<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-Senate" dms-id="A1" public-private="public">
	<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>116 S1932 IS: Drought Resiliency and Water Supply Infrastructure Act</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2019-06-20</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
		<distribution-code display="yes">II</distribution-code>
		<congress>116th CONGRESS</congress><session>1st Session</session>
		<legis-num>S. 1932</legis-num>
		<current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber>
		<action>
			<action-date date="20190620">June 20, 2019</action-date>
			<action-desc><sponsor name-id="S377">Mr. Gardner</sponsor> (for himself, <cosponsor name-id="S221">Mrs. Feinstein</cosponsor>, <cosponsor name-id="S400">Ms. McSally</cosponsor>, and <cosponsor name-id="S403">Ms. Sinema</cosponsor>) introduced the following bill; which was read twice and referred to the <committee-name committee-id="SSEG00">Committee on Energy and Natural Resources</committee-name></action-desc>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title>To support water infrastructure in Reclamation States, and for other purposes.</official-title>
	</form>
	<legis-body>
 <section id="S1" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>Drought Resiliency and Water Supply Infrastructure Act</short-title></quote>.</text>
 </section><section id="id3D2C831DA70A4C43BC106EEFF88F1D93"><enum>2.</enum><header>Definitions</header><text display-inline="no-display-inline">In this Act:</text> <paragraph id="idECA2C945C3B847A390CA4E780F101E61"><enum>(1)</enum><header>Design; study</header><text>The terms <term>design</term> and <term>study</term> include any design, permitting, materials engineering or testing, surveying, or preconstruction activity relating to a water storage facility.</text>
 </paragraph><paragraph id="id03EAB8A21F3F4A87AACB493D04C9911F"><enum>(2)</enum><header>Secretary</header><text>The term <term>Secretary</term> means the Secretary of the Interior.</text> </paragraph></section><section id="idF3485482650B489ABD79995BB6E24D47"><enum>3.</enum><header>Surface and groundwater storage and supporting projects</header> <subsection id="id230700b5e6ef48ca9044ddf45d1d830a"><enum>(a)</enum><header>Definitions</header><text>In this section:</text>
 <paragraph id="idd3bfb3cd8b5244f99d9de455a1a847e3"><enum>(1)</enum><header>Appropriate committees of Congress</header><text>The term <term>appropriate committees of Congress</term> means—</text> <subparagraph id="idA05950CCEE844D329BAA2D344883EF45"><enum>(A)</enum><text>the Committee on Appropriations of the Senate;</text>
 </subparagraph><subparagraph id="id20BD0B369B0E487B9E781783F11B25CD"><enum>(B)</enum><text>the Committee on Energy and Natural Resources of the Senate;</text> </subparagraph><subparagraph id="id7C6831ABA039432C96BBA3E990365769"><enum>(C)</enum><text>the Committee on Appropriations of the House of Representatives; and</text>
 </subparagraph><subparagraph id="id81DA86F64B0D458B83E5E81D3FE15155"><enum>(D)</enum><text>the Committee on Natural Resources of the House of Representatives.</text> </subparagraph></paragraph><paragraph id="id59249748d6d148b8ab2738a31f545056"><enum>(2)</enum><header>Eligible entity</header><text>The term <term>eligible entity</term> means—</text>
 <subparagraph id="id81fbb71588054209ab29ff07239542cb"><enum>(A)</enum><text>any State, political subdivision of a State, department of a State, or public agency organized pursuant to State law;</text>
 </subparagraph><subparagraph id="id6d35de1e27e24003b52e566b9f950e80"><enum>(B)</enum><text>an Indian tribe (as defined in section 4 of the Indian Self-Determination and Education Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/25/5304">25 U.S.C. 5304</external-xref>)) or an entity controlled by an Indian tribe;</text>
 </subparagraph><subparagraph id="idd1086829e1314ec696cafc84d648ccb3"><enum>(C)</enum><text>a water users’ association;</text> </subparagraph><subparagraph id="idd4e0d62eded84863b9974ca2630efee0"><enum>(D)</enum><text>an agency established by an interstate compact; and</text>
 </subparagraph><subparagraph id="id2ac9581a24a340d9a81a273505d025da"><enum>(E)</enum><text>an agency established under State law for the joint exercise of powers.</text> </subparagraph></paragraph><paragraph id="id57ffae5f54ae424f9619bd83ecb8d4e8"><enum>(3)</enum><header>Federally owned storage project</header><text>The term <term>federally owned storage project</term> means any project in a Reclamation State—</text>
 <subparagraph id="id7196C14F9F1B4E84A9F267325116BEBE"><enum>(A)</enum><text>that involves the construction, expansion, upgrade, or capital repair of—</text> <clause id="id0FE2639274794C869B969A5B3114ABF0"><enum>(i)</enum><text>a surface water storage facility; or</text>
 </clause><clause id="id232F3BC18D2647DA9A42B83FB9D835C4"><enum>(ii)</enum><text>a facility conveying water to or from a surface or groundwater storage facility;</text> </clause></subparagraph><subparagraph id="id0b76e96d89d44d6fbe3d05d65f66e9ef"><enum>(B)</enum><text>to which the United States holds title; and</text>
 </subparagraph><subparagraph id="id6a8e784b866a41bca252c36185ebc2a5"><enum>(C)</enum><text>that was authorized to be constructed, operated, and maintained pursuant to—</text> <clause id="idAFD8B92C1C544C43969F6924F5A5996E"><enum>(i)</enum><text>the reclamation laws; or</text>
 </clause><clause id="idB780B7E705A94F5D8699CFA1E2C3D0F8"><enum>(ii)</enum><text>the Act of August 11, 1939 (commonly known as the <quote>Water Conservation and Utilization Act</quote>) (<external-xref legal-doc="usc" parsable-cite="usc/16/590y">16 U.S.C. 590y</external-xref> et seq.).</text> </clause></subparagraph></paragraph><paragraph id="id10C5F6F3423B492F9C8B6D1345494AF9"><enum>(4)</enum><header>Non-Federal storage project</header><text>The term <term>non-Federal storage project</term> means any project in a Reclamation State that—</text>
 <subparagraph id="idfe877119d6344756a93ad3443a1f9f0c"><enum>(A)</enum><text>involves the construction, expansion, upgrade, or capital repair by an eligible entity of—</text> <clause id="id8df200b031654d038d9a4a581b6ed279"><enum>(i)</enum><text>a surface or groundwater storage facility that is not federally owned; or</text>
 </clause><clause id="id84ba2f79f69b4910a711ae86df41a5e2"><enum>(ii)</enum><text>a facility that is not federally owned conveying water to or from a surface or groundwater storage facility; and</text>
 </clause></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="idafe2c14b9fa24249ac96e86908614d5b"><enum>(B)</enum><text>provides a benefit in meeting any obligation under applicable Federal law (including regulations).</text>
 </subparagraph></paragraph><paragraph commented="no" id="id2879b30de38f47588289b204f2a09762"><enum>(5)</enum><header>Reclamation laws</header><text>The term <term>reclamation laws</term> means Federal reclamation law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act.</text>
 </paragraph><paragraph commented="no" id="id25508DF8D51F4194BBD39D937B860D0A"><enum>(6)</enum><header>Reclamation State</header><text>The term <term>Reclamation State</term> has the meaning given the term in section 4014 of the Water Infrastructure Improvements for the Nation Act (<external-xref legal-doc="usc" parsable-cite="usc/43/390b">43 U.S.C. 390b</external-xref> note; <external-xref legal-doc="public-law" parsable-cite="pl/114/322">Public Law 114–322</external-xref>).</text>
 </paragraph></subsection><subsection id="ida3903ac2adaf42f18e7f6fdd734f867f"><enum>(b)</enum><header>Grant program</header><text>The Secretary may provide a grant under this section to an eligible entity to carry out, within a Reclamation State—</text>
 <paragraph id="idDBA0373F79994DCFBF01A162FD93B2DE"><enum>(1)</enum><text>a federally owned storage project in accordance with subsection (c); or</text> </paragraph><paragraph id="id93CFE9EEA23C4CC0BB3D1F11A9249648"><enum>(2)</enum><text>a non-Federal storage project in accordance with subsection (d).</text>
				</paragraph></subsection><subsection id="idE9211DB0F16649A4B51D1C0171315214"><enum>(c)</enum><header>Federally owned storage projects</header>
 <paragraph id="id72b6cacd182d426f9583b487f4c3776b"><enum>(1)</enum><header>Agreements</header><text>On request of an eligible entity, the Secretary may negotiate and enter into an agreement on behalf of the United States for the design, study, construction, expansion, upgrade, or capital repair of a federally owned storage project located in a Reclamation State in accordance with this subsection.</text>
 </paragraph><paragraph id="id484a082d57c3433097e93763ad55376a"><enum>(2)</enum><header>Federal share</header><text>Subject to the requirements of this subsection, the Secretary may participate in a federally owned storage project in an amount equal to not more than 50 percent of the total cost of the federally owned storage project.</text>
 </paragraph><paragraph id="id44ea44ff321d4c71af551c03a084b913"><enum>(3)</enum><header>Conditions for Federal construction funding</header><text>The construction of a federally owned storage project that is the subject of an agreement under this subsection shall not commence until the Secretary—</text>
 <subparagraph id="ide20fac8f642540c3a4816dc25ce45a3b"><enum>(A)</enum><text>determines that the proposed federally owned storage project is feasible in accordance with the reclamation laws;</text>
 </subparagraph><subparagraph id="id37ea8355a57c47c79d8cb1e43a056cb5"><enum>(B)</enum><text>determines that—</text> <clause id="id76315E88EB07435AA776A96A8A0893B7"><enum>(i)</enum><text>the federally owned storage project provides a Federal benefit in accordance with the reclamation laws; and</text>
 </clause><clause id="idC364EFF6662B441293D8ED5345DD5ED1"><enum>(ii)</enum><text>not less than a proportionate share of the benefits of the federally owned storage project are Federal benefits, including water supplies dedicated to specific purposes, such as water quality improvements or fish and wildlife protection and restoration, including a wildlife refuge; and</text>
 </clause></subparagraph><subparagraph id="id5de216be700e42b68713313230c74780"><enum>(C)</enum><text>secures an agreement providing such upfront funding as is necessary to pay the non-Federal share of the capital costs of the federally owned storage project.</text>
 </subparagraph></paragraph><paragraph id="idc6f3fab3b9664688905ab88ac5b5a2c8"><enum>(4)</enum><header>Notification</header><text>The Secretary shall submit to the appropriate committees of Congress a written notification of the determinations under paragraph (3) by not later than 30 days after the date of the determinations.</text>
 </paragraph><paragraph id="id5bfbfcb913804a2bb0f678ed474efdf0"><enum>(5)</enum><header>Environmental laws</header><text>In participating in a federally owned storage project under this subsection, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.).</text>
 </paragraph><paragraph id="id34bf9b24dbe04d2fbf9e31c10064e85a"><enum>(6)</enum><header>Expansion or upgrade</header><text>The Secretary shall require, as a condition for design, study, or any other participation in the expansion or upgrade of a federally owned storage project—</text>
