<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-House" bill-type="olc" dms-id="HCEE5264A94484DB88527E5DA2C15D44F" key="H" public-private="public"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>116 HR 1744 IH: Storage Technology for Operational Readiness And Generating Energy Act</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2019-03-13</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">I</distribution-code><congress display="yes">116th CONGRESS</congress><session display="yes">1st Session</session><legis-num display="yes">H. R. 1744</legis-num><current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber><action display="yes"><action-date date="20190313">March 13, 2019</action-date><action-desc><sponsor name-id="T000472">Mr. Takano</sponsor> (for himself and <cosponsor name-id="C001092">Mr. Collins of New York</cosponsor>) introduced the following bill; which was referred to the <committee-name committee-id="HIF00">Committee on Energy and Commerce</committee-name>, and in addition to the <committee-name committee-id="HSY00">Committee on Science, Space, and Technology</committee-name>, for a period to be subsequently determined by the Speaker, in each case for consideration of such
			 provisions as fall within the jurisdiction of the committee concerned</action-desc></action><legis-type>A BILL</legis-type><official-title display="yes">To provide for the consideration of energy storage systems by electric utilities as part of a
			 supply side resource process, and for other purposes.</official-title></form>
	<legis-body id="HD84C9E9BE6F74B379943E36FF62E9011" style="OLC">
 <section id="H7FD68AC7E0844F46B3B19E2401C8FE64" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>Storage Technology for Operational Readiness And Generating Energy Act</short-title></quote> or the <quote><short-title>S.T.O.R.A.G.E. Act</short-title></quote>.</text> </section><section id="H6B579669C5C448E7A6D79D6FDD4FE688"><enum>2.</enum><header>Consideration of energy storage systems</header> <subsection id="HAF75FBBDBC9E40B2B0C09351D79DE4AA"><enum>(a)</enum><header>In general</header><text>Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2621">16 U.S.C. 2621(d)</external-xref>) is amended by adding at the end the following:</text>
				<quoted-block id="H7B48BE283CC5436AA4C3BBD378B0458C" style="OLC">
 <paragraph id="H47754558EE78408F8CF4750A4970AEC1"><enum>(20)</enum><header>Consideration of energy storage systems</header><text>Each State shall consider requiring that, as part of a supply side resource planning process, an electric utility of the State demonstrate to the State that the electric utility considered an investment in energy storage systems based on appropriate factors, including—</text>
 <subparagraph id="H50414E23E319410AB9DFA60443E5C8CD"><enum>(A)</enum><text>total costs and normalized life cycle costs;</text> </subparagraph><subparagraph id="H021BF2939C4946418B47C903B80D3E02"><enum>(B)</enum><text>cost effectiveness;</text>
 </subparagraph><subparagraph id="H15A43AA379E64C50A012243EA6E458D1"><enum>(C)</enum><text>improved reliability;</text> </subparagraph><subparagraph id="H188294721CD9456E865AEB0F60D3E4C5"><enum>(D)</enum><text>security; and</text>
 </subparagraph><subparagraph id="HEFBB77D6DD364071B113F641CC85573A"><enum>(E)</enum><text>system performance and efficiency.</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block> </subsection><subsection id="HBEA3A70CCBAD435DA46115E1602027CB"><enum>(b)</enum><header>Time limitations</header><text>Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2622">16 U.S.C. 2622(b)</external-xref>) is amended by adding at the end the following:</text>
				<quoted-block id="HBFB473C30BEB43DBBC7C36FD2972407B" style="OLC">
					<paragraph id="H0A3C4AC1C4144090AA62310C73E58E6E"><enum>(7)</enum>
 <subparagraph commented="no" display-inline="yes-display-inline" id="H895CDC9E7FB845BD9376DFE44B251159"><enum>(A)</enum><text>Not later than 1 year after enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State regulatory authority has ratemaking authority) and each nonregulated utility shall commence the consideration referred to in section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (20) of section 111(d).</text>
 </subparagraph><subparagraph id="H5356CA16D0BD42D793422FB21C6FA49E" indent="up1"><enum>(B)</enum><text>Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State regulatory authority has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 111 with respect to the standard established by paragraph (20) of section 111(d).</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block>
 </subsection><subsection id="H235D49804C8942379A6088D48ECED7BB"><enum>(c)</enum><header>Failure To comply</header><text>Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2622">16 U.S.C. 2622(c)</external-xref>) is amended by adding at the end the following: <quote>In the case of the standard established by paragraph (20) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph.</quote>.</text>
 </subsection><subsection id="H76A93C416E5F4A2989429D2C7E0D5E7B"><enum>(d)</enum><header>Prior state actions</header><text>Section 112(d) of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2622">16 U.S.C. 2622(d)</external-xref>) is amended in the matter preceding paragraph (1) by striking <quote>(19)</quote> and inserting <quote>(20)</quote>.</text>
 </subsection></section><section id="H7D7D70CC817547DDB98BAC27C8D69D60"><enum>3.</enum><header>Coordination of programs</header><text display-inline="no-display-inline">To the maximum extent practicable, the Secretary of Energy shall ensure that the funding and administration of the different offices within the Grid Modernization Initiative of the Department of Energy and other programs conducting energy storage research are coordinated and streamlined.</text>
		</section></legis-body></bill>


