<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-House" bill-type="olc" dms-id="H91C8ECC6104048E4B2B324CDA19D67EE" public-private="public">
<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>109 HR 5705 IH: To authorize the Secretary of the Interior to conduct
</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2006-06-28</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
	<form>
		<distribution-code display="yes">I</distribution-code>
		<congress>109th CONGRESS</congress>
		<session>2d Session</session>
		<legis-num>H. R. 5705</legis-num>
		<current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber>
		<action>
			<action-date date="20060628">June 28, 2006</action-date>
			<action-desc><sponsor name-id="R000571">Mr. Rehberg</sponsor>
			 introduced the following bill; which was referred to the
			 <committee-name committee-id="HII00">Committee on
			 Resources</committee-name></action-desc>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title>To authorize the Secretary of the Interior to conduct
		  studies to determine the feasibility and environmental impact of rehabilitating
		  the St. Mary Diversion and Conveyance Works and the Milk River Project, to
		  authorize the rehabilitation and improvement of the St. Mary Diversion and
		  Conveyance Works, to develop an emergency response plan for use in the case of
		  catastrophic failure of the St. Mary Diversion and Conveyance Works, and for
		  other purposes.</official-title>
	</form>
	<legis-body id="H0EB7F32284664CE19950AD6321D99BC8" style="OLC">
		<section display-inline="no-display-inline" id="H1EE72FC5B868452A983D68E866EE646" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote>St. Mary
			 Diversion and Conveyance Works and Milk River Project Act of
			 2006</quote>.</text>
		</section><section id="H0B19EC0F9F334E1EA512008FB4C8306C"><enum>2.</enum><header>Definitions</header><text display-inline="no-display-inline">In this Act:</text>
			<paragraph id="H17AA5A89CC6F4FDA844C0100CF295F3B"><enum>(1)</enum><header>Blackfeet
			 irrigation project</header><text>The term <term>Blackfeet Irrigation
			 Project</term> means the Bureau of Indian Affairs Blackfeet Irrigation Project
			 located within the exterior boundaries of the Blackfeet Reservation.</text>
			</paragraph><paragraph id="H36FD2AB838724A06826B027186217C81"><enum>(2)</enum><header>Blackfeet
			 reservation</header><text>The term <term>Blackfeet Reservation</term> means the
			 Blackfeet Indian Reservation of Montana.</text>
			</paragraph><paragraph id="H19C91C903DC24F31922C0731CDFDC999"><enum>(3)</enum><header>Blackfeet
			 tribe</header><text>The term <term>Blackfeet Tribe</term> means the Blackfeet
			 Tribe of the Blackfeet Reservation.</text>
			</paragraph><paragraph id="HFBD14687E822413CA2F5EA32F33B77EB"><enum>(4)</enum><header>Board</header><text>The
			 term <term>Board</term> means the Joint Board of Control for the Milk River
			 Project established in accordance with State law .</text>
			</paragraph><paragraph id="HCF01C43DB3DD4CDDBD7B49BDA478F2A2"><enum>(5)</enum><header>Catastrophic
			 infrastructure failure</header><text>The term <term>catastrophic infrastructure
			 failure</term> means a failure of the infrastructure of the St. Mary Diversion
			 and Conveyance Works that causes a significant disruption in the operation of
			 the water system that, if not addressed, would, as determined by the Secretary,
			 pose a serious threat to—</text>
				<subparagraph id="H03DBBB7A00364C7ABD00B016D784BFB7"><enum>(A)</enum><text>the lives, health,
			 or property of the residents of the Blackfeet Reservation; or</text>
				</subparagraph><subparagraph id="HFD2B73374A00473080A28673750000F"><enum>(B)</enum><text>the economic or
			 environmental health of—</text>
					<clause id="H3D0857F3AD174468991EF366002294EB"><enum>(i)</enum><text>the
			 Blackfeet Reservation; or</text>
					</clause><clause id="HCEBFCAD2BFF64C62AA330023925C5BD8"><enum>(ii)</enum><text>the
			 region served by the Milk River Project.</text>
					</clause></subparagraph></paragraph><paragraph id="HCEBC1BD5B28C478DBAFAAA067B2339D"><enum>(6)</enum><header>Chinook
			 division</header><text>The term <term>Chinook Division</term> means the Harlem,
			 Paradise Valley, Zurich, Alfalfa Valley, and Fort Belknap irrigation districts
			 established in accordance with State law.</text>
			</paragraph><paragraph id="HB339341D199A4C81A694D9D5C6805C5"><enum>(7)</enum><header>Emergency
			 response plan</header><text>The term <term>emergency response plan</term> means
			 the emergency response plan developed under section 4(a).</text>
			</paragraph><paragraph id="H43B17CA8CCB2437893D8BCFF23A4ACAA"><enum>(8)</enum><header>Fort belknap
			 reservation</header><text>The term <term>Fort Belknap Reservation</term> means
			 the Fort Belknap Reservation of the Fort Belknap Indian Community of
			 Montana.</text>
			</paragraph><paragraph id="HE5ECF0A7EF004628907DEC9B795CFB70"><enum>(9)</enum><header>Fund</header><text>The
			 term <term>Fund</term> means the Emergency Response Plan Fund established by
			 section 5(a).</text>
			</paragraph><paragraph id="HFC9506EC2F2E48EAAC8912E1E6D22700"><enum>(10)</enum><header>Milk river
			 project</header>
				<subparagraph id="H61E80B9BBAA94D6CA1A1E2143C15FE75"><enum>(A)</enum><header>In
			 general</header><text>The term <term>Milk River Project</term> means the Bureau
			 of Reclamation project authorized by the Secretary on March 14, 1903, under the
			 Act of June 17, 1902 (32 Stat. 388, chapter 1093), commencing at Lake Sherburne
			 Reservoir and providing water to a point approximately 6 miles east of Nashua,
			 Montana.</text>
				</subparagraph><subparagraph id="H571B9FDFABD941B6AEDA14F06C361659"><enum>(B)</enum><header>Inclusions</header><text>The
			 term <term>Milk River Project</term> includes—</text>
					<clause id="HFF3B3A2481584A7790C219C0039B94D"><enum>(i)</enum><text>Swiftcurrent
			 Dike;</text>
					</clause><clause id="H451E06257E14463A865CC4B8ABE595E2"><enum>(ii)</enum><text>Lake
			 Sherburne;</text>
					</clause><clause id="H2D67744ED527411483D1AA14CC1994F7"><enum>(iii)</enum><text>Nelson and
			 Fresno dams, dikes, and reservoirs;</text>
					</clause><clause id="HFE09719D078F4DFCB55DB2AC32B9536"><enum>(iv)</enum><text>St.
