<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-House" dms-id="HC20D3B61E97A4A6A9C495E532DC4AF52" public-private="public" bill-type="olc"> 
<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>110 HR 186 IH: Arkansas Valley Conduit Act</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2007-01-04</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form> 
<distribution-code display="yes">I</distribution-code> 
<congress>110th CONGRESS</congress> <session>1st Session</session> 
<legis-num>H. R. 186</legis-num> 
<current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber> 
<action> 
<action-date date="20070104">January 4, 2007</action-date> 
<action-desc><sponsor name-id="M001152">Mrs. Musgrave</sponsor> introduced the following bill; which was referred to the <committee-name committee-id="HII00">Committee on Natural Resources</committee-name></action-desc> 
</action> 
<legis-type>A BILL</legis-type> 
<official-title>To authorize the construction of the Arkansas Valley Conduit in the State of Colorado, and for other purposes.</official-title> 
</form> 
<legis-body id="HFD1EDF31192F4F55927D8188197B89F5" style="OLC"> 
<section id="HCCAD3F88F87247D9A782F3701E06EBDC" section-type="section-one" display-inline="no-display-inline"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>Arkansas Valley Conduit Act</short-title></quote>.</text></section> 
<section id="H2143CAEED4134FC5A8963C7F973DF6FB"><enum>2.</enum><header>Findings and purposes</header> 
<subsection id="H4642EA6E9FCA4FB099002FF0E8731687"><enum>(a)</enum><header>Findings</header><text>Congress finds that—</text> 
<paragraph id="H4E99E64EC8A34C8CA56890ACFD625656"><enum>(1)</enum><text>Public Law 87–590 (76 Stat. 389) authorized the Fryingpan-Arkansas project, including construction of the Arkansas Valley Conduit, a pipeline extending from Pueblo Reservoir, Pueblo, Colorado to Lamar, Colorado;</text></paragraph> 
<paragraph id="H764608A19AA54AC08353D7BC6B5D0988"><enum>(2)</enum><text>the Arkansas Valley Conduit was never built, partly because of the inability of local communities to pay 100 percent of the costs of construction of the Arkansas Valley Conduit;</text></paragraph> 
<paragraph id="HC8C77EB400EB458AAE028FD0082134B0"><enum>(3)</enum><text>in furtherance of the goals and authorization of the Fryingpan-Arkansas project, it is necessary to provide separate authorization for the construction of the Arkansas Valley Conduit;</text></paragraph> 
<paragraph id="H104DF57D6DC64D4DBB970005949C2759"><enum>(4)</enum><text>the construction of the Arkansas Valley Conduit is necessary for the continued viability of southeast Colorado; and</text></paragraph> 
<paragraph id="H0358D3AF2B9749028C02651F44CF5FD"><enum>(5)</enum><text>the Arkansas Valley Conduit would provide the communities of southeast Colorado with safe, clean, and affordable water.</text></paragraph></subsection> 
<subsection id="HD220969A0CA846D9ABA129BF698CB072"><enum>(b)</enum><header>Purposes</header><text>The purposes of this Act are—</text> 
<paragraph id="HDA9A9F98C61445A98BC79797701D0000"><enum>(1)</enum><text>to ensure a safe and adequate water supply for the beneficiaries identified in <external-xref legal-doc="public-law" parsable-cite="pl/87/590">Public Law 87–590</external-xref> (76 Stat. 389) and related authorizing documents and subsequent studies; and</text></paragraph> 
<paragraph id="HC19419BE0C42443DB9A8A22800626470"><enum>(2)</enum><text>to establish a cost-sharing requirement for the construction of the Arkansas Valley Conduit.</text></paragraph></subsection></section> 
<section id="H8DD5477A8B6F42B08DAC3C19AEC0E235"><enum>3.</enum><header>Arkansas Valley Conduit, Colorado</header> 
<subsection id="HA1755C4E53294115B7FC1198D91129D0"><enum>(a)</enum><header>In general</header><text>The Secretary of the Interior (referred to in this Act as the <quote>Secretary</quote>) shall plan, design, and construct a water delivery pipeline, and branch lines as needed, from a location in the vicinity (as determined by the Secretary) of Pueblo Reservoir, Pueblo, Colorado to a location in the vicinity (as determined by the Secretary) of Lamar, Colorado, to be known as the <quote>Arkansas Valley Conduit</quote>, without regard to the cost-ceiling for the Fryingpan Arkansas Project established under section 7 of <external-xref legal-doc="public-law" parsable-cite="pl/87/590">Public Law 87–590</external-xref> (76 Stat. 393).</text></subsection> 
