[Congressional Bills 104th Congress]
[From the U.S. Government Publishing Office]
[S. 1649 Introduced in Senate (IS)]
2d Session
S. 1649
To extend contracts between the Bureau of Reclamation and irrigation
districts in Kansas and Nebraska, and for other purposes.
_______________________________________________________________________
IN THE SENATE OF THE UNITED STATES
March 28, 1996
Mr. Kerrey (for himself, Mr. Dole, Mr. Exon, and Mrs. Kassebaum)
introduced the following bill; which was read twice and referred to the
Committee on Energy and Natural Resources
_______________________________________________________________________
A BILL
To extend contracts between the Bureau of Reclamation and irrigation
districts in Kansas and Nebraska, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Irrigation Project Contract
Extension Act of 1996''.
SEC. 2. EXTENSION OF CONTRACTS.
The Secretary of the Interior shall extend the construction
repayment and water service contracts for the following projects,
entered into by the Secretary of the Interior under subsections (d) and
(e) of section 9 of the Reclamation Project Act of 1939 (43 U.S.C.
485h) and section 9(c) of the Act of December 22, 1944 (58 Stat. 891,
chapter 665), for a period of 4 additional years after the dates on
which each of the contracts, respectively, would expire but for this
section:
(1) The Ainsworth Unit, Missouri River Basin Project,
consisting of the project constructed and operated under the
Act of December 22, 1944 (58 Stat. 887, chapter 665), the Act
of August 21, 1954 (68 Stat. 757, chapter 781), and the Act of
May 18, 1956 (70 Stat. 160, chapter 285), situated in Cherry
County, Brown County, and Rock County, Nebraska.
(2) The Almena Unit, Missouri River Basin Project,
consisting of the project constructed and operated under the
Act of December 22, 1944 (58 Stat. 887, chapter 665), and the
Flood Control Act of 1946 (60 Stat. 641, chapter 596), as a
component of the Pick-Sloan Missouri Basin Program, situated in
Norton County and Phillips County, Kansas.
(3) The Bostwick Unit (Kansas portion), Missouri River
Basin Project, consisting of the project constructed and
operated under the Act of December 22, 1944 (58 Stat. 887,
chapter 665), as a component of the Pick-Sloan Missouri Basin
Program, situated in Republic County, Jewell County, and Cloud
County, Kansas.
(4) The Bostwick Unit (Nebraska portion), Missouri River
Basin Project, consisting of the project constructed and
operated under the Act of December 22, 1944 (58 Stat. 887,
chapter 665), as a component of the Pick-Sloan Missouri Basin
Program, situated in Harlan County, Franklin County, Webster
County, and Nuckolls County, Nebraska.
(5) The Farwell Unit, Missouri River Basin Project,
consisting of the project constructed and operated under the
Act of December 22, 1944 (58 Stat. 887, chapter 665), and the
Act of August 3, 1956 (70 Stat. 975, chapter 923), situated in
Howard County, Sherman County, and Valley County, Nebraska.
(6) The Frenchman-Cambridge Unit, Missouri River Basin
Project, consisting of the project constructed and operated
under the Act of December 22, 1944 (58 Stat. 887, chapter 665),
as a component of the Pick-Sloan Missouri Basin Program,
situated in Chase County, Frontier County, Hitchcock County,
Furnas County, and Harlan County, Nebraska.
(7) The Frenchman Valley Unit, Missouri River Basin
Project, consisting of the project constructed and operated
under the Act of December 22, 1944 (58 Stat. 887, chapter 665),
as a component of the Pick-Sloan Missouri Basin Program,
situated in Hayes County and Hitchcock County, Nebraska.
(8) The Kirwin Unit, Missouri River Basin Project,
consisting of the project constructed and operated under the
Act of December 22, 1944 (58 Stat. 887, chapter 665), and the
Flood Control Act of 1946 (60 Stat. 641, chapter 596), as a
component of the Pick-Sloan Missouri Basin Program, situated in
Phillips County, Smith County, and Osborne County, Kansas.
(9) The Sargent Unit, Missouri River Basin Project,
consisting of the project constructed and operated under the
Act of December 22, 1944 (58 Stat. 887, chapter 665), and the
Flood Control Act of 1946 (60 Stat. 641, chapter 596), situated
in Blaine County, Custer County, and Valley County, Nebraska.
(10) The Webster Unit, Missouri River Basin Project,
consisting of the project constructed and operated under the
Act of December 22, 1944 (58 Stat. 887, chapter 665), and the
Flood Control Act of 1946 (60 Stat. 641, chapter 596), as a
component of the Pick-Sloan Missouri Basin Program, situated in
Rooks County and Osborn County, Kansas.
<all>