			 Mary, Dodson, Vandalia, and Paradise diversion dams;</text>
					</clause><clause id="H8F7C01D69E3C4F0D8D44595F1CE92182"><enum>(v)</enum><text>Dodson pumping
			 plant; and</text>
					</clause><clause id="H45A3122F7C6E445586111BC5DACA92A8"><enum>(vi)</enum><text>miles of
			 associated canals, laterals, and drains.</text>
					</clause></subparagraph></paragraph><paragraph id="HB2DBFD2DD2FF4C00AD2B09C51DC21747"><enum>(11)</enum><header>Rehabilitation
			 project</header><text>The term <term>rehabilitation project</term> means the
			 St. Mary Diversion and Conveyance Works rehabilitation and improvement project
			 authorized under section 3(b)(1).</text>
			</paragraph><paragraph id="HF4BDA2292E57430D874CEAAF427AC00"><enum>(12)</enum><header>Repayment
			 contract</header><text>The term <term>repayment contract</term> means the
			 repayment contract entered into under section 3(b)(6)(C).</text>
			</paragraph><paragraph id="H3D5FBACFD0364FD59B9BECC36241FAA7"><enum>(13)</enum><header>Secretary</header><text>The
			 term <term>Secretary</term> means the Secretary of the Interior.</text>
			</paragraph><paragraph id="HCB8AC914F9EC4FE89BD037CA424C54FD"><enum>(14)</enum><header>State</header><text>The
			 term <term>State</term> means the State of Montana.</text>
			</paragraph><paragraph id="HD33AC23273E148A58D93CBAE6302ECB"><enum>(15)</enum><header>St. mary
			 diversion and conveyance works</header>
				<subparagraph id="H69CC2B7B26194D8B92F0AC7D615C8E1B"><enum>(A)</enum><header>In
			 general</header><text>The term <term>St. Mary Diversion and Conveyance
			 Works</term> means the portion of the Milk River Project authorized by the
			 Secretary on March 25, 1905, under the Act of June 17, 1902 (32 Stat. 388,
			 chapter 1093), that—</text>
					<clause id="H0D2444AD16A44BFAA23C86FD3064CDD6"><enum>(i)</enum><text>is
			 located within the exterior boundaries of the Blackfeet Reservation; and</text>
					</clause><clause id="H8E1C0A2AE5ED41778100C44738006B3D"><enum>(ii)</enum><text>diverts water
			 from the St. Mary River into the North Fork of the Milk River.</text>
					</clause></subparagraph><subparagraph id="HC4526B317064471AAC23EEFCD465AFEC"><enum>(B)</enum><header>Inclusions</header><text>The
			 term <term>St. Mary Diversion and Conveyance Works</term> includes—</text>
					<clause id="HA6C38F4889AB4B51967CCC92BA78BDCC"><enum>(i)</enum><text>the
			 diversion dam on the St. Mary River;</text>
					</clause><clause id="H6BF430E3872943F8BA00838300D41361"><enum>(ii)</enum><text>Swiftcurrent
			 Dike;</text>
					</clause><clause id="H337CCB9245874722A9BE9000D6384521"><enum>(iii)</enum><text>canals;</text>
					</clause><clause id="H8EB5C7C43F694B75A2459C48C5004776"><enum>(iv)</enum><text>siphons;</text>
					</clause><clause id="H46722419F22E441FB36114DA819F5B"><enum>(v)</enum><text>the 5
			 drop structures; and</text>
					</clause><clause id="H00CEB2F3FC8B41F200F8C9A88B432C62"><enum>(vi)</enum><text>other associated
			 canal facilities.</text>
					</clause></subparagraph></paragraph></section><section id="H87A5864A851541BB82223846E41703D0"><enum>3.</enum><header>St. Mary
			 Diversion and Conveyance Works</header>
			<subsection id="H333193954733417B91009173A636C78E"><enum>(a)</enum><header>Authorization of
			 Studies</header>
				<paragraph id="H890C8F1C9CFB43F282EEFE92FDF6D589"><enum>(1)</enum><header>In
			 general</header><text>The Secretary, in consultation with the State, the
			 Blackfeet Tribe, and other rehabilitation project stakeholders, shall conduct 1
			 or more studies—</text>
					<subparagraph id="HB3DCF9E7080D4170BB9FF3A726DE81A5"><enum>(A)</enum><text>to determine the
			 feasibility of rehabilitating and improving the St. Mary Diversion and
			 Conveyance Works to provide for sustained environmental and economic benefit
			 within the St. Mary and Milk River basins; and</text>
					</subparagraph><subparagraph id="HB398C45518D44D24BAA9B07675BF3AE"><enum>(B)</enum><text>to determine the
			 environmental impact of the proposed rehabilitation project.</text>
					</subparagraph></paragraph><paragraph id="H1744FF257C494DE6A8C813B5C029DDE"><enum>(2)</enum><header>Use of existing
			 information and resources</header><text>In preparing any study under paragraph
			 (1), the Secretary shall, to the maximum extent practicable, use existing
			 studies, including engineering and resource information provided by, or at the
			 direction of, the Blackfeet Tribe or Federal, State, or local agencies.</text>
				</paragraph><paragraph id="HBC59876351E645A2AD390327A1527E39"><enum>(3)</enum><header>Cooperative
			 agreement with the state and the blackfeet tribe</header><text>The Secretary
			 may enter into cooperative agreements with the State and the Blackfeet Tribe to
			 carry out all or a portion of 1 or more studies authorized under paragraph (1)
			 if the Secretary determines that the cooperative agreements would be
			 cost-effective and efficient.</text>
				</paragraph><paragraph id="H2946910F6836461E87E225BDFA5B482"><enum>(4)</enum><header>Reimbursement of
			 study costs</header>
					<subparagraph id="HFC68445088BD42FB8CFC2EFA93E7084D"><enum>(A)</enum><header>In
			 general</header><text>Except as provided in subparagraph (B), the costs of
			 preparing any study under paragraph (1) shall be—</text>
						<clause id="HB6CC8DE518204135A3EE758440D7DDFE"><enum>(i)</enum><text>considered to be a
			 rehabilitation project cost under subsection (b); and</text>
						</clause><clause id="H568AC5C4DD034AE986009D06AD5800CB"><enum>(ii)</enum><text>if
			 the proposed rehabilitation project is carried out under subsection (b),
			 reimbursed in accordance with the repayment contract.</text>
						</clause></subparagraph><subparagraph id="H8AF2B3E32CF347C7B42C029EB30085E1"><enum>(B)</enum><header>Blackfeet