<subsection id="H69899343F57248D6A3A27100EF3465E"><enum>(b)</enum><header>Lead non-Federal entity</header> 
<paragraph id="H4CE0C4C21F2F43268187FE504E000939"><enum>(1)</enum><header>Designation</header><text>The Southeastern Colorado Water Conservancy District, or a designee of the Southeastern Colorado Water Conservancy District that is recognized under State law as an entity that has taxing authority, shall be the lead non-Federal entity for the Arkansas Valley Conduit.</text></paragraph> 
<paragraph id="H46C1EB880B80473A9D644D04056C2F2F"><enum>(2)</enum><header>Duties</header><text>The lead non-Federal entity shall—</text> 
<subparagraph id="H76C864C284684720B1DCABAF489A386"><enum>(A)</enum><text>act as the official agent of the Arkansas Valley Conduit;</text></subparagraph> 
<subparagraph id="H078F8AD93A16458FBCA31835E122E138"><enum>(B)</enum><text>pay—</text> 
<clause id="H0C236DAE8BE84ACA913607A7F9532167"><enum>(i)</enum><text>the non-Federal share of any increased costs required under subsection (e)(2)(C); and</text></clause> 
<clause id="H7110FA2CED6746829142A2FCEA3CC293"><enum>(ii)</enum><text>the non-Federal share of construction costs under subsection (e)(2); and</text></clause></subparagraph> 
<subparagraph id="H32EA3FA4B0D64A79ABFFE8BF439344E9"><enum>(C)</enum><text>pay costs relating to, and perform, the operations, maintenance, and replacement of the Arkansas Valley Conduit.</text></subparagraph></paragraph></subsection> 
<subsection id="H1B5897DA527E4445A4A4014600954D10"><enum>(c)</enum><header>Cooperation</header><text display-inline="yes-display-inline">To the maximum extent practicable during the planning, design, and construction of the Arkansas Valley Conduit, the Secretary shall collaborate and cooperate with the United States Army Corps of Engineers, other Federal agencies, and non-Federal entities.</text></subsection> 
<subsection id="H1A98D4199672469A9FE66DCD2F19F662"><enum>(d)</enum><header>Cost estimate</header> 
<paragraph id="H1CDA37607941442FA3F53009442BD300"><enum>(1)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of this Act, the Secretary, in cooperation with the lead non-Federal entity, shall prepare an estimate of the total costs of constructing the Arkansas Valley Conduit.</text></paragraph> 
<paragraph id="H019C9B29DC854493BACA1422F165C30"><enum>(2)</enum><header>Actual costs</header><text>If the actual costs of construction exceed the estimated costs, the difference between the actual costs and the estimated costs shall be apportioned in accordance with subsection (e)(2)(C).</text></paragraph> 
<paragraph id="H308F312B591443C700E286CE00081C46"><enum>(3)</enum><header>Agreement on estimate and design</header><text>The estimate prepared under paragraph (1), and the final design for the Arkansas Valley Conduit, shall be—</text> 
<subparagraph id="HE3D8E6D1B8E4405789699E1C506C586E"><enum>(A)</enum><text>subject to the agreement of the Secretary and the lead non-Federal entity;</text></subparagraph> 
<subparagraph id="H43C0BAFAAAC04997AE784854AE77FCFE"><enum>(B)</enum><text>developed in cooperation with the lead non-Federal entity; and</text></subparagraph> 
<subparagraph id="HE185FEA0AF244F7897DBFC070000BBBB"><enum>(C)</enum><text>consistent with commonly accepted engineering practices.</text></subparagraph></paragraph></subsection> 
<subsection id="H101ECF1E9AAB48C40024684275CE1400"><enum>(e)</enum><header>Cost-sharing requirement</header> 
<paragraph id="H304991CC07754C21ABC4C40013B894CD"><enum>(1)</enum><header>Federal share</header> 
<subparagraph id="H9DD577B406EB47A3BFCE5D1C9EA205DF"><enum>(A)</enum><header>In general</header><text>The Federal share of the total costs of the planning, design, and construction of the Arkansas Valley Conduit shall be 80 percent.</text></subparagraph> 
<subparagraph id="H538F8208D1A4440CB3D5BA057A615B2"><enum>(B)</enum><header>Increased costs</header><text>The Federal share of any increased costs that are a result of fundamental design changes conducted at the request of any person other than the lead non-Federal entity shall be 100 percent.</text></subparagraph></paragraph> 
<paragraph id="H7232C78452CD469EA5C0DAAF0056D36B"><enum>(2)</enum><header>Non-federal share</header> 
<subparagraph id="H75CB84B684E04E469EAEB3E8777F3F3"><enum>(A)</enum><header>Non-federal share</header><text>The non-Federal share of the total costs of the planning, design, and construction of the Arkansas Valley Conduit shall be 20 percent.</text></subparagraph> 
