<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-House" dms-id="H750B1EDF2F834255B6915973807509C7" public-private="public" key="H" bill-type="olc"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>119 HR 9806 IH: Fair Licensing for Operations of Water Structures Act</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2026-07-21</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">I</distribution-code><congress display="yes">119th CONGRESS</congress><session display="yes">2d Session</session><legis-num display="yes">H. R. 9806</legis-num><current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber><action display="yes"><action-date date="20260721">July 21, 2026</action-date><action-desc><sponsor name-id="L000600">Mr. Langworthy</sponsor> (for himself and <cosponsor name-id="S001216">Ms. Schrier</cosponsor>) introduced the following bill; which was referred to the <committee-name committee-id="HIF00">Committee on Energy and Commerce</committee-name></action-desc></action><legis-type>A BILL</legis-type><official-title display="yes">To amend the Federal Power Act to address certain alterations in, and the maintenance and repair of, project works, to provide for the licensing of micro hydrokinetic energy projects, and for other purposes.</official-title></form><legis-body id="HF407C74B0DEC47F5BE0E7E82F24C2258" style="OLC"> 
<section id="H92C3E9662FA142DE823684086E2908E1" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>Fair Licensing for Operations of Water Structures Act</short-title></quote> or the <quote><short-title>FLOWS Act</short-title></quote>.</text></section> <section id="HE5A4825C2E8E4062A7D2C5C813E5CC05"><enum>2.</enum><header>Hydropower maintenance and temporary adjustments</header> <subsection id="HFA72B46DA15D4274B55A3E43759F0499"><enum>(a)</enum><header>Alterations in project works</header><text>Section 10(b) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/803">16 U.S.C. 803(b)</external-xref>) is amended by adding at the end the following: <quote>Except as previously provided in this subsection, the Commission shall require prior approval of a <quote>substantial alteration or addition</quote> to project works or to project operations consisting of any significant modification of the project works or operation of the project that is not in conformity with the project plans previously approved by the Commission. The Commission shall not require approval of any alteration or addition other than a substantial alteration or addition as determined pursuant to regulations promulgated under section 2(c) of the <short-title>Fair Licensing for Operations of Water Structures Act</short-title> or any temporary variance to the project operations necessitated by circumstances beyond the reasonable control of the licensee, including extreme weather, natural disasters, equipment failures, or other unforeseen circumstances.</quote>.</text></subsection>
<subsection id="H111E12E5EFA34828B5B4B5AB626CB459"><enum>(b)</enum><header>Maintenance and repair of project works</header><text>Section 10(c) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/803">16 U.S.C. 803(c)</external-xref>) is amended by inserting after the first sentence the following: <quote>The Commission shall not require approval or an amendment to a project license for any routine maintenance, repair, or replacement of any portion of a project works necessary to maintain the project works in accordance with this subsection.</quote>.</text></subsection> <subsection id="HD083BF060B9B408183ECE821488E388B"><enum>(c)</enum><header>Guidance and process</header> <paragraph id="H958EF4C7253F463984B1B3E70337974B"> <enum>(1)</enum> <header>Guidance</header> <text>Not later than 90 days after the date of enactment of this Act, the Federal Energy Regulatory Commission shall issue a notice of proposed rulemaking proposing a process or considerations for determining a <quote>substantial alteration or addition</quote>, <quote>nonsubstantial alteration or addition</quote>, and <quote>routine maintenance, repair, or replacement</quote> to a hydropower project works based on the results of the Notice of Inquiry of the Federal Energy Regulatory Commission entitled <quote>Authorizations for Certain Post-Licensing Activities at Hydroelectric Projects</quote> (90 Fed. Reg. 53310; Docket No. RM26–3–000) issued on November 20, 2025, initially scheduled to close on January 26, 2026, but extended and officially closed on February 10, 2026.</text>
        </paragraph>
<paragraph id="H989D84AC2E9A479A9DAD4E632EADCD0F"><enum>(2)</enum><header>Process</header><text>Not later than 180 days after the date of issuance of the notice of proposed rulemaking under paragraph (1), and after public notice and opportunity for comment, the Federal Energy Regulatory Commission shall promulgate a final rule establishing—</text> <subparagraph commented="no" display-inline="no-display-inline" id="H94AAE76E19B24665891D3B4B65553CD3"><enum>(A)</enum><text display-inline="yes-display-inline">standards for determining a <quote>substantial alteration or addition</quote>, <quote>nonsubstantial alteration or addition</quote>, and <quote>routine maintenance, repair, or replacement</quote> to a hydropower project works; and</text></subparagraph>