			 tribe</header><text>Any Federal funds provided to the Blackfeet Tribe under a
			 cooperative agreement entered into under paragraph (3) shall be nonreimbursable
			 and nonreturnable to the United States.</text>
					</subparagraph></paragraph><paragraph id="H42A690B71BD14CD49FCADD727CD63B3"><enum>(5)</enum><header>Report</header><text>Not
			 later than 2 years after the date of enactment of this Act, the Secretary shall
			 submit to the Committee on Energy and Natural Resources of the Senate and the
			 Committee on Resources of the House of Representatives any studies required to
			 be conducted under paragraph (1).</text>
				</paragraph></subsection><subsection id="H0DE25E4F3B3A445790A34D6193FC8D1"><enum>(b)</enum><header>Authorization of
			 Rehabilitation Project</header>
				<paragraph id="H2328729934674E73BA722D7FAC2961E2"><enum>(1)</enum><header>In
			 general</header><text>Not later than 180 days after the date on which a study
			 is submitted under subsection (a)(5), the Secretary shall initiate the
			 planning, design, and construction of the St. Mary Diversion and Conveyance
			 Works rehabilitation and improvement project alternative that is selected under
			 paragraph (2).</text>
				</paragraph><paragraph id="H66E44A3586014C2A902DA96F1E1CD0E0"><enum>(2)</enum><header>Selection of
			 alternative</header><text>The Secretary, in consultation and coordination with
			 the State, the Blackfeet Tribe, and other affected rehabilitation project
			 stakeholders, shall select the alternative for construction of the
			 rehabilitation project that the Secretary determines would best meet the needs
			 of the State, the Blackfeet Tribe, and other affected rehabilitation project
			 stakeholders.</text>
				</paragraph><paragraph id="HC9517D8D54C8443288D101C06E3193DD"><enum>(3)</enum><header>Cooperative
			 agreement</header><text>The Secretary shall enter into 1 or more cooperative
			 agreements with the State, the Blackfeet Tribe, and the Board to provide the
			 State, the Blackfeet Tribe, and the Board with information on, and
			 opportunities to provide comments with respect to, all aspects of the planning,
			 design, and construction of the rehabilitation project.</text>
				</paragraph><paragraph id="H00F0EEEF927841F49C8E410042A7E858"><enum>(4)</enum><header>Cost-sharing
			 requirements</header>
					<subparagraph id="HE3BD9D3FE3374F1BBA6B5D3C7883C13E"><enum>(A)</enum><header>In
			 general</header><text>Of the total rehabilitation projects costs—</text>
						<clause id="H7169E3220E1A45DDA5A4459376CB19D2"><enum>(i)</enum><text>45
			 percent shall be reimbursable; and</text>
						</clause><clause id="HC66E49338E2448D6A48471CA4BD72C48"><enum>(ii)</enum><text>55
			 percent shall be nonreimbursable.</text>
						</clause></subparagraph><subparagraph id="HB8AB242D6CCC457989E936E49B73D608"><enum>(B)</enum><header>Reimbursable
			 costs</header>
						<clause id="H6930346B59E04C3C00024189473C4C00"><enum>(i)</enum><header>Federal
			 share</header><text>The Federal share of the total reimbursable rehabilitation
			 project costs, as identified in the repayment contract, shall be 75
			 percent.</text>
						</clause><clause id="HD909E2D2B15C46C200ADAC6714BEC5D"><enum>(ii)</enum><header>Non-federal
			 share</header><text>The non-Federal share of the total reimbursable project
			 costs, as identified in the repayment contract, shall be the lesser of—</text>
							<subclause id="HEA483A59F36C46A79F496FDBA36F00B1"><enum>(I)</enum><text>the amount that is
			 equal to 25 percent of the total reimbursable costs of carrying out the
			 project; or</text>
							</subclause><subclause id="HF9A88CFCB14F4F96A5EE80007DC282E1"><enum>(II)</enum><text>$25,000,000.</text>
							</subclause></clause></subparagraph><subparagraph id="H8D8C171E604346D7B0A200430022FB33"><enum>(C)</enum><header>Form of
			 non-federal share</header><text>The non-Federal share required under
			 subparagraphs (A) and (B) may be in the form of—</text>
						<clause id="HAF038868E5C04D1400324BC5C5C40039"><enum>(i)</enum><text>any
			 in-kind, documented contribution of goods or services, whether provided before,
			 on, or after the date of enactment of this Act; or</text>
						</clause><clause id="HC294B7E5802444789409F53E1FA3B868"><enum>(ii)</enum><text>any
			 amounts paid by the State, the Blackfeet Tribe, or other affected
			 rehabilitation project stakeholders, whether paid before, on, or after the date
			 of enactment of this Act, for engineering or other studies that contribute to
			 the rehabilitation and improvement of the St. Mary Diversion and Conveyance
			 Works.</text>
						</clause></subparagraph></paragraph><paragraph id="HDA2B297C1B174FAEA0D5388D1BE2F82B"><enum>(5)</enum><header>Limitation on
			 certain project costs</header>
					<subparagraph id="H3BCD369E18D14EDB003DFF0957D0A654"><enum>(A)</enum><header>Administrative
			 costs</header><text>The total amount of funds expended by the Secretary for the
			 administration of the rehabilitation project shall be not more than 4 percent
			 of the amount provided for the total rehabilitation project construction
			 budget.</text>
					</subparagraph><subparagraph id="H600367996A0941698ED7C719DA625FA6"><enum>(B)</enum><header>Design and
			 construction</header><text>The total amount of funds expended by the Secretary
			 for design, and construction oversight of the rehabilitation project shall be
			 not more than 20 percent of the amount provided for the total rehabilitation
			 project construction budget.</text>
					</subparagraph></paragraph><paragraph id="H711AA48FF83E4C9ABE9441D355FAB66"><enum>(6)</enum><header>Construction
			 funds</header><text>The Secretary shall not obligate any funds made available
			 for rehabilitation project construction activities authorized under this
			 subsection until—</text>
