<?xml version="1.0" encoding="UTF-8"?><BillSummaries>
<item congress="115" measure-type="s" measure-number="1142" measure-id="id115s1142" originChamber="SENATE" orig-publish-date="2017-05-16" update-date="2018-08-28">
<title>J. Bennett Johnston Waterway Hydropower Extension Act of 2018</title>
<summary summary-id="id115s1142v35" currentChamber="SENATE" update-date="2018-08-28">
<action-date>2018-08-22</action-date>
<action-desc>Passed Senate amended</action-desc>
<summary-text><![CDATA[<p><b>J. Bennett Johnston Waterway Hydropower Extension Act of 2018</b></p> <p>(Sec.2)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana.</p> <p>FERC may reinstate the construction license if it is expired.</p>]]></summary-text>
</summary>
<summary summary-id="id115s1142v01" currentChamber="SENATE" update-date="2018-08-03">
<action-date>2018-07-30</action-date>
<action-desc>Reported to Senate with amendment(s)</action-desc>
<summary-text><![CDATA[<p><b>J. Bennett Johnston Waterway Hydropower Extension Act of 2018</b></p> <p>This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana.</p> <p>FERC may reinstate the construction license if it is expired.</p>]]></summary-text>
</summary>
<summary summary-id="id115s1142v00" currentChamber="SENATE" update-date="2018-01-04">
<action-date>2017-05-16</action-date>
<action-desc>Introduced in Senate</action-desc>
<summary-text><![CDATA[<p><b>J. Bennett Johnston Waterway Hydropower Extension Act of 2017</b></p> <p>This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana.</p> <p>The licensee is not required to pay an annual charge for administrative expenses until construction commences.</p> <p>FERC may reinstate the construction license if it is expired.</p>]]></summary-text>
</summary>
</item>
<dublinCore xmlns:dc="http://purl.org/dc/elements/1.1/">
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
<dc:contributor>Congressional Research Service, Library of Congress</dc:contributor>
<dc:description>This file contains bill summaries for federal legislation. A bill summary describes the most significant provisions of a piece of legislation and details the effects the legislative text may have on current law and federal programs. Bill summaries are authored by the Congressional Research Service (CRS) of the Library of Congress. As stated in Public Law 91-510 (2 USC 166 (d)(6)), one of the duties of CRS is "to prepare summaries and digests of bills and resolutions of a public general nature introduced in the Senate or House of Representatives". For more information, refer to the User Guide that accompanies this file.</dc:description>
</dublinCore>
</BillSummaries>
