<?xml version="1.0" encoding="UTF-8"?><BillSummaries>
    <item congress="119" measure-type="s" measure-number="465" measure-id="id119s465" originChamber="SENATE" orig-publish-date="2025-02-06" update-date="2026-04-17">
        <title>GRID Power Act</title>
        <summary summary-id="id119s465v00" currentChamber="SENATE" update-date="2026-04-17">
            <action-date>2025-02-06</action-date>
            <action-desc>Introduced in Senate</action-desc>
            <summary-text><![CDATA[<p><strong>Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act</strong></p><p>This bill requires the Federal Energy Regulatory Commission (FERC) to issue and periodically review a rule that revises the approval process for interconnection requests of generating units that produce&nbsp;electricity to prioritize dispatchable power projects (e.g., certain fossil fuel projects).&nbsp;</p><p>Under the bill,<em> d</em><em>ispatchable power</em> generally refers to an electric energy generation resource, such as a generating unit that produces electricity from fossil fuels, capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability.&nbsp;Currently, FERC receives interconnection requests&nbsp;from those projects and other generating units, such as units that produce electricity from renewable energy. Interconnection requests are&nbsp;requests from generating units to connect to the high voltage transmission lines of the electric grid.</p><p>First, the rule must address the&nbsp;efficiency and effectiveness of the existing procedures&nbsp;for processing interconnection&nbsp;requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably.&nbsp;</p><p>Second, the rule must revise the pro forma Large Generator Interconnection Procedures, and the pro forma Large Generator Interconnection Agreement as appropriate,&nbsp;to authorize transmission providers to submit proposals to FERC to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue of the provider. FERC must review and approve or deny such proposals within 60 days after the proposal is submitted.</p>]]></summary-text>
        </summary>
    </item>
    <dublinCore xmlns:dc="http://purl.org/dc/elements/1.1/">
        <dc:format>text/xml</dc:format>
        <dc:language>EN</dc:language>
        <dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
        <dc:contributor>Congressional Research Service, Library of Congress</dc:contributor>
        <dc:description>This file contains bill summaries for federal legislation. A bill summary describes the most significant provisions of a piece of legislation and details the effects the legislative text may have on current law and federal programs. Bill summaries are authored by the Congressional Research Service (CRS) of the Library of Congress. As stated in Public Law 91-510 (2 USC 166 (d)(6)), one of the duties of CRS is "to prepare summaries and digests of bills and resolutions of a public general nature introduced in the Senate or House of Representatives". For more information, refer to the User Guide that accompanies this file.</dc:description>
    </dublinCore>
</BillSummaries>