					<subparagraph id="HEF86DAC098694410B02C198848D09CFF"><enum>(A)</enum><text>any applicable
			 requirements of the <act-name parsable-cite="NEPA69">National Environmental
			 Policy Act of 1969</act-name> (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321 et seq.</external-xref>) have been met;</text>
					</subparagraph><subparagraph id="H789DE4293D784C8FA3B03000C7D12943"><enum>(B)</enum><text>a final
			 engineering report has been—</text>
						<clause id="H4F13A3DF048945BF80A3DC3D173CF8D6"><enum>(i)</enum><text>prepared and
			 submitted to the Secretary; and</text>
						</clause><clause id="H662340E599FD4BC1833CC0A384E701D9"><enum>(ii)</enum><text>transmitted by
			 the Secretary to the Committee on Energy and Natural Resources of the Senate
			 and the Committee on Resources of the House of Representatives by the date that
			 is 60 days after the date on which the report has been submitted to the
			 Secretary; and</text>
						</clause></subparagraph><subparagraph id="H3AC2D8F2F3C34A5EB3037D5807409FDE"><enum>(C)</enum><text>a contract
			 providing for the repayment of reimbursable costs for the rehabilitation
			 project has been entered into by the Secretary and the applicable non-Federal
			 entities.</text>
					</subparagraph></paragraph><paragraph id="H86D7202FA6FA4EB7A24058C3E39FDCD7"><enum>(7)</enum><header>Employment
			 preference</header><text>The Secretary shall require that any contract or
			 subcontract for the construction of the rehabilitation project include a
			 provision that the contractor or subcontractor provide a hiring preference to
			 qualified members of the Blackfeet Tribe.</text>
				</paragraph><paragraph id="HE831E2A2263B442E9141008DFAD76D41"><enum>(8)</enum><header>Deadline</header><text>The
			 rehabilitation project shall be substantially complete by not later than
			 January 1, 2018.</text>
				</paragraph></subsection></section><section id="H2BDC65D6C649455D98714F1E40AEECD8"><enum>4.</enum><header>Emergency
			 response plan</header>
			<subsection id="HA43B545434FB4A21BFB49090F85BDA31"><enum>(a)</enum><header>In
			 General</header><text>Not later than 1 year after the date of enactment of this
			 Act, the Secretary, in consultation with the State, local and tribal
			 authorities, and other Milk River Project stakeholders, shall develop and,
			 subject to the availability of funds, implement an emergency response plan to
			 be followed in the event of a catastrophic infrastructure failure.</text>
			</subsection><subsection id="H321AC6BD04DC48C5B0936C41027763A7"><enum>(b)</enum><header>Contents</header><text>The
			 emergency response plan shall—</text>
				<paragraph id="HDD39E30DFB544BD8B7EBABE4C953B721"><enum>(1)</enum><text>identify the
			 potential impacts of a catastrophic infrastructure failure on public safety and
			 the environment, with an emphasis on the impacts on any portions of the
			 Blackfeet Reservation in which the St. Mary Diversion and Conveyance Works are
			 located;</text>
				</paragraph><paragraph id="H49EB9A0836584086AA5503207C557FD2"><enum>(2)</enum><text>provide a response
			 plan to address the public safety and environmental impacts in the State and
			 the Blackfeet Reservation within a reasonable period following a catastrophic
			 infrastructure failure;</text>
				</paragraph><paragraph id="H7DD0788ADC75456480DB7402FB54E7D"><enum>(3)</enum><text>define the
			 responsibilities of emergency response personnel in the event of a catastrophic
			 infrastructure failure;</text>
				</paragraph><paragraph id="HCB86FD70EADD4C8EABF6C8DD293BE0D7"><enum>(4)</enum><text>ensure
			 communication and coordination among the Federal, State, tribal, and local
			 agencies and other Milk River Project stakeholders that are responsible for
			 implementing the emergency response plan;</text>
				</paragraph><paragraph id="H2E2E372D54494EC2A761D648DC668B42"><enum>(5)</enum><text>establish public
			 notification procedures to be carried out in the event of a catastrophic
			 infrastructure failure;</text>
				</paragraph><paragraph id="HE5CAD6BE05F4494CB8B96C6C223E8235"><enum>(6)</enum><text>provide for the
			 repair or replacement of failed infrastructure with components that are
			 compatible with the rehabilitation project;</text>
				</paragraph><paragraph id="HDEBB78C6414C40E9B4A534FDB8D7480"><enum>(7)</enum><text>include a
			 cost-sharing agreement that—</text>
					<subparagraph id="H6045E0965BD5412D8DDDDEF53261F038"><enum>(A)</enum><text>specifies the
			 manner in which costs will be shared and any reimbursable amounts will be
			 repaid if the emergency response plan is implemented; and</text>
					</subparagraph><subparagraph id="HBB691EDDB68545D696ADA10026F32F0"><enum>(B)</enum><text>is consistent with
			 subsection (e); and</text>
					</subparagraph></paragraph><paragraph id="H29C937336A3048698000E17823F3FDFE"><enum>(8)</enum><text>incorporate any
			 other elements that the Secretary, in consultation with the State, tribal and
			 local authorities, and other Milk River Project stakeholders, determines would
			 ensure a rapid and effective response to a catastrophic infrastructure
			 failure.</text>
				</paragraph></subsection><subsection id="H288A23BFFEA942BDB6BC4916C6DABA68"><enum>(c)</enum><header>Title</header><text>Title
			 to all project works and facilities constructed under this section shall be
			 held by the United States.</text>
			</subsection><subsection id="H3EB3963E190D4013A5667E2E76AED3F"><enum>(d)</enum><header>Development
			 Costs</header><text>Any costs incurred by the Secretary in developing the
			 emergency response plan shall be nonreimbursable.</text>
			</subsection><subsection id="H91DA9658B0314EE8A3BB002867F30090"><enum>(e)</enum><header>Implementation
			 Costs</header>
				<paragraph id="HF814EA6675814CDFB761D38077E83EA8"><enum>(1)</enum><header>In
