<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Reported-in-House" dms-id="H67762EDAC33348B7B4F65938B2CBE4C0" public-private="public" key="H" bill-type="olc"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>110 HR 7575 RH: Water Resources Development Act of 2020</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2020-07-24</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">IB</distribution-code><calendar display="yes">Union Calendar No. 369</calendar><congress display="yes">116th CONGRESS</congress><session display="yes">2d Session</session><legis-num display="yes">H. R. 7575</legis-num><associated-doc role="report" display="yes">[Report No. 116–460, Part I]</associated-doc><current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber><action display="yes"><action-date date="20200713">July 13, 2020</action-date><action-desc><sponsor name-id="D000191">Mr. DeFazio</sponsor> (for himself, <cosponsor name-id="G000546">Mr. Graves of Missouri</cosponsor>, <cosponsor name-id="N000179">Mrs. Napolitano</cosponsor>, and <cosponsor name-id="W000821">Mr. Westerman</cosponsor>) introduced the following bill; which was referred to the <committee-name committee-id="HPW00">Committee on Transportation and Infrastructure</committee-name>, and in addition to the Committee on <committee-name committee-id="HBU00">the Budget</committee-name>, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned</action-desc></action><action display="yes"><action-date date="20200724">July 24, 2020</action-date><action-desc>Reported from the <committee-name added-display-style="italic" committee-id="HPW00" deleted-display-style="strikethrough">Committee on Transportation and Infrastructure</committee-name> with an amendment</action-desc><action-instruction>Strike out all after the enacting clause and insert the part printed in italic</action-instruction></action><action display="yes"><action-date date="20200724">July 24, 2020</action-date><action-desc>Committee on <committee-name committee-id="HBU00">the Budget</committee-name> discharged; committed to the Committee of the Whole House on the State of the Union and ordered to be printed</action-desc><action-instruction>For text of introduced bill, see copy of bill as introduced on July 13, 2020</action-instruction></action><action><action-desc><pagebreak></pagebreak></action-desc></action><legis-type>A BILL</legis-type><official-title display="yes">To provide for improvements to the rivers and harbors of the United States, to provide for the conservation and development of water and related resources, and for other purposes.<pagebreak></pagebreak></official-title></form><legis-body display-enacting-clause="yes-display-enacting-clause" changed="added" style="OLC" committee-id="HPW00" reported-display-style="italic" id="HACD41758234645B0808BCD089B2DCDCE"><section id="H33EF5CC96BF94244BC124A3D6B36EABD" section-type="section-one"><enum>1.</enum><header>Short title; table of contents</header><subsection id="H6F51BC44D9594D1083469D52534687AD"><enum>(a)</enum><header>Short title</header><text display-inline="yes-display-inline">This Act may be cited as the <quote><short-title>Water Resources Development Act of 2020</short-title></quote>.</text></subsection><subsection id="H1AFD6590D0FF4E999826874F5F079AEC"><enum>(b)</enum><header>Table of contents</header><text>The table of contents for this Act is as follows: </text><toc container-level="legis-body-container" lowest-bolded-level="division-lowest-bolded" lowest-level="section" quoted-block="no-quoted-block" regeneration="yes-regeneration" changed="added" reported-display-style="italic" committee-id="HPW00"><toc-entry idref="H33EF5CC96BF94244BC124A3D6B36EABD" level="section">Sec. 1. Short title; table of contents.</toc-entry><toc-entry idref="HAB3178DA2E0B4E2F90277E90AF745835" level="section">Sec. 2. Secretary defined.</toc-entry><toc-entry idref="H9F6285FF99554E5FAB992038D34C97EA" level="title">Title I—General Provisions</toc-entry><toc-entry idref="H6AD17E1F752749D7800047FB64201D16" level="section">Sec. 101. Budgetary treatment expansion and adjustment for the Harbor Maintenance Trust Fund.</toc-entry><toc-entry idref="H56197146FA0945128344EA1F7C430010" level="section">Sec. 102. Funding for navigation.</toc-entry><toc-entry idref="H4B55D5DC11AD4E5282DFCDEF373FCE02" level="section">Sec. 103. Annual report to Congress on the Harbor Maintenance Trust Fund.</toc-entry><toc-entry idref="H03D6C2EBF62E49DD8812152517395365" level="section">Sec. 104. Additional measures at donor ports and energy transfer ports.</toc-entry><toc-entry idref="H14C15447744F4028851D23F7C1D71B12" level="section">Sec. 105. Assumption of maintenance of a locally preferred plan.</toc-entry><toc-entry idref="HCEA99E2A3347462AA6E34C619A533529" level="section">Sec. 106. Coast Guard anchorages.</toc-entry><toc-entry idref="HCAEB1BC9628E429B8E01DC5B2B90A76F" level="section">Sec. 107. State contribution of funds for certain operation and maintenance costs.</toc-entry><toc-entry idref="HED3A725F3D2E41558096DDF478D7EF64" level="section">Sec. 108. Inland waterway projects.</toc-entry><toc-entry idref="HAEACB73C967249FCB81B95EC80117113" level="section">Sec. 109. Implementation of water resources principles and requirements.</toc-entry><toc-entry idref="H5A7BF6EE04674A0CB647780C8A1637AD" level="section">Sec. 110. Resiliency planning assistance.</toc-entry><toc-entry idref="H932983C4DE5243AF86E8317FAD6A8B74" level="section">Sec. 111. Project consultation.</toc-entry><toc-entry idref="H78E1EC39986D49E39F6E4E6FA70A308A" level="section">Sec. 112. Review of resiliency assessments.</toc-entry><toc-entry idref="HE4C1CFEE9DA94414A291F87E1552130D" level="section">Sec. 113. Small flood control projects.</toc-entry><toc-entry idref="H98AD792A5C1444888D89216D06C2D983" level="section">Sec. 114. Conforming amendment.</toc-entry><toc-entry idref="H0068E8D42C5A48DBB2648C0E34508843" level="section">Sec. 115. Feasibility studies; review of natural and nature-based features.</toc-entry><toc-entry idref="HD959631C9A01452A98377FEC7AEE3D55" level="section">Sec. 116. Report on corrosion prevention activities.</toc-entry><toc-entry idref="H8B79AF39FDC2422FAA421FA8EAFBFC77" level="section">Sec. 117. Quantification of benefits for flood risk management projects in seismic zones.</toc-entry><toc-entry idref="H2A55AD579A964123BF732B182300DED7" level="section">Sec. 118. Federal interest determination.</toc-entry><toc-entry idref="H3CECCB0721664171B8EAAF8513E72AF7" level="section">Sec. 119. Economically disadvantaged community flood protection and hurricane and storm damage reduction study pilot program.</toc-entry><toc-entry idref="HF7E3D4FD2B454FF491B5D9E58724BF88" level="section">Sec. 120. Permanent measures to reduce emergency flood fighting needs for communities subject to repetitive flooding.</toc-entry><toc-entry idref="HF0DE8901E5344F9E991A40B036E30B5A" level="section">Sec. 121. Emergency response to natural disasters.</toc-entry><toc-entry idref="H8A19330324FE40D7818EAF6664DA3D0F" level="section">Sec. 122. Study on natural infrastructure at Corps of Engineers projects.</toc-entry><toc-entry idref="H0A2EFAB6B4FC4747B9D2EE31E6F2A58E" level="section">Sec. 123. Review of Corps of Engineers assets.</toc-entry><toc-entry idref="H55769360F72446A98F137EC7A9D2EE00" level="section">Sec. 124. Sense of Congress on multipurpose projects.</toc-entry><toc-entry idref="H361304A31A044F079D3981AF7F292EB7" level="section">Sec. 125. Beneficial reuse of dredged material; dredged material management plans.</toc-entry><toc-entry idref="H8C495C1859764935B9E20CF8EA0DC363" level="section">Sec. 126. Aquatic ecosystem restoration for anadromous fish.</toc-entry><toc-entry idref="HD9DCA1256D86486B922D1A48DA9BA6EA" level="section">Sec. 127. Annual report to Congress.</toc-entry><toc-entry idref="H050FEF16C9BD4E20A51B4D2828B4A12B" level="section">Sec. 128. Harmful algal bloom demonstration program.</toc-entry><toc-entry idref="HBBDE06D801764096BFA60C341143163E" level="section">Sec. 129. Update on Invasive Species Policy Guidance.</toc-entry><toc-entry idref="H90A9AFF82DEA498C8B3E767562455DEB" level="section">Sec. 130. Report on debris removal.</toc-entry><toc-entry idref="H79E21EBCB1B24C349DC1B70EBA5A1E68" level="section">Sec. 131. Missouri River interception-rearing complex construction.</toc-entry><toc-entry idref="H859B7AACAF20450E820F3790BDB72B96" level="section">Sec. 132. Cost and benefit feasibility assessment.</toc-entry><toc-entry idref="HBB469F1AC0F64543AE11A3BF0D1CABF9" level="section">Sec. 133. Materials, services, and funds for repair, restoration, or rehabilitation of projects.</toc-entry><toc-entry idref="H034AD2C86B0348FFAE77402425993372" level="section">Sec. 134. Levee safety.</toc-entry><toc-entry idref="H47127491653E40A288E83EFF675F3B38" level="section">Sec. 135. National Dam Safety Program.</toc-entry><toc-entry idref="H94A0213962B84A5C8E29B0E721A0E219" level="section">Sec. 136. Rehabilitation of Corps of Engineers constructed pump stations.</toc-entry><toc-entry idref="H1D915B5AF08742C4A94416000BAE2B6E" level="section">Sec. 137. Non-Federal Project Implementation Pilot Program.</toc-entry><toc-entry idref="HD7E296BFE52E487287848BA02E97E8AF" level="section">Sec. 138. Definition of economically disadvantaged community.</toc-entry><toc-entry idref="HAC3D7092A5884BA1A83AEBEF7B72E101" level="section">Sec. 139. Cost sharing provisions for territories and Indian Tribes.</toc-entry><toc-entry idref="HCD255037AC2A4ADDBA89FBD583367DE6" level="section">Sec. 140. Flood control and other purposes.</toc-entry><toc-entry idref="H9E82154105F54C119C6672CFDE95D423" level="section">Sec. 141. Review of contracting policies.</toc-entry><toc-entry idref="H163D8F398F884FF4BAAB8C2C5A643BA8" level="section">Sec. 142. Buy America.</toc-entry><toc-entry idref="H80A8063CB4774400A185397AA0ED732E" level="section">Sec. 143. Annual report on status of feasibility studies.</toc-entry><toc-entry idref="HDE8444F35ED640DE82C44BAA7FE0F042" level="title">Title II—Studies and Reports</toc-entry><toc-entry idref="H8D6CEE8542774CE2B6ADD67A31EC394F" level="section">Sec. 201. Authorization of proposed feasibility studies.</toc-entry><toc-entry idref="HFB602FA2AA5B48DA9FB462BBAA188984" level="section">Sec. 202. Expedited completions.</toc-entry><toc-entry idref="H2E058A70A60E497985570F999BA28635" level="section">Sec. 203. Feasibility study modifications.</toc-entry><toc-entry idref="H0064B2FF27C042EB9876251FC6C9D3B5" level="section">Sec. 204. Selma, Alabama.</toc-entry><toc-entry idref="HEBC27D45CFAE4B468D750F656CF5DFE3" level="section">Sec. 205. Comprehensive study of the Sacramento River, Yolo Bypass, California.</toc-entry><toc-entry idref="H4610E4786594407DAE27EA2C4ED0C973" level="section">Sec. 206. Lake Okeechobee regulation schedule, Florida.</toc-entry><toc-entry idref="H6EB70F4B65854495ABB6FBB7CAA36A08" level="section">Sec. 207. Great Lakes Coastal Resiliency Study.</toc-entry><toc-entry idref="H9CFB8E8EC7DA4D25839A2E18E4AAD7A2" level="section">Sec. 208. Rathbun Lake, Chariton River, Iowa.</toc-entry><toc-entry idref="HB290C726005745D38F729A9F4C77E301" level="section">Sec. 209. Report on the status of restoration in the Louisiana coastal area.</toc-entry><toc-entry idref="H2AD7FBD9CA4F4593A19E5115B0DB4F4C" level="section">Sec. 210. Lower Mississippi River comprehensive study.</toc-entry><toc-entry idref="H22FE8AE6049244D789F227C47E4B8204" level="section">Sec. 211. Upper Mississippi River Comprehensive Plan.</toc-entry><toc-entry idref="H153966140E7F45948126E39B3E641046" level="section">Sec. 212. Lower Missouri Basin Flood Risk and Resiliency Study, Iowa, Kansas, Nebraska, and Missouri.</toc-entry><toc-entry idref="H9900943E76434961A9ED7D16E7C20ECC" level="section">Sec. 213. Portsmouth Harbor and Piscataqua River and Rye Harbor, New Hampshire.</toc-entry><toc-entry idref="H574A55675D7A403192A404AC514AA5FD" level="section">Sec. 214. Cougar and Detroit Dams, Willamette River Basin, Oregon.</toc-entry><toc-entry idref="H09A6A34DE1AB485CAB51708E16A07455" level="section">Sec. 215. Port Orford, Oregon.</toc-entry><toc-entry idref="HB0A7670A167E411EB9E24639BDEC3FDE" level="section">Sec. 216. Wilson Creek and Sloan Creek, Fairview, Texas.</toc-entry><toc-entry idref="H67F108264FC744CFBD87981BD4701F0D" level="section">Sec. 217. GAO study on mitigation for water resources development projects.</toc-entry><toc-entry idref="HFB7BA6CF367447F0B6FBDB96E36646CA" level="section">Sec. 218. GAO study on application of Harbor Maintenance Trust Fund expenditures.</toc-entry><toc-entry idref="H53F2BA90448B401A9A7670F559DD27F0" level="section">Sec. 219. GAO study on administration of environmental banks.</toc-entry><toc-entry idref="H118D1111A8654C4F989FE0702CAF2703" level="section">Sec. 220. Study on water supply and water conservation at water resources development projects.</toc-entry><toc-entry idref="HA2D2710A94E5412F89D5195D77E58EE0" level="section">Sec. 221. PFAS review and inventory at Corps facilities.</toc-entry><toc-entry idref="HE95FD57403814D29961CC03C9E2EB684" level="section">Sec. 222. Report on recreational facilities.</toc-entry><toc-entry idref="H0C034AEAED7B43BD90388BF2DCA157B2" level="title">Title III—Deauthorizations and Modifications</toc-entry><toc-entry idref="H5DA3C5D6EF774E919C860EA3F4B4CB54" level="section">Sec. 301. Deauthorization of inactive projects.</toc-entry><toc-entry idref="H1D23C937E85E4B418FE8351FBC674944" level="section">Sec. 302. Abandoned and inactive noncoal mine restoration.</toc-entry><toc-entry idref="HA3737FDCF718464BBBF53C59C610BC48" level="section">Sec. 303. Tribal partnership program.</toc-entry><toc-entry idref="HE89F4F89D4B142309F42D6D9C444B328" level="section">Sec. 304. Lakes program.</toc-entry><toc-entry idref="H440F092EB76B429C98023C4B80E3F189" level="section">Sec. 305. Watercraft inspection stations.</toc-entry><toc-entry idref="HB12FCBFD390F4354BA8528274B3CE1E0" level="section">Sec. 306. Chesapeake Bay Environmental Restoration and Protection Program.</toc-entry><toc-entry idref="H4CEF7C2DFC5840A38A77983510A51DE2" level="section">Sec. 307. Upper Mississippi River System Environmental Management Program.</toc-entry><toc-entry idref="H4959D7E15A9B44068328A5543947466F" level="section">Sec. 308. McClellan-Kerr Arkansas River Navigation System.</toc-entry><toc-entry idref="H0F19C23D5DF9492A82CF0B1B8B8D8ADB" level="section">Sec. 309. Ouachita-Black River Navigation Project, Arkansas.</toc-entry><toc-entry idref="HF003A592DD6A470FA61C3A44B3574051" level="section">Sec. 310. Sacramento River, Glenn-Colusa, California.</toc-entry><toc-entry idref="H12CD05BAD2F344B7966E08A606C2AFFB" level="section">Sec. 311. Lake Isabella, California.</toc-entry><toc-entry idref="H57C259672AF948CC89588987A67D63C1" level="section">Sec. 312. Lower San Joaquin River flood control project.</toc-entry><toc-entry idref="H74EC9FB10F6743CFA1E1159F78778978" level="section">Sec. 313. San Diego River and Mission Bay, San Diego County, California.</toc-entry><toc-entry idref="H84F864589D3B4A2F802BBB93D5D509E0" level="section">Sec. 314. San Francisco, California, Waterfront Area.</toc-entry><toc-entry idref="H7C0DE552AEBF42ADB80ADCFDBAD1CE17" level="section">Sec. 315. Western Pacific Interceptor Canal, Sacramento River, California.</toc-entry><toc-entry idref="HF6860625A8344C978D04CD69A5BA80D5" level="section">Sec. 316. Rio Grande Environmental Management Program, Colorado, New Mexico, and Texas.</toc-entry><toc-entry idref="HD927E9509471457F80CCC65B79B28749" level="section">Sec. 317. New London Harbor Waterfront Channel, Connecticut.</toc-entry><toc-entry idref="H2DFC6BC61B74484084E69CC626DACE57" level="section">Sec. 318. Washington Harbor, District of Columbia.</toc-entry><toc-entry idref="H771ED15140594D44B3EA68C6714F8C23" level="section">Sec. 319. Central Everglades, Florida.</toc-entry><toc-entry idref="HD96DD1586C4348FF8208E7E5B9D69B5D" level="section">Sec. 320. Miami River, Florida.</toc-entry><toc-entry idref="H1C4357754B4540BB895D52FDD21E48B9" level="section">Sec. 321. Taylor Creek Reservoir and Levee L–73 (Section 1), Upper St. Johns River Basin, Florida.</toc-entry><toc-entry idref="H5D7BE6B6629645949B52D8A72B4A2ECB" level="section">Sec. 322. Calcasieu River and Pass, Louisiana.</toc-entry><toc-entry idref="H4A79733A5A7B4666B21BE162007B91CC" level="section">Sec. 323. San Juan-Chama project; Abiquiu Dam, New Mexico.</toc-entry><toc-entry idref="H023A061955CF400490316617B8D5FC92" level="section">Sec. 324. Pawcatuck River, Little Narragansett Bay and Watch Hill Cove, Rhode Island and Connecticut.</toc-entry><toc-entry idref="H8BA7708858AB42A0AE52CF1834A84BB6" level="section">Sec. 325. Harris County, Texas.</toc-entry><toc-entry idref="H141A8C98A7FC4259AF08BE2420440C2B" level="section">Sec. 326. Cap Sante Waterway, Washington.</toc-entry><toc-entry idref="H1B2D2E94B0324FD2BE8167AF09019F5C" level="section">Sec. 327. Regional sediment management.</toc-entry><toc-entry idref="HD549ECD293EB4DE5849942FCAAF409E0" level="section">Sec. 328. Additional assistance for critical projects.</toc-entry><toc-entry idref="H7A2411C5EA304993903CD484E33DF43A" level="section">Sec. 329. Project modification authorizations.</toc-entry><toc-entry idref="HB4043BA6EE224795BC207834B253BDCD" level="section">Sec. 330. Application of credit.</toc-entry><toc-entry idref="HDF128B658AEA4A138B0DB980BB5B14DC" level="section">Sec. 331. Project reauthorizations.</toc-entry><toc-entry idref="H26FA4DC078454E09823FB376ADE24E48" level="section">Sec. 332. Conveyances.</toc-entry><toc-entry idref="H2224590327334DF4959A0CA026511CDC" level="section">Sec. 333. Repeals.</toc-entry><toc-entry idref="HE6FAC3080B5F45E599F4993A5925728C" level="title">Title IV—Water Resources Infrastructure</toc-entry><toc-entry idref="H514F7AAF51084A6384FBB17B344BC35A" level="section">Sec. 401. Project authorizations.</toc-entry><toc-entry idref="H4D39529BF285475B9FAF1A1E52DA98F1" level="section">Sec. 402. Special rules.</toc-entry><toc-entry idref="H1586E49236FD410AA898B1AC96585888" level="section">Sec. 403. Authorization of projects based on feasibility studies prepared by non-Federal interests.</toc-entry></toc></subsection></section><section id="HAB3178DA2E0B4E2F90277E90AF745835" section-type="subsequent-section"><enum>2.</enum><header>Secretary defined</header><text display-inline="no-display-inline">In this Act, the term <term>Secretary</term> means the Secretary of the Army. </text></section><title id="H9F6285FF99554E5FAB992038D34C97EA"><enum>I</enum><header>General Provisions</header><section id="H6AD17E1F752749D7800047FB64201D16"><enum>101.</enum><header>Budgetary treatment expansion and adjustment for the Harbor Maintenance Trust Fund</header><subsection id="HE6C66AE9FCA34399858079FECF754F7B"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Section 14003 of division B of the CARES Act (<external-xref legal-doc="public-law" parsable-cite="pl/116/136">Public Law 116–136</external-xref>) is amended to read as follows:</text><quoted-block display-inline="no-display-inline" id="HBAB3E302E45C4DB796D5F1E9E4A9A59C" style="appropriations" changed="added" reported-display-style="italic" committee-id="HPW00"><section id="H99CB7BFCE56C472BAE71D882A61A2BF2"><enum>14003.</enum><text display-inline="yes-display-inline">Section 251(b)(2) of the Balanced Budget and Emergency Deficit Control Act of 1985 (<external-xref legal-doc="usc" parsable-cite="usc/2/901">2 U.S.C. 901(b)(2)</external-xref>) is amended by adding at the end the following:</text><quoted-block display-inline="no-display-inline" id="HA68B5871A31A48989EEF80E47A972FBF" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subparagraph id="H7EBED9E486C24B55935C3C4EC4B0B67A"><enum>(H)</enum><header>Harbor Maintenance Activities</header><text display-inline="yes-display-inline">If, for any fiscal year, appropriations for the Construction, Mississippi River and Tributaries, and Operation and Maintenance accounts of the Corps of Engineers are enacted that are derived from the Harbor Maintenance Trust Fund established under <external-xref legal-doc="usc" parsable-cite="usc/26/9505">section 9505(a)</external-xref> of the Internal Revenue Code of 1986 and that the Congress designates in statute as being for harbor operations and maintenance activities, then the adjustment for that fiscal year shall be the total of such appropriations that are derived from such Fund and designated as being for harbor operations and maintenance activities.</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></section><after-quoted-block>.</after-quoted-block></quoted-block></subsection><subsection id="HF4F6A0D33C944EFC9B951AD6849F7583"><enum>(b)</enum><header>Effective date</header><text display-inline="yes-display-inline">The amendment made by subsection (a) shall take effect as if included in the enactment of the CARES Act (<external-xref legal-doc="public-law" parsable-cite="pl/116/136">Public Law 116–136</external-xref>).</text></subsection></section><section id="H56197146FA0945128344EA1F7C430010" section-type="subsequent-section"><enum>102.</enum><header>Funding for navigation</header><subsection id="H829A57ABB51748948FAA7CB802D52EB0"><enum>(a)</enum><header>Funding for navigation</header><text display-inline="yes-display-inline">Section 210 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238</external-xref>) is amended, in the section heading, by striking <quote><header-in-text level="section" style="OLC">Authorization of appropriations</header-in-text></quote> and inserting <quote><header-in-text level="section" style="OLC">Funding for navigation</header-in-text></quote>. </text></subsection><subsection id="H6C8B4B0F2FF94E159374B641E7D3D06C"><enum>(b)</enum><header>Operation and Maintenance of Harbor Projects</header><text display-inline="yes-display-inline">Section 210(c) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238(c)</external-xref>) is amended—</text><paragraph id="H4794C80B2E6849E086FC11199D6964B4"><enum>(1)</enum><text>by amending paragraph (1) to read as follows:</text><quoted-block display-inline="no-display-inline" id="H7526D0FA9FD94A628D73B3361A4B6F64" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="HF41857F7FBCA4B98987B4726D829EDBE"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">For each fiscal year, of the funds made available under this section (including funds appropriated from the Harbor Maintenance Trust Fund), the Secretary shall make expenditures to pay for operation and maintenance costs of the harbors and inland harbors referred to in subsection (a)(2), using—</text><subparagraph id="H67707FFDF31E4028BCE9556D4B5CFB50"><enum>(A)</enum><text>not less than 20 percent of such funds for emerging harbor projects, to the extent there are identifiable operations and maintenance needs, including eligible breakwater and jetty needs, at such harbor projects;</text></subparagraph><subparagraph id="H51773ACD00C0497088E26D1D2D5456E0"><enum>(B)</enum><text>not less than 12 percent of such funds for projects that are located within the Great Lakes Navigation System;</text></subparagraph><subparagraph id="HB8A1E545B45547308E7F8E96F2EA06A9"><enum>(C)</enum><text>10 percent of such funds for expanded uses carried out at donor ports, as such term is defined in section 2106 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238c">33 U.S.C. 2238c</external-xref>); and</text></subparagraph><subparagraph id="HDD649C04EC964CC38001CEE90E2F79F8"><enum>(D)</enum><text display-inline="yes-display-inline">any remaining funds for operation and maintenance costs of any harbor or inland harbor referred to in subsection (a)(2) based on an equitable allocation of such funds among such harbors and inland harbors.</text></subparagraph></paragraph><after-quoted-block>;</after-quoted-block></quoted-block></paragraph><paragraph id="H7E39BB9D0AEF4F9CB6A337EFEBDE6616"><enum>(2)</enum><text>by amending paragraph (3) to read as follows:</text><quoted-block display-inline="no-display-inline" id="H84C5020F992340C599580E0F20A923BB" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H6369B71999B04FCB822D138284FDC7EA"><enum>(3)</enum><header>Additional uses at emerging harbors</header><subparagraph id="H19C0CADD638B48B8AA4B5903F10B63E3"><enum>(A)</enum><header>In general</header><text display-inline="yes-display-inline">In each fiscal year, the Secretary may use not more than $5,000,000 of funds designated for emerging harbor projects under paragraph (1)(A) to pay for the costs of up to 10 projects for maintenance dredging of a marina or berthing area, in an emerging harbor, that includes an area that is located adjacent to, or is accessible by, a Federal navigation project, subject to subparagraphs (B) and (C) of this paragraph.</text></subparagraph><subparagraph id="H438277BF8D324C629B3C0A2CA21677C5"><enum>(B)</enum><header>Eligible emerging harbors</header><text>The Secretary may use funds as authorized under subparagraph (A) at an emerging harbor that—</text><clause id="HA585A051F7FD4D749DFA2C4ACEC40216"><enum>(i)</enum><text>supports commercial activities, including commercial fishing operations, commercial fish processing operations, recreational and sport fishing, and commercial boat yards; or </text></clause><clause id="H501724975E55463580D7E2C58181D770"><enum>(ii)</enum><text>supports activities of the Secretary of the department in which the Coast Guard is operating. </text></clause></subparagraph><subparagraph id="H5A0E0CF612424E5C8A93E1381B8BDA79"><enum>(C)</enum><header>Cost-sharing requirements</header><text display-inline="yes-display-inline">The Secretary shall require a non-Federal interest to contribute not less than 25 percent of the costs for maintenance dredging of that portion of a maintenance dredging project described in subparagraph (A) that is located outside of the Federal navigation project, which may be provided as an in-kind contribution, including through the use of dredge equipment owned by non-Federal interest to carry out such activities.</text></subparagraph></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph><paragraph id="HAFD2CF51C68E4FD8BFBBEE25BA5ECCF2"><enum>(3)</enum><text>by adding at the end the following:</text><quoted-block display-inline="no-display-inline" id="H4EBE6DF7F0F64090A51B67E1AC7FE28C" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="HCFDF1DAF99FC42A79204F864C4F4D1BF"><enum>(5)</enum><header>Emergency expenditures</header><text>Nothing in this subsection prohibits the Secretary from making an expenditure to pay for the operation and maintenance costs of a specific harbor or inland harbor, including the transfer of funding from the operation and maintenance of a separate project, if—</text><subparagraph id="H3D41E3F2F67A42F78D690C2515E8FCCF"><enum>(A)</enum><text>the Secretary determines that the action is necessary to address the navigation needs of a harbor or inland harbor where safe navigation has been severely restricted due to an unforeseen event; and</text></subparagraph><subparagraph id="H8D6FF1501E0B488D8B86E2CB6EC6BB34"><enum>(B)</enum><text>the Secretary provides within 90 days of the action notice and information on the need for the action to the Committee on Environment and Public Works and the Committee on Appropriations of the Senate and the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives.</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection><subsection id="HA9EF51A52D22493FB09A3BC3E85BBC4C"><enum>(c)</enum><header>Prioritization</header><text display-inline="yes-display-inline">Section 210 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238</external-xref>) is amended by striking subsection (d) and redesignating subsections (e) and (f) as subsections (d) and (e), respectively.</text></subsection><subsection id="H9CB2C5FDA6704871AD771B9748744CA0"><enum>(d)</enum><header>Assessment of harbors and inland harbors</header><text display-inline="yes-display-inline">Section 210(d)(2)(A)(ii) of the Water Resources Development Act of 1986 (as so redesignated) is amended by striking <quote>expanded uses at eligible harbors or inland harbors referred to in subsection (d)(2)</quote> and inserting <quote>uses described in paragraphs (1)(C) and (3) of subsection (c)</quote>.</text></subsection><subsection id="H866F42E570614E35989C39BE06F29AA7"><enum>(e)</enum><header>Definitions</header><text display-inline="yes-display-inline">Section 210(e) of the Water Resources Development Act of 1986 (as so redesignated) is amended—</text><paragraph id="H890532C9A9534C2AA65FE9DA32636B0D"><enum>(1)</enum><text>by striking paragraphs (6) through (9);</text></paragraph><paragraph id="HB54E98C4E5A74DAA94175F35357C2678"><enum>(2)</enum><text>by redesignating paragraphs (3) through (5) as paragraphs (4) through (6), respectively;</text></paragraph><paragraph id="H42A6867C872C40269B9CE7FD63898F62"><enum>(3)</enum><text>by striking paragraph (2) and inserting the following:</text><quoted-block display-inline="no-display-inline" id="H82DBB138FA7247B787F7875F2748F566" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="HCC99AB87A5D64831B5A8A3917157DE68"><enum>(2)</enum><header>Emerging harbor</header><text display-inline="yes-display-inline">The term <term>emerging harbor</term> means a harbor or inland harbor referred to in subsection (a)(2) that transits less than 1,000,000 tons of cargo annually.</text></paragraph><paragraph id="H5C5EA3CA941D48AAB9514C807B809450"><enum>(3)</enum><header>Emerging harbor project</header><text display-inline="yes-display-inline">The term <term>emerging harbor project</term> means a project that is assigned to an emerging harbor. </text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph><paragraph id="H547946BBDE554D42854ECE621191D1BE"><enum>(4)</enum><text>in paragraph (4) (as so redesignated), by adding at the end the following:</text><quoted-block display-inline="no-display-inline" id="H5281EC8772B1471DA4A1360DB1087BC8" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subparagraph id="H1CBE50E25CEC464AB0ADDE6E77F2903D"><enum>(C)</enum><text display-inline="yes-display-inline">An in-water improvement, if the improvement—</text><clause id="H6437CC3ECD5048C59C9937B632B5CEFB"><enum>(i)</enum><text display-inline="yes-display-inline">is for the seismic reinforcement of a wharf or other berthing structure, or the repair or replacement of a deteriorating wharf or other berthing structure, at a port facility;</text></clause><clause id="HA9D0E3C50880438EAE8089177C60C441"><enum>(ii)</enum><text>benefits commercial navigation at the harbor; and</text></clause><clause id="HF6518CB06468403B9466D5B183447D29"><enum>(iii)</enum><text>is located in, or adjacent to, a berth that is accessible to a Federal navigation project.</text></clause></subparagraph><subparagraph id="H1BF1BB92CF204208B84CE3C4122570CA"><enum>(D)</enum><text>An activity to maintain slope stability at a berth in a harbor that is accessible to a Federal navigation project if such activity benefits commercial navigation at the harbor.</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection></section><section id="H4B55D5DC11AD4E5282DFCDEF373FCE02"><enum>103.</enum><header>Annual report to Congress on the Harbor Maintenance Trust Fund</header><text display-inline="no-display-inline">Section 330 of the Water Resources Development Act of 1992 (<external-xref legal-doc="usc" parsable-cite="usc/26/9505">26 U.S.C. 9505</external-xref> note; 106 Stat. 4851) is amended—</text><paragraph id="HAF3A893C7DCB4B1EB7162FBC6132667D"><enum>(1)</enum><text>in subsection (a)— </text><subparagraph id="H5E56B58676014DE19E7AF91D2B128B53"><enum>(A)</enum><text>by striking <quote>and annually thereafter,</quote> and inserting <quote>and annually thereafter concurrent with the submission of the President’s annual budget request to Congress,</quote>; and </text></subparagraph><subparagraph id="H82EA6D416101491BB5F2875C9843E244"><enum>(B)</enum><text>by striking <quote>Public Works and Transportation</quote> and inserting <quote>Transportation and Infrastructure</quote>; and </text></subparagraph></paragraph><paragraph id="H1C81E5B223F84B19B01B46F3A250014E"><enum>(2)</enum><text>in subsection (b)(1) by adding at the end the following: </text><quoted-block id="H8D21E517E1B244C0A892BA33BF190703" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subparagraph id="H2519661DDA4D4C558424A63E8E2130DD"><enum>(D)</enum><text>A description of the expected expenditures from the trust fund to meet the needs of navigation for the fiscal year of the budget request.</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section><section id="H03D6C2EBF62E49DD8812152517395365" section-type="subsequent-section"><enum>104.</enum><header>Additional measures at donor ports and energy transfer ports</header><subsection id="H883312F37A1A41F382F4495C6D2829A4"><enum>(a)</enum><header>Definitions</header><text display-inline="yes-display-inline">Section 2106(a) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238c">33 U.S.C. 2238c(a)</external-xref>) is amended—</text><paragraph id="H58D7302B24124DF691D7056D1C4F9265"><enum>(1)</enum><text>in paragraph (3)(A)—</text><subparagraph id="H99F2C84FDD3B479DB8CEC8411ECD0FF9"><enum>(A)</enum><text>by amending clause (ii) to read as follows:</text><quoted-block display-inline="no-display-inline" id="HA037DD067E3A415BB1A468886478C2C7" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><clause commented="no" id="H5DF88F63C5D1403D94B75E81BF90C335"><enum>(ii)</enum><text display-inline="yes-display-inline">at which the total amount of harbor maintenance taxes collected (including the estimated taxes related to domestic cargo and cruise passengers) comprise not less than $15,000,000 annually of the total funding of the Harbor Maintenance Trust Fund in each of the previous 3 fiscal years;</text></clause><after-quoted-block>;</after-quoted-block></quoted-block></subparagraph><subparagraph id="H6E1EB1E3AB37457B9106E2FDF52845B4"><enum>(B)</enum><text>in clause (iii), by inserting <quote>(including the estimated taxes related to domestic cargo and cruise passengers)</quote> after <quote>taxes collected</quote>; and </text></subparagraph><subparagraph commented="no" id="H6312FF57A8D941209656E8FBA0415A5A"><enum>(C)</enum><text>in clause (iv), by striking <quote>fiscal year 2012</quote> and inserting <quote>each of the previous 3 fiscal years</quote>;</text></subparagraph></paragraph><paragraph commented="no" id="H1167C60BA12F43A4A7639E49712FEB3F"><enum>(2)</enum><text display-inline="yes-display-inline">in paragraph (5)(B), by striking <quote>fiscal year 2012</quote> each place it appears and inserting <quote>each of the previous 3 fiscal years</quote>;</text></paragraph><paragraph id="HB6041B09B2524C738B26C8E9D6303DC1"><enum>(3)</enum><text>by redesignating paragraph (8) as paragraph (9) and inserting after paragraph (7) the following:</text><quoted-block display-inline="no-display-inline" id="H69980531BC374040A501F1867ED5A801" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="HBB11B5AB19E143788F21672823E858F5"><enum>(8)</enum><header>Harbor Maintenance Trust Fund</header><text display-inline="yes-display-inline">The term <term>Harbor Maintenance Trust Fund</term> means the Harbor Maintenance Trust Fund established by <external-xref legal-doc="usc" parsable-cite="usc/26/9505">section 9505</external-xref> of the Internal Revenue Code of 1986.</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph><paragraph id="H3744A971CBBA463BB87796C46040EEF3"><enum>(4)</enum><text>in paragraph (9), as so redesignated—</text><subparagraph id="H118714854E724D0092B7B422973DAF2F"><enum>(A)</enum><text>by amending subparagraph (B) to read as follows:</text><quoted-block display-inline="no-display-inline" id="H4062A791AD3941258B4E95F4DD7FACDC" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subparagraph commented="no" id="HBA425DB717EC4CD5AD9BDB103AE820A4"><enum>(B)</enum><text display-inline="yes-display-inline">at which the total amount of harbor maintenance taxes collected (including the estimated taxes related to domestic cargo and cruise passengers) comprise annually more than $5,000,000 but less than $15,000,000 of the total funding of the Harbor Maintenance Trust Fund in each of the previous 3 fiscal years;</text></subparagraph><after-quoted-block>;</after-quoted-block></quoted-block></subparagraph><subparagraph id="H3D08A7A1DC884377ACF22E39BF2BCFBA"><enum>(B)</enum><text>in subparagraph (C), by inserting <quote>(including the estimated taxes related to domestic cargo and cruise passengers)</quote> after <quote>taxes collected</quote>; and </text></subparagraph><subparagraph commented="no" id="H62BC7B908F6841D1AA91B6B80B4A4584"><enum>(C)</enum><text display-inline="yes-display-inline">in subparagraph (D), by striking <quote>fiscal year 2012</quote> and inserting <quote>each of the previous 3 fiscal years</quote>.</text></subparagraph></paragraph></subsection><subsection id="H4E4AF786E8A541578D933B44EC821C01"><enum>(b)</enum><header>Report to Congress; authorization of appropriations</header><text display-inline="yes-display-inline">Section 2106 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238c">33 U.S.C. 2238c</external-xref>) is amended—</text><paragraph id="HABC544BBE3BE47FE8ACD412A6D193F23"><enum>(1)</enum><text>by striking subsection (e) and redesignating subsections (f) and (g) as subsections (e) and (f), respectively; and</text></paragraph><paragraph id="HD742E27FC5F541AEB9507C169CB90912"><enum>(2)</enum><text>in subsection (e), as so redesignated—</text><subparagraph id="H08D91F02B6EF41D1A41D41E261F51D01"><enum>(A)</enum><text>in paragraph (1), by striking <quote>2020</quote> and inserting <quote>2030</quote>; and</text></subparagraph><subparagraph id="H89758374B38240278219A110849052F1"><enum>(B)</enum><text display-inline="yes-display-inline">by striking paragraph (3).</text></subparagraph></paragraph></subsection></section><section id="H14C15447744F4028851D23F7C1D71B12"><enum>105.</enum><header>Assumption of maintenance of a locally preferred plan</header><text display-inline="no-display-inline"> Section 204(f) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2232">33 U.S.C. 2232(f)</external-xref>) is amended to read as follows:</text><quoted-block display-inline="no-display-inline" id="H613D2E8AC59049EEA04F41DF60DA5A03" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subsection id="H2A3F017292F3484BAD366A0555F6FC59"><enum>(f)</enum><header>Operation and maintenance</header><paragraph id="HE8873CE59AA0455799E108E14DCDF3FC"><enum>(1)</enum><header>Assumption of maintenance</header><text display-inline="yes-display-inline">Whenever a non-Federal interest carries out improvements to a federally authorized harbor or inland harbor, the Secretary shall be responsible for operation and maintenance in accordance with section 101(b) if—</text><subparagraph id="HDF9FE0A4300C410B8C48EED190E4AA25"><enum>(A)</enum><text display-inline="yes-display-inline">before construction of the improvements—</text><clause id="HC93BB6F55CAF4E75AF657E3B7C813F7E"><enum>(i)</enum><text>the Secretary determines that the improvements are feasible and consistent with the purposes of this title; and</text></clause><clause id="H8D469F0B34A94807B64724952FFC56F6"><enum>(ii)</enum><text>the Secretary and the non-Federal interest execute a written agreement relating to operation and maintenance of the improvements;</text></clause></subparagraph><subparagraph id="H896D0DEB616944129757E7E90484313C"><enum>(B)</enum><text>the Secretary certifies that the project or separable element of the project is constructed in accordance with applicable permits and appropriate engineering and design standards; and</text></subparagraph><subparagraph id="H104E4AC82E834C1CADE456FB7E04DEB4"><enum>(C)</enum><text>the Secretary does not find that the project or separable element is no longer feasible.</text></subparagraph></paragraph><paragraph commented="no" id="H21EC9D2B4BFB4A6897D7EF2C572AB19F"><enum>(2)</enum><header>Federal financial participation in the costs of a locally preferred plan</header><text>In the case of improvements determined by the Secretary pursuant to paragraph (1)(A)(i) to deviate from the national economic development plan, the Secretary shall be responsible for all operation and maintenance costs of such improvements, as described in section 101(b), including costs in excess of the costs of the national economic development plan, if the Secretary determines that the improvements satisfy the requirements of paragraph (1).</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></section><section id="HCEA99E2A3347462AA6E34C619A533529" section-type="subsequent-section"><enum>106.</enum><header>Coast Guard anchorages</header><text display-inline="no-display-inline">The Secretary is authorized to perform dredging at Federal expense within and adjacent to anchorages on the Columbia River established by the Coast Guard pursuant to section 7 of the Act of March 14, 1915 (<external-xref legal-doc="usc" parsable-cite="usc/33/471">33 U.S.C. 471</external-xref>), to provide safe anchorage for deep draft vessels commensurate with the authorized Federal navigation channel depth, including advanced maintenance.</text></section><section id="HCAEB1BC9628E429B8E01DC5B2B90A76F"><enum>107.</enum><header>State contribution of funds for certain operation and maintenance costs</header><text display-inline="no-display-inline">In carrying out eligible operations and maintenance activities within the Great Lakes Navigation System pursuant to section 210 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238</external-xref>) in a State that has implemented any additional State limitation on the disposal of dredged material in the open waters of such State, the Secretary may, pursuant to section 5 of the Act of June 22, 1936 (<external-xref legal-doc="usc" parsable-cite="usc/33/701h">33 U.S.C. 701h</external-xref>), receive from such State, and expend, such funds as may be contributed by the State to cover the additional costs for operations and maintenance activities for a harbor or inland harbor within such State that result from such limitation.</text></section><section commented="no" id="HED3A725F3D2E41558096DDF478D7EF64" section-type="subsequent-section"><enum>108.</enum><header>Inland waterway projects</header><subsection commented="no" id="HC586BF08741447099810D5CD618174E4"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Notwithstanding section 102 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2212">33 U.S.C. 2212</external-xref>), 35 percent of the costs of construction of any project for navigation on the inland waterways shall be paid from amounts appropriated from the Inland Waterways Trust Fund—</text><paragraph commented="no" id="HBCFDA7C0C8B84F0F8CEEC249AB92AC9B"><enum>(1)</enum><text>during each of fiscal years 2021 through 2027; and</text></paragraph><paragraph commented="no" id="HB88AB86C764A4F71BE8DB6C0136E7BD8"><enum>(2)</enum><text>for a project the construction of which is initiated during such period, in each fiscal year until such construction is complete.</text></paragraph></subsection><subsection commented="no" id="HC8BA5E6750D3411F9D45F37D1F6C0FB8"><enum>(b)</enum><header>Prioritization</header><text display-inline="yes-display-inline">In selecting projects described in subsection (a) for which to initiate construction during any of fiscal years 2021 through 2027, the Secretary shall prioritize projects that are included in the most recent 20-year program for making capital investments developed under section 302(d) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2251">33 U.S.C. 2251(d)</external-xref>).</text></subsection></section><section id="HAEACB73C967249FCB81B95EC80117113"><enum>109.</enum><header>Implementation of water resources principles and requirements</header><subsection id="H04F1B8506636486482A1B75E89B61DDD"><enum>(a)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of this Act, the Secretary shall issue final agency-specific procedures necessary to implement the principles and requirements and the interagency guidelines.</text></subsection><subsection id="H36384F772C9946DFA3B8B78CF4E995E0"><enum>(b)</enum><header>Development of future water resources development projects</header><text>The procedures required by subsection (a) shall ensure that the Secretary, in the formulation of future water resources development projects—</text><paragraph id="H104B947951D44366AB9EB8E76F662C15"><enum>(1)</enum><text>develops such projects in accordance with—</text><subparagraph id="H3C75058B898E437A8E14FCC3486D5A77"><enum>(A)</enum><text>the guiding principles established by the principles and requirements; and</text></subparagraph><subparagraph id="HFD50287C5B9C4A2593703EE91F3EE1AE"><enum>(B)</enum><text>the national water resources planning policy established by section 2031(a) of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/42/1962-3">42 U.S.C. 1962–3(a)</external-xref>); and</text></subparagraph></paragraph><paragraph id="H678F3E61AFC94474AD139547E29CE284"><enum>(2)</enum><text>fully identifies and analyzes national economic development benefits, regional economic development benefits, environmental quality benefits, and other societal effects.</text></paragraph></subsection><subsection id="H70411ADE186B45CFAC8F098BAACD3095"><enum>(c)</enum><header>Review and update</header><text>Every 5 years, the Secretary shall review and, where appropriate, revise the procedures required by subsection (a).</text></subsection><subsection id="H999B2A9DD7A24FA8AD80FF1E3E429145"><enum>(d)</enum><header>Public review, notice, and comment</header><text>In issuing, reviewing, and revising the procedures required by this section, the Secretary shall—</text><paragraph id="H8B5E87251EE04579BDB6B09A2E77CC12"><enum>(1)</enum><text>provide notice to interested non-Federal stakeholders of the Secretary’s intent to revise the procedures;</text></paragraph><paragraph id="HD148B52658B64E53818C0EA7290120A6"><enum>(2)</enum><text>provide opportunities for interested non-Federal stakeholders to engage with, and provide input and recommendations to, the Secretary on the revision of the procedures; and</text></paragraph><paragraph id="H6AB3672F1D9E4D74AF9A6FE32516CD7C"><enum>(3)</enum><text>solicit and consider public and expert comments.</text></paragraph></subsection><subsection id="H5C3CA78EA2D249D9A5ACD53ED18DC77D"><enum>(e)</enum><header>Definitions</header><text>In this section:</text><paragraph commented="no" id="HEE2623774CC14461982AD01886DB7013"><enum>(1)</enum><header>Interagency guidelines</header><text>The term <term>interagency guidelines</term> means the interagency guidelines contained in the document finalized by the Council on Environmental Quality pursuant to section 2031 of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/42/1962-3">42 U.S.C. 1962–3</external-xref>) in December 2014, to implement the principles and requirements.