[Congressional Bills 116th Congress]
[From the U.S. Government Publishing Office]
[S. 3897 Introduced in Senate (IS)]
<DOC>
116th CONGRESS
2d Session
S. 3897
To clarify and expand sanctions applicable with respect to the
construction of the Nord Stream 2 or TurkStream pipeline projects.
_______________________________________________________________________
IN THE SENATE OF THE UNITED STATES
June 4, 2020
Mr. Cruz (for himself, Mrs. Shaheen, Mr. Barrasso, Mr. Cotton, and Mr.
Johnson) introduced the following bill; which was read twice and
referred to the Committee on Foreign Relations
_______________________________________________________________________
A BILL
To clarify and expand sanctions applicable with respect to the
construction of the Nord Stream 2 or TurkStream pipeline projects.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Protecting Europe's Energy Security
Clarification Act of 2020''.
SEC. 2. CLARIFICATION AND EXPANSION OF SANCTIONS RELATING TO
CONSTRUCTION OF NORD STREAM 2 OR TURKSTREAM PIPELINE
PROJECTS.
(a) In General.--Subsection (a)(1) of section 7503 of the
Protecting Europe's Energy Security Act of 2019 (title LXXV of Public
Law 116-92) is amended--
(1) in subparagraph (A), by inserting ``or pipe-laying
activities'' after ``pipe-laying''; and
(2) in subparagraph (B)--
(A) in clause (i)--
(i) by striking ``sold, leased, or
provided'' and inserting ``facilitated selling,
leasing, or providing''; and
(ii) by striking ``; or'' and inserting a
semicolon;
(B) in clause (ii), by striking the period at the
end and inserting a semicolon; and
(C) by adding at the end the following:
``(iii) provided underwriting services or
insurance or reinsurance for those vessels;
``(iv) provided services or facilities for
technology upgrades or installation of welding
equipment for, or retrofitting or tethering of,
those vessels; or
``(v) provided services for the testing,
inspection, or certification necessary for, or
associated with the operation of, the Nord
Stream 2 pipeline.''.
(b) Definitions.--Subsection (i) of such section is amended--
(1) by redesignating paragraph (5) as paragraph (6); and
(2) by inserting after paragraph (4) the following:
``(5) Pipe-laying activities.--The term `pipe-laying
activities' means activities that facilitate pipe-laying,
including site preparation, trenching, surveying, placing
rocks, stringing, bending, welding, coating, lowering of pipe,
and backfilling.''.
(c) Effective Date.--
(1) In general.--The amendments made by this section take
effect on the date of the enactment of the Protecting Europe's
Energy Security Act of 2019.
(2) Report required.--Not later than 60 days after the date
of the enactment of this Act, the Secretary of State, in
consultation with the Secretary of the Treasury, shall submit
to the appropriate congressional committees, as defined in
subsection (i) of section 7503 of the Protecting Europe's
Energy Security Act of 2019, a report on the matters required
by subsection (a) of that section, as amended by this section,
for the period beginning on the date of the enactment of that
Act and ending on the date on which the report is submitted.
<all>