<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Referred-in-Senate" bill-type="olc" dms-id="H7318EDDF50F34FB88E8755453C57B788" public-private="public">
<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>110 HR 1803 : To direct the Secretary of the Interior to
</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2007-10-23</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
	<form>
		<distribution-code display="yes">IIB</distribution-code>
		<congress>110th CONGRESS</congress>
		<session>1st Session</session>
		<legis-num>H. R. 1803</legis-num>
		<current-chamber display="yes">IN THE SENATE OF THE UNITED
		  STATES</current-chamber>
		<action>
			<action-date date="20071023">October 23, 2007</action-date>
			<action-desc>Received; read twice and referred to the
			 <committee-name committee-id="SSEG00">Committee on Energy and Natural
			 Resources</committee-name></action-desc>
		</action>
		<legis-type>AN ACT</legis-type>
		<official-title display="yes">To direct the Secretary of the Interior to
		  conduct a feasibility study to design and construct a four reservoir intertie
		  system for the purposes of improving the water storage opportunities, water
		  supply reliability, and water yield of San Vicente, El Capitan, Murray, and
		  Loveland Reservoirs in San Diego County, California in consultation and
		  cooperation with the City of San Diego and the Sweetwater Authority, and for
		  other purposes.</official-title>
	</form>
	<legis-body id="H780A444CBF3649E7B31FC0C3E861D27E" style="OLC">
		<section display-inline="no-display-inline" id="H9B299F27C0514540A4686290B336A993" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote>San
			 Diego Water Storage and Efficiency Act of 2007</quote>.</text>
		</section><section id="H3BED9D39BDEB4FE9A8A1482E43148D5"><enum>2.</enum><header>Feasibility study,
			 project development, cost share</header>
			<subsection id="H389531120B8E4CC6B5FC17F319D3C994"><enum>(a)</enum><header>In
			 General</header><text>The Secretary of the Interior (hereinafter referred to as
			 <quote>Secretary</quote>), in consultation and cooperation with the City of San
			 Diego and the Sweetwater Authority, is authorized to undertake a study to
			 determine the feasibility of constructing a four reservoir intertie system to
			 improve water storage opportunities, water supply reliability, and water yield
			 of the existing non-Federal water storage system. The feasibility study shall
			 document the Secretary’s engineering, environmental, and economic investigation
			 of the proposed reservoir and intertie project taking into consideration the
			 range of potential solutions and the circumstances and needs of the area to be
			 served by the proposed reservoir and intertie project, the potential benefits
			 to the people of that service area, and improved operations of the proposed
			 reservoir and intertie system. The Secretary shall indicate in the feasibility
			 report required under subsection (d) whether the proposed reservoir and
			 intertie project is recommended for construction.</text>
			</subsection><subsection id="H0B4E98178D5E455083AA1BCEE4FE17F"><enum>(b)</enum><header>Federal Cost
			 Share</header><text>The Federal share of the costs of the feasibility study
			 shall not exceed 50 percent of the total study costs. The Secretary may accept
			 as part of the non-Federal cost share, any contribution of such in-kind
			 services by the City of San Diego and the Sweetwater Authority that the
			 Secretary determines will contribute toward the conduct and completion of the
			 study.</text>
			</subsection><subsection id="HC3E6D46ED2EA40A7885F3CEA9D0063DF"><enum>(c)</enum><header>Cooperation</header><text>The
			 Secretary shall consult and cooperate with appropriate State, regional, and
			 local authorities in implementing this section.</text>
			</subsection><subsection id="H61AE37B5AED04EACA37300E0CF441F2B"><enum>(d)</enum><header>Feasibility
			 Report</header><text>The Secretary shall submit to Congress a feasibility
			 report for the project the Secretary recommends, and to seek, as the Secretary
			 deems appropriate, specific authority to develop and construct any recommended
			 project. This report shall include—</text>
				<paragraph id="H470B41093BA342FDA0001D595D99E4A"><enum>(1)</enum><text>good faith letters
			 of intent by the City of San Diego and the Sweetwater Authority and its
			 non-Federal partners to indicate that they have committed to share the
			 allocated costs as determined by the Secretary; and</text>
				</paragraph><paragraph id="HCCEF0BAA986149BB00E7343958D9DE4"><enum>(2)</enum><text>a
			 schedule identifying the annual operation, maintenance, and replacement costs
			 that should be allocated to the City of San Diego and the Sweetwater Authority,
			 as well as the current and expected financial capability to pay operation,
			 maintenance, and replacement costs.</text>
				</paragraph></subsection></section><section id="H73655813B3D24EC5B5C4DDC0A6AA08D1"><enum>3.</enum><header>Federal
			 Reclamation projects</header><text display-inline="no-display-inline">Nothing
			 in this Act shall supersede or amend the provisions of Federal Reclamation laws
			 or laws associated with any project or any portion of any project constructed
			 under any authority of Federal Reclamation laws.</text>
		</section><section id="HD9B618AAC09C42AA00D79617002F759E"><enum>4.</enum><header>Authorization of
			 appropriations</header><text display-inline="no-display-inline">There is
			 authorized to be appropriated to the Secretary $3,000,000 for the Federal cost
			 share of the study authorized in section 2.</text>
		</section><section id="H6CA27F04BF344DFA94270506EDEF8618"><enum>5.</enum><header>Sunset</header><text display-inline="no-display-inline">The authority of the Secretary to carry out
			 any provisions of this Act shall terminate 10 years after the date of the
			 enactment of this Act.</text>
		</section></legis-body>
	<attestation>
		<attestation-group>
			<attestation-date chamber="House" date="20071022">Passed the House of
			 Representatives October 22, 2007.</attestation-date>
			<attestor display="yes">Lorraine C. Miller,</attestor>
			<role>Clerk</role>
		</attestation-group>
	</attestation>
	<endorsement display="no">
	</endorsement>
</bill>


