<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-House" bill-type="olc" dms-id="H778AB42F940340BAB825A08B504657C4" key="H" public-private="public"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>116 HR 4659 IH: Water Supply Infrastructure Rehabilitation and Utilization Act</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2019-10-11</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">I</distribution-code><congress display="yes">116th CONGRESS</congress><session display="yes">1st Session</session><legis-num display="yes">H. R. 4659</legis-num><current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber><action display="yes"><action-date date="20191011">October 11, 2019</action-date><action-desc><sponsor name-id="N000189">Mr. Newhouse</sponsor> (for himself, <cosponsor name-id="A000369">Mr. Amodei</cosponsor>, and <cosponsor name-id="S001216">Ms. Schrier</cosponsor>) introduced the following bill; which was referred to the <committee-name committee-id="HII00">Committee on Natural Resources</committee-name>, and in addition to the Committee on <committee-name committee-id="HPW00">Transportation and Infrastructure</committee-name>, for a period to be subsequently determined by the Speaker, in each case for consideration of such
			 provisions as fall within the jurisdiction of the committee concerned</action-desc></action><legis-type>A BILL</legis-type><official-title display="yes">To amend the Omnibus Public Land Management Act of 2009 to establish an Aging Infrastructure
			 Account, to amend the Reclamation Safety of Dams Act of 1978 to provide
			 additional funds under that Act, to establish a review of flood control
			 rule curves pilot project within the Bureau of Reclamation, and for other
			 purposes.</official-title></form>
	<legis-body id="H4B22985C61264ACBAE99A99AAF690B5A" style="OLC">
 <section id="H1BAC2020ACAD400C81E0E1E220A62397" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>Water Supply Infrastructure Rehabilitation and Utilization Act</short-title></quote>.</text> </section><section id="H526A54CFCAA24577ACA7E6D0B302DF54"><enum>2.</enum><header>Aging infrastructure account</header><text display-inline="no-display-inline">Section 9603 of the Omnibus Public Land Management Act of 2009 (<external-xref legal-doc="usc" parsable-cite="usc/43/510b">43 U.S.C. 510b</external-xref>) is amended by adding at the end the following:</text>
			<quoted-block display-inline="no-display-inline" id="HED57542E0A8142A7BE9FBD009306B896" style="OLC">
				<subsection id="H018058D616FE4219B7A7417D831713F0"><enum>(d)</enum><header>Aging infrastructure account</header>
 <paragraph id="H1D92F8ABA4894DC18EF7969605AEB995"><enum>(1)</enum><header>Establishment</header><text>There is established in the general fund of the Treasury a special account, to be known as the <quote>Aging Infrastructure Account</quote> (referred to in this subsection as the <quote>Account</quote>), to provide funds to, and provide for the extended repayment of the funds by, a transferred works operating entity or project beneficiary responsible for repayment of reimbursable costs for the conduct of extraordinary operation and maintenance work at a project facility, which shall consist of—</text>
 <subparagraph id="H4A529290F2BD4BC686E037B601150A3E"><enum>(A)</enum><text>any amounts that are specifically appropriated to the Account under section 9605; and</text> </subparagraph><subparagraph id="H583507A1F33946EC807C723610725992"><enum>(B)</enum><text>any amounts deposited in the Account under paragraph (3)(B).</text>
 </subparagraph></paragraph><paragraph id="H3A92087F28424B14852F60AC0A656A6E"><enum>(2)</enum><header>Expenditures</header><text>Subject to appropriations and paragraph (3), the Secretary may expend amounts in the Account to fund and provide for extended repayment of the funds for eligible projects identified in a report submitted under paragraph (5)(A).</text>
					</paragraph><paragraph id="HF4B5268B6E9C4ECBB6B349D1EF2B33D2"><enum>(3)</enum><header>Repayment contract</header>
