<?xml version="1.0" encoding="UTF-8" standalone="no"?><?xml-stylesheet type="text/css" href="uslm.css"?><pLaw xmlns="http://schemas.gpo.gov/xml/uslm" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xml:lang="en" xsi:schemaLocation="http://schemas.gpo.gov/xml/uslm https://www.govinfo.gov/schemas/xml/uslm/uslm-2.0.17.xsd">

<?I97 127 STAT. ?>
<?I98 127 STAT. ?>
<?I99 127 STAT. ?>
<?I50 PUBLIC LAW 113–23—AUG. 9, 2013?>
<?I51 PUBLIC LAW 113–23—AUG. 9, 2013?>
<?I52 PUBLIC LAW 113–23—AUG. 9, 2013?>


<!--Disclaimer: Legislative measures that include compacts or other non-standard data structures will require additional modeling and may contain inconsistencies in the converted USLM XML.-->
<meta><dc:title>Public Law 113–23: To improve hydropower, and for other purposes.</dc:title>
<dc:type>Public Law</dc:type><docNumber>23</docNumber>
<citableAs>Public Law 113–23</citableAs><citableAs>127 Stat. 493</citableAs>
<approvedDate>2013-08-09</approvedDate>
<dc:date>2013-08-09</dc:date>
<dc:publisher>United States Government Publishing Office</dc:publisher><dc:creator>National Archives and Records Administration</dc:creator><dc:creator>Office of the Federal Register</dc:creator><dc:format>text/xml</dc:format><dc:language>EN</dc:language><dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
<processedBy>GPO Locator to USLM Converter 4.15.31;Stage2.20250702</processedBy><processedDate>2026-01-03</processedDate>
<congress>113</congress><publicPrivate>public</publicPrivate>
</meta>
<preface><centerRunningHead>PUBLIC LAW 113–23—AUG. 9, 2013</centerRunningHead>
<page identifier="/us/stat/127/493">127 STAT. 493</page>
<dc:type>Public Law</dc:type><docNumber>113–23</docNumber>
<congress value="113">113th Congress</congress>
</preface>
<main>
<longTitle>
<docTitle class="centered fontsize12" style="-uslm-lc:I658005">An Act</docTitle>
<officialTitle class="indentUp0 firstIndent1 fontsize8" style="-uslm-lc:I658011">To improve hydropower, and for other purposes.<sidenote><p class="centered fontsize8" id="x49f57f45-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658076"><approvedDate date="2013-08-09">Aug. 9, 2013</approvedDate></p><p class="centered fontsize8" id="x49f5a656-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658076">[<ref href="/us/bill/113/hr/267">H.R. 267</ref>]<?GPOvSpace 08?></p></sidenote></officialTitle>
</longTitle>
<enactingFormula style="-uslm-lc:I658120"><i>  Be it enacted by the Senate and House of Representa­tives of the United States of America in Congress assembled,</i></enactingFormula><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f5a657-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Hydropower Regulatory Efficiency Act</p><p class="leftAlign firstIndent0 fontsize8" id="x49f5a658-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">of 2013.</p><p class="leftAlign firstIndent0 fontsize8" id="x49f5a659-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180"><ref href="/us/usc/t16/s791a">16 USC 791a note</ref>.</p></sidenote>
<section id="d385237e94" identifier="/us/pl/113/23/s1" style="-uslm-lc:I658146"><num class="bold" value="1">SECTION 1. </num><heading>SHORT TITLE; TABLE OF CONTENTS.</heading><subsection class="firstIndent0 fontsize10" id="y49f5cd6a-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s1/a" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="a">(a) </num><heading class="fontsize10"><inline class="smallCaps">Short Title</inline>.—</heading><content>This Act may be cited as the “<shortTitle role="act">Hydropower Regulatory Efficiency Act of 2013</shortTitle>”.</content></subsection>
<subsection class="firstIndent0 fontsize10" id="y49f5cd6b-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s1/b" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="b">(b) </num><heading class="fontsize10"><inline class="smallCaps">Table of Contents</inline>.—</heading><content>The table of contents of this Act is as follows:<?GPOvSpace 04?>
<toc>
<referenceItem role="section" style="-uslm-lc:I658242">
<designator>Sec. 1. </designator>
<label>Short title; table of contents.</label>
</referenceItem><referenceItem role="section" style="-uslm-lc:I658242">
<designator>Sec. 2. </designator>
<label>Findings.</label>
</referenceItem><referenceItem role="section" style="-uslm-lc:I658242">
<designator>Sec. 3. </designator>
<label>Promoting small hydroelectric power projects.</label>
</referenceItem><referenceItem role="section" style="-uslm-lc:I658242">
<designator>Sec. 4. </designator>
<label>Promoting conduit hydropower projects.</label>
</referenceItem><referenceItem role="section" style="-uslm-lc:I658242">
