<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-House" bill-type="olc" dms-id="H3A6FB972B02C44E688B2627344B26B49" public-private="public">
<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>110 HR 2848 IH: Solar Opportunity and Local Access
</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2007-06-25</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
	<form>
		<distribution-code display="yes">I</distribution-code>
		<congress>110th CONGRESS</congress>
		<session>1st Session</session>
		<legis-num>H. R. 2848</legis-num>
		<current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber>
		<action>
			<action-date date="20070625">June 25, 2007</action-date>
			<action-desc><sponsor name-id="C001050">Mr. Cardoza</sponsor> (for
			 himself and <cosponsor name-id="F000443">Mr. Ferguson</cosponsor>) introduced
			 the following bill; which was referred to the
			 <committee-name committee-id="HIF00">Committee on Energy and
			 Commerce</committee-name>, and in addition to the Committees on
			 <committee-name committee-id="HGO00">Oversight and Government
			 Reform</committee-name>, <committee-name committee-id="HBA00">Financial
			 Services</committee-name>, and <committee-name committee-id="HSY00">Science and
			 Technology</committee-name>, for a period to be subsequently determined by the
			 Speaker, in each case for consideration of such provisions as fall within the
			 jurisdiction of the committee concerned</action-desc>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title>To amend the Public Utility Regulatory Policies Act of
		  1978 to promote energy independence and self-sufficiency by providing for the
		  use of net metering by certain small electric energy generation systems, and
		  for other purposes.</official-title>
	</form>
	<legis-body id="H3323999CBCEB443D846ED4EAFB315311" style="OLC">
		<section id="HFCAFFA28892F420C00DC179C3B5EF1FE" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the
			 <quote><short-title>Solar Opportunity and Local Access
			 Rights Act</short-title></quote>.</text>
		</section><section id="H9C076332D6B5441694DAA4DCD6F5C7F" section-type="subsequent-section"><enum>2.</enum><header>Net metering and
			 interconnection standards</header>
			<subsection id="H40330B9A21D84D2FB62FDEBBDE991600"><enum>(a)</enum><header>In
			 general</header><text display-inline="yes-display-inline">Section 113 of the
			 Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2623">16 U.S.C. 2623</external-xref>) is amended by
			 adding at the end the following:</text>
				<quoted-block id="H1B069F9A344F47A4A411148300E3D51F" style="OLC">
					<subsection id="H3C0807B7A9474CFB8230AAB62EC21449"><enum>(d)</enum><header>Net
				metering</header>
						<paragraph id="HCCA47B7CEA3949DB884CA2EB00FC71C4"><enum>(1)</enum><header>Definitions</header><text>In
				this subsection and subsection (e):</text>
							<subparagraph id="HFA6A4AC80F6C4AC8BFC5292141CA2C34"><enum>(A)</enum><header>Customer-generator</header><text>The
				term <term>customer-generator</term> means the owner or operator of a qualified
				generation unit.</text>
							</subparagraph><subparagraph id="H0063B1D02F074EA390EC60D93638FBEE"><enum>(B)</enum><header>Electric
				generation unit</header><text>The term <term>electric generation unit</term>
				means—</text>
								<clause id="H445B8FFFD4BD407E88FCD6C9E01F6C35"><enum>(i)</enum><text>a
				qualified generation unit; and</text>
								</clause><clause id="HB2EE1AE663C946B399AD0019D71B6AE"><enum>(ii)</enum><text>any electric
				generation unit that qualifies for net metering under a net metering tariff or
				rule approved by a State.</text>
								</clause></subparagraph><subparagraph id="H3AAD253A48F54B1C943CEE001848378F"><enum>(C)</enum><header>Local
				distribution system</header><text>The term <term>local distribution
				system</term> means any system for the distribution of electric energy to the
				ultimate consumer of the electricity, whether or not the owner or operator of
				the system is a retail electric supplier.</text>
							</subparagraph><subparagraph id="H6B515DBAD60A47098C7649BB4718E392"><enum>(D)</enum><header>Net
				metering</header><text display-inline="yes-display-inline">The term <term>net
				metering</term> means the process of—</text>
								<clause id="H99B61B8A87A9471281C12030225BD5BE"><enum>(i)</enum><text display-inline="yes-display-inline">measuring the difference between the
				electricity supplied to a customer-generator and the electricity generated by
				the customer-generator that is delivered to a local distribution system at the
				same point of interconnection during an applicable billing period; and</text>
								</clause><clause id="H873326912E89494A82776977E9C6533E"><enum>(ii)</enum><text display-inline="yes-display-inline">providing an energy credit to the
				customer-generator in the form of a kilowatt-hour credit for each kilowatt-hour
				of energy produced by the customer-generator from a qualified generation
				unit.</text>
								</clause></subparagraph><subparagraph id="HA2559DEF2AE1425E8BCEDD8302B982"><enum>(E)</enum><header>Qualified
				generation unit</header><text>The term <term>qualified generation unit</term>
				means an electric energy generation unit that uses as the energy source of the
				unit solar energy to generate electricity to heat or cool.</text>
								<clause id="HE8E08F71776642A182A6D0CE6C8C3DCC"><enum>(i)</enum><text>has a generating
				capacity of not more than 2,000 kilowatts;</text>
								</clause><clause id="H9F20B480D60640D49EB8402C1D003300"><enum>(ii)</enum><text>is located on
				premises that are owned, operated, leased, or otherwise controlled by the
				customer-generator;</text>
								</clause><clause id="H2168910C87454958AEE931A765BE67A2"><enum>(iii)</enum><text>operates in
				parallel with the retail electric supplier; and</text>
								</clause><clause id="HB81313F79A4147C891818654F0D600E5"><enum>(iv)</enum><text>is intended
				primarily to offset all or part of the requirements of the customer-generator
				for electric energy.</text>
								</clause></subparagraph><subparagraph id="H8A018CE9D86349159FDF5F4C56146F3C"><enum>(F)</enum><header>Retail electric
				supplier</header><text>The term <term>retail electric supplier</term> means any
