<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-Senate" public-private="public">
	<form>
		<distribution-code display="yes">II</distribution-code>
		<congress>112th CONGRESS</congress>
		<session>1st Session</session>
		<legis-num>S. 471</legis-num>
		<current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber>
		<action>
			<action-date date="20110303">March 3, 2011</action-date>
			<action-desc><sponsor name-id="S284">Ms. Stabenow</sponsor> (for
			 herself, <cosponsor name-id="S253">Mr. Durbin</cosponsor>,
			 <cosponsor name-id="S307">Mr. Brown of Ohio</cosponsor>,
			 <cosponsor name-id="S270">Mr. Schumer</cosponsor>, <cosponsor name-id="S311">Ms. Klobuchar</cosponsor>, <cosponsor name-id="S131">Mr.
			 Levin</cosponsor>, and <cosponsor name-id="S331">Mrs. Gillibrand</cosponsor>)
			 introduced the following bill; which was read twice and referred to the
			 <committee-name committee-id="SSEV00">Committee on Environment and Public
			 Works</committee-name></action-desc>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title>To require the Secretary of the Army to study the
		  feasibility of the hydrological separation of the Great Lakes and Mississippi
		  River Basins.</official-title>
	</form>
	<legis-body>
		<section id="idE782A94AE7DD4CA4A9E7D9E4A8F86580" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the
			 <quote><short-title>Stop Asian Carp Act of
			 2011</short-title></quote>.</text>
		</section><section id="S1" section-type="subsequent-section"><enum>2.</enum><header>Definitions</header><text display-inline="no-display-inline">In this Act:</text>
			<paragraph id="id307B8D142371480EBB8F8A4321872F5E"><enum>(1)</enum><header>CAWS</header><text>The
			 term <term>CAWS</term> means the Chicago Area Water System.</text>
			</paragraph><paragraph id="id522367379EAE48C693236998F413D5A4"><enum>(2)</enum><header>Director</header><text>The
			 term <term>Director</term> means the Director of the United States Geological
			 Survey.</text>
			</paragraph><paragraph id="id3307650A7404406898AB43458B95E09A"><enum>(3)</enum><header>Hydrological
			 separation</header><text>The term <term>hydrological separation</term> means a
			 physical separation on the CAWS that—</text>
				<subparagraph id="id89F4D72C10A94E1FA9F6D92BAB76297F"><enum>(A)</enum><text>would disconnect
			 the Mississippi River from Lake Michigan; and</text>
				</subparagraph><subparagraph id="id101531AA2D2442E99A857AA943DF88B3"><enum>(B)</enum><text>shall be designed
			 to be adequate in scope to prevent the transfer of aquatic species between each
			 of those bodies of water.</text>
				</subparagraph></paragraph><paragraph id="id9009B80952D2438C9AFAA9274B1B2C77"><enum>(4)</enum><header>Secretary</header><text>The
			 term <term>Secretary</term> means the Secretary of the Army, acting through the
			 Chief of Engineers.</text>
			</paragraph><paragraph id="idB1E397AB0CBC4A6DBFBA6957BA311D67"><enum>(5)</enum><header>Study</header><text>The
			 term <term>study</term> means the feasibility study described in section
			 101(a).</text>
			</paragraph></section><title id="id43EFC1E4729D42F0A93A6C096F8D92B2"><enum>I</enum><header>Feasibility
			 study</header>
			<section id="idA056D1A227614783A21A2041E0F93B7B"><enum>101.</enum><header>Feasibility
			 study</header>
				<subsection id="idB37C15D6EC9E4BEB977FD8323289B24F"><enum>(a)</enum><header>In
			 general</header><text display-inline="yes-display-inline">Not later than 30
			 days after the date of enactment of this Act, the Secretary, pursuant to
			 section 206 of the Flood Control Act of 1958 (Public Law 85–500; 72 Stat. 317),
			 shall initiate a study of the watersheds of the following rivers (including the
			 tributaries of the rivers) that drain directly into Lake Michigan:</text>
					<paragraph id="id06CD9AE79AEB43F5B6FA99DD4567F673"><enum>(1)</enum><text>The Illinois