<designator>Sec. 5. </designator>
<label>FERC authority to extend preliminary permit periods.</label>
</referenceItem><referenceItem role="section" style="-uslm-lc:I658242">
<designator>Sec. 6. </designator>
<label>Promoting hydropower development at nonpowered dams and closed loop pumped storage projects.</label>
</referenceItem><referenceItem role="section" style="-uslm-lc:I658242">
<designator>Sec. 7. </designator>
<label>DOE study of pumped storage and potential hydropower from conduits.</label>
</referenceItem></toc>
</content></subsection>
</section>
<section id="d385237e162" identifier="/us/pl/113/23/s2" style="-uslm-lc:I658141"><num class="fontsize12" value="2">SEC. 2. </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f5cd6c-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180"><ref href="/us/usc/t16/s791">16 USC 791 note</ref> prec.</p></sidenote><heading>FINDINGS.</heading><chapeau class="indentUp0 firstIndent0 fontsize10" id="x49f5f47d-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658120">  Congress finds that—</chapeau><paragraph class="fontsize10" id="y49f5f47e-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s2/1" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="1">(1) </num><content>the hydropower industry currently employs approximately 300,000 workers across the United States;</content></paragraph>
<paragraph class="fontsize10" id="y49f5f47f-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s2/2" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="2">(2) </num><content>hydropower is the largest source of clean, renewable electricity in the United States;</content></paragraph>
<paragraph class="fontsize10" id="y49f5f480-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s2/3" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="3">(3) </num><chapeau>as of the date of enactment of this Act, hydropower resources, including pumped storage facilities, provide—</chapeau><subparagraph class="fontsize10" id="y49f5f481-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s2/3/A" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="A">(A) </num><content>nearly 7 percent of the electricity generated in the United States; and</content></subparagraph>
<subparagraph class="fontsize10" id="y49f5f482-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s2/3/B" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="B">(B) </num><content>approximately 100,000 megawatts of electric capacity in the United States;</content></subparagraph>
</paragraph>
<paragraph class="fontsize10" id="y49f5f483-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s2/4" role="instruction" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="4">(4) </num><content>only 3 percent of the 80,000 dams in the United States generate electricity, so there is substantial potential for <amendingAction type="add">adding</amendingAction> hydropower generation to nonpowered dams; and</content></paragraph>
<paragraph class="fontsize10" id="y49f5f484-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s2/5" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="5">(5) </num><content>according to one study, by utilizing currently untapped resources, the United States could add approximately 60,000 megawatts of new hydropower capacity by 2025, which could create 700,000 new jobs over the next 13 years.</content></paragraph>
</section>
<section id="d385237e214" identifier="/us/pl/113/23/s3" role="instruction" style="-uslm-lc:I658141"><num class="fontsize12" value="3">SEC. 3. </num><heading>PROMOTING SMALL HYDROELECTRIC POWER PROJECTS.</heading><content style="-uslm-lc:I658120">  Subsection (d) of section 405 of the Public Utility Regulatory Policies Act of 1978 (<ref href="/us/usc/t16/s2705">16 U.S.C. 2705</ref>) <amendingAction type="amend">is amended</amendingAction> by <amendingAction type="delete">striking</amendingAction> “<quotedText>5,000</quotedText>” and <amendingAction type="insert">inserting</amendingAction> “<quotedText>10,000</quotedText>”.<page identifier="/us/stat/127/494">127 STAT. 494</page></content></section>