 <subparagraph id="H30D61D3773B1449B9E7A1F94FCD3765C"><enum>(A)</enum><header>In general</header><text>The Secretary may not expend amounts under paragraph (2) with respect to an eligible project described in that paragraph unless the transferred works operating entity or project beneficiary responsible for repayment of reimbursable costs has entered into a contract to repay the amounts under subsection (b)(2).</text>
 </subparagraph><subparagraph id="H3E13857121A248DBAA5FC576312990F6"><enum>(B)</enum><header>Deposit of repaid funds</header><text>Amounts repaid by a transferred works operating entity or project beneficiary responsible for repayment of reimbursable costs receiving funds under a repayment contract entered into under this subsection shall be deposited in the Account and shall be available to the Secretary for expenditure in accordance with this subsection without further appropriation.</text>
						</subparagraph></paragraph><paragraph id="H954BBAC27FA84B69A9D5574457AF6C7E"><enum>(4)</enum><header>Application for funding</header>
 <subparagraph id="H615744BB2E8E4E8BB898CA18443409DB"><enum>(A)</enum><header>In general</header><text>Not less than once per fiscal year, the Secretary shall accept, during an application period established by the Secretary, applications from transferred works operating entities or project beneficiaries responsible for payment of reimbursable costs for funds and extended repayment for eligible projects.</text>
 </subparagraph><subparagraph id="H83382841CFE04CF6AC7F393AC5D2187F"><enum>(B)</enum><header>Eligible project</header><text>A project eligible for funding and extended repayment under this subsection is a project that—</text> <clause id="HF94B95FC1F8E4C4FB8887FF550F4FB25"><enum>(i)</enum><text>qualifies as an extraordinary operation and maintenance work under this section;</text>
 </clause><clause id="H3911E28AD5494C048DF224007C2C93A5"><enum>(ii)</enum><text>is for the major, non-recurring maintenance of a mission-critical asset; and</text> </clause><clause id="H8D57B291590D4E17A165B790F48E24E9"><enum>(iii)</enum><text>is not eligible to be carried out or funded under the repayment provisions of section 4(c) of the Reclamation Safety of Dams Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/43/508">43 U.S.C. 508(c)</external-xref>).</text>
 </clause></subparagraph><subparagraph id="H5FCBE32A7488401EAD0FE90CE3D45D0E"><enum>(C)</enum><header>Guidelines for applications</header><text>Not later than 60 days after the date of enactment of this subsection, the Secretary shall issue guidelines describing the information required to be provided in an application for funding and extended repayment under this subsection that require, at a minimum—</text>
 <clause id="H18A8F6390B2F408092CA989D49898D16"><enum>(i)</enum><text>a description of the project for which the funds are requested;</text> </clause><clause id="HDBABE692A3964FC1A27491E5C78E3E1D"><enum>(ii)</enum><text>the amount of funds requested;</text>
 </clause><clause id="H6D1F00A7A19D4F408748EE9A2EE20906"><enum>(iii)</enum><text>the repayment period requested by the transferred works operating entity or project beneficiary responsible for repayment of reimbursable costs;</text>
 </clause><clause id="H61AB738568A04245B95F9074FD6EB909"><enum>(iv)</enum><text>alternative non-Federal funding options that have been evaluated;</text> </clause><clause id="H56444F063F7E42D5A890411584A13AE9"><enum>(v)</enum><text>the financial justification for requesting an extended repayment period; and</text>
 </clause><clause id="HB77F106D8143467893AB97B4A13E5577"><enum>(vi)</enum><text>the financial records of the transferred works operating entity or project beneficiary responsible for repayment of reimbursable costs.</text>
 </clause></subparagraph><subparagraph id="H5795DC90F905435EACF8F676E17E6590"><enum>(D)</enum><header>Review by the secretary</header><text>The Secretary shall review each application submitted under subparagraph (A)—</text> <clause id="H7CD58E1444DD4328AE82DEE9B20E8AB8"><enum>(i)</enum><text>to determine whether the project is eligible for funds and an extended repayment period under this subsection;</text>