 <subparagraph id="idA5EEC2184D0443059830E084E55D3C31"><enum>(A)</enum><text>the agreement of any single entity that has an existing water service contract or repayment contract for more than 60 percent of the capacity or yield of the federally owned storage project that the expansion will not adversely affect any right or interest of the entity under the water service contract or repayment contract, as applicable; and</text>
 </subparagraph><subparagraph id="idec9e996d73bb467f80a6b09a2cac341e"><enum>(B)</enum><text>the agreement of the non-Federal entity that, pursuant to a formal operations and maintenance transfer contract or other legal agreement with the Secretary, acting through the Commissioner of Reclamation, carries out the operations and maintenance of the federally owned storage project, if applicable.</text>
					</subparagraph></paragraph></subsection><subsection id="id2b080fef768f4ff8ae7343b9a3a64ab3"><enum>(d)</enum><header>Non-Federal storage projects</header>
 <paragraph id="idac4a66bdf51b4380ade60feecddd2ba6"><enum>(1)</enum><header>In general</header><text>Subject to the requirements of this subsection, the Secretary may participate in the design, study, construction, expansion, upgrade, or capital repair of a non-Federal storage project in an amount equal to not more than 25 percent of the total cost of the non-Federal storage project.</text>
 </paragraph><paragraph id="ida6a376b0d0fa4b0ba6fd8a2d0d05108d"><enum>(2)</enum><header>Conditions for Federal design and study funding</header><text>The Secretary shall only fund a design or study activity for a non-Federal storage project under this subsection if—</text>
 <subparagraph id="ide6a6de6c595b4f5292455f679adf2817"><enum>(A)</enum><text>Federal participation has been requested by the Governor of the State in which the non-Federal storage project is located; and</text>
 </subparagraph><subparagraph id="idd24aa59db67a46cc9a19c7fdca1d0c4b"><enum>(B)</enum><text>the Secretary has identified the potential for Federal benefit sufficient to proceed.</text> </subparagraph></paragraph><paragraph id="id81b0dad741e344058d2110c4a85d3efe"><enum>(3)</enum><header>Conditions for Federal construction funding</header><text>Participation by the Secretary in the construction of a non-Federal storage project under this subsection shall not occur unless—</text>
 <subparagraph id="id58c5a6e1ee8f43edb1e9c8e95ced047e"><enum>(A)</enum><text>the Governor of the State in which the non-Federal storage project is located has requested Federal participation at the time construction was initiated; and</text>
 </subparagraph><subparagraph id="idA5862FCC4821450196D9B15E0F1070F0"><enum>(B)</enum><text>the applicable non-Federal sponsor determines, and the Secretary concurs, that—</text>
 <clause id="id74913927895e4bbbabf09866d563098a"><enum>(i)</enum><text>the non-Federal storage project is technically and financially feasible;</text> </clause><clause id="idC96D4D73AE544E989D6B05FE21E5BF6A"><enum>(ii)</enum><text>the non-Federal storage project provides a Federal benefit in accordance with the reclamation laws;</text>
 </clause><clause commented="no" display-inline="no-display-inline" id="id4DFBFA38008348CBA9680A57DB037067"><enum>(iii)</enum><text>not less than a proportionate share of the benefits of the non-Federal storage project are Federal benefits, including water supplies dedicated to specific purposes, such as water quality improvements or fish and wildlife protection and restoration, including a wildlife refuge; and</text>
 </clause><clause id="id50272b63355f43378df36f407b77d9ec"><enum>(iv)</enum><text>each sponsor of the non-Federal project is financially capable of funding the non-Federal share of the project costs.</text>
 </clause></subparagraph></paragraph><paragraph id="id39f86ae0949d4307b2b065644ee6a751"><enum>(4)</enum><header>Notification</header><text>The Secretary shall submit to the appropriate committees of Congress a written notification of the determinations under paragraphs (2) and (3) by not later than 30 days after the date of the determinations.</text>
 </paragraph><paragraph id="idb6ef83683e834bc48fbae67d6db4528b"><enum>(5)</enum><header>Environmental laws</header><text>In participating in a non-Federal storage project under this subsection, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.).</text>
				</paragraph><paragraph id="idd8cbffa6369a43dfa951070f8acd4d89"><enum>(6)</enum><header>Information</header>
 <subparagraph id="idD20A691C4D4B475EB7184C8D22967230"><enum>(A)</enum><header>In general</header><text>In participating in a non-Federal storage project under this subsection, the Secretary—</text> <clause id="id680125d1821b4033a5190bf93a2aaf8d"><enum>(i)</enum><text>shall—</text>
 <subclause id="id05BEEA4CD6AD44589D96FADF37B0F114"><enum>(I)</enum><text>generally, rely on reports prepared by the sponsor of the non-Federal storage project, including feasibility or equivalent studies, environmental analyses, and other pertinent reports and analyses; but</text>
 </subclause><subclause id="id521AF38E7AB34AE9AA5C2C43ECC339F9"><enum>(II)</enum><text>retain responsibility for making the independent determinations described in paragraphs (2) and (3); and</text>
 </subclause></clause><clause id="idd78ae5b729fa454ea6b28d018d4da7e2"><enum>(ii)</enum><text>may prepare studies supplementary to the studies described in clause (i)(I), on—</text> <subclause id="idD05D53950AB44A7FA5F305031EE70BDD"><enum>(I)</enum><text>request of the sponsor of the non-Federal storage project; and</text>
 </subclause><subclause id="id965C988B68184A918BFCF148D052D93F"><enum>(II)</enum><text>agreement by the Secretary.</text> </subclause></clause></subparagraph><subparagraph id="id5a48c2062afa46218a6f42b7e9c69c76"><enum>(B)</enum><header>Guidelines</header> <clause id="id7283BCE9778844569F4043C4D989FC27"><enum>(i)</enum><header>Draft</header><text>Not later than 180 days after the date of enactment of this Act, the Secretary shall issue draft guidelines for feasibility or equivalent studies for non-Federal storage projects prepared by a project sponsor that shall be consistent with requirements for a title XVI Feasibility Study Report, including the economic analysis, contained in the Reclamation Manual Directives and Standards numbered WTR 11–01, subject to—</text>
 <subclause id="idE9E37058BE58451DAAA065EFA52F98A9"><enum>(I)</enum><text>any additional requirements necessary to provide sufficient information for making the independent determinations described in paragraphs (2)(B) and (3); and</text>
 </subclause><subclause id="id0a7c135b92324bee96f189bec6b6f1e6"><enum>(II)</enum><text>the condition that the Bureau of Reclamation shall not bear responsibility for the technical adequacy of any design, cost estimate, or construction relating to a non-Federal storage project.</text>
 </subclause></clause><clause id="ida823d9ee30454c1fb83bd23ff39493f7"><enum>(ii)</enum><header>Final</header><text>The Secretary shall finalize the guidelines under clause (i) by not later than 1 year after the date of enactment of this Act.</text>
 </clause></subparagraph></paragraph></subsection><subsection id="idb845009f14864e19adf0bffd6e51357d"><enum>(e)</enum><header>Rights To use capacity</header><text>Subject to compliance with applicable Reclamation State water rights laws, the right to use the capacity of a federally owned storage project or non-Federal storage project with respect to which the Secretary has entered into an agreement under this subsection shall be allocated in such manner as may be mutually agreed to by the Secretary and each other party to the agreement, including any party described in subsection (c)(6)(B).</text>
 </subsection><subsection id="id270dfe4241ce48a8bb6e0d34308efe7b"><enum>(f)</enum><header>Federal benefits</header><text>In making a determination relating to a Federal benefit under this section, the Secretary may include any benefit realized from the existence of operational flexibility to optimize the achievement of an authorized project purpose (whether reimbursable or nonreimbursable), taking into consideration the hydrology of a given water year, including through the coordinated management of Federal and non-Federal facilities.</text>
			</subsection><subsection id="id1c3c7a1742024c2a88dddb4538294002"><enum>(g)</enum><header>Funding</header>
 <paragraph id="id524DC072708743FE9B307D6BE483A476"><enum>(1)</enum><header>Authorization of appropriations</header><text>There is authorized to be appropriated to the Secretary to carry out this section $670,000,000 for the period of fiscal years 2020 through 2024.</text>
				</paragraph><paragraph id="id3837b32007d149e6bf3010d279319733"><enum>(2)</enum><header>Congressional approval initially required</header>
 <subparagraph id="id501184067FEA48A08869D83B8B2DC80B"><enum>(A)</enum><header>Design and study funding</header><text>Each initial award under this section for design and study of a federally owned storage project or a non-Federal storage project shall be approved in an appropriations Act.</text>
 </subparagraph><subparagraph id="id5217558c0427468a9dda0520c329c329"><enum>(B)</enum><header>Construction funding</header><text>Each initial award under this section for construction of a federally owned storage project or a non-Federal storage project shall be approved in an appropriations Act.</text>
					</subparagraph><subparagraph id="idef2c4f23acaf47a9971579812daed24f"><enum>(C)</enum><header>Reclamation recommendations</header>
 <clause id="idB339EC5E9D2847FEA0D883EF3B0E320C"><enum>(i)</enum><header>In general</header><text>Subject to clause (ii), the Commissioner of Reclamation shall submit to the appropriate committees of Congress recommendations regarding the initial award of design and study funding, and of construction funding, for each federally owned storage project and non-Federal storage project subject to consideration under subparagraphs (A) and (B).</text>
 </clause><clause id="id5792e72f32b042c588c8d7e2cb2266ef"><enum>(ii)</enum><header>Requirement</header><text>The Commissioner of Reclamation shall confer with the appropriate committees of Congress before submitting the recommendations under clause (i).</text>
						</clause></subparagraph></paragraph><paragraph commented="no" display-inline="no-display-inline" id="idc7358df0dfbe4483b9663e4a9705c527"><enum>(3)</enum><header>Subsequent funding awards</header>
 <subparagraph commented="no" display-inline="no-display-inline" id="id8BA3164E11554977B8778C9DBDC6E031"><enum>(A)</enum><header>Design and study funding</header><text>After approval by Congress of an initial award of design and study funding for a federally owned storage project or a non-Federal storage project under paragraph (2), the Secretary may award additional design and study funding for the federally owned storage project or non-Federal storage project without further congressional approval.</text>