				electric utility that sells electric energy to the ultimate consumer of the
				energy.</text>
							</subparagraph></paragraph><paragraph id="H6281F6D35627444FA31DFBAE0575C900"><enum>(2)</enum><header>Adoption</header><text display-inline="yes-display-inline">Not later than 1 year after the date of
				enactment of this subsection, each State regulatory authority (with respect to
				each electric utility for which the State regulatory authority has ratemaking
				authority), and each nonregulated electric utility, shall—</text>
							<subparagraph id="HBF73EFC78E584818A3F5164B592DD869"><enum>(A)</enum><text display-inline="yes-display-inline">provide public notice and conduct a hearing
				with respect to the standards established under paragraph (3); and</text>
							</subparagraph><subparagraph id="HCB16846B5F8C4EAEA6B9B8A6FB6E41E0"><enum>(B)</enum><text display-inline="yes-display-inline">on the basis of the hearing, adopt the
				standard.</text>
							</subparagraph></paragraph><paragraph id="HF8BF28EB253147DAA55388F60087B97D"><enum>(3)</enum><header>Establishment of
				net metering standard</header>
							<subparagraph id="HCC13EA59EDAA4F598803C224A893CE4E"><enum>(A)</enum><header>In
				general</header><text>Each retail electric supplier shall offer to arrange
				(either directly or through a local distribution company or other third party)
				to make net metering available, on a first-come, first-served basis, to each of
				the retail customers of the retail electric supplier in accordance with the
				requirements described in subparagraph (B) and other provisions of this
				subsection.</text>
							</subparagraph><subparagraph id="HF0D159663E82426AA164663B43332008"><enum>(B)</enum><header>Requirements</header><text>The
				requirements referred to in subparagraph (A) are, with respect to a retail
				electric supplier, that—</text>
								<clause id="H1BC87C791B9048DBAD6CF309F8001CAC"><enum>(i)</enum><text>rates and charges
				and contract terms and conditions for the sale of electric energy to
				customer-generators shall be the same as the rates and charges and contract
				terms and conditions that would be applicable if the customer-generator did not
				own or operate a qualified generation unit and use a net metering system;
				and</text>
								</clause><clause id="H210444D9097047B2A9F611F7E923203"><enum>(ii)</enum><text display-inline="yes-display-inline">each retail electric supplier shall notify
				all of the retail customers of the retail electric supplier of the standard
				established under this paragraph as soon as practicable after the adoption of
				the standard.</text>
								</clause></subparagraph></paragraph><paragraph id="H44DDE7F97F95408DBDDA309BC3BD1912"><enum>(4)</enum><header>Net energy
				measurement</header>
							<subparagraph id="H56BA4E7CF2D04DB680A727ACCD30D9B4"><enum>(A)</enum><header>In
				general</header><text display-inline="yes-display-inline">Each retail electric
				supplier shall arrange to provide to customer-generators who qualify for net
				metering under subsection (b) an electrical energy meter capable of net
				metering and measuring, to the maximum extent practicable, the flow of
				electricity to or from the customer, using a single meter and single
				register.</text>
							</subparagraph><subparagraph id="H03FA1559E6984E21BB37E792DCF92332"><enum>(B)</enum><header>Impracticability</header><text display-inline="yes-display-inline">In a case in which it is not practicable to
				provide a meter to a customer-generator under subparagraph (A), a retail
				electric supplier (either directly or through a local distribution company or
				other third party) shall, at the expense of the retail electric supplier,
				install 1 or more of those electric energy meters for the customer-generators
				concerned.</text>
							</subparagraph></paragraph><paragraph id="H6C177CC8008E49CB88C8307BB97B4194"><enum>(5)</enum><header>Billing</header>
							<subparagraph id="HE60CB520F08E47728B82064BB1E5BC4D"><enum>(A)</enum><header>In
				general</header><text display-inline="yes-display-inline">Each retail electric
				supplier subject to subsection (b) shall calculate the electric energy
				consumption for a customer using a net metering system in accordance with
				subparagraphs (B) through (D).</text>
							</subparagraph><subparagraph id="HFE3FA79164574C16857025DDE2364026"><enum>(B)</enum><header>Measurement of
				electricity</header><text display-inline="yes-display-inline">The retail
				electric supplier shall measure the net electricity produced or consumed during
				the billing period using the metering installed in accordance with paragraph
				(4).</text>
							</subparagraph><subparagraph id="H1F2096D0F113483383005EA6A4AB641B"><enum>(C)</enum><header>Billing and
				crediting</header>
								<clause id="H4C4E2567C4344E03A92E4654A7740022"><enum>(i)</enum><header>Billing</header><text display-inline="yes-display-inline">If the electricity supplied by the retail
				electric supplier exceeds the electricity generated by the customer-generator
				during the billing period, the customer-generator shall be billed for the net
				electric energy supplied by the retail electric supplier in accordance with
				normal billing practices</text>
								</clause><clause id="HEB5E52B3D1444D8CACDECB865E70B71E"><enum>(ii)</enum><header>Crediting</header>
									<subclause id="H7B4015FF1F2E4D18BFEFEB76EFE7F6A4"><enum>(I)</enum><header>In
				general</header><text display-inline="yes-display-inline">If electric energy
				generated by the customer-generator exceeds the electric energy supplied by the
				retail electric supplier during the billing period, the customer-generator
				shall be billed for the appropriate customer charges for that billing period
				and credited for the excess electric energy generated during the billing
				period, with the credit appearing as a kilowatt-hour credit on the bill for the
				following billing period.</text>
									</subclause><subclause id="HF80EFAF93C7E4473955FA24361F24B1D"><enum>(II)</enum><header>Application of
				credits</header><text display-inline="yes-display-inline">Any kilowatt-hour
				credits provided to a customer-generator under this clause shall be applied to