<section id="d385237e236" identifier="/us/pl/113/23/s4" style="-uslm-lc:I658141"><num class="fontsize12" value="4">SEC. 4. </num><heading>PROMOTING CONDUIT HYDROPOWER PROJECTS.</heading><subsection class="firstIndent0 fontsize10" id="y49f669b5-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s4/a" role="instruction" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="a">(a) </num><heading class="fontsize10"><inline class="smallCaps">Applicability of, and Exemption From, Licensing Requirements</inline>.—</heading><chapeau>Section 30 of the Federal Power Act (<ref href="/us/usc/t16/s823a">16 U.S.C. 823a</ref>) <amendingAction type="amend">is amended</amendingAction>—</chapeau><paragraph class="fontsize10" id="y49f669b6-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s4/a/1" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="1">(1) </num><content>by <amendingAction type="delete">striking</amendingAction> subsections (a) and (b) and <amendingAction type="insert">inserting</amendingAction> the following:<quotedContent><subsection class="indentDown1 firstIndent0 fontsize10" id="y49f6dee7-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="a">“(a)</num><paragraph class="inline" id="y49f6dee8-e887-11f0-bc57-ad3ac4b1618c"><num value="1">(1) </num><content>A qualifying conduit hydropower facility shall not be required to be licensed under this part.</content></paragraph>
<paragraph class="indentUp0 firstIndent0 fontsize10" id="y49f6dee9-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="2">“(2)</num><subparagraph class="inline" id="y49f6deea-e887-11f0-bc57-ad3ac4b1618c"><num value="A">(A) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f6deeb-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Notice.</p></sidenote><content>Any person, State, or municipality proposing to construct a qualifying conduit hydropower facility shall file with the Commission a notice of intent to construct such facility. The notice shall include sufficient information to demonstrate that the facility meets the qualifying criteria.</content></subparagraph>
<subparagraph class="indentUp0 firstIndent0 fontsize10" id="y49f6deec-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="B">“(B) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f6deed-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Deadline.</p></sidenote><chapeau>Not later than 15 days after receipt of a notice of intent filed under subparagraph (A), the Commission shall—</chapeau><clause class="fontsize10" id="y49f6deee-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="i">“(i) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f6deef-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Determination.</p></sidenote><content>make an initial determination as to whether the facility meets the qualifying criteria; and</content></clause>
<clause class="fontsize10" id="y49f6def0-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="ii">“(ii) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f6def1-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Publication.</p><p class="leftAlign firstIndent0 fontsize8" id="x49f6def2-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Public information.</p><p class="leftAlign firstIndent0 fontsize8" id="x49f6def3-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Notice.</p></sidenote><content>if the Commission makes an initial determination, pursuant to clause (i), that the facility meets the qualifying criteria, publish public notice of the notice of intent filed under subparagraph (A).</content></clause>
</subparagraph>
<subparagraph class="indentUp0 firstIndent0 fontsize10" id="y49f6def4-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="C">“(C) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f6def5-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Deadline.</p></sidenote><chapeau>If, not later than 45 days after the date of publication of the public notice described in subparagraph (B)(ii)—</chapeau><clause class="fontsize10" id="y49f6def6-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="i">“(i) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f6def7-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Determination.</p></sidenote><content>an entity contests whether the facility meets the qualifying criteria, the Commission shall promptly issue a written determination as to whether the facility meets such criteria; or</content></clause>
<clause class="fontsize10" id="y49f6def8-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="ii">“(ii) </num><content>no entity contests whether the facility meets the qualifying criteria, the facility shall be deemed to meet such criteria.</content></clause>
</subparagraph>
</paragraph>
<paragraph class="indentUp0 firstIndent0 fontsize10" id="y49f6def9-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="3">“(3) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f6defa-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Definitions.</p></sidenote><chapeau>For purposes of this section:</chapeau><subparagraph class="fontsize10" id="y49f6defb-e887-11f0-bc57-ad3ac4b1618c" role="definitions" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="A">“(A) </num><content>The term ‘<term>conduit</term>’ means any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.</content></subparagraph>
