<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE amendment-doc PUBLIC "-//US Congress//DTDs/amend.dtd//EN" "amend.dtd">
<amendment-doc amend-stage="proposed" amend-type="engrossed-amendment" amend-degree="first" key="H"> 
<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>115 S3021 EAH: America’s Water Infrastructure Act of 2018</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2018-09-13</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<engrossed-amendment-form>
<distribution-code display="no"><?xm-replace_text {distribution code}?></distribution-code> 
<congress display="yes">115th CONGRESS</congress><session display="yes">2d Session</session> 
<current-chamber display="yes">In the House of Representatives, U. S.,</current-chamber> 
<action> 
<action-date date="20180913">September 13, 2018</action-date> 
</action> 
<legis-type display="yes">AMENDMENTS:</legis-type></engrossed-amendment-form> 
<engrossed-amendment-body> 
<section section-type="resolved" id="H483024832"> <text>That the bill from the Senate (S. 3021) entitled <quote>An Act to designate the United States courthouse located at 300 South Fourth Street in Minneapolis, Minnesota, as the <quote>Diana E. Murphy United States Courthouse</quote>.</quote>, do pass with the following</text></section><amendment> <amendment-instruction line-numbers="off"><text>Strike out all after the enacting clause and insert:</text></amendment-instruction>
<amendment-block id="H0E525A857A914629A38F8F766822E789" style="OLC" changed="added" reported-display-style="italic">
<legis-body display-enacting-clause="yes-display-enacting-clause" style="OLC" id="H8EAE3C8777E24B15BBAF5971A3FEBAF2">
<section id="H06B3579ACE594C1E8A59431BB8205551" section-type="section-one"><enum>1.</enum><header>Short title; table of contents</header>
<subsection id="H1B8125356FA04D8B97027E1AEECE9275"><enum>(a)</enum><header>Short title</header><text display-inline="yes-display-inline">This Act may be cited as <quote><short-title>America’s Water Infrastructure Act of 2018</short-title></quote>.</text></subsection> <subsection id="HC271825FCA5D4C1FBD8093B9D18BA89F"><enum>(b)</enum><header>Table of contents</header><text>The table of contents for this Act is as follows: </text>
<toc container-level="legis-body-container" quoted-block="no-quoted-block" lowest-level="section" regeneration="yes-regeneration" lowest-bolded-level="division-lowest-bolded">
<toc-entry idref="H06B3579ACE594C1E8A59431BB8205551" level="section">Sec. 1. Short title; table of contents.</toc-entry>
<toc-entry idref="H964A0C9F43584501B7CF73540403E04B" level="title">Title I—Water Resources Development</toc-entry>
<toc-entry idref="HAFBE247182C4445FB761C93EAF975B75" level="section">Sec. 101. Short title.</toc-entry>
<toc-entry idref="H54DB00AC65D0469D972E94AD536C38D8" level="section">Sec. 102. Secretary defined.</toc-entry>
<toc-entry idref="HFBD37873B36C4D6DBB41230233F387EC" level="subtitle">Subtitle A—General Provisions</toc-entry>
<toc-entry idref="H3ED2B86E8B444B708278BB29CBD8B835" level="section">Sec. 1101. Sense of Congress regarding water resources development bills.</toc-entry>
<toc-entry idref="HF037E40C67BE4A13A91C837CBD4951D4" level="section">Sec. 1102. Study of the future of the United States Army Corps of Engineers.</toc-entry>
<toc-entry idref="H4FD98026F2C04D32B2953AFD36C5AFF8" level="section">Sec. 1103. Study on economic and budgetary analyses.</toc-entry>
<toc-entry idref="H5D6F0A16139549AC9C16881085B67BB5" level="section">Sec. 1104. Dissemination of information.</toc-entry>
<toc-entry idref="HC004495CBBE94A7592DE6BE79E79FB4B" level="section">Sec. 1105. Non-Federal engagement and review.</toc-entry>
<toc-entry idref="H7B862DC3DA6542E79542A2A3B12693AA" level="section">Sec. 1106. Lake Okeechobee regulation schedule review.</toc-entry>
<toc-entry idref="H6A05F2F9A66F45B69BDDBF5E24BA35F2" level="section">Sec. 1107. Access to real estate data.</toc-entry>
<toc-entry idref="HA3CC069C27D548E68B83203C67683280" level="section">Sec. 1108. Aquatic invasive species research.</toc-entry>
<toc-entry idref="H9EED489A08B74E86B2462E3E7F8E9411" level="section">Sec. 1109. Harmful algal bloom technology demonstration.</toc-entry>
<toc-entry idref="H614BF9695A2448EBBC2A7FD2B44A6A65" level="section">Sec. 1110. Bubbly Creek, Chicago ecosystem restoration.</toc-entry>
<toc-entry idref="H16FEDC45373E47A3998B94FB5EB1630E" level="section">Sec. 1111. Dredge pilot program.</toc-entry>
<toc-entry idref="H44875E5CFB6549DEA21D447D11A53E21" level="section">Sec. 1112. Hurricane and storm damage protection program.</toc-entry>
<toc-entry idref="H5C5BC12F8A17426697968EE22CE19D63" level="section">Sec. 1113. Operation and maintenance of existing infrastructure.</toc-entry>
<toc-entry idref="H85C57E21EBE842AB8C1B20FBD45FB34C" level="section">Sec. 1114. Assistance relating to water supply.</toc-entry>
<toc-entry idref="H1FE198C3B9014834A4209DA20A47FB5D" level="section">Sec. 1115. Property acquisition.</toc-entry>
<toc-entry idref="H617D65FADCDC417FA480DF91BD18E488" level="section">Sec. 1116. Dredged material management plans.</toc-entry>
<toc-entry idref="HD9091C7379DE4EA08052BDF27E06B2A2" level="section">Sec. 1117. Inclusion of project or facility in Corps of Engineers workplan.</toc-entry>
<toc-entry idref="H7934C61E401543E585ED21AB25219A0B" level="section">Sec. 1118. Geomatic data.</toc-entry>
<toc-entry idref="H9024BF58085B4C039D25A04753E9419D" level="section">Sec. 1119. Local government reservoir permit review.</toc-entry>
<toc-entry idref="HE44FF6FDE43C4A91A9DF360EC8E16075" level="section">Sec. 1120. Transparency and accountability in cost sharing for water resources development projects.</toc-entry>
<toc-entry idref="H56C456BF7D0B49099ED398092113CBE1" level="section">Sec. 1121. Upper Missouri Mainstem Reservoir water withdrawal intake easement review.</toc-entry>
<toc-entry idref="H8C8F7CFD030B4913B9AE0E63580641A7" level="section">Sec. 1122. Limitation on contract execution.</toc-entry>
<toc-entry idref="HBAE2A410A1D949F3A023A2A563AF4761" level="section">Sec. 1123. Certain levee improvements.</toc-entry>
<toc-entry idref="H8B1FABF6BADC44BE84F37344E23B2E37" level="section">Sec. 1124. Cost-share payment for certain projects.</toc-entry>
<toc-entry idref="HDB01A9F623D5429CA7D9E0199037A9F7" level="section">Sec. 1125. Locks on Allegheny River.</toc-entry>
<toc-entry idref="HFBC131184CB54AF994B3F2CB97491852" level="section">Sec. 1126. Purpose and need.</toc-entry>
<toc-entry idref="H3A65DA29254747F1A32FE72CB3449895" level="section">Sec. 1127. Prior project authorization.</toc-entry>
<toc-entry idref="HD2E06A58E257429F9BE101B3EC1D39CE" level="section">Sec. 1128. Mississippi River and Tributaries Project.</toc-entry>
<toc-entry idref="HB781BFB2B18C414EAAC9FF587910BA6F" level="section">Sec. 1129. Inclusion of Tribal interests in project consultations.</toc-entry>
<toc-entry idref="H2AD928AB9EF540BF9CD32D4B679E654D" level="section">Sec. 1130. Beneficial use of dredged material.</toc-entry>
<toc-entry idref="H50D3400C44B64DCC881F55412891F284" level="section">Sec. 1131. Ice jam prevention and mitigation.</toc-entry>
<toc-entry idref="HEB6ADCA10A604F7982536F120EED278F" level="section">Sec. 1132. Rehabilitation of Corps of Engineers constructed dams.</toc-entry>
<toc-entry idref="H3279D353A02C4081921AF7AC4967E908" level="section">Sec. 1133. Columbia River.</toc-entry>
<toc-entry idref="HACDA55C51AD649A28AD6B4C24724332B" level="section">Sec. 1134. Missouri River Reservoir sediment management.</toc-entry>
<toc-entry idref="H3087B7B8294F43258B22C16F99C4E283" level="section">Sec. 1135. Reauthorization of lock operations pilot program.</toc-entry>
<toc-entry idref="H6E25C6C4DC1D41298CA8AE629E9E76CB" level="section">Sec. 1136. Credit or reimbursement.</toc-entry>
<toc-entry idref="H0E6C74D955664B86BB15127416C03F12" level="section">Sec. 1137. Non-Federal implementation pilot program.</toc-entry>
<toc-entry idref="H8F19908FB7D94732B3070D6F9E3D410D" level="section">Sec. 1138. Surplus water contracts and water storage agreements.</toc-entry>
<toc-entry idref="H3AA473E69AAC407EA529893FD4AD7A79" level="section">Sec. 1139. Post-disaster watershed assessments in territories of the United States.</toc-entry>
<toc-entry idref="H5ED4382F48934FB98F57F1A74E0C2682" level="section">Sec. 1140. Expedited consideration.</toc-entry>
<toc-entry idref="HA8F25CC885F14ABA8FB2B98B834DA83D" level="section">Sec. 1141. Project studies subject to independent peer review.</toc-entry>
<toc-entry idref="H54B2ADC26037487FB5F50711675DED5F" level="section">Sec. 1142. Feasibility of Chicago Sanitary and Ship Canal Dispersal Barriers Project, Illinois.</toc-entry>
<toc-entry idref="HD09A70BD521A471BB75B4E699A66A058" level="section">Sec. 1143. Acknowledgment of credit.</toc-entry>
<toc-entry idref="HE58F3BDD06ED4D84BEF9AB4CF7FE1EC9" level="section">Sec. 1144. Levee safety initiative reauthorization.</toc-entry>
<toc-entry idref="H0A80075C08544E30B97DBE7D7CBDBB3E" level="section">Sec. 1145. Funding to process permits.</toc-entry>
<toc-entry idref="HDD55D9A4130F4D3187F08BBD1CCAB4A3" level="section">Sec. 1146. Reservoir sediment.</toc-entry>
<toc-entry idref="HA23820E4CF634138B0F9847B35431B4B" level="section">Sec. 1147. Clarification for integral determination.</toc-entry>
<toc-entry idref="H7D1E49D28C1344888E18FA73069E3240" level="section">Sec. 1148. Beneficial use of dredged sediment.</toc-entry>
<toc-entry idref="H74FF23245D014D80BD5FC822352EA6BA" level="section">Sec. 1149. Inclusion of alternative measures for aquatic ecosystem restoration.</toc-entry>
<toc-entry idref="H1A59EA059B724DA89EDAD0BE14BCF3D9" level="section">Sec. 1150. Regional sediment management.</toc-entry>
<toc-entry idref="HE8A0CEB566CB4862AD6AB38428537E47" level="section">Sec. 1151. Operation and maintenance of navigation and hydroelectric facilities.</toc-entry>