 </clause><clause id="H2E8B2BDBCE524E34BD8A7A177294418B"><enum>(ii)</enum><text>to determine if the project has been identified by the Bureau of Reclamation as part of the major rehabilitation and replacement of a project facility; and</text>
 </clause><clause id="H45698C6759DC4F32ADEDD51BEA0F9796"><enum>(iii)</enum><text>to conduct a financial analysis of—</text> <subclause id="HD9323956A26C4ABBA5A5A5E6AE538A24"><enum>(I)</enum><text>the project; and</text>
 </subclause><subclause id="H5A6A00A6CA504FB6A49BC025C0689BD2"><enum>(II)</enum><text>the transferred works operating entity or project beneficiary responsible for repayment of reimbursable costs.</text>
 </subclause></clause></subparagraph></paragraph><paragraph id="HE563339D0AB54D84A417F6F30CD451B3"><enum>(5)</enum><header>Report</header><text>Not later than 90 days after the date on which an application period closes under paragraph (4)(A), the Secretary shall submit to the Committees on Energy and Natural Resources and Appropriations of the Senate and the Committees on Natural Resources and Appropriations of the House of Representatives a report that—</text>
 <subparagraph id="H405020F4929A481684DA3493030C15B0"><enum>(A)</enum><text>identifies each project eligible for funding and extended repayment under this subsection;</text> </subparagraph><subparagraph id="HAD18C40D574E4B6BB6988F09642362F1"><enum>(B)</enum><text>with respect to each eligible project identified under subparagraph (A), includes—</text>
 <clause id="H2D3BF09633414D298FD35ECE21552949"><enum>(i)</enum><text>a description of—</text> <subclause id="HFC49A34FFFD94E769E5C6C50F08BA671"><enum>(I)</enum><text>the eligible project;</text>
 </subclause><subclause id="H2C9C430A29224194BBA86C241CE2A524"><enum>(II)</enum><text>the anticipated cost and duration of the eligible project; and</text> </subclause><subclause id="H55F1A7C83416448F9057F9D856A79A48"><enum>(III)</enum><text>any remaining engineering or environmental compliance that is required before the eligible project commences;</text>
 </subclause></clause><clause id="HAA9E1E74CAD84D21B125AA90E0077210"><enum>(ii)</enum><text>an analysis of—</text> <subclause id="H4B455345FB304BFABAE81D8491DECFDD"><enum>(I)</enum><text>the repayment period proposed in the application; and</text>
 </subclause><subclause id="H4D54A26B62194C188E6C78470F0A0DD1"><enum>(II)</enum><text>if the Secretary recommends a minimum necessary repayment period that is different than the repayment period proposed in the application, the minimum necessary repayment period recommended by the Secretary; and</text>
 </subclause></clause><clause id="H2DA87E6AA84E42CB94C12E8776E280D3"><enum>(iii)</enum><text>an analysis of alternative non-Federal funding options; and</text> </clause></subparagraph><subparagraph id="HD2C7AB25F7A347F08F06789F3D0D4230"><enum>(C)</enum><text>describes the balance of funds in the Account as of the date of the report.</text>
 </subparagraph></paragraph><paragraph id="H4C3CC00ACAF04933867BAB7F19241F9B"><enum>(6)</enum><header>Effect of subsection</header><text>Nothing in this subsection affects—</text> <subparagraph id="HACBEA852F19A4251BBFA7E09796FCA1D"><enum>(A)</enum><text>any funding provided, or contracts entered into, under subsection (a) before the date of enactment of this subsection; or</text>
 </subparagraph><subparagraph id="HEAD95540CBB34C258733927510D40172"><enum>(B)</enum><text>the use of funds otherwise made available to the Secretary to carry out subsection (a).</text></subparagraph></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block> </section><section id="H53AA2FC1C08A42E6907228AAD65D4232"><enum>3.</enum><header>Authorization of appropriations for the Reclamation Safety of Dams Act of 1978</header><text display-inline="no-display-inline">Section 5 of the Reclamation Safety of Dams Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/43/509">43 U.S.C. 509</external-xref>) is amended, in the first sentence, by inserting <quote>, and, effective October 1, 2019, not to exceed an additional $550,000,000 (October 1, 2019, price levels)</quote> before <quote>, plus or minus</quote>.</text>