			 general</header><text>Except as provided in paragraph (2), the cost-sharing
			 requirements of section 3(b)(4) shall apply to any costs of implementing the
			 emergency response plan under this section.</text>
				</paragraph><paragraph id="H4193C20F1287418ABCD68B4223AD9F7D"><enum>(2)</enum><header>Blackfeet
			 tribe</header><text>Notwithstanding paragraph (1), any Federal funds provided
			 for noninfrastructure activities carried out under this section on the
			 Blackfeet Reservation are nonreimbursable and nonreturnable to the United
			 States.</text>
				</paragraph></subsection></section><section id="H3B05F14108CF4D0AB77CF8F8C072FAAC"><enum>5.</enum><header>Emergency
			 Response Plan Fund</header>
			<subsection id="H65BB48E30CEB4EE8849608970053486B"><enum>(a)</enum><header>Establishment</header><text>There
			 is established in the Treasury of the United States a revolving fund,
			 consisting of—</text>
				<paragraph id="H9B22E9AAB9E240408943EFB545D601C"><enum>(1)</enum><text>such amounts as are
			 appropriated to the Fund under section 10(d); and</text>
				</paragraph><paragraph id="H53A2CA402CFC449C006D23E4D14DEA1B"><enum>(2)</enum><text>any interest
			 earned on investment of amounts in the Fund under subsection (c).</text>
				</paragraph></subsection><subsection id="HB1EA95602B6F4BE4B44B9B21A4E56FF"><enum>(b)</enum><header>Expenditures From
			 Fund</header>
				<paragraph id="HF0E72AC65C2E4694BD5825401414CF6C"><enum>(1)</enum><header>In
			 general</header><text>If the Secretary determines that a catastrophic
			 infrastructure failure has occurred, the Secretary of the Treasury, on request
			 of the Secretary, shall transfer from the Fund to the Secretary such amounts as
			 the Secretary determines are necessary to implement the emergency response
			 plan.</text>
				</paragraph><paragraph id="H58CB6D9EFF5D4EFD9426197D4C8760A8"><enum>(2)</enum><header>Report</header><text>Not
			 later than 60 days after the date on which amounts from the Fund are
			 transferred to the Secretary under paragraph (1), the Secretary shall submit to
			 the Committee on Energy and Natural Resources of the Senate and the Committee
			 on Resources of the House of Representatives a report that describes—</text>
					<subparagraph id="H04A2182F2E8742C3B7AA97517273A512"><enum>(A)</enum><text>the event that
			 triggered the determination that a catastrophic infrastructure failure had
			 occurred;</text>
					</subparagraph><subparagraph id="H9BC5F204D7994C4E808BA27514A9DFEE"><enum>(B)</enum><text>the amount
			 transferred to the Secretary from the Fund;</text>
					</subparagraph><subparagraph id="H0D493EE3D1294DDBAB00A18390706E94"><enum>(C)</enum><text>a description of
			 any construction carried out using the amounts transferred; and</text>
					</subparagraph><subparagraph id="H051B292C870F4368AA622EE29BB592B6"><enum>(D)</enum><text>the estimated cost
			 of completing any construction being carried out under the emergency response
			 plan.</text>
					</subparagraph></paragraph></subsection><subsection id="H9DE6AEA1B1644C53A4DD6E007DD4FDCB"><enum>(c)</enum><header>Investment of
			 Amounts</header>
				<paragraph id="HCD0FF5B335FF412A9D8CED309C75691B"><enum>(1)</enum><header>In
			 general</header><text>The Secretary of the Treasury shall invest such portion
			 of the Fund as is not, in the judgment of the Secretary of the Treasury,
			 required to meet current withdrawals.</text>
				</paragraph><paragraph id="H979D5925BA4B45C8A8A592DFDFB6600"><enum>(2)</enum><header>Interest-bearing
			 obligations</header><text>Investments may be made only in interest-bearing
			 obligations of the United States.</text>
				</paragraph><paragraph id="H6E1AE2ADDB354B1983CF2F8DA5E781C5"><enum>(3)</enum><header>Acquisition of
			 obligations</header><text>For the purpose of investments under paragraph (1),
			 obligations may be acquired—</text>
					<subparagraph id="H48B0D31F39B54594AF5F73F6AF9300A4"><enum>(A)</enum><text>on original issue
			 at the issue price; or</text>
					</subparagraph><subparagraph id="H2F1233822D0144B60044BBD99044F7AC"><enum>(B)</enum><text>by purchase of
			 outstanding obligations at the market price.</text>
					</subparagraph></paragraph><paragraph id="HF97BDB2AAFDF48F79653D8F9DEF8FBD9"><enum>(4)</enum><header>Sale of
			 obligations</header><text>Any obligation acquired by the Fund may be sold by
			 the Secretary of the Treasury at the market price.</text>
				</paragraph><paragraph id="H2938CE9B0AFF4789B1B4EB0CDBA2E60"><enum>(5)</enum><header>Credits to
			 fund</header><text>The interest on, and the proceeds from the sale or
			 redemption of, any obligations held in the Fund shall be credited to, and form
			 a part of, the Fund.</text>
				</paragraph></subsection><subsection id="H5D8C5FD6661C43E28542A1E8AAD7C13"><enum>(d)</enum><header>Termination of
			 Fund</header>
				<paragraph id="H6F3263E82F6345F2B49451CB366333A"><enum>(1)</enum><header>In
			 general</header><text>If the Secretary determines that the St. Mary Diversion
			 and Conveyance Works no longer pose an unacceptable risk of catastrophic
			 infrastructure failure—</text>
					<subparagraph id="H6E6D820AC6F74F6600CAA0934546AF1F"><enum>(A)</enum><text>the Fund shall be
			 terminated; and</text>
					</subparagraph><subparagraph id="H5B1E68C2B7F741D1975E3613852E6711"><enum>(B)</enum><text>the unexpended and
			 unobligated balance of the Fund shall be made available for the construction of
			 the rehabilitation project authorized under section 3(b)(1).</text>
					</subparagraph></paragraph><paragraph id="H88F42E31809445B28C843353C6DF1EC9"><enum>(2)</enum><header>Additional
			 funds</header><text>Amounts made available for the construction of the
			 rehabilitation project under paragraph (1)(B) shall be in addition to the