 </subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="idF1A0F24E95134047935325FD0E5E43A7"><enum>(B)</enum><header display-inline="yes-display-inline">Construction funding</header><text display-inline="yes-display-inline">After approval by Congress of an initial award of construction funding for a federally owned storage project or a non-Federal storage project under paragraph (2), the Secretary may award additional construction funding for the federally owned storage project or non-Federal storage project without further congressional approval.</text>
 </subparagraph></paragraph><paragraph id="id20d25440d6f34389bd156f3e39a5ebbe"><enum>(4)</enum><header>Preliminary studies</header><text>Of the amounts made available under paragraph (1), not more than 25 percent shall be provided for appraisal studies, feasibility studies, or other preliminary studies.</text>
				</paragraph><paragraph commented="no" display-inline="no-display-inline" id="ide66dac86478e4a0e98e6c73f269b7f60"><enum>(5)</enum><header display-inline="yes-display-inline">WIIN Act storage funding</header>
 <subparagraph commented="no" display-inline="no-display-inline" id="idD4EC47F3B2744D0C9224F11372ECE2DC"><enum>(A)</enum><header display-inline="yes-display-inline">Appropriations</header><text display-inline="yes-display-inline">Each federally owned storage project and non-Federal storage project shall be eligible to receive any amounts made available pursuant to section 4007(h) of the Water Infrastructure Improvements for the Nation Act (<external-xref legal-doc="usc" parsable-cite="usc/43/390b">43 U.S.C. 390b</external-xref> note; <external-xref legal-doc="public-law" parsable-cite="pl/114/322">Public Law 114–322</external-xref>) (as in effect on the day before the date of enactment of this Act), in accordance with paragraphs (2) and (3).</text>
					</subparagraph><subparagraph id="id0fc4b72d936f446d984f1dca27277c09"><enum>(B)</enum><header>Individual projects</header>
 <clause id="id9ef517e2802d48f7b76b9dab820029f1"><enum>(i)</enum><header>Federally owned storage projects</header><text>If the Secretary determines that a federally owned storage project is eligible for funding under section 4007(b) of the Water Infrastructure Improvements for the Nation Act (<external-xref legal-doc="usc" parsable-cite="usc/43/390b">43 U.S.C. 390b</external-xref> note; <external-xref legal-doc="public-law" parsable-cite="pl/114/322">Public Law 114–322</external-xref>), the federally owned storage project shall remain eligible for funding under subsection (c).</text>
 </clause><clause id="idcbc01d729b4b4e83b24291580aeae606"><enum>(ii)</enum><header>Non-Federal storage projects</header><text>If the Secretary determines that a non-Federal storage project is eligible for funding as a State-led storage project under section 4007(c) the Water Infrastructure Improvements for the Nation Act (<external-xref legal-doc="usc" parsable-cite="usc/43/390b">43 U.S.C. 390b</external-xref> note; <external-xref legal-doc="public-law" parsable-cite="pl/114/322">Public Law 114–322</external-xref>), the non-Federal storage project shall remain eligible for funding under subsection (d).</text>
 </clause></subparagraph></paragraph></subsection><subsection id="id36d0e6b97f8c4627aaf90c9fa18962bd"><enum>(h)</enum><header>Consistency with State law</header><text>Nothing in this section preempts or modifies any obligation of the United States or an eligible entity to act in accordance with applicable State law.</text>
 </subsection><subsection id="idc53df7c2563e4b9a9df2dd6cd6b0c696"><enum>(i)</enum><header>Partnership and agreements relating to certain water storage projects</header><text>The Secretary, acting through the Commissioner of Reclamation, may enter into a partnership or other agreement relating to a water storage project described in section 103 of the Calfed Bay-Delta Authorization Act (<external-xref legal-doc="public-law" parsable-cite="pl/108/361">Public Law 108–361</external-xref>; 118 Stat. 1683) with a local joint-powers authority established pursuant to State law by 1 or more irrigation districts or other local water districts or units of local government within the applicable hydrologic region, to advance the project.</text>
 </subsection><subsection id="id58AD3943CB984429807CD29A66347058"><enum>(j)</enum><header>Calfed reauthorization</header><text>Title I of <external-xref legal-doc="public-law" parsable-cite="pl/108/361">Public Law 108–361</external-xref> (118 Stat. 1681; 123 Stat. 2860; 128 Stat. 164; 128 Stat. 2312; 129 Stat. 2407; 130 Stat. 1866) is amended by striking <quote>2019</quote> each place it appears and inserting <quote>2024</quote>.</text>
 </subsection><subsection id="idA2940F331AD6468BA76D5ABAB06C7AC7"><enum>(k)</enum><header>Conforming amendment</header><text>Section 4007 of the Water Infrastructure Improvements for the Nation Act (<external-xref legal-doc="usc" parsable-cite="usc/43/390b">43 U.S.C. 390b</external-xref> note; <external-xref legal-doc="public-law" parsable-cite="pl/114/322">Public Law 114–322</external-xref>) is repealed.</text>
			</subsection></section><section id="idaa749cb1c0d948a8a5bf67cb5b4fffd3"><enum>4.</enum><header>Water recycling and reuse</header>
 <subsection id="id957e25fdc4be44fbabfa07e8f10618f1"><enum>(a)</enum><header>Authorization of new water recycling and reuse projects</header><text>Section 1602 of the Reclamation Wastewater and Groundwater Study and Facilities Act (<external-xref legal-doc="usc" parsable-cite="usc/43/390h">43 U.S.C. 390h</external-xref>) is amended by striking paragraph (2) of subsection (f) and all that follows through the end of subsection (g) and inserting the following:</text>
				<quoted-block display-inline="no-display-inline" id="id2ed8036f6dd04af78d5b157880205302" style="OLC">
 <paragraph id="id27b0455ab34049fd8d3a3c2ea44b7ab0"><enum>(2)</enum><header>Priorities and diversity of project types</header><text>In providing grants under paragraph (1), the Secretary shall—</text> <subparagraph id="ide4adf9065ec442608bfd2d095ac006d0"><enum>(A)</enum><text>give priority to projects that—</text>
 <clause id="idbc460a2d554e4b78b9ca6420d77684c3"><enum>(i)</enum><text>are likely to provide a more-reliable water supply for a unit of State or local government;</text> </clause><clause id="id758098557a0245b394c611fb71bd9f19"><enum>(ii)</enum><text>are likely to increase the water management flexibility and reduce impacts on environmental resources; or</text>
 </clause><clause id="id626e58cc7b8048f1b1089460d0dcde19"><enum>(iii)</enum><text>provide multiple benefits, including water supply reliability, ecosystem benefits, groundwater management and enhancements, and water quality improvements; and</text>
 </clause></subparagraph><subparagraph id="id47bbb9e5251044229e0e1627aaab4b93"><enum>(B)</enum><text>take into consideration selecting a diversity of project types, including projects that serve—</text> <clause id="idd1cd8a1f0ceb4d8ba1d05e56f994289e"><enum>(i)</enum><text>a region or more than 1 community;</text>
 </clause><clause id="id1c85fa569f6d40979c54be0ecf140395"><enum>(ii)</enum><text>a rural or small community; or</text> </clause><clause id="idadb7af39e0264a418865c14abe10a08e"><enum>(iii)</enum><text>an urban community or city.</text>
							</clause></subparagraph></paragraph><subsection id="id1a027c31a2994549b3a127cd09ddd448"><enum>(g)</enum><header>Funding</header>
 <paragraph id="id5ff6ad2e9e0c45e3809e9d789a4e5a26"><enum>(1)</enum><header>Authorization of appropriations</header><text>There is authorized to be appropriated to the Secretary to carry out subsections (e) and (f) $100,000,000 for the period of fiscal years 2020 through 2024.</text>
 </paragraph><paragraph id="idf956669dbf0e44ec92b4db8f8ceefbdb"><enum>(2)</enum><header>Funding opportunity announcement</header><text>The Commissioner of Reclamation shall release a funding opportunity announcement for the competitive grant program under subsection (f) by not later than 75 days after the date of enactment of an Act that provides funding for the program.</text>
						</paragraph><paragraph id="id78E6AB1ED0C249298C3D99E0B90F5F3D"><enum>(3)</enum><header>Congressional approval initially required</header>
 <subparagraph id="id10D5DDBB42414F40AFEB0DB3CB25ECD1"><enum>(A)</enum><header>In general</header><text>Each initial award under this section for design and study, or for construction, of a project under subsection (e) or (f) shall be approved in an appropriations Act.</text>
 </subparagraph><subparagraph id="id4E0517E81A4C4AE38AC92CF502E48AAA"><enum>(B)</enum><header>Reclamation recommendations</header><text>The Commissioner of Reclamation shall submit recommendations regarding the initial award of design and study funding and construction funding for consideration under subparagraph (A) to—</text>
 <clause id="id59171C46866E46E2BB645929E66062D6"><enum>(i)</enum><text>the Committee on Appropriations of the Senate;</text> </clause><clause id="id8B150E6E98AE4F319576B7D1857C68EC"><enum>(ii)</enum><text>the Committee on Energy and Natural Resources of the Senate;</text>
 </clause><clause id="id0B0DFD139CB948B29D4508C480A6FF2F"><enum>(iii)</enum><text>the Committee on Appropriations of the House of Representatives; and</text> </clause><clause commented="no" display-inline="no-display-inline" id="id53F1C26F8F6A4A2EBAE19A38E642997F"><enum>(iv)</enum><text>the Committee on Natural Resources of the House of Representatives.</text>
 </clause></subparagraph></paragraph><paragraph commented="no" display-inline="no-display-inline" id="id8FA94A9CDADC4D9A90D54EB04CDE2A2C"><enum>(4)</enum><header>Subsequent funding awards</header><text>After approval by Congress of an initial award of design and study funding or construction funding for a project under paragraph (3), the Commissioner of Reclamation may award additional design and study funding or construction funding, respectively, for the project without further congressional approval.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block>
 </subsection><subsection id="id043de5eeac244334bf52f5834aeb6303"><enum>(b)</enum><header>Limitation on funding</header><text>Section 1631(d) of the Reclamation Wastewater and Groundwater Study and Facilities Act (<external-xref legal-doc="usc" parsable-cite="usc/43/390h-13">43 U.S.C. 390h–13(d)</external-xref>) is amended—</text>
 <paragraph id="idB3240191691746CAA60CCE3798D2EE1E"><enum>(1)</enum><text>in paragraph (1)—</text> <subparagraph id="id865689A79A7C4D06866AFB9487C111B4"><enum>(A)</enum><text>by striking <quote>by paragraph (2)</quote> and inserting <quote>in paragraphs (2) and (3)</quote>; and</text>
 </subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="idD83E8D40B0864DC1A9B36F18C9ACBC16"><enum>(B)</enum><text>striking <quote>$20,000,000 (October 1996 prices)</quote> and inserting <quote>$30,000,000 (in prices as determined for January 2019)</quote>; and</text> </subparagraph></paragraph><paragraph id="id54C04420CE1544C39FBAA128C5EEEE55"><enum>(2)</enum><text>in paragraph (2)—</text>
 <subparagraph id="id6D62C7B813E544D3B53EE083791A7B5C"><enum>(A)</enum><text>in subparagraph (B)—</text> <clause id="id873BBF32D7AF43A4846ABA307B08FB1D"><enum>(i)</enum><text>by striking <quote>(B) In the case</quote> and inserting the following:</text>
							<quoted-block display-inline="no-display-inline" id="id38475FB9E25C4AF3BB6E5D961BFE719C" style="OLC">