<toc-entry idref="HC07635CFCFEA4626AE74A9A0CD86AB88" level="section">Sec. 1152. Study of water resources development projects by non-Federal interests.</toc-entry>
<toc-entry idref="HA3833E24CD5A4839A0D475AE15CBE115" level="section">Sec. 1153. Construction of water resources development projects by non-Federal interests.</toc-entry>
<toc-entry idref="H6BE8DD9E69834FF18206D6193D383CB3" level="section">Sec. 1154. Corps budgeting; project deauthorizations; comprehensive backlog report.</toc-entry>
<toc-entry idref="H82BBAD0665E040529B4F0C7B276D1CFA" level="section">Sec. 1155. Indian Tribes.</toc-entry>
<toc-entry idref="H53F42B9152C34D7E9FD84D2A5C9F60FF" level="section">Sec. 1156. Inflation adjustment of cost-sharing provisions for territories and Indian Tribes.</toc-entry>
<toc-entry idref="H0B1DA436E4CD42FFB0A3AB9848D675F6" level="section">Sec. 1157. Corps of Engineers continuing authorities program.</toc-entry>
<toc-entry idref="H12FAAB76BACB42C585ACCD14FABEBD7E" level="section">Sec. 1158. Hurricane and storm damage reduction.</toc-entry>
<toc-entry idref="H97ED3166C6A4451689E85F67C5C02950" level="section">Sec. 1159. Regional coalitions and higher education.</toc-entry>
<toc-entry idref="HD725218FDCFD4BF7B3DD3AD8DBE60169" level="section">Sec. 1160. Emergency response to natural disasters.</toc-entry>
<toc-entry idref="H07C295D846DB44E7A0EF98AF60AEFD8B" level="section">Sec. 1161. Cost and benefit feasibility assessment.</toc-entry>
<toc-entry idref="H97938ABA85A046C48466939F85B39FEF" level="section">Sec. 1162. Extended community assistance by the Corps of Engineers.</toc-entry>
<toc-entry idref="H2CBFE18BF6F3451A925B0BC6D61167C5" level="section">Sec. 1163. Dam safety.</toc-entry>
<toc-entry idref="HAB49DF885B2B4871B9E624411CE8846B" level="section">Sec. 1164. Local government water management plans.</toc-entry>
<toc-entry idref="H66157E4C56C1429A826C6D956D3FC69C" level="section">Sec. 1165. Structures and facilities constructed by Secretary.</toc-entry>
<toc-entry idref="H62A8F6BF31A643E0AC46ACFB201BD050" level="section">Sec. 1166. Advanced funds for water resources development studies and projects.</toc-entry>
<toc-entry idref="H98A454D1E96144029A56DBDDDC9D0026" level="section">Sec. 1167. Costs in excess of Federal participation limit.</toc-entry>
<toc-entry idref="H49AB53B4643446A98A17192DD89B7F6A" level="section">Sec. 1168. Disposition of projects.</toc-entry>
<toc-entry idref="H83EA6F6955784FC7BB821085FD95E898" level="section">Sec. 1169. Contributed funds for non-Federal reservoir operations.</toc-entry>
<toc-entry idref="H9BDF9D1A8AC5425C9BD53C7606C9AAFB" level="section">Sec. 1170. Watercraft inspection stations.</toc-entry>
<toc-entry idref="HAACEAB09D56F4E98BD36A16A33A5AD90" level="section">Sec. 1171. Restricted areas at Corps of Engineers dams.</toc-entry>
<toc-entry idref="H8BD16CD7E3CC40559C1B51D02DD9FC9C" level="section">Sec. 1172. Coastal erosion.</toc-entry>
<toc-entry idref="H05C4D461904747E9827642D66F842C15" level="section">Sec. 1173. Prohibition on surplus water fees, Lake Cumberland Watershed, Kentucky and Tennessee.</toc-entry>
<toc-entry idref="HD0D782A390424E29A3885D6A7D451092" level="section">Sec. 1174. Middle Rio Grande peak flow restoration.</toc-entry>
<toc-entry idref="H2E2256AFE392471A9F56F6A07C6DCAF3" level="section">Sec. 1175. Prohibition of administrative fees in implementing Rough River Lake Flowage Easement Encroachment Resolution Plan.</toc-entry>
<toc-entry idref="H3BD45DF2FFC743FFAAAEB665AC32082D" level="section">Sec. 1176. Preconstruction engineering design demonstration program.</toc-entry>
<toc-entry idref="H11F7AF90EB7A46D7946EFAFB71046CB2" level="subtitle">Subtitle B—Studies and Reports</toc-entry>
<toc-entry idref="HE273BB0AB18548748E6BCE19F32542BA" level="section">Sec. 1201. Authorization of proposed feasibility studies.</toc-entry>
<toc-entry idref="H82EAF454E02444FF84C53C66EFAD692E" level="section">Sec. 1202. Additional studies.</toc-entry>
<toc-entry idref="H3CBEF5FCE8F64294AB4C7EC34D237900" level="section">Sec. 1203. Expedited completion.</toc-entry>
<toc-entry idref="H994437A1D42048AC80F7FDD12CFCA662" level="section">Sec. 1204. GAO study on benefit-cost analysis reforms.</toc-entry>
<toc-entry idref="H7C0F6C741E0246789476C4AB21BC3C44" level="section">Sec. 1205. Harbor Maintenance Trust Fund report.</toc-entry>
<toc-entry idref="H18BAFD0D611B4848BC666D137DAC0EDC" level="section">Sec. 1206. Identification of nonpowered dams for hydropower development.</toc-entry>
<toc-entry idref="H9A9FA87CFF514B46B108C28C122348B6" level="section">Sec. 1207. Study on innovative ports for offshore wind development.</toc-entry>
<toc-entry idref="H4409190E6A8F45E886A96D6AD5E1680A" level="section">Sec. 1208. Innovative materials and advanced technologies report.</toc-entry>
<toc-entry idref="HAF41CDB75B3C477FBBE4082527239363" level="section">Sec. 1209. Study and report on expediting certain waiver processes.</toc-entry>
<toc-entry idref="H9E9D97729F1D4251BC9E3C32799A07E5" level="section">Sec. 1210. Report on debris removal.</toc-entry>
<toc-entry idref="H8D8781BAB5D44080ABA62BD981EA4DC8" level="section">Sec. 1211. Corps flood policy within urban areas.</toc-entry>
<toc-entry idref="HD987876FB642402FB4C4D758BD88EB3D" level="section">Sec. 1212. Feasibility studies for mitigation of damage.</toc-entry>
<toc-entry idref="HE67F187E70844B93A61E018F210E61BD" level="section">Sec. 1213. Applications of military leasing authorities.</toc-entry>
<toc-entry idref="HB91FF0CD748D490693950FA161D70CEC" level="section">Sec. 1214. Community engagement.</toc-entry>
<toc-entry idref="HC6F130AA2A564D2CB78E43F3F8C18030" level="section">Sec. 1215. Transparency in administrative expenses.</toc-entry>
<toc-entry idref="H7DD3F7D90D0546CFBBED6B9CA9D6676C" level="section">Sec. 1216. Assessment of harbors and inland harbors.</toc-entry>
<toc-entry idref="HFE2BDBCA01C345DF9CE70267150A6A55" level="section">Sec. 1217. Maintenance of high-risk flood control projects.</toc-entry>
<toc-entry idref="H93681089D9DF454D89F84AB5855B91D2" level="section">Sec. 1218. North Atlantic Division report on hurricane barriers and harbors of refuge.</toc-entry>
<toc-entry idref="HB5DC835104AF46A0842ADF1F40451DD3" level="section">Sec. 1219. Great Lakes coastal resiliency study.</toc-entry>
<toc-entry idref="HCE3E8FF7AF284A1B8A2F0E9E2D8408CA" level="section">Sec. 1220. McMicken Dam, Arizona, and Muddy River, Massachusetts.</toc-entry>
<toc-entry idref="HBC9D60D9DAC742DA82A4332CD7DB724A" level="section">Sec. 1221. Table Rock Lake, Arkansas and Missouri.</toc-entry>
<toc-entry idref="HE1983AF15484406A95FF994038B1CD33" level="section">Sec. 1222. Forecast-informed reservoir operations.</toc-entry>
<toc-entry idref="H50FA706BD0CD42DEBCE6D26EC753671B" level="section">Sec. 1223. Cedar River, Iowa.</toc-entry>
<toc-entry idref="H7C92315E9DD040CF9D9016B5C06B5E05" level="section">Sec. 1224. Old River control structure, Louisiana.</toc-entry>
<toc-entry idref="H0F6B737FBF8444FB8BE68189CDF41FA0" level="section">Sec. 1225. Upper Mississippi River protection.</toc-entry>
<toc-entry idref="HB0721CEA9B734B7AA54CD24BE04E1D3B" level="section">Sec. 1226. Missouri River.</toc-entry>
<toc-entry idref="H67D226DD19F94567A7ECE5A909B08C0B" level="section">Sec. 1227. Lower Missouri River bank stabilization and navigation.</toc-entry>
<toc-entry idref="H7E9A1E6AEA04403185E63F55FCF74FBF" level="section">Sec. 1228. Coastal Texas study.</toc-entry>
<toc-entry idref="HF15D8151FCB94BD5898C86EAC680953E" level="section">Sec. 1229. Report on water supply contract, Wright Patman Lake, Texas.</toc-entry>
<toc-entry idref="HD9796E21C19D42B4831D6B09F95B0FE3" level="subtitle">Subtitle C—Deauthorizations, Modifications, and Related Provisions</toc-entry>
<toc-entry idref="H8C4C737A3E754C0EA11D008F0DE9AF9D" level="section">Sec. 1301. Deauthorization of inactive projects.</toc-entry>
<toc-entry idref="H63CA387179024539BA81A7E8A33EB4AA" level="section">Sec. 1302. Backlog prevention.</toc-entry>
<toc-entry idref="HA20A4C3B06D84EE5BBB4E8DFECAD5E84" level="section">Sec. 1303. Project modifications.</toc-entry>
<toc-entry idref="H8336F04FC2CC44B482109CCD9D8FF7FB" level="section">Sec. 1304. Lytle and Cajon Creeks, California.</toc-entry>
<toc-entry idref="H5D8B5ADE42FC489784D84F177BAC7B38" level="section">Sec. 1305. Yuba River Basin, California.</toc-entry>
<toc-entry idref="HDF5898FEDD834FB5AC17583F68ADDE5C" level="section">Sec. 1306. Bridgeport Harbor, Connecticut.</toc-entry>
<toc-entry idref="HDCA923EA72494EF9BABC7F37AFEF4FF5" level="section">Sec. 1307. Delaware River navigation project.</toc-entry>
<toc-entry idref="HC1F2066A1D384DC79E3FC623E35E28EF" level="section">Sec. 1308. Comprehensive Everglades restoration plan, Central and Southern Florida, Everglades Agricultural Area, Florida.</toc-entry>
<toc-entry idref="H69775F6328654FBA9CDB07832F8D5C95" level="section">Sec. 1309. Kissimmee River restoration, Florida.</toc-entry>
<toc-entry idref="H6EF218E95A414870BB7CA1E3B5CF2525" level="section">Sec. 1310. Levee L–212, Four River Basin, Ocklawaha River, Florida.</toc-entry>
<toc-entry idref="H63C20345A7A949F2A0C1569F62732F03" level="section">Sec. 1311. Green River and Barren River Locks and Dams, Kentucky.</toc-entry>
<toc-entry idref="HC33DFC6DA0A64DC882F154ACC686A58E" level="section">Sec. 1312. Cape Arundel Disposal Site, Maine.</toc-entry>
<toc-entry idref="H92841B9CDDAC4F169715D3AE89BF8900" level="section">Sec. 1313. Penobscot River, Maine.</toc-entry>
<toc-entry idref="H45A2A3E99EF347D88C8CADA0C799D267" level="section">Sec. 1314. Boston harbor reserved channel deauthorizations.</toc-entry>
<toc-entry idref="H9DE9D971264348539B6280685A22D02C" level="section">Sec. 1315. Corps of Engineers bridge repair program for New England evacuation routes.</toc-entry>