</text></paragraph><paragraph id="H5169F722E3D34E2B87246AF5EDF663C2"><enum>(2)</enum><header>Principles and requirements</header><text>The term <term>principles and requirements</term> means the principles and requirements contained in the document prepared by the Council on Environmental Quality pursuant to section 2031 of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/42/1962-3">42 U.S.C. 1962–3</external-xref>), entitled <quote>Principles and Requirements for Federal Investments in Water Resources</quote>, and dated March 2013.</text></paragraph></subsection></section><section id="H5A7BF6EE04674A0CB647780C8A1637AD"><enum>110.</enum><header>Resiliency planning assistance</header><subsection id="H1DEEAE840C63403F813C33B062D27A1E"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Section 206(a) of the Flood Control Act of 1960 (<external-xref legal-doc="usc" parsable-cite="usc/33/709a">33 U.S.C. 709a(a)</external-xref>) is amended by inserting <quote>, to avoid repetitive flooding impacts, to anticipate, prepare, and adapt to changing climatic conditions and extreme weather events, and to withstand, respond to, and recover rapidly from disruption due to the flood hazards</quote> after <quote>in planning to ameliorate the flood hazard</quote>.</text></subsection><subsection id="HBE790140C32749CE90738C22A01E82B9"><enum>(b)</enum><header>Prioritizing flood risk resiliency technical assistance for economically disadvantaged communities</header><text>In carrying out section 206 of the Flood Control Act of 1960 (<external-xref legal-doc="usc" parsable-cite="usc/33/709a">33 U.S.C. 709a</external-xref>), the Secretary shall prioritize the provision of technical assistance to support flood risk resiliency planning efforts of an economically disadvantaged community.</text></subsection></section><section commented="no" id="H932983C4DE5243AF86E8317FAD6A8B74"><enum>111.</enum><header>Project consultation</header><subsection commented="no" id="HFDB91D65B7414BD1B9001878159096C6"><enum>(a)</enum><header>Reports required</header><text>Not later than 180 days after the date of enactment of this Act, the Secretary shall submit the following reports:</text><paragraph commented="no" id="HF24C92DF7F354DEABC035FB4884519F2"><enum>(1)</enum><text>The report required under section 1214 of the Water Resources Development Act of 2018 (132 Stat. 3809).</text></paragraph><paragraph commented="no" id="HC6602504FCCE43C690966816D2BB1C2B"><enum>(2)</enum><text>The report required under section 1120(a)(3) of the Water Resources Development Act of 2016 (130 Stat. 1643).</text></paragraph></subsection><subsection commented="no" id="H17FC0C0AAB174EAEBE87EC51FF92724F"><enum>(b)</enum><header>Consultation</header><paragraph commented="no" id="HEFC1D806A377466D9A4A989AE45288A5"><enum>(1)</enum><header>Agencies and Tribes</header><text>The Secretary shall ensure that all covered community consultation policies, regulations, and guidance of the Corps of Engineers continue to be implemented, and that consultations with Federal and State agencies and Indian Tribes required for a water resources development project are carried out.</text></paragraph><paragraph commented="no" id="H83C56294D9674BE78B1FBCDFA1685D0A"><enum>(2)</enum><header>Communities</header><text display-inline="yes-display-inline">The Secretary shall ensure that any covered communities, including such communities identified in the reports submitted under subsection (a), that are found to be disproportionately or adversely affected are included in consultation policies, regulations, and guidance of the Corps of Engineers.</text></paragraph><paragraph commented="no" id="HCAF6F11607D8443B83AF4A5E87AC5BC9"><enum>(3)</enum><header>Project planning and construction</header><text>The Secretary shall ensure that covered communities are consulted in the development of water resources development project planning and construction, for the purposes of achieving environmental justice and addressing any disproportionate or adverse effects on such communities.</text></paragraph></subsection><subsection commented="no" id="HF056A0AB66014526B2B6DCE516A8D882"><enum>(c)</enum><header>Environmental justice updates</header><paragraph id="H74A8C8A167004EE695EABE8DC3130390"><enum>(1)</enum><header>In general</header><text>Not later than 1 year after the date of enactment of this Act, the Secretary shall update any policies, regulations, and guidance of the Corps of Engineers related to achieving environmental justice for covered communities.</text></paragraph><paragraph id="H874E96DCBB9441C1BD264FBE809B2903"><enum>(2)</enum><header>Recommendations and consultation</header><text>In carrying out paragraph (1), the Secretary shall—</text><subparagraph id="H04EAC49CF3004D23BECCC43FC6E94C3B"><enum>(A)</enum><text>consult with a wide array of representatives of covered communities; and</text></subparagraph><subparagraph id="HB8CCDF965B434D61A564462265913405"><enum>(B)</enum><text>use the recommendations from the reports submitted under subsection (a).</text></subparagraph></paragraph></subsection><subsection commented="no" id="H795650662FD74CE8A4AAC77D40183AD0"><enum>(d)</enum><header>Community engagement</header><text>The Secretary shall ensure that in carrying out authorized water resources development projects in, and all other activities of the Corps of Engineers related to, covered communities, the Corps of Engineers—</text><paragraph commented="no" id="H0CD10368126E4FE2A4511A89C88B2ECE"><enum>(1)</enum><text>promotes the meaningful involvement of such communities in the project development and implementation, enforcement efforts, and other activities of the Corps of Engineers;</text></paragraph><paragraph commented="no" id="H86991DAAACA24934AC7F7EE43781B7E9"><enum>(2)</enum><text>provides guidance and technical assistance to such communities to increase understanding of the project development and implementation activities, regulations, and policies of the Corps of Engineers; and</text></paragraph><paragraph commented="no" id="H378298BBE4D9456E8949ED18A3FA5776"><enum>(3)</enum><text>cooperates with State, Tribal, and local governments with respect to activities carried out pursuant to this subsection.</text></paragraph></subsection><subsection commented="no" id="HDBD5CAE12F0A4FD8A386E2BF68EB2391"><enum>(e)</enum><header>Tribal lands and consultation</header><text display-inline="yes-display-inline">The Secretary shall ensure that in carrying out authorized water resources development projects and in all other activities of the Corps of Engineers, that the Corps of Engineers—</text><paragraph commented="no" id="H15456CEDB0F143718F4A36B93C3850C7"><enum>(1)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="HF4F1BDC8DFCB467AAE094F8D9E23A3D6"><enum>(A)</enum><text>consults with Indian Tribes specifically on any Tribal lands near or adjacent to any activities of the Corps of Engineers, for purposes of identifying lands of ancestral, cultural, or religious importance; and</text></subparagraph><subparagraph commented="no" id="HC47DE56557EE4864822441C0049759B7" indent="up1"><enum>(B)</enum><text>cooperates with Indian Tribes to avoid, or otherwise find alternate solutions with respect to, such lands; and</text></subparagraph></paragraph><paragraph commented="no" id="H75720FA391A24023BF15C53C7E9A2B3C"><enum>(2)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="H907FB22CF0D741D5A27D026A6859825B"><enum>(A)</enum><text display-inline="yes-display-inline">consults with Indian Tribes specifically on any Tribal areas near or adjacent to any activities of the Corps of Engineers, for purposes of identifying lands, waters, and other resources critical to the livelihood of the Indian Tribes; and</text></subparagraph><subparagraph commented="no" id="HF40D994BB6874934A632BEBC5519FCD0" indent="up1"><enum>(B)</enum><text>cooperates with Indian Tribes to avoid, or otherwise find alternate solutions with respect to, such areas.</text></subparagraph></paragraph></subsection><subsection commented="no" id="H1385B310E40F4CE2A566EBEDA06B021A"><enum>(f)</enum><header>Definitions</header><text>In this section:</text><paragraph commented="no" id="H6BFBD4AB8CB24A8A9C04EC7A40381FDD"><enum>(1)</enum><header>Community of color</header><text>The term <term>community of color</term> means a community of individuals who are—</text><subparagraph commented="no" id="H1B6AACD82BE848A3BD0B75FD5E97B743"><enum>(A)</enum><text>American Indian or Alaska Native;</text></subparagraph><subparagraph commented="no" id="H574E614436FB461D929F141200D38EDA"><enum>(B)</enum><text>Asian or Pacific Islander;</text></subparagraph><subparagraph commented="no" id="H45B6479C2E5C405887028A5A0AAD54B5"><enum>(C)</enum><text>Black, not of Hispanic origin; or</text></subparagraph><subparagraph commented="no" id="H4A45C3EE406A47F68A24B63DA0F11EAC"><enum>(D)</enum><text>Hispanic.</text></subparagraph></paragraph><paragraph commented="no" id="H1CC9B922C7664C6EACF3A15F6094BA08"><enum>(2)</enum><header>Covered community</header><text>The term <term>covered community</term> means each of the following:</text><subparagraph commented="no" id="HF9B840D7205D462680474547407E589D"><enum>(A)</enum><text>A community of color.</text></subparagraph><subparagraph commented="no" id="H2B044A623A87446AB7EE9A74C8D2AE4E"><enum>(B)</enum><text>An economically disadvantaged community.</text></subparagraph><subparagraph commented="no" id="H682EBECFEB6F41F996528D3DF22E0C32"><enum>(C)</enum><text>A rural community.</text></subparagraph><subparagraph commented="no" id="H5BA352EDC50F4D8EB00BA29CFD366B68"><enum>(D)</enum><text>A Tribal or indigenous community.</text></subparagraph></paragraph><paragraph id="H982EF4D87F574B30B668FA1D1FBDF2DC"><enum>(3)</enum><header>State</header><text display-inline="yes-display-inline">The term <term>State</term> means each of the several States, the District of Columbia, and each of the commonwealths, territories, and possessions of the United States.</text></paragraph></subsection></section><section id="H78E1EC39986D49E39F6E4E6FA70A308A"><enum>112.</enum><header>Review of resiliency assessments</header><subsection id="H17BBD08901A8489D946C2899F908C2E1"><enum>(a)</enum><header>Resiliency assessment</header><paragraph id="HB0AC7DF23E234BDDA2D0F2A9B4CDA824"><enum>(1)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of this section, and in conjunction with the development of procedures under section 109 of this Act, the Secretary is directed to review, and where appropriate, revise the existing planning guidance documents and regulations on the assessment of the effects of sea level rise on future water resources development projects to ensure that such guidance documents and regulations are based on the best available, peer-reviewed science and data on the current and future effects of sea level rise on coastal communities.</text></paragraph><paragraph id="HF8D639FDB2D8494C866C920CF959AF3C"><enum>(2)</enum><header>Coordination</header><text>In carrying out this subsection, the Secretary shall—</text><subparagraph id="HBCA835312D884270BC8DCBCF438C83F5"><enum>(A)</enum><text>coordinate the review with the Engineer Research and Development Center, other Federal and State agencies, and other relevant entities; and</text></subparagraph><subparagraph id="H8926B563C23448CA9F40120475B863F8"><enum>(B)</enum><text>to the maximum extent practicable and where appropriate, utilize data provided to the Secretary by such agencies.</text></subparagraph></paragraph></subsection><subsection id="HFD16A92588144804B911CCFA8CF831EE"><enum>(b)</enum><header>Assessment of benefits of sea level rise resiliency in feasibility reports</header><paragraph id="H85A96E54F9D747CE93C4037AE3E557F9"><enum>(1)</enum><header>In general</header><text>Upon the request of a non-Federal interest, in carrying out a feasibility study for a project for flood risk mitigation, hurricane and storm damage risk reduction, or ecosystem restoration under section 905 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282">33 U.S.C. 2282</external-xref>), the Secretary shall consider whether the need for the project is predicated upon or exacerbated by conditions related to sea level rise.</text></paragraph><paragraph id="H99140D258AD0425B806684FE62EF4F92"><enum>(2)</enum><header>Sea level rise resiliency benefits</header><text>To the maximum extent practicable, in carrying out a study pursuant to paragraph (1), the Secretary shall document the potential effects of sea level rise on the project, and benefits of the project relating to sea level rise, during the 50-year period after the date of completion of the project.</text></paragraph></subsection></section><section id="HE4C1CFEE9DA94414A291F87E1552130D"><enum>113.</enum><header>Small flood control projects</header><text display-inline="no-display-inline">Section 205 of the Flood Control Act of 1948 (<external-xref legal-doc="usc" parsable-cite="usc/33/701s">33 U.S.C. 701s</external-xref>) is amended by inserting <quote>, and projects that use natural features or nature-based features (as those terms are defined in section 1184(a) of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2289a">33 U.S.C. 2289a(a)</external-xref>)),</quote> after <quote>nonstructural projects</quote>.</text></section><section id="H98AD792A5C1444888D89216D06C2D983"><enum>114.</enum><header>Conforming amendment</header><text display-inline="no-display-inline">Section 103(b) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2213">33 U.S.C. 2213</external-xref>) is amended—</text><paragraph id="H87D2B2C6D95D47C98241D94292D8AEFC"><enum>(1)</enum><text>in the subsection heading, by striking <quote><header-in-text level="subsection" style="OLC">Nonstructural flood control projects</header-in-text></quote> and inserting <quote><header-in-text level="subsection" style="OLC">Projects using nonstructural, natural, or nature-Based features</header-in-text></quote>; and</text></paragraph><paragraph id="H634A3F121CF04E9D865ED9513D99CE73"><enum>(2)</enum><text display-inline="yes-display-inline">in paragraph (1)—</text><subparagraph id="HC689030014E742148EF5589EB2AE51F4"><enum>(A)</enum><text display-inline="yes-display-inline">by striking <quote>nonstructural flood control measures</quote> and inserting <quote>a flood risk management or hurricane and storm damage risk reduction measure using a nonstructural feature, or a natural feature or nature-based feature (as those terms are defined in section 1184(a) of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2289a">33 U.S.C. 2289a(a)</external-xref>)),</quote>; and</text></subparagraph><subparagraph id="H0080A1C0D46B4A1397B1EEB40BEEE1A7"><enum>(B)</enum><text>by striking <quote>cash during construction of the project</quote> and inserting <quote>cash during construction for a nonstructural feature if the costs of land, easements, rights-of-way, dredged material disposal areas, and relocations for such feature are estimated to exceed 35 percent</quote>.</text></subparagraph></paragraph></section><section id="H0068E8D42C5A48DBB2648C0E34508843"><enum>115.</enum><header>Feasibility studies; review of natural and nature-based features</header><subsection id="HF706A530E617433B8D6A9FCB08CCA412"><enum>(a)</enum><header>Technical correction</header><text>Section 1149(c) of the Water Resources Development Act of 2018 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282">33 U.S.C. 2282</external-xref> note; 132 Stat. 3787) is amended by striking <quote>natural infrastructure alternatives</quote> and inserting <quote>natural feature or nature-based feature alternatives (as such terms are defined in section 1184 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/32/2289a">32 U.S.C. 2289a</external-xref>))</quote>.</text></subsection><subsection id="HC4E2FE316C884C7F9A3E0B197E7C86AF"><enum>(b)</enum><header>Summary of analysis</header><text>To the maximum extent practicable, the Secretary shall include in each feasibility report developed under section 905 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282">33 U.S.C. 2282</external-xref>) for a project that contains a flood risk management or hurricane and storm damage risk reduction element, a summary of the natural feature or nature-based feature alternatives that were evaluated in the development of the feasibility report, and, if such alternatives were not included in the recommended plan, an explanation of why such alternatives were not included into the recommended plan.</text></subsection></section><section id="HD959631C9A01452A98377FEC7AEE3D55"><enum>116.</enum><header>Report on corrosion prevention activities</header><text display-inline="no-display-inline">Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, and make publicly available, a report that describes—</text><paragraph id="H5A3213113F5041C8BDC4D2DE34AB7D24"><enum>(1)</enum><text>the extent to which the Secretary has carried out section 1033 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2350">33 U.S.C. 2350</external-xref>);</text></paragraph><paragraph id="H66103137FCE04B02AB32E35AF771C78C"><enum>(2)</enum><text>the extent to which the Secretary has incorporated corrosion prevention activities (as defined in such section) at water resources development projects constructed or maintained by the Secretary since the date of enactment of such section; and</text></paragraph><paragraph id="H465D27F0223843D29077AC3B81000D0C"><enum>(3)</enum><text>in instances where the Secretary has not incorporated corrosion prevention activities at such water resources development projects since such date, an explanation as to why such corrosion prevention activities have not been incorporated.</text></paragraph></section><section id="H8B79AF39FDC2422FAA421FA8EAFBFC77"><enum>117.</enum><header>Quantification of benefits for flood risk management projects in seismic zones</header><subsection id="HF94DFBB2D3264677B7D2CF8C4736E5CA"><enum>(a)</enum><header>In general</header><text>Upon the request of the non-Federal interest for a flood risk management project in a seismic zone, the Secretary shall quantify the seismic hazard risk reduction benefits for the project if the non-Federal interest identifies, and the Secretary approves, an acceptable methodology to quantify such benefits.</text></subsection><subsection id="HEBEE80D33C514A03AF82B6F84B15D41A"><enum>(b)</enum><header>Applicability</header><text>The Secretary shall—</text><paragraph id="H0B05A92A645A49BEB116260F2E89186B"><enum>(1)</enum><text>include all associated seismic hazard risk reduction benefits approved by the Secretary in the calculation of the national economic development benefit-cost ratio for a flood risk management project in a seismic hazard zone for purposes of plan formulation pursuant to section 905 of the Water Resources Development Act of 1986; and</text></paragraph><paragraph id="H3AD8253AFAC44C939AF1C6B631EFCD28"><enum>(2)</enum><text display-inline="yes-display-inline">seek to maximize the combination of flood risk reduction and seismic hazard risk reduction benefits in the formulation of the national economic development alternative for such project.</text></paragraph></subsection></section><section id="H2A55AD579A964123BF732B182300DED7"><enum>118.</enum><header>Federal interest determination</header><text display-inline="no-display-inline">Section 905 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282">33 U.S.C. 2282</external-xref>) is amended by inserting after subsection (a) the following:</text><quoted-block id="H06855EC9F95A449086AF6CFC26119B5C" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subsection id="HB1C4908FE751476DA1094D2F4FA0C641"><enum>(b)</enum><header>Federal interest determination</header><paragraph id="H8529E668C338417FA7B340B72A2A8012"><enum>(1)</enum><header>In general</header><text>In preparing a feasibility report under subsection (a) for a study that will benefit an economically disadvantaged community, upon request by the non-Federal interest for the study, the Secretary shall first determine the Federal interest in carrying out the study and the projects that may be proposed in the study.</text></paragraph><paragraph id="HB27AE447C94A48BA867FBEBBDB69DB45"><enum>(2)</enum><header>Cost share</header><text>The costs of a determination under paragraph (1)—</text><subparagraph id="HC260A750069B46F5B4A6C33579654E85"><enum>(A)</enum><text>shall be at Federal expense; and</text></subparagraph><subparagraph id="H3A44B1CDAE87406EB405DAA8C683CA09"><enum>(B)</enum><text>shall not exceed $200,000.</text></subparagraph></paragraph><paragraph id="H8C14F90ED19B46BA9543A2E02B8142D6"><enum>(3)</enum><header>Deadline</header><text>A determination under paragraph (1) shall be completed by not later than 120 days after the date on which funds are made available to the Secretary to carry out the determination.</text></paragraph><paragraph id="H14BD0AB2E5C04961AF62395E5CD2CFAA"><enum>(4)</enum><header>Treatment</header><subparagraph id="H0B341CD695B840D996E58C8574C844AC"><enum>(A)</enum><header>Timing</header><text>The period during which a determination is being completed under paragraph (1) for a study shall not be included for purposes of the deadline to complete a final feasibility report under section 1001(a)(1) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282c">33 U.S.C. 2282c(a)(1)</external-xref>).</text></subparagraph><subparagraph id="H1FED480643B34F4D999098825668494A"><enum>(B)</enum><header>Cost</header><text>The cost of a determination under paragraph (1) shall not be included for purposes of the maximum Federal cost under section 1001(a)(2) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282c">33 U.S.C. 2282c(a)(2)</external-xref>).</text></subparagraph></paragraph><paragraph id="H024596F5E5FD47C492DC61E0FA7DCA94"><enum>(5)</enum><header>Report to non-Federal interest</header><text>If, based on a determination under paragraph (1), the Secretary determines that a study or project is not in the Federal interest because the project will not result, or is unlikely to result, in a recommended plan that will produce national economic development benefits greater than cost, but may result in a technically sound and environmentally acceptable plan that is otherwise consistent with section 904 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2281">33 U.S.C. 2281</external-xref>), the Secretary shall issue a report to the non-Federal interest with recommendations on how the non-Federal interest might modify the proposal such that the project could be in the Federal interest and feasible.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></section><section id="H3CECCB0721664171B8EAAF8513E72AF7"><enum>119.</enum><header>Economically disadvantaged community flood protection and hurricane and storm damage reduction study pilot program</header><subsection id="H83C2F16224C644F9A7E75F9177663582"><enum>(a)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of this Act, the Secretary shall establish and implement a pilot program to evaluate opportunities to address the flood risk management and hurricane and storm damage risk reduction needs of economically disadvantaged communities.</text></subsection><subsection id="H297037CCD3D74D6EBCE35E2FD4694551"><enum>(b)</enum><header>Participation in pilot program</header><text>In carrying out subsection (a), the Secretary shall—</text><paragraph id="HADA219D432664D9B9F78558FA0F88B71"><enum>(1)</enum><text display-inline="yes-display-inline">publish a notice in the Federal Register that requests from non-Federal interests proposals for the potential feasibility study of a flood risk management project or hurricane and storm damage risk reduction project for an economically disadvantaged community;</text></paragraph><paragraph id="HE7C1074596664E58B508E23F1D28C07B"><enum>(2)</enum><text>upon request of a non-Federal interest for such a project, provide technical assistance to such non-Federal interest in the formulation of a proposal for a potential feasibility study to be submitted to the Secretary under the pilot program; and</text></paragraph><paragraph id="HE69DB231A7774FE284619BA359AB71DE"><enum>(3)</enum><text>review such proposals and select 10 feasibility studies for such projects to be carried out by the Secretary, in coordination with the non-Federal interest, under this pilot program.</text></paragraph></subsection><subsection id="H61AF5592CEE54162A5617EAF6BA3801B"><enum>(c)</enum><header>Selection criteria</header><text>In selecting a feasibility study under subsection (b)(3), the Secretary shall consider whether—</text><paragraph id="H1F948A2D0C634A5C8BF3196515E5972E"><enum>(1)</enum><text>the percentage of people living in poverty in the county or counties (or county-equivalent entity or entities) in which the project is located is above the percentage of people living in poverty in the State, based on census bureau data;</text></paragraph><paragraph id="HA2102F8C25A248FE8A4BD5965B48F38B"><enum>(2)</enum><text>the percentage of families with income above the poverty threshold but below the average household income in the county or counties (or county-equivalent entity or entities) in which the project is located is above the percentage of the same for the State, based on census bureau data;</text></paragraph><paragraph id="H2791BFB67E8B4FF69959F4714750005E"><enum>(3)</enum><text>the percentage of the population that identifies as belonging to a minority or indigenous group in the county or counties (or county-equivalent entity or entities) in which the project is located is above the average percentage in the State, based on census bureau data; and</text></paragraph><paragraph commented="no" id="HE053235D8F46493AA0D2C8B3E0ACA1BD"><enum>(4)</enum><text display-inline="yes-display-inline">the project is addressing flooding or hurricane or storm damage effects that have a disproportionate impact on a rural community or a community of color (as such term is defined in section 111 of this Act), including Tribal or indigenous peoples.</text></paragraph></subsection><subsection id="HC9785FD0804C4F8BBD1E9DBCCD763007"><enum>(d)</enum><header>Administration</header><text>Notwithstanding the requirements of section 105(a)(1)(A) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2215">33 U.S.C. 2215</external-xref>), the Federal share of the cost of a feasibility study carried out under the pilot program shall be 100 percent.</text></subsection><subsection id="H42ED6CD4A1AE4DF68AE0567920A40C65"><enum>(e)</enum><header>Geographic diversity</header><text>When selecting feasibility studies under subsection (b)(3), the Secretary shall consider the geographic diversity among proposed projects.</text></subsection><subsection id="H2722BE857D4C45E38DC46233C4716323"><enum>(f)</enum><header>Study requirements</header><text>Feasibility studies carried out under this subsection shall, to the maximum extent practical, incorporate natural features or nature-based features (as such terms are defined in section 1184 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2289a">33 U.S.C. 2289a</external-xref>)), or a combination of such features and nonstructural features, that avoid or reduce at least 50 percent of flood or storm damages in one or more of the alternatives included in the final alternatives evaluated.</text></subsection><subsection id="H8786E07721114A6A9F33667E52173B8A"><enum>(g)</enum><header>Notification</header><text>The Secretary shall notify the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate of the selection of each feasibility study under the pilot program.</text></subsection><subsection id="H3C60CD2E0D9F4142AA8C14641BB9D54D"><enum>(h)</enum><header>Completion</header><text>Upon completion of a feasibility report for a feasibility study selected to be carried out under this section, the Secretary shall transmit the report to Congress for authorization, and shall include the report in the next annual report submitted under section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>).</text></subsection><subsection id="HD819439F72BE47D3B710EFFAF12397CF"><enum>(i)</enum><header>Sunset</header><text>The authority to commence a feasibility study under this section shall terminate on the date that is 10 years after the date of enactment of this Act.</text></subsection><subsection id="H756D850F98D04CDFA6DCDD7039D635F7"><enum>(j)</enum><header>Report</header><text display-inline="yes-display-inline">Not later than 5 years and 10 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, and make publicly available, a report detailing the results of the pilot program carried out under this section, including—</text><paragraph id="H57D02EBF24CB415C9210127CFF09636B"><enum>(1)</enum><text>a description of proposals received from non-Federal interests pursuant to subsection (b)(1);</text></paragraph><paragraph id="HB7CCF5A5F98548C48AFC82E9EB2C5AAF"><enum>(2)</enum><text>a description of technical assistance provided to non-Federal interests under subsection (b)(2); and</text></paragraph><paragraph id="H65E90B5AAC2D4B9AA06698FD1F43F232"><enum>(3)</enum><text>a description of proposals selected under subsection (b)(3) and criteria used to select such proposals.</text></paragraph></subsection><subsection id="H51D2FAEA4C7A4210BF9178075C659C68"><enum>(k)</enum><header>State defined</header><text display-inline="yes-display-inline">In this section, the term <term>State</term> means each of the several States, the District of Columbia, and each of the commonwealths, territories, and possessions of the United States. </text></subsection></section><section id="HF7E3D4FD2B454FF491B5D9E58724BF88"><enum>120.</enum><header>Permanent measures to reduce emergency flood fighting needs for communities subject to repetitive flooding</header><subsection id="HEA6B8085CBA648E09F0B37BF74FDE654"><enum>(a)</enum><header>Definitions</header><text display-inline="yes-display-inline">In this section:</text><paragraph id="HE3B5E3C6C1754EC7BED07DE0189C8407"><enum>(1)</enum><header>Affected community</header><text display-inline="yes-display-inline">The term <term>affected community</term> means a legally constituted public body (as that term is used in section 221(b) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(b))—</text><subparagraph id="H22E3C1915E09477AA8B64608FB5EFCEE"><enum>(A)</enum><text>with jurisdiction over an area that has been subject to flooding in two or more events in any 10-year period; and</text></subparagraph><subparagraph id="HEDE165990601436992B4AC9DEB99AF95"><enum>(B)</enum><text>that has received emergency flood-fighting assistance, including construction of temporary barriers by the Secretary, under section 5 of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n</external-xref>) with respect to such flood events.</text></subparagraph></paragraph><paragraph id="HF353A0BA543446EC83C498805BAB8B09"><enum>(2)</enum><header>Natural feature; nature-based feature</header><text display-inline="yes-display-inline">The terms <term>natural feature</term> and <term>nature-based feature</term> have the meanings given those terms in section 1184 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2289a">33 U.S.C. 2289a</external-xref>).</text></paragraph></subsection><subsection id="H654730646C9248E2967C6DAC9174E538"><enum>(b)</enum><header>Program</header><paragraph id="H9987389DFF874DD0BE22ADED9FDF4DF3"><enum>(1)</enum><header>In general</header><text>The Secretary is authorized to carry out a program to study, design, and construct water resources development projects through measures involving, among other things, strengthening, raising, extending, realigning, or otherwise modifying existing flood control works, designing new works, and incorporating natural features, nature-based features, or nonstructural features, as appropriate to provide flood and coastal storm risk management to affected communities.</text></paragraph><paragraph id="H2929E6A3E77E492B886FD082E364D332"><enum>(2)</enum><header>Considerations</header><text>In carrying out paragraph (1), the Secretary shall, to the maximum extent practical, review and, where appropriate, incorporate natural features or nature-based features, or a combination of such features and nonstructural features, that avoid or reduce at least 50 percent of flood or storm damages in one or more of the alternatives included in the final alternatives evaluated.</text></paragraph><paragraph id="H71740FC58D814E7D945BAAF3F63146AB"><enum>(3)</enum><header>Construction</header><subparagraph id="H2D6907E3BA0241A688D31424CDBB50C7"><enum>(A)</enum><header>In general</header><text>The Secretary may carry out a project described in paragraph (1) without further congressional authorization if—</text><clause id="H99BE19E18BAE4E24B94D7DD7750198C0"><enum>(i)</enum><text>the Secretary determines that the project—</text><subclause id="HF2CA434C319049D1B40CC83B02972D0C"><enum>(I)</enum><text>is advisable to reduce the risk of flooding for an affected community; and</text></subclause><subclause id="H900DD68A62EB470C9F5782BDC159A99E"><enum>(II)</enum><text>produces benefits that are in excess of the estimated costs; and</text></subclause></clause><clause id="HFB0DCE76018D432F837FC47F1B202539"><enum>(ii)</enum><text>the Federal share of the cost of the construction does not exceed $15,000,000.</text></clause></subparagraph><subparagraph id="H5899789B10134695B7F416F2EFA8FDD0"><enum>(B)</enum><header>Specific authorization</header><text>If the Federal share of the cost of a project described in paragraph (1) exceeds $15,000,000, the Secretary shall submit the project recommendation to Congress for authorization prior to construction, and shall include the project recommendation in the next annual report submitted under section 7001 of the Water Resources Reform and Development Act of 2014.</text></subparagraph><subparagraph id="H48CE3B2D7889451E9460A9D860F87493"><enum>(C)</enum><header>Financing</header><clause id="HF7EBD3E99E86489B8255C35D90657838"><enum>(i)</enum><header>Contributions</header><text>If, based on a study carried out pursuant to paragraph (1), the Secretary determines that a project described in paragraph (1) will not produce benefits greater than cost, the Secretary shall allow the affected community to pay, or provide contributions equal to, an amount sufficient to make the remaining costs of design and construction of the project equal to the estimated value of the benefits of the project.</text></clause><clause id="H5EBDDF71D64D40149486A9F7A4D9C40D"><enum>(ii)</enum><header>Effect on non-Federal share</header><text>Amounts provided by an affected community under clause (i) shall be in addition to any payments or contributions the affected community is required to provide toward the remaining costs of design and construction of the project under section 103 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2213">33 U.S.C. 2213</external-xref>).</text></clause></subparagraph></paragraph><paragraph id="H8AC5FC983B714EC79EB93C011985127A"><enum>(4)</enum><header>Ability to pay</header><subparagraph id="H57BA6E0C10E848069B07246784E11171"><enum>(A)</enum><header>In general</header><text>Any cost-sharing agreement for a project entered into pursuant to this section shall be subject to the ability of the affected community to pay.</text></subparagraph><subparagraph id="HD362802C655A4631BEAB67494A2FC5DC"><enum>(B)</enum><header>Determination</header><text>The ability of any affected community to pay shall be determined by the Secretary in accordance with procedures established by the Secretary.</text></subparagraph><subparagraph id="H8FAD43B4F75D4F2EADD19DE4C50169A0"><enum>(C)</enum><header>Effect of reduction</header><text display-inline="yes-display-inline">Any reduction in the non-Federal share of the cost of a project described in paragraph (1) as a result of a determination under this paragraph shall not be included in the Federal share for purposes of subparagraphs (A) and (B) of paragraph (3).</text></subparagraph></paragraph></subsection></section><section id="HF0DE8901E5344F9E991A40B036E30B5A"><enum>121.</enum><header>Emergency response to natural disasters</header><subsection id="H24EB6638A574439EBFCF8534B1C21F54"><enum>(a)</enum><header>In general</header><text>Section 5 of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n</external-xref>) is amended—</text><paragraph id="H2C9394951B18406E938E65E7BA91194D"><enum>(1)</enum><text>in subsection (a), by adding at the end the following—</text><quoted-block id="HACA5DD48BB774A03A97BB1B2EEF28CE6" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H5CD47E0534DE438CBB757F771089A848"><enum>(5)</enum><header>Feasibility study</header><subparagraph id="H4ACE555515674C40B0AB44D0B2C613BF"><enum>(A)</enum><header>Determination</header><text>Not later than 180 days after receiving, from a non-Federal sponsor of a project to repair or rehabilitate a flood control work described in paragraph (1), a request to initiate a feasibility study to further modify the relevant flood control work to provide for an increased level of protection, the Secretary shall provide to the non-Federal sponsor a written decision on whether the Secretary has the authority under section 216 of the Flood Control Act of 1970 (<external-xref legal-doc="usc" parsable-cite="usc/33/549a">33 U.S.C. 549a</external-xref>) to undertake the requested feasibility study.</text></subparagraph><subparagraph id="HE0E8A85574D145C5BB6B9FA85F781044"><enum>(B)</enum><header>Recommendation</header><text>If the Secretary determines under subparagraph (B) that the Secretary does not have the authority to undertake the requested feasibility study, the Secretary shall include the request for a feasibility study in the annual report submitted under section 7001 of the Water Resources Reform and Development Act of 2014.</text></subparagraph></paragraph><after-quoted-block>;</after-quoted-block></quoted-block></paragraph><paragraph id="HF221ED5DDF114960A9DCBDCEBA41B413"><enum>(2)</enum><text>in subsection (c)—</text><subparagraph id="H99BEFC6FF56743AFB7A2A35CEB579D0D"><enum>(A)</enum><text>in the subsection heading, by striking <quote><header-in-text level="subsection" style="OLC">Levee owners manual</header-in-text></quote> and inserting <quote><header-in-text level="subsection" style="OLC">Eligibility</header-in-text></quote>;</text></subparagraph><subparagraph id="HBA0176C5872A4B829ACBE91522BFC78D"><enum>(B)</enum><text>in paragraph (1), in the heading, by striking <quote><header-in-text level="paragraph" style="OLC">In general</header-in-text></quote> and inserting <quote><header-in-text level="paragraph" style="OLC">Levee owner’s manual</header-in-text></quote>; </text></subparagraph><subparagraph id="H5ED688F5EFB24FD8A91DA14AC2B3FAE8"><enum>(C)</enum><text>by redesignating paragraphs (2) and (3) as paragraphs (3) and (4), respectively, and inserting after paragraph (1) the following:</text><quoted-block id="HE9058CFEA0644D9A88BE2670CC403EB0" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H00D6A41AFA264852A7ECAD38EE9CC55D"><enum>(2)</enum><header>Compliance</header><subparagraph id="HF1D94F20CAAC41AD9EE9E39BD8126921"><enum>(A)</enum><header>In general</header><text>Notwithstanding the status of compliance of a non-Federal interest with the requirements of a levee owner’s manual described in paragraph (1), or with any other eligibility requirement established by the Secretary related to the maintenance and upkeep responsibilities of the non-Federal interest, the Secretary shall consider the non-Federal interest to be eligible for repair and rehabilitation assistance under this section if the non-Federal interest—</text><clause id="HE1662D339A0A49309489628719DC250C"><enum>(i)</enum><text>enters into a written agreement with the Secretary that identifies any items of deferred or inadequate maintenance and upkeep identified by the Secretary prior to the natural disaster; and</text></clause><clause id="HC1DB4F99A6EC4C6EBEECA4D882C7CD73"><enum>(ii)</enum><text>pays, during performance of the repair and rehabilitation work, all costs to address—</text><subclause id="HFF9EA5DC75404CA3900D0E942471E822"><enum>(I)</enum><text>any items of deferred or inadequate maintenance and upkeep identified by the Secretary; and</text></subclause><subclause id="H70E97DDA2D68436BAB38F21BD9469DD0"><enum>(II)</enum><text>any repair or rehabilitation work necessary to address damage the Secretary attributes to such deferred or inadequate maintenance or upkeep.</text></subclause></clause></subparagraph><subparagraph commented="no" id="HD0887979007D4DD2963B18007F927E91"><enum>(B)</enum><header>Eligibility</header><text>The Secretary may only enter into one agreement under subparagraph (A) with any non-Federal interest.</text></subparagraph><subparagraph id="H3B3314179CD6469B8B7753FBB22EFDFC"><enum>(C)</enum><header>Sunset</header><text>The authority of the Secretary to enter into agreements under paragraph (2) shall terminate on the date that is 5 years after the date of enactment of this paragraph.</text></subparagraph></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph><subparagraph id="HF239D4718BE34CA38E63624BE4FEB527"><enum>(D)</enum><text>in paragraph (3) (as so redesignated), by striking <quote>this subsection</quote> and inserting <quote>paragraph (1)</quote>.</text></subparagraph></paragraph></subsection></section><section id="H8A19330324FE40D7818EAF6664DA3D0F"><enum>122.</enum><header>Study on natural infrastructure at Corps of Engineers projects</header><subsection id="HB82AFE62D6E044D99EDE53918A873822"><enum>(a)</enum><header>Definition of natural feature and nature-based feature</header><text>In this section, the terms <term>natural feature</term> and <term>nature-based feature</term> have the meanings given those terms in section 1184(a) of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2289a">33 U.S.C. 2289a(a)</external-xref>).</text></subsection><subsection id="H86EF401E2C3442D3BEA28DF44248AE3E"><enum>(b)</enum><header>Study</header><text>Not later than 2 years after the date of enactment of this Act, the Comptroller General of the United States shall conduct, and submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, a report on the results of a study on the consideration by the Secretary of natural infrastructure, natural features, and nature-based features in the study of the feasibility of projects for flood risk management, hurricane and storm damage risk reduction, and ecosystem restoration.</text></subsection><subsection id="HF17C85E2C7E64A459471DBB3398F09F3"><enum>(c)</enum><header>Requirements</header><text>The study under subsection (b) shall include—</text><paragraph id="HDD560C4A29DF43A593461DCC10DF5E20"><enum>(1)</enum><text>a description of guidance or instructions issued, and other measures taken, by the Secretary to consider natural infrastructure, natural features, and nature-based features in project feasibility studies;</text></paragraph><paragraph id="H63FB517BF63D4347B000BB09E176D4BC"><enum>(2)</enum><text>an assessment, based on information from relevant Federal and non-Federal sources, of—</text><subparagraph id="HAA709A1CD8FA452B8D8056E48F637EDE"><enum>(A)</enum><text>the costs, benefits, and effects associated with natural infrastructure, natural features, and nature-based features recommended by the Secretary for flood risk management, hurricane and storm damage risk reduction, and ecosystem restoration; and</text></subparagraph><subparagraph id="H70B948785C594B3C9B13E951739EB4B9"><enum>(B)</enum><text>the effectiveness of natural infrastructure, natural features, and nature-based features;</text></subparagraph></paragraph><paragraph id="H4D49BC67805E4572B7A83EC9DEB19638"><enum>(3)</enum><text display-inline="yes-display-inline">an analysis of projects for flood risk management, hurricane and storm damage risk reduction, and ecosystem restoration that have incorporated natural infrastructure, natural features, or nature-based features to identify best practices, including for measuring project benefits and costs;</text></paragraph><paragraph id="H9B661C3478AD4688B4E8042C0A52BB7C"><enum>(4)</enum><text>a description of any statutory, fiscal, regulatory, or other policy barriers to the appropriate consideration and use of a full array of natural infrastructure, natural features, and nature-based features in carrying out feasibility studies and projects; and</text></paragraph><paragraph id="H8A274B78B22B4A8A926019C8EE3D6067"><enum>(5)</enum><text display-inline="yes-display-inline">any recommendations for changes to law, or to fiscal, regulatory, or other policies, to improve the use of natural infrastructure, natural features, and nature-based features by the Corps of Engineers in carrying out feasibility studies and projects.</text></paragraph></subsection></section><section id="H0A2EFAB6B4FC4747B9D2EE31E6F2A58E"><enum>123.</enum><header>Review of Corps of Engineers assets</header><text display-inline="no-display-inline">Section 6002 of the Water Resources Reform and Development Act of 2014 (128 Stat. 1349) is amended to read as follows:</text><quoted-block id="H1F32F7857CCD48EEA867DCDA38E7D1B3" changed="added" reported-display-style="italic" committee-id="HPW00"><section id="HB32408F4C57B4F6AA3F63ABECDBF6CA0"><enum>6002.</enum><header>Review of Corps of Engineers assets</header><subsection id="H3E215A39D7334A9A94B1FBA875A48A15"><enum>(a)</enum><header>Assessment</header><text>The Secretary shall conduct an assessment of projects constructed by the Secretary for which the Secretary continues to have financial or operational responsibility.</text></subsection><subsection id="H4CF36AF0248C4CF69A893C9D7A801380"><enum>(b)</enum><header>Inventory</header><text>Not later than 18 months after the date of enactment of the <short-title>Water Resources Development Act of 2020</short-title>, the Secretary shall, based on the assessment carried out under subsection (a), develop an inventory of projects or portions of projects—</text><paragraph id="H036567C061864850890803B5170CED20"><enum>(1)</enum><text>that are not needed for the missions of the Corps of Engineers;</text></paragraph><paragraph id="HFCE7AFAD4BAA49358E0A63794F629275"><enum>(2)</enum><text>the modification of which, including though the use of natural features or nature-based features (as those terms are defined in section 1184(a) of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2289a">33 U.S.C. 2289a(a)</external-xref>), could improve the sustainable operations of the project, or reduce operation and maintenance costs for the project; or</text></paragraph><paragraph id="HF93B746347E74687BCB840979B1E449F"><enum>(3)</enum><text display-inline="yes-display-inline">that are no longer having project purposes adequately met by the Corps of Engineers, because of deferment of maintenance or other challenges, and the divestment of which to a non-Federal entity could better meet the local and regional needs for operation and maintenance.