				customer-generator electric energy consumption on the following billing period
				bill (except for a billing period that ends in the next calendar year).</text>
									</subclause><subclause id="HD05E91ECC688490083DB4B90DB00F0C4"><enum>(III)</enum><header>Carryover of
				unused credits</header><text display-inline="yes-display-inline">At the
				beginning of each 12-month period, any unused kilowatt-hour credits remaining
				from the preceding year will carry over to the new 12-month period.</text>
									</subclause></clause></subparagraph><subparagraph id="HAE0A2039611441EA88064ED665F5F882"><enum>(D)</enum><header>Use of
				time-differentiated rates</header>
								<clause id="HAA93C4DCD3284D209FE86CC644F8FA5E"><enum>(i)</enum><header>In
				general</header><text display-inline="yes-display-inline">Except as provided in
				clause (ii), if a customer-generator is using a meter and retail billing
				arrangement that has time-differentiated rates—</text>
									<subclause id="H571E2550730440A192D000B55E189164"><enum>(I)</enum><text display-inline="yes-display-inline">the kilowatt-hour credit shall be based on
				the ratio representing the difference in retail rates for each time-of-use
				rate; or</text>
									</subclause><subclause id="H763C5F9734214DE48820582B1B80BD34"><enum>(II)</enum><text display-inline="yes-display-inline">the credits shall be reflected on the bill
				of the customer-generator as a monetary credit reflecting retail rates at the
				time of generation of the electric energy by the customer-generator.</text>
									</subclause></clause><clause id="H41DB4381E31B491499EEEE94A99BEC4D"><enum>(ii)</enum><header>Different
				tariffs or services</header><text display-inline="yes-display-inline">A retail
				electric supplier shall offer a customer-generator the choice of a
				time-differentiated energy tariff rate or a nontime-differentiated energy
				tariff rate, if the retail electric supplier offers the choice to customers in
				the same rate class as the customer-generator.</text>
								</clause></subparagraph></paragraph><paragraph id="H7AD1271C00684B7A964B7970ED204132"><enum>(6)</enum><header>Percent
				limitations</header>
							<subparagraph id="HDACCE45CB9174B4BAEBB3FFE8501C65"><enum>(A)</enum><header>4 percent
				limitation</header><text display-inline="yes-display-inline">The standard
				established under this subsection shall not apply for a calendar year in the
				case of a customer-generator served by a local distribution company if the
				total generating capacity of all customer-generators with net metering systems
				served by the local distribution company in the calendar year is equal to or
				more than 4 percent of the capacity necessary to meet the average forecasted
				aggregate customer peak demand of the company for the calendar year.</text>
							</subparagraph><subparagraph id="HE7855A9D1420451D904129B1BEB24BED"><enum>(B)</enum><header>2 percent
				limitation</header><text display-inline="yes-display-inline">The standard
				established under this subsection shall not apply for a 12-month period in the
				case of a customer-generator served by a local distribution company if the
				total generating capacity of all customer-generators with net metering systems
				served by the local distribution company in the calendar year using a single
				type of qualified generation units (as described in paragraph (1)(D)(i)) is
				equal to or more than 2 percent of the capacity necessary to meet the
				forecasted aggregate customer peak demand of the company for the calendar
				year.</text>
							</subparagraph><subparagraph id="H0DB3D59A6E3C4BB9B4746BD817B9B76D"><enum>(C)</enum><header>Records and
				notice</header>
								<clause id="H208FEEF6CE604723AE8616E1B8D2B82"><enum>(i)</enum><header>Records</header><text display-inline="yes-display-inline">Each retail electric supplier shall
				maintain, and make available to the public, records of—</text>
									<subclause id="H2E264F3E1BDC4EDC8F4ECD3D797B9421"><enum>(I)</enum><text display-inline="yes-display-inline">the total generating capacity of
				customer-generators of the system of the retail electric supplier that are
				using net metering; and</text>
									</subclause><subclause id="H153E8926B436489F814279CF634BF05D"><enum>(II)</enum><text display-inline="yes-display-inline">the type of generating systems and energy
				source used by the electric generating systems used by the
				customer-generators.</text>
									</subclause></clause><clause id="HE25D088570A44345AF7BD9655832F45"><enum>(ii)</enum><header>Notice</header><text display-inline="yes-display-inline">Each such retail electric supplier shall
				notify the State regulatory authority and the Commission at each time at which
				the total generating capacity of the customer-generators of the retail electric
				supplier reaches a level that equals or exceeds—</text>
									<subclause id="H3EAA2527D7D847228567A36BAFAEE71D"><enum>(I)</enum><text display-inline="yes-display-inline">75 percent of the limitation specified in
				subparagraph (B); or</text>
									</subclause><subclause id="HFEE46BCD925F4AA18FCE9342DB74264F"><enum>(II)</enum><text display-inline="yes-display-inline">the limitation specified in subparagraph
				(B).</text>
									</subclause></clause></subparagraph></paragraph><paragraph id="HF1B78A3C436A4B2FA138E1F1EA996D6C"><enum>(7)</enum><header>Ownership of
				credits</header>
							<subparagraph id="H2D51706A7A8245D29537A899138CA2AA"><enum>(A)</enum><header>In
				general</header><text display-inline="yes-display-inline">For purposes of
				Federal and State laws providing renewable energy credits or greenhouse gas
				credits, a customer-generator with a qualified generation unit and net metering
				shall be treated as owning and having title to the renewable energy attributes,
				renewable energy credits and greenhouse gas emission credits relating to any
				electricity produced by the qualified generation unit.</text>
							</subparagraph><subparagraph id="HA108389BBCF24F1299F76CD295E6DCAB"><enum>(B)</enum><header>Retail electric
				suppliers</header><text display-inline="yes-display-inline">No retail electric
				supplier shall claim title to or ownership of any renewable energy attributes,
				renewable energy credits, or greenhouse gas emission credits of a