<toc-entry idref="HC15E45B5BA2D45659B03B8D599D5A5F5" level="section">Sec. 1316. Plymouth Harbor, Massachusetts.</toc-entry>
<toc-entry idref="H6067507AAE754BF8847B722FE8C13E0C" level="section">Sec. 1317. Portsmouth Harbor and Piscataqua River.</toc-entry>
<toc-entry idref="HEEEF2C5770FA463CB36310B13C38FABA" level="section">Sec. 1318. Missouri River and tributaries at Kansas Cities, Missouri and Kansas.</toc-entry>
<toc-entry idref="HD368B0D823F8443C97024641CABCC269" level="section">Sec. 1319. Hampton Harbor, New Hampshire, navigation improvement project.</toc-entry>
<toc-entry idref="H58ABF04D1A34490EABF19078AEAAD21F" level="section">Sec. 1320. Passaic River Federal Navigation Channel, New Jersey.</toc-entry>
<toc-entry idref="H6E2C9B85D28D4B9BAD84E70511BE5BE1" level="section">Sec. 1321. Fargo-Moorhead Metropolitan Area Diversion Project, North Dakota.</toc-entry>
<toc-entry idref="HD3C5748C422A477BA2E492965DDFA9C8" level="section">Sec. 1322. Clatsop County, Oregon.</toc-entry>
<toc-entry idref="HBD3B71754A8741EE9EC1B9663C3C4415" level="section">Sec. 1323. Svensen Island, Oregon.</toc-entry>
<toc-entry idref="H730A08E85F734AFC924A58467115B481" level="section">Sec. 1324. West Tennessee Tributaries project, Tennessee.</toc-entry>
<toc-entry idref="HB0A01337BD204680A014B4341BC728FD" level="section">Sec. 1325. Puget Sound nearshore ecosystem restoration.</toc-entry>
<toc-entry idref="HD149D07AE5144AE094B741C88426DB73" level="section">Sec. 1326. Milwaukee Harbor, Milwaukee, Wisconsin.</toc-entry>
<toc-entry idref="H8DE94AB00CF9480884782949774CE0C7" level="section">Sec. 1327. Project completion for disaster areas.</toc-entry>
<toc-entry idref="H1809E92B8C3E47A4A05BBE4A22673B88" level="section">Sec. 1328. Federal assistance.</toc-entry>
<toc-entry idref="HD24AA17F60D84EDABE459ACEAC1D8DD1" level="section">Sec. 1329. Expedited initiation.</toc-entry>
<toc-entry idref="H52C6A18FAF8149059D289DEED61E9868" level="section">Sec. 1330. Project deauthorization and study extensions.</toc-entry>
<toc-entry idref="H4D9CA5FE066E4141B92DC1EAAFD6BFFB" level="section">Sec. 1331. Conveyances.</toc-entry>
<toc-entry idref="HBECFAFBDE1DE4AD9A0507BE7B57A7533" level="section">Sec. 1332. Report on future water resources development.</toc-entry>
<toc-entry idref="H3ABBE23025004C49BD1C23886F4A9044" level="subtitle">Subtitle D—Water Resources Infrastructure</toc-entry>
<toc-entry idref="HBC22B970BE764E6292F44AA197517CC1" level="section">Sec. 1401. Project authorizations.</toc-entry>
<toc-entry idref="HF08ACEFFA36D4B9DB6FC859F769F088F" level="section">Sec. 1402. Special rules.</toc-entry>
<toc-entry idref="HA092D47383B1466D92979E17A28B0827" level="section">Sec. 1403. Norfolk Harbor and Channels, Virginia.</toc-entry>
<toc-entry idref="H766B6B65954F497BB6ECC93B2FE313C6" level="title">Title II—Drinking Water System Improvement</toc-entry>
<toc-entry idref="HA2194B8FBFFD4B0DADF2FB919F3AB7E6" level="section">Sec. 2001. Indian reservation drinking water program.</toc-entry>
<toc-entry idref="H731EC1535F084D6FB7FF1BE160381FB4" level="section">Sec. 2002. Clean, safe, reliable water infrastructure.</toc-entry>
<toc-entry idref="HB6A8632DE3B440C59CA18C6A782DF3DC" level="section">Sec. 2003. Study on intractable water systems.</toc-entry>
<toc-entry idref="H9DEF7FC3105C4F71893D9A29F6732E71" level="section">Sec. 2004. Sense of Congress relating to access to nonpotable water.</toc-entry>
<toc-entry idref="H916445DCEAB1468A89E9FCB3EF38AFC4" level="section">Sec. 2005. Drinking water infrastructure resilience and sustainability.</toc-entry>
<toc-entry idref="HFB81E4AB0A8C4817B3FF0B788E1C09F9" level="section">Sec. 2006. Voluntary school and child care program lead testing grant program enhancement.</toc-entry>
<toc-entry idref="HC054D825361D42B790C15F5610F58BAA" level="section">Sec. 2007. Innovative water technology grant program.</toc-entry>
<toc-entry idref="H61C2F5A900BB4DD1BBACB035DE928ADC" level="section">Sec. 2008. Improved consumer confidence reports.</toc-entry>
<toc-entry idref="HC5FD26DFA8214D1086CD8268DE99ADB2" level="section">Sec. 2009. Contractual agreements.</toc-entry>
<toc-entry idref="H73F4A7C3F9DC4F7E8B148149D21CCA14" level="section">Sec. 2010. Additional considerations for compliance.</toc-entry>
<toc-entry idref="H450A342BEEA0423CB35D7405153C6219" level="section">Sec. 2011. Improved accuracy and availability of compliance monitoring data.</toc-entry>
<toc-entry idref="H723D4C7C16DA40B698182075C061B9AD" level="section">Sec. 2012. Asset management.</toc-entry>
<toc-entry idref="HA97A54F8197D4FA881D1D4658E4D0E90" level="section">Sec. 2013. Community water system risk and resilience.</toc-entry>
<toc-entry idref="H0B05BBC058334CA3A4651E695CC19C5C" level="section">Sec. 2014. Authorization for grants for State programs.</toc-entry>
<toc-entry idref="H35366427C3E94C76A7F77CF97536BCA6" level="section">Sec. 2015. State revolving loan funds.</toc-entry>
<toc-entry idref="H03D2D708DB91449BA6DD6038DA5222D8" level="section">Sec. 2016. Authorization for source water petition programs.</toc-entry>
<toc-entry idref="H97A58FEE50BA43A480485781B7A90CE5" level="section">Sec. 2017. Review of technologies.</toc-entry>
<toc-entry idref="H42D1725123474BECB2BF9A12FD60AF06" level="section">Sec. 2018. Source water.</toc-entry>
<toc-entry idref="H9AB3CD0412AC4187BAD17B84723D9918" level="section">Sec. 2019. Report on Federal cross-cutting requirements.</toc-entry>
<toc-entry idref="HB503F877FA2346A798076CA84269BDFD" level="section">Sec. 2020. Assistance for areas affected by natural disasters.</toc-entry>
<toc-entry idref="HD9F24503A6C9405391E364BFF4FD198A" level="section">Sec. 2021. Monitoring for unregulated contaminants.</toc-entry>
<toc-entry idref="H4FEFED0DE7AC4BA391B6E6AFC946C8BC" level="section">Sec. 2022. American iron and steel products.</toc-entry>
<toc-entry idref="H1A0694866E634E55990969E4F3632D05" level="section">Sec. 2023. Authorization for capitalization grants to States for State drinking water treatment revolving loan funds.</toc-entry>
<toc-entry idref="HB8183B9FD8FB4D2DAF1FFBB6DA37A2EA" level="title">Title III—Energy</toc-entry>
<toc-entry idref="H174EEA561E6444CDAC32AFE3D236593F" level="section">Sec. 3001. Modernizing authorizations for necessary hydropower approvals.</toc-entry>
<toc-entry idref="HBA21AA3DF73D435DA3D80CE1F7463F25" level="section">Sec. 3002. Qualifying conduit hydropower facilities.</toc-entry>
<toc-entry idref="HC485817226444106BBFCFF5C970BD853" level="section">Sec. 3003. Promoting hydropower development at existing nonpowered dams.</toc-entry>
<toc-entry idref="HD573A984E6D740CC94E4AE89CC20F31F" level="section">Sec. 3004. Closed-Loop pumped storage projects.</toc-entry>
<toc-entry idref="H59BAAD504A774567A765166C866C4C66" level="section">Sec. 3005. Considerations for relicensing terms.</toc-entry>
<toc-entry idref="HD1F1673764F748EA936E78F487C28A22" level="section">Sec. 3006. Fair ratepayer accountability, transparency, and efficiency standards.</toc-entry>
<toc-entry idref="H6D0BE6F5F4E149AABA28B8F322F38F71" level="section">Sec. 3007. J. Bennett Johnston Waterway hydropower extension.</toc-entry>
<toc-entry idref="H50EAE71A67B0438F929A51322E35ACFE" level="section">Sec. 3008. Stay and Reinstatement of FERC License No. 11393 for the Mahoney Lake Hydroelectric Project.</toc-entry>
<toc-entry idref="H8B9D9C1F5F414EBBB77B2728E32AAD2B" level="section">Sec. 3009. Strategic Petroleum Reserve drawdown.</toc-entry>
<toc-entry idref="HB737512DE74D4045AA9239FD908E52CB" level="title">Title IV—Other Matters</toc-entry>
<toc-entry idref="H4BBBFD7BB6EF49AD862D1F4808E4249E" level="subtitle">Subtitle A—Clean Water</toc-entry>
<toc-entry idref="H549532D0779A4DB29E62A9028CAE69B5" level="section">Sec. 4101. Stormwater infrastructure funding task force.</toc-entry>
<toc-entry idref="HD7AA523266D74436BE0F724E301FF8ED" level="section">Sec. 4102. Wastewater technology clearinghouse.</toc-entry>
<toc-entry idref="H1A40A8F6E7DE41AE955F357C71FE7E29" level="section">Sec. 4103. Technical assistance for treatment works.</toc-entry>
<toc-entry idref="H91910773B4D344899FF9B9925897AAE8" level="section">Sec. 4104. Amendments to Long Island Sound programs.</toc-entry>
<toc-entry idref="H2D96236074D647919A02A30391C06F6A" level="section">Sec. 4105. Authorization of appropriations for Columbia river basin restoration.</toc-entry>
<toc-entry idref="H9F655031C0D9469887CB4D6D46398A8D" level="section">Sec. 4106. Sewer overflow control grants.</toc-entry>
<toc-entry idref="HE12E9F51AF144AB291FB78F1C22064A1" level="section">Sec. 4107. Assistance for individual household decentralized wastewater systems of individuals with low or moderate income.</toc-entry>
<toc-entry idref="H3F02A5DF65474790BAD4756D15E63D1D" level="subtitle">Subtitle B—WIFIA Reauthorization and Innovative Financing for State Loan Funds</toc-entry>
<toc-entry idref="HF9640E15703548A78376CC835ECFD5CD" level="section">Sec. 4201. WIFIA reauthorization and innovative financing for State loan funds.</toc-entry>
<toc-entry idref="H9F5D1B4C789C49109594553FA09E82A1" level="subtitle">Subtitle C—Miscellaneous</toc-entry>
<toc-entry idref="H9202625AB13A4231A4278E8E57A75E62" level="section">Sec. 4301. Agreement with Commissioner of Reclamation.</toc-entry>
<toc-entry idref="H257A40BA505E492B8482BE7EBB41B53F" level="section">Sec. 4302. Snake River Basin flood prevention action plan.</toc-entry>
<toc-entry idref="H10F953D2FB864BF18744C926CA68FBC6" level="section">Sec. 4303. GAO audit of contracts and Tainter gate repairs of Harlan County Dam.</toc-entry>
<toc-entry idref="H007E7D20AD824A2CB83AB5B00AE54298" level="section">Sec. 4304. Water infrastructure and workforce investment.</toc-entry>
<toc-entry idref="HF3B70D595D5B448ABC9ABDB3EF3A7C16" level="section">Sec. 4305. Regional liaisons for minority, Tribal, and low-income communities.</toc-entry>