<subparagraph class="fontsize10" id="y49f6defc-e887-11f0-bc57-ad3ac4b1618c" role="definitions" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="B">“(B) </num><content>The term ‘<term>qualifying conduit hydropower facility</term>’ means a facility (not including any dam or other impoundment) that is determined or deemed under paragraph (2)(C) to meet the qualifying criteria.</content></subparagraph>
<subparagraph class="fontsize10" id="y49f6defd-e887-11f0-bc57-ad3ac4b1618c" role="definitions" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="C">“(C) </num><chapeau>The term ‘<term>qualifying criteria</term>’ means, with respect to a facility—</chapeau><clause class="fontsize10" id="y49f6defe-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="i">“(i) </num><content>the facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit;</content></clause>
<clause class="fontsize10" id="y49f6deff-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="ii">“(ii) </num><content>the facility has an installed capacity that does not exceed 5 megawatts; and</content></clause>
<clause class="fontsize10" id="y49f6df00-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="iii">“(iii) </num><content>on or before the date of enactment of the Hydropower Regulatory Efficiency Act of 2013, the facility is not licensed under, or exempted from the license requirements contained in, this part.</content></clause>
</subparagraph>
</paragraph>
</subsection>
<subsection class="indentDown1 firstIndent0 fontsize10" id="y49f6df01-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="b">“(b) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f6df02-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Determination.</p></sidenote><chapeau>Subject to subsection (c), the Commission may grant an exemption in whole or in part from the requirements of this part, including any license requirements contained in this part, to any facility (not including any dam or other impoundment) constructed, operated, or maintained for the generation of electric power which the Commission determines, by rule or order—</chapeau><page identifier="/us/stat/127/495">127 STAT. 495</page>
<paragraph class="fontsize10" id="y49f6df03-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="1">“(1) </num><content>utilizes for such generation only the hydroelectric potential of a conduit; and</content></paragraph>
<paragraph class="fontsize10" id="y49f6df04-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="2">“(2) </num><content>has an installed capacity that does not exceed 40 megawatts.”</content></paragraph>
</subsection>
</quotedContent>;</content></paragraph>
<paragraph class="fontsize10" id="y49f6df05-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s4/a/2" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="2">(2) </num><content>in subsection (c), by <amendingAction type="delete">striking</amendingAction> “<quotedText>subsection (a)</quotedText>” and <amendingAction type="insert">inserting</amendingAction> “<quotedText>subsection (b)</quotedText>”; and</content></paragraph>
<paragraph class="fontsize10" id="y49f6df06-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s4/a/3" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="3">(3) </num><content>in subsection (d), by <amendingAction type="delete">striking</amendingAction> “<quotedText>subsection (a)</quotedText>” and <amendingAction type="insert">inserting</amendingAction> “<quotedText>subsection (b)</quotedText>”.</content></paragraph>
</subsection>
<subsection class="firstIndent0 fontsize10" id="y49f6df07-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s4/b" role="instruction" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="b">(b) </num><heading class="fontsize10"><inline class="smallCaps">Conforming Amendment</inline>.—</heading><content>Subsection (d) of section 405 of the Public Utility Regulatory Policies Act of 1978 (<ref href="/us/usc/t16/s2705">16 U.S.C. 2705</ref>), as amended, is further amended by <amendingAction type="delete">striking</amendingAction> “<quotedText>subsection (a) of such section 30</quotedText>” and <amendingAction type="insert">inserting</amendingAction> “<quotedText>subsection (b) of such section 30</quotedText>”.</content></subsection>
</section>