				customer-generator as a result of interconnecting the customer-generator or
				providing or offering the customer-generator net metering.</text>
							</subparagraph></paragraph><paragraph id="H5A5EA4B4BB484A45B51B27A5151285F9"><enum>(8)</enum><header>Safety and
				performance standards</header>
							<subparagraph id="H75CC0F5676244C84AAE6D76D10F7EBF9"><enum>(A)</enum><header>In
				general</header><text>A qualified generation unit and net metering system used
				by a customer-generator shall meet all applicable safety and performance and
				reliability standards established by—</text>
								<clause id="H22928FD953AA4215BD9E76DC100A7A0"><enum>(i)</enum><text>the
				national electrical code;</text>
								</clause><clause id="HAD2DF2F9BA4A46F29CB904C6DE97B213"><enum>(ii)</enum><text>the Institute of
				Electrical and Electronics Engineers;</text>
								</clause><clause id="HAFA2EE510D91428ABB7DE17994C1756C"><enum>(iii)</enum><text>Underwriters
				Laboratories; or</text>
								</clause><clause id="HD0152ECC878C49ADB68104D9FB49AC2F"><enum>(iv)</enum><text>the American
				National Standards Institute.</text>
								</clause></subparagraph><subparagraph id="HFC402F323CBD4608AE79AC3F754BBD8F"><enum>(B)</enum><header>Additional
				charges</header><text>The Commission shall, after consultation with State
				regulatory authorities and nonregulated local distribution systems and after
				notice and opportunity for comment, prohibit by regulation the imposition of
				additional charges by retail electric suppliers and local distribution systems
				for equipment or services for safety or performance that are in addition to
				those necessary to meet the standards and requirements referred to in
				subparagraph (A) and subsection (e).</text>
							</subparagraph></paragraph><paragraph id="H75FD52C1E8444E808F8D00967B6DD22C"><enum>(9)</enum><header>Determination of
				compliance</header>
							<subparagraph id="HE2EEDE1505A64B868927D7105FDEB467"><enum>(A)</enum><header>In
				general</header><text display-inline="yes-display-inline">Any State regulatory
				authority (with respect to each electric utility for which the authority has
				ratemaking authority), and each nonregulated electric utility, may apply to the
				Commission for a determination that any State net metering requirement or
				regulations complies with this subsection.</text>
							</subparagraph><subparagraph id="H6C1ED8CC68314AD7AD97BF04DB6B0069"><enum>(B)</enum><header>Orders</header><text display-inline="yes-display-inline">In the absence of a determination under
				subparagraph (A), the Commission, on the motion of the Commission or pursuant
				to the petition of any interested person, may, after notice and opportunity for
				a hearing on the record, issue an order requiring against any retail electric
				supplier or local distribution company to require compliance with this
				subsection.</text>
							</subparagraph><subparagraph id="H9714E857EDDE43E59064A0280C36BF7"><enum>(C)</enum><header>Enforcement</header>
								<clause id="H654DBAE78FDA4942A27F1D9F3B484FE4"><enum>(i)</enum><header>In
				general</header><text display-inline="yes-display-inline">Any person who
				violates this subsection shall be subject to a civil penalty in the amount of
				$500 for each day that the violation continues.</text>
								</clause><clause id="HCCEC2FB948564D1FA88BFDF3E096CF9"><enum>(ii)</enum><header>Assessment</header><text display-inline="yes-display-inline">The penalty may be assessed by the
				Commission, after notice and opportunity for hearing, in the same manner as
				penalties are assessed under section 31(d) of the Federal Power Act (16 U.S.C.
				823b(d)).</text>
								</clause></subparagraph></paragraph></subsection><subsection id="HCC8D71D8EFBB450E9BA9393A7B9584D"><enum>(e)</enum><header>Interconnection
				standards</header>
						<paragraph id="HBD032A0478974AF5A0C80387241F8183"><enum>(1)</enum><header>Model
				standards</header>
							<subparagraph id="H3FFD99AAD4B44E54B15304CE67DD2F55"><enum>(A)</enum><header>In
				general</header><text display-inline="yes-display-inline">Not later than 1 year
				after the date of enactment of this subsection, the Commission shall publish
				model standards for the physical connection between local distribution systems
				and qualified generation units and electric generation units that—</text>
								<clause id="H69C970EBCD9944009EAFA12BA363D950"><enum>(i)</enum><text display-inline="yes-display-inline">are qualified generation units (as defined
				in subsection (d)(1)(D) (other than clause (ii) of subsection (d)(1)(D));
				and</text>
								</clause><clause id="H9AAE4EC6A1F54320BA9828729683F5CE"><enum>(ii)</enum><text display-inline="yes-display-inline">do not exceed 2,000 kilowatts of
				capacity.</text>
								</clause></subparagraph><subparagraph id="HBBEFB3B150A743799BF5A3213B319DF9"><enum>(B)</enum><header>Purposes</header><text display-inline="yes-display-inline">The model standards shall be designed
				to—</text>
								<clause id="H881C96E6E10A4A18009D8C8185F65F3C"><enum>(i)</enum><text display-inline="yes-display-inline">encourage the use of qualified generation
				units; and</text>
								</clause><clause id="H3D304936A7E643BEBE3951E48B61B065"><enum>(ii)</enum><text display-inline="yes-display-inline">ensure the safety and reliability of the
				qualified generation units and the local distribution systems interconnected
				with the qualified generation units.</text>
								</clause></subparagraph><subparagraph id="H9930CD5090974049AEBE4765B000E4ED"><enum>(C)</enum><header>Expedited
				procedures</header>
								<clause id="HBBAA1D3CE5EB4CE5861700803DF436A0"><enum>(i)</enum><header>In
				general</header><text display-inline="yes-display-inline">The model standards
				shall have 2 separate expedited procedures, including—</text>
									<subclause id="H3AA28DEEF2454A7698FA59170157D771"><enum>(I)</enum><text display-inline="yes-display-inline">a standard for interconnecting qualified
				generation units of not more than 15 kilowatts; and</text>
									</subclause><subclause id="HBCA8A3BF313D43C2B77BE57EF4E58F80"><enum>(II)</enum><text display-inline="yes-display-inline">a separate standard that expedites