<toc-entry idref="HD6CCEC985A9B4D6EBA95DF9BCD43E8DD" level="section">Sec. 4306. WaterSense.</toc-entry>
<toc-entry idref="HB64364FA21FA4687A93F2FC269A55435" level="section">Sec. 4307. Predatory and other wild animals.</toc-entry>
<toc-entry idref="H9ABCBDC0E0994B068FDE9FE335772AE2" level="section">Sec. 4308. Klamath project water and power.</toc-entry>
<toc-entry idref="H57FA7FA6003741F9892835AED5CB51CA" level="section">Sec. 4309. Certain Bureau of Reclamation dikes.</toc-entry>
<toc-entry idref="HBA53EC9C57BA4FD291180AF704DC0D88" level="section">Sec. 4310. Authority to make entire active capacity of Fontenelle Reservoir available for use.</toc-entry>
<toc-entry idref="H4BC3798B9C324F4E8F381C76101346C8" level="section">Sec. 4311. Blackfeet water rights settlement.</toc-entry>
<toc-entry idref="H0EA0C70BFE994657842B599DFEAF9DD0" level="section">Sec. 4312. Indian irrigation fund reauthorization.</toc-entry>
<toc-entry idref="H9D6649045FFB4232A56C9278B8FF25E9" level="section">Sec. 4313. Reauthorization of repair, replacement, and maintenance of certain Indian irrigation projects.</toc-entry>
<toc-entry idref="HF74B41F1F19B4DD7A3164B05554C5588" level="section">Sec. 4314. Indian dam safety reauthorization.</toc-entry>
<toc-entry idref="H71BE9E5C269642ECB02E756C2D03FB87" level="section">Sec. 4315. Diana E. Murphy United States Courthouse.</toc-entry></toc></subsection></section>
<title id="H964A0C9F43584501B7CF73540403E04B"><enum>I</enum><header>Water Resources Development</header>
<section id="HAFBE247182C4445FB761C93EAF975B75"><enum>101.</enum><header>Short title</header><text display-inline="no-display-inline">This title may be cited as the <quote><short-title>Water Resources Development Act of 2018</short-title></quote>.</text></section> <section id="H54DB00AC65D0469D972E94AD536C38D8"><enum>102.</enum><header>Secretary defined</header><text display-inline="no-display-inline">In this title, the term <quote>Secretary</quote> means the Secretary of the Army.</text></section>
<subtitle id="HFBD37873B36C4D6DBB41230233F387EC"><enum>A</enum><header>General Provisions</header>
<section id="H3ED2B86E8B444B708278BB29CBD8B835" commented="no"><enum>1101.</enum><header>Sense of Congress regarding water resources development bills</header><text display-inline="no-display-inline">It is the sense of Congress that, because the missions of the Corps of Engineers for navigation, flood control, beach erosion control and shoreline protection, hydroelectric power, recreation, water supply, environmental protection, restoration, and enhancement, and fish and wildlife mitigation benefit all Americans, and because water resources development projects are critical to maintaining the country’s economic prosperity, national security, and environmental protection, Congress should consider a water resources development bill not less often than once every Congress. </text></section> <section id="HF037E40C67BE4A13A91C837CBD4951D4" commented="no"><enum>1102.</enum><header>Study of the future of the United States Army Corps of Engineers</header> <subsection id="HFBDA3A93247F42E38F30910AC80E90AC" commented="no"><enum>(a)</enum><header>In general</header><text>The Secretary shall enter into an agreement with the National Academy of Sciences to convene a committee of experts to carry out a comprehensive study on—</text>
<paragraph id="H814E050D2A8D46E7BE0E128AAF057074" commented="no"><enum>(1)</enum><text>the ability of the Corps of Engineers to carry out its statutory missions and responsibilities, and the potential effects of transferring the functions (including regulatory obligations), personnel, assets, and civilian staff responsibilities of the Secretary relating to civil works from the Department of Defense to a new or existing agency or subagency of the Federal Government, including how such a transfer might affect the Federal Government’s ability to meet the current statutory missions and responsibilities of the Corps of Engineers; and</text></paragraph> <paragraph id="HED172F391509418BAC18E7C20CEADD94" commented="no"><enum>(2)</enum><text>improving the Corps of Engineers’ project delivery processes, including recommendations for such improvements, taking into account factors including—</text>
<subparagraph id="H8C35090B6E12441ABFE6F3FA743C41D6" commented="no"><enum>(A)</enum><text>the effect of the annual appropriations process on the ability of the Corps of Engineers to efficiently secure and carry out contracts for water resources development projects and perform regulatory obligations;</text></subparagraph> <subparagraph id="H4B0FC0D759464609861001F7B9FC0641" commented="no"><enum>(B)</enum><text>the effect that the current Corps of Engineers leadership and geographic structure at the division and district levels has on its ability to carry out its missions in a cost-effective manner; and</text></subparagraph>
<subparagraph id="H72072F38AAA04E6580417923B287DC1C" commented="no"><enum>(C)</enum><text>the effect of the frequency of rotations of senior leaders of the Corps of Engineers and how such frequency affects the function of the district.</text></subparagraph></paragraph></subsection> <subsection id="HF70B0018B64348EF971FD3A1141697FD" commented="no"><enum>(b)</enum><header>Considerations</header><text>The study carried out under subsection (a) shall include consideration of—</text>
<paragraph id="H9D120CC56DD244089D90D1E952375C1C" commented="no"><enum>(1)</enum><text>effects on the national security of the United States;</text></paragraph> <paragraph id="H0DFA011A1402419FBC54746FDBD16194" commented="no"><enum>(2)</enum><text>the ability of the Corps of Engineers to maintain sufficient engineering capability and capacity to assist ongoing and future operations of the United States armed services;</text></paragraph>
<paragraph id="H87CF6F7886854175AF875747A372FFE6" commented="no"><enum>(3)</enum><text>emergency and natural disaster response obligations of the Federal Government that are carried out by the Corps of Engineers; and</text></paragraph> <paragraph id="HBD8651209C504FCDADA9E6C45927D9BF" commented="no"><enum>(4)</enum><text>the ability of the Corps of Engineers to increase efficiency, coordination, transparency, and cost savings of the project delivery process.</text></paragraph></subsection>
<subsection id="H36B481B85B184F8EA73279EBDF813315" commented="no"><enum>(c)</enum><header>Submission to Congress</header><text>The Secretary shall submit the final report of the National Academy containing the findings of the study carried out under subsection (a) to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate not later than 2 years after the date of enactment of this Act.</text></subsection> <subsection id="HF27B4AADAACE42A2A881BEA9013C3598" commented="no"><enum>(d)</enum><header>Congressional approval</header><text>The Secretary may not implement the findings of the study carried out under subsection (a) unless expressly authorized by Congress.</text></subsection></section>
<section id="H4FD98026F2C04D32B2953AFD36C5AFF8" commented="no"><enum>1103.</enum><header>Study on economic and budgetary analyses</header>
<subsection id="H8F8478E7039A4822807B911F50AE3DC9" commented="no"><enum>(a)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of this Act, the Secretary shall enter into an agreement with the National Academy of Sciences to—</text> <paragraph id="H1C18CEAF431741B9BC5CA6CD759AF272" commented="no"><enum>(1)</enum><text>carry out a study on the economic principles and analytical methodologies currently used by or applied to the Corps of Engineers to formulate, evaluate, and budget for water resources development projects; and</text></paragraph>
<paragraph id="HC222C4350B8549179FF34CB035D45544" commented="no"><enum>(2)</enum><text>make recommendations to Congress on potential changes to such principles and methodologies to improve transparency, return on Federal investment, cost savings, and prioritization, in the formulation, evaluation, and budgeting of such projects.</text></paragraph></subsection> <subsection id="H3093FB1EF2A74A9AB2AE80E628E838A4" commented="no"><enum>(b)</enum><header>Considerations</header><text>The study under subsection (a) shall include—</text>
<paragraph id="H7E27A173AF5145988EE8AB9547273242" commented="no"><enum>(1)</enum><text>an analysis of the current economic principles and analytical methodologies used by or applied to the Corps of Engineers in determining the total benefits and total costs during the formulation of, and plan selection for, a water resources development project;</text></paragraph> <paragraph id="H1481A92798AA43729DC4F6D614ED3108" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">an analysis of improvements or alternatives to how the Corps of Engineers utilizes the National Economic Development, Regional Economic Development, Environmental Quality, and Other Social Effects accounts developed by the Institute for Water Resources of the Corps of Engineers in the formulation of, and plan selection for, such projects;</text></paragraph>
<paragraph id="H0F96146CCE354030B17AC425E12F2300" commented="no"><enum>(3)</enum><text>an analysis of whether such principles and methodologies fully account for all of the potential benefits of project alternatives, including any reasonably associated benefits of such alternatives that are not contrary to law, Federal policy, or sound water resources management;</text></paragraph> <paragraph id="HCE5911D40041416D92B9F5827892BBA1" commented="no"><enum>(4)</enum><text display-inline="yes-display-inline">an analysis of whether such principles and methodologies fully account for all of the costs of project alternatives, including potential societal costs, such as lost ecosystem services, and full lifecycle costs for such alternatives; </text></paragraph>
