<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/css" href="uslm.css"?><statuteCompilation xmlns="http://schemas.gpo.gov/xml/uslm" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:gpo="http://www.gpo.gov/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://schemas.gpo.gov/xml/uslm https://www.govinfo.gov/schemas/xml/uslm/uslm-2.0.10.xsd" xml:lang="en" style="-uslm-dtd:statute">
    <meta style="-uslm-dtd:compilation-act-form">
        <dc:title>NATURAL GAS ACT</dc:title>
        <citableAs>Public Law 556, as amended</citableAs>
        <citableAsShortTitle>NATURAL GAS ACT</citableAsShortTitle>
        <docNumber>ch556</docNumber>
        <currentThroughPublicLaw>109–58</currentThroughPublicLaw>
        <dc:type>Statute Compilation</dc:type>
        <dc:creator>United States House of Representatives</dc:creator>
        <dc:creator>Office of the Legislative Counsel</dc:creator>
        <dc:format>text/xml</dc:format>
        <dc:language>EN</dc:language>
        <dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
        <processedBy>GPO Statute Compilations USLM converter, version 20210527.1</processedBy>
        <processedDate>2021-10-15</processedDate>
        <containsShortTitle>Natural Gas Act</containsShortTitle>
        <property role="fileId">868</property>
        <congress>75</congress>
        <approvedDate>1938-06-21</approvedDate>
    </meta>
    <preface style="-uslm-dtd:compilation-act-form">
        <property style="-uslm-dtd:comp-short-title" role="compShortTitle">NATURAL GAS ACT</property>
        <citationNote style="-uslm-dtd:public-law">[The Act of <date date="1938-06-21">June 21, 1938</date>, Chapter 556; 75th Congress]</citationNote>
        <editionNote style="-uslm-dtd:updated-through-note">[As Amended Through <currentThroughPublicLaw>P.L. 109–58</currentThroughPublicLaw>, Enacted <date date="2005-08-08">August 8, 2005</date>]</editionNote>
        <explanationNote style="-uslm-dtd:explanatory-note"><b>[</b>Currency: This publication is a compilation of the text of Chapter 556 of the 75th Congress. It was last amended by the public law listed in the As Amended Through note above and below at the bottom of each page of the pdf version and reflects current law through the date of the enactment of the public law listed at https://www.govinfo.gov/app/collection/comps/<b>]</b></explanationNote>
        <explanationNote style="-uslm-dtd:explanatory-note"><b>[</b>Note: While this publication does  not represent an official version of any Federal statute, substantial efforts have been made to ensure the accuracy of its contents. The official version of Federal law is found in the United States Statutes at Large and in the United States Code. The legal effect to be given to the Statutes at Large and the United States Code is established by statute (1 U.S.C. 112, 204).<b>]</b></explanationNote>
    </preface>
    <main style="-uslm-dtd:legis-body"><longTitle><docTitle style="-uslm-dtd:legis-type">AN ACT</docTitle><officialTitle style="-uslm-dtd:official-title">To regulate the transportation and sale of natural gas in interstate commerce, and for other purposes.</officialTitle></longTitle><enactingFormula style="-uslm-dtd:enacting-clause">Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,</enactingFormula>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s1" styleType="traditional">
            <heading style="-uslm-dtd:header">necessity for regulation of natural gas companies </heading>
            <num style="-uslm-dtd:enum" value="1">Section 1. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s1/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">As disclosed in reports of the Federal Trade Commission made pursuant to Senate Resolution 83 (Seventieth Congress, first session) and other reports made pursuant to the authority of Congress, it is hereby declared that the business of transporting and selling natural gas for ultimate distribution to the public is affected with a public interest, and that Federal regulation in matters relating to the transportation of natural gas and the sale thereof in interstate and foreign commerce is necessary in the public interest.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s1/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">The provisions of this Act shall apply to the transportation of natural gas in interstate commerce, to the sale in interstate commerce of natural gas for resale for ultimate public consumption for domestic, commercial, industrial, or any other use, and to natural gas companies engaged in such transportation or sale, and to the importation or exportation of natural gas in foreign commerce and to persons engaged in such importation or exportation, but shall not apply to any other transportation or sale of natural gas or to the local distribution of natural gas or to the facilities used for such distribution or to the production or gathering of natural gas.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s1/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">The provisions of this Act shall not apply to any person engaged in or legally authorized to engage in the transportation in interstate commerce or the sale in interstate commerce for resale, of natural gas received by such person from another person within or at the boundary of a State if all the natural gas so received is ultimately consumed within such State, or to any facilities used by such person for such transportation or sale, provided that the rates and service of such person and facilities be subject to regulation by a State commission. The matters exempted from the provisions of this Act by this subsection are hereby declared to be matters primarily of local concern and subject to regulation by the several States. A certification from such State commission to the Federal Power Commission that such State commission has regulatory jurisdiction over rates and service of such person and facilities and is exercising such jurisdiction shall constitute conclusive evidence of such regulatory power or jurisdiction.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s1/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><chapeau style="-uslm-dtd:text">The provisions of this Act shall not apply to any person solely by reason of, or with respect to, any sale or transportation of vehicular natural gas if such person is—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s1/d/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">not otherwise a natural-gas company; or</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s1/d/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">subject primarily to regulation by a State commission, whether or not such State commission has, or is exercising, jurisdiction over the sale, sale for resale, or transportation of vehicular natural gas.</content>
                </paragraph>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717">15 U.S.C. 717</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s2" styleType="traditional-inline">
            <num style="-uslm-dtd:enum" value="2">Sec. 2. </num><chapeau style="-uslm-dtd:text">When used in this Act, unless the context otherwise requires—</chapeau>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/1" styleType="OLC">
                <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">Person</term>” includes an individual or a corporation.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/2" styleType="OLC">
                <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">Corporation</term>” includes any corporation, joint stock company, partnership, association, business trust, organized group of persons, whether incorporated or not, receiver or receivers, trustee or trustees of any of the foregoing, but shall not include municipalities as hereinafter defined.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/3" styleType="OLC">
                <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">Municipality</term>” means a city, county, or other political subdivision or agency of a State.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/4" styleType="OLC">
                <num style="-uslm-dtd:enum" value="4">(4) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">State</term>” means a State admitted to the Union, the District of Columbia, and any organized Territory of the United States.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/5" styleType="OLC">
                <num style="-uslm-dtd:enum" value="5">(5) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">Natural gas</term>” means either natural gas unmixed, or any mixture of natural and artificial gas.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/6" styleType="OLC">
                <num style="-uslm-dtd:enum" value="6">(6) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">Natural-gas company</term>” means a person engaged in the transportation of natural gas in interstate commerce, or the sale in interstate commerce of such gas for resale.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/7" styleType="OLC">
                <num style="-uslm-dtd:enum" value="7">(7) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">Interstate commerce</term>” means commerce between any point in a State and any point outside thereof, or between points within the same State but through any place outside thereof, but only insofar as such commerce takes place within the United States.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/8" styleType="OLC">
                <num style="-uslm-dtd:enum" value="8">(8) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">State commission</term>” means the regulatory body of the State or municipality having jurisdiction to regulate rates and charges for the sale of natural gas to consumers within the State or municipality.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/9" styleType="OLC">
                <num style="-uslm-dtd:enum" value="9">(9) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">Commission</term>” and “<quotedText style="-uslm-dtd:quote">Commissioner</quotedText>” means the Federal Power Commission, and a member thereof, respectively.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/10" styleType="OLC">
                <num style="-uslm-dtd:enum" value="10">(10) </num><content style="-uslm-dtd:text">“<term style="-uslm-dtd:term">Vehicular natural gas</term>” means natural gas that is ultimately used as a fuel in a self-propelled vehicle.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s2/11" styleType="OLC">
                <num style="-uslm-dtd:enum" value="11">(11) </num><chapeau style="-uslm-dtd:text">“<term style="-uslm-dtd:term">LNG terminal</term>” includes all natural gas facilities located onshore or in State waters that are used to receive, unload, load, store, transport, gasify, liquefy, or process natural gas that is imported to the United States from a foreign country, exported to a foreign country from the United States, or transported in interstate commerce by waterborne vessel, but does not include—</chapeau>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s2/11/A" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">waterborne vessels used to deliver natural gas to or from any such facility; or</content>
                </subparagraph>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s2/11/B" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">any pipeline or storage facility subject to the jurisdiction of the Commission under section 7.</content>
                </subparagraph>
            </paragraph><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717a">15 U.S.C. 717a</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s3" styleType="traditional">
            <heading style="-uslm-dtd:header">exportation or importation of natural gas; lng terminals </heading>
            <num style="-uslm-dtd:enum" value="3">Sec. 3. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">After six months from the date on which this act takes effect no person shall export any natural gas from the United States to a foreign country or import any natural gas from a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application, unless, after opportunity for hearing, it finds that the proposed exportation or importation will not be consistent with the public interest. The Commission may by its order grant such application, in whole or in part, with such modification and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing, and for good cause shown, make such supplemental order in the premises as it may find necessary or appropriate.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><chapeau style="-uslm-dtd:text">With respect to natural gas which is imported into the United States from a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas, and with respect to liquefied natural gas—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/b/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">the importation of such natural gas shall be treated as a “<quotedText style="-uslm-dtd:quote">first sale</quotedText>” within the meaning of section 2(21) of the Natural Gas Policy Act of 1978; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/b/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">the Commission shall not, on the basis of national origin, treat any such imported natural gas on an unjust, unreasonable, unduly discriminatory, or preferential basis.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">For purposes of subsection (a), the importation of the natural gas referred to in subsection (b), or the exportation of natural gas to a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas, shall be deemed to be consistent with the public interest, and applications for such importation or exportation shall be granted without modification or delay.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><chapeau style="-uslm-dtd:text">Except as specifically provided in this Act, nothing in this Act affects the rights of States under—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/d/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.);</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/d/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">the Clean Air Act (42 U.S.C. 7401 et seq.); or</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/d/3" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.).</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3/e" styleType="OLC">
