Union Calendar No. 723
|
119th CONGRESS
2d Session |
[Report No. 119–824]
To establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors.
Mrs. Fedorchak introduced the following bill; which was referred to the Committee on Energy and Commerce
Additional sponsors: Mr. Hamadeh of Arizona, Mr. Crenshaw, Mr. Shreve, and Mr. Wittman
Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed
[Strike out all after the enacting clause and insert the part printed in italic]
[For text of introduced bill, see copy of bill as introduced on December 11, 2025]
To establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SEC. 2. Best-available transmission conductor class.
The Federal Power Act is amended by inserting after section 223 (16 U.S.C. 824w) the following:
“SEC. 224. Use of best-available transmission conductors.
“(a) Use of best-available transmission conductors.—In exercising its authority under sections 205 and 206, the Commission shall require that public utilities use transmission conductors that are designated as part of the best-available transmission conductor class when carrying out covered projects.
“(b) Regulations.—
“(1) IN GENERAL.—Not later than 1 year after the date of enactment of this section, the Commission shall issue regulations to carry out this section.
“(2) INCLUSIONS.—In issuing regulations under paragraph (1), the Commission shall—
“(A) establish, in consultation with the Secretary of Energy, a methodology to designate, as part of the best-available transmission conductors class, transmission conductors that—
“(i) provide the greatest feasible and commercially available energy-carrying capacity at a given voltage level;
“(B) using such methodology, designate transmission conductors as part of the best-available transmission conductor class;
“(C) establish filing requirements for public utilities to demonstrate compliance with the regulations, including (as applicable) such information and data the Commission determines necessary to demonstrate project-specific impacts described in subparagraph (D); and
“(D) provide that the requirement to use transmission conductors that are designated as part of the best-available transmission conductor class not apply—
“(i) to carrying out any covered project for which a public utility, prior to the date of enactment of this section, has—
“(c) Periodic review and updates.—The Commission may, to reflect improvements in technology, periodically review and update—
“(d) Definitions.—In this section:
“(1) BEST-AVAILABLE TRANSMISSION CONDUCTOR CLASS.—The term ‘best-available transmission conductor class’ means a class of transmission conductors that are designated as part of the class pursuant to this section.
|
Union Calendar No. 723 |
|||||
|
|||||
|
[Report No. 119–824]
|
|||||
|
A BILL
|
|||||
|
To establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors.
|
|||||
|
September 14, 2026
|
|||||
|
Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed
|