<section id="d385237e443" identifier="/us/pl/113/23/s5" role="instruction" style="-uslm-lc:I658141"><num class="fontsize12" value="5">SEC. 5. </num><heading>FERC AUTHORITY TO EXTEND PRELIMINARY PERMIT PERIODS.</heading><chapeau class="indentUp0 firstIndent0 fontsize10" id="x49f70618-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658120">  Section 5 of the Federal Power Act (<ref href="/us/usc/t16/s798">16 U.S.C. 798</ref>) <amendingAction type="amend">is amended</amendingAction>—</chapeau><paragraph class="fontsize10" id="y49f70619-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s5/1" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="1">(1) </num><content>by designating the first, second, and third sentences as subsections (a), (c), and (d), respectively; and</content></paragraph>
<paragraph class="fontsize10" id="y49f7061a-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s5/2" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="2">(2) </num><content>by <amendingAction type="insert">inserting</amendingAction> after subsection (a) (as so designated) the following:<quotedContent><subsection class="indentDown1 firstIndent0 fontsize10" id="y49f7061b-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="b">“(b) </num><content>The Commission may extend the period of a preliminary permit once for not more than 2 additional years beyond the 3 years permitted by subsection (a) if the Commission finds that the permittee has carried out activities under such permit in good faith and with reasonable diligence.”</content></subsection>
</quotedContent>.</content></paragraph>
</section>
<section id="d385237e477" identifier="/us/pl/113/23/s6" style="-uslm-lc:I658141"><num class="fontsize12" value="6">SEC. 6. </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f7061c-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180"><ref href="/us/usc/t16/s797">16 USC 797 note</ref>.</p></sidenote><heading>PROMOTING HYDROPOWER DEVELOPMENT AT NONPOWERED DAMS AND CLOSED LOOP PUMPED STORAGE PROJECTS.</heading><subsection class="firstIndent0 fontsize10" id="y49f7c96d-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/a" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="a">(a) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f7c96e-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Time period.</p></sidenote><heading class="fontsize10"><inline class="smallCaps">In General</inline>.—</heading><content>To improve the regulatory process and reduce delays and costs for hydropower development at nonpowered dams and closed loop pumped storage projects, the Federal Energy Regulatory Commission (referred to in this section as the “Commission”) shall investigate the feasibility of the issuance of a license for hydropower development at nonpowered dams and closed loop pumped storage projects in a 2-year period (referred to in this section as a “2-year process”). Such a 2-year process shall include any prefiling licensing process of the Commission.</content></subsection>
<subsection class="firstIndent0 fontsize10" id="y49f7c96f-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/b" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="b">(b) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f7c970-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Deadlines.</p></sidenote><heading class="fontsize10"><inline class="smallCaps">Workshops and Pilots</inline>.—</heading><chapeau>The Commission shall—</chapeau><paragraph class="fontsize10" id="y49f7c971-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/b/1" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="1">(1) </num><content>not later than 60 days after the date of enactment of this Act, hold an initial workshop to solicit public comment and recommendations on how to implement a 2-year process;</content></paragraph>
<paragraph class="fontsize10" id="y49f7c972-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/b/2" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="2">(2) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f7c973-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Criteria.</p></sidenote><content>develop criteria for identifying projects featuring hydropower development at nonpowered dams and closed loop pumped storage projects that may be appropriate for licensing within a 2-year process;</content></paragraph>
<paragraph class="fontsize10" id="y49f7c974-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/b/3" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="3">(3) </num><content>not later than 180 days after the date of enactment of this Act, develop and implement pilot projects to test a 2-year process, if practicable; and</content></paragraph>