                <num style="-uslm-dtd:enum" value="e">(e)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/e/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">The Commission shall have the exclusive authority to approve or deny an application for the siting, construction, expansion, or operation of an LNG terminal. Except as specifically provided in this Act, nothing in this Act is intended to affect otherwise applicable law related to any Federal agency's authorities or responsibilities related to LNG terminals.</content></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/e/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><chapeau style="-uslm-dtd:text">Upon the filing of any application to site, construct, expand, or operate an LNG terminal, the Commission shall—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3/e/2/A" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">set the matter for hearing;</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3/e/2/B" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">give reasonable notice of the hearing to all interested persons, including the State commission of the State in which the LNG terminal is located and, if not the same, the Governor-appointed State agency described in section 3A;</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3/e/2/C" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="C">(C) </num><content style="-uslm-dtd:text">decide the matter in accordance with this subsection; and</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3/e/2/D" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="D">(D) </num><content style="-uslm-dtd:text">issue or deny the appropriate order accordingly.</content>
                    </subparagraph>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/e/3" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="3">(3)</num><subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3/e/3/A" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">Except as provided in subparagraph (B), the Commission may approve an application described in paragraph (2), in whole or part, with such modifications and upon such terms and conditions as the Commission find necessary or appropriate.</content></subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3/e/3/B" styleType="OLC" class="leftIndentDecrease2">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><chapeau style="-uslm-dtd:text">Before January 1, 2015, the Commission shall not—</chapeau>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/75/556/s3/e/3/B/i" styleType="OLC" class="leftIndentDecrease2">
                            <num style="-uslm-dtd:enum" value="i">(i) </num><content style="-uslm-dtd:text">deny an application solely on the basis that the applicant proposes to use the LNG terminal exclusively or partially for gas that the applicant or an affiliate of the applicant will supply to the facility; or</content>
                        </clause>
                        <clause style="-uslm-dtd:clause" identifier="/us/sComp/75/556/s3/e/3/B/ii" styleType="OLC" class="leftIndentDecrease2">
                            <num style="-uslm-dtd:enum" value="ii">(ii) </num><chapeau style="-uslm-dtd:text">condition an order on—</chapeau>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/75/556/s3/e/3/B/ii/I" styleType="OLC" class="leftIndentDecrease2">
                                <num style="-uslm-dtd:enum" value="I">(I) </num><content style="-uslm-dtd:text">a requirement that the LNG terminal offer service to customers other than the applicant, or any affiliate of the applicant, securing the order;</content>
                            </subclause>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/75/556/s3/e/3/B/ii/II" styleType="OLC" class="leftIndentDecrease2">
                                <num style="-uslm-dtd:enum" value="II">(II) </num><content style="-uslm-dtd:text">any regulation of the rates, charges, terms, or conditions of service of the LNG terminal; or</content>
                            </subclause>
                            <subclause style="-uslm-dtd:subclause" identifier="/us/sComp/75/556/s3/e/3/B/ii/III" styleType="OLC" class="leftIndentDecrease2">
                                <num style="-uslm-dtd:enum" value="III">(III) </num><content style="-uslm-dtd:text">a requirement to file with the Commission schedules or contracts related to the rates, charges, terms, or conditions of service of the LNG terminal.</content>
                            </subclause>
                        </clause>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3/e/3/C" styleType="OLC" class="leftIndentDecrease2">
                        <num style="-uslm-dtd:enum" value="C">(C) </num><content style="-uslm-dtd:text">Subparagraph (B) shall cease to have effect on January 1, 2030.</content>
                    </subparagraph>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/e/4" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="4">(4) </num><content style="-uslm-dtd:text">An order issued for an LNG terminal that also offers service to customers on an open access basis shall not result in subsidization of expansion capacity by existing customers, degradation of service to existing customers, or undue discrimination against existing customers as to their terms or conditions of service at the facility, as all of those terms are defined by the Commission.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3/f" styleType="OLC">
                <num style="-uslm-dtd:enum" value="f">(f)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/f/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><chapeau style="-uslm-dtd:text">In this subsection, the term “<term style="-uslm-dtd:term">military installation</term>”—</chapeau>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3/f/1/A" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">means a base, camp, post, range, station, yard, center, or homeport facility for any ship or other activity under the jurisdiction of the Department of Defense, including any leased facility, that is located within a State, the District of Columbia, or any territory of the United States; and</content>
                </subparagraph>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3/f/1/B" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">does not include any facility used primarily for civil works, rivers and harbors projects, or flood control projects, as determined by the Secretary of Defense.</content>
                </subparagraph></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/f/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">The Commission shall enter into a memorandum of understanding with the Secretary of Defense for the purpose of ensuring that the Commission coordinate and consult with the Secretary of Defense on the siting, construction, expansion, or operation of liquefied natural gas facilities that may affect an active military installation.</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3/f/3" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">The Commission shall obtain the concurrence of the Secretary of Defense before authorizing the siting, construction, expansion, or operation of liquefied natural gas facilities affecting the training or activities of an active military installation.</content>
                </paragraph>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717b">15 U.S.C. 717b</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s3A" styleType="traditional">
            <heading style="-uslm-dtd:header">STATE AND LOCAL SAFETY CONSIDERATIONS </heading>
            <num style="-uslm-dtd:enum" value="3A">Sec. 3A. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3A/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">The Commission shall promulgate regulations on the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) pre-filing process within 60 days after the date of enactment of this section. An applicant shall comply with pre-filing process required under the National Environmental Policy Act of 1969 prior to filing an application with the Commission. The regulations shall require that the pre-filing process commence at least 6 months prior to the filing of an application for authorization to construct an LNG terminal and encourage applicants to cooperate with State and local officials.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3A/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><chapeau style="-uslm-dtd:text">The Governor of a State in which an LNG terminal is proposed to be located shall designate the appropriate State agency for the purposes of consulting with the Commission regarding an application under section 3. The Commission shall consult with such State agency regarding State and local safety considerations prior to issuing an order pursuant to section 3. For the purposes of this section, State and local safety considerations include—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3A/b/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">the kind and use of the facility;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3A/b/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">the existing and projected population and demographic characteristics of the location;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3A/b/3" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">the existing and proposed land use near the location;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3A/b/4" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="4">(4) </num><content style="-uslm-dtd:text">the natural and physical aspects of the location;</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3A/b/5" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="5">(5) </num><content style="-uslm-dtd:text">the emergency response capabilities near the facility location; and</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3A/b/6" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="6">(6) </num><content style="-uslm-dtd:text">the need to encourage remote siting.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3A/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">The State agency may furnish an advisory report on State and local safety considerations to the Commission with respect to an application no later than 30 days after the application was filed with the Commission. Before issuing an order authorizing an applicant to site, construct, expand, or operate an LNG terminal, the Commission shall review and respond specifically to the issues raised by the State agency described in subsection (b) in the advisory report. This subsection shall apply to any application filed after the date of enactment of the Energy Policy Act of 2005. A State agency has 30 days after such date of enactment to file an advisory report related to any applications pending at the Commission as of such date of enactment.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3A/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><content style="-uslm-dtd:text">The State commission of the State in which an LNG terminal is located may, after the terminal is operational, conduct safety inspections in conformance with Federal regulations and guidelines with respect to the LNG terminal upon written notice to the Commission. The State commission may notify the Commission of any alleged safety violations. The Commission shall transmit information regarding such allegations to the appropriate Federal agency, which shall take appropriate action and notify the State commission.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s3A/e" styleType="OLC">