<subparagraph id="H1141964D2DC94595931128CEC7F3CA33"><enum>(B)</enum><text>a formal process, as appropriate, for determining whether a proposed alteration or addition constitutes a <quote>substantial alteration or addition</quote> under the final rule that requires approval of the Federal Energy Regulatory Commission under section 10(b) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/803">16 U.S.C. 803(b)</external-xref>).</text></subparagraph></paragraph> <paragraph id="HA1715D1B3AD24B768880FB04568D3035"><enum>(3)</enum><header>Effect</header><text>The rule promulgated under paragraph (2) shall establish a process or considerations for determining which licensee-requested project alterations require the approval of the Federal Energy Regulatory Commission.</text></paragraph></subsection>
<subsection id="H276DA10020774EECA21BE242001ACDBF"><enum>(d)</enum><header>Savings clause</header><text>Nothing in this section or an amendment made by this section—</text> <paragraph id="H2A4C2459555C4E66A06394903CF67C5D"><enum>(1)</enum><text>affects any authority of the Federal Energy Regulatory Commission—</text>
<subparagraph id="H72CF8BB74A3D49B0BDE33C5176FC3E48"><enum>(A)</enum><text>to require notice from a licensee under subsection (a) or (b) of section 10 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/803">16 U.S.C. 803</external-xref>); or</text></subparagraph> <subparagraph id="H42ED8F406CBA42BAB13FF32C8624928B"><enum>(B)</enum><text>to enforce requirements of that section or the terms of a license issued under part I of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/792">16 U.S.C. 792 et seq.</external-xref>) with respect to the safety of any dam and appurtenant works and structures; or</text></subparagraph></paragraph>
<paragraph id="H8A1B2BC3E1AB4FB0B16686ADC71489E8"><enum>(2)</enum>
<subparagraph commented="no" display-inline="yes-display-inline" id="HDCAE70256C724A099C834C4FE875BED2"><enum>(A)</enum><text>precludes any prompt, informal consultation between the licensee and the Federal Energy Regulatory Commission, at the request of the licensee or the Federal Energy Regulatory Commission, with respect to the safety of any dam and appurtenant works and structures in advance of work to be undertaken under section 10 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/803">16 U.S.C. 803</external-xref>); or</text></subparagraph> <subparagraph id="H7257919107A447E48B892681840F68C7" indent="paragraph"> <enum>(B)</enum> <text>affects any authority of the Federal Energy Regulatory Commission to require changes in advance of the work described in subparagraph (A) to protect the safety of any dam and appurtenant works and structures.</text>
          </subparagraph></paragraph></subsection></section>
<section id="H6E0F84DDF32A49B0B60D6013571F1361"><enum>3.</enum><header>Micro hydrokinetic energy projects</header><text display-inline="no-display-inline">Part I of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/792">16 U.S.C. 792 et seq.</external-xref>) is amended by adding at the end the following:</text> <quoted-block style="OLC" display-inline="no-display-inline" id="H1EF3E1E51F8E40B88DD92FF3DE8C8996"> <section id="H378DC0CE21CD423F94BA71CC05C3E6EA"><enum>37.</enum><header>Licensing of micro hydrokinetic energy projects</header> <subsection id="HADE83E974E9F467BB1A2B4416C81A829"><enum>(a)</enum><header>Definition of micro hydrokinetic energy project</header><text>In this section, the term <term>micro hydrokinetic energy project</term>—</text>
<paragraph id="H6A080B48F8984DA2968DA57A7CDA8657"><enum>(1)</enum><text>means a project that—</text> <subparagraph id="HDA0C33D8A08F47ECBDC49AFD5BA7F4A5"><enum>(A)</enum><text>has an installed capacity of not more than 5 megawatts; and</text></subparagraph>
<subparagraph id="HE14F422AE60C43BB942703B99BC60A78"><enum>(B)</enum><text>converts to electric energy the hydrokinetic energy from a generator driven by a turbine from—</text> <clause id="H82CFB3CBEF10429F865D323C068D41AD"><enum>(i)</enum><text>waves, tides, or currents in oceans, estuaries, or tidal areas; or</text></clause>
<clause id="H251C8D6744B24B9495D128609CA90059"><enum>(ii)</enum><text>free flowing water in rivers, lakes, streams, or man-made channels; and</text></clause></subparagraph></paragraph> <paragraph id="H21C7B0B8A23647CA954E01D178205F7A"><enum>(2)</enum><text>does not include a project that impounds water to generate electricity.</text></paragraph></subsection>