				interconnection for qualified generation units of more than 15 kilowatts but
				not more than 2,000 kilowatts.</text>
									</subclause></clause><clause id="H3E2D8D793F774891AC84003171F63840"><enum>(ii)</enum><header>Best
				practices</header><text display-inline="yes-display-inline">The expedited
				procedures shall be based on the best practices that have been used in States
				that have adopted interconnection standards.</text>
								</clause><clause id="HF9291329881F4DD585A76CF13520900"><enum>(iii)</enum><header>Model
				Rule</header><text display-inline="yes-display-inline">In designing the
				expedited procedures, the Commission shall consider Interstate Renewable Energy
				Council Model Rule MR–I2005.</text>
								</clause></subparagraph><subparagraph id="H510A21E19B304DF0AFC182E56FFC2577"><enum>(D)</enum><header>Adoption of
				standards</header>
								<clause id="HAF45A2A2AC2442618978B3AA2F5FD5C2"><enum>(i)</enum><header>In
				general</header><text>Not later than 2 years after the date of enactment of
				this subsection, each State shall—</text>
									<subclause id="HB68620429E924D15AEDB072348CC76DF"><enum>(I)</enum><text>adopt the model
				standards established under this paragraph, with or without modification;
				and</text>
									</subclause><subclause id="HF7EE200B95AC4F1F95CC3CB8D5FD2991"><enum>(II)</enum><text>submit the
				standards to the Commission for approval.</text>
									</subclause></clause><clause id="H0731A417BA1A44629BB4238171494914"><enum>(ii)</enum><header>Approval of
				modification</header><text>The Commission shall approve a modification of the
				model standards only if the Commission determines that the modification
				is—</text>
									<subclause id="H2408EADDCFA140B9BC4400F9CBA55C"><enum>(I)</enum><text>consistent with or
				superior to the purpose of the standards; and</text>
									</subclause><subclause id="HD733100526B447C7B4EEC54B1890A8C"><enum>(II)</enum><text>required by reason
				of local conditions.</text>
									</subclause></clause></subparagraph><subparagraph id="H302DCBB08BD24986A82BDD32A5C644B"><enum>(E)</enum><header>Nonapproval of
				standards for a State</header><text display-inline="yes-display-inline">If
				standards have not been approved under this paragraph by the Commission for any
				State during the 2-year period beginning on the date of enactment of this
				subsection, the Commission shall, by rule or order, enforce the model standards
				of the Commission in the State until such time as State standards are approved
				by the Commission.</text>
							</subparagraph><subparagraph id="HFF5F8279DD2345D2B5F97577788408F2"><enum>(F)</enum><header>Updates</header>
								<clause id="HE5713C617AA4440FB5629467297327C3"><enum>(i)</enum><header>In
				general</header><text display-inline="yes-display-inline">Not later than 2
				years after the date of enactment of this subsection and after notice and
				opportunity for comment, the Commission shall publish an update of the model
				standards, after considering changes in the underlying standards and
				technologies.</text>
								</clause><clause id="H3E7A1FA75545470390DCF4F2048E3EAA"><enum>(ii)</enum><header>Availability</header><text display-inline="yes-display-inline">The updates shall be made available to
				State regulatory authorities for the consideration of the authorities.</text>
								</clause></subparagraph></paragraph><paragraph id="HE6C35F50D817434E8F4BB5B0345878C7"><enum>(2)</enum><header>Safety,
				reliability, performance, and cost</header>
							<subparagraph id="H88EF25F92F4F420ABB8879C1EA3E3BD4"><enum>(A)</enum><header>In
				general</header><text display-inline="yes-display-inline">The standards under
				this subsection shall establish such measures for the safety and reliability of
				the affected equipment and local distribution systems as are
				appropriate.</text>
							</subparagraph><subparagraph id="H202AED69061247688068AB5C291DD09B"><enum>(B)</enum><header>Administration</header><text display-inline="yes-display-inline">The standards shall—</text>
								<clause id="HBF7A2606C4C945AAB19401FEDE414356"><enum>(i)</enum><text display-inline="yes-display-inline">be consistent with all applicable safety
				and performance standards established by—</text>
									<subclause id="H905543B76BE64174B006ED7134718F3B"><enum>(I)</enum><text display-inline="yes-display-inline">the national electrical code;</text>
									</subclause><subclause id="HC5E4F6DBBA5D428CAF3EFF00442F6277"><enum>(II)</enum><text display-inline="yes-display-inline">the Institute of Electrical and Electronics
				Engineers;</text>
									</subclause><subclause id="H30649670C1044E3E92C2A850D05046AC"><enum>(III)</enum><text display-inline="yes-display-inline">Underwriters Laboratories; or</text>
									</subclause><subclause id="HD11AF386DE6C4C2AABD37F5382550010"><enum>(IV)</enum><text display-inline="yes-display-inline">the American National Standards Institute;
				and</text>
									</subclause></clause><clause id="HFBA336F9D6074BAB81BCFA03705C5176"><enum>(ii)</enum><text display-inline="yes-display-inline">impose not more than such minimum cost and
				technical burdens to the interconnecting customer generator as the Commission
				determines, by rule, are practicable.</text>
								</clause></subparagraph></paragraph><paragraph id="HEBE45C8DADAC4EF7A19E9B58A1D0F950"><enum>(3)</enum><header>Additional
				charges</header><text display-inline="yes-display-inline">The model standards
				under this subsection shall prohibit the imposition of additional charges by
				local distribution systems for equipment or services for interconnection that
				are in excess of—</text>
							<subparagraph id="HFC0CC22D25344D35A7566C7913A7C004"><enum>(A)</enum><text display-inline="yes-display-inline">the charges necessary to meet the
				standards; and</text>
							</subparagraph><subparagraph id="H34B02E8DAFFC40F88502B9F5C6F22536"><enum>(B)</enum><text display-inline="yes-display-inline">the charges and equipment requirements
				identified in the best practices of States with interconnection
				standards.</text>
							</subparagraph></paragraph><paragraph id="HCC4C5E8C2D3145EF98B91E32FCFA2B5"><enum>(4)</enum><header>Relationship to