                <num style="-uslm-dtd:enum" value="e">(e)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3A/e/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">In any order authorizing an LNG terminal the Commission shall require the LNG terminal operator to develop an Emergency Response Plan. The Emergency Response Plan shall be prepared in consultation with the United States Coast Guard and State and local agencies and be approved by the Commission prior to any final approval to begin construction. The Plan shall include a cost-sharing plan.</content></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s3A/e/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><chapeau style="-uslm-dtd:text">A cost-sharing plan developed under paragraph (1) shall include a description of any direct cost reimbursements that the applicant agrees to provide to any State and local agencies with responsibility for security and safety—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3A/e/2/A" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">at the LNG terminal; and</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s3A/e/2/B" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">in proximity to vessels that serve the facility.</content>
                    </subparagraph>
                </paragraph>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717b–1">15 U.S.C. 717b–1</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s4" styleType="traditional">
            <heading style="-uslm-dtd:header">rates and charges; schedules; suspension of new rates </heading>
            <num style="-uslm-dtd:enum" value="4">Sec. 4. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s4/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">All rates and charges made, demanded, or received by any natural-gas company for or in connection with the transportation or sale of natural gas subject to the jurisdiction of the Commission, and all rules and regulations affecting or pertaining to such rates or charges, shall be just and reasonable, and any such rate or charge that is not just and reasonable is hereby declared to be unlawful.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s4/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><chapeau style="-uslm-dtd:text">No natural-gas company shall, with respect to any transportation or sale of natural gas subject to the jurisdiction of the Commission,</chapeau><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s4/b/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1"> (1) </num><content style="-uslm-dtd:text">make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage, or</content></paragraph><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s4/b/2" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="2"> (2) </num><content style="-uslm-dtd:text">maintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, either as between localities or as between classes of service.</content></paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s4/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">Under such rules and regulations as the Commission may prescribe, every natural-gas company shall file with the Commission, within such time (not less than sixty days from the date this act takes effect) and in such form as the Commission may designate, and shall keep open in convenient form and place for public inspection, schedules showing all rates and charges for any transportation or sale subject to the jurisdiction of the Commission, and the classifications, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s4/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><content style="-uslm-dtd:text">Unless the Commission otherwise orders, no change shall be made by any natural-gas company in any such rate, charge, classification, or service, or in any rule, regulations, or contract relating thereto, except after thirty days' notice to the Commission and to the public. Such notice shall be given by filing with the Commission and keeping open for public inspection new schedules stating plainly the change or changes to be made in the schedule or schedules then in force and the time when the change or changes will go into effect. The Commission, for good cause shown, may allow changes to take effect without requiring the thirty days' notice herein provided for by an order specifying the changes so to be made and the time when they shall take effect and the manner in which they shall be filed and published.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s4/e" styleType="OLC">
                <num style="-uslm-dtd:enum" value="e">(e) </num><content style="-uslm-dtd:text">Whenever any such new schedule is filed the Commission shall have authority, either upon complaint of any State, municipality, State commission, or gas distributing company or upon its own initiative without complaint, at once, and if it so orders, without answer or formal pleading by the natural-gas company, but upon reasonable notice, to enter upon a hearing concerning the lawfulness of such rate, charge, classification, or service; and, pending such hearing and the decision thereon, the Commission, upon filing with such schedules and delivering to the natural-gas company affected thereby a statement in writing of its reasons for such suspension, may suspend the operation of such schedule and defer the use of such rate, charge, classification, or service, but not for a longer period than five months beyond the time when it would otherwise go into effect; and after full hearings, either completed before or after the rate, charge, classification, or service goes into effect, the Commission may make such orders with reference thereto as would be proper in a proceeding initiated after it had become effective. If the proceeding has not been concluded and an order made at the expiration of the suspension period, on motion of the natural-gas company making the filing, the proposed change of rate, charge, classification, or service shall go into effect. Where increased rates or charges are thus made effective, the Commission may, by order, require the natural-gas company to furnish a bond, to be approved by the Commission, to refund any amounts ordered by the Commission, to keep accurate accounts in detail of all amounts received by reason of such increase, specifying by whom and in whose behalf such amounts were paid, and, upon completion of the hearing and decision, to order such natural-gas company to refund, with interest, the portion of such increased rates or charges by its decision found not justified. At any hearing involving a rate or charge sought to be increased, the burden of proof to show that the increased rate or charge is just and reasonable shall be upon the natural-gas company, and the Commission shall give to the hearing and decision of such questions preference over other questions pending before it and decide the same as speedily as possible.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s4/f" styleType="OLC">
                <num style="-uslm-dtd:enum" value="f">(f)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s4/f/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><chapeau style="-uslm-dtd:text">In exercising its authority under this Act or the Natural Gas Policy Act of 1978 (15 U.S.C. 3301 et seq.), the Commission may authorize a natural gas company (or any person that will be a natural gas company on completion of any proposed construction) to provide storage and storage-related services at market-based rates for new storage capacity related to a specific facility placed in service after the date of enactment of the Energy Policy Act of 2005, notwithstanding the fact that the company is unable to demonstrate that the company lacks market power, if the Commission determines that—</chapeau>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s4/f/1/A" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">market-based rates are in the public interest and necessary to encourage the construction of the storage capacity in the area needing storage services; and</content>
                </subparagraph>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s4/f/1/B" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">customers are adequately protected.</content>
                </subparagraph></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s4/f/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">The Commission shall ensure that reasonable terms and conditions are in place to protect consumers.</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s4/f/3" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><content style="-uslm-dtd:text">If the Commission authorizes a natural gas company to charge market-based rates under this subsection, the Commission shall review periodically whether the market-based rate is just, reasonable, and not unduly discriminatory or preferential.</content>
                </paragraph>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717c">15 U.S.C. 717c</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s4A" styleType="traditional">
            <heading style="-uslm-dtd:header">PROHIBITION ON MARKET MANIPULATION </heading>
            <num style="-uslm-dtd:enum" value="4A">Sec. 4A. </num><content style="-uslm-dtd:text">It shall be unlawful for any entity, directly or indirectly, to use or employ, in connection with the purchase or sale of natural gas or the purchase or sale of transportation services subject to the jurisdiction of the Commission, any manipulative or deceptive device or contrivance (as those terms are used in section 10(b) of the Securities Exchange Act of 1934 (15 U.S.C. 78j(b))) in contravention of such rules and regulations as the Commission may prescribe as necessary in the public interest or for the protection of natural gas ratepayers. Nothing in this section shall be construed to create a private right of action.</content><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717c–1">15 U.S.C. 717c–1</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s5" styleType="traditional">
            <heading style="-uslm-dtd:header">fixing rate and charges; determination of cost of production or transportation </heading>
            <num style="-uslm-dtd:enum" value="5">Sec. 5. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s5/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">Whenever the Commission, after a hearing had upon its own motion or upon complaint of any State, municipality, State commission, or gas distributing company, shall find that any rate, charge, or classification demanded, observed, charged, or collected by any natural-gas company in connection with any transportation or sale of natural gas, subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affecting such rate, charge, or classification is unjust, unreasonable, unduly discriminatory, or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order: <i style="-uslm-dtd:italic">Provided, however, </i>That the Commission shall have no power to order any increase in any rate contained in the currently effective schedule of such natural-gas company on file with the Commission, unless such increase is in accordance with a new schedule filed by such natural-gas company; but the Commission may order a decrease where existing rates are unjust, unduly discriminatory, preferential, otherwise unlawful, or are not the lowest reasonable rates.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s5/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">The Commission upon its own motion, or upon the request of any State commission, whenever it can do so without prejudice to the efficient and proper conduct of its affairs, may investigate and determine the cost of the production or transportation of natural gas by a natural-gas company in cases where the Commission has no authority to establish a rate governing the transportation or sale of such natural gas.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717d">15 U.S.C. 717d</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s6" styleType="traditional">
            <heading style="-uslm-dtd:header">ascertainment of cost of property </heading>
            <num style="-uslm-dtd:enum" value="6">Sec. 6. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s6/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">The Commission may investigate and ascertain the actual legitimate cost of the property of every natural-gas company, the depreciation therein, and, when found necessary for rate-making purposes, other facts which bear on the determination of such cost or depreciation and the fair value of such property.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s6/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">Every natural-gas company upon request shall file with the Commission an inventory of all or any part of its property and a statement of the original cost thereof, and shall keep the Commission informed regarding the cost of all additions, betterments, extensions, and new construction.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717e">15 U.S.C. 717e</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s7" styleType="traditional">
            <heading style="-uslm-dtd:header">extension of facilities; abandonment of service </heading>
