<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Reported-in-House" dms-id="H0E01219016F64B67807294F10033238B" public-private="public" bill-type="olc"> 
<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>109 HR 1190 RH: San Diego Water Storage and Efficiency Act of 2005</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2005-12-06</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form> 
<distribution-code display="yes">IB</distribution-code> 
<calendar display="yes">Union Calendar No. 175</calendar> 
<congress>109th CONGRESS</congress> <session>1st Session</session> 
<legis-num>H. R. 1190</legis-num> 
<associated-doc role="report">[Report No. 109–321]</associated-doc> 
<current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber> 
<action> 
<action-date date="20050309">March 9, 2005</action-date> 
<action-desc><sponsor name-id="H000981">Mr. Hunter</sponsor> introduced the following bill; which was referred to the <committee-name committee-id="HII00" added-display-style="italic" deleted-display-style="strikethrough">Committee on Resources</committee-name></action-desc> 
</action> 
<action>
<action-date date="20051206">December 6, 2005</action-date>
<action-desc>Additional sponsors: <cosponsor name-id="D000598">Mrs. Davis of California</cosponsor>, <cosponsor name-id="C000994">Mr. Cunningham</cosponsor>, and <cosponsor name-id="I000056">Mr. Issa</cosponsor></action-desc>
</action>
<action> 
<action-date date="20051206">December 6, 2005</action-date> 
<action-desc>Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed</action-desc> 
<action-instruction>Strike out all after the enacting clause and insert the part printed in italic</action-instruction> 
<action-instruction>For text of introduced bill, see copy of bill as introduced on March 9, 2005</action-instruction> 
</action> 
<legis-type>A BILL</legis-type> 
<official-title>To direct the Secretary of the Interior to conduct a feasibility study to design and construct a four reservoir intertie system for the purposes of improving the water storage opportunities, water supply reliability, and water yield of San Vicente, El Capitan, Murray, and Loveland Reservoirs in San Diego County, California in consultation and cooperation with the City of San Diego and the Sweetwater Authority, and for other purposes.</official-title> 
</form> 
<legis-body display-enacting-clause="yes-display-enacting-clause" changed="added" style="OLC" committee-id="HII00" reported-display-style="italic" id="H4822281414A14E6EA8EF46779DC1AA6E"> 
<section id="HA62678FF8BF141969F4285E6A9E93396" section-type="section-one" display-inline="no-display-inline"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>San Diego Water Storage and Efficiency Act of 2005</short-title></quote>.</text></section> 
<section id="H27C7590E1DFD449F87F7AB4CAFD7346E"><enum>2.</enum><header>Feasibility study, project development, cost share</header> 
<subsection id="H8E37662E21644C32A803C9C718D71D6"><enum>(a)</enum><header>In General</header><text>The Secretary of the Interior (hereinafter referred to as <quote>Secretary</quote>), in consultation and cooperation with the City of San Diego and the Sweetwater Authority, is authorized to undertake a study to determine the feasibility of constructing a four reservoir intertie system to improve water storage opportunities, water supply reliability, and water yield of the existing non-Federal water storage system. The feasibility study shall document the Secretary’s engineering, environmental, and economic investigation of the proposed reservoir and intertie project taking into consideration the range of potential solutions and the circumstances and needs of the area to be served by the proposed reservoir and intertie project, the potential benefits to the people of that service area, and improved operations of the proposed reservoir and intertie system. The Secretary shall indicate in the feasibility report required under subsection (d) whether the proposed reservoir and intertie project is recommended for construction.</text></subsection> 
<subsection id="HFDA07473463B4BB5978B2D88312C4F02"><enum>(b)</enum><header>Federal Cost Share</header><text>The Federal share of the costs of the feasibility study shall not exceed 50 percent of the total study costs. The Secretary may accept as part of the non-Federal cost share, any contribution of such in-kind services by the City of San Diego and the Sweetwater Authority that the Secretary determines will contribute toward the conduct and completion of the study</text></subsection> 
<subsection id="H4C747CBB1D804DAA903EB844D943EAE6"><enum>(c)</enum><header>Cooperation</header><text display-inline="yes-display-inline">The Secretary shall consult and cooperate with appropriate State, regional, and local authorities in implementing this section.</text></subsection> 
<subsection id="HA7D4DC2FCE7B49E1A5D5A4BC1717AD30"><enum>(d)</enum><header>Feasibility Report</header><text>The Secretary shall submit to Congress a feasibility report for the project the Secretary recommends, and to seek, as the Secretary deems appropriate, specific authority to develop and construct any recommended project. This report shall include—</text> 
<paragraph id="H5BA6316B34E0472BAD858BB1C4C30079"><enum>(1)</enum><text>good faith letters of intent by the City of San Diego and the Sweetwater Authority and its non-Federal partners to indicate that they have committed to share the allocated costs as determined by the Secretary; and</text></paragraph> 
<paragraph id="H4E05B2DB5AD8487CB15F0930E400D452"><enum>(2)</enum><text>a schedule identifying the annual operation, maintenance, and replacement costs that should be allocated to the City of San Diego and the Sweetwater Authority, as well as the current and expected financial capability to pay operation, maintenance, and replacement costs.</text></paragraph></subsection></section> 
<section id="H5B4677846A034235A63E2D1588B370CB"><enum>3.</enum><header>Federal reclamation projects</header><text display-inline="no-display-inline">Nothing in this Act shall supersede or amend the provisions of Federal Reclamation laws or laws associated with any project or any portion of any project constructed under any authority of Federal Reclamation laws.</text></section> 
<section id="HA5403972E40E41618EDFE0E7B9D11F6"><enum>4.</enum><header>Authorization of appropriations</header><text display-inline="no-display-inline">The Federal costs for the feasibility study to be conducted and pursuant to this Act shall not exceed $3,000,000 of the total amount appropriated to carry out this section.</text></section> 
<section id="HA4FA3A8B7CDF4B98BD3FE5F1C4000727"><enum>5.</enum><header>Sunset</header><text display-inline="no-display-inline">The authority of the Secretary to carry out any provisions of this Act shall terminate 10 years after the date of the enactment of this Act.</text></section> 
</legis-body> 
<endorsement> 
<action-date date="20051206">December 6, 2005</action-date> 
<action-desc>Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed</action-desc></endorsement> 
</bill> 