</text></paragraph></subsection><subsection id="HAF5489B9931F4E7C9B3196E4FFB979F3"><enum>(c)</enum><header>Criteria</header><text>In conducting the assessment under subsection (a) and developing the inventory under subsection (b), the Secretary shall use the following criteria:</text><paragraph id="HEAAD8E0973864215A2028A8B5F3A709B"><enum>(1)</enum><text>The extent to which the project aligns with the current missions of the Corps of Engineers.</text></paragraph><paragraph id="H78C1F85EC54F401A8DEC345431BB5BCD"><enum>(2)</enum><text>The economic and environmental impacts of the project on existing communities in the vicinity of the project.</text></paragraph><paragraph id="HA57B68FE495E411889933DD79D2756E7"><enum>(3)</enum><text>The extent to which the divestment or modification of the project could reduce operation and maintenance costs of the Corps of Engineers.</text></paragraph><paragraph id="H4D0871F802E4408681FECD7CC272BA52"><enum>(4)</enum><text>The extent to which the divestment or modification of the project is in the public interest.</text></paragraph><paragraph id="HC39E0646F39C43AEB16132C7A7187000"><enum>(5)</enum><text>The extent to which investment of additional Federal resources in the project proposed for divestment or modification, including investment needed to bring the project to a good state of repair, is in the public interest.</text></paragraph><paragraph id="H789EE44D04FD4407AF6DCA2D51F20CE0"><enum>(6)</enum><text>The extent to which the authorized purpose of the project is no longer being met.</text></paragraph></subsection><subsection id="H5AA6A6B434174EF68AEEC5FA481C229B"><enum>(d)</enum><header>Recommendations of non-Federal interests</header><text>A non-Federal interest for a project may recommend that the Secretary include such project in the assessment or inventory required under this section.</text></subsection><subsection id="H83BF578956CD4B62AC61A7E5A8F3F2F9"><enum>(e)</enum><header>Report to Congress</header><paragraph id="HCF403320FD454C15BFDD4B324C659A5B"><enum>(1)</enum><header>In general</header><text>Upon completion of the inventory required by subsection (b), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives, and make publicly available, a report containing the findings of the Secretary with respect to the assessment and inventory required under this section.</text></paragraph><paragraph id="H47AA98B25C4B4818A515DD8F07212FBC"><enum>(2)</enum><header>Inclusion</header><text>The Secretary shall list in an appendix any recommendation of a non-Federal interest made with respect to a project under subsection (d) that the Secretary determines not to include in the inventory developed under subsection (b), based on the criteria in subsection (c), including information about the request and the reasons for the Secretary’s determination.</text></paragraph></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></section><section id="H55769360F72446A98F137EC7A9D2EE00"><enum>124.</enum><header>Sense of Congress on multipurpose projects</header><text display-inline="no-display-inline">It is the sense of Congress that the Secretary, in coordination with non-Federal interests, should maximize the development, evaluation, and recommendation of project alternatives for future water resources development projects that produce multiple project benefits, such as navigation, flood risk management, and ecosystem restoration benefits, including through the use of natural or nature-based features and the beneficial reuse of dredged material.</text></section><section id="H361304A31A044F079D3981AF7F292EB7"><enum>125.</enum><header>Beneficial reuse of dredged material; dredged material management plans</header><subsection id="H85D0114E3AFE4AFBA24884681538CE3C"><enum>(a)</enum><header>National policy on the beneficial reuse of dredged material</header><paragraph id="H02566247A5D644D89611C2ABDBE4D5A5"><enum>(1)</enum><header>In general</header><text>It is the policy of the United States for the Corps of Engineers to maximize the beneficial reuse, in an environmentally acceptable manner, of suitable dredged material obtained from the construction or operation and maintenance of water resources development projects.</text></paragraph><paragraph id="HA679DBF9DC23469AAB1C407BFA051B3E"><enum>(2)</enum><header>Placement of dredged materials</header><subparagraph id="HE916A3D1D34D45D39C1FE5FE57C3C0AC"><enum>(A)</enum><header>In general</header><text display-inline="yes-display-inline">In evaluating the placement of dredged material obtained from the construction or operation and maintenance of water resources development projects, the Secretary shall consider—</text><clause id="HA8B0BF5F2C0B46B49CDFA7C6EC04FE83"><enum>(i)</enum><text>the suitability of the dredged material for a full range of beneficial uses; and</text></clause><clause id="H21B8FD0AA4CF41EA892EFD11BB32D913"><enum>(ii)</enum><text>the economic and environmental benefits, efficiencies, and impacts (including the effects on living coral) of using the dredged material for beneficial uses, including, in the case of beneficial reuse activities that involve more than one water resources development project, the benefits, efficiencies, and impacts that result from the combined activities.</text></clause></subparagraph><subparagraph id="H8164A70471A442AB8E7F84638566C85B"><enum>(B)</enum><header>Calculation of Federal standard</header><text>The economic benefits and efficiencies from the beneficial use of dredged material considered by the Secretary under subparagraph (A) shall be included in any determination relating to the <quote>Federal standard</quote> by the Secretary under section 335.7 of title 33, Code of Federal Regulations for the placement or disposal of such material.</text></subparagraph></paragraph></subsection><subsection id="H3EBD3B8E3A2647B88E9144B5DA840D30"><enum>(b)</enum><header>Beneficial use of dredged material</header><paragraph id="H2DB5F92BDF0849379A66D64455EEDC89"><enum>(1)</enum><header>Pilot program projects</header><text>Section 1122 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326</external-xref> note) is amended—</text><subparagraph id="HA024B6CA76934266AE078425CB242509"><enum>(A)</enum><text>in subsection (b)(1), by striking <quote>20</quote> and inserting <quote>30</quote>; and</text></subparagraph><subparagraph id="H0785C1A42AF24C93A79B605A851878CE"><enum>(B)</enum><text>in subsection (g), by striking <quote>20</quote> and inserting <quote>30</quote>.</text></subparagraph></paragraph><paragraph id="H2D2B997CC631443C83F97A3F9818DC5C"><enum>(2)</enum><header>Sense of Congress</header><text>It is the sense of Congress that the Secretary, in selecting projects for the beneficial reuse of dredged materials under section 1122 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326</external-xref> note), should ensure the thorough evaluation of project submissions from rural, small, and economically disadvantaged communities.</text></paragraph></subsection><subsection id="H6EBD80F10F5D4F929A237E7169BD4AE8"><enum>(c)</enum><header>Five-Year regional dredged material management plans</header><paragraph id="HCB38AFC1B84B485C8553885A19E704B3"><enum>(1)</enum><header>In general</header><text>Not later than 1 year after the date of enactment of this Act, and annually thereafter, the District Commander of each district of the Corps of Engineers that obtains dredged material through the construction or operation and maintenance of a water resources development project shall, at Federal expense, develop and submit to the Secretary a 5-year dredged material management plan in coordination with relevant State agencies and stakeholders.</text></paragraph><paragraph id="HD0FF24418D4A4480A12AE99B5FD3E80D"><enum>(2)</enum><header>Scope</header><text>Each plan developed under this subsection shall include—</text><subparagraph id="H6C879ADA7939422ABF7E7423DCC4BBB3"><enum>(A)</enum><text display-inline="yes-display-inline">a dredged material budget for each watershed or littoral system within the district;</text></subparagraph><subparagraph id="H79F384EEB994414A8E74A19306433844"><enum>(B)</enum><text display-inline="yes-display-inline">an estimate of the amount of dredged material likely to be obtained through the construction or operation and maintenance of all water resources development projects projected to be carried out within the district during the 5-year period following submission of the plan, and the estimated timing for obtaining such dredged material;</text></subparagraph><subparagraph id="H3F4C75C53C9E48659E3D8644193A9BAF"><enum>(C)</enum><text display-inline="yes-display-inline">an identification of potential water resources development projects projected to be carried out within the district during such 5-year period that are suitable for, or that require, the placement of dredged material, and an estimate of the amount of dredged material placement capacity of such projects;</text></subparagraph><subparagraph id="H2401DDC955C74BDC9B683F22492E464D"><enum>(D)</enum><text>an evaluation of—</text><clause id="H86E0BA9BAF8449F9941B13FD02B9C6A9"><enum>(i)</enum><text display-inline="yes-display-inline">the suitability of the dredged material for a full range of beneficial uses; and</text></clause><clause id="H8119FCFCAEBE44AA93DDC85421A507B3"><enum>(ii)</enum><text display-inline="yes-display-inline">the economic and environmental benefits, efficiencies, and impacts (including the effects on living coral) of using the dredged material for beneficial uses, including, in the case of beneficial reuse activities that involve more than one water resources development project, the benefits, efficiencies, and impacts that result from the combined activities; and</text></clause></subparagraph><subparagraph id="H4BD78278713140FE8751B84B0E2AB6EF"><enum>(E)</enum><text display-inline="yes-display-inline">the district-wide goals for beneficial reuse of the dredged material, including any expected cost savings from aligning and coordinating multiple projects (including projects across Corps districts) in the reuse of the dredged material.</text></subparagraph></paragraph><paragraph id="HFA7A8FEC926A4247954DC9D90D67D013"><enum>(3)</enum><header>Public comment</header><text>In developing each plan under this subsection, each District Commander shall provide notice and an opportunity for public comment.</text></paragraph><paragraph id="HE5D63887EAC74B749774A929427C79B6"><enum>(4)</enum><header>Public availability</header><text>Upon submission of each plan to the Secretary under this subsection, each District Commander shall make the plan publicly available, including on a publicly available website.</text></paragraph></subsection><subsection id="HD9E00564A68B4A499A94326A8CDE37D4"><enum>(d)</enum><header>Dredge pilot program</header><paragraph id="HB4AB5331011A41D3812439A248E9BF64"><enum>(1)</enum><header>Revisions</header><text>Section 1111 of the Water Resources Development Act of 2018 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326</external-xref> note) is amended—</text><subparagraph id="HE9046D3E25714B3ABFBD6CDE00FE930F"><enum>(A)</enum><text display-inline="yes-display-inline">in subsection (a), by striking <quote>for the operation and maintenance of harbors and inland harbors</quote> and all that follows through the period at the end and inserting the following: “for the—</text><quoted-block display-inline="no-display-inline" id="H7073C9352D4D47B68EA68BDECC032CC5" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H2E237D9F63E94727B394028F86BDAF78"><enum>(1)</enum><text display-inline="yes-display-inline">harbors and inland harbors referred to in section 210(a)(2) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238(a)(2)</external-xref>); or</text></paragraph><paragraph id="HE8BBD595011B4796A72A533AD38B7171"><enum>(2)</enum><text>inland and intracoastal waterways of the United States described in section 206 of the Inland Waterways Revenue Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/33/1804">33 U.S.C. 1804</external-xref>).</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph><subparagraph id="H523D5AB3C7FA4A66AE39BBDE8EE741E4"><enum>(B)</enum><text>in subsection (b), by striking <quote>or inland harbors</quote> and inserting <quote>, inland harbors, or inland or intracoastal waterways</quote>.</text></subparagraph></paragraph><paragraph id="H2871F1F38596456AAFCAC3295C6C9C6F"><enum>(2)</enum><header>Coordination with existing authorities</header><text>The Secretary may carry out the dredge pilot program authorized by section 1111 of the Water Resources Development Act of 2018 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326</external-xref> note) in coordination with Federal regional dredge demonstration programs in effect on the date of enactment of this Act.</text></paragraph></subsection></section><section id="H8C495C1859764935B9E20CF8EA0DC363"><enum>126.</enum><header>Aquatic ecosystem restoration for anadromous fish</header><subsection id="H05E66CD67DFD412C9071A28C9E59E6B6"><enum>(a)</enum><header>Anadromous fish habitat and passage</header><text>Section 206 of the Water Resources Development Act of 1996 (<external-xref legal-doc="usc" parsable-cite="usc/33/2330">33 U.S.C. 2330</external-xref>) is amended—</text><paragraph id="H4672A54168944760962761A2A5B1D92F"><enum>(1)</enum><text>in subsection (a), by adding at the end the following:</text><quoted-block id="H0290C3ADECD94ADBBFE31BF8DCAB9A79" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H593739B1A047496D9AF716700E61B2A6"><enum>(3)</enum><header>Anadromous fish habitat and passage</header><subparagraph id="H768AB0642F444B6DA2B738011AB23793"><enum>(A)</enum><header>Measures</header><text display-inline="yes-display-inline">A project under this section may include measures to improve habitat or passage for anadromous fish, including—</text><clause id="HB6617F3DB64040528283773200B70DFC"><enum>(i)</enum><text>installing fish bypass structures on small water diversions;</text></clause><clause id="HE53CCAEFD610441093496C7AA26C747C"><enum>(ii)</enum><text>modifying tide gates; and</text></clause><clause id="HF153760D4A4543C597C7F3E0CE2A4571"><enum>(iii)</enum><text display-inline="yes-display-inline">restoring or reconnecting floodplains and wetlands that are important for anadromous fish habitat or passage.</text></clause></subparagraph><subparagraph id="H98AA7EC54F814C7FA9E3E8D9FE771052"><enum>(B)</enum><header>Benefits</header><text display-inline="yes-display-inline">A project that includes measures under this paragraph shall be formulated to maximize benefits for the anadromous fish species benefitted by the project.</text></subparagraph></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph><paragraph id="H19F52A8832FE4D46A502FD155CEB8E9F"><enum>(2)</enum><text>by adding at the end the following:</text><quoted-block id="H72B1EA6C14294522BE80717747E85300" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subsection id="HE5FB21888FAB4585B81E7EB44AC45545"><enum>(g)</enum><header>Prioritization</header><text>The Secretary shall give projects that include measures described in subsection (a)(3) equal priority for implementation as other projects under this section.</text></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection></section><section id="HD9DCA1256D86486B922D1A48DA9BA6EA"><enum>127.</enum><header>Annual report to Congress</header><text display-inline="no-display-inline">Section 7001(c)(4)(B) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d(c)(4)(B)</external-xref>) is amended—</text><paragraph id="HB846B9489076457BA08A182D48FC44F4"><enum>(1)</enum><text>in clause (i), by striking <quote>and</quote> at the end;</text></paragraph><paragraph id="H78C8E45E55934C0B826F33A1386FE19F"><enum>(2)</enum><text>by redesignating clause (ii) as clause (iii); and </text></paragraph><paragraph id="H3B3999F6E40D4D43B7A90389BA2C5652"><enum>(3)</enum><text>by inserting after clause (i) the following:</text><quoted-block id="H41263F8144EE42648F95E3CE56E99C33" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><clause id="HDF28B6FB018C4A9399CE55AECEE511C3"><enum>(ii)</enum><text display-inline="yes-display-inline">the Secretary shall not include proposals in the appendix of the annual report that otherwise meet the criteria for inclusion in the annual report solely on the basis that the proposals are for the purposes of navigation, flood risk management, ecosystem restoration, or municipal or agricultural water supply; and</text></clause><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section><section id="H050FEF16C9BD4E20A51B4D2828B4A12B"><enum>128.</enum><header>Harmful algal bloom demonstration program</header><subsection id="H010CF976359C4D97A4F76EB32C78CC45"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">The Secretary shall carry out a demonstration program to determine the causes of, and implement measures to effectively detect, prevent, treat, and eliminate, harmful algal blooms associated with water resources development projects.</text></subsection><subsection id="H9FFA68A8ED9A4952ABD96A6AB16123A9"><enum>(b)</enum><header>Consultation; use of existing data and program authorities</header><text display-inline="yes-display-inline">In carrying out the demonstration program under subsection (a), the Secretary shall—</text><paragraph id="HE5EF14B7F581424A93AC837161B6EFCA"><enum>(1)</enum><text>consult with the heads of appropriate Federal and State agencies; and</text></paragraph><paragraph id="HFBC20F1FC2C9473F83DB0DA52976A5ED"><enum>(2)</enum><text>make maximum use of existing Federal and State data and ongoing programs and activities of Federal and State agencies, including the activities of the Secretary carried out through the Engineer Research and Development Center pursuant to section 1109 of the Water Resources Development Act of 2018 (<external-xref legal-doc="usc" parsable-cite="usc/33/610">33 U.S.C. 610</external-xref> note).</text></paragraph></subsection><subsection id="HF00842ADD9D940758C319F1EC88B7A11"><enum>(c)</enum><header>Focus areas</header><text>In carrying out the demonstration program under subsection (a), the Secretary shall undertake program activities related to harmful algal blooms in the Great Lakes, the tidal and inland waters of the State of New Jersey, the coastal and tidal waters of the State of Louisiana, the waterways of the counties that comprise the Sacramento-San Joaquin Delta, California, and Lake Okeechobee, Florida.</text></subsection></section><section id="HBBDE06D801764096BFA60C341143163E"><enum>129.</enum><header>Update on Invasive Species Policy Guidance</header><subsection id="HB2BA12DAE51440EEADE80737EBF7C9A2"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">The Secretary shall periodically update the Invasive Species Policy Guidance, developed under section 104 of the River and Harbor Act of 1958 (<external-xref legal-doc="usc" parsable-cite="usc/33/610">33 U.S.C. 610</external-xref>) and the Nonindigenous Aquatic Nuisance Prevention and Control Act of 1990 (<external-xref legal-doc="usc" parsable-cite="usc/16/4701">16 U.S.C. 4701</external-xref> et seq.), in accordance with the most recent National Invasive Species Council Management Plan developed pursuant to Executive Order 13112.</text></subsection><subsection id="HA4F371F4072445CE88D9922BDE0C5E3E"><enum>(b)</enum><header>Inclusion</header><text>The Secretary may include in the updated guidance invasive species specific efforts at federally authorized water resources development projects located in—</text><paragraph id="HBBF01C9587504AB8B579763066DE7764"><enum>(1)</enum><text>high-altitude lakes; and</text></paragraph><paragraph id="HF6FEA0755C3E418987DA9462DD4B5DCE"><enum>(2)</enum><text>the Tennessee and Cumberland River basins.</text></paragraph></subsection></section><section id="H90A9AFF82DEA498C8B3E767562455DEB"><enum>130.</enum><header>Report on debris removal</header><text display-inline="no-display-inline">Section 1210 of the Water Resources Development Act of 2018 (132 Stat. 3808) is amended to read as follows:</text><quoted-block id="H821F6147A9BB4FF29900D5443B3FA3E0" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><section id="HE36E3B15E3D0452BA67C517C8A4E5DCB"><enum>1210.</enum><header>Report on debris removal</header><text display-inline="no-display-inline">Not later than 180 days after the date of enactment of the <short-title>Water Resources Development Act of 2020</short-title>, the Secretary shall submit to Congress and make publicly available a report that describes—</text><paragraph id="H2C9EF625740C44C8809E656737907269"><enum>(1)</enum><text>the extent to which, during the 10 fiscal years prior to such date of enactment, the Secretary has carried out section 3 of the Act of March 2, 1945 (<external-xref legal-doc="usc" parsable-cite="usc/33/603a">33 U.S.C. 603a</external-xref>);</text></paragraph><paragraph id="H6164C6EC38934E308E765503983C2755"><enum>(2)</enum><text>how the Secretary has evaluated potential work to be carried out under that section; and</text></paragraph><paragraph id="HE311472FC020460E9F88C90137EEA8E4"><enum>(3)</enum><text>the extent to which the Secretary plans to start, continue, or complete debris removal activities in the 3 years following submission of the report.</text></paragraph></section><after-quoted-block>.</after-quoted-block></quoted-block></section><section id="H79E21EBCB1B24C349DC1B70EBA5A1E68"><enum>131.</enum><header>Missouri River interception-rearing complex construction</header><subsection id="H5321C82AB20141A885266642E79C49D1"><enum>(a)</enum><header>Report</header><text display-inline="yes-display-inline">Not later than 1 year after the date of enactment of this Act, and annually thereafter, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the effects of any interception-rearing complex constructed on the Missouri River on—</text><paragraph id="H97C22F8DBBF542B78A6FC543AB7B3102"><enum>(1)</enum><text>flood risk management and navigation; and</text></paragraph><paragraph id="H3B3A610A91DD43F080B1A52BF672C055"><enum>(2)</enum><text>the population recovery of the pallid sturgeon, including baseline population counts.</text></paragraph></subsection><subsection id="H97DBC51E4EDB4E838738C8C76181879A"><enum>(b)</enum><header>No additional IRC construction</header><text>The Secretary may not authorize construction of an interception-rearing complex on the Missouri River until the Secretary—</text><paragraph id="H5D60B78EF2514EF0BF23504312516CEF"><enum>(1)</enum><text display-inline="yes-display-inline">submits the report required by subsection (a);</text></paragraph><paragraph id="HCEB5EED1CEDB47EF90C4EFE5DF15799B"><enum>(2)</enum><text display-inline="yes-display-inline">acting through the Engineer Research and Development Center, conducts further research on interception-rearing complex design, including any effects on existing flows, flood risk management, and navigation; and</text></paragraph><paragraph id="HF0B73E2FBF1B4F1AB00160826DF43180"><enum>(3)</enum><text>develops a plan—</text><subparagraph id="H5C0E314AB3F143C19F1427E6BA1C846E"><enum>(A)</enum><text>to repair dikes and revetments that are affecting flood risk and bank erosion; and</text></subparagraph><subparagraph id="HB6F2BBECEE97441DA178FBC9040B1769"><enum>(B)</enum><text>to establish, repair, or improve water control structures at the headworks of constructed shallow water habitat side-channels.</text></subparagraph></paragraph></subsection><subsection id="HBCBED0C781E84E128FF8ED0315D60B8B"><enum>(c)</enum><header>Future IRC construction</header><paragraph id="HDA4C64648327438F891BB0A014D86B82"><enum>(1)</enum><header>Public comment</header><text display-inline="yes-display-inline">The Secretary shall provide an opportunity for comment from the public and the Governor of each affected State on any proposals to construct an interception-rearing complex after the date of enactment of this Act.</text></paragraph><paragraph id="HDA63BEF4409B47DB895D46139D7D7426"><enum>(2)</enum><header>Period</header><text display-inline="yes-display-inline">The public comment period required by paragraph (1) shall be not less than 90 days for each proposal to construct an interception-rearing complex on the Missouri River.</text></paragraph></subsection></section><section id="H859B7AACAF20450E820F3790BDB72B96"><enum>132.</enum><header>Cost and benefit feasibility assessment</header><subsection id="H055DB8D0CCD1452895C7250AC20B9712"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Section 5(a)(2)(B) of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n(a)(2)(B)</external-xref>) is amended—</text><paragraph id="HFE9500DB20664943B6C11A01763BBED7"><enum>(1)</enum><text>in clause (i)(I), by inserting <quote>, or provide contributions equal to,</quote> after <quote>pay</quote>; and</text></paragraph><paragraph id="H7D4C9C15941E45C08D3D09022FB1EBD1"><enum>(2)</enum><text>in clause (ii)—</text><subparagraph id="H77FD411C93254D64A5AEAA2E1B9487B6"><enum>(A)</enum><text>in the heading, by inserting <quote><header-in-text level="clause" style="OLC">and contributions</header-in-text></quote> after <quote><header-in-text level="clause" style="OLC">of payments</header-in-text></quote>; </text></subparagraph><subparagraph id="H86545F7E37EF494F86786351A1A78E27"><enum>(B)</enum><text>by inserting <quote>or contributions</quote> after <quote>Non-Federal payments</quote>; and</text></subparagraph><subparagraph id="H89BFF80E23E7463DB9CB35548223011B"><enum>(C)</enum><text display-inline="yes-display-inline">by inserting <quote>or contributions</quote> after <quote>non-Federal payments</quote>.</text></subparagraph></paragraph></subsection><subsection id="H707632FC98014C8F91D2B66A6ADA9CA3"><enum>(b)</enum><header>Continued eligibility</header><text>Section 1161(b) of the Water Resources Development Act of 2018 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n</external-xref> note) is amended—</text><paragraph id="H0C2C1DBB16D54A318F1A9CDAB9814CFA"><enum>(1)</enum><text>in the matter preceding paragraph (1)—</text><subparagraph id="H99BF7BC027794B15923E779E6C3EDF0C"><enum>(A)</enum><text>by striking the <quote>three fiscal years preceding</quote> and inserting <quote>five fiscal years preceding</quote>; and</text></subparagraph><subparagraph id="HAA9083C5071B44AE8F2AA878D2DF32F5"><enum>(B)</enum><text>by striking <quote>last day of the third fiscal year</quote> and inserting <quote>last day of the fifth fiscal year</quote>;</text></subparagraph></paragraph><paragraph id="HAB6DB0190AE5413A8BD84C47E309B936"><enum>(2)</enum><text>in paragraph (1), by inserting <quote>, or provide contributions equal to,</quote> before <quote>an amount sufficient</quote>; and</text></paragraph><paragraph id="HCFFF1C7FADBD41B48A4B13EE0BDEDADA"><enum>(3)</enum><text>by striking paragraph (2) and inserting the following:</text><quoted-block style="OLC" id="H7FDD41BDAB33469FBE05798A64B6BEFB" display-inline="no-display-inline" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H46D7F121691B4C64887B604C4A729B89"><enum>(2)</enum><text display-inline="yes-display-inline">the Secretary determines that the damage to the structure was not as a result of negligent operation or maintenance.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection></section><section id="HBB469F1AC0F64543AE11A3BF0D1CABF9"><enum>133.</enum><header>Materials, services, and funds for repair, restoration, or rehabilitation of projects</header><subsection id="H787DC906F8724EBE93A94EF1CF6F466E"><enum>(a)</enum><header>In general</header><text>In any area covered by an emergency or major disaster declaration declared under the Robert T. Stafford Disaster Relief and Emergency Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/42/5121">42 U.S.C. 5121</external-xref> et seq.), the Secretary is authorized to accept and use materials, services, and funds, during the period the declaration is in effect, from a non-Federal interest or private entity to repair, restore, or rehabilitate a federally authorized water resources development project, and to provide reimbursement to such non-Federal interest or private entity for such materials, services, and funds, in the Secretary’s sole discretion, and subject to the availability of appropriations, if the Secretary determines that reimbursement is in the public interest.</text></subsection><subsection id="HFD616754DA9944BC8E9489CEC27A70C9"><enum>(b)</enum><header>Additional requirement</header><text display-inline="yes-display-inline">The Secretary may only reimburse for the use of materials or services accepted under this section if such materials or services meet the Secretary’s specifications and comply with all applicable laws and regulations that would apply if such materials and services were acquired by the Secretary, including sections 3141 through 3148 and 3701 through 3708 of title 40, United States Code, section 8302 of title 41, United States Code, and the National Environmental Policy Act of 1969.</text></subsection><subsection id="H501227FCABA1492AB083E0954FD1E8A7"><enum>(c)</enum><header>Agreements</header><paragraph display-inline="no-display-inline" id="HF9150DB2B3754B368E96913CDB37FA88"><enum>(1)</enum><header>In general</header><text>Prior to the acceptance of materials, services, or funds under this section, the Secretary and the non-Federal interest shall enter into an agreement that specifies—</text><subparagraph id="H21BFDED4D3E24EF486449955E4C24FD7"><enum>(A)</enum><text>the non-Federal interest shall hold and save the United States free from any and all damages that arise from use of materials or services of the non-Federal interest, except for damages due to the fault or negligence of the United States or its contractors;</text></subparagraph><subparagraph id="H0D926E8CA0D44129A91F3AA966C576F2"><enum>(B)</enum><text>the non-Federal interest shall certify that the materials or services comply with all applicable laws and regulations under subsection (b); and</text></subparagraph><subparagraph id="HA495920A787E450C97A4A9D46315B8E2"><enum>(C)</enum><text>any other term or condition required by the Secretary.</text></subparagraph></paragraph><paragraph id="H1897C8BF22C64E589CA31C7658FBE848"><enum>(2)</enum><header>Exception</header><text>If an agreement under paragraph (1) was not entered prior to materials or services being contributed, a non-Federal interest shall enter into an agreement with the Secretary that—</text><subparagraph id="H62453BCD676B4C4A9EC84AE5D4F8FD68"><enum>(A)</enum><text>specifies the value, as determined by the Secretary, of those materials or services contributed and eligible for reimbursement; and</text></subparagraph><subparagraph id="H25BABDC4B4994156ACDFB60A4AD22226"><enum>(B)</enum><text>ensures that the materials or services comply with subsection (b) and paragraph (1).</text></subparagraph></paragraph></subsection></section><section id="H034AD2C86B0348FFAE77402425993372"><enum>134.</enum><header>Levee safety</header><text display-inline="no-display-inline">Section 9004 of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/33/3303">33 U.S.C. 3303</external-xref>) is amended by adding at the end the following:</text><quoted-block id="H8961DE7DB58A49E2B8C70EF6126FF89F" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subsection id="H286AD78B54A24EC3A51CDB8D9A209D22"><enum>(d)</enum><header>Identification of deficiencies</header><paragraph id="H1CB0B8AFE53D4C5FA4DFB4BD50234C23"><enum>(1)</enum><header>In general</header><text>For each levee included in an inventory established under subsection (b) or for which the Secretary has conducted a review under subsection (c), the Secretary shall—</text><subparagraph id="H414E39FEFFEC4248BF5A736535F7075F"><enum>(A)</enum><text>identify the specific engineering and maintenance deficiencies, if any; and</text></subparagraph><subparagraph id="H65C4B901F8DA4977AF8263F8021738D8"><enum>(B)</enum><text>describe the recommended remedies to correct each deficiency identified under subparagraph (A), and, if requested by owner of a non-Federal levee, the associated costs of those remedies.</text></subparagraph></paragraph><paragraph id="H3D32887F893147F99F8DF5352B458886"><enum>(2)</enum><header>Consultation</header><text>In identifying deficiencies and describing remedies for a levee under paragraph (1), the Secretary shall consult with relevant non-Federal interests, including by providing an opportunity for comment by those non-Federal interests.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></section><section id="H47127491653E40A288E83EFF675F3B38" section-type="subsequent-section"><enum>135.</enum><header>National Dam Safety Program</header><subsection id="H06107387FC0D421987F4D78D724DDF14"><enum>(a)</enum><header>Definitions</header><text display-inline="yes-display-inline">Section 2 of the National Dam Safety Program Act (<external-xref legal-doc="usc" parsable-cite="usc/33/467">33 U.S.C. 467</external-xref>) is amended—</text><paragraph id="HB2FBA033897E4CE1867893904A3A35C8"><enum>(1)</enum><text>in paragraph (4)—</text><subparagraph id="H08A12D42115A41298224B53A40BB3C6F"><enum>(A)</enum><text>in subparagraph (A)—</text><clause id="HA2840366CD0B421C8DFB4FAF8DEBD5A2"><enum>(i)</enum><text>by striking clause (iii) and inserting the following: </text><quoted-block display-inline="no-display-inline" id="H629A718FEC1E482FAE29C705D5A59F24" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><clause id="H38FFD1D439594740A80ACAA58A20889B"><enum>(iii)</enum><text display-inline="yes-display-inline">has an emergency action plan that—</text><subclause id="H1F3343A00FF74EC29698D973C2AF7875"><enum>(I)</enum><text>is approved by the relevant State dam safety agency; or</text></subclause><subclause commented="no" id="H95D021A45C41467C8F1E613B6BE343B9"><enum>(II)</enum><text display-inline="yes-display-inline">is in conformance with State law and pending approval by the relevant State dam safety agency;</text></subclause></clause><after-quoted-block>; and </after-quoted-block></quoted-block></clause><clause id="HF8510004D87D4D44AB93FB72D28185EA" commented="no"><enum>(ii)</enum><text>by striking clause (iv) and inserting the following:</text><quoted-block display-inline="no-display-inline" id="H52AF82D8312841FBBA09B3B95DAEC581" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><clause commented="no" id="H466044B15E9E46EEB4328290F3A87BE5"><enum>(iv)</enum><text display-inline="yes-display-inline">fails to meet minimum dam safety standards of the State in which the dam is located, as determined by the State; and</text></clause><clause commented="no" id="H8AD249FD79974DC1A2AF7EB56857FC36"><enum>(v)</enum><text display-inline="yes-display-inline">poses an unacceptable risk to the public, as determined by the Administrator, in consultation with the Board.</text></clause><after-quoted-block>; and</after-quoted-block></quoted-block></clause></subparagraph><subparagraph id="H4BBF4F41FF3C4000B4115FCC1A3EB06E"><enum>(B)</enum><text>in subparagraph (B)(i), by inserting <quote>under a hydropower project with an authorized installed capacity of greater than 1.5 megawatts</quote> after <quote>dam</quote>; and</text></subparagraph></paragraph><paragraph id="H31BAF3A503AC4E308C2FF453884CC5EB"><enum>(2)</enum><text>in paragraph (10)—</text><subparagraph id="H50062FDEE60943728B0081D242230F6C"><enum>(A)</enum><text>in the heading, by striking <quote><header-in-text level="paragraph" style="OLC">Non-Federal sponsor</header-in-text></quote> and inserting <quote><header-in-text level="paragraph" style="OLC">Eligible subrecipient</header-in-text></quote>; and</text></subparagraph><subparagraph id="H3310E75C3F4844188473262A246810B5"><enum>(B)</enum><text>by striking <quote>The term <term>non-Federal sponsor</term></quote> and inserting <quote>The term <term>eligible subrecipient</term></quote>.</text></subparagraph></paragraph></subsection><subsection display-inline="no-display-inline" id="H6815CC49C0B44E31BB85065832618B73"><enum>(b)</enum><header>Rehabilitation of high hazard potential dams</header><paragraph id="HB8BBA21B5AE2448FB8D6DF30372F47F4"><enum>(1)</enum><header>Establishment of program</header><text>Section 8A(a) of the National Dam Safety Program Act (<external-xref legal-doc="usc" parsable-cite="usc/33/467f-2">33 U.S.C. 467f–2(a)</external-xref>) is amended by striking <quote>to non-Federal sponsors</quote> and inserting <quote>to States with dam safety programs</quote>.</text></paragraph><paragraph id="H2226BB86CC7341BEA4B2B884AF047941"><enum>(2)</enum><header>Eligible activities</header><text>Section 8A(b) of the National Dam Safety Program Act (<external-xref legal-doc="usc" parsable-cite="usc/33/467f-2">33 U.S.C. 467f–2(b)</external-xref>) is amended, in the matter preceding paragraph (1), by striking <quote>for a project may be used for</quote> and inserting <quote>to a State may be used by the State to award grants to eligible subrecipients for</quote>.</text></paragraph><paragraph id="HB3951CAD4B27479BBACE424A57D5A2F0"><enum>(3)</enum><header>Award of grants</header><text display-inline="yes-display-inline">Section 8A(c) of the National Dam Safety Program Act (<external-xref legal-doc="usc" parsable-cite="usc/33/467f-2">33 U.S.C. 467f–2(c)</external-xref>) is amended—</text><subparagraph id="HD7E08598B09C4886B838DE6BA5E3ECD9"><enum>(A)</enum><text display-inline="yes-display-inline">in paragraph (1)(A), by striking <quote>non-Federal sponsor</quote> and inserting <quote>State</quote>; and</text></subparagraph><subparagraph id="H9EA12EA7A862475BB8CF60C55A929E39"><enum>(B)</enum><text>in paragraph (2)—</text><clause id="HE3DE361AD70D49D5825FB7CD424CC774"><enum>(i)</enum><text>in subparagraph (A), by striking <quote>an eligible high hazard potential dam to a non-Federal sponsor</quote> and inserting <quote>eligible high hazard potential dams to a State</quote>;</text></clause><clause id="H6FF009081ED0484A9558D19A274BD2F7"><enum>(ii)</enum><text>in subparagraph (B)—</text><subclause id="H6EEE501FA311431FBA03AB1A9FC2CF01"><enum>(I)</enum><text>in the subparagraph heading, by striking <quote><header-in-text level="subparagraph" style="OLC">Project grant</header-in-text></quote> and inserting <quote><header-in-text level="subparagraph" style="OLC">Grant</header-in-text></quote>;</text></subclause><subclause id="HC8D9BC9089304E13BB228DED47667F45"><enum>(II)</enum><text>by striking <quote>project grant agreement with the non-Federal sponsor</quote> and inserting <quote>grant agreement with the State</quote>; and</text></subclause><subclause id="H896B198A9CA74A8FB76153E5011CBF6A"><enum>(III)</enum><text>by striking <quote>project,</quote> and inserting <quote>projects for which the grant is awarded,</quote>; </text></subclause></clause><clause id="HF6E60419EE59492EB7A49A2F6D018483"><enum>(iii)</enum><text>by amending subparagraph (C) to read as follows:</text><quoted-block display-inline="no-display-inline" id="HF2F0EBA9A8D541D4A6C1ED4CEEEE8607" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subparagraph id="H4F3D017114024451B0A55A120CF8F8DE"><enum>(C)</enum><header>Grant assurance</header><text display-inline="yes-display-inline">As part of a grant agreement under subparagraph (B), the Administrator shall require that each eligible subrecipient to which the State awards a grant under this section provides an assurance, with respect to the dam to be rehabilitated by the eligible subrecipient, that the dam owner will carry out a plan for maintenance of the dam during the expected life of the dam.</text></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block></clause><clause id="H4DF9374E131D4FDBAF111206D33587FE"><enum>(iv)</enum><text>in subparagraph (D), by striking <quote>A grant provided under this section shall not exceed</quote> and inserting <quote>A State may not award a grant to an eligible subrecipient under this section that exceeds, for any 1 dam,</quote>.</text></clause></subparagraph></paragraph><paragraph id="H7D60C1978F4B4F0A90C163FAF49282D6"><enum>(4)</enum><header>Requirements</header><text display-inline="yes-display-inline">Section 8A(d) of the National Dam Safety Program Act (<external-xref legal-doc="usc" parsable-cite="usc/33/467f-2">33 U.S.C. 467f–2(d)</external-xref>) is amended—</text><subparagraph commented="no" id="HE4313BA2FEEA4C409332428ABBBC1AC5"><enum>(A)</enum><text display-inline="yes-display-inline">in paragraph (1), by inserting <quote>to an eligible subrecipient</quote> after <quote>this section</quote>;</text></subparagraph><subparagraph id="HC1D16F7EDE3747369FA8E83872F1C291"><enum>(B)</enum><text>in paragraph (2)—</text><clause id="H8D48F12138E14A78BDD8180360A56E4B"><enum>(i)</enum><text>in the paragraph heading, by striking <quote><header-in-text level="paragraph" style="OLC">Non-Federal sponsor</header-in-text></quote> and inserting <quote><header-in-text level="paragraph" style="OLC">Eligible subrecipient</header-in-text></quote>;</text></clause><clause id="H2DF623C4BB9045EE9DE2B99B2FB1DA35"><enum>(ii)</enum><text>in the matter preceding subparagraph (A), by striking <quote>the non-Federal sponsor shall</quote> and inserting <quote>an eligible subrecipient shall, with respect to the dam to be rehabilitated by the eligible subrecipient</quote>;</text></clause><clause commented="no" id="H43CC5654C291417685947B282FAA3E7F"><enum>(iii)</enum><text>in subparagraph (A), by striking <quote>participate in, and comply with,</quote> and inserting <quote>demonstrate that the community in which the dam is located participates in, and complies with,</quote>;</text></clause><clause id="HDA83A330DDA74513970FE5A63E2B1870"><enum>(iv)</enum><text>in subparagraph (B), by striking <quote>have</quote> and inserting <quote>beginning not later than 2 years after the date on which the Administrator publishes criteria for hazard mitigation plans under paragraph (3), demonstrate that the Tribal or local government with jurisdiction over the area in which the dam is located has</quote>; and</text></clause><clause id="H1113AA7184FF4C5397B19F18193FD9F6"><enum>(v)</enum><text display-inline="yes-display-inline">in subparagraph (C), by striking <quote>50-year period</quote> and inserting <quote>expected life of the dam</quote>; and</text></clause></subparagraph><subparagraph id="H4443CFEC6B3745EDBD7EA220397C1601"><enum>(C)</enum><text>by adding at the end the following:</text><quoted-block display-inline="no-display-inline" id="HDAEA14C908DB45E593CCE658FC9D95D1" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H8FF1D13A3BEC4F82AEA6EF95CBCB1F40"><enum>(3)</enum><header>Hazard mitigation plan criteria</header><text display-inline="yes-display-inline">Not later than 1 year after the date of enactment of this paragraph, the Administrator, in consultation with the Board, shall publish criteria for hazard mitigation plans required under paragraph (2)(B).</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph><paragraph id="H53D751ED9DAA49C0AC708541A4E056B4"><enum>(5)</enum><header>Floodplain management plans</header><text display-inline="yes-display-inline">Section 8A(e) of the National Dam Safety Program Act (<external-xref legal-doc="usc" parsable-cite="usc/33/467f-2">33 U.S.C. 467f–2(e)</external-xref>) is amended—</text><subparagraph id="HAB014257AFD3471EA232AB8217FF0102"><enum>(A)</enum><text display-inline="yes-display-inline">in paragraph (1)—</text><clause id="H88542270DEDA4DF5BE34CF749F506323"><enum>(i)</enum><text>in the matter preceding subparagraph (A), by striking <quote>the non-Federal sponsor</quote> and inserting <quote>an eligible subrecipient</quote>; and</text></clause><clause id="H9B705AE940774A0F99391558B28F829C"><enum>(ii)</enum><text>in subparagraph (B), by striking <quote>1 year</quote> and inserting <quote>2 years</quote> each place it appears; and</text></clause></subparagraph><subparagraph id="H19C51AF961E7415CAD08C5EB83E6AE39"><enum>(B)</enum><text>by striking paragraph (3) and inserting the following:</text><quoted-block display-inline="no-display-inline" id="H4967A4BA123B440A981BE59C68580441" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H1293313DF14B4378BE572F1C2AC08E8D"><enum>(3)</enum><header>Plan criteria and technical support</header><text display-inline="yes-display-inline">The Administrator, in consultation with the Board, shall provide criteria, and may provide technical support, for the development and implementation of floodplain management plans prepared under this subsection.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph><paragraph id="HA887FBFA8DEE4B7CA865AF6F10752877"><enum>(6)</enum><header>Contractual requirements</header><text display-inline="yes-display-inline">Section 8A(i)(1) of the National Dam Safety Program Act (<external-xref legal-doc="usc" parsable-cite="usc/33/467f-2">33 U.S.C. 467f–2(i)(1)</external-xref>) is amended by striking <quote>a non-Federal sponsor</quote> and inserting <quote>an eligible subrecipient</quote>.</text></paragraph></subsection></section><section id="H94A0213962B84A5C8E29B0E721A0E219"><enum>136.</enum><header>Rehabilitation of Corps of Engineers constructed pump stations</header><subsection id="H07B21870AC834BCEB9F605936B43D5B8"><enum>(a)</enum><header>Definitions</header><text>In this section:</text><paragraph id="HEDAF3E805D8749089A539D41B61B8718"><enum>(1)</enum><header>Eligible pump station</header><text>The term <term>eligible pump station</term> means a pump station—</text><subparagraph id="H9DFB70C6BDA74B9B979D4E822B773C70"><enum>(A)</enum><text>constructed, in whole or in part, by the Corps of Engineers for flood risk management purposes;</text></subparagraph><subparagraph id="HCB61DEE36A5A4AD098CCC32406A8233F"><enum>(B)</enum><text>that the Secretary has identified as having a major deficiency; and</text></subparagraph><subparagraph id="H2A76529F5B774120A0E90F52B583FFEC"><enum>(C)</enum><text>the failure of which the Secretary has determined would impair the function of a flood risk management project constructed by the Corps of Engineers.</text></subparagraph></paragraph><paragraph id="HA0AB009A830244D598FF13EC7AAA0E77"><enum>(2)</enum><header>Rehabilitation</header><subparagraph id="H973B8DF33BC649AB95BB6E8AB2A6DDD8"><enum>(A)</enum><header>In general</header><text>The term <term>rehabilitation</term>, with respect to an eligible pump station, means to address a major deficiency of the eligible pump station caused by long-term degradation of the foundation, construction materials, or engineering systems or components of the eligible pump station.