				existing law regarding interconnection</header><text display-inline="yes-display-inline">Nothing in this subsection affects the
				application of section 111(d)(15) relating to interconnection.</text>
						</paragraph><paragraph id="HD1CF2D7161F3456784C6D2557449BA77"><enum>(5)</enum><header>Consumer-friendly
				contracts</header>
							<subparagraph id="H9B16C8FDE296481BA94900064749C736"><enum>(A)</enum><header>In
				general</header><text display-inline="yes-display-inline">The Commission
				shall—</text>
								<clause id="HD3417465C4E44DCB8D405E417300EB3B"><enum>(i)</enum><text display-inline="yes-display-inline">promulgate regulations that ensure that
				simplified contracts will be used for the interconnection of electric energy by
				electric energy transmission or local distribution systems and generating
				facilities that have a power production capacity of not greater than 2,000
				kilowatts; and</text>
								</clause><clause id="HC46F812625804DEEA2A57DC34837F57B"><enum>(ii)</enum><text display-inline="yes-display-inline">consider the best practices for
				consumer-friendly contracts that are used by States or national associations of
				State regulators.</text>
								</clause></subparagraph><subparagraph id="HB7EC6B3974744127956F0406A8D4751E"><enum>(B)</enum><header>Liability or
				insurance</header><text display-inline="yes-display-inline">The contracts shall
				not require liability or other insurance in excess of the liability or
				insurance that is typically carried by customer-generators for general
				liability.</text>
							</subparagraph></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block>
			</subsection><subsection id="H25A8148B052A4D8EADD44403F7C4CE9B"><enum>(b)</enum><header>Conforming
			 amendment</header><text>Section 1262 of the Public Utility Holding Company Act
			 of 2005 (<external-xref legal-doc="usc" parsable-cite="usc/42/16451">42 U.S.C. 16451</external-xref>) is amended by striking paragraph (5) and inserting
			 the following:</text>
				<quoted-block display-inline="no-display-inline" id="H8BD239BD4061467E8CEB3770E74550AF" style="OLC">
					<paragraph id="HC83BC61ED5BF42C5A3FE2EDECAE700C2"><enum>(5)</enum><header>Electric utility
				company</header>
						<subparagraph id="HD7AC6D86009743979FE600F455EC84E1"><enum>(A)</enum><header>In
				general</header><text>The term <term>electric utility company</term> means any
				company that owns or operates facilities used for the generation, transmission,
				or distribution of electric energy for sale.</text>
						</subparagraph><subparagraph id="H07C5F98E2C1340CF8FAEA1B04D00D9F8"><enum>(B)</enum><header>Exclusion</header><text>The
				term <term>electric utility company</term> does not include an electric
				generation unit (as defined in section 113(d) of the Public Utility Regulatory
				Policies Act of
				1978).</text>
						</subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block>
			</subsection></section><section id="H6A711003371747B79274983D1988FDE"><enum>3.</enum><header>Relationship to
			 State law</header><text display-inline="no-display-inline">Section 117(b) of
			 the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2627">16 U.S.C. 2627(b)</external-xref>) is
			 amended—</text>
			<paragraph id="H5DFF56FA388B462E8242DA6C1F6CB87"><enum>(1)</enum><text display-inline="yes-display-inline">by striking <quote>Nothing</quote> and
			 inserting the following:</text>
				<quoted-block display-inline="no-display-inline" id="H453024AFD36E4CAC86EA187CC3D42C00" style="OLC">
					<paragraph id="H6586AD2961CA49198B40033D493ED231"><enum>(1)</enum><header>In
				general</header><text display-inline="yes-display-inline">Except as provided in
				paragraph (2), nothing</text>
					</paragraph><after-quoted-block>;
				and</after-quoted-block></quoted-block>
			</paragraph><paragraph id="H816E1558BA764DC79F76A8858FB2965C"><enum>(2)</enum><text display-inline="yes-display-inline">by adding at the end the following:</text>
				<quoted-block display-inline="no-display-inline" id="H5A7F8DE50C5F44E7B1CCB1CF3E65CAE6" style="traditional">
					<paragraph id="H35375A800DEF48388190894C8BBEE2F5"><enum>(2)</enum><header>Net metering and
				interconnection standards</header>
						<subparagraph id="HB9687B2019F14DEDAF5D5134FB6E89F9"><enum>(A)</enum><header>In
				general</header><text display-inline="yes-display-inline">Subject to
				subparagraph (B), no State or nonregulated utility may adopt or enforce any
				standard or requirement concerning net metering or interconnection that
				restricts access to the electric power transmission or local distribution
				system by qualified generators beyond those standards and requirements
				established under section 113.</text>
						</subparagraph><subparagraph id="HBB8C9F95022D43D9B590D7528F83E946"><enum>(B)</enum><header>Equivalent or
				greater access</header><text display-inline="yes-display-inline">Nothing in
				this Act precludes a State from adopting or enforcing incentives or
				requirements to encourage qualified generation and net metering that—</text>
							<clause id="HF63E5F16E30A4317A73C44CAF8001649"><enum>(i)</enum><text display-inline="yes-display-inline">are in addition to or equivalent to
				incentives or requirements under section 113; or</text>
							</clause><clause id="HC3DE20F3B4D04342ABFFC1BCED42ED2B"><enum>(ii)</enum><text display-inline="yes-display-inline">afford greater access to the electric power
				transmission and local distribution systems by qualified generators (as defined
				in section 113) or afford greater compensation or credit for electricity
				generated by the qualified
				generators.</text>
							</clause></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block>
			</paragraph></section><section id="H166FCE16E4FA47DCA1B300A9A7CD26EA"><enum>4.</enum><header>Contracts for
			 renewable energy for executive agencies</header><text display-inline="no-display-inline"><external-xref legal-doc="usc" parsable-cite="usc/40/501">Section 501(b)(1)(B)</external-xref> of title 40, United
			 States Code, is amended—</text>
			<paragraph id="HBE6A44F4B930419DAB39FB1A8BC1E6"><enum>(1)</enum><text display-inline="yes-display-inline">by striking <quote>A contract</quote> and
			 inserting the following:</text>
				<quoted-block display-inline="no-display-inline" id="H1611272C01AB4024A8D5236C6E9371F9" style="OLC">