 <subparagraph id="id124E60B7573148C7B8723E3C928FC517"><enum>(B)</enum><header>San Gabriel Basin</header><text>In the case</text></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block> </clause><clause id="idDDEFD7C084D2434D8B53292D4F350F7A"><enum>(ii)</enum><text>by indenting clauses (i) and (ii) appropriately; and</text>
 </clause></subparagraph><subparagraph id="id8030657DE9F9488DA93076DCA75B7260"><enum>(B)</enum><text>by striking <quote>(2)(A) Subject to</quote> and inserting the following:</text> <quoted-block display-inline="no-display-inline" id="idCB0D62F73EC14949B6A78AB4A348CB14" style="OLC"> <paragraph id="idDBE7AB08237D42D1AB324846D84915D8"><enum>(2)</enum><header>Projects funded as of 2020</header><text>The Federal share of the cost of any single project authorized under this title shall be $20,000,000 if the project has received that amount as of December 31, 2020.</text>
							</paragraph><paragraph id="idE439B0A467F94B64B18323BC5866D0CB"><enum>(3)</enum><header>Older projects</header>
 <subparagraph id="idD4D9381E451E4F688BA0A4D426C7AE29"><enum>(A)</enum><header>In general</header><text>Subject to</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block> </subparagraph></paragraph></subsection></section><section id="id3ffc6d0a31a34603b92902f5e287547d"><enum>5.</enum><header>Desalination</header> <text display-inline="no-display-inline">Section 4(a) of the Water Desalination Act of 1996 (<external-xref legal-doc="usc" parsable-cite="usc/42/10301">42 U.S.C. 10301</external-xref> note; <external-xref legal-doc="public-law" parsable-cite="pl/104/298">Public Law 104–298</external-xref>) is amended by striking the second paragraph (1) (relating to projects) and inserting the following:</text>
			<quoted-block display-inline="no-display-inline" id="idbc18d3f540c04b678e55a9381b8bb79b" style="OLC">
				<paragraph id="idd1e35c068d5443c39d00c746f46acb4f"><enum>(2)</enum><header>Projects</header>
 <subparagraph id="id842e240dcc7e4974b07af33cb74e0cea"><enum>(A)</enum><header>Definition of eligible desalination project</header><text>In this paragraph, the term <term>eligible desalination project</term> means any project located in a Reclamation State, or for which the construction, operation, sponsorship, or funding is the responsibility of, and the primary water supply benefit accrues to, 1 or more entities in a Reclamation State, that—</text>
 <clause id="id1a515684823648aaa60d10fe606c73d0"><enum>(i)</enum><text>involves an ocean or brackish water desalination facility—</text> <subclause id="ida16288dd82ef4e73b6feb9e4bc2c6fad"><enum>(I)</enum><text>constructed, operated, and maintained by a State, Indian Tribe, irrigation district, water district, or other organization with water or power delivery authority; or</text>
 </subclause><subclause id="idbb9bcb90a9bc4dd7be0c66b5f0227572"><enum>(II)</enum><text>sponsored or funded by any State, department of a State, political subdivision of a State, or public agency organized pursuant to State law, including through—</text>
 <item id="id73e36e0ea6ca4abf89d8f4d91aa2ccca"><enum>(aa)</enum><text>direct sponsorship or funding; or</text> </item><item id="ida0e4bc52e58644f6bb6062be1f804e4b"><enum>(bb)</enum><text>indirect sponsorship or funding, such as by paying for the water provided by the facility; and</text>
 </item></subclause></clause><clause id="id0ced77ee6483480c93fb1bf839cd3e5e"><enum>(ii)</enum><text>provides a Federal benefit in accordance with the reclamation laws.</text> </clause></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id5572ae7d8bbb4812820baf886547b8c5"><enum>(B)</enum><header display-inline="yes-display-inline">Federal share</header><text display-inline="yes-display-inline">Subject to the requirements of this paragraph, the Secretary may participate in an eligible desalination project in an amount equal to not more than 25 percent of the total cost of the eligible desalination project.</text>
 </subparagraph><subparagraph id="id2dab1045e1f942368563b5db891cd1c4"><enum>(C)</enum><header>State role</header><text>Participation by the Secretary in an eligible desalination project under this paragraph shall not occur unless—</text>
 <clause id="id028eb50de4404dcb9233ccc4e355bb03"><enum>(i)</enum><subclause commented="no" display-inline="yes-display-inline" id="id2DF06E210C3549D993E0E9F65394A2A2"><enum>(I)</enum><text>the eligible desalination project is included in a State-approved plan; or</text> </subclause><subclause id="id6EC6003FAAC549F9ADA1919665F20D95" indent="up1"><enum>(II)</enum><text>the participation has been requested by the Governor of the State in which the eligible desalination project is located; and</text>
 </subclause></clause><clause id="id89a22f72d9214830952ac149a8741f79"><enum>(ii)</enum><text>the State or local sponsor of the eligible desalination project determines, and the Secretary concurs, that—</text>
 <subclause id="id0118c18ce194434eb71bfaf2c9a2452a"><enum>(I)</enum><text>the eligible desalination project—</text> <item id="id2C12DE07988846019B852EA81D04FB2A"><enum>(aa)</enum><text>is technically and financially feasible; and</text>
 </item><item id="id4AA8B04D24404F93BBC0173D5750EAF5"><enum>(bb)</enum><text>provides a Federal benefit in accordance with the reclamation laws; and</text>
 </item></subclause><subclause id="id7f28b352c28b41c398356333805eba79"><enum>(II)</enum><text>the non-Federal project sponsor is financially capable of funding the non-Federal share of the project costs; and</text>
 </subclause></clause><clause id="id84aa1176872a4528bc665a1ee11dcda8"><enum>(iii)</enum><text>the Secretary submits to Congress a written notification of the determinations under clause (ii) by not later than 30 days after the date of the determinations.</text>
 </clause></subparagraph><subparagraph id="idc6856ec76d3643ef9f74326642e16870"><enum>(D)</enum><header>Environmental laws</header><text>In participating in an eligible desalination project under this paragraph, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.).</text>
 </subparagraph><subparagraph id="idd0723205fe9c411d82cca9b5283e0cc4"><enum>(E)</enum><header>Information</header><text>In participating in an eligible desalination project under this subsection, the Secretary—</text> <clause id="id4153b43e16624ba29089e746346bd5ae"><enum>(i)</enum><text>may rely on reports prepared by the sponsor of the eligible desalination project, including feasibility or equivalent studies, environmental analyses, and other pertinent reports and analyses; but</text>
 </clause><clause id="idfd1c32702ccf41e1a7931b70f2a53af5"><enum>(ii)</enum><text>shall retain responsibility for making the independent determinations described in subparagraph (C).</text>
						</clause></subparagraph><subparagraph id="id134b7195b95e485e926c407d9c9dd904"><enum>(F)</enum><header>Funding</header>
 <clause id="id3FDB2959D60346B189F7C29C64CD3E24"><enum>(i)</enum><header>Authorization of appropriations</header><text>There is authorized to be appropriated to carry out this paragraph $60,000,000 for the period of fiscal years 2020 through 2024.</text>
 </clause><clause id="idA5DBB94665394B94A753AC8666E2A526"><enum>(ii)</enum><header>Funding opportunity announcement</header><text>The Commissioner of Reclamation shall release a funding opportunity announcement for a grant program under this paragraph by not later than 75 days after the date of enactment of an Act that provides funding for the program.</text>
						</clause><clause id="idC63281581C2144E9954EE37350B1454E"><enum>(iii)</enum><header>Congressional approval initially required</header>
 <subclause id="id8529C03A1F3F4934AACCE5A2BEAA0D09"><enum>(I)</enum><header>In general</header><text>Each initial award under this paragraph for design and study, or for construction, of an eligible desalination project shall be approved in an appropriations Act.</text>
 </subclause><subclause id="idF4F3570AED154A398207F253303B5A8B"><enum>(II)</enum><header>Reclamation recommendations</header><text>The Commissioner of Reclamation shall submit recommendations regarding the initial award of design and study funding and construction funding for consideration under subclause (I) to—</text>
 <item id="id72F00FABEF2E4686A829F0190694FA7A"><enum>(aa)</enum><text>the Committee on Appropriations of the Senate;</text> </item><item id="id8BEDC503A4FB4A06B73321C5BEF1AF89"><enum>(bb)</enum><text>the Committee on Energy and Natural Resources of the Senate;</text>
 </item><item id="id7783D7C3B2834DBFB7130C7BBC2CAD17"><enum>(cc)</enum><text>the Committee on Appropriations of the House of Representatives; and</text> </item><item commented="no" display-inline="no-display-inline" id="id8935A7D8B6084970A3E05D27768D40AA"><enum>(dd)</enum><text>the Committee on Natural Resources of the House of Representatives.</text>
 </item></subclause></clause><clause commented="no" display-inline="no-display-inline" id="id211F579C17DA4BD982202DD392F5F741"><enum>(iv)</enum><header>Subsequent funding awards</header><text>After approval by Congress of an initial award of design and study funding or construction funding for an eligible desalination project under clause (iii), the Commissioner of Reclamation may award additional design and study funding or construction funding, respectively, for the eligible desalination project without further congressional approval.</text></clause></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block>
		</section><section id="id20ee767a6a3d4c209d94a929b4dc8255"><enum>6.</enum><header>Reclamation infrastructure finance and innovation pilot program</header>
 <subsection id="id570281d7fa964f8f9f582d22321f2375"><enum>(a)</enum><header>Establishment</header><text>The Secretary shall establish and carry out a pilot program under which the Secretary shall provide to eligible entities described in subsection (c) financial assistance in accordance with this section to carry out eligible projects described in subsection (b).</text>
			</subsection><subsection id="id86db43dc2a164357bfad3b2579582531"><enum>(b)</enum><header>Eligible projects</header>
 <paragraph id="id701ed6255ecf4b8491b4d9b6b9b4f276"><enum>(1)</enum><header>In general</header><text>A project eligible to receive assistance under the pilot program under this section is a water supply project that, as determined by the Secretary—</text>
 <subparagraph id="ida070dbb8f44e4e62ae0163116ed4586e"><enum>(A)</enum><text>is located in—</text> <clause id="id7d1747442a054febb8e246de99bdaab0"><enum>(i)</enum><text>the State of Alaska;</text>
 </clause><clause id="id78434fe0abbb4df8bf6b128f7137eb18"><enum>(ii)</enum><text>the State of Hawaii; or</text> </clause><clause id="id3a48354b06c94217b53f34ab9f785ebb"><enum>(iii)</enum><text>a State or territory described in the first section of the Act of June 17, 1902 (32 Stat. 388, chapter 1093; <external-xref legal-doc="usc" parsable-cite="usc/43/391">43 U.S.C. 391</external-xref>);</text>
 </clause></subparagraph><subparagraph id="idb850a38b1b404a39934da234f7643ca2"><enum>(B)</enum><text>would contribute directly or indirectly (including through groundwater recharge) to a safe, adequate water supply for domestic, agricultural, environmental, or municipal or industrial use; and</text>