</text></subparagraph><subparagraph id="H26C280AE702E43BF819738F3D15741F3"><enum>(B)</enum><header>Inclusions</header><text>The term <term>rehabilitation</term>, with respect to an eligible pump station, includes—</text><clause id="H7286FEC52B7B468C952ED37CDFBDFC62"><enum>(i)</enum><text>the incorporation into the eligible pump station of—</text><subclause id="H68A2CFC624D84E3186309D789534660A"><enum>(I)</enum><text>current design standards;</text></subclause><subclause id="H1C85A243699C45819546BABC5EF8EA6E"><enum>(II)</enum><text>efficiency improvements; and</text></subclause><subclause id="H53318F374FF24E54983DEE1C5DAC3E24"><enum>(III)</enum><text>associated drainage; and</text></subclause></clause><clause id="HC94D7C8AC25440FC8FA6B863E20D0FFE"><enum>(ii)</enum><text>increasing the capacity of the eligible pump station, subject to the condition that the increase shall—</text><subclause id="H5B8DD68E683A4CF5AD582E189690639C"><enum>(I)</enum><text>significantly decrease the risk of loss of life and property damage; or</text></subclause><subclause id="H21CCCD2690194DF488F4C0B570B40A86"><enum>(II)</enum><text>decrease total lifecycle rehabilitation costs for the eligible pump station.</text></subclause></clause></subparagraph></paragraph></subsection><subsection id="H09750ED99CA149A9BB2B58B9DEB5AEEC"><enum>(b)</enum><header>Authorization</header><text>The Secretary may carry out rehabilitation of an eligible pump station, if the Secretary determines that the rehabilitation is feasible.</text></subsection><subsection id="H9BF432BF47CD4F6C8B3BF1A1378213ED"><enum>(c)</enum><header>Cost sharing</header><text>The non-Federal interest for the eligible pump station shall—</text><paragraph id="HC447A15CCDF54E96AA5F6E13591920AF"><enum>(1)</enum><text>provide 35 percent of the cost of rehabilitation of an eligible pump station carried out under this section; and</text></paragraph><paragraph id="H44938255535342EF89EF55D083089129"><enum>(2)</enum><text>provide all land, easements, rights-of-way, and necessary relocations associated with the rehabilitation described in subparagraph (A), at no cost to the Federal Government.</text></paragraph></subsection><subsection id="H40DEA313DF1D41EC8599A95B7C06A61B"><enum>(d)</enum><header>Agreement required</header><text>The rehabilitation of an eligible pump station pursuant to this section shall be initiated only after a non-Federal interest has entered into a binding agreement with the Secretary—</text><paragraph id="HB879F808046E4D68A15DC056F49CF236"><enum>(1)</enum><text>to pay the non-Federal share of the costs of rehabilitation under subsection (c); and</text></paragraph><paragraph id="H216C1A531A6B416CB87C354CF6C6C87D"><enum>(2)</enum><text>to pay 100 percent of the operation and maintenance costs of the rehabilitated eligible pump station, in accordance with regulations promulgated by the Secretary.</text></paragraph></subsection><subsection id="HB8FC08484CBF4848A08F5DA794B7B7EC"><enum>(e)</enum><header>Treatment</header><text>The rehabilitation of an eligible pump station pursuant to this section shall not be considered to be a separable element of the associated flood risk management project constructed by the Corps of Engineers.</text></subsection><subsection id="HACAFD126B78744409BCAD4FFEBC8B385"><enum>(f)</enum><header>Authorization of appropriations</header><text>There is authorized to be appropriated to carry out this section $60,000,000, to remain available until expended.</text></subsection></section><section id="H1D915B5AF08742C4A94416000BAE2B6E" section-type="subsequent-section"><enum>137.</enum><header>Non-Federal Project Implementation Pilot Program</header><text display-inline="no-display-inline">Section 1043(b) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2201">33 U.S.C. 2201</external-xref> note) is amended—</text><paragraph id="HF0823E6BBFE841ED9393E19D0CCF57BA"><enum>(1)</enum><text>in paragraph (7), by striking <quote>the date that is 5 years after the date of enactment of this Act</quote> and inserting <quote>September 30, 2026</quote>; </text></paragraph><paragraph commented="no" id="H3DC24F32763841AB811A87BA3CC3B3EF"><enum>(2)</enum><text>in paragraph (8), by striking <quote>2023</quote> and inserting <quote>2026</quote>; and</text></paragraph><paragraph id="HB7D0E0DABA1F4E68978BCC786D55F074"><enum>(3)</enum><text>by adding at the end the following:</text><quoted-block display-inline="no-display-inline" id="H1F26861421874535B81C94E74DDE52D8" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H631EC46E8E1940DB9BDD8C9B3045CE86"><enum>(9)</enum><header>Implementation guidance</header><subparagraph id="H475BD2CFE5A24B40BAF97767C7718FBF"><enum>(A)</enum><header>In general</header><text>Not later than 120 days after the date of enactment of this paragraph, the Secretary shall issue guidance for the implementation of the pilot program that, to the extent practicable, identifies—</text><clause id="HFB70BF884B1E4340BE34174B0E4CEC6D"><enum>(i)</enum><text display-inline="yes-display-inline">the metrics for measuring the success of the pilot program;</text></clause><clause id="H1CFA8C52F87A42F2B02BDE95944D6606"><enum>(ii)</enum><text display-inline="yes-display-inline">a process for identifying future projects to participate in the pilot program; </text></clause><clause id="HC63B3016620247B0A425EB27536B4C09"><enum>(iii)</enum><text display-inline="yes-display-inline">measures to address the risks of a non-Federal interest constructing projects under the pilot program, including which entity bears the risk for projects that fail to meet the Corps of Engineers standards for design or quality;</text></clause><clause id="HDAF71C610FD04E0EBA4C9021786A2701"><enum>(iv)</enum><text display-inline="yes-display-inline">the laws and regulations that a non-Federal interest must follow in carrying out a project under the pilot program; and</text></clause><clause id="H63DF2A3A11E24A0DB38403C76E972DEE"><enum>(v)</enum><text display-inline="yes-display-inline">which entity bears the risk in the event that a project carried out under the pilot program fails to be carried out in accordance with the project authorization or this subsection.</text></clause></subparagraph><subparagraph id="H39505498CB1247619CE5B2300EDE16BC"><enum>(B)</enum><header>New project partnership agreements</header><text display-inline="yes-display-inline">The Secretary may not enter into a project partnership agreement under this subsection during the period beginning on the date of enactment of this paragraph and ending on the date on which the Secretary issues the guidance under subparagraph (A).</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section><section id="HD7E296BFE52E487287848BA02E97E8AF"><enum>138.</enum><header>Definition of economically disadvantaged community</header><subsection id="H4D51302D95464093BEB6F40181E4600A"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Not later than 180 days after the date of enactment of this Act, the Secretary shall issue guidance defining the term <term>economically disadvantaged community</term> for the purposes of this Act and the amendments made by this Act.</text></subsection><subsection id="H7B892716F80F4167A110CEB1BF01BD68"><enum>(b)</enum><header>Considerations</header><text>In defining the term <term>economically disadvantaged community</term> under subsection (a), the Secretary shall, to the maximum extent practicable, utilize the criteria under paragraphs (1) or (2) of section 301(a) of the Public Works and Economic Development Act of 1965 (<external-xref legal-doc="usc" parsable-cite="usc/42/3161">42 U.S.C. 3161</external-xref>), to the extent that such criteria are applicable in relation to the development of water resources development projects.</text></subsection></section><section id="HAC3D7092A5884BA1A83AEBEF7B72E101"><enum>139.</enum><header>Cost sharing provisions for territories and Indian Tribes</header><text display-inline="no-display-inline">Section 1156(b) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2310">33 U.S.C. 2310(b)</external-xref>) is amended by striking <quote>inflation</quote> and all that follows through the period at the end and inserting <quote>on an annual basis for inflation.</quote>.</text></section><section id="HCD255037AC2A4ADDBA89FBD583367DE6"><enum>140.</enum><header>Flood control and other purposes</header><text display-inline="no-display-inline">Section 103(k) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2213">33 U.S.C. 2213</external-xref>) is amended—</text><paragraph id="H00AB7D64A1FF4C2EB7FD8B2F34F35102"><enum>(1)</enum><text>by striking <quote>Except as</quote> and inserting the following: </text><quoted-block display-inline="no-display-inline" id="HC93222CE0F7A47ACA04EA879151ADE7C" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="HD3B97E0D18C44F208732C87061AB9257"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">Except as</text></paragraph><after-quoted-block>; and </after-quoted-block></quoted-block></paragraph><paragraph id="H4B59AD4FEEA84B21BA22AAE06BA3F913"><enum>(2)</enum><text>by adding at the end the following: </text><quoted-block display-inline="no-display-inline" id="H765A26922BAE48799B5F95D1E08031CB" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H6F2319B6FE654DACA11A02A4E94B78AD"><enum>(2)</enum><header>Renegotiation of terms</header><subparagraph id="H16483C0A307E43B79AF8B9FC126D3AF6"><enum>(A)</enum><header>In general</header><text display-inline="yes-display-inline">At the request of a non-Federal interest, the Secretary and the non-Federal interest may renegotiate the terms and conditions of an eligible deferred payment, including—</text><clause id="H5DBA59078D4541BAA4A31F402F41D1E6"><enum>(i)</enum><text display-inline="yes-display-inline">permitting the non-Federal contribution to be made without interest, pursuant to paragraph (1);</text></clause><clause id="H2CC42E5859004C4EA2672CFD337AA8C3"><enum>(ii)</enum><text>recalculation of the interest rate;</text></clause><clause id="H2D2B11B7A9E4456589DE8148325A307F"><enum>(iii)</enum><text>full or partial forgiveness of interest accrued during the period of construction; and</text></clause><clause id="H8DFA132C3F6E436EA1506177EEE571EE"><enum>(iv)</enum><text display-inline="yes-display-inline">a credit against construction interest for a non-Federal investment that benefits the completion or performance of the project or separable element.</text></clause></subparagraph><subparagraph id="H0A49AE9AABD24DC8B34561965F501F95"><enum>(B)</enum><header>Eligible deferred payment</header><text>An eligible deferred payment agreement under subparagraph (A) is an agreement for which—</text><clause id="H1851E5A09D0B4EB193E09CA0BEE20827"><enum>(i)</enum><text>the non-Federal contribution was made with interest; </text></clause><clause id="HAE1073DBD16D4D14A8D243D255825B18"><enum>(ii)</enum><text display-inline="yes-display-inline">the period of project construction exceeds 10 years from the execution of a project partnership agreement or appropriation of funds; and</text></clause><clause id="H941BA0D3690E4EB4891576BE645B3473"><enum>(iii)</enum><text display-inline="yes-display-inline">the construction interest exceeds $45,000,000.</text></clause></subparagraph><subparagraph id="H76C8431144E442108DF49C6126BA103F"><enum>(C)</enum><header>Credit for non-Federal contribution</header><clause id="H4231251E7A154C80842698ECFAB3C512"><enum>(i)</enum><header>In general</header><text>The Secretary is authorized to credit any costs incurred by the non-Federal interest (including in-kind contributions) to remedy a design or construction deficiency of a covered project or separable element toward the non-Federal share of the cost of the covered project, if the Secretary determines the remedy to be integral to the completion or performance of the covered project.</text></clause><clause id="H4E7C6C4ED6F54F7A84E916523E11323D"><enum>(ii)</enum><header>Credit of costs</header><text>If the non-Federal interest incurs costs or in-kind contributions for a project to remedy a design or construction deficiency of a project or separable element which has a 100 percent Federal cost share, and the Secretary determines the remedy to be integral to the completion or performance of the project, the Secretary is authorized to credit such costs to any interest accrued on a deferred non-Federal contribution.</text></clause></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section><section id="H9E82154105F54C119C6672CFDE95D423"><enum>141.</enum><header>Review of contracting policies</header><subsection id="H66C75DE0A741490FB99B4C88C0AF6CF0"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Not later than 180 days after the date of enactment of this section, the Secretary shall complete a review of the policies, guidelines, and regulations of the Corps of Engineers for the development of contractual agreements between the Secretary and non-Federal interests and utilities associated with the construction of water resources development projects.</text></subsection><subsection id="HB0D02C6BA44A460ABD8560851BC5EFE2"><enum>(b)</enum><header>Report</header><text>Not later than 90 days after completing the review under subsection (a), the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, and make publicly available, a report that includes—</text><paragraph id="HD9480132FBA845C380A9A85CA8742B70"><enum>(1)</enum><text display-inline="yes-display-inline">a summary of the results of the review; and</text></paragraph><paragraph id="H51DD17E564FE4D178DBD4EB23376B7CF"><enum>(2)</enum><text display-inline="yes-display-inline">public guidance on best practices for non-Federal interest to use when writing or developing contractual agreements with the Secretary and utilities.</text></paragraph></subsection><subsection id="H98B5884B80AE418585ED0084D05EF303"><enum>(c)</enum><header>Provision of guidance</header><text>The Secretary shall provide the best practices guidance included under subsection (b)(2) to non-Federal interests prior to the development of contractual agreements.</text></subsection></section><section id="H163D8F398F884FF4BAAB8C2C5A643BA8"><enum>142.</enum><header>Buy America</header><text display-inline="no-display-inline">With respect to all Corps of Engineers construction and rehabilitation contracts to be awarded after the date of enactment of this Act, the steel components furnished and delivered under such contracts shall be manufactured or fabricated in whole or substantial part in the United States with steel produced or made in the United States, its territories, or possessions.</text></section><section id="H80A8063CB4774400A185397AA0ED732E"><enum>143.</enum><header>Annual report on status of feasibility studies</header><text display-inline="no-display-inline">Concurrent with each report submitted under section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>), the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works a report that provides for an accounting of all outstanding feasibility studies being conducted by the Secretary, including, for each such study, its length, cost, and expected completion date. </text></section></title><title id="HDE8444F35ED640DE82C44BAA7FE0F042"><enum>II</enum><header>Studies and Reports</header><section id="H8D6CEE8542774CE2B6ADD67A31EC394F"><enum>201.</enum><header>Authorization of proposed feasibility studies</header><subsection id="H00D839F5C0334FACA5EEB300BDD18C69"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">The Secretary is authorized to conduct a feasibility study for the following projects for water resources development and conservation and other purposes, as identified in the reports titled <quote>Report to Congress on Future Water Resources Development</quote> submitted to Congress pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>) or otherwise reviewed by Congress:</text><paragraph id="HC44911783E144DC1A99C1A6F23485119"><enum>(1)</enum><header>Tonto Creek, Gila River, Arizona</header><text display-inline="yes-display-inline">Project for flood risk management, Tonto Creek, Gila River, Arizona.</text></paragraph><paragraph id="H65968EC6F54E41049243227CA6391CF9"><enum>(2)</enum><header>Sulphur River, Arkansas and Texas</header><text>Project for ecosystem restoration, Sulphur River, Arkansas and Texas.</text></paragraph><paragraph id="H3B02CFC2974A4C4E829CB85F1E7AB395"><enum>(3)</enum><header>Cable Creek, California</header><text display-inline="yes-display-inline">Project for flood risk management, water supply, and related benefits, Cable Creek, California.</text></paragraph><paragraph id="H9C8DDB3931AC47FAB614A40BBD577D7B"><enum>(4)</enum><header>Del Mar Bluffs, California</header><text display-inline="yes-display-inline">Project for shoreline stabilization, Del Mar Bluffs, San Diego County, California.</text></paragraph><paragraph commented="no" id="H0C44DFACF0FE43E590DA2E91557DF5ED"><enum>(5)</enum><header>Redbank and Fancher Creeks, California</header><text>Project for water conservation and water supply, Redbank and Fancher Creeks, California.</text></paragraph><paragraph id="HDF41B12B899C47AEA14BB0C7B22E6E88"><enum>(6)</enum><header>Rio Hondo Channel, California</header><text>Project for ecosystem restoration, Rio Hondo Channel, San Gabriel River, California.</text></paragraph><paragraph commented="no" id="H05F89DEE95274941AF518D802326F646"><enum>(7)</enum><header>Southern California, California</header><text display-inline="yes-display-inline">Project for coastal storm damage reduction, Southern California.</text></paragraph><paragraph id="H742146B172C043A7A3A2A2B0B56C2F6F"><enum>(8)</enum><header>Shingle Creek and Kissimmee River, Florida</header><text>Project for ecosystem restoration and water storage, Shingle Creek and Kissimmee River, Osceola County, Florida.</text></paragraph><paragraph id="H4EF122A9DF1F4F5C81DA4483BD0910B4"><enum>(9)</enum><header>St. John’s River and Lake Jesup, Florida</header><text>Project for ecosystem restoration, St. John’s River and Lake Jesup, Florida.</text></paragraph><paragraph id="H6B744F6F8081430AA47DD4F2592587B8"><enum>(10)</enum><header>Waimea River, Hawaii</header><text>Project for flood risk management, Waimea River, Kauai, Hawaii.</text></paragraph><paragraph id="HEF1E81A95F26476EB21E7118A917A58A"><enum>(11)</enum><header>Chicago area waterways system, Illinois</header><text>Project for ecosystem restoration, recreation, and other purposes, Illinois River, Chicago River, Calumet River, Grand Calumet River, Little Calumet River, and other waterways in the vicinity of Chicago, Illinois.</text></paragraph><paragraph id="H865F39633B7B4E61A59524D6551FF1CB"><enum>(12)</enum><header>Fox River, Illinois</header><text>Project for flood risk management, Fox River, Illinois.</text></paragraph><paragraph id="HB4AA0C608A2B4CC59FEDB099DBBA41AE"><enum>(13)</enum><header>Lower Missouri River, Kansas</header><text>Project for bank stabilization and navigation, Lower Missouri River, Sioux City, Kansas.</text></paragraph><paragraph id="H80F4FB8E4E74454DA256DF3159443C8F"><enum>(14)</enum><header>Tangipahoa Parish, Louisiana</header><text display-inline="yes-display-inline">Project for flood risk management, Tangipahoa Parish, Louisiana.</text></paragraph><paragraph id="HEE0306E7E4874016A7BE667112C10304"><enum>(15)</enum><header>Kent Narrows and Chester River, Maryland</header><text>Project for navigation, Kent Narrows and Chester River, Queen Anne’s County, Maryland.</text></paragraph><paragraph id="H9F8115794F114385A6CDB046E17A2BE7"><enum>(16)</enum><header>Boston, Massachusetts</header><text display-inline="yes-display-inline">Project for hurricane and storm damage risk reduction, Boston, Massachusetts, pursuant to the comprehensive study authorized under the Disaster Relief Appropriations Act, 2013 (<external-xref legal-doc="public-law" parsable-cite="pl/113/2">Public Law 113–2</external-xref>).</text></paragraph><paragraph id="H87B1EE49523A444886D7236094F91001"><enum>(17)</enum><header>Lower St. Croix River, Minnesota</header><text>Project for flood risk management, ecosystem restoration, and recreation, Lower St. Croix River, Minnesota.</text></paragraph><paragraph id="H575F2A52DC244DD6A0DF92653488456E"><enum>(18)</enum><header>Escatawpa River Basin, Mississippi</header><text>Project for flood risk management and ecosystem restoration, Escatawpa River, Jackson County, Mississippi.</text></paragraph><paragraph id="H84EAAFE531634EC8BF600834D73CF757"><enum>(19)</enum><header>Long Beach, Bay St. Louis and Mississippi Sound, Mississippi</header><text>Project for hurricane and storm damage risk reduction and flood risk management, Long Beach, Bay St. Louis and Mississippi Sound, Mississippi.</text></paragraph><paragraph id="H3EA074887FE64D428EEAC1EA105FBCE7"><enum>(20)</enum><header>Pascagoula River Basin, Mississippi</header><text>Project for comprehensive watershed study, Pascagoula, Mississippi.</text></paragraph><paragraph id="H5AFCA0F27D9547C19D8446F60D840FBD"><enum>(21)</enum><header>Tallahoma and Tallahala creeks, Mississippi</header><text>Project for flood risk management, Leaf River, Jones County, Mississippi.</text></paragraph><paragraph id="H583BD47B832049F683131A25713996F9"><enum>(22)</enum><header>Lower Osage River Basin, Missouri</header><text>Project for ecosystem restoration, Lower Osage River Basin, Missouri.</text></paragraph><paragraph commented="no" id="H7A1078234F684486A1EFDF0070825BD3"><enum>(23)</enum><header>Upper Basin and Stony Brook (Green Brook Sub-basin), Raritan River Basin, New Jersey</header><text>Reevaluation of the Upper Basin and Stony Brook portions of the project for flood control, Green Brook Sub-basin, Raritan River Basin, New Jersey, authorized by section 401 of the Water Resources Development Act of 1986 (100 Stat. 4119), including the evaluation of nonstructural measures to achieve the project purpose.</text></paragraph><paragraph commented="no" id="H9142643944A84CEE944BBC142AAF6CC5"><enum>(24)</enum><header>Lake Ontario shoreline, New York</header><text>Project for coastal storm resiliency, Lake Ontario shoreline, New York.</text></paragraph><paragraph id="HA48E85A65CE5467393ADF455D1D9F7B0"><enum>(25)</enum><header>Wading River Creek, New York</header><text>Project for hurricane and storm damage risk reduction, flood risk management, navigation, and ecosystem restoration, Wading River Creek, New York.</text></paragraph><paragraph id="HFE294F894C624FAEBA8BF13ED1EA0465"><enum>(26)</enum><header>Reel Point Preserve, New York</header><text>Project for navigation and shoreline stabilization, Reel Point Preserve, New York.</text></paragraph><paragraph id="HBFE8DC3DB16C4DC4A54E1D41A09563D2"><enum>(27)</enum><header>Goldsmith Inlet, New York</header><text>Project for navigation, Goldsmith Inlet, New York.</text></paragraph><paragraph id="H4F9BD1D8B19D4E5B90D88F38B771CD38"><enum>(28)</enum><header>Tuscarawas River Basin, Ohio</header><text>Project for comprehensive watershed study, Tuscarawas River Basin, Ohio.</text></paragraph><paragraph id="HC9A21A18404D4F788E53AF338BB8B213"><enum>(29)</enum><header>Lower Columbia River Basin (turning basin), Oregon and Washington</header><text>Project to improve turning basins for the project for navigation, Columbia River Channel, Oregon and Washington, authorized by section 101(b)(13) of the Water Resources Development Act of 1999 (113 Stat. 280).</text></paragraph><paragraph id="H348182AEC3D0414998EC41C422462FA3"><enum>(30)</enum><header>Williamsport, Pennsylvania</header><text>Project for flood risk management and levee rehabilitation, greater Williamsport, Pennsylvania.</text></paragraph><paragraph id="H8D52A8AB912748E3B6F5EBD9A6F119A6"><enum>(31)</enum><header>City of Charleston, South Carolina</header><text>Project for tidal- and inland-related flood risk management, Charleston, South Carolina.</text></paragraph><paragraph id="HE133CB8D217B41A6937D0DFE720C3BB8"><enum>(32)</enum><header>Tennessee and Cumberland River Basins, Tennessee</header><text>Project to deter, impede, or restrict the dispersal of aquatic nuisance species in the Tennessee and Cumberland River Basins, Tennessee.</text></paragraph><paragraph id="HA5DEA20BE1F24B6E947F2195C07C5022"><enum>(33)</enum><header>Sabine Pass to Galveston Bay, Texas</header><text display-inline="yes-display-inline">Modification of the project for hurricane and storm damage risk reduction, Port Arthur and Orange County, Texas, authorized by section 203 of the Flood Control Act of 1962 (76 Stat. 1184), and authorized as a separable element of the project for Sabine Pass to Galveston Bay, authorized by item 3 of section 1401(3) of the Water Resources Development Act of 2018 (132 Stat. 3838), to reduce the risk of flooding through the construction of improvements to interior drainage.</text></paragraph><paragraph id="HFCE7598909A7490BAA2F203718C594ED"><enum>(34)</enum><header>Port of Victoria, Texas</header><text>Project for flood risk management, Port of Victoria, Texas.</text></paragraph><paragraph id="H225F196B6CD64EB092DFF0727E10D287"><enum>(35)</enum><header>Lower Fox River Basin, Wisconsin</header><text>Project for comprehensive watershed study, Lower Fox River Basin, Wisconsin.</text></paragraph><paragraph id="HD281C1A1E1704B63958FD7F62C6698A8"><enum>(36)</enum><header>Upper Fox River and Wolf River, Wisconsin</header><text>Project for flood risk management and ecosystem restoration, Upper Fox River and Wolf River, Wisconsin.</text></paragraph></subsection><subsection id="H5C75881CB5CA4DAA9AFB2AC371955E70"><enum>(b)</enum><header>Special rule</header><text display-inline="yes-display-inline">The Secretary shall consider any study carried out by the Secretary to formulate the modifications to the project for hurricane and storm damage risk reduction, Port Arthur and Orange County, Texas, identified in subsection (a)(33) to be a continuation of the study carried out for Sabine Pass to Galveston Bay, Texas, authorized by a resolution of the Committee on Environment and Public Works of the Senate, approved June 23, 2004, and funded by title IV of division B of the Bipartisan Budget Act of 2018, under the heading <quote>Corps of Engineers—Civil—Department of the Army—Construction</quote> (<external-xref legal-doc="public-law" parsable-cite="pl/115/123">Public Law 115–123</external-xref>; 132 Stat. 76).</text></subsection></section><section id="HFB602FA2AA5B48DA9FB462BBAA188984"><enum>202.</enum><header>Expedited completions</header><subsection id="HFF3E385DF8A4428DB60FC81003F358DB"><enum>(a)</enum><header>Feasibility reports</header><text>The Secretary shall expedite the completion of a feasibility study for each of the following projects, and if the Secretary determines that the project is justified in a completed report, may proceed directly to preconstruction planning, engineering, and design of the project:</text><paragraph id="H2C0F53F6A3094054AD090532CA5A58E6"><enum>(1)</enum><text>Project for navigation, St. George Harbor, Alaska.</text></paragraph><paragraph commented="no" id="HB1245805AAE74B57A23C940D6F31F9A2"><enum>(2)</enum><text>Project for shoreline stabilization, Aunu‘u Harbor, American Samoa.</text></paragraph><paragraph commented="no" id="HA97726D71593476480D7B0126BAB068D"><enum>(3)</enum><text display-inline="yes-display-inline">Project for shoreline stabilization, Tutuila Island, American Samoa.</text></paragraph><paragraph id="H0C34DFEB5D4747AA9DC7487FF00877FE"><enum>(4)</enum><text display-inline="yes-display-inline">Project for flood risk management, Lower Santa Cruz River, Arizona.</text></paragraph><paragraph id="HB5C13E41A29D43C2ADE166A6C0F4D544"><enum>(5)</enum><text display-inline="yes-display-inline">Project for flood control, water conservation, and related purposes, Coyote Valley Dam, California.</text></paragraph><paragraph id="H41ADEF0CAE50425F81E6DD52B9B4FD1C"><enum>(6)</enum><text display-inline="yes-display-inline">Project for flood damage reduction and ecosystem restoration, Del Rosa Channel, city of San Bernardino, California.</text></paragraph><paragraph id="H1C146644F0C647CB93837739C20885FA"><enum>(7)</enum><text display-inline="yes-display-inline">Project for flood risk management, Lower Cache Creek, California.</text></paragraph><paragraph id="H2A6047B406884D38A6A69CD37DE72127"><enum>(8)</enum><text display-inline="yes-display-inline">Project for flood damage reduction and ecosystem restoration, Mission-Zanja Channel, cities of San Bernardino and Redlands, California.</text></paragraph><paragraph id="HE4D4C143CD8C487482F1E3A0EC913265"><enum>(9)</enum><text display-inline="yes-display-inline">Project for shoreline protection, Oceanside, California, authorized pursuant to section 414 of the Water Resources Development Act of 2000 (114 Stat. 2636; 121 Stat. 1176).</text></paragraph><paragraph id="H6A1951EA37EC47E3B8BFC841F2051596"><enum>(10)</enum><text display-inline="yes-display-inline">Project for flood risk management, Prado Basin, California.</text></paragraph><paragraph id="HB48F3144785147B48244DB780FD7563A"><enum>(11)</enum><text display-inline="yes-display-inline">Project to modify the project for navigation, San Francisco Bay to Stockton, California.</text></paragraph><paragraph id="HF92B44F02B5B43C6846589300C45B02D"><enum>(12)</enum><text display-inline="yes-display-inline">Project to modify the Seven Oaks Dam, California, portion of the project for flood control, Santa Ana River Mainstem, California, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4113; 101 Stat. 1329–111; 104 Stat. 4611; 110 Stat. 3713; 121 Stat. 1115), to include water conservation as an authorized purpose.</text></paragraph><paragraph commented="no" id="H1BB938C068424E6493182AB0A9A5D863"><enum>(13)</enum><text display-inline="yes-display-inline">Project to modify the project for navigation, Delaware River Mainstem and Channel Deepening, Delaware, New Jersey, and Pennsylvania, authorized by section 101(6) of the Water Resources Development Act of 1992 (106 Stat. 4802; 113 Stat. 300; 114 Stat. 2602), to include the construction of a turning basin located near the Packer Avenue Marine Terminal.</text></paragraph><paragraph id="H8E203C4F67484309BC6106C658987B35"><enum>(14)</enum><text display-inline="yes-display-inline">Project for ecosystem restoration, Central and Southern Florida Project Canal 111 (C–111), South Dade County, Florida.</text></paragraph><paragraph id="H90FBC7F6A2D842D286647AEFBF5C3334"><enum>(15)</enum><text>Project for comprehensive hurricane and storm damage risk reduction and shoreline erosion protection, Chicago, Illinois, authorized by section 101(a)(12) of the Water Resources Development Act of 1996 (110 Stat. 3664; 113 Stat. 302).</text></paragraph><paragraph commented="no" display-inline="no-display-inline" id="HCED0388668E542B8B7C0255BC332EB73"><enum>(16)</enum><text display-inline="yes-display-inline">Project for flood risk management, Wheaton, DuPage County, Illinois.</text></paragraph><paragraph id="H8A0EF95DBA8540A1815C99831EAFD7F1"><enum>(17)</enum><text display-inline="yes-display-inline">Project for flood damage reduction, ecosystem restoration, and recreation, Blue River Basin, Kansas City, Kansas, carried out pursuant to the resolution of the Committee on Transportation and Infrastructure of the House of Representatives adopted on September 24, 2008 (docket number 2803).</text></paragraph><paragraph id="H47D63344F0594471A85CC12F48D79118"><enum>(18)</enum><text display-inline="yes-display-inline">Project for flood control, Amite River and Tributaries east of the Mississippi River, Louisiana.</text></paragraph><paragraph id="H014F51E929B147F6BAF9909007FE32B8"><enum>(19)</enum><text display-inline="yes-display-inline">Project for coastal storm risk management, Upper Barataria Basin, Louisiana.</text></paragraph><paragraph id="HE5CF89A5CDC142069816BF4B3B3C0267"><enum>(20)</enum><text display-inline="yes-display-inline">Project to replace the Bourne and Sagamore Bridges, Cape Cod, Massachusetts.</text></paragraph><paragraph commented="no" display-inline="no-display-inline" id="H29883D5585FE4AD7AFE54CE816A6D311"><enum>(21)</enum><text display-inline="yes-display-inline">Project to deepen the project for navigation, Gulfport Harbor, Mississippi, authorized by section 202(a) of the Water Resources Development Act of 1986 (100 Stat. 4094).</text></paragraph><paragraph id="H54393673980F429BACD59C27D21264B0"><enum>(22)</enum><text display-inline="yes-display-inline">Project for flood risk management, Rahway River Basin, New Jersey.</text></paragraph><paragraph id="HA9BCD053A80743619F8F3B4120D379F2"><enum>(23)</enum><text>Project for hurricane and storm damage risk reduction, Raritan Bay and Sandy Hook Bay, Highlands, New Jersey.</text></paragraph><paragraph commented="no" id="H73D31081C5D24D469CCFA2309ED6DF8B"><enum>(24)</enum><text>Project for navigation, Shark River, New Jersey.</text></paragraph><paragraph id="H3E1B5E1D468A42CD8E0549A2A8878FEB"><enum>(25)</enum><text display-inline="yes-display-inline">Project for flood risk management, Rondout Creek-Wallkill River Watershed, New York, carried out pursuant to the resolution of the Committee on Transportation and Infrastructure of the House of Representatives adopted on May 2, 2007 (docket number 2776).</text></paragraph><paragraph display-inline="no-display-inline" id="H114AC1AC905C4B5FB0F08B71FCA73B3F"><enum>(26)</enum><text display-inline="yes-display-inline">Project for ecosystem restoration and hurricane and storm damage risk reduction, Spring Creek South (Howard Beach), Queens, New York.</text></paragraph><paragraph id="HF0CB00CABF614BCCB856B6CE9C0B9596"><enum>(27)</enum><text display-inline="yes-display-inline">Project to resolve increased silting and shoaling adjacent to the Federal channel, Port of Bandon, Coquille River, Oregon.</text></paragraph><paragraph commented="no" id="H760A7A588E514DE5998C34B8DE6A5E4A"><enum>(28)</enum><text display-inline="yes-display-inline">Project for flood control, 42nd Street Levee, Springfield, Oregon, being carried out under section 205 of the Flood Control Act of 1948 (<external-xref legal-doc="usc" parsable-cite="usc/33/701s">33 U.S.C. 701s</external-xref>).</text></paragraph><paragraph display-inline="no-display-inline" id="HE254177ADCD14E86B759041B54FAE41A"><enum>(29)</enum><text display-inline="yes-display-inline">Project for ecosystem restoration, Hood River at the confluence with the Columbia River, Oregon.</text></paragraph><paragraph id="H697AA07F5F5647CEAB769CD3008756D6"><enum>(30)</enum><text display-inline="yes-display-inline">Project for flood risk management, Rio Culebrinas, Puerto Rico.</text></paragraph><paragraph id="HEDB388A6668D46D1B5D0B77354B6F0D3"><enum>(31)</enum><text display-inline="yes-display-inline">Project for flood risk management, Rio Grande de Manati, Puerto Rico.</text></paragraph><paragraph id="H911FBE1CA64A47F0A85407C2DD406A14"><enum>(32)</enum><text display-inline="yes-display-inline">Project for flood risk management, Rio Guayanilla, Puerto Rico.</text></paragraph><paragraph id="HCA2991B94B014AE0A10FD6F5C293E17D"><enum>(33)</enum><text display-inline="yes-display-inline">Project for flood risk management, Dorchester County, South Carolina.</text></paragraph><paragraph id="H4477605A33334E2884C39AD8CF25D8F9"><enum>(34)</enum><text display-inline="yes-display-inline">Project for navigation, Georgetown Harbor, South Carolina.</text></paragraph><paragraph id="H3487CDB1A7F244148D3B5784E666A8F2"><enum>(35)</enum><text display-inline="yes-display-inline">Project for hurricane and storm damage risk reduction, Myrtle Beach, South Carolina.</text></paragraph><paragraph id="H389EB94C96FA4F1EB1615AE14A6273FC"><enum>(36)</enum><text display-inline="yes-display-inline">Project to modify the projects for navigation and other purposes, Old Hickory Lock and Dam and the Cordell Hull Dam and Reservoir, Cumberland River, Tennessee, authorized by the Act of July 24, 1946 (chapter 595, 60 Stat. 636), to add flood risk management as an authorized purpose.</text></paragraph><paragraph commented="no" id="HBD9AAD41FB0646BC880D1E92238597AF"><enum>(37)</enum><text display-inline="yes-display-inline">Project for flood risk management, ecosystem restoration, water supply, and related purposes, Lower Rio Grande River, Cameron County, Texas, carried out pursuant to the resolution of the Committee on Transportation and Infrastructure of the House of Representatives adopted on May 21, 2003 (docket number 2710).</text></paragraph><paragraph id="H8AA57474745E419398B9736AEAC31FF5"><enum>(38)</enum><text display-inline="yes-display-inline">Project for hurricane and storm damage risk reduction and shoreline erosion protection, Bolongo Bay, St. Thomas, United States Virgin Islands.</text></paragraph><paragraph id="HA64C51E5600E40A79991DEA3EF54DB86"><enum>(39)</enum><text display-inline="yes-display-inline">Project for flood risk management, Savan Gut Phase II, St. Thomas, United States Virgin Islands.</text></paragraph><paragraph id="H29BDF3A0C1574AB4943248E9CE26E766"><enum>(40)</enum><text display-inline="yes-display-inline">Project for flood risk management, Turpentine Run, St. Thomas, United States Virgin Islands.</text></paragraph><paragraph id="HFAF502B14F384C1C9E004D394C527955"><enum>(41)</enum><text display-inline="yes-display-inline">Project for navigation, North Landing Bridge, Atlantic Intracoastal Waterway, Virginia.</text></paragraph></subsection><subsection id="H2BB7787EA2654E1AA7891C4F589244CF"><enum>(b)</enum><header>Post-Authorization change reports</header><text>The Secretary shall expedite completion of a post-authorization change report for the following projects:</text><paragraph id="H6F1B8BFA4AF6406DB9532E655934A90C"><enum>(1)</enum><text display-inline="yes-display-inline">Project for ecosystem restoration, Tres Rios, Arizona.</text></paragraph><paragraph id="HAF499A51F8DD49C681AB158E0E471A1E"><enum>(2)</enum><text display-inline="yes-display-inline">Project for flood control, San Luis Rey River, California.</text></paragraph><paragraph id="H877E95F2D47C4DB9800FCA9E5CEFC98C"><enum>(3)</enum><text display-inline="yes-display-inline">Project for ecosystem restoration, Central and Southern Florida Project Canal 111 (C–111), South Dade County, Florida.</text></paragraph><paragraph id="H01EC4B7381FB4469827E3975D27E0FCA"><enum>(4)</enum><text display-inline="yes-display-inline">Project for ecosystem restoration, Comprehensive Everglades Restoration Plan, Caloosahatchee River C–43, West Basin Storage Reservoir, Florida.</text></paragraph><paragraph id="H0485C61C19554CBCBB88639ADC3077BA"><enum>(5)</enum><text display-inline="yes-display-inline">Project for flood risk management, Des Moines Levee System, including Birdland Park Levee, Des Moines and Raccoon Rivers, Des Moines, Iowa.</text></paragraph></subsection><subsection id="H7AA651C6B66A41AFA458613233A33F24"><enum>(c)</enum><header>Watershed and river basin assessments</header><text>The Secretary shall expedite the completion of an assessment under section 729 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2267a">33 U.S.C. 2267a</external-xref>), for the following:</text><paragraph id="HB7AC2B8593C644608DDCE889EE7EB5CE"><enum>(1)</enum><text>Kansas River Basin, Kansas.</text></paragraph><paragraph id="H5AFF02E4CB004AA0B957940D359CE10B"><enum>(2)</enum><text>Merrimack River Basin, Massachusetts.</text></paragraph></subsection><subsection id="H95B842017FC14E009B11560BDC861B47"><enum>(d)</enum><header>Disposition study</header><text display-inline="yes-display-inline">The Secretary shall expedite the completion of a disposition study, carried out under section 216 of the Flood Control Act of 1970 (<external-xref legal-doc="usc" parsable-cite="usc/33/549a">33 U.S.C. 549a</external-xref>), for the project for Salinas Reservoir (Santa Margarita Lake), California.</text></subsection></section><section id="H2E058A70A60E497985570F999BA28635"><enum>203.</enum><header>Feasibility study modifications</header><subsection id="H34EA49920D7B44F79A543EA663D4E07A"><enum>(a)</enum><header>San Francisco Bay, California</header><text>Section 142 of the Water Resources Development Act of 1976 (90 Stat. 2930) is amended—</text><paragraph id="H3CA10EE739B944DF9699B3CE9ACA5D3A"><enum>(1)</enum><text>by inserting <quote>, and along the ocean shoreline of San Mateo, San Francisco, and Marin Counties,</quote> after <quote>Sacramento and San Joaquin Rivers</quote>;</text></paragraph><paragraph id="H0B9B039FC21641848851732E03DD3D86"><enum>(2)</enum><text>by inserting <quote>and, with respect to the bay and ocean shorelines of San Mateo, San Francisco, and Marin Counties, the feasibility of and the Federal interest in providing measures to adapt to rising sea levels</quote> after <quote>tidal and fluvial flooding</quote>;</text></paragraph><paragraph id="H081489BBECC24597AC8E707EB809D70D"><enum>(3)</enum><text>by striking <quote>investigation</quote> and inserting in its place <quote>investigations</quote>; and</text></paragraph><paragraph id="H3860F4A1996B4DECBFD30E21C5BF7AAF"><enum>(4)</enum><text>by inserting after <quote>San Francisco Bay region</quote> the following: <quote>and, with respect to the bay and ocean shorelines and streams running to the bay and ocean shorelines of San Mateo, San Francisco, and Marin Counties, the effects of proposed measures or improvements on the local economy; habitat restoration, enhancement, or expansion efforts or opportunities; public infrastructure protection and improvement; stormwater runoff capacity and control measures, including those that may mitigate flooding; erosion of beaches and coasts; and any other measures or improvements relevant to adapting to rising sea levels</quote>.</text></paragraph></subsection><subsection id="HB8128EE095C445748DEAF91D48B27623"><enum>(b)</enum><header>Sacramento River, southern Sutter County, California</header><text>The study for flood control and allied purposes for the Sacramento River Basin, authorized by section 209 of the Flood Control Act of 1962 (76 Stat. 1197), is modified to authorize the Secretary to conduct a study for flood risk management, southern Sutter County between the Sacramento River and Sutter Bypass, California.</text></subsection><subsection id="HA26AA8E1A3D740D7B62FB02A529AC0A2"><enum>(c)</enum><header>Salton Sea, California</header><text>In carrying out the program to implement projects to restore the Salton Sea, California, authorized by section 3032 of the Water Resources Development Act of 2007 (121 Stat. 1113; 130 Stat. 1677), the Secretary is authorized to carry out a study for the construction of a perimeter lake, or a northern or southern subset thereof, for the Salton Sea, California.</text></subsection><subsection id="H88614DFDFABA4DF2AD87553147E4E4D1"><enum>(d)</enum><header>New York and New Jersey Harbor and Tributaries, New York and New Jersey</header><text display-inline="yes-display-inline">The study for flood and storm damage reduction for the New York and New Jersey Harbor and Tributaries project, authorized by the Act of June 15, 1955 (chapter 140, 69 Stat. 132), and being carried out pursuant to the Disaster Relief Appropriations Act, 2013 (<external-xref legal-doc="public-law" parsable-cite="pl/113/2">Public Law 113–2</external-xref>), is modified to require the Secretary to—</text><paragraph id="H3DA9A729CA9B49EDA74582162D5C68CD"><enum>(1)</enum><text>evaluate and address the impacts of low-frequency precipitation and sea-level rise on the study area;</text></paragraph><paragraph id="H6D1B92EDA5A9404A99B8FD21BE0535D8"><enum>(2)</enum><text>consult with affected communities; and</text></paragraph><paragraph id="H7BC200A655BC4B108FAEA4CB96185CEA"><enum>(3)</enum><text>ensure the study is carried out in accordance with section 1001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282c">33 U.S.C. 2282c</external-xref>).</text></paragraph></subsection></section><section id="H0064B2FF27C042EB9876251FC6C9D3B5"><enum>204.</enum><header>Selma, Alabama</header><text display-inline="no-display-inline">Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that—</text><paragraph id="H047D55DA36F343058A7A8651925874F0"><enum>(1)</enum><text>provides an update on the study for flood risk management and riverbank stabilization, Selma, Alabama, authorized by resolutions of the Committees on Public Works and Rivers and Harbors of the House of Representatives on June 7, 1961, and April 28, 1936, respectively, the completion of which the Secretary was required to expedite by section 1203 of the Water Resources Development Act of 2018 (132 Stat. 3803); and</text></paragraph><paragraph id="H5BB6E0BEF7814D55979058BEE680DF66"><enum>(2)</enum><text>identifies project alternatives necessary to—</text><subparagraph id="H5D84FA454A7742EEA639DDD1929AF53C"><enum>(A)</enum><text>assure the preservation of cultural and historic values associated with national historic landmarks within the study area; and</text></subparagraph><subparagraph id="HDEA30C59AA6D4962AF91E4276853F3ED"><enum>(B)</enum><text>provide flood risk management for economically disadvantaged communities within the study area.</text></subparagraph></paragraph></section><section id="HEBC27D45CFAE4B468D750F656CF5DFE3"><enum>205.</enum><header>Comprehensive study of the Sacramento River, Yolo Bypass, California</header><subsection id="H3FC91BDAE0AA4BE98338DD30CF364549"><enum>(a)</enum><header>Comprehensive study</header><text>The Secretary shall conduct a comprehensive study of the Sacramento River in the vicinity of the Yolo Bypass System, California, to identify actions to be undertaken by the Secretary for the comprehensive management of the Yolo Bypass System for the purposes of flood risk management, ecosystem restoration, water supply, hydropower, and recreation.</text></subsection><subsection id="H9FC5A1E53E404C7BA1EE7362BE2E8FEA"><enum>(b)</enum><header>Consultation and use of existing data</header><paragraph id="H005AC83EA4564EA7ABA5F0AE46C47A2D"><enum>(1)</enum><header>Consultation</header><text>In conducting the comprehensive study under subsection (a), the Secretary shall consult with the Governor of the State of California, applicable Federal, State, and local agencies, non-Federal interests, the Yolo Bypass and Cache Slough Partnership, and other stakeholders.</text></paragraph><paragraph id="HBCFAB9B0E26E490190CEF907B8E9F398"><enum>(2)</enum><header>Use of existing data and prior studies</header><text>To the maximum extent practicable and where appropriate, the Secretary may—</text><subparagraph id="H8E763FBDCA7B47FBA87813E968A9BF8B"><enum>(A)</enum><text>make use of existing data provided to the Secretary by the entities identified in paragraph (1); and</text></subparagraph><subparagraph id="H1B1B97D828FA4984A98C37B9AD0A7499"><enum>(B)</enum><text>incorporate—</text><clause id="HFF6EF64B522646EFA70871264AF82E84"><enum>(i)</enum><text>relevant information from prior studies and projects carried out by the Secretary within the study area; and</text></clause><clause id="H74D4785E71F94452A2AADB1B1F522AFC"><enum>(ii)</enum><text>the latest technical data and scientific approaches to changing hydrologic and climatic conditions.