[Congressional Bills 116th Congress]
[From the U.S. Government Publishing Office]
[H.R. 2784 Introduced in House (IH)]
<DOC>
116th CONGRESS
1st Session
H. R. 2784
To clarify section 224 of the Communications Act of 1934 as not
limiting the ability of a State to adopt a one touch make ready policy
for pole attachments, and for other purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
May 16, 2019
Ms. Eshoo introduced the following bill; which was referred to the
Committee on Energy and Commerce
_______________________________________________________________________
A BILL
To clarify section 224 of the Communications Act of 1934 as not
limiting the ability of a State to adopt a one touch make ready policy
for pole attachments, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as ``Clearing Local Impediments Makes
Broadband Open to New Competition and Enhancements'' or the ``CLIMB
ONCE Act''.
SEC. 2. STATE ADOPTION OF ONE TOUCH MAKE READY POLICY FOR POLE
ATTACHMENTS.
(a) Construction.--Nothing in section 224 of the Communications Act
of 1934 (47 U.S.C. 224) or the implementing rules of the Federal
Communications Commission shall be construed to limit the ability of a
State to adopt a one touch make ready policy with respect to pole
attachments.
(b) Development of Model Policy.--Not later than 180 days after the
date of the enactment of this Act, the Commission shall publish
recommendations on best practices, including a model policy, relating
to the implementation of a one touch make ready policy by a State.
(c) Definitions.--In this section:
(1) Commission.--The term ``Commission'' means the Federal
Communications Commission.
(2) One touch make ready policy.--The term ``one touch make
ready policy'' means, with respect to the addition or
modification of a pole attachment, regulations relating to the
activity undertaken in order to prepare the pole, duct,
conduit, or right-of-way for the addition of a new attachment
including the ability of an attacher to perform all make ready
work in a single trip to the pole and a requirement of the
designation by a pole owner or utility of a list of at least
two approved contractors for each pole, duct, conduit, or
right-of-way to perform all such activity.
(3) Pole attachment; state; utility.--The terms ``pole
attachment'', ``State'', and ``utility'' have the meanings
given those terms in section 224(a) of the Communications Act
of 1934 (47 U.S.C. 224(a)).
<all>