            <num style="-uslm-dtd:enum" value="7">Sec. 7. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s7/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">Whenever the Commission, after notice and opportunity for hearing, finds such action necessary or desirable in the public interest, it may by order direct a natural-gas company to extend or improve its transportation facilities, to establish physical connection of its transportation facilities with the facilities of, and sell natural gas to, any person or municipality engaged or legally authorized to engage in the local distribution of natural or artificial gas to the public, and for such purpose to extend its transportation facilities to communities immediately adjacent to such facilities or to territory served by such natural-gas company, if the Commission finds that no undue burden will be placed upon such natural-gas company thereby: <i style="-uslm-dtd:italic">Provided, </i>That the Commission shall have no authority to compel the enlargement of transportation facilities for such purposes, or to compel such natural-gas company to establish physical connection or sell natural gas when to do so would impair its ability to render adequate service to its customers.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s7/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">No natural-gas company shall abandon all or any portion of its facilities subject to the jurisdiction of the Commission, or any service rendered by means of such facilities, without the permission and approval of the Commission first had and obtained, after due hearing, and a finding by the Commission that the available supply of natural gas is depleted to the extent that the continuance of service is unwarranted, or that the present or future public convenience or necessity permit such abandonment.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s7/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s7/c/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1)</num><subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s7/c/1/A" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">No natural-gas company or person which will be a natural-gas company upon completion of any proposed construction or extension shall engage in the transportation or sale of natural gas, subject to the jurisdiction of the Commission, or undertake the construction or extension of any facilities therefor, or acquire or operate any such facilities or extensions thereof, unless there is in force with respect to such natural-gas company a certificate of public convenience and necessity issued by the Commission authorizing such acts or operations: <i style="-uslm-dtd:italic">Provided, however, </i>That if any such natural-gas company or predecessor in interest was bona fide engaged in transportation or sale of natural gas, subject to the jurisdiction of the Commission, on the effective date of this amendatory Act, over the route or routes or within the area for which application is made and has so operated since that time, the Commission shall issue such certificate without requiring further proof that public convenience and necessity will be served by such operation, and without further proceedings, if application for such certificate is made to the Commission within ninety days after the effective date of this amendatory Act. Pending the determination of any such application, the continuance of such operation shall be lawful.</content></subparagraph>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s7/c/1/B" styleType="OLC" class="leftIndentDecrease2">
                    <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">In all other cases the Commission shall set the matter for hearing and shall give such reasonable notice of the hearing thereon to all interested persons as in its judgment may be necessary under rules and regulations to be prescribed by the Commission; and the application shall be decided in accordance with the procedure provided in subsection (e) of this section and such certificate shall be issued or denied accordingly: <i style="-uslm-dtd:italic">Provided, however, </i>That the Commission may issue a temporary certificate in cases of emergency, to assure maintenance of adequate service or to serve particular customers, without notice or hearing, pending the determination of an application for a certificate, and may by regulation exempt from the requirements of this section temporary acts or operations for which the issuance of a certificate will not be required in the public interest.</content>
                </subparagraph></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s7/c/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><chapeau style="-uslm-dtd:text">The Commission may issue a certificate of public convenience and necessity to a natural-gas company for the transportation in interstate commerce of natural gas used by any person for one or more high-priority uses, as defined, by rule, by the Commission, in the case of—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s7/c/2/A" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">natural gas sold by the producer to such person; and</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s7/c/2/B" styleType="OLC" class="leftIndentDecrease1">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">natural gas produced by such person.</content>
                    </subparagraph>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s7/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><content style="-uslm-dtd:text">Application for certificates shall be made in writing to the Commission, be verified under oath, and shall be in such form, contain such information, and notice thereof shall be served upon such interested parties and in such manner as the Commission shall, by regulation, require.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s7/e" styleType="OLC">
                <num style="-uslm-dtd:enum" value="e">(e) </num><content style="-uslm-dtd:text">Except in the cases governed by the provisos contained in subsection (c)(1) of this section, a certificate shall be issued to any qualified applicant therefor, authorizing the whole or any part of the operation, sale, service, construction, extension, or acquisition covered by the application, if it is found that the applicant is able and willing properly to do the acts and to perform the service proposed and to conform to the provisions of the Act and the requirements, rules, and regulations of the Commission thereunder, and that the proposed service, sale, operation, construction, extension, or acquisition, to the extent authorized by the certificate, is or will be required by the present or future public convenience and necessity; otherwise such application shall be denied. The Commission shall have the power to attach to the issuance of the certificate and to the exercise of the rights granted thereunder such reasonable terms and conditions as the public convenience and necessity may require.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s7/f" styleType="OLC">
                <num style="-uslm-dtd:enum" value="f">(f)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s7/f/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">The Commission, after a hearing had upon its own motion or upon application, may determine the service areas to which each authorization under this section is to be limited. Within such service area as determined by the Commission a natural-gas company may enlarge or extend its facilities for the purpose of supplying increased market demands in such service area without further authorization; and</content></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s7/f/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">If the Commission has determined a service area pursuant to this subsection, transportation to ultimate consumers in such service area by the holder of such service area determination, even if across State lines, shall be subject to the exclusive jurisdiction of the State commission in the State in which the gas is consumed. This section shall not apply to the transportation of natural gas to another natural gas company.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s7/g" styleType="OLC">
                <num style="-uslm-dtd:enum" value="g">(g) </num><content style="-uslm-dtd:text">Nothing contained in this section shall be construed as a limitation upon the power of the Commission to grant certificates of public convenience and necessity for service of an area already being served by another natural-gas company.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s7/h" styleType="OLC">
                <num style="-uslm-dtd:enum" value="h">(h) </num><content style="-uslm-dtd:text">When any holder of a certificate of public convenience and necessity cannot acquire by contract, or is unable to agree with the owner of property to the compensation to be paid for, the necessity right-of-way to construct, operate, and maintain a pipe line or pipe lines for the transportation of natural gas, and the necessary land or other property, in addition to right-of-way, for the location of compressor stations, pressure apparatus, or other stations or equipment necessary to the proper operation of such pipe line or pipe lines, it may acquire the same by the exercise of the right of eminent domain in the district court of the United States for the district in which such property may be located, or in the State courts. The practice and procedure in any action or proceeding for that purpose in the district court of the United States shall conform as nearly as may be with the practice and procedure in similar action or proceeding in the courts of the State where the property is situated: <i style="-uslm-dtd:italic">Provided, </i>That the United States district courts shall only have jurisdiction of cases when the amount claimed by the owner of the property to be condemned exceeds $3,000.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717f">15 U.S.C. 717f</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s8" styleType="traditional">
            <heading style="-uslm-dtd:header">accounts, records, and memoranda </heading>
            <num style="-uslm-dtd:enum" value="8">Sec. 8. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s8/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">Every natural-gas company shall make, keep, and preserve for such periods, such accounts, records of cost-accounting procedures, correspondence, memoranda, papers, books, and other records as the Commission may by rules and regulations prescribe as necessary or appropriate for purposes of the administration of this act: <i style="-uslm-dtd:italic">Provided, however, </i>That nothing in this act shall relieve any such natural-gas company from keeping any accounts, memoranda, or records which such natural-gas company may be required to keep by or under authority of the laws of any State. The Commission may prescribe a system of accounts to be kept by such natural-gas companies, and may classify such natural-gas companies and prescribe a system of accounts for each class. The Commission, after notice and opportunity for hearing, may determine by order the accounts in which particular outlays or receipts shall be entered, charged, or credited. The burden of proof to justify every accounting entry questioned by the Commission shall be on the person making, authorizing, or requiring such entry, and the Commission may suspend a charge or credit pending submission of satisfactory proof in support thereof.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s8/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">The Commission shall at all times have access to and the right to inspect and examine all accounts, records, and memoranda of natural-gas companies; and it shall be the duty of such natural-gas companies to furnish to the Commission, within such reasonable time as the Commission may order, any information with respect thereto which the Commission may by order require, including copies of maps, contracts, reports of engineers, and other data, records, and papers, and to grant to all agents of the Commission free access to its property and its accounts, records, and memoranda when requested so to do. No member, officer, or employee of the Commission shall divulge any fact or information which may come to his knowledge during the course of examination of books, records, data, or accounts, except insofar as he may be directed by the Commission or by a court.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s8/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">The books, accounts, memoranda, and records of any person who controls directly or indirectly a natural-gas company subject to the jurisdiction of the Commission and of any other company controlled by such person, insofar as they relate to transactions with or the business of such natural-gas company, shall be subject to examination on the order of the Commission.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717g">15 U.S.C. 717g</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s9" styleType="traditional">
            <heading style="-uslm-dtd:header">rates of depreciation </heading>
