[Congressional Bills 118th Congress]
[From the U.S. Government Publishing Office]
[H.R. 2750 Introduced in House (IH)]
<DOC>
118th CONGRESS
1st Session
H. R. 2750
To amend the Federal Power Act to authorize the allocation of the costs
of certain interstate electric power transmission lines and electric
power transmission lines that are located offshore, and for other
purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
April 20, 2023
Ms. Castor of Florida introduced the following bill; which was referred
to the Committee on Energy and Commerce
_______________________________________________________________________
A BILL
To amend the Federal Power Act to authorize the allocation of the costs
of certain interstate electric power transmission lines and electric
power transmission lines that are located offshore, and for other
purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Enhancing Electric Grid Resilience
Act''.
SEC. 2. ALLOCATION OF COSTS OF CERTAIN TRANSMISSION FACILITIES.
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended
by adding at the end the following:
``SEC. 224. ALLOCATION OF COSTS OF CERTAIN TRANSMISSION FACILITIES.
``(a) Allocation of Costs.--
``(1) In general.--Any entity that proposes to own,
control, or operate a transmission facility of national
significance may file a tariff with the Commission in
accordance with section 205 and the regulations of the
Commission allocating the costs of such transmission facility
of national significance.
``(2) Cost causation principle.--The Commission shall
require that any tariff filed under paragraph (1) allocate the
costs of a transmission facility of national significance to
customers within the applicable transmission planning region or
regions in a manner that is at least roughly commensurate with
the estimated anticipated benefits described in paragraph (3).
``(3) Cost allocation principle.--The Commission shall
require that any tariff filed under paragraph (1) allocate
costs based on the broad range of reliability, economic, public
policy, resilience, and other reasonably anticipated benefits
of the applicable transmission facility of national
significance.
``(b) Transmission Facility of National Significance.--In this
section, the term `transmission facility of national significance'
means--
``(1) an interstate electric power transmission line (and
any facilities necessary for the operation of such electric
power transmission line) or an electric power transmission line
that is located offshore (and any facilities necessary for the
operation of such electric power transmission line)--
``(A) that has a transmission capacity of not less
than 1,000 megawatts; and
``(B) the construction of which is completed on or
after the date of enactment of this section; or
``(2) an expansion of, or upgrade to, an interstate
electric power transmission line (and any facilities necessary
for the operation of such electric power transmission line) or
an electric power transmission line that is located offshore
(and any facilities necessary for the operation of such
electric power transmission line) that--
``(A) increases the transmission capacity of such
electric power transmission line by at least 500
megawatts; and
``(B) is completed on or after the date of
enactment of this section.
``(c) Savings Provision.--This section does not affect the
authority of the Commission to approve the allocation of costs of
transmission facilities other than transmission facilities of national
significance.''.
<all>