<subparagraph id="HBBF0EF0B29124F529FF1B7CDBA6800B0"><enum>(B)</enum><header>Form</header><text>Up to 100 percent of the non-Federal share may be in the form of in-kind contributions or tasks that are identified in the cost estimate prepared under subsection (d)(1) as necessary for the planning, design, and construction of the Arkansas Valley Conduit.</text></subparagraph> 
<subparagraph id="HFF13F884BACF45D600592BE12BB90061"><enum>(C)</enum><header>Increased costs</header> 
<clause id="HD373F019C4494315BD47792F5C6900F5"><enum>(i)</enum><header>Fundamental design changes</header><text>The lead non-Federal entity shall pay any increased costs that are a result of fundamental design changes conducted at the request of the lead non-Federal entity.</text></clause> 
<clause id="HA1DE0445C674469AA1C3DE3FBE24E667"><enum>(ii)</enum><header>Other causes</header><text>For any increased costs that are from causes (including increased supply and labor costs and unforseen field changes) other than fundamental design changes referred to in clause (i) and paragraph (1)(B)—</text> 
<subclause id="H94624C1565F142B583A609AD5984E676"><enum>(I)</enum><text>the Federal share shall be 80 percent; and</text></subclause> 
<subclause commented="no" display-inline="no-display-inline" id="H7F361E95C1864A8CB80030383758F862"><enum>(II)</enum><text>the non-Federal share shall be 20 percent.</text></subclause></clause></subparagraph> 
<subparagraph id="HD7C888144D754027A1E697BBF3AD5F25"><enum>(D)</enum><header>Up-front payment</header><text>Not later than 180 days after the date of completion of the cost-estimate under subsection (d), the Secretary and the non-Federal entity may enter into an agreement under which—</text> 
<clause id="H8099173823B945E2AB9388FDA9453FB8"><enum>(i)</enum><text>the Secretary pays 100 percent of the non-Federal share on behalf of the non-Federal entity; and</text></clause> 
<clause id="HC241AAA86D484A70A4DB240112683439"><enum>(ii)</enum><text>the non-Federal entity reimburses the Secretary for the funds paid by the Secretary in accordance with the terms of the agreement.</text></clause></subparagraph> 
<subparagraph id="H4E0E11A40619403EA32913E51807651"><enum>(E)</enum><header>Timing</header><text>Except as provided in subparagraph (D), the non-Federal share shall be paid in accordance with a schedule established by the Secretary that—</text> 
<clause id="HC90937B0E77543F0BB649DC222C36100"><enum>(i)</enum><text>takes into account the capability of the applicable non-Federal entities to pay; and</text></clause> 
<clause id="H0E7F91680F3941E9B4004862CA268BF1"><enum>(ii)</enum><text>provides for full payment of the non-Federal share by a date that is not later than 50 years after the date on which the Arkansas Valley Conduit is capable of delivering water.</text></clause></subparagraph></paragraph></subsection> 
<subsection id="HDD926407CD424D6CB9BCB908FC02B041"><enum>(f)</enum><header>Transfer on completion</header><text>On completion of the Arkansas Valley Conduit, as certified in an agreement between the Secretary and the lead non-Federal entity, the Secretary shall transfer ownership of the Arkansas Valley Conduit to the lead non-Federal entity.</text></subsection> 
<subsection id="HFB906BAC5B0C444986A5F2E5A3547BF0"><enum>(g)</enum><header>Applicable law</header><text>Except as provided in this Act, <external-xref legal-doc="public-law" parsable-cite="pl/87/590">Public Law 87–590</external-xref> (76 Stat. 389) and related authorizing documents and subsequent studies shall apply to the planning, design, and construction of the Arkansas Valley Conduit.</text></subsection> 
<subsection id="H7BCDD16C1EF64038A8315C001CC348FB"><enum>(h)</enum><header>Water rights</header><text>Nothing in this Act affects any State water law or interstate compact.</text></subsection></section> 
<section id="HFA4140196F8C42A8B3F58C045BEF9E5D"><enum>4.</enum><header>Authorization of appropriations</header> 
<subsection id="H91B116D459B441A6B900325D3CB7A58F"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">There are authorized to be appropriated such sums as are necessary to carry out this Act.</text></subsection> 
<subsection id="HA33D473B954B4B089E8B86AC580031DC"><enum>(b)</enum><header>Limitation</header><text>Amounts made available under subsection (a) shall not be used for the operation or maintenance of the Arkansas Valley Conduit.</text></subsection></section> 
</legis-body> 
</bill> 


