<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-House" bill-type="olc" dms-id="H50ED12E29496497CABF4C149D1747A92" key="H" public-private="public"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>116 HR 1292 IH: Border Community Input in Border Security Act</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2019-02-14</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">I</distribution-code><congress display="yes">116th CONGRESS</congress><session display="yes">1st Session</session><legis-num display="yes">H. R. 1292</legis-num><current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber><action display="yes"><action-date date="20190214">February 14, 2019</action-date><action-desc><sponsor name-id="V000132">Mr. Vela</sponsor> (for himself and <cosponsor name-id="T000193">Mr. Thompson of Mississippi</cosponsor>) introduced the following bill; which was referred to the <committee-name committee-id="HHM00">Committee on Homeland Security</committee-name></action-desc></action><legis-type>A BILL</legis-type><official-title display="yes">To amend the Homeland Security Act of 2002 to require border community stakeholder consultation
			 before the Secretary of Homeland Security may construct, install, deploy,
			 operate, or maintain additional physical barriers, tactical
			 infrastructure, or technology between ports of entry along the land border
			 with Mexico, and for other purposes.</official-title></form>
	<legis-body id="H31AA79D76F2C43A89FDCAD999B919162" style="OLC">
 <section id="HF78FB253280341DB87972B1BE607F4E3" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>Border Community Input in Border Security Act</short-title></quote>.</text> </section><section id="HEE321715164E4FCC9C1DA927A6DE2AEF"><enum>2.</enum><header>Border community stakeholder consultation</header> <subsection id="HDA6C37A5796B43CDAF4F171D00DCED12"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Subtitle H of title VIII of the Homeland Security Act of 2002 (<external-xref legal-doc="usc" parsable-cite="usc/6/451">6 U.S.C. 451</external-xref> et seq.) is amended by adding at the end the following:</text>
				<quoted-block id="H762E3BE1C4D04BC0B0AB0CFD31D3A44E" style="OLC">
					<section id="H20EC84D9052D474E8FAF377FDCE34A39"><enum>890B.</enum><header>Border community stakeholder consultation</header>
 <subsection id="H5D9756F75A264043834D9187767AC822"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Notwithstanding section 102 of the Illegal Immigration Reform and Immigrant Responsibility Act of 1996, the Secretary may not construct, install, deploy, operate, or maintain additional physical barriers, tactical infrastructure, or technology (including the removal of obstacles for such purpose) between ports of entry in a Border Patrol sector along the land border with Mexico until the Secretary publishes in the Federal Register a final mitigation plan with respect to such sector to minimize in such sector the impact on the economic, environmental, ecological, historical, cultural, commercial, or other quality of life factors for the communities and residents located near the sites at which any such physical barriers, tactical infrastructure, or technology are to be constructed, installed, deployed, operated, or maintained (or obstacles are to be removed), as the case may be. Such final mitigation plan shall be developed in accordance with this section.</text>
 </subsection><subsection id="H8DD5EB1CC3B946BA8C7269259B416D2E"><enum>(b)</enum><header>Initial mitigation plan</header><text>The Secretary shall publish on a publicly available website of the Department an announcement regarding any removal, construction, installation, deployment, operation, or maintenance described in subsection (a). Such announcement shall—</text>
 <paragraph id="HBED8846B22754C759BDF3562EFEF3945"><enum>(1)</enum><text>explain the basis for the Secretary’s determination that any such removal, construction, installation, deployment, operation, or maintenance, as the case may be, is the most practical and effective method to achieve situational awareness and operational control at the site in the Border Patrol sector at issue along such border;</text>
 </paragraph><paragraph id="H2DD3BF096425453BA15884CD00CCB957"><enum>(2)</enum><text>include, with respect to any such removal, construction, installation, deployment, operation, or maintenance, an initial mitigation plan to minimize the impact on the economic, environmental, ecological, historical, cultural, commercial, or other quality of life factors for border community stakeholders;</text>
 </paragraph><paragraph id="HFFBA771DE84E41158150E6218FDC0B0C"><enum>(3)</enum><text>provide an opportunity for written feedback and input from border community stakeholders; and</text> </paragraph><paragraph id="HECD2E48B08A444C79F49346EDC1CE885"><enum>(4)</enum><text>include the dates, times, and places for at least two public meetings in locations within 20 miles of each site for which the Secretary makes a determination pursuant to paragraph (1) for the purpose of soliciting feedback and input from border community stakeholders regarding such initial mitigation plan.</text>
 </paragraph></subsection><subsection id="H88121044315247DF988BCA81798B1D63"><enum>(c)</enum><header>Final mitigation plan</header><text>After receiving feedback and input under subsection (b) regarding an initial mitigation plan, the Secretary shall develop a final mitigation plan taking into consideration such feedback and input. The Secretary shall publish in the Federal Register such final mitigation plan.</text>