 </subparagraph><subparagraph id="id34421af7145f4745878ca89bc6e99000"><enum>(C)</enum><text>is otherwise eligible for assistance under this section.</text> </subparagraph></paragraph><paragraph id="idb2576a56c9ea4960be5f12caec5f4e1b"><enum>(2)</enum><header>Projects associated with Bureau of Reclamation facilities</header><text>A project that supports an improvement to, or is associated with, a Bureau of Reclamation facility shall be eligible to receive assistance under the pilot program under this section if—</text>
 <subparagraph id="id7d579c737b5d477f9f4642d378f6ea5c"><enum>(A)</enum><text>the project meets the criteria described in paragraph (1);</text> </subparagraph><subparagraph id="id88214e9a09c74a10b39f25270f0eb6f8"><enum>(B)</enum><text>the eligible entity carrying out the project demonstrates to the satisfaction of the Secretary that the eligible entity is initiating and implementing the project for non-Federal purposes;</text>
 </subparagraph><subparagraph id="id42c543fba064409fab071faf73fa5ecb"><enum>(C)</enum><text>the eligible entity retains or secures, through a long-term Federal property lease, operation and maintenance transfer agreement that provides for self-funding, or easement agreement with the Secretary, substantial control over the assets, operation, management, and maintenance of the project; and</text>
 </subparagraph><subparagraph id="id107d932fee584312be6b53802e203cc1"><enum>(D)</enum><text>the project meets such other criteria as the Secretary may establish.</text> </subparagraph></paragraph><paragraph id="idf284e8c48cc84fc6bdcb85d08ab74b31"><enum>(3)</enum><header>Small community projects</header><text>For projects eligible for assistance under this section and section 5028(a)(2)(B) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3907">33 U.S.C. 3907(a)(2)(B)</external-xref>), the Secretary may assist applicants in combining 1 or more projects into a single application in order to meet the minimum project cost of $5,000,000 required under that section.</text>
 </paragraph></subsection><subsection id="id1cd4e27e8b4847b082dc955f1a36d642"><enum>(c)</enum><header>Eligible entities</header><text>The following entities are eligible to receive assistance under this section:</text> <paragraph id="idaeaef37bd8f2476f929595124619cb09"><enum>(1)</enum><text>An entity described in section 5025 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3904">33 U.S.C. 3904</external-xref>).</text>
 </paragraph><paragraph id="id9f9289c084b149f7a941454ee13b7d67"><enum>(2)</enum><text>A conservancy district, Reclamation district, irrigation district, or water district.</text> </paragraph><paragraph id="id5887843c062d43748849f29a73948672"><enum>(3)</enum><text>A canal company or mutual water company.</text>
 </paragraph><paragraph id="id0e3c58d408274299882fede00bc533ac"><enum>(4)</enum><text>A water users’ association.</text> </paragraph><paragraph id="id25f9b156b9d445f58e2bd9bfbb1cbac0"><enum>(5)</enum><text>An agency established by an interstate compact.</text>
 </paragraph><paragraph id="idc4879917187742708eed5069792f3b79"><enum>(6)</enum><text>An agency established under State law for the joint exercise of powers.</text> </paragraph><paragraph id="id89c1e1cf012646c6ba6e534aeabeff93"><enum>(7)</enum><text>Any other individual or entity that has the capacity to contract with the United States under the reclamation laws.</text>
				</paragraph></subsection><subsection id="id6d123e525eca4900b76411b36c6490bc"><enum>(d)</enum><header>Requirements</header>
 <paragraph id="id9d482c2425784503a6dd467c939a8cc5"><enum>(1)</enum><header>Project selection</header><text>In selecting eligible projects to receive assistance under the pilot program under this section, the Secretary shall ensure diversity with respect to—</text>
 <subparagraph id="idf36f2afda00e47e2ab4a3e390e9498ad"><enum>(A)</enum><text>project type; and</text> </subparagraph><subparagraph id="id7c40726dfe084d95a9371a16582c5e24"><enum>(B)</enum><text>geographical location within the States referred to in subsection (b)(1)(A).</text>
 </subparagraph></paragraph><paragraph id="ided757d5e51494193b141669f92bf0a98"><enum>(2)</enum><header>Importation of other requirements</header><text>The following provisions of law shall apply to the pilot program under this section:</text> <subparagraph id="id8748067af6744a10bdbd4d8136442dd9"><enum>(A)</enum><text>Sections 5022, 5024, 5027, 5028, 5029, 5030, 5031, 5032, and 5034(a) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3901">33 U.S.C. 3901</external-xref>, 3903, 3906, 3907, 3908, 3909, 3910, 3911, 3913(a)), except that—</text>
 <clause id="id14c4210ce3354499a05635398ab1c9d9"><enum>(i)</enum><text>any reference contained in those sections to the Secretary of the Army shall be considered to be a reference to the Secretary;</text>
 </clause><clause id="idcee340122ab14168be937ed9fce97058"><enum>(ii)</enum><text>any reference contained in those sections to an eligible project shall be considered to be a reference to an eligible project described in subsection (b);</text>
 </clause><clause id="id2560a71289c14fe48076053f99081f1e"><enum>(iii)</enum><text>paragraphs (1)(E) and (6)(B) of subsection (a), and subsection (b)(3), of section 5028 of that Act (<external-xref legal-doc="usc" parsable-cite="usc/33/3907">33 U.S.C. 3907</external-xref>) shall not apply with respect to this section; and</text>
 </clause><clause id="id44dd395d3e944bbf898e92a6862ac048"><enum>(iv)</enum><text>subsections (e) and (f) of section 5030 of that Act (<external-xref legal-doc="usc" parsable-cite="usc/33/3909">33 U.S.C. 3909</external-xref>) shall not apply with respect to this section.</text>
 </clause></subparagraph><subparagraph id="id2e8d042bb975456e82da27d4dd853840"><enum>(B)</enum><text>The agreement between the Administrator of the Environmental Protection Agency and the Commissioner of Reclamation required under section 4301 of the America’s Water Infrastructure Act of 2018 (<external-xref legal-doc="public-law" parsable-cite="pl/115/270">Public Law 115–270</external-xref>), pursuant to which the Administrator shall retain responsibility for administering any loans under this section.</text>
 </subparagraph><subparagraph id="id4151da9f4c124234a929b6153700d5f9"><enum>(C)</enum><text>Other applicable environmental laws, including the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.).</text>
					</subparagraph></paragraph></subsection><subsection id="ide18c723f5853432dba2f6c2628925f69"><enum>(e)</enum><header>Authorization of appropriations</header>
 <paragraph id="id85f95f77b3b243ea8873b0571a29c10d"><enum>(1)</enum><header>In general</header><text>There is authorized to be appropriated to the Secretary to carry out the pilot program under this section $150,000,000 for the period of fiscal years 2021 through 2025, to remain available until expended.</text>
 </paragraph><paragraph id="idcb2c4f8baa0345709c789ff707e25307"><enum>(2)</enum><header>Administrative costs</header><text>Of the funds made available pursuant to paragraph (1), the Secretary may use for administrative costs of carrying out the pilot program under this section (including for the provision of technical assistance to project sponsors pursuant to paragraph (3), to obtain any necessary approval, and for transfer to the Administrator of the Environmental Protection Agency to provide assistance in administering and servicing Federal credit instruments under the pilot program) not more than $5,000,000 for each applicable fiscal year.</text>
				</paragraph><paragraph id="id376c9119cd044d1d9b65d37f7b4b9585"><enum>(3)</enum><header>Small community projects</header>
 <subparagraph id="idc3b046fa645a4c7fad6694ddc88b7a8a"><enum>(A)</enum><header>In general</header><text>Subject to subsection (b), the Commissioner may use the funds made available under paragraph (2) to provide assistance, including assistance to pay the costs of acquiring the rating opinion letters under paragraph (1)(D) of section 5028(a) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3907">33 U.S.C. 3907(a)</external-xref>), to assist project sponsors in obtaining the necessary approvals for small community projects that are eligible for assistance under paragraph (2)(B) of that section or subsection (b)(3).</text>
 </subparagraph><subparagraph id="id249573c089e84adc81f1018ba5cbd263"><enum>(B)</enum><header>Limitation</header><text>Assistance provided to a project sponsor under subparagraph (A) may not exceed an amount equal to 75 percent of the total administrative costs incurred by the project sponsor in securing financial assistance under this section.</text>
					</subparagraph></paragraph></subsection></section><section id="id1aacb911c01749e58fe2b5f70a9b6fb6"><enum>7.</enum><header>Restoration and environmental compliance</header>
 <subsection id="id86f558c6113a483982392e246bc4fdc2"><enum>(a)</enum><header>In general</header><text>The Secretary may participate in—</text> <paragraph id="id49deb93e36554cb59686cc8f27ab83b3"><enum>(1)</enum><text>environmental restoration activities benefitting species—</text>
 <subparagraph id="id81623E4AAD654138A1D89C2388BA704D"><enum>(A)</enum><text>listed as threatened or endangered under the Endangered Species Act of 1973 (<external-xref legal-doc="usc" parsable-cite="usc/16/1531">16 U.S.C. 1531</external-xref> et seq.) that are adversely affected by the operation of water projects of the Bureau of Reclamation; or</text>
 </subparagraph><subparagraph id="idCD8C905AD0A34C948F147980C80FBDBB"><enum>(B)</enum><text>through water delivery from a Reclamation project to a wildlife refuge;</text> </subparagraph></paragraph><paragraph id="id506ecdbaddc44a3d89c9daa5b50204a9"><enum>(2)</enum><text>environmental compliance activities, including stream gauging, monitoring, and other data collection activities, to assist water projects of the Bureau of Reclamation in—</text>
 <subparagraph id="id1D26150E6D704286BE36219874DAC2C5"><enum>(A)</enum><text>achieving the purposes of the projects; and</text> </subparagraph><subparagraph id="id1D5D12CC87C44BE1B13DEBF92ABC91FE"><enum>(B)</enum><text>fulfilling the duties of the Bureau under section 7 of the Endangered Species Act of 1973 (<external-xref legal-doc="usc" parsable-cite="usc/16/1536">16 U.S.C. 1536</external-xref>); and</text>
 </subparagraph></paragraph><paragraph id="id34e9ed19835f4d02b02c78f3198cc992"><enum>(3)</enum><text>a forest, meadow, or watershed restoration activity on Federal land—</text> <subparagraph id="idcf62c85d230349d7853d45a826cbf52b"><enum>(A)</enum><text>that has the potential—</text>
 <clause id="idfe762e4152664b8ea26d966466b58c8d"><enum>(i)</enum><text>to restore healthy forest or watershed conditions that improve the quality, timing, or other attributes of runoff to—</text>
 <subclause id="idF7C94DB0EBF8456C8A6D37E92AC6AA8E"><enum>(I)</enum><text>a Bureau of Reclamation facility or project; or</text>
 </subclause><subclause id="iddb2b498091fd47f0a1f40767e1bc6c71"><enum>(II)</enum><text>a surface or groundwater storage facility that is operated in conjunction with a Bureau of Reclamation facility or project;</text>
 </subclause></clause><clause id="id3b4b84be1e154000bd785c5a587395ab"><enum>(ii)</enum><text>to reduce the rate of sedimentation of a Bureau of Reclamation facility; or</text> </clause><clause id="id96a2e068fa744586bff7354088e42660"><enum>(iii)</enum><text>to reduce the threat of wildfire that could affect runoff to, or sedimentation or structural integrity of, a Bureau of Reclamation facility; and</text>
