is proposed to be interconnected, studied, or served in combination with 1 or more generation or energy storage resources, and peak electric demand shall be measured without reduction for any such resource.</text></subparagraph></paragraph><paragraph id="idb9df681897b9435f981be8ae63426977"><enum>(4)</enum><header>Covered large-load customer</header><text>The term <term>covered large-load customer</term> means a person that owns, controls, or operates a covered large load.</text></paragraph><paragraph id="id1b98917a351a4a479ed25e402bd7f5e8"><enum>(5)</enum><header>Dedicated resource</header><text>The term <term>dedicated resource</term> means a new or incremental generation resource, energy storage resource, or enforceable flexibility arrangement, including a resource located behind the meter of, co-located with, or proximate to and electrically deliverable to the applicable covered large load, that is dedicated to the covered large load and subject to 1 or more enforceable, metered commitments.</text></paragraph><paragraph commented="no" display-inline="no-display-inline" id="id5e310db361c445bfa10fa9cbd6f63456"><enum>(6)</enum><header>Direct Assignment Facility</header><text display-inline="yes-display-inline">The term <term>Direct Assignment Facility</term> means a facility, or any portion of a facility, that is—</text><subparagraph commented="no" display-inline="no-display-inline" id="id766121e85386487198d4afdeec23d6c7"><enum>(A)</enum><text display-inline="yes-display-inline">constructed for the sole use or benefit of a particular covered large-load customer;</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id077a2f9dd6084db4943d631e7f3236ac"><enum>(B)</enum><text>classified as a Direct Assignment Facility under the applicable tariff or service agreement accepted or approved by the Commission, consistent with the definition of the term <term>Direct Assignment Facilities</term> in the pro forma open access transmission tariff established by the Commission under section 35.28 of title 18, Code of Federal Regulations (or a successor regulation), as adapted by the Commission for covered large loads; and</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="idd1216993fbdb48c99636d8683f514a83"><enum>(C)</enum><text>specified as a Direct Assignment Facility in the applicable tariff or service agreement accepted or approved by the Commission.</text></subparagraph></paragraph><paragraph id="id0ec42ad1063b4726946754b1bd04909b"><enum>(7)</enum><header>Interconnection Facility</header><text>The term <term>Interconnection Facility</term> means a facility classified as an Interconnection Facility under the applicable tariff or service agreement accepted or approved by the Commission, consistent with the definition of the term <term>Interconnection Facilities</term> in the standard interconnection procedures and agreements established by the Commission under section 35.28 of title 18, Code of Federal Regulations (or a successor regulation), as adapted by the Commission for covered large loads.</text></paragraph><paragraph id="id02ea7e92c75d41888be9076311a9b17a"><enum>(8)</enum><header>Network upgrade</header><text>The term <term>Network Upgrade</term> means an addition, modification, or upgrade to the transmission system of a transmitting utility, at or beyond the point at which the Interconnection Facilities for a covered large load connect to that system, that is required to accommodate the interconnection of, or transmission service to serve, the covered large load, consistent with the definition of the term <term>Network Upgrades</term> in the standard interconnection procedures and agreements established by the Commission under section 35.28 of title 18, Code of Federal Regulations (or a successor regulation), as adapted by the Commission for covered large loads.</text></paragraph><paragraph id="id5124ed7bae2d45ad99260460fdecd950"><enum>(9)</enum><header>Stand Alone Network Upgrade</header><text>The term <term>Stand Alone Network Upgrade</term> means a Network Upgrade classified as a Stand Alone Network Upgrade under the applicable tariff or service agreement accepted or approved by the Commission, consistent with the definition of the term <term>Stand Alone Network Upgrades</term> in the standard interconnection procedures and agreements established by the Commission under section 35.28 of title 18, Code of Federal Regulations (or a successor regulation), as adapted by the Commission for covered large loads.