<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-Senate" dms-id="A1" public-private="public" slc-id="S1-PAT26482-K51-CL-CHH"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>119 S4806 IS: Promoting Oversight of Wholesale Energy Reliability Act</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2026-06-17</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">II</distribution-code><congress>119th CONGRESS</congress><session>2d Session</session><legis-num>S. 4806</legis-num><current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber><action><action-date date="20260617">June 17, 2026</action-date><action-desc><sponsor name-id="S410">Ms. Lummis</sponsor> introduced the following bill; which was read twice and referred to the <committee-name committee-id="SSEG00" added-display-style="italic" deleted-display-style="strikethrough">Committee on Energy and Natural Resources</committee-name></action-desc></action><legis-type>A BILL</legis-type><official-title>To clarify that the interconnection of large load facilities directly to facilities used for the transmission of electric energy in interstate commerce is a matter within the jurisdiction of the Federal Energy Regulatory Commission.</official-title></form><legis-body><section id="S1" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>Promoting Oversight of Wholesale Energy Reliability Act</short-title></quote> or the <quote><short-title>POWER Up Act</short-title></quote>.</text></section><section commented="no" display-inline="no-display-inline" id="ida690b110f586416299f3ea3614e01bf2" section-type="subsequent-section"><enum>2.</enum><header display-inline="yes-display-inline">Clarification of Federal jurisdiction over large load interconnection</header><text display-inline="no-display-inline">Section 201 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824">16 U.S.C. 824</external-xref>) is amended by adding at the end the following:</text><quoted-block style="OLC" display-inline="no-display-inline" id="id7cb506286f3f419d907008ebff829f0d"><subsection id="id32c7ad95ccec42a1aad24956bdb3210a"><enum>(h)</enum><header>Jurisdiction over large load interconnection</header><paragraph id="id232f703f069648af8d09d4e69cfd02de"><enum>(1)</enum><header>Definitions</header><text>In this subsection:</text><subparagraph commented="no" display-inline="no-display-inline" id="ide0c7f06b6a94402496a684f18444107a"><enum>(A)</enum><header display-inline="yes-display-inline">Commission</header><text>The term <term>Commission</term> means the Federal Energy Regulatory Commission.</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id3eaa886e9bd44b90bee6c83ae193c7a8"><enum>(B)</enum><header display-inline="yes-display-inline">Large load facility</header><clause commented="no" display-inline="no-display-inline" id="idb298468da1e44b2f9a13309da99ed5d2"><enum>(i)</enum><header>In general</header><text display-inline="yes-display-inline">The term <term>large load facility</term> means any facility, or group of facilities described in clause (ii), the projected aggregate peak electricity demand of which is 100 megawatts or greater, subject to clause (iii).</text></clause><clause commented="no" display-inline="no-display-inline" id="idc4278ad8948540efb8a26d57baa68f71"><enum>(ii)</enum><header>Group of facilities described</header><text>A group of facilities referred to in clause (i) is a group of facilities—</text><subclause commented="no" display-inline="no-display-inline" id="id8f91533c55204f9c98e559f93318c922"><enum>(I)</enum><text display-inline="yes-display-inline">under common ownership or control; and</text></subclause><subclause commented="no" display-inline="no-display-inline" id="id41821a32d31d4ea28b1db418ffe5fcf3"><enum>(II)</enum><text display-inline="yes-display-inline">located at—</text><item commented="no" display-inline="no-display-inline" id="id68ac0b9917344bf28eff0455e49af3f4"><enum>(aa)</enum><text display-inline="yes-display-inline">a single site; or</text></item><item commented="no" display-inline="no-display-inline" id="id1f3f5d0ee6a740ec92bfc241347d489a"><enum>(bb)</enum><text display-inline="yes-display-inline">contiguous sites.</text></item></subclause></clause><clause commented="no" display-inline="no-display-inline" id="id61058b80e8dd471dadc7c8d7008a5d04"><enum>(iii)</enum><header>Adjustment</header><text display-inline="yes-display-inline">The Commission may, by rule, adjust the projected aggregate peak electricity demand at which a facility, or a group of facilities described in clause (ii), will be considered to be a large load facility, as the Commission determines to be necessary to ensure—</text><subclause commented="no" display-inline="no-display-inline" id="id90647f324e834041a9c6e9539d4adf19"><enum>(I)</enum><text display-inline="yes-display-inline">the reliability of the bulk-power system (as defined in section 215(a)); and</text></subclause><subclause commented="no" display-inline="no-display-inline" id="id63e4a7bf48e146218fc03ac94d7f7658"><enum>(II)</enum><text>the provision of just, reasonable, and not unduly discriminatory or preferential transmission service.</text></subclause></clause></subparagraph></paragraph><paragraph id="id3cc38ff292634e068824a7d4fb9c7a40"><enum>(2)</enum><header>Jurisdiction over interconnection</header><subparagraph commented="no" display-inline="no-display-inline" id="id351eb00e78664e118e76968a5876f0a8"><enum>(A)</enum><header>In general</header><text display-inline="yes-display-inline">The Commission shall have jurisdiction over the interconnection of any large load facility to 1 or more facilities used for the transmission of electric energy in interstate commerce.</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id6a802e4fd73047c498bfaa82ddfe3852"><enum>(B)</enum><header>Treatment</header><text display-inline="yes-display-inline">The interconnection of a large load facility as described in subparagraph (A) shall be—</text><clause commented="no" display-inline="no-display-inline" id="idd5f8b4b77e4f47a9b47465384b9380a8"><enum>(i)</enum><text display-inline="yes-display-inline">subject to the requirements of this section, section 205, and section 206; and</text></clause><clause commented="no" display-inline="no-display-inline" id="id06c2b2c9fab2434994f6f8c45ea3e562"><enum>(ii)</enum><text display-inline="yes-display-inline">considered to be a component of open access transmission service.</text></clause></subparagraph></paragraph><paragraph commented="no" display-inline="no-display-inline" id="id276fec2837c34029b2647413c9ac2643"><enum>(3)</enum><header>Rulemaking</header><text>Not later than 18 months after the date of enactment of this subsection, the Commission shall issue a final rule establishing—</text><subparagraph commented="no" display-inline="no-display-inline" id="id7825531538dc4552a9d80ea728b78f54"><enum>(A)</enum><text display-inline="yes-display-inline">standardized procedures and agreements for the interconnection of large load facilities, including procedures for hybrid facilities that combine large load and generation at a single point of interconnection; and</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id0447cb80ab2747a29d91ffea4f7e01c7"><enum>(B)</enum><text>a test for transmission facilities to aid in the interconnection of large load facilities and transmission facilities, including transmission lines.</text></subparagraph></paragraph><paragraph commented="no" display-inline="no-display-inline" id="ida9065e19465245119ca7d4a5a34870da"><enum>(4)</enum><header>Preservation of State authority</header><text>Nothing in this subsection affects the authority of any State or local government over—</text><subparagraph commented="no" display-inline="no-display-inline" id="idf3fb7a18044b4d379bb0e79639028b66"><enum>(A)</enum><text display-inline="yes-display-inline">the siting, permitting, or construction of any facility;</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id3fc0a1606f3c47e6a1296778ff88cee1"><enum>(B)</enum><text>retail electric service or rates;</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id08452a97a36f4c2cababd20a23b95d42"><enum>(C)</enum><text>facilities used in the local distribution of electric energy; or</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="idf12857d0f5f2470c9b4ab0b148172e32"><enum>(D)</enum><text>the generation of electric energy.</text></subparagraph></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></section></legis-body></bill>

