To amend the Federal Power Act to promote hydropower development at
existing nonpowered dams, and for other purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
June 12, 2017
Mr. Bucshon introduced the following bill; which was referred to the
Committee on Energy and Commerce
_______________________________________________________________________
A BILL
To amend the Federal Power Act to promote hydropower development at
existing nonpowered dams, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Promoting Hydropower Development at
Existing Nonpowered Dams Act''.
SEC. 2. PROMOTING HYDROPOWER DEVELOPMENT AT EXISTING NONPOWERED DAMS.
Part I of the Federal Power Act (16 U.S.C. 792 et seq.) is amended
by adding at the end the following:
``SEC. 34. PROMOTING HYDROPOWER DEVELOPMENT AT EXISTING NONPOWERED
DAMS.
``(a) Exemptions for Qualifying Facilities.--
``(1) Exemption qualifications.--Subject to the
requirements of this subsection, the Commission may grant an
exemption in whole or in part from the requirements of this
part, including any license requirements contained in this
part, to any facility the Commission determines is a qualifying
facility.
``(2) Consultation with federal and state agencies.--In
granting any exemption under this subsection, the Commission
shall consult with--
``(A) the United States Fish and Wildlife Service,
the National Marine Fisheries Service, and the State
agency exercising administrative control over the fish
and wildlife resources of the State in which the
facility will be located, in the manner provided by the
Fish and Wildlife Coordination Act;
``(B) any Federal department supervising any public
lands or reservations occupied by the project; and
``(C) any Indian tribe affected by the project.
``(3) Exemption conditions.--
``(A) In general.--The Commission shall include in
any exemption granted under this subsection only such
terms and conditions that the Commission determines
are--
``(i) necessary to protect public safety;
or
``(ii) reasonable, economically feasible,
and essential to prevent loss of or damage to,
or to mitigate adverse effects on, fish and
wildlife resources directly caused by the
construction and operation of the qualifying
facility, as compared to the environmental
baseline existing at the time the Commission
grants the exemption.
``(B) No changes to release regime.--No Federal
authorization required with respect to a qualifying
facility, including an exemption granted by the
Commission under this subsection, may include any
condition or other requirement that results in any
material change to the storage, control, withdrawal,
diversion, release, or flow operations of the
associated qualifying nonpowered dam.
``(4) Environmental review.--The Commission's environmental
review under the National Environmental Policy Act of 1969 of a
proposed exemption under this subsection shall consist only of
an environmental assessment, unless the Commission determines,
by rule or order, that the Commission's obligations under such
Act for granting exemptions under this subsection can be met
through a categorical exclusion.
``(5) Violation of terms of exemption.--Any violation of a
term or condition of any exemption granted under this
subsection shall be treated as a violation of a rule or order
of the Commission under this Act.
``(6) Annual charges for enhancement activities.--Exemptees
under this subsection for any facility located at a non-Federal
dam shall pay to the United States reasonable annual charges in
an amount to be fixed by the Commission for the purpose of
funding environmental enhancement projects in watersheds in
which facilities exempted under this subsection are located.
Such annual charges shall be equivalent to the annual charges
for use of a Government dam under section 10(e), unless the
Commission determines, by rule, that a lower charge is
appropriate to protect exemptees' investment in the project or
avoid increasing the price to consumers of power due to such
charges. The proceeds of charges made by the Commission under
this paragraph shall be paid into the Treasury of the United
States and credited to miscellaneous receipts. Subject to
annual appropriation Acts, such proceeds shall be available to
Federal and State fish and wildlife agencies for purposes of
carrying out specific environmental enhancement projects in
watersheds in which one or more facilities exempted under this
subsection are located. Not later than 180 days after the date
of enactment of this section, the Commission shall establish
rules, after notice and opportunity for public comment, for the
collection and administration of annual charges under this
paragraph.
``(7) Effect of jurisdiction.--The jurisdiction of the
Commission over any qualifying facility exempted under this
subsection shall extend only to the qualifying facility
exempted and any associated primary transmission line, and
shall not extend to any conduit, dam, impoundment, shoreline or
other land, or any other project work associated with the
qualifying facility exempted under this subsection.
``(b) Definitions.--For purposes of this section:
``(1) Federal authorization.--The term `Federal
authorization'--
``(A) means any authorization required under
Federal law with respect to an application for a
license, license amendment, or exemption under this
part; and
``(B) includes any permits, special use
authorizations, certifications, opinions, or other
approvals as may be required under Federal law to
approve or implement the license, license amendment, or
exemption under this part.
``(2) Qualifying criteria.--The term `qualifying criteria'
means, with respect to a facility--
``(A) as of the date of enactment of this section,
the facility is not licensed under, or exempted from
the license requirements contained in, this part;
``(B) the facility will be associated with a
qualifying nonpowered dam;
``(C) the facility will be constructed, operated,
and maintained for the generation of electric power;
``(D) the facility will use for such generation any
withdrawals, diversions, releases, or flows from the
associated qualifying nonpowered dam, including its
associated impoundment or other infrastructure; and
``(E) the operation of the facility will not result
in any material change to the storage, control,
withdrawal, diversion, release, or flow operations of
the associated qualifying nonpowered dam.
``(3) Qualifying facility.--The term `qualifying facility'
means a facility that is determined under this section to meet
the qualifying criteria.
``(4) Qualifying nonpowered dam.--The term `qualifying
nonpowered dam' means any dam, dike, embankment, or other
barrier--
``(A) the construction of which was completed on or
before the date of enactment of this section;
``(B) that is operated for the control, release, or
distribution of water for agricultural, municipal,
navigational, industrial, commercial, environmental,
recreational, aesthetic, or flood control purposes;
``(C) that, as of the date of enactment of this
section, is not equipped with hydropower generating
works that are licensed under, or exempted from the
license requirements contained in, this part; and
``(D) that, in the case of a non-Federal dam, has
been certified by an independent consultant approved by
the Commission as complying with the Commission's dam
safety requirements.''.