		</section><section id="HDFC108122E984B1F8377A9FD9373C894"><enum>4.</enum><header>Review of flood control rule curves pilot project</header>
 <subsection id="H0BFB713ED9E2416BB3E423854941E0A3"><enum>(a)</enum><header>Definitions</header><text>In this section:</text> <paragraph id="H06475C6AC23C40B6B55E9D0CEF24D5F3"><enum>(1)</enum><header>Bureau</header><text>The term <term>Bureau</term> means the Bureau of Reclamation.</text>
				</paragraph><paragraph id="H4CFA97C029F344428E5EC8F12901EA30"><enum>(2)</enum><header>Eligible works</header>
 <subparagraph id="H951FAC08A05648BBAF2FE3799548FBAB"><enum>(A)</enum><header>In general</header><text>The term <term>eligible works</term> means a reserved works, or a transferred works for which—</text> <clause id="H6FBB454A2D384F27B54DF47E46B33EE3"><enum>(i)</enum><text>the flood control rule curve has not been substantially adjusted during the 10-year period ending on the date of enactment of this Act; and</text>
 </clause><clause id="H7DCAF1DDECCE41CE958745E8199D7C21"><enum>(ii)</enum><text>the Secretary receives a request in accordance with subsection (c)(1)(A).</text> </clause></subparagraph><subparagraph id="H49A9226269954762B43FA06569FBB740"><enum>(B)</enum><header>Exclusions</header><text>The term <term>eligible works</term> does not include—</text>
 <clause id="HAD06307014604339B977838F9AECC03F"><enum>(i)</enum><text>any project authorized by the Boulder Canyon Project Act (<external-xref legal-doc="usc" parsable-cite="usc/43/617">43 U.S.C. 617</external-xref> et seq.);</text> </clause><clause id="HC86D0F498BCE42D696E765449261DCEC"><enum>(ii)</enum><text>any project authorized by the Act of April 11, 1956 (commonly known as the <quote>Colorado River Storage Project Act</quote>) (<external-xref legal-doc="usc" parsable-cite="usc/43/620">43 U.S.C. 620</external-xref> et seq.); or</text>
 </clause><clause id="H535CA96580DE41E99304E8647C85BD5D"><enum>(iii)</enum><text>any project of the Pick-Sloan Missouri River Basin Program (authorized by section 9 of the Act of December 22, 1944 (commonly known as the <quote>Flood Control Act of 1944</quote>) (58 Stat. 891, chapter 665)).</text>
 </clause></subparagraph></paragraph><paragraph id="H573A5AEE22C3411599E7EE5E99719933"><enum>(3)</enum><header>Pilot project</header><text>The term <term>pilot project</term> means the pilot project established under subsection (b).</text> </paragraph><paragraph id="H7DE8ED5A34B74C868529EF0551D9FBFF"><enum>(4)</enum><header>Responsible party</header><text>The term <term>responsible party</term> means—</text>
 <subparagraph id="H28FFFB861144484AB3862BE544E4F192"><enum>(A)</enum><text>with respect to a reserved works—</text> <clause id="HB43318C338D442A4B9DA1D1CFD73BE16"><enum>(i)</enum><text>a non-Federal water user or power contractor that has an active repayment, water service, or power service contract with the Bureau;</text>
 </clause><clause id="H43A496C246724D2BB4B92A9C792290D5"><enum>(ii)</enum><text>a power contractor that has an active contract with a Federal power marketing administration for energy, capacity, or energy and capacity, from a hydropower facility owned by the Bureau; or</text>
 </clause><clause id="H504AB3AC59BA43AD8B09D4F0B1815759"><enum>(iii)</enum><text>a non-Federal operating entity, including a joint powers authority or board of control, that has assumed responsibility on behalf of multiple water users, through a contract with the Bureau, for the operation and maintenance of the reserved works; and</text>
 </clause></subparagraph><subparagraph id="HB715508CFD5047E3AD7375F0C6067A6B"><enum>(B)</enum><text>with respect to a transferred works, the operating entity of the transferred works.</text> </subparagraph></paragraph><paragraph id="HDDCA387B0FA846AF90C0F5F01748C0D2"><enum>(5)</enum><header>Secretary</header><text>The term <term>Secretary</term> means Secretary of the Interior.</text>