 </clause></subparagraph><subparagraph id="id243ab70bb3794338adae38c0ce9248e1"><enum>(B)</enum><text>with respect to which—</text> <clause id="id54a80b5ca544441d849f3b9079c0ec09"><enum>(i)</enum><text>the proportion that the amount of Federal funding under this section bears to the total cost of the project is approximately equal to, or less than, the proportion that water-related benefits bears to the total benefits of the project, as calculated by the Secretary using a methodology at the discretion of the Secretary; and</text>
 </clause><clause id="ida9ab0102390f4c97afeb5683a8052acb"><enum>(ii)</enum><text>Federal water contractors are likely to receive at least part of the water supply or water quality benefits of the project.</text>
 </clause></subparagraph></paragraph></subsection><subsection id="id351a1cf8e9f6428e8f335fe9567d9ad2"><enum>(b)</enum><header>Priority</header><text>In carrying out this section, the Secretary shall give priority to restoration or environmental compliance activities that—</text>
 <paragraph id="idb8662c216bb24d07b7da0a38f8a587b4"><enum>(1)</enum><text>implement congressional direction, such as projects described in—</text> <subparagraph id="idE9FB3D51A209443DB29B73FA61BB95FC"><enum>(A)</enum><text>subsection (a)(3);</text>
 </subparagraph><subparagraph id="id6A37847EA9304B1D8B92F1365387EBC2"><enum>(B)</enum><text>section 4001 or 4010 of the Water Infrastructure Improvements for the Nation Act (<external-xref legal-doc="public-law" parsable-cite="pl/114/322">Public Law 114–322</external-xref>; 130 Stat. 1851); or</text>
 </subparagraph><subparagraph id="idd03f844205fe43af934597c40dce1426"><enum>(C)</enum><text>congressionally authorized species recovery programs on the Colorado River;</text> </subparagraph></paragraph><paragraph id="id25c2ccb0ffae460580bab800e58c0da9"><enum>(2)</enum><text>are recommended by collaborative processes or plans developed by Federal agencies in conjunction with States, water contractors, environmental or fishing interests, or other stakeholders; or</text>
 </paragraph><paragraph id="id35eb0aa9a43a40919ea8db6ab6b74101"><enum>(3)</enum><text>implement settlements with State agencies or requirements under State water laws to restore species listed as threatened or endangered under the Endangered Species Act of 1973 (<external-xref legal-doc="usc" parsable-cite="usc/16/1531">16 U.S.C. 1531</external-xref> et seq.) or other species adversely affected by the operation of water projects of the Bureau of Reclamation.</text>
				</paragraph></subsection><subsection id="ida874d6b3471c45ffbaedef5e5e9d6e4b"><enum>(c)</enum><header>Cost-Share</header>
 <paragraph id="id65c3dc1cf0c4487e8666c4c5fc9e95a5"><enum>(1)</enum><header>In general</header><text>The Federal share of the cost of any individual program, activity, or project carried out using funds made available pursuant to this section—</text>
 <subparagraph id="idE523D89F3D1E4F5DB997CEE6360A1615"><enum>(A)</enum><text>shall be not more than 50 percent; and</text>
 </subparagraph><subparagraph id="id61182110759F4F578708A9CC67F91B1A"><enum>(B)</enum><text>shall be nonreimbursable.</text> </subparagraph></paragraph><paragraph id="id84fc09b9bdc34a1a8d4005e6befad2a7"><enum>(2)</enum><header>Program-level calculation</header><text>The Federal cost-share described in paragraph (1) shall be calculated at the program level, at which a group of activities or projects are considered to be a part of a broader, cohesive program.</text>
 </paragraph></subsection><subsection id="id15262ef69ae746babe8d380b10bf3d45"><enum>(d)</enum><header>Authorization of appropriations</header><text>There are authorized to be appropriated to the Secretary—</text> <paragraph id="idE601878FAC47491F920D91A81ACBFB73"><enum>(1)</enum><text>$20,000,000 to carry out subsection (a)(3) for the period of fiscal years 2020 and 2021; and</text>
 </paragraph><paragraph id="id81E0A2A3364B47FAAE25343065FD6C6B"><enum>(2)</enum><text>$120,000,000 to carry out this section for the period of fiscal years 2022 through 2024.</text>
 </paragraph></subsection><subsection id="id80c5024bb7044ff08ce8a22842451d9a"><enum>(e)</enum><header>Applicable law</header><text>Nothing in this section shall be interpreted or implemented in a manner that—</text> <paragraph id="id84625bd197394b70a3a49c687e9c57c6"><enum>(1)</enum><text>preempts or modifies any obligation of the United States under Federal law to act in accordance with applicable State law, including applicable State water law; or</text>
 </paragraph><paragraph id="id1f5ce3a208314bd1a9390c903819d37f"><enum>(2)</enum><text>affects or modifies any obligation under Federal environmental law.</text> </paragraph></subsection></section><section id="id75f1ec83ccc44e1f8f000957716f8026"><enum>8.</enum><header>Deauthorization of certain water recycling projects</header> <subsection id="id4986099218744a6d83205c4e9b8162ee"><enum>(a)</enum><header>Purpose; definition</header> <paragraph id="idc5666d1eefe04026bf8208ee33827acb"><enum>(1)</enum><header>Purpose</header><text>The purpose of this section is to establish an efficient and transparent 1-time process for deauthorizing Bureau of Reclamation title XVI projects that have failed—</text>
 <subparagraph id="id619A8F2FAC1349858F5A77C986135BE0"><enum>(A)</enum><text>to receive a minimum level of Federal investment; or</text>
 </subparagraph><subparagraph id="id7B0A2873356D4B7EAF02D1A54CF42AFE"><enum>(B)</enum><text>to initiate construction.</text> </subparagraph></paragraph><paragraph id="id784ff9bd057e4b81b6b04104d7a6a0b4"><enum>(2)</enum><header>Definition of title XVI project</header><text>In this section, the term <term>title XVI project</term> means a project authorized by title XVI of <external-xref legal-doc="public-law" parsable-cite="pl/102/575">Public Law 102–575</external-xref> (<external-xref legal-doc="usc" parsable-cite="usc/43/390h">43 U.S.C. 390h</external-xref> et seq.).</text>
 </paragraph></subsection><subsection id="id82d71084bd2c4b20be4f61d64c912489"><enum>(b)</enum><header>Backlog list</header><text>Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives, and make available on a publicly accessible internet website in a manner that is downloadable, searchable, and sortable, a list of—</text>
 <paragraph id="idcb2fe5c4ccbc4f3bb3863cd4996e3f38"><enum>(1)</enum><text>title XVI projects—</text> <subparagraph id="id928A13B8606C4A4C83508BFB0C30A5A8"><enum>(A)</enum><text>that are authorized; and</text>
 </subparagraph><subparagraph id="id1E1C0063F27A447286A202E0EFEFAF05"><enum>(B)</enum><text>for which, during the fiscal year in which this Act is enacted and each of the preceding 10 fiscal years—</text>
 <clause id="id73cac8f17048441282ef0c4d6e558b75"><enum>(i)</enum><text>no application for Federal funding has been received; and</text> </clause><clause id="id8dd6d8f8cda24562bb8e0bc6019957cd"><enum>(ii)</enum><text>no construction has occurred; and</text>
 </clause></subparagraph></paragraph><paragraph id="idf54596d6d30f4204a19f9fce77f9fd5d"><enum>(2)</enum><text>for each title XVI project listed under paragraph (1)—</text> <subparagraph id="id9db0ceaeaa5945f08398387a6448bbb9"><enum>(A)</enum><text>the date of authorization of the title XVI project, including any subsequent modifications to the original authorization;</text>
 </subparagraph><subparagraph id="id2d94378b2a934040ba6e9b7af3bf092b"><enum>(B)</enum><text>a brief description of the title XVI project; and</text> </subparagraph><subparagraph id="id33236a077cf14a008d3149775a8f2e24"><enum>(C)</enum><text>any amounts appropriated for the title XVI project that remain unobligated.</text>
					</subparagraph></paragraph></subsection><subsection id="idec0ee1aee5534f2f8464fc2f79b8fcdf"><enum>(c)</enum><header>Interim deauthorization list</header>
 <paragraph id="idd71cb24de30949f399a6930ccae64a59"><enum>(1)</enum><header>In general</header><text>The Secretary shall develop and make publicly available an interim deauthorization list that identifies each title XVI project described in subsection (b)(1).</text>
				</paragraph><paragraph id="id21f6c8538d8540c6a1a749b50009950a"><enum>(2)</enum><header>Public comment and consultation</header>
 <subparagraph id="id607788c7f332422b9066c5e8d3b3005a"><enum>(A)</enum><header>In general</header><text>The Secretary shall solicit and accept, for a period of not less than 90 days, comments relating to the interim deauthorization list under paragraph (1) from—</text>
 <clause id="idBB4FF6C662614EF3818FC522BEBF0918"><enum>(i)</enum><text>the public; and</text> </clause><clause id="idC0D49C5B86B249AC863AE6145D1359DD"><enum>(ii)</enum><text>the Governor of each applicable State.</text>
 </clause></subparagraph><subparagraph id="idf58bd6bddf874b23859a67eb831ee547"><enum>(B)</enum><header>Project sponsors</header><text>As part of the public comment period under subparagraph (A), the Secretary shall provide to title XVI project sponsors the opportunity to provide to the Secretary a notice of the intent to initiate construction of the title XVI project by not later than the date that is 2 years after the date of publication of the preliminary final deauthorization list under subsection (d).</text>
 </subparagraph></paragraph><paragraph id="id45797100ab114a80825f4cb00b1c135c"><enum>(3)</enum><header>Submission to Congress; publication</header><text>Not later than 90 days after the date of submission of the backlog list under subsection (b), the Secretary shall—</text>
 <subparagraph id="id35c60044d4d943fba55e409a91930fb2"><enum>(A)</enum><text>submit the interim deauthorization list under paragraph (1) to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives; and</text>
 </subparagraph><subparagraph id="id2542c3ae3b944e0bb4df7ae867780f27"><enum>(B)</enum><text>publish the interim deauthorization list in the Federal Register.</text> </subparagraph></paragraph></subsection><subsection id="id142a139f362848ca9da09dc9aa4deb32"><enum>(d)</enum><header>Preliminary final deauthorization list</header> <paragraph id="id025f228a446f4b4db1134c0cb8d6f4cf"><enum>(1)</enum><header>In general</header><text>The Secretary shall develop a preliminary final deauthorization list that includes each title XVI project identified pursuant to paragraph (2).</text>
				</paragraph><paragraph id="idac547d84712c47638ad422aa984fe264"><enum>(2)</enum><header>Identification of projects</header>
 <subparagraph id="idae3378ac934f4c2f9dbeffd561818245"><enum>(A)</enum><header>Exclusions</header><text>The Secretary may identify a title XVI project described in subsection (b)(1) for exclusion from the preliminary final deauthorization list if the Secretary determines, on a case-by-case basis following receipt of public comments, that the title XVI project is critical for interests of the United States, based on the practicable impact of the title XVI project on—</text>
 <clause id="id0D9D43D85F8D4B55BA55AE890C1C84E1"><enum>(i)</enum><text>public health and safety;</text>