			 River, at and in the vicinity of Chicago, Illinois.</text>
					</paragraph><paragraph id="id8C97031EECD443E69B7E2EAE8190B0BC"><enum>(2)</enum><text>The Chicago River
			 in the State of Illinois.</text>
					</paragraph><paragraph id="id0C5CA52A88604669AC75577CFB04E082"><enum>(3)</enum><text>The Calumet River
			 in the States of Illinois and Indiana.</text>
					</paragraph></subsection><subsection id="idC91D291C70054900BAB63D2330251F79"><enum>(b)</enum><header>Purpose of
			 study</header><text>The purpose of the study shall be to determine the
			 feasibility and best means of implementing the hydrological separation of the
			 Great Lakes and Mississippi River Basins to prevent the introduction or
			 establishment of populations of aquatic nuisance species between the Great
			 Lakes and Mississippi River Basins through the CAWS and other aquatic
			 pathways.</text>
				</subsection><subsection id="id7E0E628043694B4D97A6789DC5282D2E"><enum>(c)</enum><header>Requirements of
			 study</header>
					<paragraph id="idE7011F6704D043B7B0AD776B3E34AC3F"><enum>(1)</enum><header>Options</header><text>The
			 study shall include options to address—</text>
						<subparagraph id="idFF06BB9642FD48CEB5BCCE2CF1CA585D"><enum>(A)</enum><text>flooding;</text>
						</subparagraph><subparagraph id="id22CCCEBDB707431A92088CF4BA9D5C3A"><enum>(B)</enum><text>Chicago
			 wastewater and stormwater infrastructure;</text>
						</subparagraph><subparagraph id="id4C5DBCCA43024C9799B58839C3008D41"><enum>(C)</enum><text>waterway safety
			 operations; and</text>
						</subparagraph><subparagraph id="idC56C10DB323E45B1B9691BA795BA75FD"><enum>(D)</enum><text>barge and
			 recreational vessel traffic alternatives, which shall include—</text>
							<clause id="id7B797E50B914423584C9C30C9C7BEF30"><enum>(i)</enum><text>examining other
			 modes of transportation for cargo and CAWS users; and</text>
							</clause><clause id="idBFA7353D369E4609948F135A291E8876"><enum>(ii)</enum><text>creating
			 engineering designs to move canal traffic from 1 body of water to another body
			 of water without transferring aquatic species.</text>
							</clause></subparagraph></paragraph><paragraph id="id656D6B2885CA49FD919F592EBA4B08DB"><enum>(2)</enum><header>Cost-benefit
			 analysis</header><text>The study shall contain a detailed analysis of the
			 environmental benefits and costs of each option described in paragraph
			 (1).</text>
					</paragraph><paragraph id="id725A1FDEC9B94B6B8DF851A3564F62CC"><enum>(3)</enum><header>Association
			 with other study</header><text>The study shall be conducted in association with
			 the study required under section 3061(d) of the Water Resources Development Act
			 of 2007 (Public Law 110–114; 121 Stat. 1121).</text>
					</paragraph><paragraph id="id39880EE581A643BD87A69FB10D0F03BC"><enum>(4)</enum><header>Consultation</header><text>In
			 conducting the study, the Secretary shall consult with any relevant expert or
			 stakeholder knowledgeable on the issues of hydrological separation and aquatic
			 nuisance species.</text>
					</paragraph></subsection><subsection id="id3971351554AC4FB8BC9896B8BDF53139"><enum>(d)</enum><header>Deadline</header><text>The
			 Secretary shall complete the study by not later than the date that is 18 months
			 after the date of enactment of this Act.</text>
				</subsection></section><section id="id7E261E45C7154AA99B77E8C7F3931D23"><enum>102.</enum><header>Report</header>
				<subsection id="idAF493851C54945CCA463B0DC0378E8F3"><enum>(a)</enum><header>In
			 general</header><text>The Secretary shall prepare a report on the waterways
			 described in section 101(a) in accordance with—</text>
					<paragraph id="id8576005F56D7481980CFF406AE8C3F8C"><enum>(1)</enum><text>the purpose
			 described in section 101(b); and</text>
					</paragraph><paragraph id="id0CD58BB6EAB84A6180480FD400FC615E"><enum>(2)</enum><text>each requirement