<paragraph id="HA06B286AE12846BD9E51C522CF74EC4B" commented="no"><enum>(5)</enum><text display-inline="yes-display-inline">an analysis of the methodologies utilized by the Federal Government in setting and applying discount rates for benefit-cost analyses used in the formulation, evaluation, and budgeting of Corps of Engineers water resources development projects;</text></paragraph> <paragraph id="H7B65C12D6EB74CE9AE9316BFA76E5ADF"><enum>(6)</enum><text display-inline="yes-display-inline">an analysis of whether or not the Corps of Engineers—</text>
<subparagraph id="HB902D87AF5A44CF0BDCF2A2C608AF7E9"><enum>(A)</enum><text>considers cumulative benefits of locally developed projects, including Master Plans approved by the Corps; and</text></subparagraph> <subparagraph id="H63D1258CB3DA4B129DD6BCF30B282BC0"><enum>(B)</enum><text>uses the benefits referred to in subparagraph (A) for purposes of benefit-cost analysis for project justification for potential projects within such Master Plans; and</text></subparagraph></paragraph>
<paragraph id="H7C06BB27CA1A4AB9B4D024868A04259C" commented="no"><enum>(7)</enum><text display-inline="yes-display-inline">consideration of the report submitted under section 1204, if that report is submitted prior to completion of the study under this section. </text></paragraph></subsection> <subsection id="H6442A4C3E7D0485F81922CAD95196BD0" commented="no"><enum>(c)</enum><header>Publication</header><text>The agreement entered into under subsection (a) shall require the National Academy of Sciences to, not later than 30 days after the completion of the study—</text>
<paragraph id="H992E4C4A4BE244C7A169A6AAC40BFC11" commented="no"><enum>(1)</enum><text>submit a report containing the results of the study and the recommendations to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives; and</text></paragraph> <paragraph id="H15F9DDD9C17446B1979875CADD74C88F" commented="no"><enum>(2)</enum><text>make a copy of such report available on a publicly accessible website.</text></paragraph></subsection></section>
<section id="H5D6F0A16139549AC9C16881085B67BB5"><enum>1104.</enum><header>Dissemination of information</header>
<subsection id="H5E81A53F475F418F8EBFABDE9F9FDD31" commented="no"><enum>(a)</enum><header>Findings</header><text>Congress finds the following:</text> <paragraph id="HEF06B05E8A4040A88449A69EC07362BF" commented="no"><enum>(1)</enum><text>Congress plays a central role in identifying, prioritizing, and authorizing vital water resources infrastructure activities throughout the United States.</text></paragraph>
<paragraph id="H027824B1CB4B4B309796E3A6E15693DA" commented="no"><enum>(2)</enum><text>The Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="public-law" parsable-cite="pl/113/121">Public Law 113–121</external-xref>) established a new and transparent process to review and prioritize the water resources development activities of the Corps of Engineers with strong congressional oversight.</text></paragraph> <paragraph id="H07082FB34CEF4213B3043F8E61ADDC29" commented="no"><enum>(3)</enum><text>Section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>) requires the Secretary to develop and submit to Congress each year a Report to Congress on Future Water Resources Development and, as part of the annual report process, to—</text>
<subparagraph id="H1241656C7045445992D51609D0212514" commented="no"><enum>(A)</enum><text>publish a notice in the Federal Register that requests from non-Federal interests proposed feasibility studies and proposed modifications to authorized water resources development projects and feasibility studies for inclusion in the report; and</text></subparagraph> <subparagraph id="H1FFF6A419EFB47B59EF0AFECEC9835C6" commented="no"><enum>(B)</enum><text>review the proposals submitted and include in the report those proposed feasibility studies and proposed modifications that meet the criteria for inclusion established under such section 7001.</text></subparagraph></paragraph>
<paragraph id="H18BB1181A8134CB0A20ED28F5631092D" commented="no"><enum>(4)</enum><text>Congress will use the information provided in the annual Report to Congress on Future Water Resources Development to determine authorization needs and priorities for purposes of water resources development legislation.</text></paragraph> <paragraph id="H122C32B6514C41C9AF5F565805ED8BCA" commented="no"><enum>(5)</enum><text>To ensure that Congress can gain a thorough understanding of the water resources development needs and priorities of the United States, it is important that the Secretary take sufficient steps to ensure that non-Federal interests are made aware of the new annual report process, including the need for non-Federal interests to submit proposals during the Secretary’s annual request for proposals in order for such proposals to be eligible for consideration by Congress.</text></paragraph></subsection>
<subsection id="H7DDB207A41A74842A6F7A0ED1E17A779"><enum>(b)</enum><header>Dissemination of process information</header><text>The Secretary shall develop, support, and implement education and awareness efforts for non-Federal interests with respect to the annual Report to Congress on Future Water Resources Development required under section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>), including efforts to—</text> <paragraph id="H04564C634EFC410AA7535D8292BA67CC"><enum>(1)</enum><text>develop and disseminate technical assistance materials, seminars, and guidance on the annual process as it relates to non-Federal interests;</text></paragraph>
<paragraph id="H0D2CE754C97C4159BB41435C6EE10DA5"><enum>(2)</enum><text>provide written notice to local elected officials and previous and potential non-Federal interests on the annual process and on opportunities to address local water resources challenges through the missions and authorities of the Corps of Engineers;</text></paragraph> <paragraph id="H636F6C9EBA0B426FAB23EF5F30A9E02C"><enum>(3)</enum><text>issue guidance for non-Federal interests to assist such interests in developing proposals for water resources development projects that satisfy the requirements of such section 7001; and</text></paragraph>
<paragraph id="H4DA2E55F586F49FF9B9F831919FC0806"><enum>(4)</enum><text>provide, at the request of a non-Federal interest, assistance with researching and identifying existing project authorizations and Corps of Engineers decision documents.</text></paragraph></subsection></section> <section id="HC004495CBBE94A7592DE6BE79E79FB4B" commented="no"><enum>1105.</enum><header>Non-Federal engagement and review</header> <subsection id="H7B56AD39980146A688ADA23F5DBBE2BA" commented="no"><enum>(a)</enum><header>Issuance</header><text>The Secretary shall expeditiously issue guidance to implement each covered provision of law in accordance with this section.</text></subsection>
<subsection id="HE2BB6BE2CF0946CF8D6F09F2482EFD4D" commented="no"><enum>(b)</enum><header>Public notice</header>
<paragraph id="H635F88CDE3834E0DA0E70A13589FB450" commented="no"><enum>(1)</enum><header>In general</header><text>Prior to developing and issuing any new or revised implementation guidance for a covered water resources development law, the Secretary shall issue a public notice that—</text> <subparagraph id="H6A35119F14F1437DB7B4CAF042ED52EC" commented="no"><enum>(A)</enum><text>informs potentially interested non-Federal stakeholders of the Secretary’s intent to develop and issue such guidance; and</text></subparagraph>
<subparagraph id="HBA8C1636B9A84707ADD96ED4490BA7AF" commented="no"><enum>(B)</enum><text>provides an opportunity for interested non-Federal stakeholders to engage with, and provide input and recommendations to, the Secretary on the development and issuance of such guidance.</text></subparagraph></paragraph> <paragraph id="HE929B24EE2CC4EBEAE28F6DA49E67E04" commented="no"><enum>(2)</enum><header>Issuance of notice</header><text>The Secretary shall issue the notice under paragraph (1) through a posting on a publicly accessible website dedicated to providing notice on the development and issuance of implementation guidance for a covered water resources development law.</text></paragraph></subsection>
<subsection id="HBA340DFBFE8F460299DB839F9E1712A0" commented="no"><enum>(c)</enum><header>Stakeholder engagement</header>
<paragraph id="H529089EF9086426FBDF8B15B4A5F8126" commented="no"><enum>(1)</enum><header>Input</header><text>The Secretary shall allow a minimum of 60 days after issuance of the public notice under subsection (b) for non-Federal stakeholders to provide input and recommendations to the Secretary, prior to finalizing implementation guidance for a covered water resources development law.</text></paragraph> <paragraph id="HF8785A5486724DE7BAB83ABE1C72BD3B" commented="no"><enum>(2)</enum><header>Outreach</header><text>The Secretary may, as appropriate (as determined by the Secretary), reach out to non-Federal stakeholders and circulate drafts of implementation guidance for a covered water resources development law for informal input and recommendations.</text></paragraph></subsection>
<subsection id="H6F901A01C730446280F57596E73FD36E" commented="no"><enum>(d)</enum><header>Submission</header><text>The Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a copy of all input and recommendations received pursuant to subsection (c) and a description of any consideration of such input and recommendations.</text></subsection> <subsection id="H0A7984EBAEA249048FA01488DA7D753D" commented="no"><enum>(e)</enum><header>Development of guidance</header><text>When developing implementation guidance for a covered water resources development law, the Secretary shall take into consideration the input and recommendations received from non-Federal stakeholders, and make the final guidance available to the public on the publicly accessible website described in subsection (b)(2).</text></subsection>