</text></clause></subparagraph></paragraph></subsection><subsection id="H468223835B3746C5AE0FDE08FE08BEA6"><enum>(c)</enum><header>Recommendations</header><paragraph id="H5495DCA32C414EC7986608E29365FFD5"><enum>(1)</enum><header>In general</header><text>In conducting the comprehensive study under subsection (a), the Secretary may develop a recommendation to Congress for—</text><subparagraph id="H29573D569A404634A761B446E5732448"><enum>(A)</enum><text>the construction of a water resources development project;</text></subparagraph><subparagraph id="H7EA1AE2A4353452B9E1DCBD1F0090976"><enum>(B)</enum><text>the structural or operational modification of an existing water resources development project;</text></subparagraph><subparagraph id="H98E3A6872BCF478C9A52D51A090D0EF1"><enum>(C)</enum><text>additional monitoring of, or adaptive management measures to carry out with respect to, existing water resources development projects, to respond to changing hydrologic and climatic conditions; or</text></subparagraph><subparagraph id="H46822697D45940B9871C0ACD57B5BA06"><enum>(D)</enum><text>geographic areas within the Yolo Bypass System for additional study by the Secretary.</text></subparagraph></paragraph><paragraph id="H17D848AD78754BF9978DE2D5C25B1C5B"><enum>(2)</enum><header>Additional considerations</header><text>Any feasibility study carried out pursuant to a recommendation under paragraph (1)(D) shall be considered to be a continuation of the comprehensive study authorized under subsection (a).</text></paragraph></subsection><subsection id="HF1868BB890D04A8681D98FC729A378A1"><enum>(d)</enum><header>Completion of study; report to Congress</header><text>Not later than 3 years after the date of enactment of this section, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report detailing—</text><paragraph id="H07348F5980FB46A99A6E859F77B1FC86"><enum>(1)</enum><text>the results of the comprehensive study conducted under subsection (a), including any recommendations developed under subsection (c);</text></paragraph><paragraph id="H8E2D259475134D71A605522A48BDC035"><enum>(2)</enum><text>any additional, site-specific areas within the Yolo Bypass System where additional study for flood risk management or ecosystem restoration projects is recommended by the Secretary; and</text></paragraph><paragraph commented="no" id="H393D27E148034A7FA964702F76D90DDD"><enum>(3)</enum><text display-inline="yes-display-inline">any interim actions relating to existing water resources development projects undertaken by the Secretary during the study period.</text></paragraph></subsection><subsection id="HCEF1233B1E444F0CBBC3CCA135E9F666"><enum>(e)</enum><header>Definitions</header><text>In this section:</text><paragraph id="HBF3AEFDB5B514524A1050F370F3A0F02"><enum>(1)</enum><header>Yolo Bypass System</header><text>The term <term>Yolo Bypass System</term> means the system of weirs, levees, bypass structures, and other water resources development projects in California’s Sacramento River Valley, extending from the Fremont Weir near Woodland, California, to the Sacramento River near Rio Vista, California, authorized pursuant to section 2 of the Act of March 1, 1917 (chapter 144; 39 Stat. 949).</text></paragraph><paragraph id="H92806B221EEE4F2EBB6BC920D968408D"><enum>(2)</enum><header>Yolo Bypass and Cache Clough Partnership</header><text>The term <term>Yolo Bypass and Cache Slough Partnership</term> means the group of parties to the Yolo Bypass and Cache Slough Memorandum of Understanding, effective May 2016, regarding collaboration and cooperation in the Yolo Bypass and Cache Slough region.</text></paragraph></subsection></section><section id="H4610E4786594407DAE27EA2C4ED0C973"><enum>206.</enum><header>Lake Okeechobee regulation schedule, Florida</header><subsection id="HA63A12882B804AC880E96E41A9A8C519"><enum>(a)</enum><header>In general</header><text>In carrying out the review of the Lake Okeechobee regulation schedule pursuant to section 1106 of the Water Resources Development Act of 2018 (132 Stat. 3773), the Secretary shall—</text><paragraph id="HF6810EF2AE1F44CC8C06268901C5BF90"><enum>(1)</enum><text>evaluate the implications of prohibiting releases from Lake Okeechobee through the S–308 and S–80 lock and dam structures on the operation of the lake in accordance with authorized purposes and seek to minimize unnecessary releases to coastal estuaries; and</text></paragraph><paragraph id="H6D307833402441929121B41577B89ED1"><enum>(2)</enum><text>to the maximum extent practicable, coordinate with the ongoing efforts of Federal and State agencies responsible for monitoring, forecasting, and notification of cyanobacteria levels in Lake Okeechobee.</text></paragraph></subsection><subsection id="H8C33E86ECFAD43CC891F2D6440F5DFE0"><enum>(b)</enum><header>Monthly report</header><text>Each month, the Secretary shall make public a report, which may be based on the Water Management Daily Operational Reports, disclosing the volumes of water deliveries to or discharges from Lake Okeechobee &amp; Vicinity, Water Conservation Area I, Water Conservation Area II, Water Conservation Area III, East Coast Canals, and the South Dade Conveyance. Such report shall be aggregated and reported in a format designed for the general public, using maps or other widely understood communication tools.</text></subsection><subsection id="H8CBA3A495F4C49569F97900E83FB050A"><enum>(c)</enum><header>Effect</header><text>In carrying out the evaluation under subsection (a)(1), nothing shall be construed to authorize any new purpose for the management of Lake Okeechobee or authorize the Secretary to affect any existing authorized purpose, including flood protection and management of Lake Okeechobee to provide water supply for all authorized users.</text></subsection></section><section id="H6EB70F4B65854495ABB6FBB7CAA36A08"><enum>207.</enum><header>Great Lakes Coastal Resiliency Study</header><subsection id="HEFC1FCE605174E1F8CEBFBCD51BB0D40"><enum>(a)</enum><header>In general</header><text>In carrying out the comprehensive assessment of water resources needs for the Great Lakes System under section 729 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2267a">33 U.S.C. 2267a</external-xref>), as required by section 1219 of the Water Resources Development Act of 2018 (132 Stat. 3811), the Secretary shall—</text><paragraph id="H73E371BE662F4FDE91BE150849F02E44"><enum>(1)</enum><text>taking into account recent high lake levels within the Great Lakes, assess and make recommendations to Congress on—</text><subparagraph commented="no" id="H5CF46EF2E0D34908B226DE11C3B780D3"><enum>(A)</enum><text>coastal storm and flood risk management measures, including measures that use natural features and nature-based features, as those terms are defined in section 1184 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2289a">33 U.S.C. 2289a</external-xref>);</text></subparagraph><subparagraph id="H53DEC706200747A5A3B4DF6E2C502B22"><enum>(B)</enum><text>operation and maintenance of the Great Lakes Navigation System, as such term is defined in section 210 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238</external-xref>);</text></subparagraph><subparagraph id="H259A8323F1204654AB52395ACB5755AC"><enum>(C)</enum><text>ecosystem protection and restoration;</text></subparagraph><subparagraph id="H92623D9E6BD34137935003EA65D2BBFA"><enum>(D)</enum><text>the prevention and control of invasive species and the effects of invasive species; and</text></subparagraph><subparagraph id="H155BCA1D7D44499F82CF7BD5B11DE735"><enum>(E)</enum><text>recreation associated with water resources development projects;</text></subparagraph></paragraph><paragraph id="HAD614A77A88B4F4BB198DEF5C303CECC"><enum>(2)</enum><text>prioritize actions necessary to protect critical public infrastructure, communities, and critical natural or cultural resources; and</text></paragraph><paragraph id="H8B80E548A63A4A718B36C40FD63F6E12"><enum>(3)</enum><text>to the maximum extent practicable and where appropriate, utilize existing data provided to the Secretary by Federal and State agencies, Indian Tribes, and other stakeholders, including data obtained through other Federal programs.</text></paragraph></subsection><subsection id="HCCDF03EB45804A6D9B0E876E234F33C5"><enum>(b)</enum><header>Recommendations; additional study</header><paragraph id="H8CC5421BD9CB40C6BD418E234928CB43"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">In carrying out the comprehensive assessment described in subsection (a), the Secretary may make a recommendation to Congress for—</text><subparagraph id="HD14EBFDB455141FA843CD220EE53333C"><enum>(A)</enum><text>the construction of a water resources development project;</text></subparagraph><subparagraph id="HAB324D04F2514722A68A5017EBD91C8A"><enum>(B)</enum><text>the structural or operational modification of an existing water resources development project;</text></subparagraph><subparagraph id="HF88ACA3763E14C208DD8AA9390CDCBA1"><enum>(C)</enum><text display-inline="yes-display-inline">such additional monitoring of, or adaptive management measures to carry out with respect to, existing water resources development projects, to respond to changing hydrologic and climatic conditions; or</text></subparagraph><subparagraph id="HA0EC9218D8C549A08771E3FBB91367FA"><enum>(D)</enum><text display-inline="yes-display-inline">geographic areas within the Great Lakes System for additional study by the Secretary.</text></subparagraph></paragraph><paragraph id="H6BE1B64F5CF4408AB1066E0F2F3F7692"><enum>(2)</enum><header>Additional considerations</header><text display-inline="yes-display-inline">Any feasibility study carried out pursuant to a recommendation under paragraph (1)(D) shall be considered to be a continuation of the comprehensive assessment described in subsection (a).</text></paragraph></subsection><subsection id="H469CE4A733DF477D91AE00A58B7D2307"><enum>(c)</enum><header>Exemption from maximum study cost and duration limitations</header><text>Section 1001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282c">33 U.S.C. 2282c</external-xref>) shall not apply to any study recommended under subsection (b)(1)(D).</text></subsection></section><section id="H9CFB8E8EC7DA4D25839A2E18E4AAD7A2"><enum>208.</enum><header>Rathbun Lake, Chariton River, Iowa</header><text display-inline="no-display-inline">Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that evaluates—</text><paragraph id="H4F93BE69863E44409523DEB2B4F9969B"><enum>(1)</enum><text>the existing allocations of storage space for Rathbun Lake, authorized pursuant to the Flood Control Act of 1954 (68 Stat. 1262; 121 Stat. 1124), including the existing allocation for municipal water supply;</text></paragraph><paragraph id="HEFD55EF658CA4E1EB41A2FD10CCAF414"><enum>(2)</enum><text>the feasibility of expanding the existing allocation of storage for municipal water supply; and</text></paragraph><paragraph id="HD874A711F17B4746AC7ABF77E8AEDEAB"><enum>(3)</enum><text>the affordability of future municipal water supply allocations from Rathbun Lake, for residential users of such future allocations, at projected future costs.</text></paragraph></section><section id="HB290C726005745D38F729A9F4C77E301"><enum>209.</enum><header>Report on the status of restoration in the Louisiana coastal area</header><text display-inline="no-display-inline">Not later than 1 year after the date of enactment of this Act, the Coastal Louisiana Ecosystem Protection and Restoration Task Force established by section 7004 of Water Resources Development Act of 2007 (121 Stat. 1272) shall submit to Congress a report that summarizes the activities and recommendations of the task force, including—</text><paragraph id="HD18DB7B7518F44E0BAA1FBA527735FA7"><enum>(1)</enum><text>policies, strategies, plans, programs, projects, and activities undertaken for addressing conservation, protection, restoration, and maintenance of the coastal Louisiana ecosystem; and</text></paragraph><paragraph id="H5DF4066E65BC489292EABCCA004399C5"><enum>(2)</enum><text>financial participation by each agency represented on the Task Force in conserving, protecting, restoring, and maintaining the coastal Louisiana ecosystem.</text></paragraph></section><section id="H2AD7FBD9CA4F4593A19E5115B0DB4F4C"><enum>210.</enum><header>Lower Mississippi River comprehensive study</header><subsection id="H7641EDE6CA0A49EAA4038B234785E9CD"><enum>(a)</enum><header>Comprehensive study</header><paragraph id="H770439E33F294F6C9FD48DD55E2B54D2"><enum>(1)</enum><header>In general</header><text>The Secretary shall conduct a comprehensive study of the Lower Mississippi River basin, from Cape Girardeau, Missouri, to the Gulf of Mexico, to identify actions to be undertaken by the Secretary for the comprehensive management of the basin for the purposes of flood risk management, navigation, ecosystem restoration, water supply, hydropower, and recreation.</text></paragraph><paragraph id="HB7610B3A45574F0288642ED8E7D95053"><enum>(2)</enum><header>Focus areas</header><text display-inline="yes-display-inline">In conducting the comprehensive study under paragraph (1), the Secretary shall investigate projects, including—</text><subparagraph id="HB3AFCBE91CBD45EF81E5A81E1D1BFFBC"><enum>(A)</enum><text display-inline="yes-display-inline">projects proposed in the comprehensive coastal protection master plan entitled <quote>Louisiana Comprehensive Master Plan for a Sustainable Coast</quote> prepared by the State of Louisiana and accepted by the Louisiana Coastal Protection and Restoration Authority (including any subsequent amendments or revisions), including—</text><clause id="H5AFBA01C6BB8495099334869E9114864"><enum>(i)</enum><text>Ama sediment diversion;</text></clause><clause id="H51201695F622498AAEC3A6AA1F3D00D1"><enum>(ii)</enum><text>Union freshwater diversion;</text></clause><clause id="H1B5322E8F058493EB2A3944E0D470623"><enum>(iii)</enum><text>increase Atchafalaya flow to Terrebonne; and</text></clause><clause id="HA85500049E21443D9D117CCFAA90725E"><enum>(iv)</enum><text>Manchac Landbridge diversion; and</text></clause></subparagraph><subparagraph id="H41CA0CF9B5B64BB2ADB5E83406501978"><enum>(B)</enum><text display-inline="yes-display-inline">natural features and nature-based features, including levee setbacks and instream and floodplain restoration. </text></subparagraph></paragraph></subsection><subsection id="H415C12CD50084FC5B8D4A5924E258D90"><enum>(b)</enum><header>Consultation and use of existing data</header><text>In conducting the comprehensive study under subsection (a), the Secretary shall consult with applicable Federal, State, and local agencies, Indian Tribes, non-Federal interests, and other stakeholders, and, to the maximum extent practicable and where appropriate, make use of existing data provided to the Secretary by such parties.</text></subsection><subsection id="HB78DA84603344B8EAD36D913DEEBC87B"><enum>(c)</enum><header>Recommendations</header><paragraph id="H665E72A3EA0D4AC28CF24289F78D37F6"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">In conducting the comprehensive study under subsection (a), the Secretary may develop a recommendation to Congress for—</text><subparagraph id="H48ADAEAF49134961B9DE584B904DDEAE"><enum>(A)</enum><text>the construction of a water resources development project;</text></subparagraph><subparagraph id="H017BC0EC6C494353A5B5EA32AAA22AD9"><enum>(B)</enum><text>the structural or operational modification of an existing water resources development project;</text></subparagraph><subparagraph id="H28C910D3E43044CAACDE9866695197A5"><enum>(C)</enum><text display-inline="yes-display-inline">such additional monitoring of, or adaptive management measures to carry out with respect to, existing water resources development projects, to respond to changing conditions; or</text></subparagraph><subparagraph id="H6F56C62F2BA84138B05866579AEB15C7"><enum>(D)</enum><text display-inline="yes-display-inline">geographic areas within the Lower Mississippi River basin for additional study by the Secretary.</text></subparagraph></paragraph><paragraph id="HACD925A01E2F4A8AA695A087C613C959"><enum>(2)</enum><header>Additional considerations</header><text display-inline="yes-display-inline">Any feasibility study carried out pursuant to a recommendation under this subsection shall be considered to be a continuation of the comprehensive study required under subsection (a).</text></paragraph></subsection><subsection id="H0A78FF9D992949A681FA84F831F1707D"><enum>(d)</enum><header>Completion of study; report to Congress</header><text>Not later than 3 years after the date of enactment of this section, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report detailing—</text><paragraph id="HA6BF81B9B9694A648F8AC2D14FA53BF3"><enum>(1)</enum><text display-inline="yes-display-inline">the results of the comprehensive study required by this section, including any recommendations developed under subsection (c); and</text></paragraph><paragraph id="HD69CE191C3E54A4EA50A0910389A7C1E"><enum>(2)</enum><text display-inline="yes-display-inline">any interim actions relating to existing water resources development projects undertaken by the Secretary during the study period.</text></paragraph></subsection></section><section id="H22FE8AE6049244D789F227C47E4B8204"><enum>211.</enum><header>Upper Mississippi River Comprehensive Plan</header><subsection id="H1E7EEA4EC73640C788A4858EA1FF208F"><enum>(a)</enum><header>Assessment</header><text display-inline="yes-display-inline">The Secretary shall conduct an assessment of the water resources needs of the Upper Mississippi River under section 729 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2267a">33 U.S.C. 2267a</external-xref>).</text></subsection><subsection commented="no" id="HDBBBDD0E775647C1A0E5CFF2B4300137"><enum>(b)</enum><header>Requirements</header><text display-inline="yes-display-inline">The Secretary shall carry out the assessment under subsection (a) in accordance with the requirements in section 1206(b) of Water Resources Development Act of 2016 (130 Stat. 1686).</text></subsection></section><section id="H153966140E7F45948126E39B3E641046"><enum>212.</enum><header>Lower Missouri Basin Flood Risk and Resiliency Study, Iowa, Kansas, Nebraska, and Missouri</header><subsection id="H5E4399E7066C4FCDA47590AA43BA0620"><enum>(a)</enum><header>Additional studies</header><paragraph id="H43673CA22DB84936A7E091441CFACCB6"><enum>(1)</enum><header>In general</header><text>Except as provided in paragraph (2), upon the request of the non-Federal interest for the Lower Missouri Basin study, the Secretary shall expand the scope of such study to investigate and provide recommendations relating to—</text><subparagraph id="HA5651301100F491CAC1B8A96C7BAF671"><enum>(A)</enum><text display-inline="yes-display-inline">modifications to projects in Iowa, Kansas, Nebraska, and Missouri authorized under the Pick-Sloan Missouri River Basin Program (authorized by section 9(b) of the Flood Control Act of December 22, 1944 (chapter 665, 58 Stat. 891)) and the Missouri River Bank Stabilization and Navigation project (authorized by section 2 of the Act of March 2, 1945 (chapter 19, 59 Stat. 19)), including modifications to the authorized purposes of such projects to further flood risk management and resiliency; and</text></subparagraph><subparagraph id="HE62F2D0822474E79B0A38F95404E2F93"><enum>(B)</enum><text>modifications to non-Federal, publicly owned levees in the Lower Missouri River Basin.</text></subparagraph></paragraph><paragraph id="HC34E94BE681146EA895A71A0E9B72DBE"><enum>(2)</enum><header>Exception</header><text display-inline="yes-display-inline">If the Secretary determines that expanding the scope of the Lower Missouri Basin study as provided in paragraph (1) is not practicable, and the non-Federal interest for such study concurs in such determination, the Secretary shall carry out such additional studies as are necessary to investigate the modifications described in paragraph (1).</text></paragraph><paragraph id="HD46D7670A195493692EB6E8A872E669A"><enum>(3)</enum><header>Continuation of Lower Missouri Basin study</header><text display-inline="yes-display-inline">The following studies shall be considered a continuation of the Lower Missouri Basin study:</text><subparagraph id="HB94C69E4CBB846DC90C601082C456A59"><enum>(A)</enum><text>Any additional study carried out under paragraph (2).</text></subparagraph><subparagraph id="HDEA9A83E1EF64DAFA98E4A6A3C123187"><enum>(B)</enum><text display-inline="yes-display-inline">Any study recommended to be carried out in a report that the Chief of Engineers prepares for the Lower Missouri Basin study.</text></subparagraph><subparagraph id="HFE2830E36E2E4CB2B271E1AE9E0FDA61"><enum>(C)</enum><text>Any study recommended to be carried out in a report that the Chief of Engineers prepares for an additional study carried out under paragraph (2).</text></subparagraph><subparagraph id="H45F28D656E994A5EA7A1605E8B5BD3C8"><enum>(D)</enum><text display-inline="yes-display-inline">Any study spun off from the Lower Missouri Basin study before the completion of such study.</text></subparagraph><subparagraph id="H05A6AE22B087431B8ACA97E9A426AF08"><enum>(E)</enum><text>Any study spun off from an additional study carried out under paragraph (2) before the completion of such additional study.</text></subparagraph></paragraph><paragraph id="H8B53605ED05F41739EB9CF4ADB9CD07F"><enum>(4)</enum><header>Reliance on existing information</header><text display-inline="yes-display-inline">In carrying out any study described in or authorized by this section, the Secretary, to the extent practicable, shall rely on existing data and analysis, including data and analysis prepared under section 22 of the Water Resources Development Act of 1974 (<external-xref legal-doc="usc" parsable-cite="usc/42/1962d-16">42 U.S.C. 1962d–16</external-xref>).</text></paragraph><paragraph id="HC4B4535BB27A4A288BF4ADB252F5BEAE"><enum>(5)</enum><header>Consideration; consultation</header><text>In developing recommendations under paragraph (1), the Secretary shall—</text><subparagraph id="HAE9ECDD374C04F5CA0FDF4D6D50555A8"><enum>(A)</enum><text>consider the use of—</text><clause id="H8F3430F4650644BABB9CC04831685230"><enum>(i)</enum><text>structural and nonstructural measures, including the setting back of levees and removing structures from areas of recurring flood vulnerability, where advantageous, to reduce flood risk and damages in the Lower Missouri River Basin; and</text></clause><clause id="H7C820D377C8544BA8E4406F96A9788AB"><enum>(ii)</enum><text display-inline="yes-display-inline">where such features are locally acceptable, natural features or nature-based features (as such terms are defined in section 1184 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2289a">33 U.S.C. 2289a</external-xref>); and</text></clause></subparagraph><subparagraph id="H89B2BBE9C2604EBDA63C0126D8BAC5C3"><enum>(B)</enum><text display-inline="yes-display-inline">consult with applicable Federal and State agencies, Indian Tribes, and other stakeholders within the Lower Missouri River Basin and solicit public comment on such recommendations.</text></subparagraph></paragraph><paragraph id="H5F37776783E8414C90267B36B23B43B4"><enum>(6)</enum><header>Exemption from maximum study cost and duration limitations</header><text display-inline="yes-display-inline">Section 1001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282c">33 U.S.C. 2282c</external-xref>) shall not apply to the Lower Missouri Basin study or any study described in paragraph (3).</text></paragraph><paragraph commented="no" id="H4A564EDBF8AF42D398DE64423231540E"><enum>(7)</enum><header>Preconstruction, engineering, and design</header><text>Upon completion of a study authorized by this section, if the Secretary determines that a recommended project, or modification to a project described in paragraph (1), is justified, the Secretary may proceed directly to preconstruction planning, engineering, and design of the project or modification.</text></paragraph><paragraph id="HE2C6A9EBD65148CBB8D7F185222B47C1"><enum>(8)</enum><header>Technical assistance</header><subparagraph id="H34242B51450342FC8FD4FDC1CFA79B75"><enum>(A)</enum><header>In general</header><text>For the provision of technical assistance to support small communities and economically disadvantaged communities in the planning and design of flood risk management and flood risk resiliency projects in the Lower Missouri River Basin, for each of fiscal years 2021 through 2026, there are authorized to be appropriated—</text><clause id="H6A0FAD2EEAD54B6596004C61A6403DA2"><enum>(i)</enum><text display-inline="yes-display-inline">$2,000,000 to carry out section 206 of the Flood Control Act of 1960 (<external-xref legal-doc="usc" parsable-cite="usc/33/709a">33 U.S.C. 709a</external-xref>), in addition to amounts otherwise authorized to carry out such section; and</text></clause><clause id="H9FE6A871989741128F010E44BC8EB560"><enum>(ii)</enum><text display-inline="yes-display-inline">$2,000,000 to carry out section 22(a)(2) of the Water Resources Development Act of 1974 (<external-xref legal-doc="usc" parsable-cite="usc/42/1962d-16">42 U.S.C. 1962d–16</external-xref>), in addition to amounts otherwise authorized to carry out such section.</text></clause></subparagraph><subparagraph id="HE4253DEC90BE420E997B3F34FB4BEFAB"><enum>(B)</enum><header>Conditions</header><clause id="HF2E750D8581C441286BCBD75F34B08C9"><enum>(i)</enum><header>Limitations not applicable</header><text display-inline="yes-display-inline">The limitations on the use of funds in section 206(d) of the Flood Control Act of 1960 and section 22(c)(2) of the Water Resources Development Act of 1974 shall not apply to the amounts authorized to be appropriated by subparagraph (A).</text></clause><clause id="H2388695CFE1947AF953F651A7E06C6E8"><enum>(ii)</enum><header>Rule of construction</header><text>Nothing in this paragraph restricts the authority of the Secretary to use any funds otherwise appropriated to carry out section 206 of the Flood Control Act of 1960 or section 22(a)(2) of the Water Resources Development Act of 1974 to provide technical assistance described in subparagraph (A).</text></clause></subparagraph></paragraph><paragraph id="HA7E257B0FA3042F4BEFA95A16C113D77"><enum>(9)</enum><header>Completion of study; report to Congress</header><text>Not later than 3 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report detailing—</text><subparagraph id="H5D9BB9C4C1394A349765A72BEB303EBD"><enum>(A)</enum><text>the results of the study authorized by this section;</text></subparagraph><subparagraph id="H8165A89E5230473BBAD0F9C21626A961"><enum>(B)</enum><text>any additional, site-specific areas within the Lower Missouri River Basin for which additional study for flood risk management projects is recommended by the Secretary; and</text></subparagraph><subparagraph id="H39A8768D1A0049799F3204DAEAEF202C"><enum>(C)</enum><text>any interim actions relating to existing water resources development projects undertaken by the Secretary during the study period.</text></subparagraph></paragraph></subsection><subsection id="H2314F7F712DC479EAF820C5A05ECD6C0"><enum>(b)</enum><header>Definitions</header><text>In this section:</text><paragraph id="H9DF007D4E15D4008B04646DF5CFF8A3D"><enum>(1)</enum><header>Lower Missouri Basin study</header><text display-inline="yes-display-inline">The term <term>Lower Missouri Basin study</term> means the Lower Missouri Basin Flood Risk and Resiliency Study, Iowa, Kansas, Nebraska, and Missouri, authorized pursuant to section 216 of the Flood Control Act of 1970 (<external-xref legal-doc="usc" parsable-cite="usc/33/549a">33 U.S.C. 549a</external-xref>).</text></paragraph><paragraph id="H2BEA52ECF6BA4E4E8FB2BFCD52AD631C"><enum>(2)</enum><header>Small community</header><text>The term <term>small community</term> means a local government that serves a population of less than 15,000.</text></paragraph></subsection></section><section id="H9900943E76434961A9ED7D16E7C20ECC"><enum>213.</enum><header>Portsmouth Harbor and Piscataqua River and Rye Harbor, New Hampshire</header><text display-inline="no-display-inline">Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to Congress a written status update regarding—</text><paragraph display-inline="no-display-inline" id="HE606C10C5FB74F1A854335DAD8EC8513"><enum>(1)</enum><text display-inline="yes-display-inline">efforts to address the impacts of shoaling affecting the project for navigation, Rye Harbor, New Hampshire, authorized by section 101 of the River and Harbor Act of 1960 (74 Stat. 480); and </text></paragraph><paragraph id="H184E29844E8040AF921DF8C28FB872CC"><enum>(2)</enum><text display-inline="yes-display-inline">the project for navigation, Portsmouth Harbor and Piscataqua River, authorized by section 101 of the River and Harbor Act of 1962 (76 Stat. 1173), as required to be expedited under section 1317 of the Water Resources Development Act of 2018 (<external-xref legal-doc="public-law" parsable-cite="pl/115/270">Public Law 115–270</external-xref>).</text></paragraph></section><section id="H574A55675D7A403192A404AC514AA5FD"><enum>214.</enum><header>Cougar and Detroit Dams, Willamette River Basin, Oregon</header><subsection id="H5C8C75D1287F47CFAA793053BD68B437"><enum>(a)</enum><header>Report</header><text display-inline="yes-display-inline">Not later than 2 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, and make publicly available, a report providing an initial analysis of deauthorizing hydropower as a project purpose at the Cougar and Detroit Dams project.</text></subsection><subsection id="HFBE9704E8CF84420AC99273D516C2EDB"><enum>(b)</enum><header>Contents</header><text>The Secretary shall include in the report submitted under subsection (a)—</text><paragraph id="HA5324B1AAAD6475D95664697DCA0DCC7"><enum>(1)</enum><text display-inline="yes-display-inline">a description of the potential effects of deauthorizing hydropower as a project purpose at the Cougar and Detroit Dams project on—</text><subparagraph commented="no" id="H0490A82CD84548069163894C4D456B1D"><enum>(A)</enum><text display-inline="yes-display-inline">the operation of the project, including with respect to the other authorized purposes of the project;</text></subparagraph><subparagraph id="H59C08EE444144F079A29E9397F8F48E6"><enum>(B)</enum><text display-inline="yes-display-inline">compliance of the project with the Endangered Species Act;</text></subparagraph><subparagraph id="H7CA5ACFEBFA84562BF19EAC26256DDE4"><enum>(C)</enum><text display-inline="yes-display-inline">costs that would be attributed to other authorized purposes of the project, including costs relating to compliance with such Act; and</text></subparagraph><subparagraph id="H61EEB2BD23DB4BE8BD98ECEE0223470B"><enum>(D)</enum><text>other ongoing studies in the Willamette River Basin; and</text></subparagraph></paragraph><paragraph commented="no" id="H4B6BA033B38F49E0B0F8BF1BE00C5AD7"><enum>(2)</enum><text display-inline="yes-display-inline">identification of any further research needed.</text></paragraph></subsection><subsection commented="no" id="H5D7382F6C00B4DE1899DB17AFAD3D25E"><enum>(c)</enum><header>Project defined</header><text>In this section, the terms <term>Cougar and Detroit Dams project</term> and <term>project</term> mean the Cougar Dam and Reservoir project and Detroit Dam and Reservoir project, Willamette River Basin, Oregon, authorized by section 204 of the Flood Control Act of 1950 (64 Stat. 179). </text></subsection></section><section id="H09A6A34DE1AB485CAB51708E16A07455"><enum>215.</enum><header>Port Orford, Oregon</header><text display-inline="no-display-inline">Not later than 180 days after the date of enactment of this Act, the Secretary shall, at Federal expense, submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a summary report on the research completed and data gathered by the date of enactment of this Act with regards to the configuration of a breakwater for the project for navigation, Port Orford, Oregon, authorized by section 117 of the River and Harbor Act of 1970 (84 Stat. 1822; 106 Stat. 4809), for the purposes of addressing shoaling issues to minimize long-term maintenance costs.</text></section><section commented="no" id="HB0A7670A167E411EB9E24639BDEC3FDE"><enum>216.</enum><header>Wilson Creek and Sloan Creek, Fairview, Texas</header><text display-inline="no-display-inline">Not later than 180 days after the date of enactment of this section, the Secretary shall submit to Congress a written status update regarding efforts to address flooding along Wilson Creek and Sloan Creek in the City of Fairview, Texas.</text></section><section id="H67F108264FC744CFBD87981BD4701F0D"><enum>217.</enum><header>GAO study on mitigation for water resources development projects</header><text display-inline="no-display-inline">Not later than 18 months after the date of enactment of this Act, the Comptroller General of the United States shall—</text><paragraph commented="no" id="HD90A92A0AD9542EB90950BF918CEA998"><enum>(1)</enum><text display-inline="yes-display-inline">conduct a study on the mitigation of the impact of water resources development projects, including the impact on fish and wildlife, consistent with the requirements of section 906 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2283">33 U.S.C. 2283</external-xref>), section 307(a) of the Water Resources Development Act of 1990 (<external-xref legal-doc="usc" parsable-cite="usc/33/2317">33 U.S.C. 2317(a)</external-xref>), and section 2036(b) of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/33/2283a">33 U.S.C. 2283a</external-xref>), including—</text><subparagraph commented="no" id="HDB730505E9404CFD927019D50FC9B8A5"><enum>(A)</enum><text>an evaluation of guidance or instructions issued, and other measures taken, by the Secretary to ensure successful mitigation of such impacts;</text></subparagraph><subparagraph commented="no" id="H80861F1B19C146ECB0F8506D436550A8"><enum>(B)</enum><text>a review of the methods of mitigation, including the use of in-lieu fees, mitigation banking, and permittee-responsible mitigation, and their long-term effectiveness of restoring or mitigating ecosystem services impacted by such projects;</text></subparagraph><subparagraph commented="no" id="H0BA8D162E17C495B9CF581C2D964DD8D"><enum>(C)</enum><text>a review of how the use of the different mitigation methods for such projects varies across Corps of Engineers districts;</text></subparagraph><subparagraph commented="no" id="H85E17EB715B64270BE894702FCDBFB02"><enum>(D)</enum><text display-inline="yes-display-inline">an assessment of the backlog of mitigation projects, including the number of mitigation projects pending completion to address such impacts resulting from constructed water resources development projects;</text></subparagraph><subparagraph commented="no" id="H966550B10788443AA86FB980295461E8"><enum>(E)</enum><text display-inline="yes-display-inline">an evaluation of how the Secretary tracks compliance with the mitigation requirements across Corps of Engineers districts;</text></subparagraph><subparagraph commented="no" id="HD8F9E784A5F44E389B97D6C93F2DFF2B"><enum>(F)</enum><text display-inline="yes-display-inline">a review of how the mitigation requirements for water resources development projects contributes to the resilience of water resources in the United States;</text></subparagraph><subparagraph commented="no" id="H572C3E6340ED4B32A8BB56A54264114B"><enum>(G)</enum><text>an assessment of whether mitigation is being done prior to or contemporaneously with the construction of projects, as required by section 906 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2283">33 U.S.C. 2283</external-xref>);</text></subparagraph><subparagraph commented="no" id="HB864269A919844AF8BEA71398D861989"><enum>(H)</enum><text display-inline="yes-display-inline">an evaluation of compliance with section 906(d) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2283">33 U.S.C. 2283(d)</external-xref>) for the development of specific mitigation plans for projects, whether such plans were successful in mitigating the designated impacts of the projects, and, in instances where such plans were not successful, what actions the Secretary is taking to modify the plans such that they will be successful; and</text></subparagraph><subparagraph commented="no" id="HE6377E5350E34E3098C00BC308463E73"><enum>(I)</enum><text>an assessment of how the Secretary might take advantage of natural infrastructure in mitigation planning to reduce flood risks and flood recovery costs for some communities; and </text></subparagraph></paragraph><paragraph id="H35665525147F45A4AFA01F3DDBFFE635"><enum>(2)</enum><text>submit to Congress a report that—</text><subparagraph id="H82CD6B39CB3A49D5BEB72DDD3D6808A2"><enum>(A)</enum><text>describes the results of the study conducted under paragraph (1);</text></subparagraph><subparagraph id="H6E9633A66C454D489E2E1849C39473BA"><enum>(B)</enum><text>includes recommendations to ensure compliance with and successful implementation of mitigation requirements for water resources development projects; and</text></subparagraph><subparagraph id="H4008E681ADE44AE2A2551C201C51AD65"><enum>(C)</enum><text>includes recommendations to ensure existing programs and authorities include the use, to the maximum extent practicable, of natural infrastructure.</text></subparagraph></paragraph></section><section commented="no" id="HFB7BA6CF367447F0B6FBDB96E36646CA"><enum>218.</enum><header>GAO study on application of Harbor Maintenance Trust Fund expenditures</header><subsection commented="no" id="H2F0EA9A0671D484FA2C18E4DDD235F9E"><enum>(a)</enum><header>Study</header><text>Not later than 18 months after the date of enactment of this Act, the Comptroller General of the United States shall conduct a study of the operation and maintenance needs of federally authorized harbor and inland harbor projects, including—</text><paragraph commented="no" id="H3026ABC82FF24657815D78658344B241"><enum>(1)</enum><text>an inventory of all federally authorized harbor and inland harbor projects;</text></paragraph><paragraph commented="no" id="H0540B0D60D7944B28BA2BC413871F4B9"><enum>(2)</enum><text>an assessment of current uses of such projects (and, to the extent practicable, the national, regional, and local benefits of such uses), including the uses listed in section 210(d)(2)(B) of the Water Resources Development Act of 1986;</text></paragraph><paragraph commented="no" id="H88596864CB4D45B8A80258054C8FC79E"><enum>(3)</enum><text>an assessment of the annual operation and maintenance needs associated with harbors and inland harbors referred to in subsection (a)(2) of section 210 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238</external-xref>), including a breakdown of such needs for each of the following types of projects—</text><subparagraph commented="no" id="H606F7DDA0CC64F6BB7583B62F589AE6C"><enum>(A)</enum><text>emerging harbor projects (as defined in such section);</text></subparagraph><subparagraph commented="no" id="HCD636A84D75E4B1D8C821CF879145116"><enum>(B)</enum><text>moderate-use harbor projects (as defined in such section on the day before the date of enactment of this Act);</text></subparagraph><subparagraph commented="no" id="HEC2C7634DBC94E1B9A6261FB0BE83BA9"><enum>(C)</enum><text>high-use harbor projects (as defined in such section on the day before the date of enactment of this Act); and</text></subparagraph><subparagraph commented="no" id="H1069B5BB8F7C4DA19B329900E8297DF4"><enum>(D)</enum><text>projects assigned to harbors and inland harbors within the Great Lakes Navigation System (as defined in such section);</text></subparagraph></paragraph><paragraph commented="no" id="H38A571AB89D844C0A8F908B7A6AE5382"><enum>(4)</enum><text>an assessment of any deferred operation and maintenance needs for such projects;</text></paragraph><paragraph id="H3225CADC2AAF418EBFE76FBCCAA29AAA"><enum>(5)</enum><text display-inline="yes-display-inline">an assessment of the annual funding level trends for moderate-use harbor projects (as defined in section 210 of the Water Resources Development Act of 1986 on the day before the date of enactment of this Act) after the date of enactment of the Water Resources Development Act of 2014 (<external-xref legal-doc="public-law" parsable-cite="pl/113/121">Public Law 113–121</external-xref>), excluding funds awarded to donor ports, medium-sized donor ports, and energy transfer ports (as such terms are defined in section 2106 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2201">33 U.S.C. 2201</external-xref>));</text></paragraph><paragraph commented="no" id="H8DBFDE6ED0A14D5F9563EB66B2E52AEB"><enum>(6)</enum><text display-inline="yes-display-inline">an assessment of projected needs associated with donor ports, medium-sized donor ports, and energy transfer ports (as such terms are defined in section 2106 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2201">33 U.S.C. 2201</external-xref>)); and</text></paragraph><paragraph commented="no" id="H34624B78873E4AA1A775DDFF5EBB1F5E"><enum>(7)</enum><text>an itemization of expenditures provided to donor ports, medium-sized donor ports, and energy transfer ports under section 2106 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2201">33 U.S.C. 2201</external-xref>).</text></paragraph></subsection><subsection commented="no" id="H10355FCE78174E1D88A17D5BC2AF39B9"><enum>(b)</enum><header>Report to Congress</header><text display-inline="yes-display-inline">Upon completion of the report under subsection (a), the Comptroller General shall submit such report to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate.</text></subsection></section><section id="H53F2BA90448B401A9A7670F559DD27F0"><enum>219.</enum><header>GAO study on administration of environmental banks</header><subsection id="HE3CDED51917541AD8F5E232DF3E9FB09"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Not later than one year after the date of enactment of this Act, the Comptroller General of the United States shall conduct a study and submit to the appropriate committees of Congress a report that analyzes the administration of section 309 of the Coastal Wetlands Planning, Protection and Restoration Act to establish an environmental bank (as defined in such section), such that the Secretary—</text><paragraph id="HE6FCC3E98CBD484999A31ED691DF2450"><enum>(1)</enum><text>achieves the objectives of the report of the Chief of Engineers for ecosystem restoration in the Louisiana Coastal Area or the objectives of the comprehensive coastal protection master plan entitled <quote>Louisiana Comprehensive Master Plan for a Sustainable Coast</quote> prepared by the State of Louisiana and accepted by the Louisiana Coastal Protection and Restoration Authority (including any subsequent amendments or revisions);</text></paragraph><paragraph id="H271F1E7AD91548EF98F4B06E902D2F72"><enum>(2)</enum><text>promotes ridge restoration, barrier island restoration, marsh creation, nonstructural risk management, or any other projects authorized, funded, or undertaken, or proposed to be authorized, funded, or undertaken, pursuant to such comprehensive coastal protection master plan;</text></paragraph><paragraph id="H679DCBDB041D4FD19B70A99D1B4BAE56"><enum>(3)</enum><text>allows for proactive investment in projects by a public or private entity seeking to generate credits to satisfy responsibilities associated with environmental compliance;</text></paragraph><paragraph id="H2C8225A18C2348E2B800638AA08BE565"><enum>(4)</enum><text>allows for leveraging additional State, Parish, or Federal funds; and </text></paragraph><paragraph id="HCC834C6D24224759A7427C70BF43EDF0"><enum>(5)</enum><text>recommends methods for awarding additional credit for high-priority projects listed in the report and plan described in paragraph (1).</text></paragraph></subsection><subsection id="H0D32DAA267D44B38A55788A6AE08F5F8"><enum>(b)</enum><header>Consultation with stakeholders</header><text>In carrying out subsection (a), the Comptroller General of the United States shall consult with the Secretary, the Louisiana Coastal Wetlands Conservation and Restoration Task Force, the Governor of Louisiana (or an appointee), and other stakeholders, to the extent practicable.</text></subsection></section><section id="H118D1111A8654C4F989FE0702CAF2703"><enum>220.</enum><header>Study on water supply and water conservation at water resources development projects</header><subsection id="H91E8E36F86264559903464D1B1F6E944"><enum>(a)</enum><header>In general</header><text>Not later than 18 months after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of the Representatives and the Committee on Environment and Public Works of the Senate a report that analyzes the benefits and consequences of including municipal water supply and water conservation as a primary mission of the Corps of Engineers in carrying out water resources development projects. </text></subsection><subsection id="H984F8EE58CD04F3AABA57BA485B30F5F"><enum>(b)</enum><header>Inclusion</header><text>The Secretary shall include in the report submitted under subsection (a)— </text><paragraph id="H4A0F944C9ECC4092B86264A407A96A0E"><enum>(1)</enum><text>a description of existing water resources development projects with municipal water supply or water conservation as authorized purposes, and the extent to which such projects are utilized for such purposes; </text></paragraph><paragraph id="HB8AA206F445A406AB975B697CFB16AEB"><enum>(2)</enum><text display-inline="yes-display-inline">a description of existing water resources development projects with respect to which—</text><subparagraph id="H9922FD5F30B44C628CE07C0C639D220B"><enum>(A)</enum><text>municipal water supply or water conservation could be added as a project purpose, including those with respect to which a non-Federal interest has expressed an interest in adding municipal water supply or water conservation as a project purpose; and</text></subparagraph><subparagraph id="H1D2A14BAA17A4EF2A5F6A3AE0EB29B55"><enum>(B)</enum><text>such a purpose could be accommodated while maintaining existing authorized purposes;</text></subparagraph></paragraph><paragraph id="H634863A991FD4CFABF334894579C9A36"><enum>(3)</enum><text display-inline="yes-display-inline">a description of ongoing water resources development project studies the authorizations for which include authorization for the Secretary to study the feasibility of carrying out the project with a purpose of municipal water supply or water conservation;</text></paragraph><paragraph id="HC2514BAD26C942D8899F687DBA04ECE5"><enum>(4)</enum><text>an analysis of how adding municipal water supply and water conservation as a primary mission of the Corps of Engineers would affect the ability of the Secretary to carry out future water resources development projects; and </text></paragraph><paragraph id="HD2936701C57E49A68F2194CF2C3E7A9A"><enum>(5)</enum><text>any recommendations of the Secretary relating to including municipal water supply and water conservation as a primary mission of the Corps of Engineers. </text></paragraph></subsection></section><section id="HA2D2710A94E5412F89D5195D77E58EE0"><enum>221.