 </paragraph></subsection><subsection id="HF9DFBED46CD2437B85F73883ACAB84A9"><enum>(b)</enum><header>Establishment of pilot project</header><text>The Secretary, in consultation with the Secretary of the Army, shall establish within the Bureau a pilot project to adjust flood control rule curves in accordance with subsection (d).</text>
			</subsection><subsection id="HAEE532ACA44E444C8F07AA1AEC207468"><enum>(c)</enum><header>Selection of eligible works</header>
				<paragraph id="H7A3BC380AE94428696D52D20CD56E083"><enum>(1)</enum><header>Request</header>
 <subparagraph id="H336FE5F3C2B84119BB28602452B3BD83"><enum>(A)</enum><header>In general</header><text>In order for an eligible works to be selected for inclusion in the pilot project, a responsible party shall submit a written request to the Secretary seeking a flood control rule curve adjustment.</text>
 </subparagraph><subparagraph id="H80581BFBE24B46369C000F783BCC3AD9"><enum>(B)</enum><header>Notice</header><text>Not later than 30 days after the date on which the Secretary receives a request under subparagraph (A), the Secretary shall notify—</text>
 <clause id="H3123A13F1B0D4847B20D155F42909802"><enum>(i)</enum><text>each responsible party of that request, using lists maintained by the Bureau; and</text> </clause><clause id="H7DB72F754D8B47C7BB746900D6CA4897"><enum>(ii)</enum><text>if applicable, the appropriate Federal power marketing administration.</text>
 </clause></subparagraph></paragraph><paragraph id="H3CDF5A7DA38B4275A6A6A973064C58A5"><enum>(2)</enum><header>Selection</header><text>Each year, the Secretary shall—</text> <subparagraph id="H61565703ECFD468CA08B3656C63103B9"><enum>(A)</enum><text>select 1 or more eligible works for inclusion in the pilot project; and</text>
 </subparagraph><subparagraph id="HF7254412A8C14831B6BD47C0B2B4C658"><enum>(B)</enum><text>submit a list of those eligible works to—</text> <clause id="H9EE6DD5A3208431FABC36D0D0D204B17"><enum>(i)</enum><text>the Secretary of the Army;</text>
 </clause><clause id="H24745C01933843DAAEE6A41AC485CF32"><enum>(ii)</enum><text>the Committee on Natural Resources of the House of Representatives; and</text> </clause><clause id="HB6D54E96F8C941A6AC98CCE0FD1401C9"><enum>(iii)</enum><text>the Committee on Energy and Natural Resources of the Senate.</text>
 </clause></subparagraph></paragraph><paragraph id="H6DA3E195916C4A919A9E8E8AD4A40BD9"><enum>(3)</enum><header>Exclusion</header><text>The Secretary shall not select an eligible works for inclusion in the pilot project under paragraph (2)(A) if, not later than 60 days after the date on which the notice is provided to each responsible party under paragraph (1)(B)(i), a majority of the responsible parties submit to the Secretary an objection to the inclusion of the eligible works in the pilot project.</text>
				</paragraph></subsection><subsection id="H6219C47ED5EE4F129936D1A419C943FD"><enum>(d)</enum><header>Adjustment of a flood control rule</header>
 <paragraph id="H179BDC6BD5824EBF8F650D87B12CBD64"><enum>(1)</enum><header>In general</header><text>The flood control rule curve of an eligible works shall be adjusted pursuant to section 7 of the Act of December 22, 1944 (<external-xref legal-doc="usc" parsable-cite="usc/33/709">33 U.S.C. 709</external-xref>), if the Secretary of the Army determines that the adjustment would enhance the authorized purposes of the eligible works.</text>
 </paragraph><paragraph id="HC695289E5D744B64BD00342FC475E0F3"><enum>(2)</enum><header>Considerations</header><text>In the adjustment of a flood control rule curve under paragraph (1), the following factors shall be considered:</text>
 <subparagraph id="H7C5A6F37FCB84D078063269113FB9560"><enum>(A)</enum><text>Forecast-informed reservoir operations.</text> </subparagraph><subparagraph id="HF6E8D7DA5D9042C6BF75CBAF46583F1F"><enum>(B)</enum><text>Improved hydrologic forecasting for—</text>