			 amounts made available for the rehabilitation project under section
			 10(b).</text>
				</paragraph></subsection></section><section id="HCFC1A93B347544F790BF502D622F78F0"><enum>6.</enum><header>Milk River
			 Project</header>
			<subsection id="H81E94BD842FC4BA0AA83C47807E32250"><enum>(a)</enum><header>Authorized
			 Uses</header><text>Notwithstanding any other provision of law—</text>
				<paragraph id="HFF55B2D5771047EABA1FABFA19ED4C98"><enum>(1)</enum><text>the authorized
			 uses of Lake Sherburne Reservoir, St. Mary Diversion and Conveyance Works,
			 Fresno Reservoir, Nelson Reservoir, and the Vandalia Diversion Dam shall
			 include irrigation, flood control, the provision of municipal and industrial
			 water supplies, recreation, fish and wildlife conservation and development, and
			 water conservation; and</text>
				</paragraph><paragraph id="H6877CD15336441F3A5BF6200D4D83FEA"><enum>(2)</enum><text>the Milk River
			 Project shall be operated—</text>
					<subparagraph id="H0FDA18D33FC0426690C4EE6586C2B709"><enum>(A)</enum><text>primarily for the
			 purpose of irrigation; and</text>
					</subparagraph><subparagraph id="HC15D1740B6C84A819883C41149B161AF"><enum>(B)</enum><text>in a manner that
			 does not interfere with any contracts in existence on the date of enactment of
			 this Act that are executed under the reclamation laws.</text>
					</subparagraph></paragraph></subsection><subsection id="H4229738498B746FAAD62F1FE0481BD38"><enum>(b)</enum><header>Service
			 Area</header><text>The service area of the Milk River Project is—</text>
				<paragraph id="H85ED314DC0F843E7A9F60018062B7122"><enum>(1)</enum><text>the Milk River
			 Basin; and</text>
				</paragraph><paragraph id="H8521E5E1015E4DD7BD18D915A09C845"><enum>(2)</enum><text>the portion of the
			 St. Mary River Basin that is accessible to the Milk River Project.</text>
				</paragraph></subsection><subsection id="H47A9BDA552C449E98E947E71C5D44FBD"><enum>(c)</enum><header>Feasibility
			 Studies</header>
				<paragraph id="H761C7796887B4F97942108BB781CB92D"><enum>(1)</enum><header>Priority</header><text>In
			 consultation with the State and affected Milk River Project stakeholders, the
			 Secretary shall prioritize the Milk River Project structures that are in need
			 of rehabilitation and improvement.</text>
				</paragraph><paragraph id="H2A5518ABFD1E4F889CAF63B9A8BF00AC"><enum>(2)</enum><header>Preparation of
			 studies</header><text>The Secretary or the non-Federal project sponsor shall
			 prepare 1 or more feasibility studies for Milk River Project structures in
			 order of the priority established under paragraph (1).</text>
				</paragraph><paragraph id="HD813B980858A4030B68DE2669DB75ED5"><enum>(3)</enum><header>Costs</header><text>The
			 costs of any feasibility studies prepared under paragraph (2) shall be—</text>
					<subparagraph id="H73BE535DBB574374BC27F1DF8B7610E9"><enum>(A)</enum><text>considered to be
			 Milk River Project rehabilitation and improvement costs; and</text>
					</subparagraph><subparagraph id="H2E5D2A358EDE48789D1F1319B7816026"><enum>(B)</enum><text>reimbursable if
			 the proposed Milk River Project rehabilitation and improvement is carried
			 out.</text>
					</subparagraph></paragraph><paragraph id="H5DA4EF0D263C479982549020904E9417"><enum>(4)</enum><header>Cooperative
			 agreements</header><text>The Secretary may enter into any cooperative
			 agreements with the non-Federal project sponsors that the Secretary determines
			 to be necessary to carry out this subsection.</text>
				</paragraph></subsection><subsection id="H08B8CF4F414C4D069CE43DFE09207CED"><enum>(d)</enum><header>Milk River
			 Project Rehabilitation and Improvement Costs</header><text>The cost-sharing
			 requirements of section 3(b)(4) shall apply to the costs of studying,
			 designing, planning, and constructing any rehabilitation of, or improvements
			 to, Milk River Project structures that are carried out in accordance with a
			 feasibility study prepared under subsection (c).</text>
			</subsection></section><section id="H45E6F6EAF6904E30BF22902B2F44D1BC"><enum>7.</enum><header>Blackfeet
			 Tribe</header>
			<subsection id="H7548ED9D1ED24FDFBB7896CD9359EB4"><enum>(a)</enum><header>Protection of
			 Land and Water Rights</header><text>In carrying out the rehabilitation project,
			 the Secretary shall ensure that the land and water rights held in trust for the
			 benefit of the Blackfeet Tribe and the members of the Blackfeet Tribe are
			 protected.</text>
			</subsection><subsection id="H147807BDA2214180946BD0004E892EE2"><enum>(b)</enum><header>Settlement of
			 Milk River Project Claims</header>
				<paragraph id="H58B6465BD1E344518366A499F94634EF"><enum>(1)</enum><header>In
			 general</header><text>Notwithstanding any other provision of law, the Secretary
			 shall resolve any land, water, environmental, and other claims of the Blackfeet
			 Tribe against the United States relating to the portions of the Milk River
			 Project located within the exterior boundaries of the Blackfeet
			 Reservation.</text>
				</paragraph><paragraph id="H239A06FB046D4F328E3070FBB8A22E00"><enum>(2)</enum><header>Costs</header><text>Any
			 Federal funds expended under paragraph (1) shall be nonreimbursable and
			 nonreturnable to the United States.</text>
				</paragraph><paragraph id="H61320948D2AA47479B92CF5175C0D1B0"><enum>(3)</enum><header>Report</header><text>Not
			 later than January 1, 2008, or if the Secretary and the Blackfeet Tribe agree
			 to a later date, the date agreed to by the Secretary and the Blackfeet Tribe,
			 the Secretary shall submit to Congress a report that describes the resolution
			 of any claims under paragraph (1), including a description of the amount of
			 funds necessary to resolve the claims.</text>