 </subsection><subsection id="H00E705391F664B6DAFBDCCE19BF9EAD2"><enum>(d)</enum><header>Updates to final mitigation plan</header><text display-inline="yes-display-inline">The Secretary shall update a final mitigation plan under this section if significant construction, installation, deployment, operation, or maintenance of additional physical barriers, tactical infrastructure, or technology (including the removal of obstacles for such purpose) is determined necessary. Any such update shall—</text>
 <paragraph id="HEEAEB98CB5FC434089A6503BF6F276B4"><enum>(1)</enum><text>be published on a publicly available website of the Department;</text> </paragraph><paragraph id="H490D6DEF1C7E49A584F43734EC3FFDDC"><enum>(2)</enum><text>meet the requirement described in subsection (b)(1); and</text>
 </paragraph><paragraph id="HEA678021D9F84BB69F263F8E9F343CDD"><enum>(3)</enum><text>provide an opportunity for written feedback and input from border community stakeholders.</text> </paragraph></subsection><subsection id="HAD37140C57AC41C782178E2CA75B1B29"><enum>(e)</enum><header>Notification</header><text>Not more than 90 days before commencing any construction, installation, deployment, operation, or maintenance of additional physical barriers, tactical infrastructure, or technology (including removal of obstacles for such purpose) at a site in a Border Patrol sector in accordance with this section, the Secretary shall provide the Comptroller General of the United States, the Committee on Homeland Security of the House of Representatives, and the Committee on Homeland Security and Governmental Affairs of the Senate with the following:</text>
 <paragraph id="H16CEFB05A61F4DCD92EDB645B6308899"><enum>(1)</enum><text>The final mitigation plan under subsection (c) or an updated final mitigation plan under subsection (d), together with information relating to the feedback and input received in accordance with subsection (b) or subsection (d), respectively.</text>
 </paragraph><paragraph id="H31CA3CC1CDCF4C93B45C94F7486EBA9C"><enum>(2)</enum><text>Information on the following:</text> <subparagraph id="HD8E04E877E894B8F85D84F256F0489CB"><enum>(A)</enum><text>The type of additional physical barriers, tactical infrastructure, or technology the Secretary has determined is most practical and effective to achieve situational awareness and operational control at such site.</text>
 </subparagraph><subparagraph id="H479DF77C08D9441CA7DF4189FB78FB28"><enum>(B)</enum><text>The associated timeline for the construction, installation, deployment, operation, or maintenance of such additional physical barriers, tactical infrastructure, or technology (including removal of obstacles for such purpose).</text>
 </subparagraph><subparagraph id="H7CAC2F44623F41E193D10F2A8CBABF71"><enum>(C)</enum><text>Projected costs, analysis of alternatives, and plans for such removal, construction, installation, deployment, operation, or maintenance or such additional physical barriers, tactical infrastructure, or technology, together with specific information on how much of such site is privately owned and may be subject to eminent domain.</text>
 </subparagraph></paragraph></subsection><subsection id="HAC19D6487CD64D8DB303E54D0AD29140"><enum>(f)</enum><header>Definitions</header><text>In this section:</text> <paragraph id="HE9031328472441AB8CB36F1E38A4A1C8"><enum>(1)</enum><header>Border community stakeholders</header><text>The term <quote>border community stakeholders</quote> means, with respect to sites in Border Patrol sectors at which construction, installation, deployment, operation, or maintenance of additional physical barriers, tactical infrastructure, or technology (including removal of obstacles for such purpose) is the subject of an initial, final, or updated final mitigation plan under this section—</text>
 <subparagraph id="H007333A9270D4F6C93DE07FC59E79BD2"><enum>(A)</enum><text>private property owners of such sites;</text> </subparagraph><subparagraph id="HBD7F9C0E28FB4E1CB50A3DA001F2D7AB"><enum>(B)</enum><text>State or local governments or Indian tribes that own, manage, or administer such sites or the use of resources of such sites; and</text>
 </subparagraph><subparagraph id="HF39FE31B22D74E10901946824D197F30"><enum>(C)</enum><text>other individuals who could be impacted by such departmental action, as determined by the Secretary.</text>
 </subparagraph></paragraph><paragraph id="H1FBC5CC3C95246D5A33E49ED53B00B86"><enum>(2)</enum><header>Operational control</header><text display-inline="yes-display-inline">The term <quote>operational control</quote> has the meaning given such term in section 2 of the Secure Fence Act of 2006 (<external-xref legal-doc="public-law" parsable-cite="pl/109/367">Public Law 109–367</external-xref>; <external-xref legal-doc="usc" parsable-cite="usc/8/1701">8 U.S.C. 1701</external-xref> note).</text>
 </paragraph><paragraph id="HC2F2137025D74B4DA8644C467FC550A5"><enum>(3)</enum><header>Property</header><text>The term <quote>property</quote> means land, including an estate or interest in land, including an easement or right of way in land.</text></paragraph></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block>
 </subsection><subsection id="HA61CF34D2E1A42B9AB1F42A161E7569A"><enum>(b)</enum><header>Clerical amendment</header><text>The table of contents in section 1(b) of the Homeland Security Act of 2002 is amended by inserting after the item relating to section 890A the following new item:</text>
				<quoted-block display-inline="no-display-inline" id="H6B3811B4544F406F90DB94B169C73E54" style="OLC">
					<toc regeneration="no-regeneration">
						<toc-entry level="section">Sec. 890B. Border community stakeholder consultation.</toc-entry></toc><after-quoted-block>.</after-quoted-block></quoted-block>
			</subsection></section></legis-body></bill>