<subsection id="HF5DE63B510284FB0BD68DAA218F687A8" commented="no"><enum>(f)</enum><header>Definitions</header><text>In this section:</text> <paragraph id="HC6ABA76BD5DB4141AED079D1CF0E168E" commented="no"><enum>(1)</enum><header>Covered provision of law</header><text>The term <term>covered provision of law</term> means a provision of law under the jurisdiction of the Secretary contained in, or amended by, a covered water resources development law, with respect to which—</text>
<subparagraph id="H0C3B6957F4F24C1697CEE015F7E92401" commented="no"><enum>(A)</enum><text>the Secretary determines guidance is necessary in order to implement the provision; and</text></subparagraph> <subparagraph id="HEB19FF3723B743DE8B7B8BC8694DDAED" commented="no"><enum>(B)</enum><text>no such guidance has been issued as of the date of enactment of this Act.</text></subparagraph></paragraph>
<paragraph id="H786FD3362BB84CD98675D3EBBC7E9AB1" commented="no"><enum>(2)</enum><header>Covered water resources development law</header><text>The term <term>covered water resources development law</term> means—</text> <subparagraph id="HEAFFEA927BCF4DBC8601E2BA7C609E32" commented="no"><enum>(A)</enum><text>the Water Resources Reform and Development Act of 2014;</text></subparagraph>
<subparagraph id="H5E0069F97331445A8C41529FB2EF06F0" commented="no"><enum>(B)</enum><text>the Water Resources Development Act of 2016;</text></subparagraph> <subparagraph id="H347B766491F6426AB5B18AE356620EF4" commented="no"><enum>(C)</enum><text>this Act; and</text></subparagraph>
<subparagraph id="H6F0997DECBDA42CE8B38847A692A285C" commented="no"><enum>(D)</enum><text>any Federal water resources development law enacted after the date of enactment of this Act.</text></subparagraph></paragraph></subsection></section> <section id="H7B862DC3DA6542E79542A2A3B12693AA"><enum>1106.</enum><header>Lake Okeechobee regulation schedule review</header><text display-inline="no-display-inline">The Secretary shall expedite completion of the Lake Okeechobee regulation schedule to coincide with the completion of the Herbert Hoover Dike project, and may consider all relevant aspects of the Comprehensive Everglades Restoration Plan described in section 601 of the Water Resources Development Act of 2000 (114 Stat. 2680).</text></section>
<section id="H6A05F2F9A66F45B69BDDBF5E24BA35F2" commented="no"><enum>1107.</enum><header>Access to real estate data</header>
<subsection id="HD43FE5A918204EA78E7EE1128C7764FC" commented="no"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Using available funds, the Secretary shall make publicly available, including on a publicly accessible website, information on all Federal real estate assets in the United States that are owned, operated, or managed by, or in the custody of, the Corps of Engineers. </text></subsection> <subsection id="HAFFAEBE45D5D4512BC0A18DB9EB6C469" commented="no"><enum>(b)</enum><header>Requirements</header> <paragraph id="HDCEE49F11DF745BCBCF415D12EE4832B" commented="no"><enum>(1)</enum><header>In general</header><text>The real estate information made available under subsection (a) shall include—</text>
<subparagraph id="HF9682B4C91BC450998C51489E184634F" commented="no"><enum>(A)</enum><text>existing standardized real estate plat descriptions of assets described in subsection (a); and</text></subparagraph> <subparagraph id="H856B25EB2C474AACBD3CD87042CF6438" commented="no"><enum>(B)</enum><text>existing geographic information systems and geospatial information associated with such assets.</text></subparagraph></paragraph>
<paragraph id="H87CC03D67467497890D36547D0412405" commented="no"><enum>(2)</enum><header>Collaboration</header><text display-inline="yes-display-inline">In making information available under subsection (a), the Secretary shall consult with the Administrator of General Services. Such information may be made available, in whole or in part, in the Federal real property database published under section 21 of the Federal Assets Sale and Transfer Act of 2016 (<external-xref legal-doc="public-law" parsable-cite="pl/114/287">Public Law 114–287</external-xref>), as determined appropriate by the Administrator of General Services. Nothing in this paragraph shall be construed as requiring the Administrator of General Services to add additional data elements or features to such Federal real property database if such additions are impractical or would add additional costs to such database.</text></paragraph></subsection> <subsection id="H0410CB0A887A407E91688BB37442180C" commented="no"><enum>(c)</enum><header>Limitation</header><text>Nothing in this section shall compel or authorize the disclosure of data or other information determined by the Secretary to be confidential, privileged, national security information, personal information, or information the disclosure of which is otherwise prohibited by law.</text></subsection>
<subsection id="HE3A073BB4C66441B9F7DB3821F2D9680" commented="no"><enum>(d)</enum><header>Timing</header><text>The Secretary shall ensure that the implementation of subsection (a) occurs as soon as practicable.</text></subsection> <subsection id="H7811D0AC62EA448AA992C3E2BFD681D6" commented="no"><enum>(e)</enum><header>Effect on other laws</header><text>Nothing in this section shall be construed as modifying, or exempting the Corps of Engineers from, the requirements of the Federal real property database published under section 21 of the Federal Assets Sale and Transfer Act of 2016 (<external-xref legal-doc="public-law" parsable-cite="pl/114/287">Public Law 114–287</external-xref>). </text></subsection></section>
<section id="HA3CC069C27D548E68B83203C67683280"><enum>1108.</enum><header>Aquatic invasive species research</header>
<subsection id="H3C974FA26D754E4DA830DFE76EE14F8B"><enum>(a)</enum><header>In General</header><text>As part of the ongoing activities of the Engineer Research and Development Center to address the spread and impacts of aquatic invasive species, the Secretary shall undertake research on the management and eradication of aquatic invasive species, including Asian carp and zebra mussels.</text></subsection> <subsection id="HC00ECE7525C04DAA8D06D8C3D93F2CAD"><enum>(b)</enum><header>Locations</header><text>In carrying out subsection (a), the Secretary shall work with Corps of Engineers district offices representing diverse geographical regions of the continental United States that are impacted by aquatic invasive species, such as the Atlantic, Pacific, and Gulf coasts and the Great Lakes.</text></subsection>
<subsection id="H7EBDCD9024214548BBF2555B13EE0054"><enum>(c)</enum><header>Report</header><text>Not later than 180 days after the date of enactment of this section, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report recommending a plan to address the spread and impacts of aquatic invasive species.</text></subsection></section> <section id="H9EED489A08B74E86B2462E3E7F8E9411" section-type="subsequent-section" commented="no"><enum>1109.</enum><header>Harmful algal bloom technology demonstration</header> <subsection id="HF1D28D531BE342869B9DCF50762B3533" commented="no"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">The Secretary, acting through the Engineer Research and Development Center, shall implement a 5-year harmful algal bloom technology development demonstration program under the Aquatic Nuisance Research Program. To the extent practicable, the Secretary shall support research that will identify and develop improved strategies for early detection, prevention, and management techniques and procedures to reduce the occurrence and effects of harmful algal blooms in the Nation’s water resources.</text></subsection>
<subsection id="H481E10A7BFC541E39FA8FD73A829AC64" commented="no"><enum>(b)</enum><header>Scalability requirement</header><text display-inline="yes-display-inline">The Secretary shall ensure that technologies identified, tested, and deployed under the harmful algal bloom technology development demonstration program have the ability to scale up to meet the needs of harmful-algal-bloom-related events.</text></subsection></section> <section id="H614BF9695A2448EBBC2A7FD2B44A6A65"><enum>1110.</enum><header>Bubbly Creek, Chicago ecosystem restoration</header><text display-inline="no-display-inline">The Secretary shall enter into a memorandum of understanding with the Administrator of the Environmental Protection Agency to facilitate ecosystem restoration activities at the South Fork of the South Branch of the Chicago River (commonly known as Bubbly Creek).</text></section>
<section id="H16FEDC45373E47A3998B94FB5EB1630E" commented="no"><enum>1111.</enum><header>Dredge pilot program</header>
<subsection id="H460C262374CF445885F2A7603B04D46B" commented="no"><enum>(a)</enum><header>In General</header><text>The Secretary is authorized to carry out a pilot program to award contracts with a duration of up to 5 years for the operation and maintenance of harbors and inland harbors referred to in section 210(a)(2) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238(a)(2)</external-xref>).</text></subsection> <subsection id="H08BAA7ECCB5E477D91A6913CAA15F4AB" commented="no"><enum>(b)</enum><header>Scope</header><text>In carrying out the pilot program under subsection (a), the Secretary may award a contract described in such subsection, which may address one or more harbors or inland harbors in a geographical region, if the Secretary determines that the contract provides cost savings compared to the awarding of such work on an annual basis or on a project-by-project basis.</text></subsection>