</text></paragraph></subsection><subsection id="id6a8a918eba3d4f83918be6c3ed4f97c4"><enum>(b)</enum><header>Jurisdiction over large load interconnection</header><paragraph id="id3f12dfa025324577bacf60c0ca7b161b"><enum>(1)</enum><header>In general</header><text>The Commission shall have jurisdiction over the interconnection of any covered large load to 1 or more facilities used for the transmission of electric energy in interstate commerce.</text></paragraph><paragraph id="idb5fbf5fc1c614ca6a546ba6a79adaff4"><enum>(2)</enum><header>Treatment</header><text>The interconnection described in paragraph (1) shall be—</text><subparagraph id="idcd7ac7ca643244f6904d6ff2a6f12729"><enum>(A)</enum><text>subject to the requirements of this section and sections 205 and 206; and</text></subparagraph><subparagraph id="id17cb34fed8aa4429ac29a5f812bcce0e"><enum>(B)</enum><text>considered to be a component of open access transmission service.</text></subparagraph></paragraph><paragraph id="idff296cc1ef2542f1b2f1e0dfd3a903ad"><enum>(3)</enum><header>Included matters</header><text>The jurisdiction of the Commission under paragraph (1) includes—</text><subparagraph id="id08f5856c122540119d62b1cbc30c42e9"><enum>(A)</enum><text>flexible interconnection service, subject to enforceable operating limits;</text></subparagraph><subparagraph id="id215de55d0809429cbe873e7c8cc371b8"><enum>(B)</enum><text>provisional or phased interconnection service; and</text></subparagraph><subparagraph id="id0078ffba2bed44469c2aa749b061cb9c"><enum>(C)</enum><text>the study and interconnection, separately or together, of a covered large load and any associated generation, energy storage, or verifiable load flexibility, including a dedicated resource.</text></subparagraph></paragraph></subsection><subsection id="idb27ef2327867402eaa75268b111b0af2"><enum>(c)</enum><header>Rulemaking</header><paragraph id="idc40aec1699c34abeae00926fb4fa5fd4"><enum>(1)</enum><header>In general</header><text>Not later than 1 year after the date of enactment of this section, the Commission shall issue a final rule, applicable to each transmitting utility, establishing standards and procedures for the interconnection of covered large loads.</text></paragraph><paragraph commented="no" display-inline="no-display-inline" id="idf9e6b50d89fe4a6d8ff8d273a28e7e4f"><enum>(2)</enum><header>Inclusions</header><text display-inline="yes-display-inline">The rule under paragraph (1) shall include pro forma provisions and regionally tailored requirements.</text></paragraph><paragraph id="id70fc00d16d8a484ca75129d074ccdde6"><enum>(3)</enum><header>Threshold criteria</header><text>The rule under paragraph (1) shall establish criteria and procedures for determining whether a load or group of loads is a covered large load.</text></paragraph></subsection><subsection id="idfa376c2ac75f49fb8cb5219655cafe09"><enum>(d)</enum><header>Required standards and procedures</header><text>The rule issued under subsection (c) shall establish standards and procedures governing each of the following:</text><paragraph id="ide45c2c72edf74c978560fbe5b61e22af"><enum>(1)</enum><header>Study process</header><text>Timelines, readiness requirements, and study procedures for interconnection requests for covered large loads that—</text><subparagraph id="id6a91349953b046f7931ec667d6a3fe01"><enum>(A)</enum><text>protect other customers from the costs of speculative or duplicative requests;</text></subparagraph><subparagraph id="ide00bba2f048a4d5293be60873cb9ab30"><enum>(B)</enum><clause commented="no" display-inline="yes-display-inline" id="id7dad863f2f354fe79bb50ed2b55434eb"><enum>(i)</enum><text>identify reasonable alternatives, including the services and configurations described in subsection (b)(3) and advanced transmission technologies;</text></clause><clause commented="no" display-inline="no-display-inline" id="id7d1f809524414075a9a0b8b7b4697b3c" indent="up1"><enum>(ii)</enum><text display-inline="yes-display-inline">present the alternatives, with estimated costs and schedules, to the covered large-load customer; and</text></clause><clause commented="no" display-inline="no-display-inline" indent="up1" id="idd87960754f694fbab4549889acc32904"><enum>(iii)</enum><text display-inline="yes-display-inline">permit the covered large-load customer to elect among the alternatives in accordance with the applicable tariff; and</text></clause></subparagraph><subparagraph id="id6da77746c967475bb1f8004c1120ed48"><enum>(C)</enum><text>provide for the services and configurations described in subsection (b)(3), at the election of the covered large-load customer, where consistent with reliable operation of the bulk-power system.