</enum><header>PFAS review and inventory at Corps facilities</header><subsection id="HF3DABB18BF3841CE86A405D4E27B7EDD"><enum>(a)</enum><header>Inventory of PFAS at Corps facilities</header><paragraph id="H3B80147C8BF241A9B32505070170D7D7"><enum>(1)</enum><header>In general</header><text>Not later than 18 months after the date of enactment of this section, and annually thereafter the Secretary shall complete an inventory of Corps of Engineers civil works facilities that are or may be contaminated, or could become contaminated, by PFAS.</text></paragraph><paragraph id="H2FC09733E49A4154B26FBC43CD7199C5"><enum>(2)</enum><header>Contents of inventory</header><text>In carrying out this subsection, the Secretary shall review and identify—</text><subparagraph id="HFABCA4202F234772BA752211E0D78213"><enum>(A)</enum><text display-inline="yes-display-inline">all facilities owned or operated by the Corps of Engineers, for which there is a civil works function, that are or may be contaminated, or could become contaminated, by PFAS;</text></subparagraph><subparagraph id="H12C89E3414F54E6290FE90819EBEE141"><enum>(B)</enum><text>the nature and extent of any such contamination or potential for contamination, including any potential pathways for human exposure to PFAS;</text></subparagraph><subparagraph id="HDCDA8B67FAD542A79A806202A45F537F"><enum>(C)</enum><text>response measures taken to monitor, control, remove, or remediate PFAS, or otherwise reduce the risk of human exposure to PFAS;</text></subparagraph><subparagraph id="H9DFCEF53FEB84F7786FB54CDD295FDC7"><enum>(D)</enum><text>for facilities identified under subparagraph (A), the extent to which such facilities (or any such contamination or potential for contamination at such facilities) are related to the civil works functions of the Corps of Engineers;</text></subparagraph><subparagraph id="HAEC8FA9635A14D00A95DB7F74906BF15"><enum>(E)</enum><text display-inline="yes-display-inline">the extent to which the Secretary, or other entities, may have responsibility for such contamination or potential for contamination; and</text></subparagraph><subparagraph id="H28F0266CF30344A2A725ED59D3157C8E"><enum>(F)</enum><text display-inline="yes-display-inline">for facilities identified under subparagraph (A), the costs to remediate and reduce the risk of human exposure to PFAS.</text></subparagraph></paragraph><paragraph id="H53D3314A3967463C864ECDF607696A6E"><enum>(3)</enum><header>Coordination with other Federal agencies</header><text>To the maximum extent practicable, the actions taken under this subsection shall supplement and support work undertaken by other Federal agencies, including actions taken pursuant to the plan published by the Administrator of the Environmental Protection Agency, titled <quote>EPA’s Per- and Polyfluoroalkyl Substances (PFAS) Action Plan</quote> and dated February 2019.</text></paragraph><paragraph id="HB585A7104E1A4A08B2B2DF087DA70B4A"><enum>(4)</enum><header>Report to Congress</header><text>Upon completion of the inventory under paragraph (1), and annually thereafter concurrent with the President’s annual budget request to Congress, the Secretary shall submit the inventory to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate.</text></paragraph></subsection><subsection id="H31F48C41A0FC4FFA85FBEF2E2AF2853B"><enum>(b)</enum><header>PFAS Technology Research</header><paragraph id="H2CAD45436BF4414BB36D9EFF47F0DFD5"><enum>(1)</enum><header>Research support</header><text display-inline="yes-display-inline">The Secretary, acting through the Hazardous Waste Research Center located at the Engineer Research and Development Center, shall, to the maximum extent practicable, support the efforts of other Federal agencies in the development of innovative technologies and methodologies for the detection, treatment, and cleanup of PFAS associated with Federal facilities, including groundwater associated with such facilities.</text></paragraph><paragraph id="H77A237782A654B74A072311AE13F8DE5"><enum>(2)</enum><header>Duplication of efforts</header><text>Nothing in this subsection is intended to duplicate the activities undertaken by other Federal agencies as identified in subsection (a)(3).</text></paragraph></subsection><subsection commented="no" id="H12CBD4EF50FE411CA1E550AE26E31D41"><enum>(c)</enum><header>Definition</header><text>In this section, the term <term>PFAS</term> means a perfluoroalkyl substance or polyfluoroalkyl substance with at least one fully fluorinated carbon atom.</text></subsection></section><section id="HE95FD57403814D29961CC03C9E2EB684"><enum>222.</enum><header>Report on recreational facilities</header><text display-inline="no-display-inline">No later than 18 months after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that contains—</text><paragraph id="H6EC4150363334BAF99C90264F3C592B7"><enum>(1)</enum><text>an inventory of all recreational infrastructure and facilities associated with water resources development projects;</text></paragraph><paragraph id="HFD23533C0FA44E7BAFC4E9E74E6E3EDF"><enum>(2)</enum><text>an assessment of the annual operation and maintenance needs associated with such infrastructure and facilities;</text></paragraph><paragraph id="H48A02A43FEAB4511B24CB662778B91AA"><enum>(3)</enum><text>an assessment of deferred operation and maintenance needs for such infrastructure and facilities to operate safely at full capacity; and</text></paragraph><paragraph id="HEE12E3D3612E4709A2EA18D1ED497FF1"><enum>(4)</enum><text>an assessment of the economic benefits of recreation to local and regional economies and benefits of sustaining and improving public access at recreational infrastructure and facilities.</text></paragraph></section></title><title id="H0C034AEAED7B43BD90388BF2DCA157B2"><enum>III</enum><header>Deauthorizations and Modifications</header><section id="H5DA3C5D6EF774E919C860EA3F4B4CB54"><enum>301.</enum><header>Deauthorization of inactive projects</header><subsection id="HD9E6297B131B4FA1A2F0AC7689116057"><enum>(a)</enum><header>Purposes</header><text>The purposes of this section are—</text><paragraph id="HC8D64C18FB82435D8E9771F548AEF97A"><enum>(1)</enum><text>to identify water resources development projects authorized by Congress that are no longer viable for construction due to—</text><subparagraph id="H7D5BB189DDD3412DB0270B66A7FA6E1D"><enum>(A)</enum><text>a lack of local support;</text></subparagraph><subparagraph id="H31A75B0D1B61401F81A1C6C5E0C447F1"><enum>(B)</enum><text>a lack of available Federal or non-Federal resources; or</text></subparagraph><subparagraph id="H40532EF9674041989369DA3382209A52"><enum>(C)</enum><text>an authorizing purpose that is no longer relevant or feasible;</text></subparagraph></paragraph><paragraph id="H792A486E13B9407DB0399DFFFA5B9F7A"><enum>(2)</enum><text>to create an expedited and definitive process for Congress to deauthorize water resources development projects that are no longer viable for construction; and</text></paragraph><paragraph id="HC279E8060D6C46B9B23BEC6C99CEA2F7"><enum>(3)</enum><text>to allow the continued authorization of water resources development projects that are viable for construction.</text></paragraph></subsection><subsection id="HE898A1BD2E834B41BA73F07BC21836FE"><enum>(b)</enum><header>Proposed deauthorization list</header><paragraph id="H03B473FC92FD4EE9ADBF2D155CAAC380"><enum>(1)</enum><header>Preliminary list of projects</header><subparagraph id="H042D2284FDB74B74A7141AE7A276450F"><enum>(A)</enum><header>In general</header><text>The Secretary shall develop a preliminary list of each water resources development project, or separable element of a project, authorized for construction before November 8, 2007, for which—</text><clause id="HE1E0E3FB925547348DB68F8ADECEDE5E"><enum>(i)</enum><text>planning, design, or construction was not initiated before the date of enactment of this Act; or</text></clause><clause id="H129C7ED5D7D5415DA8C4D4E36C8C490C"><enum>(ii)</enum><text>planning, design, or construction was initiated before the date of enactment of this Act, but for which no funds, Federal or non-Federal, were obligated for planning, design, or construction of the project or separable element of the project during the current fiscal year or any of the 10 preceding fiscal years.</text></clause></subparagraph><subparagraph id="HEFA91861266145EAA0FECDFDD2C33DA7"><enum>(B)</enum><header>Use of comprehensive construction backlog and operation and maintenance report</header><text>The Secretary may develop the preliminary list from the comprehensive construction backlog and operation and maintenance reports developed pursuant to section 1001(b)(2) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/579a">33 U.S.C. 579a</external-xref>).</text></subparagraph></paragraph><paragraph id="HA3A0F244E0D34008B5AA4789EAE19142"><enum>(2)</enum><header>Preparation of proposed deauthorization list</header><subparagraph id="HB8BA87DC45CA4F3EBA54B05A4E25D000"><enum>(A)</enum><header>Deauthorization amount</header><text>The Secretary shall prepare a proposed list of projects for deauthorization comprised of a subset of projects and separable elements identified on the preliminary list developed under paragraph (1) that have, in the aggregate, an estimated Federal cost to complete that is at least $10,000,000,000.</text></subparagraph><subparagraph id="H1BDC2103589E4153B89C9A23B38A94F6"><enum>(B)</enum><header>Determination of Federal cost to complete</header><text>For purposes of subparagraph (A), the Federal cost to complete shall take into account any allowances authorized by section 902 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2280">33 U.S.C. 2280</external-xref>), as applied to the most recent project schedule and cost estimate. </text></subparagraph><subparagraph id="H2F575937DAAC4B7C8A3AEB18A0A0DF8E"><enum>(C)</enum><header>Inclusion of deauthorization of antiquated projects</header><text>The Secretary shall reduce the amount identified for deauthorization under paragraph (2)(A) by an amount equivalent to the estimated current value of each project, or separable element of a project, that is deauthorized by subsection (f).</text></subparagraph></paragraph><paragraph id="H2A3FE9F0AE4D4AD6B753818539986CE6"><enum>(3)</enum><header>Sequencing of projects</header><subparagraph id="H51D3011BE9CB439398CF73EAC53E0BB2"><enum>(A)</enum><header>In general</header><text>The Secretary shall identify projects and separable elements for inclusion on the proposed list of projects for deauthorization under paragraph (2) according to the order in which the projects and separable elements were authorized, beginning with the earliest authorized projects and separable elements and ending with the latest project or separable element necessary to meet the aggregate amount under paragraph (2)(A).</text></subparagraph><subparagraph id="H10D5ED26AC614EA6A7A83487ED2820F1"><enum>(B)</enum><header>Factors to consider</header><text>The Secretary may identify projects and separable elements in an order other than that established by subparagraph (A) if the Secretary determines, on a case-by-case basis, that a project or separable element is critical for interests of the United States, based on the possible impact of the project or separable element on public health and safety, the national economy, or the environment. </text></subparagraph></paragraph><paragraph id="H73AE91CBD1144529A1C23DAB631938D7"><enum>(4)</enum><header>Public comment and consultation</header><subparagraph id="H3A901E10E3CE4724AC1B693F70919214"><enum>(A)</enum><header>In general</header><text>The Secretary shall solicit comments from the public and the Governors of each applicable State on the proposed deauthorization list prepared under paragraph (2)(A).</text></subparagraph><subparagraph id="H552E9A0B8B38421AB6F0E336FCB2BDC3"><enum>(B)</enum><header>Comment period</header><text>The public comment period shall be 90 days.</text></subparagraph></paragraph><paragraph id="H421CF15630304DD6A87FAA1F223044C9"><enum>(5)</enum><header>Preparation of final deauthorization list</header><subparagraph id="H81FA6825910C4FEC8105DFF4FB3485EF"><enum>(A)</enum><header>In general</header><text>The Secretary shall prepare a final deauthorization list by—</text><clause id="HE5EE3FE7E5F241348AE76F01BC9DAB92"><enum>(i)</enum><text>considering any comments received under paragraph (4); and</text></clause><clause id="H560E9B7824C6423DA1241C3DEDBEAA51"><enum>(ii)</enum><text display-inline="yes-display-inline">revising the proposed deauthorization list prepared under paragraph (2)(A) as the Secretary determines necessary to respond to such comments.</text></clause></subparagraph><subparagraph id="HD06B5AEFB5F64795814A0EDB65F03DFF"><enum>(B)</enum><header>Appendix</header><text>The Secretary shall include as part of the final deauthorization list an appendix that—</text><clause id="H43D51525204440A19B16041BBA84A13F"><enum>(i)</enum><text>identifies each project or separable element on the proposed deauthorization list that is not included on the final deauthorization list; and</text></clause><clause id="HCA61B745BB844B328C6CAF15C387EB65"><enum>(ii)</enum><text>describes the reasons why the project or separable element is not included on the final deauthorization list.</text></clause></subparagraph></paragraph></subsection><subsection id="HB429AA169C6040F4B36B8682BEF8935A"><enum>(c)</enum><header>Submission of final deauthorization list to Congress for congressional review; publication</header><paragraph id="HC132005B9AFC4ACC91F1B5EE3B278034"><enum>(1)</enum><header>In general</header><text>Not later than 90 days after the date of the close of the comment period under subsection (b)(4), the Secretary shall—</text><subparagraph id="HE65DFD77701042C69216929BBB596D47"><enum>(A)</enum><text>submit the final deauthorization list and appendix prepared under subsection (b)(5) to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate; and</text></subparagraph><subparagraph id="HBE6E4473DEDE4602A156608A95D901A4"><enum>(B)</enum><text>publish the final deauthorization list and appendix in the Federal Register.</text></subparagraph></paragraph><paragraph id="HAA06190918D44C5A913E63427559AFAD"><enum>(2)</enum><header>Exclusions</header><text>The Secretary shall not include in the final deauthorization list submitted under paragraph (1) any project or separable element with respect to which Federal funds for planning, design, or construction are obligated after the development of the preliminary list under subsection (b)(1)(A) but prior to the submission of the final deauthorization list under paragraph (1)(A) of this subsection.</text></paragraph></subsection><subsection id="H2B513A2C44A54F768A2FFB598DBDE697"><enum>(d)</enum><header>Deauthorization; congressional review</header><paragraph id="H50E8131B41DF4DE2BD6B8C159B8B6877"><enum>(1)</enum><header>In general</header><text>After the expiration of the 2-year period beginning on the date of publication of the final deauthorization list and appendix under subsection (c)(1)(B), a project or separable element of a project identified in the final deauthorization list is hereby deauthorized, unless Congress passes a joint resolution disapproving the final deauthorization list prior to the end of such period.</text></paragraph><paragraph id="H4F3FD51BB02A49E1AC866EF466DE174E"><enum>(2)</enum><header>Non-Federal contributions</header><subparagraph id="H75B56FA978D64217AEF7BAAE601368F3"><enum>(A)</enum><header>In general</header><text>A project or separable element of a project identified in the final deauthorization list under subsection (c) shall not be deauthorized under this subsection if, before the expiration of the 2-year period referred to in paragraph (1), the non-Federal interest for the project or separable element of the project provides sufficient funds to complete the project or separable element of the project.</text></subparagraph><subparagraph id="HCDFBD695894042A4B58B8858A39D5473"><enum>(B)</enum><header>Treatment of projects</header><text>Notwithstanding subparagraph (A), each project and separable element of a project identified in the final deauthorization list shall be treated as deauthorized for purposes of the aggregate deauthorization amount specified in subsection (b)(2)(A).</text></subparagraph></paragraph><paragraph id="H7AF51BDE89364CE6B13E8C3055EA4401"><enum>(3)</enum><header>Projects identified in appendix</header><text>A project or separable element of a project identified in the appendix to the final deauthorization list shall remain subject to future deauthorization by Congress.</text></paragraph></subsection><subsection id="H5346EF2E6CEB404BB686FBCC82748799"><enum>(e)</enum><header>Special rules</header><paragraph id="H8232ED506B654C758B9122A6E24623F2"><enum>(1)</enum><header>Post-authorization studies</header><text>A project or separable element of a project may not be identified on the proposed deauthorization list developed under subsection (b), or the final deauthorization list developed under subsection (c), if the project or separable element received funding for a post-authorization study during the current fiscal year or any of the 10 preceding fiscal years.</text></paragraph><paragraph id="H3847A74F16CD45118606229463ED41D1"><enum>(2)</enum><header>Treatment of project modifications</header><text>For purposes of this section, if an authorized water resources development project or separable element of the project has been modified by an Act of Congress, the date of the authorization of the project or separable element shall be deemed to be the date of the most recent such modification.</text></paragraph></subsection><subsection id="H85BBA98742BE4E61844B83C9BF6B192F"><enum>(f)</enum><header>Deauthorization of antiquated projects</header><paragraph id="H45588A8A8BEF41BA8C8060A59E254FAF"><enum>(1)</enum><header>In general</header><text>Any water resources development project, or separable element of a project, authorized for construction prior to November 17, 1986, for which construction has not been initiated prior to the date of enactment of this Act, or for which funds have not been obligated for construction in the 10-year period prior to the date of enactment of this Act, is hereby deauthorized.</text></paragraph><paragraph id="HE037DF46E17943F49F2F9C9E5C384D8B"><enum>(2)</enum><header>Identification</header><text>Not later than 60 days after the date of enactment of this Act, the Secretary shall issue to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that identifies—</text><subparagraph id="H843B88D76F89430A80A84C7691A4E0E8"><enum>(A)</enum><text>the name of each project, or separable element of a project, deauthorized by paragraph (1); and</text></subparagraph><subparagraph id="H9004CECDD641482B825F79CD032759E5"><enum>(B)</enum><text>the estimated current value of each such project or separable element of a project.</text></subparagraph></paragraph></subsection><subsection id="HF4834C9C29BF4057B45A50978919FBD6"><enum>(g)</enum><header>Economic and environmental review of inactive water resources development projects</header><text>The Secretary or the non-Federal interest may not carry out any authorized water resources development project, or separable element of such project, for which construction has not been initiated in the 20-year period following the date of the authorization of such project or separable element, until—</text><paragraph id="H3C082A011D8A4A79B4F55E97AF83CAB7"><enum>(1)</enum><text>the Secretary provides to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a post-authorization change report that updates the economic and environmental analysis of the project or separable element; and</text></paragraph><paragraph id="HD49A0E5C8B31469C9F917F5744BB5516"><enum>(2)</enum><text>the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate take appropriate action to address any modifications to the economic and environmental analysis for the project or separable element of the project contained in the post-authorization change report.</text></paragraph></subsection><subsection id="H05EB2760008049759DE177E411441AEE"><enum>(h)</enum><header>Definitions</header><text>In this section:</text><paragraph id="HB4F738D962D34ABCB15A9FC786C0A40B"><enum>(1)</enum><header>Post-authorization change report</header><text>The term <term>post-authorization change report</term> has the meaning given such term in section 1132(d) of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282e">33 U.S.C. 2282e</external-xref>).</text></paragraph><paragraph id="H1E0A9477FDBE4840924160A5975D0FA3"><enum>(2)</enum><header>Post-authorization study</header><text>The term <term>post-authorization study</term> means—</text><subparagraph id="HCF67B63213BE40688EAB927334F95E0F"><enum>(A)</enum><text>a feasibility report developed under section 905 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282">33 U.S.C. 2282</external-xref>);</text></subparagraph><subparagraph id="H8470BC17392D489A83CC8DAA0BE47604"><enum>(B)</enum><text>a feasibility study, as defined in section 105(d) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2215">33 U.S.C. 2215(d)</external-xref>); or</text></subparagraph><subparagraph id="H06A6967E01284FA4AB42AFB4EFEF9CCF"><enum>(C)</enum><text>a review conducted under section 216 of the Flood Control Act of 1970 (<external-xref legal-doc="usc" parsable-cite="usc/33/549a">33 U.S.C. 549a</external-xref>), including an initial appraisal that—</text><clause id="H3A2FDC682F5B476386F3F6BF0494F023"><enum>(i)</enum><text>demonstrates a Federal interest; and</text></clause><clause id="H8634E0C4FEE44419ABC64902E02A9F74"><enum>(ii)</enum><text>requires additional analysis for the project or separable element.</text></clause></subparagraph></paragraph><paragraph id="HD88E59115F1F48BCBADAFE18AF478B1F"><enum>(3)</enum><header>Water resources development project</header><text>The term <term>water resources development project</term> includes an environmental infrastructure assistance project or program of the Corps of Engineers.</text></paragraph></subsection></section><section id="H1D23C937E85E4B418FE8351FBC674944"><enum>302.</enum><header>Abandoned and inactive noncoal mine restoration</header><text display-inline="no-display-inline">Section 560(f) of the Water Resources Development Act of 1999 (<external-xref legal-doc="usc" parsable-cite="usc/33/2336">33 U.S.C. 2336(f)</external-xref>) is amended by striking <quote>$20,000,000</quote> and inserting <quote>$30,000,000</quote>.</text></section><section id="HA3737FDCF718464BBBF53C59C610BC48" section-type="subsequent-section"><enum>303.</enum><header>Tribal partnership program</header><text display-inline="no-display-inline">Section 203(b)(4) of the Water Resources Development Act of 2000 (<external-xref legal-doc="usc" parsable-cite="usc/33/2269">33 U.S.C. 2269</external-xref>) is amended by striking <quote>$12,500,000</quote> each place it appears and inserting <quote>$15,000,000</quote>.</text></section><section id="HE89F4F89D4B142309F42D6D9C444B328"><enum>304.</enum><header>Lakes program</header><text display-inline="no-display-inline">Section 602(a) of the Water Resources Development Act of 1986 (<external-xref legal-doc="public-law" parsable-cite="pl/99/662">Public Law 99–662</external-xref>, 100 Stat. 4148; 110 Stat. 3758; 113 Stat. 295; 121 Stat. 1076) is amended—</text><paragraph id="H7356EAC5DBC6467E94B1F480AD20270A"><enum>(1)</enum><text>in paragraph (27), by striking <quote>and</quote> at the end;</text></paragraph><paragraph id="H9DF2A2A1D51A4A589E75703CB01C9A96"><enum>(2)</enum><text>in paragraph (28), by striking the period at the end and inserting a semicolon; and</text></paragraph><paragraph id="HF1BEA19C5CA6440480538E088142479C"><enum>(3)</enum><text>by adding at the end the following:</text><quoted-block id="HC15CEFEC8B3347439DF57652940D5ACE" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph id="H3B1013274925467EB52AA524952F2076"><enum>(29)</enum><text display-inline="yes-display-inline">Ellis Pond and Guild Pond, Norwood, Massachusetts; and</text></paragraph><paragraph id="H2B6895136B4E42109D7F10DA4B44114D"><enum>(30)</enum><text>Memorial Pond, Walpole, Massachusetts.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section><section commented="no" id="H440F092EB76B429C98023C4B80E3F189"><enum>305.</enum><header>Watercraft inspection stations</header><text display-inline="no-display-inline">Section 104(d)(1)(A) of the River and Harbor Act of 1958 (<external-xref legal-doc="usc" parsable-cite="usc/33/610">33 U.S.C. 610(d)(1)(A)</external-xref>) is amended—</text><paragraph commented="no" id="H433676BD103340778793F1D52FE84088"><enum>(1)</enum><text>in clause (ii), by striking <quote>; and</quote> and inserting a semicolon;</text></paragraph><paragraph commented="no" id="HA570F807B2BB4DF98DED5270261808A3"><enum>(2)</enum><text>in clause (iii), by striking <quote>Arizona River Basins.</quote> and inserting <quote>Arkansas River Basins; and</quote>; and</text></paragraph><paragraph commented="no" id="H14EBA3CE1A6E495483325EC577FD5E00"><enum>(3)</enum><text>by adding at the end the following:</text><quoted-block id="HD28D5EA0C8BB4BBF8597655168E20367" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><clause commented="no" id="H69EE912A7B1C4200B263CC77A32F75D7"><enum>(iv)</enum><text>to protect the Russian River Basin, California.</text></clause><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section><section commented="no" id="HB12FCBFD390F4354BA8528274B3CE1E0"><enum>306.</enum><header>Chesapeake Bay Environmental Restoration and Protection Program</header><subsection commented="no" id="HDAFC0DF48D8F481986453F846878AE16"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Section 510 of the Water Resources Development Act of 1996 (<external-xref legal-doc="public-law" parsable-cite="pl/104/303">Public Law 104–303</external-xref>, 110 Stat. 3759; 121 Stat. 1202; 128 Stat. 1317) is amended—</text><paragraph commented="no" id="H1355AC66854246298FD778BB7674F25D"><enum>(1)</enum><text>by redesignating subsection (h) as subsection (i) and inserting after subsection (g) the following:</text><quoted-block id="HA07F5B4103B84DA7912578B8DBDAB7DC" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><subsection commented="no" id="HCFADBB31615242FAA3AF97C682AE21C9"><enum>(h)</enum><header>Project cap</header><text>The total cost of a project carried out under this section may not exceed $15,000,000.</text></subsection><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph><paragraph commented="no" id="HE7427F48AC2B47FFB34BC26C36A1B736"><enum>(2)</enum><text>in subsection (i) (as so redesignated), by striking <quote>$40,000,000</quote> and inserting <quote>$60,000,000</quote>.</text></paragraph></subsection><subsection commented="no" id="H25C857976101448DA91C0304954B104E"><enum>(b)</enum><header>Outreach and training</header><text>The Secretary shall conduct public outreach and workshops for non-Federal interests to provide information on the Chesapeake Bay environmental restoration and protection program established under section 510 of the Water Resources Development Act of 1996, including how to participate in the program.</text></subsection></section><section id="H4CEF7C2DFC5840A38A77983510A51DE2"><enum>307.</enum><header>Upper Mississippi River System Environmental Management Program</header><text display-inline="no-display-inline">Section 1103(e)(3) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/652">33 U.S.C. 652(e)(3)</external-xref>) is amended by striking <quote>$22,750,000</quote> and inserting <quote>$40,000,000</quote>.</text></section><section id="H4959D7E15A9B44068328A5543947466F"><enum>308.</enum><header>McClellan-Kerr Arkansas River Navigation System</header><text display-inline="no-display-inline">Any Federal funds, regardless of the account from which the funds were provided, used to carry out construction of the modification to the McClellan-Kerr Arkansas River Navigation System, authorized in section 136 of the Energy and Water Development Appropriations Act, 2004 (117 Stat. 1842), shall be considered by the Secretary as initiating construction of the project such that future funds will not require a new investment decision.</text></section><section commented="no" id="H0F19C23D5DF9492A82CF0B1B8B8D8ADB"><enum>309.</enum><header>Ouachita-Black River Navigation Project, Arkansas</header><text display-inline="no-display-inline">The project for navigation, Ouachita-Black River, Arkansas, authorized by section 101 of the River and Harbor Act of 1960 (<external-xref legal-doc="public-law" parsable-cite="pl/86/645">Public Law 86–645</external-xref>), is modified to include water supply as a project purpose, subject to completion by the Secretary of a feasibility study and any other review necessary for such modification.</text></section><section id="HF003A592DD6A470FA61C3A44B3574051"><enum>310.</enum><header>Sacramento River, Glenn-Colusa, California</header><text display-inline="no-display-inline"> The portion of project for flood control, Sacramento River, California, authorized by section 2 of the Act of March 1, 1917 (chapter 144, 39 Stat. 949; 103 Stat. 649; 110 Stat. 3709; 112 Stat. 1841; 113 Stat. 299), consisting of a riverbed gradient restoration facility at the Glenn-Colusa Irrigation District Intake, is no longer authorized beginning on the date of enactment of this Act.</text></section><section id="H12CD05BAD2F344B7966E08A606C2AFFB"><enum>311.</enum><header>Lake Isabella, California</header><subsection id="H347E5AE2A97044B5B9C7EBE638EAFA81"><enum>(a)</enum><header>Sense of Congress</header><text>It is the sense of Congress that the Secretary, when evaluating alternative locations for construction of a permanent Isabella Lake Visitor Center by the Corps of Engineers to replace the facility impacted by the Isabella Dam safety modification project, should afford substantial weight to the site preference of the local community.</text></subsection><subsection id="H079650B9AF0B4B9D8B12FD789F48BB90"><enum>(b)</enum><header>Authority</header><text>The Secretary may acquire such interests in real property as the Secretary determines necessary or advisable to support construction of the Isabella Dam safety modification project.</text></subsection><subsection id="H6760588B2E494A0D9FBBEEE6C6C06C1E"><enum>(c)</enum><header>Transfer</header><text>The Secretary may transfer any real property interests acquired under subsection (b) to any other Federal agency or department without reimbursement.</text></subsection><subsection id="H87726667AF2B411E84133A4D0E605191"><enum>(d)</enum><header>Isabella dam safety modification project defined</header><text>In this section, the term <term>Isabella Dam safety modification project</term> means the dam safety modification project at the Isabella Reservoir in the San Joaquin Valley, California (authorized by Act of December 22, 1944 (chapter 665, 58 Stat. 901)), including the component of the project relating to construction a visitor center facility.</text></subsection></section><section id="H57C259672AF948CC89588987A67D63C1"><enum>312.</enum><header>Lower San Joaquin River flood control project</header><text display-inline="no-display-inline">The Secretary shall align the schedules of, and maximize complimentary efforts, minimize duplicative practices, and ensure coordination and information sharing with respect to—</text><paragraph id="H06B1EC03B85B43829DC9305FF4CE0C0D"><enum>(1)</enum><text>the project for flood risk management, Lower San Joaquin River, authorized by section 1401(2) of the Water Resources Development Act of 2018 (132 Stat. 3836); and</text></paragraph><paragraph id="H372A5EA975644D27BBCDD90FFA2C93F7"><enum>(2)</enum><text>the second phase of the feasibility study for the Lower San Joaquin River project for flood risk management, authorized for expedited completion by section 1203(a)(7) of the Water Resources Development Act 2018 (132 Stat. 3803).</text></paragraph></section><section id="H74EC9FB10F6743CFA1E1159F78778978" section-type="subsequent-section"><enum>313.</enum><header>San Diego River and Mission Bay, San Diego County, California</header><text display-inline="no-display-inline">The portion of the project for flood control and navigation, San Diego River and Mission Bay, San Diego County, California, authorized by the Act of July 24, 1946 (chapter 595, 60 Stat. 636), identified in the National Levee Database established under section 9004 of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/33/3303">33 U.S.C. 3303</external-xref>) as the San Diego River 3 segment and consisting of a 785-foot-long segment of the right bank levee from Station 209+41.75 to its end at Station 217+26.75, as described in construction plans dated August 30, 1951, is no longer authorized beginning on the date of enactment of this Act.</text></section><section id="H84F864589D3B4A2F802BBB93D5D509E0"><enum>314.</enum><header>San Francisco, California, Waterfront Area</header><subsection id="HB38A397762CE41BBB3994CAD27A0ABBB"><enum>(a)</enum><header>In general</header><text>Section 114 of the River and Harbor Act of 1968 (<external-xref legal-doc="usc" parsable-cite="usc/33/59h">33 U.S.C. 59h</external-xref>) is amended to read as follows:</text><quoted-block id="HA89D3A1ED27D49FEB9C1ACEFA8F81140" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><section id="H0624DD11F1424232B59BD4052C96F711"><enum>114.</enum><header>San Francisco, California, Waterfront Area</header><subsection id="HDFDAC39210824F44807725031CD1D040"><enum>(a)</enum><header>Area To be declared nonnavigable</header><text>The following area is declared to be nonnavigable waters of the United States: All of that portion of the City and County of San Francisco, California, lying shoreward of a line beginning at the intersection of the southerly right of way line of Earl Street prolongation with the Pierhead United States Government Pierhead line, the Pierhead line as defined in the State of California Harbor and Navigation Code Section 1770, as amended in 1961; thence northerly along said Pierhead line to its intersection with a line parallel with and distant 10 feet easterly from, the existing easterly boundary line of Pier 30–32; thence northerly along said parallel line and its northerly prolongation, to a point of intersection with a line parallel with, and distant 10 feet northerly from, the existing northerly boundary of Pier 30–32; thence westerly along last said parallel line to its intersection with said Pierhead line; thence northerly along said Pierhead line, to the intersection of the easterly right of way line of Van Ness Avenue, formerly Marlette Street, prolongation to the Pierhead line.</text></subsection><subsection id="H83EBD989D0FF4BD8ADDE9BBAC83A8EDA"><enum>(b)</enum><header>Requirement that area be improved</header><text>The declaration of nonnavigability under subsection (a) applies only to those parts of the area described in subsection (a) that are or will be bulkheaded, filled, or otherwise occupied or covered by permanent structures and does not affect the applicability of any Federal statute or regulation that relates to filling of navigable waters or to other regulated activities within the area described in subsection (a), including sections 9 and 10 of the Act of March 3, 1899 (<external-xref legal-doc="usc" parsable-cite="usc/33/401">33 U.S.C. 401</external-xref>, 403), section 404 of the Federal Water Pollution Control Act, and the National Environmental Policy Act of 1969.</text></subsection><subsection commented="no" id="H046D00238D8D4BD398A5AFF8CF49C539"><enum>(c)</enum><header>Inclusion of Embarcadero Historic District</header><text>Congress finds and declares that the area described in subsection (a) contains the seawall, piers, and wharves that comprise the Embarcadero Historic District listed on the National Register of Historic Places on May 12, 2006.</text></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></subsection><subsection commented="no" id="H55B4549CABEB4B349CED4568427F7A00"><enum>(b)</enum><header>Conforming amendment</header><text>Section 5052 of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/33/59h-1">33 U.S.C. 59h–1</external-xref>) is repealed.</text></subsection></section><section id="H7C0DE552AEBF42ADB80ADCFDBAD1CE17"><enum>315.</enum><header>Western Pacific Interceptor Canal, Sacramento River, California</header><text display-inline="no-display-inline">The portion of the project for flood protection on the Sacramento River, authorized by section 2 of the of March 1, 1917 (chapter 144, 39 Stat. 949; 45 Stat. 539; 50 Stat. 877; 55 Stat. 647; 80 Stat. 1422), consisting of the portion of the levee from GPS coordinate N2147673.584 E6690904.187 to N2147908.413 E6689057.060 associated with the Western Pacific Interceptor Canal, is no longer authorized beginning on the date of the enactment of this Act.</text></section><section id="HF6860625A8344C978D04CD69A5BA80D5"><enum>316.</enum><header>Rio Grande Environmental Management Program, Colorado, New Mexico, and Texas</header><text display-inline="no-display-inline">Section 5056(f) of the Water Resources Development Act of 2007 (<external-xref legal-doc="public-law" parsable-cite="pl/110/114">Public Law 110–114</external-xref>, 121 Stat. 1213; 128 Stat. 1314) is amended by striking <quote>2019</quote> and inserting <quote>2029</quote>.</text></section><section id="HD927E9509471457F80CCC65B79B28749"><enum>317.</enum><header>New London Harbor Waterfront Channel, Connecticut</header><subsection id="HCF31CBCCCE66438AA290AE9A81B2ACC5"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">The portion of the project for navigation, New London Harbor, Connecticut, authorized by the first section of the Act of June 13, 1902 (chapter 1079, 32 Stat. 333), described in subsection (b) is no longer authorized beginning on the date of enactment of this Act.</text></subsection><subsection id="HE2A20EFAB75A48398A9D05A7B58AAEC0"><enum>(b)</enum><header>Area described</header><text>The area referred to in subsection (a) is generally the portion between and around the 2 piers at the State Pier in New London, specifically the area—</text><paragraph id="H6D6B57A83A00421B8E6905C2F8A0CC0B"><enum>(1)</enum><text>beginning at a point N691263.78, E1181259.26;</text></paragraph><paragraph id="HF5CC4EBD2D584A9F950A48F241927AB6"><enum>(2)</enum><text display-inline="yes-display-inline">running N 35°01’50.75” W about 955.59 feet to a point N692046.26, E1180710.74;</text></paragraph><paragraph id="H41F9943F33A44FB998A0B2C1B4DFC3EE"><enum>(3)</enum><text display-inline="yes-display-inline">running N 54°58’06.78” E about 100.00 feet to a point N692103.66, E1180792.62;</text></paragraph><paragraph id="HA17019BA26574C819C5BA03164AAED74"><enum>(4)</enum><text display-inline="yes-display-inline">running S 35°01’50.75” E about 989.8 feet to a point N691293.17, E1181360.78; and</text></paragraph><paragraph id="H31DBB52D757C49F4AADDA783C9A5B962"><enum>(5)</enum><text display-inline="yes-display-inline">running S 73°51’15.45” W about 105.69 feet to the point described in paragraph (1).</text></paragraph></subsection></section><section id="H2DFC6BC61B74484084E69CC626DACE57"><enum>318.</enum><header>Washington Harbor, District of Columbia</header><text display-inline="no-display-inline">Beginning on the date of enactment of this Act, the project for navigation, Washington Harbor, District of Columbia, authorized by the Act of August 30, 1935 (chapter 831, 49 Stat. 1031), is modified to reduce, in part, the authorized dimensions of the project, such that the remaining authorized dimensions are as follows:</text><paragraph id="H16456A480E0A4DD9836D77C702895E81"><enum>(1)</enum><text>A 200 foot wide, 15 foot deep channel with a center line beginning at a point East 1,317,064.30 and North 440,373.32, thence to a point East 1,316,474.30 and North 440,028.31, thence to a point East 1,315,584.30 and North 439,388.30, thence to a point East 1,315,259.31 and North 438,908.30.</text></paragraph><paragraph id="H3696D2D1C1A543CCBB67A0F3B60B1765"><enum>(2)</enum><text>A transition area 200 foot wide to 300 foot wide, 15 foot deep, with a center line beginning at a point East 1,315,259.31 and North 438,908.30 to a point East 1,315,044.31 and North 438,748.30.</text></paragraph><paragraph id="HF366AD6956904CB9B6AF54170209588F"><enum>(3)</enum><text>A 300 foot wide, 15 foot deep channel with a centerline beginning a point East 1,315,044.31 and North 438,748.30, thence to a point East 1,314,105.31 and North 438,124.79, thence to a point East 1,311,973.30 and North 438,807.78, thence to a point East 1,311,369.73 and North 438,577.42, thence to a point East 1,311,015.73 and North 438,197.57, thence to a point East 1,309,713.47 and North 435,678.91.</text></paragraph><paragraph id="H15968BC979084B6DA471DF865E779C5E"><enum>(4)</enum><text>A transition area 300 foot wide to 400 foot wide, 15 foot deep to 24 foot deep, with a center line beginning at a point East 1,309,713.47 and North 435,678.91 to a point East 1,307,709.33 and North 434,488.25.</text></paragraph><paragraph id="HCEDEE8DE789D45EDB4CD4EA26A754ADF"><enum>(5)</enum><text>A 400 foot wide, 24 foot deep channel with a centerline beginning at a point East 1,307,709.33 and North 434,488.25, thence to a point East 1,307,459.33 and North 434,173.25, thence to a point East 1,306,476.82 and North 1,306,476.82, thence to a point East 1,306,209.79 and North 431,460.21, thence to a point at the end of the channel near Hains Point East 1,305,997.63 and North 429,978.31.</text></paragraph></section><section id="H771ED15140594D44B3EA68C6714F8C23"><enum>319.</enum><header>Central Everglades, Florida</header><text display-inline="no-display-inline">The project for ecosystem restoration, Central Everglades, authorized by section 1401(4) of the Water Resources Development Act of 2016 (130 Stat. 1713), is modified to include the project for ecosystem restoration, Central and Southern Florida, Everglades Agricultural Area, authorized by section 1308 of the Water Resources Development Act of 2018 (132 Stat. 3819), and to authorize the Secretary to carry out the project as so combined.</text></section><section id="HD96DD1586C4348FF8208E7E5B9D69B5D"><enum>320.</enum><header>Miami River, Florida</header><text display-inline="no-display-inline"> The portion of the project for navigation, Miami River, Florida, authorized by the Act of July 3, 1930 (46 Stat. 925; 59 Stat. 16; 74 Stat. 481; 100 Stat. 4257), beginning at the existing railroad bascule bridge and extending approximately 1,000 linear feet upstream to an existing salinity barrier and flood control structure, is no longer authorized beginning on the date of enactment of this Act.</text></section><section id="H1C4357754B4540BB895D52FDD21E48B9"><enum>321.</enum><header>Taylor Creek Reservoir and Levee L–73 (Section 1), Upper St. Johns River Basin, Florida</header><text display-inline="no-display-inline">The portions of the project for flood control and other purposes, Central and Southern Florida, authorized by section 203 of the Flood Control Act of 1948 (62 Stat. 1176), consisting of the Taylor Creek Reservoir and Levee L–73, Section 1, within the Upper St. Johns River Basin, Florida, are no longer authorized beginning on the date of enactment of this Act.</text></section><section id="H5D7BE6B6629645949B52D8A72B4A2ECB"><enum>322.</enum><header>Calcasieu River and Pass, Louisiana</header><text display-inline="no-display-inline">Not later than 120 days after the date of enactment of this Act, the Secretary shall provide to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on plans to modify the Calcasieu River and Pass Dredged Material Management Plan and Supplemental Environmental Impact Statement (December 16, 2010 DMMP/SEIS) to allow for the expansion of Dredged Material Placement Facilities (DMPFs) 17, 19, 22, D, and E to the lakeside foreshore rock boundaries during planned rehabilitation of these facilities.</text></section><section id="H4A79733A5A7B4666B21BE162007B91CC"><enum>323.</enum><header>San Juan-Chama project; Abiquiu Dam, New Mexico</header><subsection id="HCC4D4586CE874731A2F31AC310A0F5BE"><enum>(a)</enum><header>Abiquiu reservoir</header><text>Section 5(b) of <external-xref legal-doc="public-law" parsable-cite="pl/97/140">Public Law 97–140</external-xref> (<external-xref legal-doc="usc" parsable-cite="usc/43/620a">43 U.S.C. 620a</external-xref> note) is amended by striking <quote>a total of two hundred thousand acre-feet of</quote>.</text></subsection><subsection id="H2E80FD4993B04346B0BE0B597780B5C1"><enum>(b)</enum><header>Water storage at Abiquiu Dam, New Mexico</header><text>Section 1 of <external-xref legal-doc="public-law" parsable-cite="pl/100/522">Public Law 100–522</external-xref> (<external-xref legal-doc="usc" parsable-cite="usc/43/620a">43 U.S.C. 620a</external-xref> note) is amended—</text><paragraph id="HCB8987EB0A0D4B109E59D114A150DEC1"><enum>(1)</enum><text>by striking <quote>200,000 acre-feet of</quote>;</text></paragraph><paragraph id="H9A17461CF6094E4C9DA0E2FFFDEC5572"><enum>(2)</enum><text>by inserting <quote>and San Juan-Chama project</quote> after <quote>Rio Grande system</quote>; and</text></paragraph><paragraph id="H4854A71B9A704948A907F4646D0020D2"><enum>(3)</enum><text>by striking <quote>, in lieu of the water storage authorized by section 5 of <external-xref legal-doc="public-law" parsable-cite="pl/97/140">Public Law 97–140</external-xref>, to the extent that contracting entities under section 5 of <external-xref legal-doc="public-law" parsable-cite="pl/97/140">Public Law 97–140</external-xref> no longer require such storage</quote>.