 </clause><clause id="id0BD70A59999C469E9BED91A6F781D877"><enum>(ii)</enum><text>the national economy; or</text> </clause><clause id="idB80D9F315AC94D28A1BAEB99CFF5FA0C"><enum>(iii)</enum><text>the environment.</text>
 </clause></subparagraph><subparagraph id="id253e5b5eded14b6b92033ce370718ce8"><enum>(B)</enum><header>Subject to deauthorization designation</header><text>Any title XVI project the sponsor of which has provided to the Secretary a notice of the intent to initiate construction by not later than 2 years after the date of publication of the preliminary final deauthorization list under this subsection shall be designated on that list as <quote>subject to deauthorization</quote>.</text>
 </subparagraph><subparagraph id="id0a5ccaed44574eb78c526dbeb09d9bb1"><enum>(C)</enum><header>Appendix</header><text>The Secretary shall include as part of the preliminary final deauthorization list under this subsection an appendix that—</text>
 <clause id="ide6d17fdb92c345fb8f1cd914aa7cc62b"><enum>(i)</enum><text>identifies each title XVI project included on the interim deauthorization list under subsection (c) that is not included on the preliminary final deauthorization list; and</text>
 </clause><clause id="id56b70719716949028da773dabe827b0c"><enum>(ii)</enum><text>describes the reasons why each title XVI project identified under clause (i) is not included on the preliminary final deauthorization list.</text>
 </clause></subparagraph></paragraph><paragraph id="id7afa299af6ed4561af425c75992f9900"><enum>(3)</enum><header>Submission to Congress; publication</header><text>Not later than 120 days after the date of expiration of the public comment period under subsection (c)(2)(A), the Secretary shall—</text>
 <subparagraph id="id98329e1a4b234f718137c3c44bb83924"><enum>(A)</enum><text>submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives the preliminary final deauthorization list and the appendix required under this subsection; and</text>
 </subparagraph><subparagraph id="idb7a5b1108ffc4542b58b779b30881a0f"><enum>(B)</enum><text>publish the preliminary final deauthorization list and appendix in the Federal Register.</text> </subparagraph></paragraph></subsection><subsection id="idb378fcb435d545b5a4ecd1529f34aea7"><enum>(e)</enum><header>Deauthorization; congressional review</header><text>Effective beginning on the date that is 180 days after the date of submission to Congress of the preliminary final deauthorization list under subsection (d)(3)(A), each title XVI project included on that list is deauthorized, unless—</text>
 <paragraph id="idb3af170ab8c14f5c829562aa1af9bb0a"><enum>(1)</enum><text>the title XVI project is designated as <quote>subject to deauthorization</quote> pursuant to subsection (d)(2)(B); or</text> </paragraph><paragraph id="id201a719a31d943caa5600fe43e466bd2"><enum>(2)</enum><text>Congress has enacted a joint resolution disapproving the preliminary final deauthorization list.</text>
				</paragraph></subsection><subsection id="iddc85644370574d95bf2f0de786eb3924"><enum>(f)</enum><header>Updated final deauthorization list</header>
 <paragraph id="id57fbde6540f34bbf83787422df63c265"><enum>(1)</enum><header>Publication</header><text>Not later than the date that is 2 years after the date of publication of the preliminary final deauthorization list under subsection (d)(3)(B), the Secretary shall publish an updated final deauthorization list.</text>
 </paragraph><paragraph id="id6ce64975f2e14b56b11a8b2ef07c9a22"><enum>(2)</enum><header>Projects subject to deauthorization</header><text>On the updated final deauthorization list under this subsection, the Secretary shall describe any title XVI project designated as <quote>subject to deauthorization</quote> on the preliminary final deauthorization list pursuant to subsection (d)(2)(B) as—</text>
 <subparagraph id="id99c79b5e39734812bd9b021d692d8fae"><enum>(A)</enum><text>authorized, if the Secretary has received evidence that the sponsor of the title XVI project has substantially initiated construction on the title XVI project; or</text>
 </subparagraph><subparagraph id="id80d10e0a3cb44ec9813d7d96cdf91ff9"><enum>(B)</enum><text>deauthorized, if the Secretary has not received the evidence described in subparagraph (A).</text> </subparagraph></paragraph><paragraph id="id23a03757bbd64d9f8249450a9644c760"><enum>(3)</enum><header>Deauthorization</header><text>Any project described as deauthorized pursuant to paragraph (2)(B) shall be deauthorized on the date that is 180 days after the date of submission of the updated final deauthorization list under paragraph (1), unless Congress has enacted a joint resolution disapproving that list.</text>
 </paragraph></subsection><subsection id="id4b1b46b5473646839875c08d56679b19"><enum>(g)</enum><header>Treatment of project modifications</header><text>For purposes of this section, if a title XVI project has been modified by an Act of Congress, the date of authorization of the title XVI project shall be considered to be the date of the most recent modification.</text>
			</subsection></section><section id="id4140aef46e2f4c088d8058cc06eae969"><enum>9.</enum><header>Offsets</header>
 <subsection id="idc3eb758f56b94aa3aff22ebf3b98cd8a"><enum>(a)</enum><header>Definition of water users' association</header><text>In this section:</text> <paragraph id="id612CFAF636974847812B9713FB891764"><enum>(1)</enum><header>In general</header><text>The term <term>water users' association</term> means an entity that is—</text>
 <subparagraph id="id9B6BD94D1AEA4CBE987DB07C3DE83FE6"><enum>(A)</enum><text>organized and recognized under applicable State law; and</text> </subparagraph><subparagraph id="id89E65B88A2BD46FDBAD6FC32DA7AA96E"><enum>(B)</enum><text>eligible to enter into contracts with the Bureau of Reclamation—</text>
 <clause id="idCC51C96629C648688D0D3EEBF02F6784"><enum>(i)</enum><text>to receive contract water for delivery to end users of the water; and</text>
 </clause><clause id="id4A9626128EB94063AA341EE4F809F02C"><enum>(ii)</enum><text>to pay applicable charges relating to that water.</text> </clause></subparagraph></paragraph><paragraph commented="no" display-inline="no-display-inline" id="id33b9dd545f964298b528b9ced5a9b933"><enum>(2)</enum><header>Inclusions</header><text>The term <term>water users' association</term> includes—</text>
 <subparagraph commented="no" display-inline="no-display-inline" id="id56AA131829B14F48B41CD7A01D65F714"><enum>(A)</enum><text>an association;</text> </subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="idB414CBE25C86443F9B00D81858CF59C1"><enum>(B)</enum><text>a conservancy district;</text>
 </subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id7D8C673D8E2A49479594F8CE96A6937D"><enum>(C)</enum><text>an irrigation district;</text> </subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id4B6008B1BF7546E5AD25B25DEB581E72"><enum>(D)</enum><text>a municipality;</text>
 </subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="id7C427FD559CB4FB2B61B8BDCC58030F7"><enum>(E)</enum><text>a water project contract unit; and</text>
 </subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="idC12FDF138B1D46B6AABA5A31A498E90A"><enum>(F)</enum><text>any similar entity described in paragraph (1).</text> </subparagraph></paragraph></subsection><subsection id="id9b71e1ece10e48d285a908e90c52d103"><enum>(b)</enum><header>Prepayment of certain repayment contracts</header> <paragraph id="id03856d9542714276b9202b7bb8aae0ac"><enum>(1)</enum><header>Conversion and prepayment</header><text>On receipt of a request from a party to the contract, the Secretary shall convert any water service contract in effect on the date of enactment of this Act between the United States and a water users' association to allow for prepayment of the contract pursuant to paragraph (2) under mutually agreeable terms and conditions, subject to the conditions that—</text>
 <subparagraph id="ida0671136b9a14b818c3f04032edfefff"><enum>(A)</enum><text>a water service contract entered into under subsection (e) of section 9 of the Act of August 4, 1939 (53 Stat. 1193, chapter 418), proposed to be converted under this subsection shall be converted to a repayment contract under subsection (d) of that section; and</text>
 </subparagraph><subparagraph id="id4d88e863a4414f96ad1c4b7ebccde3de"><enum>(B)</enum><text>a water service contract entered into under subsection (c)(2) of section 9 of the Act of August 4, 1939 (53 Stat. 1193, chapter 418), proposed to be converted under this subsection shall be converted to a contract under subsection (c)(1) of that section.</text>
 </subparagraph></paragraph><paragraph id="id3c75dee213af46d6bd5e55e8065dc5fa"><enum>(2)</enum><header>Prepayment</header><text>Except for a repayment contract under which the contractor has previously negotiated for prepayment, on request of a party to the contract, a repayment contract under section 9(d) of the Act of August 4, 1939 (53 Stat. 1195, chapter 418), in effect on the date of enactment of this Act, and all contracts converted pursuant to paragraph (1)(A), shall—</text>
 <subparagraph id="id05a0d8faf8d345a5b5294d7398405164"><enum>(A)</enum><text>provide for the repayment, in lump sum or by accelerated prepayment, of the remaining construction costs identified in water project-specific irrigation rate repayment schedules, as adjusted to reflect payments not reflected in those schedules, and properly assignable for ultimate return by the contractor, or if made in approximately equal installments, not later than 3 years after the effective date of the repayment contract, subject to the conditions that—</text>
 <clause id="id76F6AA258B8041B4BD7B0B556E6098B0"><enum>(i)</enum><text>the amount shall be discounted by <fraction>1/2</fraction> the Treasury rate; and</text> </clause><clause id="id16718F1F2DE64209ACAA6C9FB270786A"><enum>(ii)</enum><text>an estimate of the remaining construction costs, as adjusted, shall be provided by the Secretary to the contractor by not later than 90 days after the date of receipt of a request from the contractor;</text>
 </clause></subparagraph><subparagraph id="ida020f02ae6894776b9f70f8cf7df0011"><enum>(B)</enum><text>require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referred to in subparagraph (A), and properly assignable to the contractor, shall be repaid—</text>
 <clause id="id12E18C2915994CE2A99759B572CC6F04"><enum>(i)</enum><text>by not later than 5 years after the date of notification of the allocation if the amount is a result of a collective annual allocation of capital costs to the contractors exercising contract conversion under this subsection of less than $5,000,000; or</text>
 </clause><clause id="id069023A0B134466ABABD79FE837244BB"><enum>(ii)</enum><text>if the amount is equal to $5,000,000 or more, in accordance with applicable reclamation laws;</text> </clause></subparagraph><subparagraph id="id52f75031a2444471948f6debca20641b"><enum>(C)</enum><text>provide that power revenues will not be available to aid in repayment of construction costs allocated to irrigation under the contract; and</text>
 </subparagraph><subparagraph id="idf433165f2df24ee08d5c74fd826c6268"><enum>(D)</enum><text>continue in effect for the period during which the contractor pays applicable charges, in accordance with section 9(d) of the Act of August 4, 1939 (53 Stat. 1195, chapter 418), and other applicable law.</text>