					<clause id="HA8AC80897AB44150A60466DB31DBADAA"><enum>(i)</enum><header>In
				general</header><text>Except as provided in clause (ii), a
				contract</text>
					</clause><after-quoted-block>;
				and</after-quoted-block></quoted-block>
			</paragraph><paragraph id="H1866340C72894C40A9F36E4D69B65786"><enum>(2)</enum><text>by adding at the
			 end the following:</text>
				<quoted-block display-inline="no-display-inline" id="H3833B1F348C34C6C927456B1F0C056D6" style="OLC">
					<clause id="H2ED3B98AA7AB4C54AE19E95449327F93"><enum>(ii)</enum><header>Renewable
				energy</header><text>A contract for renewable energy (as defined in section
				203(b) of the Energy Policy Act of 2005 (<external-xref legal-doc="usc" parsable-cite="usc/42/15852">42 U.S.C. 15852(b)</external-xref>)) may be made for a
				period of not more than 30
				years.</text>
					</clause><after-quoted-block>.</after-quoted-block></quoted-block>
			</paragraph></section><section display-inline="no-display-inline" id="HA0A5A4CFC672459AA37208665CFD7C00" section-type="subsequent-section"><enum>5.</enum><header>Solar energy systems
			 building permit requirements for receipt of community development block grant
			 funds</header><text display-inline="no-display-inline">Section 104 of the
			 Housing and Community Development Act of 1974 (<external-xref legal-doc="usc" parsable-cite="usc/42/5304">42 U.S.C. 5304</external-xref>) is amended by
			 adding at the end the following new subsection:</text>
			<quoted-block display-inline="no-display-inline" id="HDBA6B4A4E42C4F238DD2121015D19E16" style="OLC">
				<subsection id="H2A3951D8584E42598EAD37004466BA63"><enum>(n)</enum><header>Requirements for
				building permits regarding solar energy systems</header>
					<paragraph id="H21FB7FB1F7204F3E888E44685FBD75DA"><enum>(1)</enum><header>In
				general</header><text display-inline="yes-display-inline">A grant under section
				106 for a fiscal year may be made only if the grantee certifies to the
				Secretary that—</text>
						<subparagraph id="HA40DA0112222471E9589AB27899884F"><enum>(A)</enum><text>in the case of a
				grant under section 106(a) for any Indian tribe or insular area, during such
				fiscal year the cost of any permit or license, for construction or installation
				of any solar energy system for any structure, that is required by the tribe or
				insular area or by any other unit of general local government or other
				political subdivision of such tribe or insular area, complies with paragraph
				(2);</text>
						</subparagraph><subparagraph id="H1C28C447A9C0472FB6FD71B487A4C2B9"><enum>(B)</enum><text>in the case of a
				grant under section 106(b) for any metropolitan city or urban county, during
				such fiscal year the cost of any permit or license, for construction or
				installation of any solar energy system for any structure, that is required by
				the metropolitan city or urban county, or by any other political subdivision of
				such city or county, complies with paragraph (2); and</text>
						</subparagraph><subparagraph id="HDE6F2BAB32FD4117855E1319BD453577"><enum>(C)</enum><text display-inline="yes-display-inline">in the case of a grant under section 106(d)
				for any State, during such fiscal year the cost of any permit or license, for
				construction or installation of any solar energy system for any structure, that
				is required by the State, or by any other unit of general local government
				within any nonentitlement area of such State, or other political subdivision
				within any nonentitlement area of such State or such a unit of general local
				government, complies with paragraph (2).</text>
						</subparagraph></paragraph><paragraph id="H1F06C7376C544BD2BE81AC975C495BA6"><enum>(2)</enum><header>Limitation on
				cost</header><text>The cost of permit or license for construction or
				installation of any solar energy system complies with this paragraph only if
				such cost does not exceed the following amount:</text>
						<subparagraph id="H7410CBC02A084F38B3FEB77AB430096"><enum>(A)</enum><header>Residential
				structures</header><text>In the case of a structure primarily for residential
				use, $500.</text>
						</subparagraph><subparagraph id="H4055CA837ECA4340A3518F454788E2DA"><enum>(B)</enum><header>Nonresidential
				structures</header><text>In the case of a structure primarily for
				nonresidential use, 1.0 percent of the total cost of the installation or
				construction of the solar energy system, but not in excess of $10,000.</text>
						</subparagraph></paragraph><paragraph id="HFBB8E0EE3DD94705B6C1BDCCEC0E400"><enum>(3)</enum><header>Noncompliance</header><text>If
				the Secretary determines that a grantee of a grant made under section 106 is
				not in compliance with a certification under paragraph (1)—</text>
						<subparagraph id="HE121B698747940D683ACEF6DF066C1D6"><enum>(A)</enum><text display-inline="yes-display-inline">the Secretary shall notify the grantee of
				such determination; and</text>
						</subparagraph><subparagraph id="H9DF42FC47B8443299398E253CF770051"><enum>(B)</enum><text>if the grantee has
				not corrected such noncompliance before the expiration of the 6-month period
				beginning upon notification under subparagraph (A), such grantee shall not be
				eligible for 5 percent of any amounts awarded under a grant under section 106
				for the first fiscal year that commences after the expiration of such 6-month
				period.</text>
						</subparagraph></paragraph><paragraph id="H88E39F51D493436AB1BAB3C6C2A873BA"><enum>(4)</enum><header>Solar energy
				system</header><text display-inline="yes-display-inline">For purposes of this
				subsection, the term <term>solar energy system</term> means, with respect to a
				structure, equipment that uses solar energy to generate electricity for, or to
				heat or cool (or provide hot water for use in), such
				structure.</text>
					</paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block>
		</section><section id="H758849770DD24D058EF39E9D19CBD08F"><enum>6.</enum><header>Prohibition of
			 restrictions on residential installation of solar energy system</header>
			<subsection id="H66EB9BB6830A4994961B6514510087A3"><enum>(a)</enum><header>Regulations</header><text display-inline="yes-display-inline">Within 180 days after the enactment of this