<subsection id="H9184A923231D461BADC2127C9418843C" commented="no"><enum>(c)</enum><header>Report to Congress</header><text display-inline="yes-display-inline">Not later than 1 year after the date on which the first contract is awarded pursuant to the pilot program carried out under subsection (a), the Secretary shall submit to Congress a report evaluating, with respect to the pilot program and any contracts awarded under the pilot program—</text> <paragraph id="H1DCA28DFC6964370A630E0E4404345AA" commented="no"><enum>(1)</enum><text>cost effectiveness;</text></paragraph>
<paragraph id="HDCF65064F89C4DEABA7BDBB43E6C8ACC" commented="no"><enum>(2)</enum><text>reliability and performance;</text></paragraph> <paragraph id="H160A1BA9C1DA4F41BB69FBA26745F8DA" commented="no"><enum>(3)</enum><text>cost savings attributable to mobilization and demobilization of dredge equipment; and</text></paragraph>
<paragraph id="H7F33A8381B294F16AFDD5A19A3F89E26" commented="no"><enum>(4)</enum><text>response times to address navigational impediments.</text></paragraph></subsection> <subsection id="HE2FF0E60A4AF42EABD868B9F526C949C" commented="no"><enum>(d)</enum><header>Sunset</header><text display-inline="yes-display-inline">The authority of the Secretary to enter into contracts pursuant to the pilot program carried out under subsection (a), shall expire on the date that is 10 years after the date of enactment of this Act.</text></subsection></section>
<section id="H44875E5CFB6549DEA21D447D11A53E21" commented="no"><enum>1112.</enum><header>Hurricane and storm damage protection program</header>
<subsection id="H4D5A09A8DDAD4D0E979CC55259D506AC" commented="no"><enum>(a)</enum><header>In general</header><text>The Secretary is authorized to carry out a pilot program to award single contracts for more than one authorized hurricane and storm damage reduction project in a geographical region, including projects across more than one Corps of Engineers district, if the Secretary determines that the contract provides cost savings compared to the awarding of such work on a project-by-project basis.</text></subsection> <subsection id="H6C971DC177434C64BC7CD57BE86AB16A" commented="no"><enum>(b)</enum><header>Project selection</header><text display-inline="yes-display-inline">In carrying out the pilot program under subsection (a), the Secretary shall consult with relevant State agencies in selecting projects.</text></subsection>
<subsection id="H5BFAE9644BE348D492E797C957198CF3" commented="no"><enum>(c)</enum><header>Criteria</header><text display-inline="yes-display-inline">In carrying out the pilot program under subsection (a), the Secretary shall establish criteria and other considerations that—</text> <paragraph id="HB685826E7CC649EEB8434886EC0F2E3C" commented="no"><enum>(1)</enum><text>foster Federal, State, and local collaboration;</text></paragraph>
<paragraph id="H7DCA17776AE248E5A392BBEB4B8260FC" commented="no"><enum>(2)</enum><text>evaluate the performance of projects being carried out under a single contract with respect to whether such projects yield any regional or multi-district benefits; and </text></paragraph> <paragraph id="H5E95DA9C3C724C15B926BF49DC347F81" commented="no"><enum>(3)</enum><text>include other criteria and considerations that the Secretary determines to be appropriate.</text></paragraph></subsection>
<subsection id="H939183301668421B8362780131A9139E" commented="no"><enum>(d)</enum><header>Report</header><text display-inline="yes-display-inline">Not later than 1 year after the date of enactment of this Act, and annually thereafter, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that includes findings and recommendations of the Secretary with respect to the projects completed under the pilot program carried out under subsection (a).</text></subsection> <subsection id="H8C00D7A0FE9B43C793E5B90C94486208" commented="no"><enum>(e)</enum><header>Authorization of appropriations</header><text>There is authorized to be appropriated to carry out this section $75,000,000.</text></subsection>
<subsection id="H540AF7F625194B548DD96F9EA02FE444" commented="no"><enum>(f)</enum><header>Termination</header><text display-inline="yes-display-inline">The authority of the Secretary to enter into contracts pursuant to the pilot program carried out under subsection (a) shall expire on the date that is 10 years after the date of enactment of this Act.</text></subsection></section> <section id="H5C5BC12F8A17426697968EE22CE19D63" commented="no"><enum>1113.</enum><header>Operation and maintenance of existing infrastructure</header><text display-inline="no-display-inline">The Secretary shall improve the reliability, and operation and maintenance of, existing infrastructure of the Corps of Engineers, and, as necessary, improve its resilience to cyber-related threats.</text></section>
<section id="H85C57E21EBE842AB8C1B20FBD45FB34C" commented="no"><enum>1114.</enum><header>Assistance relating to water supply</header><text display-inline="no-display-inline">The Secretary may provide assistance to municipalities the water supply of which is adversely affected by construction carried out by the Corps of Engineers.</text></section> <section id="H1FE198C3B9014834A4209DA20A47FB5D" commented="no"><enum>1115.</enum><header>Property acquisition</header> <subsection id="HD78376DADCE04A5EB964C254E4D59275" commented="no"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">In acquiring an interest in land, or requiring a non-Federal interest to acquire an interest in land, the Secretary shall, in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, first consider the minimum interest in real property necessary to support the water resources development project for which such interest is acquired.</text></subsection>
<subsection id="HE69EB66ABFE94287BDE13D0342D7894F" commented="no"><enum>(b)</enum><header>Determination</header><text display-inline="yes-display-inline">In determining an interest in land under subsection (a), the Secretary shall first consider a temporary easement or other interest designed to reduce the overall cost of the water resources development project for which such interest is acquired, reduce the time to complete such project, and minimize conflict with property owners related to such project. </text></subsection> <subsection id="H172FDEFF818F417DA977542E5C424187" commented="no"><enum>(c)</enum><header>Procedures used in State</header><text display-inline="yes-display-inline">In carrying out subsection (a), the Secretary shall consider, with respect to a State, the procedures that the State uses to acquire, or require the acquisition of, interests in land, to the extent that such procedures are generally consistent with the goals of a project or action.</text></subsection></section>
<section id="H617D65FADCDC417FA480DF91BD18E488" commented="no"><enum>1116.</enum><header>Dredged material management plans</header>
<subsection id="H85DA6D79C7F84DBBB79F7C93B39F5982" commented="no"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">For purposes of dredged material management plans initiated after the date of enactment of this Act, the Secretary shall expedite the dredged material management plan process in order that such plans make maximum use of existing information, studies, and innovative dredged material management practices, and avoid any redundant information collection and studies.</text></subsection> <subsection id="H04E14C4A0ECB4720ADB053C6295D2E58" commented="no"><enum>(b)</enum><header>Report</header><text display-inline="yes-display-inline">Not later than 60 days after the date of enactment of this Act, the Secretary shall submit to Congress a report on how the Corps of Engineers intends to meet the requirements of subsection (a).</text></subsection></section>
<section id="HD9091C7379DE4EA08052BDF27E06B2A2" commented="no"><enum>1117.</enum><header>Inclusion of project or facility in Corps of Engineers workplan</header>
<subsection id="H94911D63FD1E4827B3CD3E1249EE0D0F" commented="no"><enum>(a)</enum><header>In general</header><text>The Secretary shall, to the maximum extent practicable, include in the future workplan of the Corps any authorized project or facility of the Corps of Engineers—</text> <paragraph id="HC7CCBAAF669641EDBA2A2C198FD6591F"><enum>(1)</enum><text display-inline="yes-display-inline">that the Secretary has studied for disposition under an existing authority, including by carrying out a disposition study under section 216 of the Flood Control Act of 1970 (<external-xref legal-doc="usc" parsable-cite="usc/33/549a">33 U.S.C. 549a</external-xref>); and</text></paragraph>
<paragraph id="H129A02B1CFD4445D9EA1B222092CBDA4"><enum>(2)</enum><text display-inline="yes-display-inline">for which a final report by the Director of Civil Works has been completed.</text></paragraph></subsection> <subsection id="H9FD9E3FD22E34009B0F6637DB7B40974" commented="no"><enum>(b)</enum><header>Notification to Committees</header><text>Upon completion of a final report referred to in subsection (a), the Secretary shall transmit a copy of the report to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate.</text></subsection></section>
<section id="H7934C61E401543E585ED21AB25219A0B" commented="no"><enum>1118.</enum><header>Geomatic data</header>
<subsection id="HD514A849ACA64F0BA771551FE7243487" commented="no"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">The Secretary shall develop guidance for the acceptance and use of information obtained from a non-Federal interest through geomatic techniques, including remote sensing and land surveying, cartography, geographic information systems, global navigation satellite systems, photogrammetry, or other remote means, in carrying out any authority of the Secretary.</text></subsection> <subsection id="H5B53F10CB6D2448BB646D527F8ED79C7" commented="no"><enum>(b)</enum><header>Considerations</header><text>In carrying out this section, the Secretary shall ensure that use of information described in subsection (a) meets the data quality and operational requirements of the Secretary.</text></subsection>