					</subparagraph></paragraph><paragraph id="id34cf297f82544d498236c6ef90b98511"><enum>(3)</enum><header>Covered contract requirements</header>
 <subparagraph id="id25A55675234E41D9BF74C18060750467"><enum>(A)</enum><header>Definition of covered contract</header><text>In this paragraph:</text> <clause id="id6F05F16E2B3845AEAABF67558561409E"><enum>(i)</enum><header>In general</header><text>The term <term>covered contract</term> means—</text>
 <subclause id="id03CA5CF8CC2146A5812A64F373C4ECEF"><enum>(I)</enum><text>on request of the contractor, a repayment contract under subsection (c)(1) of section 9 of the Act of August 4, 1939 (53 Stat. 1193, chapter 418), that is in effect on the date of enactment of this Act; and</text>
 </subclause><subclause id="id85D1FF6BCBE44B5DA85A884F9FC4F6B7"><enum>(II)</enum><text>a contract converted pursuant to paragraph (1)(B).</text> </subclause></clause><clause id="id5816C705B640491FAB9963D7418D4361"><enum>(ii)</enum><header>Exclusion</header><text>The term <term>covered contract</term> does not include a repayment contract under which the contractor has previously negotiated for prepayment.</text>
 </clause></subparagraph><subparagraph id="id32A35DF6DDDE4B5182DA7E835EAAE9B8"><enum>(B)</enum><header>Requirements</header><text>Each covered contract shall—</text> <clause id="id3E03C3CA86284C8CBB7D34C9C45D5987"><enum>(i)</enum><text>provide for the repayment, in lump sum, of the remaining construction costs identified in water project-specific irrigation rate repayment schedules, as adjusted to reflect payments not reflected in those schedules, and properly assignable for ultimate return by the contractor, subject to the condition that the contractor shall submit to the Secretary an estimate of any remaining construction costs, as adjusted, by not later than 90 days after the date of submission of the initial request of the contractor;</text>
 </clause><clause id="id6A9D9BE21D9546DB993074B20EF41F9F"><enum>(ii)</enum><text>require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referred to in clause (i), and properly assignable to the contractor, shall be repaid—</text>
 <subclause id="idA4DCDB91C9C341C3BFA50B9A2CAF6E65"><enum>(I)</enum><text>by not later than 5 years after the date of notification of the allocation, if the amount is a result of a collective annual allocation of capital costs to the exercising contract conversion under this subsection of less than $5,000,000; or</text>
 </subclause><subclause commented="no" display-inline="no-display-inline" id="idD3E23B6E61AD44E9A03F234EE4601FEA"><enum>(II)</enum><text>in accordance with applicable reclamation laws, if the amount is $5,000,000 or more; and</text> </subclause></clause><clause commented="no" display-inline="no-display-inline" id="id93AE41FBAA974DD982CE26D4D150C888"><enum>(iii)</enum><text display-inline="yes-display-inline">continue in effect for the period during which the contractor pays applicable charges, in accordance with section 9(c)(1) of the Act of August 4, 1939 (53 Stat. 1194, chapter 418), and other applicable law.</text>
 </clause></subparagraph></paragraph><paragraph id="id6f018714fa114107935121d10e54745b"><enum>(4)</enum><header>Conditions</header><text>A contract entered into pursuant to paragraph (1), (2), or (3)—</text> <subparagraph id="id056e7dd75e5843f1a1e0de616cc66620"><enum>(A)</enum><text>shall not be adjusted on the basis of the type of prepayment financing used by the applicable water users' association;</text>
 </subparagraph><subparagraph id="id09d87cea1e8f46b59d657813322ab2a6"><enum>(B)</enum><text>shall conform to any other agreements, such as applicable settlement agreements and newly constructed appurtenant facilities agreements; and</text>
 </subparagraph><subparagraph id="idae69b279d9ed48d4a11d585b5866dff2"><enum>(C)</enum><text>shall not modify any other water service, repayment, exchange, or transfer contractual right between the applicable water users' association and the Bureau of Reclamation, or any right, obligation, or relationship of the water users' association and any affected landowner in accordance with applicable State law.</text>
					</subparagraph></paragraph></subsection><subsection id="idb154c4d0dba8491bb6c2c81da160b9a2"><enum>(c)</enum><header>Accounting</header>
				<paragraph id="idED6CF953E62C47FF89471F0E3FE472C0"><enum>(1)</enum><header>Final
 cost allocation</header><text>Any amount paid pursuant to subsection (b) shall be subject to adjustment after a final cost allocation by the Secretary.</text>
				</paragraph><paragraph id="idA5417716F3BA4C8399840A5AE5DF5156"><enum>(2)</enum><header>Contractor responsibility</header>
 <subparagraph id="id600C5360ED244FB18F0837F50F118AF3"><enum>(A)</enum><header>In general</header><text>If a final cost allocation under paragraph (1) indicates that a cost properly assignable to a contractor covered by this section is greater than the amount paid by the contractor, the contractor shall be obligated to pay the remaining allocated costs in accordance with an additional repayment contract under subparagraph (B).</text>
 </subparagraph><subparagraph id="id2F2162EC56BC4977B341C942A2EAAEE7"><enum>(B)</enum><header>Additional repayment contracts</header><text>Subject to any other provision mutually agreed to by all affected parties, the term of an additional repayment contract under subparagraph (A) shall be—</text>
 <clause id="id42FEBFE581E14F53B8C71AF7F8BACCD0"><enum>(i)</enum><text>not less than 1 year; and</text>
 </clause><clause id="idB8961A13689C40D5835523FEF53633A5"><enum>(ii)</enum><text>not more than 10 years.</text> </clause></subparagraph></paragraph><paragraph id="id1CC37106BAB6409CB27D04821B4A5CDF"><enum>(3)</enum><header>Credit</header><text>If a final cost allocation under paragraph (1) indicates that a cost properly assignable to a contractor are less than the amount paid by the contractor, the Secretary shall credit the amount of the overpayment as an offset against any outstanding or future obligation of the contractor, with the exception of any Central Valley Project Restoration Fund charge assessed pursuant to section 3407(d) of <external-xref legal-doc="public-law" parsable-cite="pl/102/575">Public Law 102–575</external-xref> (106 Stat. 4727).</text>
				</paragraph></subsection><subsection id="id822d40b805d342ee88a51a57fbe9e1a5"><enum>(d)</enum><header>Applicability of certain provisions</header>
 <paragraph id="id12d35aec4f2346afabcd18ac4164204c"><enum>(1)</enum><header>Effect of existing law</header><text>On compliance by a contract or with, and discharge of, an obligation of repayment of construction costs pursuant to a contract under subsection (b)(2)(A), subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (<external-xref legal-doc="usc" parsable-cite="usc/43/390mm">43 U.S.C. 390mm</external-xref>) shall apply to any affected land.</text>
 </paragraph><paragraph id="id14356f67ab854ed2a7ecce6dfccccd48"><enum>(2)</enum><header>Effect of other obligations</header><text>On payment by a contractor of any amount required under a repayment contract under subsection (b)(2)(A), the obligation of a contractor to repay construction costs or other capitalized costs described in subsection (b)(2)(B), (b)(3)(B), or (c) shall not affect—</text>
 <subparagraph id="id666E576DF8E64573A1DB5E81F24B3194"><enum>(A)</enum><text>the status of the contractor as having repaid all construction costs assignable to the contractor; or</text>
 </subparagraph><subparagraph id="id41EEA9D30FB64E70A97AA670C788C571"><enum>(B)</enum><text>the applicability of subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (<external-xref legal-doc="usc" parsable-cite="usc/43/390mm">43 U.S.C. 390mm</external-xref>).</text>
 </subparagraph></paragraph></subsection><subsection id="id88cba4379ffc4d81a6b14355a95e89af"><enum>(e)</enum><header>Effect on existing law</header><text>Nothing in this section alters—</text> <paragraph id="id9dc71d83e8804a0c924b4c3cb6a2b1db"><enum>(1)</enum><text>any repayment obligation of a water service or repayment contractor receiving water from the same water project, or shifts any cost that would otherwise have been properly assignable to—</text>
 <subparagraph id="idB09309140B0E4B5AB25A84B408288334"><enum>(A)</enum><text>a water users' association identified in paragraph (1), (2), or (3) of subsection (b), including—</text> <clause id="id3440832C1F26457994D2278FEB051D75"><enum>(i)</enum><text>operation and maintenance costs;</text>
 </clause><clause id="id496382E18CE140ED8A890D23CE44240E"><enum>(ii)</enum><text>construction costs; or</text> </clause><clause id="id634A0512ED3948DC9738EBCBC37C4753"><enum>(iii)</enum><text>any other capitalized cost incurred after the date of enactment of this Act; or</text>
 </clause></subparagraph><subparagraph id="id7ACA4A48B0704F4BBB84817CE70C35CF"><enum>(B)</enum><text>another contractor;</text> </subparagraph></paragraph><paragraph id="idd7af280531cd4ad78facf3a3daa579be"><enum>(2)</enum><text>any specific requirement for the disposition of amounts received as repayment by the Secretary under Federal reclamation law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (<external-xref legal-doc="usc" parsable-cite="usc/43/371">43 U.S.C. 371</external-xref> et seq.));</text>
 </paragraph><paragraph id="id250c3540e69b43bfbeb61fa5ea2b628d"><enum>(3)</enum><text>the priority of a water service or repayment contractor to receive water; or</text> </paragraph><paragraph id="idd061e76d5fd44146a58acf5497dff684"><enum>(4)</enum><text>except as expressly provided in this section, any obligation under the reclamation laws, including the continuation of any Central Valley Project Restoration Fund charge assessed pursuant to section 3407(d) of <external-xref legal-doc="public-law" parsable-cite="pl/102/575">Public Law 102–575</external-xref> (106 Stat. 4727), of a water service or repayment contractor making a prepayment pursuant to this section.</text>
 </paragraph></subsection><subsection commented="no" display-inline="no-display-inline" id="id3F8ADE4759A54DD18D04B254D966B953"><enum>(f)</enum><header display-inline="yes-display-inline">Conforming amendment</header><text display-inline="yes-display-inline">Section 4011 of the Water Infrastructure Improvements for the Nation Act (<external-xref legal-doc="public-law" parsable-cite="pl/114/322">Public Law 114–322</external-xref>; 130 Stat. 1878) is repealed.</text>
 </subsection></section><section id="id0383306dfdc34390badf4c7e28c04482"><enum>10.</enum><header>Savings clause</header><text display-inline="no-display-inline">Nothing in this Act or an amendment made by this Act shall be interpreted or implemented in a manner that—</text>
 <paragraph id="ide9162de813174a8280299ee23e045335"><enum>(1)</enum><text>preempts or modifies any obligation of the United States or an eligible entity under Federal law to act in accordance with applicable State law, including applicable State water law; or</text>
 </paragraph><paragraph id="ida59e6d2a7fc1412084c5ef7adbee9dc0"><enum>(2)</enum><text>affects or modifies any obligation under Federal environmental law.</text></paragraph></section></legis-body> </bill> 