<paragraph class="fontsize10" id="y49f7c975-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/b/4" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="4">(4) </num><content>not later than 3 years after the date of implementation of the final pilot project testing a 2-year process, hold a final workshop to solicit public comment on the effectiveness of each tested 2-year process.</content></paragraph>
</subsection>
<subsection class="firstIndent0 fontsize10" id="y49f7c976-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/c" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="c">(c) </num><heading class="fontsize10"><inline class="smallCaps">Memorandum of Understanding</inline>.—</heading><content>The Commission shall, to the extent practicable, enter into a memorandum of understanding with any applicable Federal or State agency to implement a pilot project described in subsection (b).</content></subsection>
<subsection class="firstIndent0 fontsize10" id="y49f7c977-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="d">(d) </num><heading class="fontsize10"><inline class="smallCaps">Reports</inline>.—</heading><page identifier="/us/stat/127/496">127 STAT. 496</page>
<paragraph class="fontsize10" id="y49f7c978-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/1" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="1">(1) </num><sidenote><p class="leftAlign firstIndent0 fontsize8" id="x49f7c979-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658180">Determination.</p></sidenote><heading class="fontsize10"><inline class="smallCaps">Pilot projects not implemented</inline>.—</heading><chapeau>If the Commission determines that no pilot project described in subsection (b) is practicable because no 2-year process is practicable, not later than 240 days after the date of enactment of this Act, the Commission shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that—</chapeau><subparagraph class="fontsize10" id="y49f7c97a-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/1/A" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="A">(A) </num><content>describes the public comments received as part of the initial workshop held under subsection (b)(1); and</content></subparagraph>
<subparagraph class="fontsize10" id="y49f7c97b-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/1/B" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="B">(B) </num><content>identifies the process, legal, environmental, economic, and other issues that justify the determination of the Commission that no 2-year process is practicable, with recommendations on how Congress may address or remedy the identified issues.</content></subparagraph>
</paragraph>
<paragraph class="fontsize10" id="y49f7c97c-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/2" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="2">(2) </num><heading class="fontsize10"><inline class="smallCaps">Pilot projects implemented</inline>.—</heading><chapeau>If the Commission develops and implements pilot projects involving a 2-year process, not later than 60 days after the date of completion of the final workshop held under subsection (b)(4), the Commission shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that—</chapeau><subparagraph class="fontsize10" id="y49f7c97d-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/2/A" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="A">(A) </num><content>describes the outcomes of the pilot projects;</content></subparagraph>
<subparagraph class="fontsize10" id="y49f7c97e-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/2/B" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="B">(B) </num><content>describes the public comments from the final workshop on the effectiveness of each tested 2-year process; and</content></subparagraph>
<subparagraph class="fontsize10" id="y49f7c97f-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/2/C" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="C">(C)</num><clause class="inline" id="y49f7c980-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/2/C/i"><num value="i">(i) </num><content>outlines how the Commission will adopt policies under existing law (including regulations) that result in a 2-year process for appropriate projects;</content></clause>
<clause class="indentUp0 fontsize10" id="y49f7c981-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/2/C/ii" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="ii">(ii) </num><content>outlines how the Commission will issue new regulations to adopt a 2-year process for appropriate projects; or</content></clause>