 <clause id="H99A54511AA8B4D8E9D86CD411F5C09AF"><enum>(i)</enum><text>precipitation;</text> </clause><clause id="H2EACD791A76C4AA1A1F52F8F60E82F91"><enum>(ii)</enum><text>snowpack;</text>
 </clause><clause id="HB079C09AF24345ADBBBD4F6B8E22D71D"><enum>(iii)</enum><text>runoff; and</text> </clause><clause id="H5AADCC81A0E6417D8EA4DCD33A8307C7"><enum>(iv)</enum><text>soil moisture conditions.</text>
 </clause></subparagraph><subparagraph id="H5156F2426FDB4D1A992DFA02EAE6B3BE"><enum>(C)</enum><text>Any new watershed data, including data provided by a responsible party for the eligible works.</text> </subparagraph></paragraph><paragraph id="HD87881A5A74A472FA1D45C8DF73A3EC3"><enum>(3)</enum><header>Consultation</header><text>In the adjustment of a flood control rule curve under paragraph (1), the following entities shall be consulted:</text>
 <subparagraph id="H270A16E325364748A70134FB56B0BE50"><enum>(A)</enum><text>Each responsible party for the eligible works.</text> </subparagraph><subparagraph id="H6C6C17F4415B4F34972DB3BB539EC30C"><enum>(B)</enum><text>In the case of an eligible works that produces power marketed by the Federal Government, the Federal power marketing administration that markets the power.</text>
 </subparagraph><subparagraph id="HEB047C096581477FAB6087247315CDDC"><enum>(C)</enum><text>The Secretary.</text> </subparagraph></paragraph></subsection><subsection id="H701E4ABA28284F35A56217FD2BC7CF2E"><enum>(e)</enum><header>Consultation</header><text>The Secretary shall consult with the Secretary of the Army with respect to any action taken by the Secretary of the Army—</text>
 <paragraph id="H5F8957D62F2F4487BCB887938E0D368A"><enum>(1)</enum><text>pursuant to section 7 of the Act of December 22, 1944 (<external-xref legal-doc="usc" parsable-cite="usc/33/709">33 U.S.C. 709</external-xref>); and</text> </paragraph><paragraph id="H6C6323D7D26C4F3EA70F851E923F23B5"><enum>(2)</enum><text>that relates to the pilot project.</text>
 </paragraph></subsection><subsection id="HC08C0D4FFB22442DBD41E30E1D997CDC"><enum>(f)</enum><header>Funding</header><text>The Secretary or the Secretary of the Army, as appropriate, may accept amounts from responsible parties for eligible works to fund all or a portion of the cost of carrying out an adjustment of a flood control rule under subsection (d), including a review or revision of operational documents (including water control plans, water control manuals, water control diagrams, release schedules, rule curves, operational agreements with non-Federal entities, and any associated environmental documentation).</text>
 </subsection><subsection id="H7D23BFA993604364BF43850EFE01A5AF"><enum>(g)</enum><header>Effect</header><text>Nothing in this section—</text> <paragraph id="HED891FF50485478C8A49E332C5768911"><enum>(1)</enum><text>affects or modifies any existing authority to review or modify—</text>
 <subparagraph id="HD4748FAD1E9240A1AC3A46EFAD901FF8"><enum>(A)</enum><text>reservoir operations, including any existing forecast-informed reservoir operations at a facility of the Corps of Engineers, such as Coyote Dam; and</text>
 </subparagraph><subparagraph id="H18E294CF42DE4ADEB57310E84DAC48AD"><enum>(B)</enum><text>flood control operations; or</text> </subparagraph></paragraph><paragraph id="HE79D1B39130F4836A29F92D5043C58B6"><enum>(2)</enum><text>affects or modifies any authorized purpose of any project carried out by the Secretary.</text>
				</paragraph></subsection><subsection id="H8579A874E7B749EBA33C9AD345FF3C0E"><enum>(h)</enum><header>Termination</header>
 <paragraph id="H2FEDEBEA389042F0BE4DD285BB60DE53"><enum>(1)</enum><header>In general</header><text>The pilot project shall terminate on the date that is 15 years after the date of enactment of this Act.</text>
 </paragraph><paragraph commented="no" display-inline="no-display-inline" id="HD2AFCF0CB8F34223A376F62453B961E6"><enum>(2)</enum><header>Effect</header><text>Termination of the pilot project under paragraph (1) shall not affect any flood control rule curve developed as part of the pilot project.</text>
				</paragraph></subsection></section></legis-body></bill>