</text></paragraph></subsection><subsection id="HCEADFD07312C48DAA726ADA808C77A89"><enum>(c)</enum><header>Water storage</header><text>The Secretary shall—</text><paragraph id="HCAF7644DEC6C4636B7E00368A8E62AEA"><enum>(1)</enum><text>store up to elevation 6230.00 NGVD29 at Abiquiu Dam, New Mexico, to the extent that the necessary real property interests have been acquired by any entity requesting such storage; and</text></paragraph><paragraph id="HD20C22E9E39D498399B8FB5D96908F85"><enum>(2)</enum><text>amend the March 20, 1986, contract between the United States of America and the Albuquerque Bernalillo County Water Utility Authority (assigned by the City of Albuquerque, New Mexico to the Albuquerque Bernalillo County Water Utility Authority) for water storage space in Abiquiu Reservoir to allow for storage by the Albuquerque Bernalillo County Water Utility Authority of San Juan-Chama project water or native Rio Grande system water up to elevation 6230.00 NGVD29.</text></paragraph></subsection><subsection id="HC0576BFEFB224D5AAB6C5ECD9F8CBC53"><enum>(d)</enum><header>Storage agreements with users other than the Albuquerque Bernalillo County Water Utility Authority</header><text>The Secretary shall—</text><paragraph id="HBBDF020FCB3D4780A656BEC6D88D72D7"><enum>(1)</enum><text>retain or enter into new agreements with entities for a proportionate allocation of 29,100 acre-feet of storage space pursuant to section 5 of <external-xref legal-doc="public-law" parsable-cite="pl/97/140">Public Law 97–140</external-xref>; and</text></paragraph><paragraph id="HC9278A312B224F08BB57453F1E25DD4D"><enum>(2)</enum><text>amend or enter into new storage agreements for storage of San Juan-Chama project water or native Rio Grande system water up to the space allocated for each entity’s proportionate share of San Juan-Chama water.</text></paragraph></subsection><subsection id="H4A228730767A478FB021A2EC2B57E0D0"><enum>(e)</enum><header>Operations documents</header><text>The Secretary shall amend or revise any existing operations documents, including the Water Control Manual or operations plan for Abiquiu Reservoir, as necessary to meet the requirements of this section.</text></subsection><subsection id="H1FBC6FF9F80640EB967C28EF759090B4"><enum>(f)</enum><header>Limitations</header><text>In carrying out this section, the following limitations shall apply:</text><paragraph id="H0C9D1A05278A474486A89FAFC1354F65"><enum>(1)</enum><text>The storage of native Rio Grande system water shall be subject to the provisions of the Rio Grande Compact and the resolutions of the Rio Grande Compact Commission.</text></paragraph><paragraph id="H14162D141AF14895B0B57F8C063AD2BD"><enum>(2)</enum><text>The storage of native Rio Grande system water shall only be authorized to the extent that the necessary water ownership and storage rights have been acquired by the entity requesting such storage.</text></paragraph><paragraph id="H00571E283C7B40AFBFCFA50EB64A3F1E"><enum>(3)</enum><text>The storage of native Rio Grande system water or San-Juan Chama project water shall not interfere with the authorized purposes of the Abiquiu Dam and Reservoir project.</text></paragraph><paragraph id="H7EEF9E792E664F109E9B3F6F2DE688A3"><enum>(4)</enum><text>Each user of storage space, regardless of source of water, shall pay for any increase in costs attributable to storage of that user’s water.</text></paragraph></subsection></section><section id="H023A061955CF400490316617B8D5FC92" section-type="subsequent-section"><enum>324.</enum><header>Pawcatuck River, Little Narragansett Bay and Watch Hill Cove, Rhode Island and Connecticut</header><text display-inline="no-display-inline">Beginning on the date of enactment of this Act, that portion of the project for navigation, Pawcatuck River, Little Narragansett Bay and Watch Hill Cove, Rhode Island and Connecticut, authorized by section 2 of the Act of March 2, 1945 (chapter 19, 59 Stat. 13), consisting of a 10-foot deep, 16-acre anchorage area in Watch Hill Cove is no longer authorized.</text></section><section id="H8BA7708858AB42A0AE52CF1834A84BB6" section-type="subsequent-section"><enum>325.</enum><header>Harris County, Texas</header><text display-inline="no-display-inline">Section 575 of the Water Resources Development Act of 1996 (110 Stat. 3789) is repealed. </text></section><section id="H141A8C98A7FC4259AF08BE2420440C2B"><enum>326.</enum><header>Cap Sante Waterway, Washington</header><text display-inline="no-display-inline">Beginning on the date of enactment of this Act, the project for navigation, Cap Sante Waterway and Navigation Channel, Skagit County, Washington, authorized by the Act of March 2, 1919 (chapter 95, 40 Stat. 1285), is modified to deauthorize the portion of the project consisting of an approximately 334,434 foot area of the Federal channel within Anacortes Harbor inside and directly adjacent to the Federal breakwater and training wall structure, starting at a point with coordinates N557015.552, E1210819.619, thence running S88 13’2.06”E approximately 200 feet to a point with coordinates N557009.330, E1211019.522, thence running S01 46’58.08”W approximately 578 feet to a point with coordinates N556431.405, E1211001.534, thence running S49 49’50.23”W approximately 69 feet to a point with coordinates N556387.076, E1210949.002, thence running S51 53’0.25”E approximately 35 feet to a point with coordinates N556365.662, E1210976.316, thence running S49 38’58.48”W approximately 112 feet to a point with coordinates N556292.989, E1210890.775, thence running N88 13’1.87”W approximately 109 feet to a point with coordinates N556296.367, E1210782.226, thence running S46 46’58.97”W approximately 141 feet to a point with coordinates N556199.527, E1210679.164, thence running N88 13’1.77”W approximately 700 feet to a point with coordinates N556221.305, E1209979.502, thence running N01 46’58.08”E approximately 250 feet to a point with coordinates N556471.184, E1209987.280, thence running S88 13’1.77”E approximately 815 feet to a point with coordinates N556445.828, E1210801.886, thence running N01 46’58.08”E approximately 570 feet to the point of origin.</text></section><section id="H1B2D2E94B0324FD2BE8167AF09019F5C"><enum>327.</enum><header>Regional sediment management</header><text display-inline="no-display-inline">The Secretary shall expedite the activities required to be carried out under section 204 of the Water Resources Development Act of 1992 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326</external-xref>) regarding the use of improvement dredging of the Portsmouth Federal navigation project in Portsmouth, New Hampshire, as a source of clean beach fill material to reinforce the stone revetment at Nantasket Beach, Hull, Massachusetts.</text></section><section id="HD549ECD293EB4DE5849942FCAAF409E0"><enum>328.</enum><header>Additional assistance for critical projects</header><subsection id="HB826DC6E55BD4100AE4211556FD8C07B"><enum>(a)</enum><header>Consistency with reports</header><text>Congress finds that the project modifications described in this section are in accordance with the reports submitted to Congress by the Secretary under section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>), titled <quote>Report to Congress on Future Water Resources Development</quote>, or have otherwise been reviewed by Congress.</text></subsection><subsection commented="no" id="H7AC822308696469C8B0DD624D4A06984"><enum>(b)</enum><header>Modifications</header><paragraph commented="no" id="H3FF17006EE6E438A80D369D3E78D4746"><enum>(1)</enum><header>Sacramento area, California</header><text>Section 219(f)(23) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 117 Stat. 1840) is amended to read as follows:</text><quoted-block id="H5BCEE09770064813BFD0F369463CAE40" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph commented="no" id="HB3E8FE51BD914EAFB6C0B0EBFAE50DE9"><enum>(23)</enum><header>Sacramento area, California</header><text>$45,000,000 for regional water conservation, recycling, reliability, and resiliency projects in Placer, El Dorado, and Sacramento Counties and the San Juan Suburban Water District, California.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph><paragraph commented="no" id="HEE472D340D664226AD60E47045FAE0AC"><enum>(2)</enum><header>South Perris, California</header><text>Section 219(f)(52) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat. 2763A–220) is amended by striking <quote>$25,000,000</quote> and inserting <quote>$50,000,000</quote>.</text></paragraph><paragraph id="H5CFDC0B583334D17AC536C169DF5F37A"><enum>(3)</enum><header>Madison and St. Clair Counties, Illinois</header><text display-inline="yes-display-inline">Section 219(f)(55) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 335; 114 Stat. 2763A–221) is amended by striking <quote>$10,000,000</quote> and inserting <quote>$45,000,000</quote>.</text></paragraph><paragraph commented="no" id="H4DA847714560469490767480C1986466"><enum>(4)</enum><header>Southern and eastern Kentucky</header><text>Section 531 of the Water Resources Development Act of 1996 (110 Stat. 3773; 113 Stat. 348; 117 Stat. 142; 121 Stat. 1226) is amended—</text><subparagraph commented="no" id="H1465519996F54C0EAD6E91BD65AE83D7"><enum>(A)</enum><text>in subsection (g), by inserting <quote>Boyd, Carter, Elliott, Lincoln,</quote> after <quote>Lee,</quote>; and</text></subparagraph><subparagraph commented="no" id="HECC02175B7554AE5B00A70A3FB4C6C11"><enum>(B)</enum><text>in subsection (h), by striking <quote>$40,000,000</quote> and inserting <quote>$80,000,000</quote>.</text></subparagraph></paragraph><paragraph commented="no" id="H2B0DD7008D1B4FD6B298E6EE59B5958C"><enum>(5)</enum><header>DeSoto County, Mississippi</header><text display-inline="yes-display-inline">Section 219(f)(30) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat. 2763A–220; 119 Stat. 282; 119 Stat. 2257; 122 Stat. 1623) is amended by striking <quote>$75,000,000</quote> and inserting <quote>$130,000,000</quote>.</text></paragraph><paragraph commented="no" id="H11058CC0BF0747B3B0F108ED65A37DF9"><enum>(6)</enum><header>Jackson County, Mississippi</header><text>Section 219(e)(1) of the Water Resources Development Act of 1992 (106 Stat. 4835; 110 Stat. 3757; 113 Stat. 1494; 121 Stat. 1258) is amended by striking <quote>$32,500,000</quote> and inserting <quote>$57,500,000</quote>.</text></paragraph><paragraph id="HDDC40BBC4F8B4576A00F192ED333FCC1"><enum>(7)</enum><header>St. Louis, Missouri</header><text>Section 219(f)(32) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 337; 121 Stat. 1233) is amended by striking <quote>$35,000,000</quote> and inserting <quote>$70,000,000</quote>.</text></paragraph><paragraph commented="no" id="HFC80D83E1CC041FBB1E4DC2810F59D71"><enum>(8)</enum><header>Midwest City, Oklahoma</header><text display-inline="yes-display-inline">Section 219(f)(231) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 121 Stat. 1266) is amended by striking <quote>$2,000,000</quote> and inserting <quote>$5,000,000</quote>.</text></paragraph><paragraph commented="no" id="H3852B6B32A294E0994A73026993029A5"><enum>(9)</enum><header>South central Pennsylvania</header><text>Section 313 of the Water Resources Development Act of 1992 (106 Stat. 4845; 109 Stat. 407; 110 Stat. 3723; 113 Stat. 310; 117 Stat. 142; 121 Stat. 1146) is amended—</text><subparagraph commented="no" id="H5D32025C577D4F0894F99F1320B7684A"><enum>(A)</enum><text>in subsection (g)(1), by striking <quote>$200,000,000</quote> and inserting <quote>$400,000,000</quote>; and</text></subparagraph><subparagraph commented="no" id="HEA44F709EA344C23AAE50D3AEB2FC064"><enum>(B)</enum><text>in subsection (h)(2), by inserting <quote>Beaver, Jefferson,</quote> after <quote>Washington,</quote>.</text></subparagraph></paragraph><paragraph commented="no" id="H7BD6606C233A47F88DC6A5B7C9B46F4F"><enum>(10)</enum><header>Lakes Marion and Moultrie, South Carolina</header><text>Section 219(f)(25) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat. 2763A–220; 117 Stat. 1838; 130 Stat. 1677; 132 Stat. 3818) is amended by striking <quote>$89,550,000</quote> and inserting <quote>$110,000,000</quote>.</text></paragraph><paragraph commented="no" id="H01CE91130F3F417CB999821645F261C8"><enum>(11)</enum><header>El Paso County, Texas</header><text display-inline="yes-display-inline">Section 219(f)(269) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 121 Stat. 1268) is amended by striking <quote>$25,000,000</quote> and inserting <quote>$75,000,000</quote>.</text></paragraph><paragraph commented="no" id="H365B1A7A8BF24080AFCD2FD2EAA9F644"><enum>(12)</enum><header>Western rural water</header><text>Section 595 of the Water Resources Development Act of 1999 (113 Stat. 383; 117 Stat. 139; 117 Stat. 142; 117 Stat. 1836; 118 Stat. 440; 121 Stat. 1219; 123 Stat. 2851; 128 Stat. 1316; 130 Stat. 1681) is amended—</text><subparagraph commented="no" id="HFF3668EB5D9D455DA643305816AC77E8"><enum>(A)</enum><text>by striking the section heading and inserting <quote><header-in-text level="section" style="OLC">Western rural water.</header-in-text></quote>;</text></subparagraph><subparagraph commented="no" id="HA58A74CD1F0D47E49721733904E0EAE3"><enum>(B)</enum><text>in subsections (b) and (c), by inserting <quote>Arizona,</quote> before <quote>Idaho</quote> each place it appears; and</text></subparagraph><subparagraph commented="no" id="H171B1986F6894049845B088EDDC77F43"><enum>(C)</enum><text display-inline="yes-display-inline">in subsection (i), by striking <quote>for the period beginning with fiscal year 2001, $435,000,000, to remain available until expended.</quote> and inserting the following: “, to remain available until expended—</text><quoted-block display-inline="no-display-inline" id="HAD4D622D999542448805DC637A26C87C" style="OLC" changed="added" reported-display-style="italic" committee-id="HPW00"><paragraph commented="no" id="HC13FEA7951084A8FABEF7B3B2C143704"><enum>(1)</enum><text display-inline="yes-display-inline">for the period beginning with fiscal year 2001, $435,000,000 for Idaho, Montana, rural Nevada, New Mexico, rural Utah, and Wyoming; and</text></paragraph><paragraph commented="no" id="H3589EE2C9BD147F0B84EF0D5263DEE84"><enum>(2)</enum><text display-inline="yes-display-inline">$150,000,000 for Arizona.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph><paragraph commented="no" id="H207A273A8ED74EBB8FB5B3CE1C2661BB"><enum>(13)</enum><header>Central West Virginia</header><text>Section 571(h) of the Water Resources Development Act of 1999 (113 Stat. 371; 121 Stat. 1257) is amended by striking <quote>$20,000,000</quote> and inserting <quote>$40,000,000</quote>.</text></paragraph><paragraph commented="no" id="H0ED3B7E6FDC34DEA89FF72F36B0C9261"><enum>(14)</enum><header>Southern West Virginia</header><text>Section 340(g) of the Water Resources Development Act of 1992 (106 Stat. 4856; 110 Stat. 3727; 113 Stat. 320) is amended by striking <quote>$40,000,000</quote> and inserting <quote>$120,000,000</quote>.</text></paragraph></subsection><subsection commented="no" id="H1086DD65CBF942E0A003414F6095921C"><enum>(c)</enum><header>Lowell Creek Tunnel, Seward, Alaska</header><text>Section 5032(a)(2) of the Water Resources Development Act of 2007 (<external-xref legal-doc="public-law" parsable-cite="pl/110/114">Public Law 110–114</external-xref>, 121 Stat. 1205) is amended by striking <quote>15</quote> and inserting <quote>20</quote>.</text></subsection></section><section id="H7A2411C5EA304993903CD484E33DF43A"><enum>329.</enum><header>Project modification authorizations</header><subsection id="H86A1C390E3384D0A9B117579113FC939"><enum>(a)</enum><header>Water supply</header><text display-inline="yes-display-inline">The following project modifications for water supply, as identified in the report entitled <quote>Report to Congress on Future Water Resources Development</quote> dated February 2019, and submitted to Congress on June 3, 2019, pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>) or otherwise reviewed by Congress, are authorized to be carried out by the Secretary substantially in accordance with the recommendations, included in such report pursuant to section 301(c) of the Water Supply Act of 1958 (<external-xref legal-doc="usc" parsable-cite="usc/43/390b">43 U.S.C. 390b(c)</external-xref>):</text><paragraph id="H7DFF1DD51724434E93FD9B747BFE3CD2"><enum>(1)</enum><text>The project modification for the State of Missouri, Clarence Cannon Dam and Mark Twain Lake Project Salt River, Missouri.</text></paragraph><paragraph id="H435CAB8BB14843EA94CE1F66458B8DD3"><enum>(2)</enum><text>The project modification for the City of Plattsburg, Smithville Lake, Missouri.</text></paragraph><paragraph id="H49EED6A30716404FBDE867B16A78BD49"><enum>(3)</enum><text>The project modification for the City of Smithville, Smithville Lake, Missouri.</text></paragraph></subsection><subsection commented="no" id="HBAFD3940E7DD4AE58B8FD52A14816456"><enum>(b)</enum><header>Flood risk management</header><text display-inline="yes-display-inline">The following project modifications for flood risk management, as identified in a report entitled <quote>Report to Congress on Future Water Resources Development</quote>, and submitted to Congress pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>) or otherwise reviewed by Congress, are authorized to be carried out by the Secretary:</text><paragraph commented="no" id="H3C5E6A882F844FB496CAF7978C40A649"><enum>(1)</enum><text>Modification of the project for flood risk management, lower Mississippi River, authorized by the Act of May 15, 1928 (chapter 569, 45 Stat. 534), to incorporate the Wolf River Backwater and Nonconnah Creek levee systems into the project, authorized by section 5 of the Act of June 22, 1936 (chapter 688, 49 Stat. 1575; 50 Stat. 881), subject to the determination of the Secretary that such systems meet all requirements applicable to such project.</text></paragraph><paragraph commented="no" id="H7B636F02E426464F9778778CD52730BD"><enum>(2)</enum><text>Modification of the project for flood risk management, Red River below Denison Dam, Arkansas, Louisiana, and Texas, authorized by the Act of June 28, 1938 (chapter 795, 52 Stat. 1219), to incorporate the Cherokee Park Levee into the project, subject to the determination of the Secretary that such levee meets all requirements applicable to such project.</text></paragraph></subsection></section><section id="HB4043BA6EE224795BC207834B253BDCD"><enum>330.</enum><header>Application of credit</header><text display-inline="no-display-inline"> Section 7007(d) of the Water Resources Development Act of 2007 (121 Stat. 1277; 128 Stat. 1226) is amended by inserting <quote>, or may be applied to reduce the amounts required to be paid by the non-Federal interest under the terms of the deferred payment agreements entered into between the Secretary and the non-Federal interest for the projects authorized by section 7012(a)(1)</quote> before the period at the end. </text></section><section id="HDF128B658AEA4A138B0DB980BB5B14DC"><enum>331.</enum><header>Project reauthorizations</header><subsection id="H9C248137CF274C5481275B88B30E3C37"><enum>(a)</enum><header>In general</header><paragraph id="H2EEC1E89ECED49FA9D0036EB51F75272"><enum>(1)</enum><header>Muddy River, Massachusetts</header><text display-inline="yes-display-inline">The separable elements for ecosystem restoration of the project for flood damage reduction and environmental restoration, Muddy River, Brookline and Boston, Massachusetts, authorized by section 522 of the Water Resources Development Act of 2000 (114 Stat. 2656), and deauthorized pursuant to section 6001 of the Water Resources Reform and Development Act of 2014 (128 Stat. 1345), are authorized to be carried out by the Secretary, subject to subsection (b).</text></paragraph><paragraph id="HF1D739637B5348ABAA3294D190D82E8D"><enum>(2)</enum><header>East Chester Creek, New York</header><text display-inline="yes-display-inline">Notwithstanding section 1001 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/579a">33 U.S.C. 579a</external-xref>), the project for navigation, East Chester Creek, New York, authorized by section 101 of the River and Harbor Act of 1950 (64 Stat. 164; 100 Stat. 4181), and deauthorized pursuant to section 1001 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/579">33 U.S.C. 579(a)</external-xref>), is authorized to be carried out by the Secretary, subject to subsection (b).</text></paragraph><paragraph id="H9EF8FD4E1E244CB1BFF489B4F10478EC"><enum>(3)</enum><header>Christiansted Harbor, United States Virgin Islands</header><text display-inline="yes-display-inline">Notwithstanding section 1002 of the Water Resources Development Act of 1986 (100 Stat. 4221), the portion of the project for navigation, Christiansted Harbor, St. Croix, United States Virgin Islands, authorized by section 101 of the River and Harbor Act of 1950 (64 Stat. 167), and deauthorized under section 1002 of the Water Resources Development Act of 1986 (100 Stat. 4221), is authorized to be carried out by the Secretary, subject to subsection (b).</text></paragraph><paragraph id="HC973BEBBB82E434E882193F385C7D540"><enum>(4)</enum><header>Charlotte Harbor, United States Virgin Islands</header><text display-inline="yes-display-inline">Notwithstanding section 1002 of the Water Resources Development Act of 1986 (100 Stat. 4221), the portion of the project for navigation, Charlotte Amalie (St. Thomas) Harbor, St. Thomas, United States Virgin Islands, authorized by the Act of August 26, 1937 (chapter 832, 50 Stat. 850), and deauthorized under section 1002 of the Water Resources Development Act of 1986 (100 Stat. 4221), is authorized to be carried out by the Secretary, subject to subsection (b).</text></paragraph></subsection><subsection id="HD108F41452B4466385BE8DD498C47314"><enum>(b)</enum><header>Report to Congress</header><text display-inline="yes-display-inline">The Secretary shall complete and submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a post-authorization change report (as such term is defined in section 1132(d) of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282e">33 U.S.C. 2282e(d)</external-xref>) prior to carrying out a project identified in subsection (a).</text></subsection></section><section id="H26FA4DC078454E09823FB376ADE24E48" section-type="subsequent-section"><enum>332.</enum><header>Conveyances</header><subsection id="H6A36EF1DB24D4AABB9F444B35473B0FB"><enum>(a)</enum><header>Generally applicable provisions</header><paragraph id="HA2DF701692A24DEAB07B876137EA0F66"><enum>(1)</enum><header>Survey to obtain legal description</header><text>The exact acreage and the legal description of any real property to be conveyed under this section shall be determined by a survey that is satisfactory to the Secretary.</text></paragraph><paragraph id="HE410C5BBDCE4403590E037D697F64AA6"><enum>(2)</enum><header>Applicability of property screening provisions</header><text>Section 2696 of title 10, United States Code, shall not apply to any conveyance under this section.</text></paragraph><paragraph id="HCED5F3193DCE4504B207F19CED429E7C"><enum>(3)</enum><header>Costs of conveyance</header><text>An entity to which a conveyance is made under this section shall be responsible for all reasonable and necessary costs, including real estate transaction and environmental documentation costs, associated with the conveyance.</text></paragraph><paragraph id="HBF81B2BB468A49F58465B50A5F2174E1"><enum>(4)</enum><header>Liability</header><text>An entity to which a conveyance is made under this section shall hold the United States harmless from any liability with respect to activities carried out, on or after the date of the conveyance, on the real property conveyed. The United States shall remain responsible for any liability with respect to activities carried out, before such date, on the real property conveyed.</text></paragraph><paragraph id="HEFD522561F494A66B6E65FA4BF8BD2C5"><enum>(5)</enum><header>Additional terms and conditions</header><text>The Secretary may require that any conveyance under this section be subject to such additional terms and conditions as the Secretary considers necessary and appropriate to protect the interests of the United States.</text></paragraph></subsection><subsection id="H99949A2C5A3946F28FA85B123DA3ECEA"><enum>(b)</enum><header>Eufaula, Alabama</header><paragraph id="HF076B4B151EF46069E0E0EA37BED5918"><enum>(1)</enum><header>Conveyance authorized</header><text>The Secretary shall convey to the City of Eufaula, Alabama, all right, title, and interest of the United States in and to the real property described in the Department of the Army Lease No. DACW01–2–17–0747, containing 56.76 acres, more or less, and being a part of Tracts L–1268 (26.12 acres), L–1273 (13.71 acres), L–1278 (6.75 acres), and L1279 (10.36 acres) of the Walter F. George Lock and Dam and Lake project.</text></paragraph><paragraph commented="no" id="HD4F933C1DA524D0C966C00B885A86D2D"><enum>(2)</enum><header>Deed</header><text>The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States.</text></paragraph><paragraph id="H28F7301EA9694ABC895F38F23554B6DF"><enum>(3)</enum><header>Consideration</header><text>The City of Eufaula, Alabama, shall pay to the Secretary an amount that is not less than the fair market value of the property conveyed under this subsection, as determined by the Secretary.</text></paragraph></subsection><subsection id="HCA31260B9FA048AD8618334EEAC120DF"><enum>(c)</enum><header>Montgomery, Alabama</header><paragraph id="HD2F002D1564F4640BA328BDF78E264C4"><enum>(1)</enum><header>Conveyance authorized</header><text>The Secretary shall convey to the City of Montgomery, Alabama, all right, title, and interest of the United States in and to the real property described in paragraph (2).</text></paragraph><paragraph id="H5C99F210B5EC4DE2A68C2619989D1582"><enum>(2)</enum><header>Property</header><text>The property to be conveyed is the 62.38 acres of land and water under the primary jurisdiction of the Secretary in the R.E. <quote>Bob</quote> Woodruff Project Area that is covered by lease number DACW01–1–05–0037, including the parcels and structure known as <quote>Powder Magazine</quote>.</text></paragraph><paragraph commented="no" id="H9CE457E560C04B06A611A044B1CD52CE"><enum>(3)</enum><header>Deed</header><text>The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States, to include retaining the right to inundate with water any land transferred under this subsection.</text></paragraph><paragraph id="H69FDB497ACD04DEA999D982F6AB6C286"><enum>(4)</enum><header>Consideration</header><text>The City of Montgomery, Alabama, shall pay to the Secretary an amount that is not less than the fair market value of the property conveyed under this subsection, as determined by the Secretary.</text></paragraph></subsection><subsection commented="no" id="HA0B24ED6F058479A895A49D4D421BD8F"><enum>(d)</enum><header>Ohio River Lock and Dam Number 52, Massac County, Illinois</header><paragraph commented="no" id="HD18E89034D2A49ABA1B238990DC00A33"><enum>(1)</enum><header>Conveyance authorized</header><text>The Secretary shall convey to the Massac-Metropolis Port District, Illinois, all right, title, and interest of the United States in and to any real property located north of the south bank of the Ohio River in Massac County, Illinois, that is associated with the Ohio River Lock and Dam 52.</text></paragraph><paragraph commented="no" id="H9A1EB1E8DB8745D889E6519CE21907C9"><enum>(2)</enum><header>Deed</header><text>The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States.</text></paragraph><paragraph commented="no" id="H04C1777B3AE043B7BFFD9F68D2E417BE"><enum>(3)</enum><header>Consideration</header><text display-inline="yes-display-inline">The Massac-Metropolis Port District, Illinois, shall pay to the Secretary an amount that is not less than fair market value of the property conveyed under this subsection, as determined by the Secretary.</text></paragraph></subsection><subsection id="H184577CFB3684E93B516C7AC5A342856"><enum>(e)</enum><header>Clinton, Missouri</header><paragraph id="HB88D692943264B5E8B0D442EDAEA7A6E"><enum>(1)</enum><header>Conveyance authorized</header><text>The Secretary shall convey to the City of Clinton, Missouri, without consideration, all right, title, and interest of the United States in and to the real property described in paragraph (2).</text></paragraph><paragraph commented="no" id="H348F62084BCA4D9FAC99F6F5CA5714FA"><enum>(4)</enum><header>Property</header><text display-inline="yes-display-inline">The property to be conveyed is a tract of land situated in the S ½ of Section 12 and the N ½ of Section 13, Township 41 North, Range 26 West of the Fifth Principal Meridian, Henry County, Missouri, more particularly described as follows: Beginning at the point of intersection of the north line of said S ½ of Section 12 and the easterly right-of-way of State Highway No. 13; thence easterly along the north line of said S ½ to the northeast corner of the W ½ NW ¼ NE ¼ SW ¼ of said Section 12; thence southerly along the east line of said W ½ NW ¼ NE ¼ SW ¼ to the southeast corner thereof; thence easterly along the north line of the S ½ NE ¼ SW ¼ of said Section 12 to the southwest corner of the W ½ NW ¼ NW ¼ SE ¼ of said Section 12; thence in a northeasterly direction to the northeast corner of said W ½ NW ¼ NW ¼ SE ¼ ; thence easterly along the north line of said S ½ to the westerly right-of-way of the County Road; thence in a southeasterly and southerly direction along the westerly right-of-way of said County Road approximately 2500 feet to the center of Deer Creek; thence in a southwesterly direction along the center of said Deer Creek, approximately 3900 feet to the south line of said N ½ of Section 13; thence westerly along the south line of said N ½ to the easterly right-of-way line of the St. Louis-San Francisco Railroad; thence in a northwesterly direction along the easterly right-of-way of said railroad to the easterly right-of-way of said State Highway No. 13; thence in a northeasterly direction along the easterly right-of-way of said State Highway No. 13 to the point of the beginning; and including a roadway easement for ingress and egress, described as a strip of land 80 feet in width, lying 40 feet on each side of the following described line, the initial extremities of the following described strip being extended or reduced as required to exactly adjoin the boundary lines which they meet, situated in the S ½ of Section 12, Township 41 North Range 26 West of the Fifth Principal Meridian, Henry County, Missouri, more particularly described as follows: Commencing at the center of said Section 12, thence Sl°24’56”W, 1265.52 feet to a point, thence N88°29’02”W, 483.97 feet to the point of beginning of the strip of land herein described; thence in a northeasterly direction along a curve to the right, said curve having an initial tangent bearing of N3°44’4l”E, a radius of 238.73 feet and an interior angle of 61°29’26”, an arc distance of 256.21 feet to a point; thence N65°14’07”E 218.58 feet to a point; thence in a northeasterly direction along a curve to the left, having a radius of 674.07 feet and an interior angle of 36°00’01”, an arc distance of 423.53 feet to a point; thence N29°14’07”E, 417.87 feet to a point; thence northeasterly along a curve to the right, having a radius of 818.51 feet and an interior angle of 14°30’01”, an arc distance of 207.15 feet to a point; thence N43°44’07”E, 57.00 feet to the southerly right-of-way line of a county road, containing 2,948 acres, more or less; Excluding therefrom a tract of land situated in the S ½ of said Section 12, said Township and Range, described as commencing at the center of said Section 12; thence S1°24’56”W, 1265.52 feet to the point of beginning of the tract of land herein described; thence N88°29'02"W, 1122.50 feet; thence S1°43'26"W, 872.62 feet; thence S88°29’02”E, 1337.36 feet; thence Nl°43’26”E, 872.62 feet; thence N88°29’02”W, 214.86 feet to the point of beginning, containing 26.79 acres, more or less. The above described tract contains, in the aggregate, 177.69 acres, more or less. </text></paragraph><paragraph commented="no" id="HB3E94FB0C2C44DAC80E7FE30D0EE9B29"><enum>(2)</enum><header>Deed</header><text>The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States.</text></paragraph><paragraph id="HEF989B6C54414CBDA3646C63AA5C0436"><enum>(3)</enum><header>Reversion</header><text display-inline="yes-display-inline">If the Secretary determines that the property conveyed under this subsection is not being used for a public purpose, all right, title, and interest in and to the property shall revert, at the discretion of the Secretary, to the United States.</text></paragraph></subsection><subsection commented="no" id="H5CD55048E2F44E8B9E634D169C2EA2BA"><enum>(f)</enum><header>City of Clinton, Old Orchard Addition, Missouri</header><paragraph commented="no" id="HC6AC753098714C2F86B4C7083870D110"><enum>(1)</enum><header>Conveyance Authorized</header><text>The Secretary shall convey to the City of Clinton, Missouri, all right, title, and interest of the United States in and to the real property described in paragraph (2).</text></paragraph><paragraph commented="no" id="HA4FC10E0D2584246854EA65476D24282"><enum>(2)</enum><header>Property</header><text>The property to be conveyed is Lot 28 in Old Orchard Addition, a subdivision of the City of Clinton, Henry County, Missouri, containing 0.36 acres, more or less, including any improvements thereon.</text></paragraph><paragraph commented="no" id="HAE16DEAF338A4294B6E2532ABFEBE9C0"><enum>(3)</enum><header>Deed</header><text>The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States, including such reservations, terms, and conditions as the Secretary determines necessary to allow the United States to operate and maintain the Harry S. Truman Reservoir Project.</text></paragraph><paragraph commented="no" id="HEAF56F1530714E90B0D40DE36C8D9252"><enum>(4)</enum><header>Consideration</header><text>The City of Clinton, Missouri, shall pay to the Secretary an amount that is not less than the fair market value of the property conveyed under this subsection, as determined by the Secretary.</text></paragraph></subsection><subsection id="H98EBA35F3C1146F5AE503820621C5875"><enum>(g)</enum><header>Tri-County Levee District, Missouri</header><paragraph id="H01D95D3051F14C3B9D8CA10E1F2D3E2C"><enum>(1)</enum><header>Conveyance authorized</header><text>The Secretary shall convey to the Tri-County Levee District, Missouri, all right, title, and interest of the United States in and to the real property described in paragraph (2).</text></paragraph><paragraph id="HD43712CF00F34EBDBCAA3A9ED1F621AC"><enum>(2)</enum><header>Property</header><text display-inline="yes-display-inline">The property to be conveyed is the part of Sections 1 and 12 Township 45 North Range 6 West of the 5th P.M. in Montgomery County, Missouri, described as follows: A tract of land being 60’ wide and lying South and East of and adjoining the centerline of the existing levee and being described as follows: Commencing at the NW corner of Section 12, thence S 87° 52’ 35” E 587.4’, thence S 01° 29’ 25” W 453.68’ to the point of the beginning; said point being in the center of the levee, thence with the centerline of the levee N 77° 01’ 30” E 164.92’, thence N 74° 26’ 55” E 250.0’, thence N 72° 27’ 55” E 270.0’, thence N 69° 06’ 10” E 300.0’, thence N 66° 42’ 15” E 500.0’, thence N 64° 14’ 30” E 270.0’, thence N 61° 09’ 10” E 800.0’, thence N 60° 58’ 15” E 1724.45’, thence leaving the centerline S 01° 10’ 35” W 69.43’, thence parallel with the above described centerline S 60° 58’ 15” W 1689.62’, thence S 61° 09’ 10” W 801.71’, thence S 64° 14’ 30” W 272.91’, thence S 66° 42’ 15” W 502.55’, thence S 69° 06’ 10” W 303.02’, thence S 72° 27’ 55” W 272.8’, thence S 74° 26’ 55” W 252.39’, thence S 77° 01’ 30” W 181.75’, thence leaving the South side of the levee N 01° 26’ 25” E 61.96’ to the point of beginning and containing 5.89 acres more or less.</text></paragraph><paragraph commented="no" id="H431574C3658241228452298547C55E6E"><enum>(3)</enum><header>Deed</header><text>The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States.</text></paragraph><paragraph id="HF224D3D983B74710A2A2F4E5F3CB8D09"><enum>(4)</enum><header>Consideration</header><text>The Tri-County Levee District, Missouri, shall pay to the Secretary an amount that is not less than the fair market value of the property conveyed under this subsection, as determined by the Secretary.</text></paragraph></subsection><subsection commented="no" id="HE438D95266AD4B79AF2E442E36858BD3"><enum>(h)</enum><header>Judge Joseph Barker, Jr., House, Ohio</header><paragraph commented="no" id="HD589C9BF551042DA8D550515A89B462A"><enum>(1)</enum><header>Non-Federal entity</header><text>In this subsection, the term <term>non-Federal entity</term> means the Friends of Joseph Barker, Jr., House, a nonprofit organization in the State of Ohio.</text></paragraph><paragraph commented="no" id="H5F0E3FCA06BC479CB2A91273C35FF2A2"><enum>(2)</enum><header>Conveyance authorized</header><subparagraph commented="no" id="H1C0C365512D24A3CA6704D820205A291"><enum>(A)</enum><header>In general</header><text>Subject to paragraph (6), the Secretary shall convey to the non-Federal entity, without consideration, all right, title, and interest of the United States in and to the property described in paragraph (3)(A). </text></subparagraph><subparagraph commented="no" id="HFFA9229A577C426594DAF15B2AF67495"><enum>(B)</enum><header>Easement</header><text>Upon conveyance of the property under subparagraph (A), the Secretary shall provide to the non-Federal entity, without consideration, an easement over the property described in paragraph (3)(B) for access to the conveyed property for as long as the non-Federal entity is in legal possession of the conveyed property.</text></subparagraph></paragraph><paragraph commented="no" id="HC18BDEF6B92F4DC7869046FAF84BB799"><enum>(3)</enum><header>Descriptions of property</header><subparagraph commented="no" id="HA4C536D1AF0D424DA4579BEEE962A28E"><enum>(A)</enum><header>In general</header><text>The property referred to in paragraph (2)(A) is the following (as in existence on the date of enactment of this Act):</text><clause commented="no" id="H9BD3622099E14E4890F17184F98DC48D"><enum>(i)</enum><header>Judge Joseph Barker, Jr., House</header><text>The tract of land situated in the State of Ohio, Washington County, on the Ohio River, and being particularly bounded and described as follows: Beginning at a point located on the southern right-of-way line of Ohio Route 7, a new corner to the land now or formerly owned by the United States of America; thence, leaving the right-of-way of said Route 7 and severing the land of said United States of America parallel to and approximately 10 feet easterly of the toe of the existing dredge disposal berm, southeasterly approximately 326 feet to a point prior to the current Corps of Engineers access to the dredging spoil area; thence, northeasterly approximately 480 feet paralleling the top of the slope to the riverbank side of the house and approximately 25 feet northerly therefrom; thence, northwest approximately 302 feet to a point in the southern right-of-way of Ohio Route 7; thence with the right-of-way of said Route 7, southwesterly approximately 485 feet to the point of beginning, containing approximately 3.51 acres.</text></clause><clause commented="no" id="HC538D369AE764A5CB6525B44BF8E6463"><enum>(ii)</enum><header>Road tract</header><text>The tract of land situated in the State of Ohio, Washington County, on the Ohio River, and being particularly bounded and described as follows: Beginning at a point located on the southern right-of-way line of Ohio Route 7, a new corner to the land now or formerly owned by the United States of America; thence, leaving the right-of-way of said Route 7 and severing the land of said United States of America and with the House Parcel southeasterly 25 feet; thence, northeast, running parallel to said Route 7 right-of-way, approximately 994 feet to a point of deflection; thence northeasterly 368 feet to a point beyond the existing fence corner; thence, east 140 feet to the edge of the existing Willow Island access road; thence with said access road, northwesterly approximately 62 feet to a point in the southern right-of-way of Ohio Route 7; thence with the right-of-way of said Route 7, southwesterly approximately 1,491 feet to the point of beginning, containing approximately 1 acre.</text></clause></subparagraph><subparagraph commented="no" id="HB074FA7A805044CCBB5A6E0B2EC3CD36"><enum>(B)</enum><header>Easement</header><text>The property referred to in paragraph (2)(B) is the following: The tract of land situated in the State of Ohio, Washington County, on the Ohio River, and being particularly bounded and described as follows: Beginning at a point at the intersection of the southern right-of-way of Ohio Route 7 and the northeast side of the existing Willow Island access road, a new corner to the land now or formerly owned by the United States of America; thence, southwest, running with said Route 7 right-of-way, approximately 30 feet to a point on the southwest side of the existing access road, and corner to the road tract; thence with said access road and the line of the road parcel, southeasterly approximately 62 feet to a point; thence leaving the road parcel and crossing the existing access road northeasterly approximately 30 feet to a point located on the northeast side of the existing access road; thence, northwesterly approximately 62 feet, to the point of beginning, containing approximately 0.04 acre.</text></subparagraph></paragraph><paragraph id="H59391A59F80444A3B1E1B4BE2B7C8D88"><enum>(4)</enum><header>Deed</header><text>The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States.</text></paragraph><paragraph commented="no" display-inline="no-display-inline" id="HCF0D969A8E4F4077A29B905801C8A1FA"><enum>(5)</enum><header>Reversion</header><text display-inline="yes-display-inline">If the Secretary determines that the property conveyed under this subsection is not being used by the non-Federal entity for a public purpose, all right, title, and interest in and to the property shall revert, at the discretion of the Secretary, to the United States.</text></paragraph><paragraph commented="no" id="H7C35139845334ACB866690C973934F43"><enum>(6)</enum><header>Requirements</header><subparagraph commented="no" display-inline="no-display-inline" id="H92078893320643268073E8F6A5886927"><enum>(A)</enum><header>Improvements</header><text display-inline="yes-display-inline">The Secretary shall make such improvements and alterations to the property described in paragraph (3)(A)(i) as the Secretary, in consultation with the non-Federal entity and relevant stakeholders, determines to be appropriate to facilitate conveyance of the property and provision of the easement under this subsection, subject to the condition that the total cost of those improvements and alterations undertaken by the Secretary shall be not more than $120,000.</text></subparagraph><subparagraph commented="no" id="H8325D479F6C84552842A0E3BE15F125B"><enum>(B)</enum><header>Environmental assessment</header><text>Before making a conveyance under paragraph (2), the Secretary shall—</text><clause commented="no" id="HE0166B97B7714E26AC7E20FECDA8E1C4"><enum>(i)</enum><text>conduct, with respect to the property to be conveyed, an assessment of the environmental condition of the property, including an investigation of any potential hazardous, toxic, or radioactive waste present on such property; and </text></clause><clause commented="no" id="H6CC60F91644342B8A496FF9261CFAF55"><enum>(ii)</enum><text>submit to the non-Federal entity a report describing the results of such assessment.</text></clause></subparagraph><subparagraph commented="no" id="H78186D6066A04E05B1B56F9027C7804A"><enum>(C)</enum><header>Refusal by non-Federal entity</header><clause commented="no" id="H1306F5BAB8514F68AA253F1C3C6CE41A"><enum>(i)</enum><header>In general</header><text>Upon review by the non-Federal entity of the report under subparagraph (B), the non-Federal entity may elect to refuse the conveyance under this subsection.</text></clause><clause commented="no" id="H764532C8D5DD4D549D07AD94C6F87240"><enum>(ii)</enum><header>Election</header><text>An election under clause (i)—</text><subclause commented="no" id="H7CE6F7CF949E4B368908A94AA4D2C3D2"><enum>(I)</enum><text>shall be at the sole discretion of the non-Federal entity; and</text></subclause><subclause commented="no" id="HD442E45E5B434D2296BC49AA89DC7D2C"><enum>(II)</enum><text>shall be made by the non-Federal entity by not later than the date that is 30 days after the date of submission of the report under subparagraph (B)(ii).</text></subclause></clause></subparagraph><subparagraph commented="no" id="HF110431ADAD2433CBCFA84EB59DB46DC"><enum>(D)</enum><header>Dredged material placement activities</header><text>The Secretary shall—</text><clause commented="no" id="H5BF4AD9A8E994FEABBFAE302324E38E9"><enum>(i)</enum><text>notify and coordinate with the non-Federal entity and relevant stakeholders before carrying out any dredged material placement activities associated with the property described in paragraph (3)(A) after the date on which such property is conveyed under this subsection; and</text></clause><clause commented="no" id="H776D46E4D8F54125B3D28EE3D7B45E6E"><enum>(ii)</enum><text>in carrying out a dredged material placement activity under clause (i), act in accordance with Engineer Manual EM 1110–2–5025 (or a subsequent version of that manual).</text></clause></subparagraph></paragraph><paragraph commented="no" id="H84C88BE465C14CD88BF9F248A4D51A15"><enum>(7)</enum><header>Reservation of rights</header><text>The Secretary may reserve and retain from any conveyance under this subsection a right-of-way or any other right that the Secretary determines to be necessary for the operation and maintenance of the authorized Federal channel along the Ohio River.</text></paragraph><paragraph commented="no" id="H199D506D481F49038AD1D8BE6F12DEDC"><enum>(8)</enum><header>Treatment</header><text>Conveyance to the non-Federal entity under this subsection of property described in paragraph (3)(A)(i) shall satisfy all obligations of the Secretary with respect to such property under—</text><subparagraph commented="no" id="HD3C286240ED54F3C842F9A38211A360F"><enum>(A)</enum><text>section 306101 of title 54, United States Code; and</text></subparagraph><subparagraph commented="no" id="HA29EA1DC5A874F4DB885888AD77DA232"><enum>(B)</enum><text>section 306108 of title 54, United States Code, with respect to the effects on the property of dredged material placement activities carried out by the Secretary after the date of the conveyances.