<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Reported-in-House" bill-type="olc" dms-id="H94023A7D5AD14468B0C46864918115A8" public-private="public">
	<form>
		<distribution-code display="yes">IB</distribution-code>
		<calendar display="yes">Union Calendar No. 425</calendar>
		<congress display="yes">112th CONGRESS</congress>
		<session display="yes">2d Session</session>
		<legis-num>H. R. 4273</legis-num>
		<associated-doc display="yes" role="report">[Report No.
		  112–586]</associated-doc>
		<current-chamber display="yes">IN THE HOUSE OF
		  REPRESENTATIVES</current-chamber>
		<action>
			<action-date date="20120328">March 28, 2012</action-date>
			<action-desc><sponsor name-id="O000168">Mr. Olson</sponsor> (for
			 himself, <cosponsor name-id="D000482">Mr. Doyle</cosponsor>,
			 <cosponsor name-id="T000459">Mr. Terry</cosponsor>,
			 <cosponsor name-id="G000410">Mr. Gene Green of Texas</cosponsor>,
			 <cosponsor name-id="K000378">Mr. Kinzinger of Illinois</cosponsor>, and
			 <cosponsor name-id="G000544">Mr. Gonzalez</cosponsor>) introduced the following
			 bill; which was referred to the
			 <committee-name added-display-style="italic" committee-id="HIF00" deleted-display-style="strikethrough">Committee on Energy and
			 Commerce</committee-name></action-desc>
		</action>
		<action>
			<action-date date="20120709">July 9, 2012</action-date>
			<action-desc>Additional sponsors: <cosponsor name-id="B000213">Mr.
			 Barton of Texas</cosponsor>, <cosponsor name-id="C000794">Mr.
			 Costello</cosponsor>, <cosponsor name-id="O000169">Mr. Owens</cosponsor>,
			 <cosponsor name-id="L000566">Mr. Latta</cosponsor>,
			 <cosponsor name-id="L000576">Mr. Long</cosponsor>, <cosponsor name-id="S001155">Mr. Sullivan</cosponsor>, <cosponsor name-id="C001082">Mr.
			 Canseco</cosponsor>, <cosponsor name-id="L000575">Mr. Lankford</cosponsor>,
			 <cosponsor name-id="B001252">Mr. Barrow</cosponsor>,
			 <cosponsor name-id="W000413">Mr. Whitfield</cosponsor>,
			 <cosponsor name-id="P000602">Mr. Pompeo</cosponsor>,
			 <cosponsor name-id="G000550">Mr. Gingrey of Georgia</cosponsor>, and
			 <cosponsor name-id="M001151">Mr. Murphy of
			 Pennsylvania</cosponsor></action-desc>
		</action>
		<action>
			<action-date date="20120709">July 9, 2012</action-date>
			<action-desc>Reported with an amendment, committed to the Committee of
			 the Whole House on the State of the Union, and ordered to be
			 printed</action-desc>
			<action-instruction>Strike out all after the enacting clause and insert
			 the part printed in italic</action-instruction>
		</action>
		<action display="yes">
			<action-desc display="yes"><pagebreak></pagebreak></action-desc>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title display="yes">To clarify that compliance with an
		  emergency order under section 202(c) of the Federal Power Act may not be
		  considered a violation of any Federal, State, or local environmental law or
		  regulation, and for other purposes.<pagebreak></pagebreak></official-title>
	</form>
	<legis-body changed="deleted" committee-id="HIF00" id="H3A16A4D666AF497580F4024968C9194C" reported-display-style="strikethrough" style="OLC">
		<section id="HAEDF6FC3DFE94353BFA652166871A55A" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the
			 <quote><short-title>Resolving Environmental and Grid
			 Reliability Conflicts Act of 2012</short-title></quote>.</text>
		</section><section id="H608540BD58704A60B11F7617CEC39E5F"><enum>2.</enum><header>Amendments to the
			 Federal Power Act</header>
			<subsection id="H38D528FE1E7A49CC96F7D12DBBFDC71B"><enum>(a)</enum><header>Compliance with
			 or violation of environmental laws while under emergency order</header><text display-inline="yes-display-inline">Section 202(c) of the Federal Power Act (16
			 U.S.C. 824a(c)) is amended—</text>
				<paragraph id="H0DD72478AFED43EB941C8A0D83E655B2"><enum>(1)</enum><text>by inserting
			 <quote>(1)</quote> after <quote>(c)</quote>; and</text>
				</paragraph><paragraph id="H18A571C37E5745CBA067973BDA2CE197"><enum>(2)</enum><text display-inline="yes-display-inline">by adding at the end the following: “An
			 order issued under this section should require generation, delivery,
			 interchange, or transmission of electric energy only during times necessary to
			 meet the emergency and serve the public interest, and, to the extent
			 reasonable, be consistent with any other applicable Federal law, including any
			 environmental law or regulation, and endeavor to minimize any adverse
			 environmental impacts.</text>
					<quoted-block changed="deleted" committee-id="HIF00" display-inline="no-display-inline" id="H807FB3FE28E74F96B946DB4F8DBC3ECE" reported-display-style="strikethrough" style="OLC">
						<paragraph id="H92C61857AF274FBA8E8E4D3398B47F7D" indent="up1"><enum>(2)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="H68B14195F06E4899B6E91E79728AE917"><enum>(A)</enum><text display-inline="yes-display-inline">To the extent any omission or action taken
				by a party, which is necessary to comply with an order issued under paragraph
				(1), including any omission or action taken to voluntarily comply with such
				order, results in noncompliance with, or causes such party to not comply with,
				any Federal, State, or local environmental law or regulation, such omission or
				action shall not be considered a violation of such environmental law or
				regulation, or subject such party to any requirement, civil or criminal
				liability, or a citizen suit under such environmental law or regulation.</text>
							</subparagraph><subparagraph changed="deleted" committee-id="HIF00" id="HC799DF50ABDF48B986D707DA38B5638B" indent="up1" reported-display-style="strikethrough"><enum>(B)</enum><text display-inline="yes-display-inline">In this paragraph, the term