</text></subparagraph></paragraph><paragraph id="idb7bc586afd3149cdaad5429bcdee1dc0"><enum>(2)</enum><header>Classification and allocation of transmission costs</header><subparagraph id="id0a9fc0b1f3344349993e3c081878c94b"><enum>(A)</enum><header>Classification</header><text>Criteria and procedures governing the classification of facilities as Interconnection Facilities, Direct Assignment Facilities, Network Upgrades, or Stand Alone Network Upgrades for a covered large load, consistent with the definitions in subsection (a), with each classification supported by the record of the applicable study.</text></subparagraph><subparagraph id="id10bd4c22b9e64d5898de9cc81e601d7c"><enum>(B)</enum><header>Interconnection and direct assignment facilities</header><text>A requirement that—</text><clause commented="no" display-inline="no-display-inline" id="id8c1810a68aa442f2bc443352c06e18bd"><enum>(i)</enum><text display-inline="yes-display-inline">each applicable tariff or service agreement identify the Interconnection Facilities and Direct Assignment Facilities for a covered large load; and</text></clause><clause commented="no" display-inline="no-display-inline" id="idee99cb4e130b4f85bf11da140624334d"><enum>(ii)</enum><text display-inline="yes-display-inline">100 percent of the costs of those facilities be—</text><subclause commented="no" display-inline="no-display-inline" id="id4b00bb9019124235b11b4813eeefd5d8"><enum>(I)</enum><text display-inline="yes-display-inline">directly assigned to, and fully borne by, the applicable covered large-load customer; and</text></subclause><subclause commented="no" display-inline="no-display-inline" id="id0e4ba75d602f47509d053bad2b976df5"><enum>(II)</enum><text display-inline="yes-display-inline">paid or secured as provided under paragraph (3).</text></subclause></clause></subparagraph><subparagraph id="ida9e30101fde4467a8011213b8831a028"><enum>(C)</enum><header>Network upgrades</header><text>Costs of Network Upgrades shall be allocated to covered large-load customers, and those costs shall be credited back against transmission service charges, in a manner that is consistent with the standard interconnection procedures and agreements established by the Commission under section 35.28 of title 18, Code of Federal Regulations (or a successor regulation), as adapted by the Commission for covered large loads.</text></subparagraph><subparagraph id="id133d2ba932cf4414880e95cf92f72baf"><enum>(D)</enum><header>Option to build</header><text>A covered large-load customer may elect to construct its own Network Upgrades and Interconnection Facilities under an option to build, in a manner that is consistent with the standard interconnection procedures and agreements established by the Commission under section 35.28 of title 18, Code of Federal Regulations (or a successor regulation), as adapted by the Commission for covered large loads.</text></subparagraph></paragraph><paragraph id="id20347ef7907045cf9508e187fff0fc4a"><enum>(3)</enum><header>Payment and financial security</header><subparagraph commented="no" display-inline="no-display-inline" id="id3314c20e22134691a682a54f9be52616"><enum>(A)</enum><header>In general</header><text display-inline="yes-display-inline">Requirements for—</text><clause commented="no" display-inline="no-display-inline" id="id58cb301853a940398560459e5c73fe72"><enum>(i)</enum><text display-inline="yes-display-inline">the payment of costs allocated to a covered large-load customer; and</text></clause><clause commented="no" display-inline="no-display-inline" id="id84f310a983f84d818bb5fd3ee1380e45"><enum>(ii)</enum><text display-inline="yes-display-inline">financial security designed to protect any customer from unrecovered costs if a covered large load fails to proceed or perform.</text></clause></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id5df00f3f0ba24ee4bea9a97d02942545"><enum>(B)</enum><header>Requirements</header><text display-inline="yes-display-inline">The provision of financial security described in subparagraph (A)(ii) shall not alter the final allocation of costs.</text></subparagraph></paragraph><paragraph id="id7e29567a866749fb981ed5c18c60eac0"><enum>(4)</enum><header>Transparency</header><text>Disclosure to the applicable covered large-load customer, each applicable State commission, and the Commission of—</text><subparagraph commented="no" display-inline="no-display-inline" id="id3c3b3385c395472cb1981f58d13328fe"><enum>(A)</enum><text display-inline="yes-display-inline">the classification of, estimated and final costs of, allocation of costs for, and method of cost recovery for the facilities associated with a covered large load; and</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="iddcdb40f3f86f4ab9b7931b788b0f3d5e"><enum>(B)</enum><text display-inline="yes-display-inline">the alternatives evaluated, subject to appropriate protection of critical electric infrastructure information (as defined in section 215A(a)).