</text></subparagraph></paragraph><paragraph commented="no" display-inline="no-display-inline" id="H7D6AF57896464BE7BAC0BA25F3B0B1DB"><enum>(9)</enum><header>Inapplicability</header><text>Subtitle I of title 40, and <external-xref legal-doc="usc-chapter" parsable-cite="usc-chapter/41/4">chapter 4</external-xref> of title 41, United States Code shall not apply to any conveyance or easement provided under this subsection.</text></paragraph></subsection><subsection commented="no" id="HEB92CBC076084427A1849EA628DF465F"><enum>(i)</enum><header>Leaburg Fish Hatchery, Lane County, Oregon</header><paragraph commented="no" id="H5863B9281FAA4BE883556724F4E70D30"><enum>(1)</enum><header>Conveyance authorized</header><text>Subject to the provisions of this subsection, the Secretary shall convey, without consideration, to the State of Oregon, acting through the Oregon Department of Fish and Wildlife, all right, title, and interest of the United States in and to the real property comprising the Leaburg Fish Hatchery, consisting of approximately 21.55 acres, identified as tracts Q–1500, Q–1501E, and 300E–1 and described in Department of the Army Lease No. DACW57–1–18–0009, together with any improvements on the property.</text></paragraph><paragraph commented="no" id="H31C4FB9D0D3940F1AA178368B58A496E"><enum>(2)</enum><header>Water rights</header><text>The Secretary may transfer to the State of Oregon, acting through the Oregon Department of Fish and Wildlife, any water rights held by the United States that are appurtenant to the property conveyed under this subsection.</text></paragraph><paragraph commented="no" id="HAADA52153AA5453B9BFC3F2EF1359A29"><enum>(3)</enum><header>Deed</header><text>The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States, including a condition that all of the property conveyed under this subsection be used and maintained by the State of Oregon for the purpose of operating a fish hatchery in perpetuity.</text></paragraph><paragraph commented="no" id="HF9EED2BBE6BB4BBB8098C2503D1F5B9E"><enum>(4)</enum><header>Reversion</header><text display-inline="yes-display-inline">If the Secretary determines that the property conveyed under this subsection is not being used or maintained by the State of Oregon for the purpose of operating a fish hatchery in perpetuity, all or any portion of the property, including any water rights transferred under this subsection, shall, at the option of the Secretary, revert to the United States.</text></paragraph><paragraph commented="no" id="H17F4C14CD93243389307534083025E41"><enum>(5)</enum><header>Savings clause</header><text>If the State of Oregon does not accept the conveyance under this subsection, the Secretary may dispose of the property, including appurtenant water rights, under subchapter III of <external-xref legal-doc="usc-chapter" parsable-cite="usc-chapter/40/5">chapter 5</external-xref> of title 40, United States Code.</text></paragraph></subsection><subsection id="H6E66E8467A5A4E7AA7C0FF173E2F387E"><enum>(j)</enum><header>Willamette Falls Locks, Willamette River, Oregon</header><paragraph id="HE270C4F35F4E44BDBBCCB258D2F0761F"><enum>(1)</enum><header>Definitions</header><text>In this section:</text><subparagraph id="H20D798D8A8994616B92807DC8D8C95C7"><enum>(A)</enum><header>Real estate appendix</header><text>The term <term>real estate appendix</term> means Appendix A of the document published by the District Commander of the Portland District of the Corps of Engineers, titled <quote>Willamette Falls Locks Willamette River Oregon Section 216 Disposition Study with Integrated Environmental Assessment</quote>.</text></subparagraph><subparagraph id="H7245D0F6483249ED9A91905368EB6E8A"><enum>(B)</enum><header>Receiving entity</header><text display-inline="yes-display-inline">The term <term>receiving entity</term> means an entity identified by the State of Oregon, in consultation with the Willamette Falls Locks Commission, to receive the conveyance under paragraph (2).</text></subparagraph><subparagraph id="H78DA3E83EEE547D0A939C3F1D74F31BE"><enum>(C)</enum><header>Willamette Falls Locks project</header><text display-inline="yes-display-inline">The term <term>Willamette Falls Locks project</term> means the project for navigation, Willamette Falls Locks, Willamette River, Oregon, authorized by the Act of June 25, 1910 (36 Stat. 664, chapter 382).</text></subparagraph><subparagraph id="HB0DE14AF76674EC0A159DEA422D8A340"><enum>(D)</enum><header>Willamette Falls Locks report</header><text display-inline="yes-display-inline">The term <term>Willamette Falls Locks report</term> means the memorandum of the Director of Civil Works with the subject <quote>Willamette Falls Locks (WFL), Willamette River Oregon Section 216 Disposition Study with Integrated Environmental Assessment (Study)</quote>, dated July 11, 2019.</text></subparagraph></paragraph><paragraph id="H46E7ACE64F4945BDAD4CFC1A57FA8B87"><enum>(2)</enum><header>Conveyance authorized</header><text>The Secretary is authorized to convey to the receiving entity, without consideration, all right, title, and interest of the United States in and to any land in which the Federal Government has a property interest for the Willamette Falls Locks project, together with any improvements on the land, subject to the requirements of this subsection and in accordance with the Willamette Falls Locks report.</text></paragraph><paragraph id="HCA9AA153BF3545178B385114C3362B2B"><enum>(3)</enum><header>Deed</header><text display-inline="yes-display-inline">The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States.</text></paragraph><paragraph commented="no" id="HA0326775A4A940AF8E50C87F66CC4D0F"><enum>(4)</enum><header>Subject to existing easements and other interests</header><text display-inline="yes-display-inline">The conveyance of property under paragraph (2) shall be subject to all existing deed reservations, easements, rights-of-way, and leases that are in effect as of the date of the conveyance.</text></paragraph><paragraph commented="no" id="HBE43FDE586734F4CADDCE1251D8932B8"><enum>(5)</enum><header>Reversion</header><text display-inline="yes-display-inline">If the Secretary determines that the property conveyed under this subsection cease to be held in public ownership, all right, title, and interest in and to the property shall revert, at the discretion of the Secretary, to the United States.</text></paragraph><paragraph commented="no" id="HE33EBB15ADF54FA2A748543F8E032AC6"><enum>(6)</enum><header>Requirements before conveyance</header><subparagraph commented="no" id="HFEA2C5273FAD42C198314CB3323CF25F"><enum>(A)</enum><header>Perpetual road easement</header><text>Before making the conveyance under paragraph (2), the Secretary shall acquire a perpetual road easement from an adjacent property owner for use of an access road, which easement shall convey with the property conveyed under such paragraph.</text></subparagraph><subparagraph commented="no" id="HC97EF275465A4C77A0890C2682B162BF"><enum>(B)</enum><header>Environmental compliance</header><text display-inline="yes-display-inline">Before making the conveyance under paragraph (2), in accordance with the real estate appendix, the Secretary shall complete a Phase 1 Environmental Site Assessment pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (<external-xref legal-doc="usc" parsable-cite="usc/42/9601">42 U.S.C. 9601</external-xref> et seq.).</text></subparagraph><subparagraph commented="no" id="H8DBA05B1C2A842ECB0E503F4F289073C"><enum>(C)</enum><header>Historic preservation</header><text>The Secretary may enter into a memorandum of agreement with the Oregon State Historic Preservation Office and the Advisory Council on Historic Preservation that identifies actions the Secretary shall take before making the conveyance under paragraph (2).</text></subparagraph><subparagraph commented="no" id="HBBD2F4A1478943E8B5B10957BDD936BA"><enum>(D)</enum><header>Repairs</header><text display-inline="yes-display-inline">Before making the conveyance under paragraph (2), the Secretary shall carry out repairs to address primary seismic and safety risks in accordance with the recommendations approved in the Willamette Falls Locks report.</text></subparagraph></paragraph><paragraph id="HF422551F8CEE41EFA9573C861B987984"><enum>(7)</enum><header>Deauthorization</header><text display-inline="yes-display-inline">Beginning on the date on which the Secretary makes the conveyance under paragraph (2), the Willamette Falls Locks project is no longer authorized.</text></paragraph></subsection></section><section id="H2224590327334DF4959A0CA026511CDC"><enum>333.</enum><header>Repeals</header><subsection id="H27F47D7E8E034291A5199214772908B4"><enum>(a)</enum><text>Section 1001 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/579a">33 U.S.C. 579a</external-xref>) is amended—</text><paragraph id="H333219ECBF784D9C9CDD89D36A67656E"><enum>(1)</enum><text>in subsection (b), by striking paragraph (2) and redesignating paragraph (3) as paragraph (2); and</text></paragraph><paragraph id="H1B59951D6F2240A2A0C058FBCAFD3AB8"><enum>(2)</enum><text>by striking subsection (c).</text></paragraph></subsection><subsection id="H17950921AD254766B9399136B02B2982"><enum>(b)</enum><text>Section 6003 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/579c">33 U.S.C. 579c</external-xref>) (and the item relating to such section in the table of contents) are repealed.</text></subsection><subsection id="H5D91E62515A14E65B6493CD0837C33CA"><enum>(c)</enum><text display-inline="yes-display-inline">Section 1301 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/579d">33 U.S.C. 579d</external-xref>) (and the item relating to such section in the table of contents) are repealed.</text></subsection><subsection id="HE50DF1611BAC4545B86A7667165ED7C6"><enum>(d)</enum><text display-inline="yes-display-inline">Section 1302 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/579c-1">33 U.S.C. 579c–1</external-xref>) (and the item relating to such section in the table of contents) are repealed.</text></subsection><subsection id="HC3A7E06F80EC4ADCA90D981AC7A6AC8B"><enum>(e)</enum><text display-inline="yes-display-inline">Section 1301 of the Water Resources Development Act of 2018 (<external-xref legal-doc="usc" parsable-cite="usc/33/579d-1">33 U.S.C. 579d–1</external-xref>) (and the item relating to such section in the table of contents) are repealed.</text></subsection><subsection id="H4400CD1474374EC099C9F60D2432C019"><enum>(f)</enum><text display-inline="yes-display-inline">Section 1302 of the Water Resources Development Act of 2018 (<external-xref legal-doc="usc" parsable-cite="usc/33/579c-2">33 U.S.C. 579c–2</external-xref>) (and the item relating to such section in the table of contents) are repealed.</text></subsection></section></title><title id="HE6FAC3080B5F45E599F4993A5925728C"><enum>IV</enum><header>Water Resources Infrastructure</header><section id="H514F7AAF51084A6384FBB17B344BC35A"><enum>401.</enum><header>Project authorizations</header><text display-inline="no-display-inline">The following projects for water resources development and conservation and other purposes, as identified in the reports titled <quote>Report to Congress on Future Water Resources Development</quote> submitted to Congress pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>) or otherwise reviewed by Congress, are authorized to be carried out by the Secretary substantially in accordance with the plans, and subject to the conditions, described in the respective reports or decision documents designated in this section:</text><paragraph id="H70D3A9C799744F3EBAF4F0686D994B57"><enum>(1)</enum><header>Navigation</header><table align-to-level="section" blank-lines-before="1" colsep="1" frame="all" line-rules="all-gen" rowsep="1" rule-weights="4.4.4.4.4.0" table-template-name="Generic: 4 text, 1 num" table-type=""><tgroup cols="4" grid-typeface="1.1" rowsep="1" thead-tbody-ldg-size="10.10.12"><colspec coldef="txt-no-ldr" colname="column1" colnum="0" colwidth="44pts" min-data-value="18"></colspec><colspec coldef="txt-no-ldr" colname="column2" colnum="1" colwidth="107pts" min-data-value="50"></colspec><colspec coldef="txt-no-ldr" colname="column3" colnum="2" colwidth="144pts" min-data-value="35"></colspec><colspec coldef="txt-no-ldr" colname="column4" colnum="3" colwidth="355pts" min-data-value="80"></colspec><thead><row><entry align="center" colname="column1" morerows="0" namest="column1"><bold>A. State</bold></entry><entry align="center" colname="column2" morerows="0" namest="column2"><bold>B. <linebreak></linebreak>Name</bold></entry><entry align="center" colname="column3" morerows="0" namest="column3"><bold>C. <linebreak></linebreak>Date of <linebreak></linebreak>Report of <linebreak></linebreak>Chief of Engineers</bold></entry><entry align="center" colname="column4" morerows="0" namest="column4"><bold>D. <linebreak></linebreak>Estimated <linebreak></linebreak>Costs</bold></entry></row></thead><tbody><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">1. AK</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Port of Nome Modifications</entry><entry align="left" colname="column3" leader-modify="clr-ldr">May 29, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $368,173,000<linebreak></linebreak>Non-Federal: $122,746,000<linebreak></linebreak>Total: $490,919,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">2. AK</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Unalaska (Dutch Harbor) Channels</entry><entry align="left" colname="column3" leader-modify="clr-ldr">February 7, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $26,202,750<linebreak></linebreak>Non-Federal: $8,734,250<linebreak></linebreak>Total: $34,937,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">3. CT</entry><entry align="left" colname="column2" leader-modify="clr-ldr"> New Haven Harbor Navigation Improvement Project </entry><entry align="left" colname="column3" leader-modify="clr-ldr">May 7, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $53,489,000<linebreak></linebreak>Non-Federal: $18,822,000<linebreak></linebreak>Total: $72,311,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">4. NY, NJ</entry><entry align="left" colname="column2" leader-modify="clr-ldr">New York and New Jersey Harbor Anchorages</entry><entry align="left" colname="column3" leader-modify="clr-ldr">April 23, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $18,940,000<linebreak></linebreak>Non-Federal: $6,310,000<linebreak></linebreak>Total: $25,250,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">5. TX</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Gulf Intracoastal Waterway, Brazos River Floodgates and Colorado River Locks</entry><entry align="left" colname="column3" leader-modify="clr-ldr">October 23, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Total: $409,777,000, to be derived ½ from the general fund of the Treasury and ½ from the Inland Waterways Trust Fund.</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">6. TX</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Houston Ship Channel Expansion Channel Improvement Project, Harris, Chambers, and Galveston Counties</entry><entry align="left" colname="column3" leader-modify="clr-ldr">April 23, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $462,803,000<linebreak></linebreak>Non-Federal: $414,045,000<linebreak></linebreak>Total: $876,848,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">7. TX</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Matagorda Ship Channel Improvement Project, Port Lavaca</entry><entry align="left" colname="column3" leader-modify="clr-ldr">November 15, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $138,660,000<linebreak></linebreak>Non-Federal: $79,664,000<linebreak></linebreak>Total: $218,324,000</entry></row></tbody></tgroup></table></paragraph><paragraph id="H2DB05891EA094B0F83D8E55AA44EA385"><enum>(2)</enum><header>Flood risk management</header><table align-to-level="section" blank-lines-before="1" colsep="1" frame="all" line-rules="all-gen" rowsep="1" rule-weights="4.4.4.4.4.0" table-template-name="Generic: 4 text, 1 num" table-type=""><tgroup cols="4" grid-typeface="1.1" rowsep="1" thead-tbody-ldg-size="10.10.12"><colspec coldef="txt-no-ldr" colname="column1" colwidth="64pts" min-data-value="18"></colspec><colspec coldef="txt-no-ldr" colname="column2" colwidth="165pts" min-data-value="50"></colspec><colspec coldef="txt-no-ldr" colname="column3" colwidth="155pts" min-data-value="35"></colspec><colspec coldef="txt-no-ldr" colname="column4" colwidth="307pts" min-data-value="80"></colspec><thead><row><entry align="center" colname="column1" morerows="0" namest="column1"><bold>A. State</bold></entry><entry align="center" colname="column2" morerows="0" namest="column2"><bold>B.<linebreak></linebreak> Name</bold></entry><entry align="center" colname="column3" morerows="0" namest="column3"><bold>C. <linebreak></linebreak>Date of <linebreak></linebreak>Report of <linebreak></linebreak>Chief of Engineers</bold></entry><entry align="center" colname="column4" morerows="0" namest="column4"><bold>D. <linebreak></linebreak>Estimated <linebreak></linebreak>Costs</bold></entry></row></thead><tbody><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">1. AZ</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Little Colorado River at Winslow, Navajo County</entry><entry align="left" colname="column3" leader-modify="clr-ldr">December 14, 2018</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $52,462,000<linebreak></linebreak>Non-Federal: $28,249,000<linebreak></linebreak>Total: $80,711,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">2. CA</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Westminster, East Garden Grove, California Flood Risk Management</entry><entry align="left" colname="column3" leader-modify="clr-ldr">July 9, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $314,506,000<linebreak></linebreak>Non-Federal: $910,092,000<linebreak></linebreak>Total: $1,224,598,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">3. CT, NY</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Westchester County Streams, Byram River Basin, Fairfield County, Connecticut, and Westchester County, New York</entry><entry align="left" colname="column3" leader-modify="clr-ldr">May 7, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $14,702,500 <linebreak></linebreak>Non-Federal: $14,702,500<linebreak></linebreak>Total: $29,405,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">4. ND</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Souris River Basin Flood Risk Management</entry><entry align="left" colname="column3" leader-modify="clr-ldr">April 16, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $58,041,750 <linebreak></linebreak>Non-Federal: $31,253,250<linebreak></linebreak>Total: $89,295,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">5. NJ</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Peckman River Basin</entry><entry align="left" colname="column3" leader-modify="clr-ldr">April 29, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $95,022,000 <linebreak></linebreak>Non-Federal: $51,166,000<linebreak></linebreak>Total: $146,188,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">6. NM</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Middle Rio Grande Flood Protection, Bernalillo to Belen</entry><entry align="left" colname="column3" leader-modify="clr-ldr">March 13, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $190,538,000 <linebreak></linebreak>Non-Federal: $102,598,000<linebreak></linebreak>Total: $293,136,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">7. OK</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Tulsa and West-Tulsa Levee System, Tulsa County </entry><entry align="left" colname="column3" leader-modify="clr-ldr">April 23, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $86,780,000 <linebreak></linebreak>Non-Federal: $46,728,000<linebreak></linebreak>Total: $133,508,000</entry></row></tbody></tgroup></table></paragraph><paragraph id="H02FAF35EDF084279BD6541071DDFDF9C"><enum>(3)</enum><header>Hurricane and storm damage risk reduction</header><table align-to-level="section" blank-lines-before="1" colsep="1" frame="all" line-rules="all-gen" rowsep="1" rule-weights="4.4.4.4.4.0" table-template-name="Generic: 4 text, 1 num" table-type=""><tgroup cols="4" grid-typeface="1.1" rowsep="1" thead-tbody-ldg-size="10.10.12"><colspec coldef="txt-no-ldr" colname="column1" colnum="0" colwidth="78pts" min-data-value="18"></colspec><colspec coldef="txt-no-ldr" colname="column2" colnum="1" colwidth="146pts" min-data-value="50"></colspec><colspec coldef="txt-no-ldr" colname="column3" colnum="2" colwidth="115pts" min-data-value="35"></colspec><colspec coldef="txt-no-ldr" colname="column4" colnum="3" colwidth="339pts" min-data-value="80"></colspec><thead><row><entry align="center" colname="column1" morerows="0" namest="column1"><bold>A. State</bold></entry><entry align="center" colname="column2" morerows="0" namest="column2"><bold>B. <linebreak></linebreak>Name</bold></entry><entry align="center" colname="column3" morerows="0" namest="column3"><bold>C. <linebreak></linebreak>Date of <linebreak></linebreak>Report of <linebreak></linebreak>Chief of <linebreak></linebreak>Engineers</bold></entry><entry align="center" colname="column4" morerows="0" namest="column4"><bold>D. <linebreak></linebreak>Estimated <linebreak></linebreak>Costs</bold></entry></row></thead><tbody><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">1. DE</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Delaware Beneficial Use of Dredged Material for the Delaware River</entry><entry align="left" colname="column3" leader-modify="clr-ldr">March 6, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Initial Federal: $53,220,000<linebreak></linebreak>Initial Non-Federal: $28,660,000<linebreak></linebreak>Total: $81,880,000<linebreak></linebreak>Renourishment Federal: $116,380,000<linebreak></linebreak>Renourishment Non-Federal: $116,380,000<linebreak></linebreak>Renourishment Total: $232,760,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">2. NJ</entry><entry align="left" colname="column2" leader-modify="clr-ldr">New Jersey Beneficial Use of Dredged Material for the Delaware River </entry><entry align="left" colname="column3" leader-modify="clr-ldr">April 8, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Initial Federal: $80,780,000<linebreak></linebreak>Initial Non-Federal: $43,500,000<linebreak></linebreak>Total: $124,280,000<linebreak></linebreak>Renourishment Federal: $82,140,000<linebreak></linebreak>Renourishment Non-Federal: $82,140,000<linebreak></linebreak>Renourishment Total: $164,280,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">3. NJ</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Rahway River Basin, New Jersey Coastal Storm Risk Management</entry><entry align="left" colname="column3" leader-modify="clr-ldr">June 9, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $46,754,000<linebreak></linebreak>Non-Federal: $25,175,000<linebreak></linebreak> Total: $71,929,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">4. NY</entry><entry align="left" colname="column2" leader-modify="clr-ldr">East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, Atlantic Coast of New York</entry><entry align="left" colname="column3" leader-modify="clr-ldr">August 22, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Initial Federal: $604,203,000<linebreak></linebreak>Initial Non-Federal: $0<linebreak></linebreak>Total: $604,203,000<linebreak></linebreak>Renourishment Federal: $189,763,000<linebreak></linebreak>Renourishment Non-Federal: $189,763,000<linebreak></linebreak>Renourishment Total: $379,526,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">5. NY</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Hashamomuck Cove Coastal Storm Risk Management</entry><entry align="left" colname="column3" leader-modify="clr-ldr">December 9, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Initial Federal: $11,549,000<linebreak></linebreak>Initial Non-Federal: $6,218,000<linebreak></linebreak>Total: $17,767,000<linebreak></linebreak>Renourishment Federal: $23,481,500<linebreak></linebreak>Renourishment Non-Federal: $23,481,500<linebreak></linebreak>Renourishment Total: $46,963,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">6. RI</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Pawcatuck River Coastal Storm Risk Management Project </entry><entry align="left" colname="column3" leader-modify="clr-ldr">December 19, 2018</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $37,848,000 <linebreak></linebreak> Non-Federal: $20,379,000<linebreak></linebreak>Total: $58,227,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">7. VA</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Norfolk Coastal Storm Risk Management</entry><entry align="left" colname="column3" leader-modify="clr-ldr">February 5, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $909,040,000 <linebreak></linebreak>Non-Federal: $489,480,000<linebreak></linebreak> Total: $1,398,520,000 </entry></row></tbody></tgroup></table></paragraph><paragraph display-inline="no-display-inline" id="H3C9D589D838C48D99B2E563CD7FC5FDA"><enum>(4)</enum><header>Flood risk management and ecosystem restoration</header><table align-to-level="section" blank-lines-before="1" colsep="1" frame="all" line-rules="all-gen" rowsep="1" rule-weights="4.4.4.4.4.0" table-template-name="Generic: 4 text, 1 num" table-type=""><tgroup cols="4" grid-typeface="1.1" rowsep="1" thead-tbody-ldg-size="10.10.12"><colspec coldef="txt-no-ldr" colname="column1" colnum="0" colwidth="44pts" min-data-value="18"></colspec><colspec coldef="txt-no-ldr" colname="column2" colnum="1" colwidth="127.50pt" min-data-value="50"></colspec><colspec coldef="txt-no-ldr" colname="column3" colnum="2" colwidth="124.50pt" min-data-value="35"></colspec><colspec coldef="txt-no-ldr" colname="column4" colnum="3" colwidth="355pts" min-data-value="80"></colspec><thead><row><entry align="center" colname="column1" morerows="0" namest="column1"><bold>A. State</bold></entry><entry align="center" colname="column2" morerows="0" namest="column2"><bold>B. <linebreak></linebreak>Name</bold></entry><entry align="center" colname="column3" morerows="0" namest="column3"><bold>C. <linebreak></linebreak>Date of <linebreak></linebreak>Report of <linebreak></linebreak>Chief of Engineers</bold></entry><entry align="center" colname="column4" morerows="0" namest="column4"><bold>D. <linebreak></linebreak>Estimated <linebreak></linebreak>Costs</bold></entry></row></thead><tbody><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">1. CO</entry><entry align="left" colname="column2" leader-modify="clr-ldr">South Platte River and Tributaries, Adams and Denver Counties</entry><entry align="left" colname="column3" leader-modify="clr-ldr">July 29, 2019 </entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $334,412,000 <linebreak></linebreak>Non-Federal: $200,406,000<linebreak></linebreak>Total: $534,818,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">2. NY</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Fire Island Inlet to Montauk Point, New York Reformulation</entry><entry align="left" colname="column3" leader-modify="clr-ldr">July 9, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Initial Federal: $1,541,981,000<linebreak></linebreak>Initial Non-Federal: $0<linebreak></linebreak>Total: $1,541,981,000<linebreak></linebreak>Renourishment Federal: $742,926,500<linebreak></linebreak>Renourishment Non-Federal: $742,926,500<linebreak></linebreak>Renourishment Total: $1,485,853,000</entry></row></tbody></tgroup></table></paragraph><paragraph display-inline="no-display-inline" id="H70FB1002944048C0A9C9B68FE8AB35F6"><enum>(5)</enum><header>Ecosystem restoration</header><table align-to-level="section" blank-lines-before="1" colsep="1" frame="all" line-rules="all-gen" rowsep="1" rule-weights="4.4.4.4.4.0" table-template-name="Generic: 4 text, 1 num" table-type=""><tgroup cols="4" grid-typeface="1.1" rowsep="1" thead-tbody-ldg-size="10.10.12"><colspec coldef="txt-no-ldr" colname="column1" colnum="0" colwidth="44pts" min-data-value="18"></colspec><colspec coldef="txt-no-ldr" colname="column2" colnum="1" colwidth="120pts" min-data-value="50"></colspec><colspec coldef="txt-no-ldr" colname="column3" colnum="2" colwidth="131pts" min-data-value="35"></colspec><colspec coldef="txt-no-ldr" colname="column4" colnum="3" colwidth="355pts" min-data-value="80"></colspec><thead><row><entry align="center" colname="column1" morerows="0" namest="column1"><bold>A. State</bold></entry><entry align="center" colname="column2" morerows="0" namest="column2"><bold>B. <linebreak></linebreak>Name</bold></entry><entry align="center" colname="column3" morerows="0" namest="column3"><bold>C. <linebreak></linebreak>Date of <linebreak></linebreak>Report of <linebreak></linebreak>Chief of Engineers</bold></entry><entry align="center" colname="column4" morerows="0" namest="column4"><bold>D. <linebreak></linebreak>Estimated <linebreak></linebreak>Costs</bold></entry></row></thead><tbody><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">1. CA</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Delta Islands and Levees</entry><entry align="left" colname="column3" leader-modify="clr-ldr"> December 18, 2018</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $16,746,395 <linebreak></linebreak>Non-Federal: $9,016,736<linebreak></linebreak>Total: $25,763,131</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">2. CA</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Yuba River Ecosystem Restoration</entry><entry align="left" colname="column3" leader-modify="clr-ldr">June 20, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $65,014,326 <linebreak></linebreak>Non-Federal: $35,008,268<linebreak></linebreak>Total: $100,022,594</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">3. FL</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Comprehensive Everglades Restoration Plan, Loxahatchee River Watershed Restoration Project, Martin and Palm Beach Counties</entry><entry align="left" colname="column3" leader-modify="clr-ldr">April 8, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $372,232,000 <linebreak></linebreak>Non-Federal: $368,528,000<linebreak></linebreak>Total: $740,760,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">4. IL</entry><entry align="left" colname="column2" leader-modify="clr-ldr">The Great Lakes and Mississippi River Interbasin Study - Brandon Road, Will County</entry><entry align="left" colname="column3" leader-modify="clr-ldr">May 23, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $690,643,200 <linebreak></linebreak>Non-Federal: $172,660,800<linebreak></linebreak>Total: $863,304,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">5. IL</entry><entry align="left" colname="column2" leader-modify="clr-ldr">South Fork of the South Branch of the Chicago River, Bubbly Creek, Ecosystem Restoration</entry><entry align="left" colname="column3" leader-modify="clr-ldr">July 9, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $11,657,000 <linebreak></linebreak>Non-Federal: $6,277,000<linebreak></linebreak>Total: $17,934,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">6. MD</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Anacostia Watershed Restoration, Prince George’s County</entry><entry align="left" colname="column3" leader-modify="clr-ldr">December 19, 2018</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $23,171,000 <linebreak></linebreak>Non-Federal: $12,476,000<linebreak></linebreak>Total: $35,647,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">7. MO</entry><entry align="left" colname="column2" leader-modify="clr-ldr">St. Louis Riverfront- Meramec River Basin Ecosystem Restoration</entry><entry align="left" colname="column3" leader-modify="clr-ldr">November 1, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $60,124,000 <linebreak></linebreak>Non-Federal: $32,375,000<linebreak></linebreak>Total: $92,499,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">8. NM</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Rio Grande, Environmental Management Program, Sandia Pueblo to Isleta Pueblo, New Mexico Ecosystem Restoration</entry><entry align="left" colname="column3" leader-modify="clr-ldr">August 5, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $16,163,000 <linebreak></linebreak>Non-Federal: $8,703,000<linebreak></linebreak>Total: $24,866,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">9. NY, NJ</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Hudson-Raritan Estuary Ecosystem Restoration</entry><entry align="left" colname="column3" leader-modify="clr-ldr">May 26, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $265,320,000 <linebreak></linebreak>Non-Federal: $142,864,000<linebreak></linebreak>Total: $408,184,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">10. TX</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Jefferson County Ecosystem Restoration</entry><entry align="left" colname="column3" leader-modify="clr-ldr">September 12, 2019</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $37,615,000 <linebreak></linebreak>Non-Federal: $20,254,000<linebreak></linebreak>Total: $57,869,000</entry></row></tbody></tgroup></table></paragraph><paragraph display-inline="no-display-inline" id="H132171FD42BC44ACAF0595F9F4568BED"><enum>(6)</enum><header>Water supply</header><table align-to-level="section" blank-lines-before="1" colsep="1" frame="all" line-rules="all-gen" rowsep="1" rule-weights="4.4.4.4.4.0" table-template-name="Generic: 4 text, 1 num" table-type=""><tgroup cols="4" grid-typeface="1.1" rowsep="1" thead-tbody-ldg-size="10.10.12"><colspec coldef="txt-no-ldr" colname="column1" colnum="0" colwidth="44pts" min-data-value="18"></colspec><colspec coldef="txt-no-ldr" colname="column2" colnum="1" colwidth="94pts" min-data-value="50"></colspec><colspec coldef="txt-no-ldr" colname="column3" colnum="2" colwidth="158pts" min-data-value="35"></colspec><colspec coldef="txt-no-ldr" colname="column4" colnum="3" colwidth="355pts" min-data-value="80"></colspec><thead><row><entry align="center" colname="column1" morerows="0" namest="column1"><bold>A. State</bold></entry><entry align="center" colname="column2" morerows="0" namest="column2"><bold>B. <linebreak></linebreak>Name</bold></entry><entry align="center" colname="column3" morerows="0" namest="column3"><bold>C. <linebreak></linebreak>Date of <linebreak></linebreak>Report of <linebreak></linebreak>Chief of Engineers</bold></entry><entry align="center" colname="column4" morerows="0" namest="column4"><bold>D. <linebreak></linebreak>Estimated <linebreak></linebreak>Costs</bold></entry></row></thead><tbody><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">1. OR</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Willamette River Basin Review Reallocation,</entry><entry align="left" colname="column3" leader-modify="clr-ldr">December 18, 2019 </entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $0 <linebreak></linebreak>Non-Federal: $0<linebreak></linebreak>Total: $0</entry></row></tbody></tgroup></table></paragraph><paragraph id="H62F303B614894327BE68666F94B673DA"><enum>(7)</enum><header>Modifications and other projects</header><table align-to-level="section" blank-lines-before="1" colsep="1" frame="all" line-rules="all-gen" rowsep="1" rule-weights="4.4.4.4.4.0" table-template-name="Generic: 4 text, 1 num" table-type=""><tgroup cols="4" grid-typeface="1.1" rowsep="1" thead-tbody-ldg-size="10.10.12"><colspec coldef="txt-no-ldr" colname="column1" colwidth="64pts" min-data-value="18"></colspec><colspec coldef="txt-no-ldr" colname="column2" colwidth="165pts" min-data-value="50"></colspec><colspec coldef="txt-no-ldr" colname="column3" colwidth="155pts" min-data-value="35"></colspec><colspec coldef="txt-no-ldr" colname="column4" colwidth="307pts" min-data-value="80"></colspec><thead><row><entry align="center" colname="column1" morerows="0" namest="column1"><bold>A. State</bold></entry><entry align="center" colname="column2" morerows="0" namest="column2"><bold>B.<linebreak></linebreak> Name</bold></entry><entry align="center" colname="column3" morerows="0" namest="column3"><bold>C. <linebreak></linebreak>Date of <linebreak></linebreak>Decision <linebreak></linebreak>Document</bold></entry><entry align="center" colname="column4" morerows="0" namest="column4"><bold>D. <linebreak></linebreak>Estimated <linebreak></linebreak>Costs</bold></entry></row></thead><tbody><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">1. KY</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Kentucky Lock</entry><entry align="left" colname="column3" leader-modify="clr-ldr">June 9, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Total: $1,152,769,000 (to be derived ½ from the general fund of the Treasury and ½ from the Inland Waterways Trust Fund)</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">2. NC</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Carolina Beach Integrated Beach Renourishment </entry><entry align="left" colname="column3" leader-modify="clr-ldr">June 16, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $24,205,000<linebreak></linebreak>Non-Federal: $24,205,000<linebreak></linebreak>Total: $48,410,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">3. NC</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Wrightsville Beach </entry><entry align="left" colname="column3" leader-modify="clr-ldr">July 2, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $53,788,000<linebreak></linebreak>Non-Federal: $22,329,000 <linebreak></linebreak>Total: $76,117,000<linebreak></linebreak>Renourishment Federal: $14,553,000<linebreak></linebreak>Renourishment Non-Federal: $14,553,000<linebreak></linebreak>Renourishment Total: $29,106,000</entry></row><row><entry align="left" colname="column1" leader-modify="clr-ldr" stub-definition="txt-ldr" stub-hierarchy="1">4. TX</entry><entry align="left" colname="column2" leader-modify="clr-ldr">Corpus Christi Ship Channel, Deepening and Widening and Barge Shelves</entry><entry align="left" colname="column3" leader-modify="clr-ldr">May 4, 2020</entry><entry align="left" colname="column4" leader-modify="clr-ldr">Federal: $403,000,000 <linebreak></linebreak>Non-Federal: $273,010,000<linebreak></linebreak>Total: $676,010,000</entry></row></tbody></tgroup></table></paragraph></section><section id="H4D39529BF285475B9FAF1A1E52DA98F1" section-type="subsequent-section"><enum>402.</enum><header>Special rules</header><subsection id="H083E1E9BAAE04803A3F792C48EB248FA"><enum>(a)</enum><header>Great Lakes and Mississippi River Interbasin Project, Brandon Road, Will County, Illinois</header><text>The Secretary shall carry out the project for ecosystem restoration, Great Lakes and Mississippi River Interbasin project, Brandon Road, Will County, Illinois, authorized by section 401 of this Act, substantially in accordance with the terms and conditions described in the Report of the Chief of Engineers, dated May 23, 2019, with the following modifications:</text><paragraph id="H36CFC34E62AE40F3ACCDDB6A32445BC4"><enum>(1)</enum><text>The Federal share of the cost of construction shall be 80 percent.</text></paragraph><paragraph id="H1A1DAFD253CD4E6D87CEB74B8D4053EB"><enum>(2)</enum><text>The Secretary may include the addition or substitution of technologies or measures not described in the report, as the Secretary determines to be advisable.</text></paragraph></subsection><subsection id="H4F225BC7C0F34C0DB0CC3A0C5654157C"><enum>(b)</enum><header>Willamette River Basin review reallocation study</header><text>The Secretary shall carry out the project for water supply, Willamette River Basin Review Reallocation, Oregon, authorized by section 401 of this Act, substantially in accordance with the terms and conditions described in the Report of the Chief of Engineers, dated December 18, 2019, with the following modifications:</text><paragraph commented="no" id="HAE15333663E64B7DA0D725CD23DBC1CF"><enum>(1)</enum><text display-inline="yes-display-inline">The Secretary shall meet the obligations of the Corps of Engineers under the Endangered Species Act of 1973 by complying with the June 2019 NMFS Willamette Basin Review Study Biological Opinion Reasonable and Prudent Alternative until such time, if any, as it is modified or replaced, in whole or in part, through the consultation process under section 7(a) of the Endangered Species Act of 1973.</text></paragraph><paragraph id="H6245D1EC846E4FD0A4949E8C766A516B"><enum>(2)</enum><text>The Secretary may reallocate not more than 10 percent of overall storage in the joint conservation pool, as authorized by this Act and without further congressional action, if such reallocation is consistent with the ongoing consultation under section 7(a) of the Endangered Species Act of 1973 related to Willamette Valley System operations.</text></paragraph><paragraph id="H44C31FD40E6E4C7AB6B93E93DEDE443A"><enum>(3)</enum><text>The Secretary shall ensure that the revised reallocation is not reallocated from a single storage use, does not seriously affect authorized project purposes, and does not otherwise involve major operational changes to the project.</text></paragraph></subsection><subsection id="H35F45F016A3A492CA20EA2BB1E437B8E"><enum>(c)</enum><header>Cano Martin Pena, San Juan, Puerto Rico</header><text>Section 5127 of the Water Resources Development Act of 2007 (121 Stat. 1242) is amended by striking <quote>$150,000,000</quote> and inserting <quote>$232,430,000</quote>.</text></subsection></section><section commented="no" id="H1586E49236FD410AA898B1AC96585888"><enum>403.</enum><header>Authorization of projects based on feasibility studies prepared by non-Federal interests</header><subsection commented="no" id="H108B2AF151AC4FEB8B34ED97D225869C"><enum>(a)</enum><header>In general</header><text>The Secretary is authorized to carry out the following projects for water resources development and conservation and other purposes, subject to subsection (b):</text><paragraph commented="no" id="HBABC02C384624A93A4F31F2C09B00786"><enum>(1)</enum><header>Fort Pierce, St. Lucie County, Florida</header><text>The project for hurricane and storm damage reduction, Fort Pierce, St. Lucie County, Florida, as described in the review assessment of the Secretary, titled <quote>Review Assessment of St. Lucie County, Florida Fort Pierce Shore Protection Project Section 203 Integrated Feasibility Study and Environmental Assessment (June 2018)</quote> and dated July 2018, at a total cost of $33,107,639, and at an estimated total cost of $97,958,972 for periodic nourishment over the 50-year life of the project.</text></paragraph><paragraph commented="no" id="H1113E6EAEB574B53B94A75B9C0CF7FE2"><enum>(2)</enum><header>Baptiste Collette Bayou, Louisiana</header><text display-inline="yes-display-inline">The project for navigation, Baptiste Collette Bayou, Louisiana, as described in the review assessment of the Secretary, titled <quote>Review Assessment of Plaquemines Parish Government’s Section 203 Study Baptiste Collette Bayou Navigation Channel Deepening Project Integrated Feasibility Study and Environmental Assessment (January 2017, Amended April 2018)</quote> and dated June 2018, at a total cost of $44,920,000.</text></paragraph><paragraph commented="no" id="H111DE217D7124E4888C98FBA80810614"><enum>(3)</enum><header>Houma Navigation Canal, Louisiana</header><text display-inline="yes-display-inline">The project for navigation, Houma Navigation Canal, Louisiana, as described in the review assessment of the Secretary, titled <quote>Review Assessment of Houma Navigation Canal Deepening Project Section 203 Integrated Feasibility Report and DRAFT Environmental Impact Statement (June 2018)</quote> and dated July 2018, at a total cost of $253,458,000.</text></paragraph><paragraph commented="no" id="HF6A7897A80724E1CA76CE0B72FEC4A4B"><enum>(4)</enum><header>Chacon Creek, Texas</header><text display-inline="yes-display-inline">The project for flood risk management, ecosystem restoration, and other purposes, Chacon Creek, Texas, as described in the review assessment of the Secretary, titled <quote>Review Assessment of Chacon Creek, Texas Section 203 Integrated Feasibility Report and DRAFT Environmental Assessment (August 2018)</quote> and dated September 2018, at a total cost of $51,973,000.</text></paragraph></subsection><subsection commented="no" id="HAD6387B2FD9847B79706647D252BCB4E"><enum>(b)</enum><header>Requirements</header><text display-inline="yes-display-inline">The Secretary may only carry out a project authorized under subsection (a)—</text><paragraph commented="no" id="H3E93EC29401442F18C05249BF32BFC09"><enum>(1)</enum><text display-inline="yes-display-inline">substantially in accordance with the applicable review assessment for the project submitted by the Secretary under section 203(c) of the Water Resources Development Act of 1986, as identified in subsection (a) of this section, and subject to such modifications or conditions as the Secretary considers appropriate and identifies in a final assessment that addresses the concerns, recommendations, and conditions identified by the Secretary in the applicable review assessment; and</text></paragraph><paragraph commented="no" id="H67F460836FDB499EAB5933C1D4BC054F"><enum>(2)</enum><text display-inline="yes-display-inline">after the Secretary transmits to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate such final assessment.</text></paragraph></subsection><subsection id="H02EE44421E6F406FB08EA3A963B4C79E"><enum>(c)</enum><header>Technical correction</header><text display-inline="yes-display-inline">Section 203(c)(1) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2231">33 U.S.C. 2231(c)(1)</external-xref>) is amended, in the matter preceding subparagraph (A), by striking <quote>a report</quote> and inserting <quote>an assessment</quote>. </text></subsection></section></title></legis-body><endorsement display="yes"><action-date>July 24, 2020</action-date><action-desc>Reported from the <committee-name added-display-style="italic" committee-id="HPW00" deleted-display-style="strikethrough">Committee on Transportation and Infrastructure</committee-name> with an amendment</action-desc><action-date>July 24, 2020</action-date><action-desc>Committee on <committee-name committee-id="HBU00">the Budget</committee-name> discharged; committed to the Committee of the Whole House on the State of the Union and ordered to be printed</action-desc></endorsement></bill> 