				</paragraph></subsection><subsection id="H643E3B90907443C7814D655BF7AFA287"><enum>(c)</enum><header>Blackfeet
			 Projects</header>
				<paragraph id="H6EE87845343B49C789A8FFB1A33C03DE"><enum>(1)</enum><header>Identification
			 of projects</header><text>The Secretary, in consultation with the Blackfeet
			 Tribe, shall identify appropriate Blackfeet projects to improve economic
			 conditions on the Blackfeet Reservation.</text>
				</paragraph><paragraph id="H956B509A2B064938948E4700088890C1"><enum>(2)</enum><header>Feasibility
			 studies</header>
					<subparagraph id="HB71229C24C4D47A6B452E89404429541"><enum>(A)</enum><header>In
			 general</header><text>The Secretary shall complete 1 or more studies to
			 determine the feasibility of carrying out the Blackfeet projects identified
			 under paragraph (1).</text>
					</subparagraph><subparagraph id="H67F8FB7A22DC445987B6EA6562953CB0"><enum>(B)</enum><header>Use of existing
			 studies</header><text>In preparing a study under subparagraph (A), the
			 Secretary shall, to the maximum extent practicable, use any existing studies
			 that are identified by the Blackfeet Tribe.</text>
					</subparagraph><subparagraph id="H213EE006F6FA4013B1D200A562008848"><enum>(C)</enum><header>Considerations</header><text>The
			 Secretary may consider the use of the St. Mary Diversion and Conveyance Works
			 in—</text>
						<clause id="H82976A4851694C24AC61BA9E8967145F"><enum>(i)</enum><text>the
			 preparation of a feasibility study under this paragraph; and</text>
						</clause><clause id="H72C0236FEA15415E918296329F7D2FF5"><enum>(ii)</enum><text>the
			 subsequent planning, design, and construction of any Blackfeet projects that
			 are recommended to be carried out under this subsection.</text>
						</clause></subparagraph><subparagraph id="H6AC685421A5747DAA66C72EF302C0527"><enum>(D)</enum><header>Cooperative
			 agreements</header><text>The Secretary may enter into 1 or more cooperative
			 agreements with the Blackfeet Tribe to carry out a feasibility study under this
			 paragraph.</text>
					</subparagraph><subparagraph id="H88B82AFFE1474344A51CCD85AB72E500"><enum>(E)</enum><header>Report</header><text>Not
			 later than 180 days after the date on which a feasibility study is completed
			 under this paragraph, the Secretary shall submit to Congress a report
			 that—</text>
						<clause id="H8A1A01AA0E794C73AD615D63FCFC5D90"><enum>(i)</enum><text>identifies any
			 Blackfeet projects proposed to be carried out under this subsection; and</text>
						</clause><clause id="H0D518C7449204DC097C47492254F6A6"><enum>(ii)</enum><text>describes the
			 amount of funds necessary for the recommended Blackfeet projects.</text>
						</clause></subparagraph></paragraph></subsection><subsection id="H4D4A6004D53B424BA56C474BD4008B8F"><enum>(d)</enum><header>Hydropower
			 Preference</header><text>The Blackfeet Tribe shall be eligible for preference
			 in the development of hydropower generation on all facilities of the St. Mary
			 Diversion and Conveyance Works located within the exterior boundaries of the
			 Blackfeet Reservation on the same basis as municipalities under the Federal
			 Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/791a">16 U.S.C. 791a et seq.</external-xref>) and the reclamation laws (including the
			 Reclamation Project Act of 1939 (<external-xref legal-doc="usc" parsable-cite="usc/43/485">43 U.S.C. 485 et seq.</external-xref>)).</text>
			</subsection><subsection id="H98FE50EF7B61487B0000C2DEF7422580"><enum>(e)</enum><header>Employment
			 Preference</header><text>The Secretary shall require that any contract or
			 subcontract for the construction of the rehabilitation project require that the
			 contractor or subcontractor provide a hiring preference to qualified members of
			 the Blackfeet Tribe.</text>
			</subsection><subsection id="HFCD79A03AC9F4463A691F700B296086D"><enum>(f)</enum><header>Blackfeet
			 Irrigation Project</header>
				<paragraph id="H922775662D184DE488D272D3FBAE38D"><enum>(1)</enum><header>Feasibility
			 studies</header>
					<subparagraph id="H648CF4FC842D426FBBF191CE2F83FB"><enum>(A)</enum><header>In
			 general</header><text>As soon as practicable after the date on which the
			 Secretary completes an appraisal investigation of the Blackfeet Irrigation
			 Project, the Secretary shall conduct 1 or more studies to determine the
			 feasibility of rehabilitating and improving the Blackfeet Irrigation Project
			 structures that are determined by the Secretary to be in need of rehabilitation
			 or improvement based on the appraisal investigation.</text>
					</subparagraph><subparagraph id="HB5779F3812E9459600E5A99D0005227"><enum>(B)</enum><header>Nonreimbursable
			 costs</header><text>Any costs incurred in carrying out a feasibility study
			 under subparagraph (A) are nonreimbursable and nonreturnable to the United
			 States.</text>
					</subparagraph><subparagraph id="H36060C9443FA4FF3B3B8CB32C1AA7500"><enum>(C)</enum><header>Cooperative
			 agreement</header><text>The Secretary may enter into 1 or more cooperative
			 agreements with the Blackfeet Tribe for the conduct of the feasibility studies
			 under subparagraph (A).</text>
					</subparagraph><subparagraph id="H8E696194D24E4C668015252E414789E4"><enum>(D)</enum><header>Employment
			 preference</header><text>With respect to hiring or contracting for individuals
			 to carry out a feasibility study under subparagraph (A), the Secretary shall
			 give preference to any member of the Blackfeet Tribe that the Secretary
			 determines to be qualified for the position.</text>
					</subparagraph></paragraph><paragraph id="HB2EF6BDC10094718927FC17CE4CC00D0"><enum>(2)</enum><header>Report</header><text>Not
			 later than 180 days after the date on which a feasibility study is completed