			 described in section 101(c).</text>
					</paragraph></subsection><subsection id="id62FC57BD3193495F9CCADC0486DAB4B3"><enum>(b)</enum><header>Deadlines</header><text>The
			 Secretary shall submit to Congress and the President—</text>
					<paragraph id="id1EF8104A057044389D011D42F3700B4E"><enum>(1)</enum><text>not later than
			 180 days after the date of enactment of this Act, an initial report under this
			 section;</text>
					</paragraph><paragraph id="id0B07C82E8F97466F8DCF215BF90654CB"><enum>(2)</enum><text>not later than 1
			 year after the date of enactment of this Act, an interim report under this
			 section; and</text>
					</paragraph><paragraph id="id1FED5D6DC6B742D58A9EF9BB5CC29B91"><enum>(3)</enum><text>not later than 18
			 months after the date of enactment of this Act, a final report under this
			 section.</text>
					</paragraph></subsection></section><section id="idEB0D50E1E502450AA770C8839FBA8AB3"><enum>103.</enum><header>Federal
			 expense requirement</header><text display-inline="no-display-inline">The
			 Secretary shall carry out this Act at full Federal expense.</text>
			</section><section id="idAE215F5A1CF44FFAB2B6F3152EAFB160"><enum>104.</enum><header>Presidential
			 oversight</header><text display-inline="no-display-inline">The President, or
			 the Council on Environmental Quality, acting as a designee of the President,
			 shall oversee the study to ensure the thoroughness and timely completion of the
			 study.</text>
			</section></title><title id="id7B2639B2D3594EDD8DFE95E24BE9578F"><enum>II</enum><header>Response to
			 additional threats</header>
			<section id="id392C4591CFE447E985053E0A46F023B3"><enum>201.</enum><header>Response</header>
				<subsection id="id4481FEB1783346B182B5FAFC575582BD"><enum>(a)</enum><header>Monitoring
			 connecting waters</header><text>To identify additional threats that could allow
			 Asian Carp to enter the Great Lakes Basin, the Director, in cooperation with
			 the Director of the United States Fish and Wildlife Service, shall monitor and
			 survey all waters that connect to the Great Lakes Basin or could connect to the
			 Great Lakes Basin due to—</text>
					<paragraph id="idF0FCEFF3564B4F18976018690C9F0E89"><enum>(1)</enum><text>flooding;</text>
					</paragraph><paragraph id="idE05DF7C0FF274D369433A484C37B98DA"><enum>(2)</enum><text>underground
			 hydrological connection; or</text>
					</paragraph><paragraph id="idA0ACD4839AFB48339C7AA5267455E780"><enum>(3)</enum><text>human-made
			 diversion.</text>
					</paragraph></subsection><subsection id="id76413F238D3E458D803D5DC4C2A56AE5"><enum>(b)</enum><header>Response to
			 additional threats</header><text>As soon as practicable after the date of
			 identification of a threat under subsection (a), the Director, in cooperation
			 with the Director of the United States Fish and Wildlife Service, shall—</text>
					<paragraph id="id7A301C67E0684CB7969C210123D3A6CE"><enum>(1)</enum><text>prioritize each
			 threat; and</text>
					</paragraph><paragraph id="id6B887F4910AB4F62ABF6384722F2486B"><enum>(2)</enum><text>help identify
			 means to impede the passage of Asian Carp to the Great Lakes Basin.</text>
					</paragraph></subsection><subsection id="id290CA307125345CF8C3E57421D95EF17"><enum>(c)</enum><header>Consultation
			 with other actors</header><text>In carrying out subsections (a) and (b), the
			 Director, in cooperation with the Director of the United States Fish and
			 Wildlife Service, shall consult with each relevant—</text>
					<paragraph id="idDF0A11E8899F400B828B718577167950"><enum>(1)</enum><text>Federal
			 agency;</text>
					</paragraph><paragraph id="id53B95DE8BD48406780DB78FAEF05B521"><enum>(2)</enum><text>State; and</text>
					</paragraph><paragraph id="id40B7C747610B4D65913E8AD1435D37AB"><enum>(3)</enum><text>stakeholder.</text>
					</paragraph></subsection></section></title></legis-body>
</bill>