</text></subparagraph></paragraph><paragraph id="id66bb537e5103474d8cae244fbfb83ea2"><enum>(5)</enum><header>Reliability</header><text>Standards to ensure that the interconnection of covered large loads is consistent with current and future reliability standards (as defined in section 215(a)).</text></paragraph></subsection><subsection id="id49982106278143a59baf389c93bcf430"><enum>(e)</enum><header>Voluntary Funding of Regional and Interregional Facilities</header><paragraph id="id3b66b280037445e3aa31b701be1c5e9a"><enum>(1)</enum><header>In general</header><text>Except as provided in paragraph (2), nothing in this section alters the allocation of the costs of transmission facilities selected in a regional or interregional transmission plan under a planning process accepted or approved by the Commission.</text></paragraph><paragraph id="idb9c83b0d03c1481ba1f35aa28ebbed56"><enum>(2)</enum><header>Voluntary funding</header><text>The Commission shall include in the rule issued under subsection (c) a mechanism to allow a covered large-load customer to voluntarily fund all or a portion of a transmission facility selected in a regional or interregional transmission plan under a planning process accepted or approved by the Commission that plans for the transmission needs of anticipated load growth in exchange for a Commission-defined right to transmission service enabled by the funded facility, subject to the conditions that such funding—</text><subparagraph id="id44b7aed1fba442b5b70d6da4d84660ea"><enum>(A)</enum><text>shall reduce the costs otherwise allocated pursuant a regional or interregional cost allocation method accepted or approved by the Commission;</text></subparagraph><subparagraph id="id8a4dc744ab36476aa17b43124bbc9419"><enum>(B)</enum><text>shall not impact whether the transmission facility is selected under the rules of the Commission; and</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id7d359bdc2584471082370a0ac15400b8"><enum>(C)</enum><text display-inline="yes-display-inline">except as provided in subparagraph (A), shall not impact how the costs of the transmission facility are allocated under the rules of the Commission.</text></subparagraph></paragraph></subsection><subsection id="id9c679bbcd47e4f469fb8c511c779a0e8"><enum>(f)</enum><header>Savings provisions</header><paragraph id="id873529fe1a5b4ed6a1b4a72f2629a78b"><enum>(1)</enum><header>Commission authority; pending proceedings</header><text>Nothing in this section—</text><subparagraph commented="no" display-inline="no-display-inline" id="id9875f2c304c4434c9452cc526d8126e0"><enum>(A)</enum><text display-inline="yes-display-inline">limits or impairs any authority of the Commission under any other provision of law; or</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="ida22f64f2ee364e27bf2c8d132446dd11"><enum>(B)</enum><text display-inline="yes-display-inline">affects any proceeding pending before, or any order issued by, the Commission before the date of enactment of this section.</text></subparagraph></paragraph><paragraph id="id2f61b75589cc4620849121bde8218b63"><enum>(2)</enum><header>ERCOT</header><text>This section does not apply to ERCOT or an ERCOT utility (as those terms are defined in section 212(k)(2)) with respect to the transmission of electric energy occurring wholly within ERCOT.</text></paragraph></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></subsection><subsection id="id8e3302f23fb04f8a8d78bb1a32b84456"><enum>(b)</enum><header>Conforming amendments</header><text>Section 201 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824">16 U.S.C. 824</external-xref>) is amended—</text><paragraph id="id2964b121d53b4deba60c95ae1b330225"><enum>(1)</enum><text>in subsection (b)(2)—</text><subparagraph id="id5458ef79bc994780a98dfa7402165512"><enum>(A)</enum><text>in the first sentence, by striking <quote>and 222</quote> and inserting <quote>222, and 224</quote>; and</text></subparagraph><subparagraph id="ida78e0f1e776845608b8e39fbd251006d"><enum>(B)</enum><text>in the second sentence, by striking <quote>or 222</quote> and inserting <quote>222, or 224</quote>; and</text></subparagraph></paragraph><paragraph id="idaba58e14d339496f8ec7228deeacbb4c"><enum>(2)</enum><text>in subsection (e)—</text><subparagraph id="id81c6612243ea48f38e3c7382cad6a940"><enum>(A)</enum><text>by striking <quote>206(f),</quote>; and</text></subparagraph><subparagraph id="id7dafd99a44cc47f48fc1e0e1caeb409b"><enum>(B)</enum><text>by striking <quote>or 222</quote> and inserting <quote>222, or 224</quote>.</text></subparagraph></paragraph></subsection></section></legis-body></bill>