<clause class="indentUp0 fontsize10" id="y49f7c982-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s6/d/2/C/iii" style="-uslm-lc:I658124"><num class="fontsize10" style="-uslm-lc:emspace2" value="iii">(iii) </num><content>identifies the process, legal, environmental, economic, and other issues that justify a determination of the Commission that no 2-year process is practicable, with recommendations on how Congress may address or remedy the identified issues.</content></clause>
</subparagraph>
</paragraph>
</subsection>
</section>
<section id="d385237e614" identifier="/us/pl/113/23/s7" style="-uslm-lc:I658141"><num class="fontsize12" value="7">SEC. 7. </num><heading>DOE STUDY OF PUMPED STORAGE AND POTENTIAL HYDROPOWER FROM CONDUITS.</heading><subsection class="firstIndent0 fontsize10" id="y49f817a3-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s7/a" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="a">(a) </num><heading class="fontsize10"><inline class="smallCaps">In General</inline>.—</heading><chapeau>The Secretary of Energy shall conduct a study—</chapeau><paragraph class="fontsize10" id="y49f817a4-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s7/a/1" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="1">(1)</num><subparagraph class="inline" id="y49f817a5-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s7/a/1/A"><num value="A">(A) </num><content>of the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such existing facilities to be upgraded or retrofitted with advanced commercially available technology; and</content></subparagraph>
<subparagraph class="indentUp0 fontsize10" id="y49f817a6-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s7/a/1/B" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="B">(B) </num><content>of the technical potential of existing pumped storage facilities and new advanced pumped storage facilities, to provide grid reliability benefits; and</content></subparagraph>
</paragraph>
<paragraph class="fontsize10" id="y49f817a7-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s7/a/2" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="2">(2)</num><subparagraph class="inline" id="y49f817a8-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s7/a/2/A"><num value="A">(A) </num><content>to identify the range of opportunities for hydropower that may be obtained from conduits (as defined by the Secretary) in the United States; and</content></subparagraph>
<subparagraph class="indentUp0 fontsize10" id="y49f817a9-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s7/a/2/B" style="-uslm-lc:I658122"><num class="fontsize10" style="-uslm-lc:emspace2" value="B">(B) </num><content>through case studies, to assess amounts of potential energy generation from such conduit hydropower projects.</content></subparagraph>
</paragraph>
</subsection>
<subsection class="firstIndent0 fontsize10" id="y49f817aa-e887-11f0-bc57-ad3ac4b1618c" identifier="/us/pl/113/23/s7/b" style="-uslm-lc:I658120"><num class="fontsize10" style="-uslm-lc:emspace2" value="b">(b) </num><heading class="fontsize10"><inline class="smallCaps">Report</inline>.—</heading><content>Not later than 1 year after the date of enactment of this Act, the Secretary of Energy shall submit to the Committee <page identifier="/us/stat/127/497">127 STAT. 497</page>
on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that describes the results of the study conducted under subsection (a), including any recommendations.</content></subsection>
</section>
<action>
<actionDescription style="-uslm-lc:I658030">Approved</actionDescription> <date date="2013-08-09">August 9, 2013</date>.</action>
</main>
<legislativeHistory>
<heading style="-uslm-lc:I658031"><inline class="underline">LEGISLATIVE HISTORY</inline>—<ref href="/us/bill/113/hr/267">H.R. 267</ref>:</heading>
<note>
<headingText style="-uslm-lc:I658032">HOUSE REPORTS:</headingText> ┐No. <ref href="/us/hrpt/113/6">113–6</ref> (<committee>Comm. on Energy and Commerce</committee>).
</note>
<note>
<headingText style="-uslm-lc:I658032">SENATE REPORTS:</headingText> ┐No. <ref href="/us/srpt/113/38">113–38</ref> (<committee>Comm. on Energy and Natural Resources</committee>).
</note>
<note>
<heading style="-uslm-lc:I658032">CONGRESSIONAL RECORD, Vol. 159 (2013):</heading>
<p class="indentUp4 firstIndent-1" id="x49f817ab-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658035">Feb. 12, 13, considered and passed House.</p><p class="indentUp4 firstIndent-1" id="x49f817ac-e887-11f0-bc57-ad3ac4b1618c" style="-uslm-lc:I658035">Aug. 1, considered and passed Senate.</p></note>
</legislativeHistory>
<endMarker>○</endMarker>
</pLaw>