            <num style="-uslm-dtd:enum" value="9">Sec. 9. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s9/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">The Commission may, after hearing, require natural-gas companies to carry proper and adequate depreciation and amortization accounts in accordance with such rules, regulations, and forms of account as the Commission may prescribe. The Commission may from time to time ascertain and determine, and by order fix, the proper and adequate rates of depreciation and amortization of the several classes of property of each natural-gas company used or useful in the production, transportation, or sale of natural gas. Each natural-gas company shall conform its depreciation and amortization accounts to the rates so ascertained, determined, and fixed. No natural-gas company subject to the jurisdiction of the Commission shall charge to operating expenses and depreciation or amortization charges on classes of property other than those prescribed by the Commission, or charge with respect to any class of property a percentage of depreciation or amortization other than that prescribed therefor by the Commission. No such natural-gas company shall in any case include in any form under its operating or other expenses any depreciation, amortization, or other charge or expenditure included elsewhere as a depreciation or amortization charge or otherwise under its operating or other expenses. Nothing in this section shall limit the power of a State commission to determine in the exercise of its jurisdiction, with respect to any natural-gas company, the percentage rates of depreciation or amortization to be allowed, as to any class of property of such natural-gas company, or the composite depreciation or amortization rate, for the purpose of determining rates of charges.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s9/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">The Commission, before prescribing any rules or requirements as to accounts, records, or memoranda, or as to depreciation or amortization rates, shall notify each State commission having jurisdiction with respect to any natural-gas company involved and shall give reasonable opportunity to each such commission to present its views and shall receive and consider such views and recommendations.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717h">15 U.S.C. 717h</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s10" styleType="traditional">
            <heading style="-uslm-dtd:header">periodic and special reports </heading>
            <num style="-uslm-dtd:enum" value="10">Sec. 10. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s10/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">Every natural-gas company shall file with the Commission such annual and other periodic or special reports as the Commission may by rules and regulations or order prescribe as necessary or appropriate to assist the Commission in the proper administration of this act. The Commission may prescribe the manner and form in which such reports shall be made, and require from such natural-gas companies specific answers to all questions upon which the Commission may need information. The Commission may require that such reports shall include, among other things, full information as to assets and liabilities, capitalization, investment and reduction thereof, gross receipts, interest due and paid, depreciation, amortization, and other reserves, cost of facilities, cost of maintenance and operation of facilities for the production, transportation, or sale of natural gas, cost of renewal and replacement of such facilities, transportation, delivery, use, and sale of natural gas. The Commission may require any such natural-gas company to make adequate provision for currently determining such costs and other facts. Such reports shall be made under oath unless the Commission otherwise specifies.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s10/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">It shall be unlawful for any natural-gas company willfully to hinder, delay, or obstruct the making, filing, or keeping of any information, document, report, memorandum, record, or account required to be made, filed, or kept under this act or any rule, regulation, or order thereunder.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717i">15 U.S.C. 717i</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s11" styleType="traditional">
            <heading style="-uslm-dtd:header">state compacts; reports on </heading>
            <num style="-uslm-dtd:enum" value="11">Sec. 11. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s11/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">In case two or more States propose to the Congress compacts dealing with the conservation, production, transportation, or distribution of natural gas it shall be the duty of the Commission to assemble pertinent information relative to the matters covered in any such proposed compact, to make public and to report to the Congress information so obtained, together with such recommendations for further legislation as may appear to be appropriate or necessary to carry out the purposes of such proposed compact and to aid in the conservation of natural-gas resources within the United States and in the orderly, equitable, and economic production, transportation, and distribution of natural gas.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s11/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">It shall be the duty of the Commission to assemble and keep current pertinent information relative to the effect and operation of any compact between two or more States heretofore or hereafter approved by the Congress, to make such information public, and to report to the Congress, from time to time, the information so obtained together with such recommendations as may appear to be appropriate or necessary to promote the purposes of such compact.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s11/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">In carrying out the purposes of this act, the Commission shall, so far as practicable, avail itself of the services, records, reports, and information of the executive departments and other agencies of the Government, and the President may, from time to time, direct that such services and facilities be made available to the Commission.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717j">15 U.S.C. 717j</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s12" styleType="traditional">
            <heading style="-uslm-dtd:header">officials dealing in securities </heading>
            <num style="-uslm-dtd:enum" value="12">Sec. 12. </num><content style="-uslm-dtd:text">It shall be unlawful for any officer or director of any natural-gas company to receive for his own benefit, directly or indirectly, any money or thing of value in respect to the negotiation, hypothecation, or sale by such natural-gas company of any security issued, or to be issued, by such natural-gas company, or to share in any of the proceeds thereof, or to participate in the making or paying of any dividends, other than liquidating dividends, of such natural-gas company from any funds properly included in capital account.</content><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717k">15 U.S.C. 717k</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s13" styleType="traditional">
            <heading style="-uslm-dtd:header">complaints </heading>
            <num style="-uslm-dtd:enum" value="13">Sec. 13. </num><content style="-uslm-dtd:text">Any State, municipality, or State commission complaining of anything done or omitted to be done by any natural-gas company in contravention of the provisions of this act may apply to the Commission by petition, which shall briefly state the facts, whereupon a statement of the complaint thus made shall be forwarded by the Commission to such natural-gas company, which shall be called upon to satisfy the complaint or to answer the same in writing within a reasonable time to be specified by the Commission.</content><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717l">15 U.S.C. 717<i style="-uslm-dtd:italic">l</i></ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s14" styleType="traditional">
            <heading style="-uslm-dtd:header">investigations by commission; attendance of witnesses; depositions </heading>
            <num style="-uslm-dtd:enum" value="14">Sec. 14. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s14/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">The Commission may investigate any facts, conditions, practices, or matters which it may find necessary or proper in order to determine whether any person has violated or is about to violate any provision of this act or any rule, regulation, or order thereunder, or to aid in the enforcement of the provisions of this act or in prescribing rules or regulations thereunder, or in obtaining information to serve as a basis for recommending further legislation to the Congress. The Commission may permit any person to file with it a statement in writing, under oath or otherwise, as it shall determine, as to any or all facts and circumstances concerning a matter which may be the subject of investigation. The Commission, in its discretion, may publish in the manner authorized by section 312 of the Federal Power Act, and make available to State commissions and municipalities, information concerning any such matter.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s14/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">The Commission may, after hearing, determine the adequacy or inadequacy of the gas reserves held or controlled by any natural-gas company, or by anyone on its behalf, including its owned or leased properties or royalty contracts; and may also, after hearing, determine the propriety and reasonableness of the inclusion in operating expenses, capital, or surplus of all delay rentals or other forms of rental or compensation for unoperated lands and leases. For the purposes of such determinations, the Commission may require any natural-gas company to file with the Commission true copies of all its lease and royalty agreements with respect to such gas reserves.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s14/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">For the purpose of any investigation or any other proceeding under this act, any member of the Commission, or any officer designated by it, is empowered to administer oaths and affirmations, subpena witnesses, compel their attendance, take evidence, and require the production of any books, papers, correspondence, memoranda, contracts, agreements, or other records which the Commission finds relevant or material to the inquiry. Such attendance of witnesses and the production of any such records may be required from any place in the United States or at any designated place of hearing. Witnesses summoned by the Commission to appear before it shall be paid the same fees and mileage that are paid witnesses in the courts of the United States.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s14/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><content style="-uslm-dtd:text">In case of contumacy by, or refusal to obey a subpena issued to, any person, the Commission may invoke the aid of any court of the United States within the jurisdiction of which such investigation or proceeding is carried on, or where such person resides or carries on business in requiring the attendance and testimony of witnesses and the production of books, papers, correspondence, memoranda, contracts, agreements, and other records. Such court may issue an order requiring such person to appear before the Commission or member or officer designated by the Commission, there to produce records, if so ordered, or to give testimony touching the matter under investigation or in question; and any failure to obey such order of the court may be punished by such court as a contempt thereof. All process in any such case may be served in the judicial district whereof such person is an inhabitant or wherever he may be found or may be doing business. Any person who willfully shall fail or refuse to attend and testify or to answer any lawful inquiry to to produce books, papers, correspondence, memoranda, contracts, agreements, or other records, if in his or its power so to do, in obedience to the subpena of the Commission, shall be guilty of a misdemeanor and upon conviction shall be subject to a fine of not more than $1,000 or to imprisonment for a term of not more than one year, or both.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s14/e" styleType="OLC">
                <num style="-uslm-dtd:enum" value="e">(e) </num><content style="-uslm-dtd:text">The testimony of any witness may be taken at the instance of a party, in any proceeding or investigation pending before the Commission, by deposition at any time after the proceeding is at issue. The Commission may also order testimony to be taken by deposition in any proceeding or investigation pending before it at any stage of such proceeding or investigation. Such depositions may be taken before any person authorized to administer oaths not being of counsel or attorney to either of the parties, nor interested in the proceeding or investigation. Reasonable notice must first be given in writing by the party or his attorney proposing to take such deposition to the opposite party or his attorney of record, as either may be nearest, which notice shall state the name of the witness and the time and place of the taking of his deposition. Any person may be compelled to appear and depose, and to produce documentary evidence, in the same manner as witnesses may be compelled to appear and testify and produce documentary evidence before the Commission, as hereinbefore provided. Such testimony shall be reduced to writing by the person taking deposition, or under his direction, and shall, after it has been reduced to writing, be subscribed by the deponent.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s14/f" styleType="OLC">