			 Act, the Secretary of Housing and Urban Development, in consultation with the
			 Secretary of Energy, shall issue regulations—</text>
				<paragraph id="HC686709E80364C7BAD2B8D19C994519"><enum>(1)</enum><text>to
			 prohibit any private covenant, contract provision, lease provision, homeowners’
			 association rule or bylaw, or similar restriction, that impairs the ability of
			 the owner or lessee of any residential structure designed for occupancy by 1
			 family to install, construct, maintain, or use a solar energy system on such
			 residential property; and</text>
				</paragraph><paragraph id="H2A86E011B99D428E90F03282136616A5"><enum>(2)</enum><text display-inline="yes-display-inline">to require that whenever any such covenant,
			 provision, rule or bylaw, or restriction requires approval for the installation
			 or use of a solar energy system, the application for approval shall be
			 processed and approved by the appropriate approving entity in the same manner
			 as an application for approval of an architectural modification to the
			 property, and shall not be willfully avoided or delayed.</text>
				</paragraph></subsection><subsection id="HCF707DC735B943C8806DA1707BC7CF48"><enum>(b)</enum><header>Contents</header><text>The
			 regulations required under subsection (a) shall provide that—</text>
				<paragraph id="H630723252A69421291CB00B9562F0035"><enum>(1)</enum><text>such a covenant,
			 provision, rule or bylaw, or restriction impairs the installation,
			 construction, maintenance, or use of a solar energy system if it—</text>
					<subparagraph id="HC24C92FB22434650837361731FA736A6"><enum>(A)</enum><text>unreasonably
			 delays or prevents installation, maintenance, or use;</text>
					</subparagraph><subparagraph id="H316EE944944C41D1B5D818C00AB99E5"><enum>(B)</enum><text>unreasonably
			 increases the cost of installation, maintenance, or use; or</text>
					</subparagraph><subparagraph id="H4AA1D2F7945743C0B47800F546E81394"><enum>(C)</enum><text>precludes use of
			 such a system; and</text>
					</subparagraph></paragraph><paragraph id="HEDFD9E66B1604F4DA82E97232791C325"><enum>(2)</enum><text display-inline="yes-display-inline">any fee or cost imposed on the owner or
			 lessee of such a residential structure by such a covenant, provision, rule or
			 bylaw, or restriction shall be considered unreasonable if—</text>
					<subparagraph id="H9D10F2263A9444F88E9EFCB5005B1200"><enum>(A)</enum><text>such fee or cost
			 is not reasonable in comparison to the cost of the solar energy system or the
			 value of its use; or</text>
					</subparagraph><subparagraph id="HE7D233CACBBC46A0852E7BAF89EF500"><enum>(B)</enum><text>treatment of solar
			 energy systems by the covenant, provision, rule or bylaw, or restriction is not
			 reasonable in comparison with treatment of comparable systems by the same
			 covenant, provision, rule or bylaw, or restriction.</text>
					</subparagraph></paragraph></subsection><subsection commented="no" display-inline="no-display-inline" id="H0F82271CF1514816B9E4ADDBCD752A9"><enum>(c)</enum><header>Solar energy
			 system</header><text display-inline="yes-display-inline">For purposes of this
			 section, the term <term>solar energy system</term> means, with respect to a
			 structure, equipment that uses solar energy to generate electricity for, or to
			 heat or cool (or provide hot water for use in), such structure.</text>
			</subsection></section><section display-inline="no-display-inline" id="H0C4C2822F73F430397008187A1B23E05" section-type="subsequent-section"><enum>7.</enum><header>Center for Advanced
			 Solar Research</header>
			<subsection id="HAB87888DE7824AFCBBFEEA71FCE9AEE3"><enum>(a)</enum><header>Establishment</header><text>The
			 Secretary of Energy shall establish a Center for Advanced Solar Research and
			 Development within the Office of Energy Efficiency and Renewable Energy to
			 carry out an advanced solar research and development program to coordinate and
			 promote the further development of solar technologies. This program shall
			 include a competitive grant program for academia and private research in solar
			 technologies. The Center shall serve as a clearinghouse for United States solar
			 research and development, supporting research, development, and demonstration
			 of advanced solar energy systems. The Center shall advance—</text>
				<paragraph id="H161BD0C365B141C19BDB52D7AB8C7CA2"><enum>(1)</enum><text>performance,
			 reliability, environmental impact, and cost-competiveness of solar thermal and
			 photovoltaic technologies;</text>
				</paragraph><paragraph id="H005ECD3450F24FEBB5C2FEAABEA7DA54"><enum>(2)</enum><text>large-scale
			 photovoltaic and solar thermal power plants;</text>
				</paragraph><paragraph id="HF89F0FF07C33408E975696C6F2C9225"><enum>(3)</enum><text>thermal and
			 electricity storage technologies to enhance the dispatchability of solar
			 energy;</text>
				</paragraph><paragraph id="HD1CCD3B5ACED4CA8A9897D2B23E3F6C3"><enum>(4)</enum><text>fuel production
			 technologies using solar energy;</text>
				</paragraph><paragraph id="H9D92768B07374FBCB8FF94CDA910ADCB"><enum>(5)</enum><text>innovation in
			 manufacturing techniques and processes for solar energy systems;</text>
				</paragraph><paragraph id="H91E79A5AFC9A4B289643CF687B11BE5"><enum>(6)</enum><text>materials and
			 devices to improve photovoltaic conversion efficiencies and reduce
			 costs;</text>
				</paragraph><paragraph id="H554B23CC73DC4522BFDF7469DD948537"><enum>(7)</enum><text>policy analysis
			 aimed at increasing use of solar energy technologies, and monitoring the
			 effectiveness of existing policies; and</text>
				</paragraph><paragraph id="HEC4739B35ADD44F783CB8D5C9CFF9833"><enum>(8)</enum><text>comprehensive
			 solar systems integration.</text>
				</paragraph></subsection><subsection id="HFDBE580259464CFEB1AA2581B5EF409D"><enum>(b)</enum><header>Authorization of
			 appropriations</header><text>There are authorized to be appropriated to the
			 Secretary of Energy for carrying out this section $25,000,000 for each of the
			 fiscal years 2007 through 2011, to remain available until expended.</text>
			</subsection></section></legis-body>
</bill>