			 under paragraph (1), the Secretary shall submit to Congress a report
			 that—</text>
					<subparagraph id="HC8C666A12533465281D19E8D17415EE9"><enum>(A)</enum><text>includes
			 recommendations for the rehabilitation and improvement of the Blackfeet
			 Irrigation Project; and</text>
					</subparagraph><subparagraph id="H774EA38BEF064760A189784CBC0063FF"><enum>(B)</enum><text>describes the
			 amount of funds necessary for the rehabilitation and improvement of the
			 Blackfeet Irrigation Project.</text>
					</subparagraph></paragraph></subsection></section><section id="H2BFE2716CC664C40B908EF8574F7D26"><enum>8.</enum><header>Fort Belknap
			 Reservation feasibility study</header>
			<subsection id="H1F79F38FB5BE40D483A5652374D7ADBD"><enum>(a)</enum><header>In
			 General</header><text>The Secretary shall conduct 1 or more studies to
			 determine the feasibility of developing a safe and adequate rural, municipal,
			 and industrial water supply project for the residents of the Fort Belknap
			 Reservation and surrounding communities.</text>
			</subsection><subsection id="HF8A581F0457542D0BA331380704438FF"><enum>(b)</enum><header>Costs</header><text>Any
			 costs incurred in carrying out the feasibility study under subsection (a) are
			 nonreimbursable and nonreturnable to the United States.</text>
			</subsection></section><section id="H11C5D4BADEC94A6A9310005470115099"><enum>9.</enum><header>Effect</header>
			<subsection id="H92A580B533FF438AAF44A112D3B953B4"><enum>(a)</enum><header>In
			 General</header><text>Nothing in this Act—</text>
				<paragraph id="HF1F8326EA91446639BB6FBB0448DBAF"><enum>(1)</enum><text>create or
			 alters—</text>
					<subparagraph id="H7FBB598F611240D887E0D600B5471421"><enum>(A)</enum><text>any Federal
			 reserved water right; or</text>
					</subparagraph><subparagraph id="HA3CF052528B54F4CBC68256D75D506D2"><enum>(B)</enum><text>any other right to
			 the use of water;</text>
					</subparagraph></paragraph><paragraph id="HB7F4A3954A0C4DE19CBB0009D148E790"><enum>(2)</enum><text>expands or
			 diminishes any Federal, State, or tribal jurisdiction or authority over—</text>
					<subparagraph id="H0B5243C8DE27446DB370B453D60336FB"><enum>(A)</enum><text>water resources
			 development or control; or</text>
					</subparagraph><subparagraph id="HE06C1F482A404C079E1FF924297302DF"><enum>(B)</enum><text>water
			 rights;</text>
					</subparagraph></paragraph><paragraph id="H6053F4233F9E4A6AAFA0A44E3BA84243"><enum>(3)</enum><text>alters the private
			 ownership of any structures, canals, and laterals owned by the Chinook
			 Division; or</text>
				</paragraph><paragraph id="HEBD4AFD7EC744644B833EC7657BC7EE"><enum>(4)</enum><text>prohibits the
			 Secretary, as part of an Indian water rights settlement, from using any project
			 facilities to deliver water from the St. Mary River for the use of the
			 Blackfeet Tribe.</text>
				</paragraph></subsection><subsection id="HEEAC69D050994F9C8C970273A2C78623"><enum>(b)</enum><header>Reclamation
			 Laws</header><text>No activity carried out under this Act shall be considered
			 to be a supplemental, additional, or new benefit under the reclamation laws,
			 including the Reclamation Reform Act of 1982 (<external-xref legal-doc="usc" parsable-cite="usc/43/390aa">43 U.S.C. 390aa et seq.</external-xref>).</text>
			</subsection></section><section id="H87AE973EB3384F4FA836275FBC99F421"><enum>10.</enum><header>Authorization of
			 appropriations</header>
			<subsection id="HF0EDC785BC604397A489BFB606533FF7"><enum>(a)</enum><header>St. Mary
			 Diversion and Conveyance Works Feasibility Studies</header><text>There is
			 authorized to be appropriated to carry out section 3(a) $15,000,000, to remain
			 available until expended.</text>
			</subsection><subsection id="H812D1C90F25D4D8ABB982D19B2C5D1F3"><enum>(b)</enum><header>St. Mary
			 Diversion and Conveyance Works Rehabilitation Project</header>
				<paragraph id="H9ADD1340A1DA4BC9B0FB4007B6EE300"><enum>(1)</enum><header>In
			 general</header><text>Subject to paragraph (2), there is authorized to be
			 appropriated to carry out section 3(b) $135,000,000.</text>
				</paragraph><paragraph id="H0420F014398042B69100B4AB4BF9A9EE"><enum>(2)</enum><header>Adjustment</header><text>The
			 amount authorized under paragraph (1) shall be adjusted as necessary to account
			 for increases in development costs after January 31, 2005, as determined using
			 applicable engineering cost indices.</text>
				</paragraph></subsection><subsection id="HAC46B48520CB46A1AE485463F74BE7B"><enum>(c)</enum><header>Emergency
			 Response Plan</header><text>There is authorized to be appropriated to carry out
			 section 4 $2,000,000.</text>
			</subsection><subsection id="H4BB20FFB525A4ADC95254CCA8000AF13"><enum>(d)</enum><header>Emergency
			 Fund</header><text>There is authorized to be appropriated to the Fund
			 $15,000,000.</text>
			</subsection><subsection id="H2449F6CD71504F6582D4579307373CF4"><enum>(e)</enum><header>Milk River
			 Project Feasibility Studies</header><text>There is authorized to be
			 appropriated to carry out section 6(c) $10,000,000.</text>
			</subsection><subsection id="H21EC0FA6FDFB4D4CB36BD096A05E8481"><enum>(f)</enum><header>Blackfeet
			 Projects</header><text>There is authorized to be appropriated to carry out
			 section 7(c) $1,000,000.</text>
			</subsection><subsection id="H865C910B7EA3486689AF21E78DDEE72"><enum>(g)</enum><header>Blackfeet
			 Irrigation Project</header><text>There is authorized to be appropriated to
			 carry out section 7(f) $5,000,000.</text>
			</subsection><subsection id="H5C2623BC90B3436BBC5B4E68F88CCCC2"><enum>(h)</enum><header>Fort Belknap
			 Reservation Feasibility Study</header><text>There is authorized to be
			 appropriated to carry out section 8 $1,000,000.</text>
			</subsection></section></legis-body>
</bill>