                <num style="-uslm-dtd:enum" value="f">(f) </num><content style="-uslm-dtd:text">If a witness whose testimony may be desired to be taken by deposition be in a foreign country, the deposition may be taken before an officer or person designated by the Commission, or agreed upon by the parties by stipulation in writing to be filed with the Commission. All depositions must be promptly filed with the Commission.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s14/g" styleType="OLC">
                <num style="-uslm-dtd:enum" value="g">(g) </num><content style="-uslm-dtd:text">Witnesses whose depositions are taken as authorized in this act, and the person or officer taking the same, shall be entitled to the same fees as are paid for like services in the courts of the United States.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717m">15 U.S.C. 717m</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s15" styleType="traditional">
            <heading style="-uslm-dtd:header">process coordination; hearings; rules of procedure </heading>
            <num style="-uslm-dtd:enum" value="15">Sec. 15. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s15/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><chapeau style="-uslm-dtd:text">In this section, the term “<term style="-uslm-dtd:term">Federal authorization</term>”—</chapeau>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s15/a/1" styleType="OLC">
                <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">means any authorization required under Federal law with respect to an application for authorization under section 3 or a certificate of public convenience and necessity under section 7; and</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s15/a/2" styleType="OLC">
                <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">includes any permits, special use authorizations, certifications, opinions, or other approvals as may be required under Federal law with respect to an application for authorization under section 3 or a certificate of public convenience and necessity under section 7.</content>
            </paragraph></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s15/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><heading style="-uslm-dtd:header">Designation as Lead Agency.—</heading>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s15/b/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><heading style="-uslm-dtd:header">In general.—</heading><content style="-uslm-dtd:text">The Commission shall act as the lead agency for the purposes of coordinating all applicable Federal authorizations and for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s15/b/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><heading style="-uslm-dtd:header">Other agencies.—</heading><content style="-uslm-dtd:text">Each Federal and State agency considering an aspect of an application for Federal authorization shall cooperate with the Commission and comply with the deadlines established by the Commission.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s15/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><heading style="-uslm-dtd:header">Schedule.—</heading>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s15/c/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><heading style="-uslm-dtd:header">Commission authority to set schedule.—</heading><chapeau style="-uslm-dtd:text">The Commission shall establish a schedule for all Federal authorizations. In establishing the schedule, the Commission shall—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s15/c/1/A" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">ensure expeditious completion of all such proceedings; and</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s15/c/1/B" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">comply with applicable schedules established by Federal law.</content>
                    </subparagraph>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s15/c/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><heading style="-uslm-dtd:header">Failure to meet schedule.—</heading><content style="-uslm-dtd:text">If a Federal or State administrative agency does not complete a proceeding for an approval that is required for a Federal authorization in accordance with the schedule established by the Commission, the applicant may pursue remedies under section 19(d).</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s15/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><heading style="-uslm-dtd:header">Consolidated Record.—</heading><chapeau style="-uslm-dtd:text">The Commission shall, with the cooperation of Federal and State administrative agencies and officials, maintain a complete consolidated record of all decisions made or actions taken by the Commission or by a Federal administrative agency or officer (or State administrative agency or officer acting under delegated Federal authority) with respect to any Federal authorization. Such record shall be the record for—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s15/d/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">appeals or reviews under the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.), provided that the record may be supplemented as expressly provided pursuant to section 319 of that Act; or</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s15/d/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">judicial review under section 19(d) of decisions made or actions taken of Federal and State administrative agencies and officials, provided that, if the Court determines that the record does not contain sufficient information, the Court may remand the proceeding to the Commission for further development of the consolidated record.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s15/e" styleType="OLC">
                <num style="-uslm-dtd:enum" value="e">(e) </num><content style="-uslm-dtd:text">Hearings under this act may be held before the Commission, any member or members thereof, or any representative of the Commission designated by it, and appropriate records thereof shall be kept. In any proceeding before it, the Commission in accordance with such rules and regulations as it may prescribe, may admit as a party any interested State, State commission, municipality or any representative of interested consumers or security holders, or any competitor of a party to such proceeding, or any other person whose participation in the proceeding may be in the public interest.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s15/f" styleType="OLC">
                <num style="-uslm-dtd:enum" value="f">(f) </num><content style="-uslm-dtd:text">All hearings, investigations, and proceedings under this act shall be governed by rules of practice and procedure to be adopted by the Commission, and in the conduct thereof the technical rules of evidence need not be applied. No informality in any hearing, investigation, or proceeding or in the manner of taking testimony shall invalidate any order, decision, rule, or regulation issued under the authority of this act.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717n">15 U.S.C. 717n</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s16" styleType="traditional">
            <heading style="-uslm-dtd:header">administration powers of commission; rules, regulations, and orders </heading>
            <num style="-uslm-dtd:enum" value="16">Sec. 16. </num><content style="-uslm-dtd:text">The Commission shall have power to perform any and all acts, and to prescribe, issue, make, amend, and rescind such orders, rules, and regulations as it may find necessary or appropriate to carry out the provisions of this act. Among other things, such rules and regulations may define accounting, technical, and trade terms used in this act; and may prescribe the form or forms of all statements, declarations, applications, and reports to be filed with the Commission, the information which they shall contain, and the time within which they shall be filed. Unless a different date is specified therein, rules and regulations of the Commission shall be effective thirty days after publication in the manner which the Commission shall prescribe. Orders of the Commission shall be effective on the date and in the manner which the Commission shall prescribe. For the purposes of its rules and regulations, the Commission may classify persons and matters within its jurisdiction and prescribe different requirements for different classes of persons or matters. All rules and regulations of the Commission shall be filed with its secretary and shall be kept open in convenient form for public inspection and examination during reasonable business hours.</content><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717o">15 U.S.C. 717o</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s17" styleType="traditional">
            <heading style="-uslm-dtd:header">use of joint boards; cooperation with state commissions </heading>
            <num style="-uslm-dtd:enum" value="17">Sec. 17. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s17/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">The Commission may refer any matter arising in the administration of this act to a board to be composed of a member or members, as determined by the Commission, from the State or each of the States affected or to be affected by such matter. Any such board shall be vested with the same power and be subject to the same duties and liabilities as in the case of a member of the Commission when designated by the Commission to hold any hearings. The action of such board shall have such force and effect and its proceedings shall be conducted in such manner as the Commission shall by regulations prescribe. The Board shall be appointed by the Commission from persons nominated by the State commission of each State affected, or by the Governor of such State if there is no State commission. Each State affected shall be entitled to the same number of representatives on the board unless the nominating power of such State waives such right. The Commission shall have discretion to reject the nominee from any State, but shall thereupon invite a new nomination from that State. The members of a board shall receive such allowances for expenses as the Commission shall provide. The Commission may, when in its discretion sufficient reason exists therefor, revoke any reference to such a board.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s17/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">The Commission may confer with any State commission regarding rate structures, costs, accounts, charges, practices, classifications, and regulations of natural-gas companies; and the Commission is authorized, under such rules and regulations as it shall prescribe, to hold joint hearings with any State commission in connection with any matter with respect to which the Commission is authorized to act. The Commission is authorized in the administration of this act to avail itself of such cooperation, services, records, and facilities as may be afforded by any State commission.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s17/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">The Commission shall make available to the several State commissions such information and reports as may be of assistance in State regulation of natural-gas companies. Whenever the Commission can do so without prejudice to the efficient and proper conduct of its affairs, it may, upon request from a State commission, make available to such State commission as witnesses any of its trained rate, valuation, or other experts, subject to reimbursement of the compensation and traveling expenses of such witnesses. All sums collected hereunder shall be credited to the appropriation from which the amounts were expended in carrying out the provisions of this subsection.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717p">15 U.S.C. 717p</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s18" styleType="traditional">
            <heading style="-uslm-dtd:header">appointment of officers and employees </heading>