				<term>environmental law</term> does not include the Occupational Safety and
				Health Act of 1970 (29 U.S.C. 651 et
				seq.).</text>
							</subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block>
				</paragraph></subsection><subsection commented="no" id="H76175E10116444338339EF3A41CA8AE7"><enum>(b)</enum><header>Temporary
			 connection or construction by municipalities</header><text display-inline="yes-display-inline">Section 202(d) of the Federal Power Act (16
			 U.S.C. 824a(d)) is amended by inserting <quote>or municipality</quote> before
			 <quote>engaged in the transmission or sale of electric energy</quote>.</text>
			</subsection></section></legis-body>
	<legis-body changed="added" committee-id="HIF00" display-enacting-clause="no-display-enacting-clause" id="H5411FE8A1AE148A18D43C8A3D6D1DE52" reported-display-style="italic" style="OLC">
		<section id="HE6F8E94CFD3B4E8597924961FB788794" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the
			 <quote>Resolving Environmental and Grid Reliability Conflicts Act of
			 2012</quote>.</text>
		</section><section id="HA19450954EB141C3847781FE6C4F1973"><enum>2.</enum><header>Amendments to the
			 Federal Power Act</header>
			<subsection id="HB30E1355B50A400A804CA0CA85A7A2CE"><enum>(a)</enum><header>Compliance with or
			 violation of environmental laws while under emergency
			 order</header><text>Section 202(c) of the Federal Power Act (16 U.S.C. 824a(c))
			 is amended—</text>
				<paragraph id="HEB2E4ABB04C44301A1C0921C8746CA6C"><enum>(1)</enum><text>by inserting
			 <quote>(1)</quote> after <quote>(c)</quote>; and</text>
				</paragraph><paragraph id="H4DA1E962C4114495A2644852CAF8EB15"><enum>(2)</enum><text>by adding at the end the
			 following:</text>
					<quoted-block changed="added" committee-id="HIF00" id="H80D88F23C01C43F99B7A32C680A8F1B9" reported-display-style="italic" style="OLC">
						<paragraph id="H9EA5759B3FFE47229D959F7728B8F113" indent="up1"><enum>(2)</enum><text>With respect to an order
				issued under this subsection that may result in a conflict with a requirement
				of any Federal, State, or local environmental law or regulation, the Commission
				shall ensure that such order requires generation, delivery, interchange, or
				transmission of electric energy only during hours necessary to meet the
				emergency and serve the public interest, and, to the maximum extent
				practicable, is consistent with any applicable Federal, State, or local
				environmental law or regulation and minimizes any adverse environmental
				impacts.</text>
						</paragraph><paragraph id="H2F1CC78D89D4410A9E92F04D5F768604" indent="up1"><enum>(3)</enum><text>To the extent any
				omission or action taken by a party, that is necessary to comply with an order
				issued under this subsection, including any omission or action taken to
				voluntarily comply with such order, results in noncompliance with, or causes
				such party to not comply with, any Federal, State, or local environmental law
				or regulation, such omission or action shall not be considered a violation of
				such environmental law or regulation, or subject such party to any requirement,
				civil or criminal liability, or a citizen suit under such environmental law or
				regulation.</text>
						</paragraph><paragraph id="HC3F278890AB34DA3B7A4E8266EF55C15" indent="up1"><enum>(4)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="H3948F9BF682F43F1A337B2CC3DE5CEB7"><enum>(A)</enum><text>An order issued under
				this subsection that may result in a conflict with a requirement of any
				Federal, State, or local environmental law or regulation shall expire not later
				than 90 days after it is issued. The Commission may renew or reissue such order
				pursuant to paragraphs (1) and (2) for subsequent periods, not to exceed 90
				days for each period, as the Commission determines necessary to meet the
				emergency and serve the public interest.</text>
							</subparagraph><subparagraph changed="added" committee-id="HIF00" id="H45BD99C6E3C04B2190F145DAA745A9D2" indent="up1" reported-display-style="italic"><enum>(B)</enum><text display-inline="yes-display-inline">In renewing or reissuing an order under
				subparagraph (A), the Commission shall consult with the primary Federal agency
				with expertise in the environmental interest protected by such law or
				regulation, and shall include in any such renewed or reissued order such
				conditions as such Federal agency determines necessary to minimize any adverse
				environmental impacts to the maximum extent practicable. The conditions, if
				any, submitted by such Federal agency shall be made available to the public.
				The Commission may exclude such a condition from the renewed or reissued order
				if it determines that such condition would prevent the order from adequately
				addressing the emergency necessitating such order and provides in the order, or
				otherwise makes publicly available, an explanation of such
				determination.</text>
							</subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block>
				</paragraph></subsection><subsection id="H7E47D3188C9E484F9EC6A893031A3DAB"><enum>(b)</enum><header>Temporary connection or
			 construction by municipalities</header><text>Section 202(d) of the Federal
			 Power Act (16 U.S.C. 824a(d)) is amended by inserting <quote>or
			 municipality</quote> before <quote>engaged in the transmission or sale of
			 electric energy</quote>.</text>
			</subsection></section></legis-body>
	<endorsement display="yes">
		<action-date date="20120709">July 9, 2012</action-date>
		<action-desc>Reported with an amendment, committed to the Committee of
		  the Whole House on the State of the Union, and ordered to be
		  printed</action-desc>
	</endorsement>
</bill>