<subsection id="HC11C91D0FD1D4875A8B56E1E10453358"><enum>(b)</enum><header>Authorization</header><text>The Commission may issue a license in accordance with this section for a term of not less than 10, and not more than 20, years for the construction, operation, and maintenance of project works for a micro hydrokinetic energy project.</text></subsection> <subsection id="H173D9535E5404D0DBFEDCB8CE4DBF1F5"><enum>(c)</enum><header>Expedited licensing process</header> <paragraph id="H0B8902B598014FA9B81C42E02A2D5839"><enum>(1)</enum><header>Notification of intent</header> <subparagraph id="H7B5C53595AA246EC898C692867496163"><enum>(A)</enum><header>Filing of notification</header><text>An applicant for a license under this section shall commence the licensing process by filing a notification of intent with the Commission.</text></subparagraph>
<subparagraph id="HC2BE6E9CD805451398320CB952DB936F"><enum>(B)</enum><header>Existing license deadline</header><text>Notwithstanding section 15(b)(1), an applicant for a license under this section shall file a notification of intent under subparagraph (A) not later than 2 years before the expiration of an existing license, if applicable.</text></subparagraph></paragraph> <paragraph id="HDD856FA643BE4144A63DE3BCC902DF84"><enum>(2)</enum><header>Filing of application</header> <subparagraph id="HB120302FBB744C70A39E3524D77371F4"><enum>(A)</enum><header>In general</header><text>Except as provided in subparagraph (B), an applicant for a license under this section shall submit to the Commission an application not later than 1 year after the date on which the applicant files a notification of intent under paragraph (1).</text></subparagraph>
<subparagraph id="H3815E7AB55F64E15AE66C6F6AFBC71A2"><enum>(B)</enum><header>Existing license deadline</header><text>Notwithstanding section 15(c)(1), an applicant for a license under this section shall file an application with the Commission not later than 1 year before the date of expiration of the term of an existing license, if applicable.</text></subparagraph></paragraph> <paragraph id="HA49D0E0A5DFF425495812ED017D01594"><enum>(3)</enum><header>Deadline for issuance</header><text>The Commission shall take final action on an application for a license under this section not later than 1 year after the date on which the application is filed under paragraph (2).</text></paragraph>
<paragraph id="HD12FDE4A569F45A9B15166C144AC154B"><enum>(4)</enum><header>Schedule for final action</header><text>To the extent reasonably practicable, the Commission and any applicable conditioning or permitting agencies shall establish, with respect to each micro hydrokinetic energy project that is the subject of a notification of intent to apply for a license under this section, a joint schedule that permits the timely completion of decisions required to be made with respect to, and the timely issuance of, authorizations required under Federal law by the Commission and the conditioning or permitting agencies, subject to the requirement that any joint schedule established under this paragraph shall comply with the deadline for final action established under paragraph (3).</text></paragraph></subsection> <subsection id="H8D283106A49F4BDBB27AC4778588AF7A"><enum>(d)</enum><header>Regulations</header> <paragraph id="H27D2C31F828A4DA997CEE1E846EB1944"><enum>(1)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of this section, the Commission shall promulgate regulations to implement this section in a manner that expedites the deployment of micro hydrokinetic energy projects while ensuring the safe operation of the micro hydrokinetic energy project in compliance with applicable Federal and State laws.</text></paragraph>
<paragraph id="HEF81E77A418B4124BC9CAB27DB837F64"><enum>(2)</enum><header>Inclusion</header><text>The regulations promulgated under paragraph (1) shall provide for the use of 1 or more categorical exclusions, including allowing for extraordinary circumstances under which the categorical exclusion shall not be available, under the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321 et seq.</external-xref>) for low disturbance activities necessary for micro hydrokinetic energy projects.</text></paragraph></subsection> <subsection id="H420C4CAE307F49DA979E7217B7952E3F"><enum>(e)</enum><header>Report to congress</header><text>The Commission shall submit to Congress a report describing the impacts of the micro hydrokinetic energy projects licensed under this section on the environment, the economy, and the reliability and affordability of electricity not later than the earlier of—</text>
<paragraph id="HF1D1F0FD5871459F836A6DF81369E81B"><enum>(1)</enum><text>the date that is 5 years after the date of enactment of this section; and</text></paragraph> <paragraph id="HDFD6758D0B854FE694BAE0414BA5A952"><enum>(2)</enum><text>the date on which the first 50 micro hydrokinetic energy projects licensed under this section have been operational for not less than 1 year.</text></paragraph></subsection>
<subsection id="H0EEA44AB2C8D4CF9BD6D6A744BD27864"><enum>(f)</enum><header>Savings clause</header><text>Nothing in this section affects any authority of the Commission, at the election of an applicant, to license the construction, operation, and maintenance of project works for a micro hydrokinetic energy project under any other provision of this part.</text></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></section> </legis-body></bill>