            <num style="-uslm-dtd:enum" value="18">Sec. 18. </num><content style="-uslm-dtd:text">The Commission is authorized to appoint and fix the compensation of such officers, attorneys, examiners, and experts as may be necessary for carrying out its functions under this act, without regard to the provisions of other laws applicable to the employment and compensation of officers and employees of the United States; and the Commission may, subject to civil-service laws, appoint such other officers and employees as are necessary for carrying out such functions and fix their salaries in accordance with the Classification Act of 1923, as amended.</content><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717q">15 U.S.C. 717q</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s19" styleType="traditional">
            <heading style="-uslm-dtd:header">rehearing; court review of orders </heading>
            <num style="-uslm-dtd:enum" value="19">Sec. 19. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s19/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">Any person, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this act to which such person, State, municipality, or State commission is a party may apply for a rehearing within thirty days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any person unless such person shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this Act.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s19/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">Any party to a proceeding under this act aggrieved by an order issued by the Commission in such proceeding may obtain a review of such order in the circuit court of appeals of the United States for any circuit wherein the natural gas company to which the order relates is located or has its principal place of business, or in the United States Court of Appeals for the District of Columbia, by filing in such court, within sixty days after the order of the Commission upon the application for rehearing, a written petition praying that the order of the Commission be modified or set aside in whole or in part. A copy of such petition shall forthwith be transmitted by the clerk of the court to any member of the Commission and thereupon the Commission shall file with the court the record upon which the order complained of was entered, as provided in section 2112 of title 28, United States Code. Upon the filing of such petition such court shall have jurisdiction, which upon the filing of the record with it shall be exclusive, to affirm, modify, or set aside such order in whole or in part. No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure to do so. The finding of the Commission as to the facts, if supported by substantial evidence, shall be conclusive. If any party shall apply to the court for leave to adduce additional evidence, and shall show to the satisfaction of the court that such additional evidence is material and that there were reasonable grounds for failure to adduce such evidence in the proceedings before the Commission, the court may order such additional evidence to be taken before the Commission and to be adduced upon the hearing in such manner and upon such terms and conditions as to the court may seem proper. The Commission may modify its findings as to the facts by reason of the additional evidence to taken, and it shall file with the court such modified or new findings, which if supported by substantial evidence, shall be conclusive, and its recommendation, if any, for the modification or setting aside of the original order. The judgment and decree of the court, affirming, modifying, or setting aside, in whole or in part, any such order of the Commission, shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in <editorialNote style="-uslm-dtd:legis-comment"><b>[</b>former<b>]</b></editorialNote> sections 239 and 240 of the Judicial Code, as amended (U.S.C., title 28, sec. 1254).</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s19/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">The filing of an application for rehearing under subsection (a) shall not, unless specifically ordered by the Commission, operate as a stay of the Commission's order. The commencement of proceedings under subsection (b) of this section shall not, unless specifically ordered by the court, operate as a stay of the Commission's order.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s19/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><heading style="-uslm-dtd:header">Judicial Review.—</heading>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s19/d/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><heading style="-uslm-dtd:header">In general.—</heading><content style="-uslm-dtd:text">The United States Court of Appeals for the circuit in which a facility subject to section 3 or section 7 is proposed to be constructed, expanded, or operated shall have original and exclusive jurisdiction over any civil action for the review of an order or action of a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit, license, concurrence, or approval (hereinafter collectively referred to as “<quotedText style="-uslm-dtd:quote">permit</quotedText>”) required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.).</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s19/d/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><heading style="-uslm-dtd:header">Agency delay.—</heading><content style="-uslm-dtd:text">The United States Court of Appeals for the District of Columbia shall have original and exclusive jurisdiction over any civil action for the review of an alleged failure to act by a Federal agency (other than the Commission) or State administrative agency acting pursuant to Federal law to issue, condition, or deny any permit required under Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.), for a facility subject to section 3 or section 7. The failure of an agency to take action on a permit required under Federal law, other than the Coastal Zone Management Act of 1972, in accordance with the Commission schedule established pursuant to section 15(c) shall be considered inconsistent with Federal law for the purposes of paragraph (3).</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s19/d/3" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="3">(3) </num><heading style="-uslm-dtd:header">Court action.—</heading><content style="-uslm-dtd:text">If the Court finds that such order or action is inconsistent with the Federal law governing such permit and would prevent the construction, expansion, or operation of the facility subject to section 3 or section 7, the Court shall remand the proceeding to the agency to take appropriate action consistent with the order of the Court. If the Court remands the order or action to the Federal or State agency, the Court shall set a reasonable schedule and deadline for the agency to act on remand.</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s19/d/4" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="4">(4) </num><heading style="-uslm-dtd:header">Commission action.—</heading><content style="-uslm-dtd:text">For any action described in this subsection, the Commission shall file with the Court the consolidated record of such order or action to which the appeal hereunder relates.</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s19/d/5" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="5">(5) </num><heading style="-uslm-dtd:header">Expedited review.—</heading><content style="-uslm-dtd:text">The Court shall set any action brought under this subsection for expedited consideration.</content>
                </paragraph>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717r">15 U.S.C. 717r</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s20" styleType="traditional">
            <heading style="-uslm-dtd:header">enforcement of act; regulations and orders </heading>
            <num style="-uslm-dtd:enum" value="20">Sec. 20. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s20/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">Whenever it shall appear to the Commission that any person is engaged or about to engage in any acts or practices which constitute or will constitute a violation of the provisions of this act, or of any rule, regulation, or order thereunder, it may in its discretion bring an action in the proper district court of the United States, the District Court of the United States for the District of Columbia, or the United States courts of any Territory or other place subject to the jurisdiction of the United States, to enjoin such acts or practices and to enforce compliance with this act or any rule, regulation, or order thereunder, and upon a proper showing a permanent or temporary injunction or decree or restraining order shall be granted without bond. The Commission may transmit such evidence as may be available concerning such acts or practices or concerning apparent violations of the Federal antitrust laws to the Attorney General, who, in his discretion, may institute the necessary criminal proceedings.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s20/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">Upon application of the Commission the district courts of the United States, the District Court of the United States for the District of Columbia, and the United States courts of any Territory or other place subject to the jurisdiction of the United States shall have jurisdiction to issue writs of mandamus commanding any person to comply with the provisions of this act or any rule, regulation, or order of the Commission thereunder.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s20/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">The Commission may employ such attorneys as it finds necessary for proper legal aid and service of the Commission or its members in the conduct of their work, or for proper representation of the public interest in investigations made by it, or cases or proceedings pending before it, whether at the Commission's own instance or upon complaint, or to appear for or represent the Commission in any case in court; and the expenses of such employment shall be paid out of the appropriation for the Commission.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s20/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d) </num><chapeau style="-uslm-dtd:text">In any proceedings under subsection (a), the court may prohibit, conditionally or unconditionally, and permanently or for such period of time as the court determines, any individual who is engaged or has engaged in practices constituting a violation of section 4A (including related rules and regulations) from—</chapeau>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s20/d/1" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">acting as an officer or director of a natural gas company; or</content>
                </paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s20/d/2" styleType="OLC">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><chapeau style="-uslm-dtd:text">engaging in the business of—</chapeau>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s20/d/2/A" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">the purchasing or selling of natural gas; or</content>
                    </subparagraph>
                    <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s20/d/2/B" styleType="OLC">
                        <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">the purchasing or selling of transmission services subject to the jurisdiction of the Commission.</content>
                    </subparagraph>
                </paragraph>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717s">15 U.S.C. 717s</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s21" styleType="traditional">
            <heading style="-uslm-dtd:header">general penalties </heading>
            <num style="-uslm-dtd:enum" value="21">Sec. 21. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s21/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">Any person who willfully and knowingly does or causes or suffers to be done any act, matter, or thing in this act prohibited or delared to be unlawful, or who willfully and knowingly omits or fails to do any act, matter, or thing in this act required to be done, or willfully and knowingly causes or suffers such omission or failure, shall, upon conviction thereof, be punished by a fine of not more than $1,000,000 or by imprisonment for not more than 5 years, or both.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s21/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">Any person who willfully and knowingly violates any rule, regulation, restriction, condition, or order made or imposed by the Commission under authority of this act, shall, in addition to any other penalties provided by law, be punished upon conviction thereof by a fine of not exceeding $50,000 for each and every day during which such offense occurs.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717t">15 U.S.C. 717t</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s22" styleType="traditional">
            <heading style="-uslm-dtd:header">CIVIL PENALTY AUTHORITY </heading>
