[Congressional Bills 106th Congress]
[From the U.S. Government Publishing Office]
[H.R. 3986 Reported in House (RH)]
Union Calendar No. 520
106th CONGRESS
2d Session
H. R. 3986
[Report No. 106-864]
To provide for a study of the engineering feasibility of a water
exchange in lieu of electrification of the Chandler Pumping Plant at
Prosser Diversion Dam, Washington.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
March 15, 2000
Mr. Hastings of Washington introduced the following bill; which was
referred to the Committee on Resources
September 19, 2000
Reported with an amendment, committed to the Committee of the Whole
House on the State of the Union, and ordered to be printed
[Strike out all after the enacting clause and insert the part printed
in italic]
[For text of introduced bill, see copy of bill as introduced on March
15, 2000]
_______________________________________________________________________
A BILL
To provide for a study of the engineering feasibility of a water
exchange in lieu of electrification of the Chandler Pumping Plant at
Prosser Diversion Dam, Washington.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. CHANDLER PUMPING PLANT AND POWERPLANT OPERATIONS AT PROSSER
DIVERSION DAM, WASHINGTON.
Section 1208 of Public Law 103-434 (108 Stat. 4562) is amended--
(1) in subsection (a)--
(A) in the subsection heading, by inserting ``or
Water Exchange'' after ``Electrification'';
(B) by redesignating paragraphs (1), (2), and (3)
as subparagraphs (A), (B), and (C), respectively, and
indenting appropriately;
(C) by striking ``In order to'' and inserting the
following:
``(1) Electrification.--In order to''; and
(D) by adding at the end the following:
``(2) Water exchange alternative.--
``(A) In general.--As an alternative to the
measures authorized under paragraph (1) for
electrification, the Secretary is authorized to use not
more than $4,000,000 of sums appropriated under
paragraph (1) to study the engineering feasibility of
exchanging water from the Columbia River for water
historically diverted from the Yakima River.
``(B) Requirements.--In carrying out subparagraph
(A), the Secretary, in coordination with the Kennewick
Irrigation District and in consultation with the
Bonneville Power Administration, shall--
``(i) prepare a report that describes
project benefits and contains feasibility level
designs and cost estimates;
``(ii) secure the critical right-of-way
areas for the pipeline alignment;
``(iii) prepare an environmental
assessment; and
``(iv) conduct such other studies or
investigations as are necessary to develop a
water exchange.'';
(2) in subsection (b)--
(A) in paragraph (1), by inserting ``or water
exchange'' after ``electrification''; and
(B) in the second sentence of paragraph (2)(A), by
inserting ``or the equivalent of the rate'' before the
period;
(3) in subsection (d), by striking ``electrification,''
each place it appears and inserting ``electrification or water
exchange''; and
(4) in subsection (d), by striking ``of the two'' and
inserting ``thereof''.
Union Calendar No. 520
106th CONGRESS
2d Session
H. R. 3986
[Report No. 106-864]
_______________________________________________________________________
A BILL
To provide for a study of the engineering feasibility of a water
exchange in lieu of electrification of the Chandler Pumping Plant at
Prosser Diversion Dam, Washington.
_______________________________________________________________________
September 19, 2000
Reported with an amendment, committed to the Committee of the Whole
House on the State of the Union, and ordered to be printed