            <num style="-uslm-dtd:enum" value="22">Sec. 22. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s22/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a) </num><content style="-uslm-dtd:text">Any person that violates this Act, or any rule, regulation, restriction, condition, or order made or imposed by the Commission under authority of this Act, shall be subject to a civil penalty of not more than $1,000,000 per day per violation for as long as the violation continues.</content></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s22/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b) </num><content style="-uslm-dtd:text">The penalty shall be assessed by the Commission after notice and opportunity for public hearing.</content>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s22/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c) </num><content style="-uslm-dtd:text">In determining the amount of a proposed penalty, the Commission shall take into consideration the nature and seriousness of the violation and the efforts to remedy the violation.</content>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717t–1">15 U.S.C. 717t–1</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s23" styleType="traditional">
            <heading style="-uslm-dtd:header">NATURAL GAS MARKET TRANSPARENCY RULES </heading>
            <num style="-uslm-dtd:enum" value="23">Sec. 23. </num><subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s23/a" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="a">(a)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/a/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">The Commission is directed to facilitate price transparency in markets for the sale or transportation of physical natural gas in interstate commerce, having due regard for the public interest, the integrity of those markets, fair competition, and the protection of consumers.</content></paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/a/2" styleType="OLC" class="leftIndentDecrease1">
                <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">The Commission may prescribe such rules as the Commission determines necessary and appropriate to carry out the purposes of this section. The rules shall provide for the dissemination, on a timely basis, of information about the availability and prices of natural gas sold at wholesale and in interstate commerce to the Commission, State commissions, buyers and sellers of wholesale natural gas, and the public.</content>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/a/3" styleType="OLC" class="leftIndentDecrease1">
                <num style="-uslm-dtd:enum" value="3">(3) </num><chapeau style="-uslm-dtd:text">The Commission may—</chapeau>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s23/a/3/A" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="A">(A) </num><content style="-uslm-dtd:text">obtain the information described in paragraph (2) from any market participant; and</content>
                </subparagraph>
                <subparagraph style="-uslm-dtd:subparagraph" identifier="/us/sComp/75/556/s23/a/3/B" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="B">(B) </num><content style="-uslm-dtd:text">rely on entities other than the Commission to receive and make public the information, subject to the disclosure rules in subsection (b).</content>
                </subparagraph>
            </paragraph>
            <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/a/4" styleType="OLC" class="leftIndentDecrease1">
                <num style="-uslm-dtd:enum" value="4">(4) </num><content style="-uslm-dtd:text">In carrying out this section, the Commission shall consider the degree of price transparency provided by existing price publishers and providers of trade processing services, and shall rely on such publishers and services to the maximum extent possible. The Commission may establish an electronic information system if it determines that existing price publications are not adequately providing price discovery or market transparency.</content>
            </paragraph></subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s23/b" styleType="OLC">
                <num style="-uslm-dtd:enum" value="b">(b)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/b/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">Rules described in subsection (a)(2), if adopted, shall exempt from disclosure information the Commission determines would, if disclosed, be detrimental to the operation of an effective market or jeopardize system security.</content></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/b/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">In determining the information to be made available under this section and the time to make the information available, the Commission shall seek to ensure that consumers and competitive markets are protected from the adverse effects of potential collusion or other anticompetitive behaviors that can be facilitated by untimely public disclosure of transaction-specific information.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s23/c" styleType="OLC">
                <num style="-uslm-dtd:enum" value="c">(c)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/c/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">Within 180 days of enactment of this section, the Commission shall conclude a memorandum of understanding with the Commodity Futures Trading Commission relating to information sharing, which shall include, among other things, provisions ensuring that information requests to markets within the respective jurisdiction of each agency are properly coordinated to minimize duplicative information requests, and provisions regarding the treatment of proprietary trading information.</content></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/c/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">Nothing in this section may be construed to limit or affect the exclusive jurisdiction of the Commodity Futures Trading Commission under the Commodity Exchange Act (7 U.S.C. 1 et seq.).</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s23/d" styleType="OLC">
                <num style="-uslm-dtd:enum" value="d">(d)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/d/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">The Commission shall not condition access to interstate pipeline transportation on the reporting requirements of this section.</content></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/d/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">The Commission shall not require natural gas producers, processors, or users who have a de minimis market presence to comply with the reporting requirements of this section.</content>
                </paragraph>
            </subsection>
            <subsection style="-uslm-dtd:subsection" identifier="/us/sComp/75/556/s23/e" styleType="OLC">
                <num style="-uslm-dtd:enum" value="e">(e)</num><paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/e/1" styleType="OLC" class="inline"><num style="-uslm-dtd:enum" value="1">(1) </num><content style="-uslm-dtd:text">Except as provided in paragraph (2), no person shall be subject to any civil penalty under this section with respect to any violation occurring more than 3 years before the date on which the person is provided notice of the proposed penalty under section 22(b).</content></paragraph>
                <paragraph style="-uslm-dtd:paragraph" identifier="/us/sComp/75/556/s23/e/2" styleType="OLC" class="leftIndentDecrease1">
                    <num style="-uslm-dtd:enum" value="2">(2) </num><content style="-uslm-dtd:text">Paragraph (1) shall not apply in any case in which the Commission finds that a seller that has entered into a contract for the transportation or sale of natural gas subject to the jurisdiction of the Commission has engaged in fraudulent market manipulation activities materially affecting the contract in violation of section 4A.</content>
                </paragraph>
            </subsection><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717t–2">15 U.S.C. 717t–2</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s24" styleType="traditional">
            <heading style="-uslm-dtd:header">jurisdiction of offenses; enforcement of liabilities and duties </heading>
            <num style="-uslm-dtd:enum" value="24">Sec. 24. </num><content style="-uslm-dtd:text">The District Courts of the United States, the District Court of the United States for the District of Columbia, and the United States courts of any Territory or other place subject to the jurisdiction of the United States shall have exclusive jurisdiction of violations of this act or the rules, regulations, and orders thereunder, and of all suits in equity and actions at law, brought to enforce any liability or duty created by, or to enjoin any violation of, this act or any rule, regulation, or order thereunder. Any criminal proceeding shall be brought in the district wherein any act or transaction constituting the violation occurred. Any suit or action to enforce any liability or duty created by, or to enjoin any violation of, this act or any rule, regulation, or order thereunder may be brought in any such district or in the district wherein the defendant is an inhabitant, and process in such cases may be served wherever the defendant may be found. Judgments and decrees so rendered shall be subject to review as provided in <editorialNote style="-uslm-dtd:legis-comment"><b>[</b>former<b>]</b></editorialNote> sections 128 and 240 of the Judicial Code, as amended (U.S.C., title 28, secs. 225 and 347). No costs shall be assessed against the Commission in any judicial proceeding by or against the Commission under this act.</content><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717u">15 U.S.C. 717u</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s25" styleType="traditional">
            <heading style="-uslm-dtd:header">separability of provisions </heading>
            <num style="-uslm-dtd:enum" value="25">Sec. 25. </num><content style="-uslm-dtd:text">If any provision of this act, or the application of such provision to any person or circumstance, shall be held invalid, the remainder of the act, and the application of such provision to persons or circumstances other than those as to which it is held invalid, shall not be affected thereby.</content><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717v">15 U.S.C. 717v</ref><b>]</b> </editorialNote>
        </section>
        <section style="-uslm-dtd:section" identifier="/us/sComp/75/556/s26" styleType="traditional-inline">
            <num style="-uslm-dtd:enum" value="26">Sec. 26. </num><content style="-uslm-dtd:text">This act may be cited as the “<shortTitle style="-uslm-dtd:quote">Natural Gas Act.</shortTitle>”</content><editorialNote style="-uslm-dtd:usc-reference" role="uscRef"><b>[</b><ref href="/us/usc/t15/s717w">15 U.S.C. 717w</ref><b>]</b> </editorialNote><note style="-uslm-dtd:note"><p style="-uslm-dtd:para; margin-left:1em"><headingText style="-uslm-dtd:header-in-text">Note</headingText>.—Executive Order 10485: Providing for the performance of certain functions heretofore performed by the President with respect to electric power and natural gas facilities located on the borders of the United States states:</p><p style="-uslm-dtd:para; margin-left:1em">Whereas section 202(e) of the Federal Power Act, as amended, 49 Stat. 847 (16 U.S.C. 824a(e)), requires any person desiring to transmit any electric energy from the United States to a foreign country to obtain an order of the Federal Power Commission authorizing it to do so; and</p><p style="-uslm-dtd:para; margin-left:1em">Whereas section 3 of the Natural Gas Act, 52 Stat. 822 (15 U.S.C. 717b), requires any person desiring to export any natural gas from the United States to a foreign country or to import any natural gas from a foreign country to the United States to obtain an order from the Federal Power Commission authorizing it to do so; and</p><p style="-uslm-dtd:para; margin-left:1em">Whereas the proper conduct of the foreign relations of the United States requires that executive permission be obtained for the construction and maintenance at the borders of the United States of facilities for the exportation or importation of electric energy and natural gas; and</p><p style="-uslm-dtd:para; margin-left:1em">Whereas it is desirable to provide a systematic method in connection with the issuance and signing of permits for such purposes:</p><p style="-uslm-dtd:para; margin-left:1em">Now, Therefore, by virtue of the authority vested in me as President of the United States and commander in Chief of the armed forces of the United States, it is hereby ordered as follows:</p><p style="-uslm-dtd:para; margin-left:1em"><headingText style="-uslm-dtd:header-in-text">Section </headingText>1. (a) The Federal Power Commission is hereby designated and empowered to perform the following-described functions:</p><p style="-uslm-dtd:para; margin-left:1em">(1) To receive all applications for permits for the construction, operation, maintenance, or connection, at the borders of the United States, of facilities for the transmission of electric energy between the United States and a foreign country.</p><p style="-uslm-dtd:para; margin-left:1em">(2) To receive all applications for permits for the construction, operation, maintenance, or connection, at the borders of the United States, of facilities for the exportation or importation of natural gas to or from a foreign country.</p></note>
        </section>
    </main>
</statuteCompilation>