<subsection id="HD7F13F175D8A4EB593E7B3A8D38D4D91" commented="no"><enum>(c)</enum><header>Savings clause</header><text>Nothing in this section—</text> <paragraph id="H74CACE7E582948ACA83B63952E21B1EF" commented="no"><enum>(1)</enum><text>requires the Secretary to accept information that the Secretary determines does not meet the guidance developed under this section; or</text></paragraph>
<paragraph id="H34209521A53D48A6B81AE10B02B0624A" commented="no"><enum>(2)</enum><text>changes the current statutory or regulatory requirements of the Corps of Engineers.</text></paragraph></subsection></section> <section id="H9024BF58085B4C039D25A04753E9419D" commented="no"><enum>1119.</enum><header>Local government reservoir permit review</header> <subsection id="H28CFF5A2B3AF4D038773EAF2807822C1" commented="no"><enum>(a)</enum><header>In general</header><text>During the 10-year period after the date of enactment of this section, the Secretary shall expedite review of applications for covered permits, if the permit applicant is a local governmental entity with jurisdiction over an area for which—</text>
<paragraph id="H43F5A3141C3E455C8A3DEB6481E74E71" commented="no"><enum>(1)</enum><text>any portion of the water resources available to the area served by the local governmental entity is polluted by chemicals used at a formerly used defense site under the jurisdiction of the Department of Defense that is undergoing (or is scheduled to undergo) environmental restoration under <external-xref legal-doc="usc-chapter" parsable-cite="usc-chapter/10/160">chapter 160</external-xref> of title 10, United States Code; and</text></paragraph> <paragraph id="HB6E60D883CA84D50B4A7BEC2EABCC2B0" commented="no"><enum>(2)</enum><text>mitigation of the pollution described in paragraph (1) is ongoing.</text></paragraph></subsection>
<subsection id="HDA2DFE0A78074C1295DC739448B9659A" commented="no"><enum>(b)</enum><header>Covered permit defined</header><text display-inline="yes-display-inline">In this section, the term <term>covered permit</term> means a permit to be issued by the Secretary to modify a reservoir owned or operated by the Secretary, with respect to which not less than 80 percent of the water rights are held for drinking water supplies, in order to accommodate projected water supply needs of an area with a population of less than 80,000.</text></subsection> <subsection id="HDD30CCB7511A48F6A9632FDBCF26F630" commented="no"><enum>(c)</enum><header>Limitations</header><text>Nothing in this section affects any obligation to comply with the provisions of any Federal law, including—</text>
<paragraph id="H7DED44F8BC4C48E9A25DFE0CEBCE214C" commented="no"><enum>(1)</enum><text>the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.); and</text></paragraph> <paragraph id="H55258FA51E6D404396D1A7A1DDC66745" commented="no"><enum>(2)</enum><text>the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1251">33 U.S.C. 1251</external-xref> et seq.).</text></paragraph></subsection></section>
<section id="HE44FF6FDE43C4A91A9DF360EC8E16075" commented="no"><enum>1120.</enum><header>Transparency and accountability in cost sharing for water resources development projects</header>
<subsection id="HF7CAA067F4AC46CBB1F6EDAE6640589C" commented="no"><enum>(a)</enum><header>Definition of balance sheet</header><text>In this section, the term <term>balance sheet</term> means a document that describes—</text> <paragraph id="HA671061212344A7780B565B4E535FF48" commented="no"><enum>(1)</enum><text>the funds provided by each Federal and non-Federal interest for a water resources development project; and</text></paragraph>
<paragraph id="HD231467DAACD42F5811D21EA33F66F75" commented="no"><enum>(2)</enum><text>the status of those funds.</text></paragraph></subsection> <subsection id="H4BD1878E9DB94350BF48DA1E53E72482" commented="no"><enum>(b)</enum><header>Establishment of balance sheet</header><text>Each district of the Corps of Engineers shall, using the authority of the Secretary under section 10 of the Water Resources Development Act of 1988 (<external-xref legal-doc="usc" parsable-cite="usc/33/2315">33 U.S.C. 2315</external-xref>)—</text>
<paragraph id="H959620F2EFC24F478AD9655DA2D31A8A" commented="no"><enum>(1)</enum><text display-inline="yes-display-inline">maintain a balance sheet for each water resources development project carried out by the Secretary for which a non-Federal cost share is required; and</text></paragraph> <paragraph id="HD1F87D3FF5B441AB97CB78398EAD186F" commented="no"><enum>(2)</enum><text>on request of a non-Federal interest that provided funds for the project, provide to the non-Federal interest a copy of the balance sheet.</text></paragraph></subsection>
<subsection id="HF5AC17DD129D4FDC9484B62853F94195" commented="no"><enum>(c)</enum><header>Under-Budget projects</header><text display-inline="yes-display-inline">In the case of a water resources development project carried out by the Secretary that is completed at a cost less than the estimated cost, the Secretary shall transfer any excess non-Federal funds to the non-Federal interest in accordance with the cost-share requirement applicable to the project.</text></subsection></section> <section id="H56C456BF7D0B49099ED398092113CBE1" commented="no"><enum>1121.</enum><header>Upper Missouri Mainstem Reservoir water withdrawal intake easement review</header> <subsection id="HE98018AE47A74A52B04C73906DA3B7C7" commented="no"><enum>(a)</enum><header>In general</header><text>During the 10-year period beginning on the date of enactment of this Act, the Secretary shall, to the maximum extent practicable, expedite the review of applications for a covered easement.</text></subsection>
<subsection id="H3ECF6F2EF51148B2B7FC87ED25564B8F" commented="no"><enum>(b)</enum><header>Process</header><text>In carrying out this section, the Secretary shall develop an application to obtain a covered easement that requires an applicant for a covered easement to submit information that includes—</text> <paragraph id="H5678DCC1D2C147C7A4DD40F053ABB218" commented="no"><enum>(1)</enum><text>all permissible locations for the proposed easement;</text></paragraph>
<paragraph id="H9547A7AE6D774D1F81B81A7C82EAA5B1" commented="no"><enum>(2)</enum><text>the corresponding dimensions of the proposed easement;</text></paragraph> <paragraph id="H648FC90990B14D4697836043E5FAE307" commented="no"><enum>(3)</enum><text>the methods of installation of the water withdrawal intakes; and</text></paragraph>
<paragraph id="H550EAAE51D2E49B2937C5F8B77CBED4D" commented="no"><enum>(4)</enum><text>any other information that the Secretary may require to complete the review.</text></paragraph></subsection> <subsection id="HF4FC8CAD93FE4F02B6CF8CEC38E33166" commented="no"><enum>(c)</enum><header>Response</header><text>Not later than 30 days after the date on which the Secretary receives an application under subsection (b), the Secretary shall seek to provide to the applicant a written notification that states—</text>
<paragraph id="H951F1A11D2F24CDAAFE5A267A4751A84" commented="no"><enum>(1)</enum><text>whether the application is complete; and</text></paragraph> <paragraph id="H7D6B55446D6347129E3F5CEF67B805AE" commented="no"><enum>(2)</enum><text>if the application is not complete, what information is needed for the application to be complete.</text></paragraph></subsection>
<subsection id="HA7303AB7E0CC4682B28C2289C62F2CF5" commented="no"><enum>(d)</enum><header>Determination</header><text display-inline="yes-display-inline">To the maximum extent practicable, not later than 120 days after the date on which the Secretary receives a complete application for a covered easement, the Secretary shall approve or deny the application for the covered easement.</text></subsection> <subsection id="HA1A1827BEDFA436295F4CA505EC8EB96" commented="no"><enum>(e)</enum><header>Covered easement defined</header><text>In this section, the term <term>covered easement</term> means an easement necessary to access Federal land under the control of the Secretary for the placement of water withdrawal intakes in the Upper Missouri Mainstem Reservoirs that does not otherwise involve the alteration or modification of any structures or facilities located on that Federal land, other than those owned by the non-Federal interest.</text></subsection>
<subsection id="H6D61ADD0BC6942E585356B52D04DFF51" commented="no"><enum>(f)</enum><header>Limitations</header><text>Nothing in this section affects any obligation to comply with the provisions of any Federal law, including—</text> <paragraph id="HE89791EB22D34FE081839FF40A26C168" commented="no"><enum>(1)</enum><text>the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.); and</text></paragraph>
<paragraph id="HD919562DA3C44C32996C35617E4C0F9F" commented="no"><enum>(2)</enum><text>the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1251">33 U.S.C. 1251</external-xref> et seq.).</text></paragraph></subsection></section> <section id="H8C8F7CFD030B4913B9AE0E63580641A7" commented="no"><enum>1122.</enum><header>Limitation on contract execution</header> <subsection id="HC52EEAB50E284762BC5FF99927C875D0" commented="no"><enum>(a)</enum><header>Limitation</header><text display-inline="yes-display-inline">For any new covered contract entered into during the period beginning on the date of enactment of this Act and ending on December 31, 2020, any local governmental entity that is a party to a covered contract entered into before such period shall be required to pay not more than 110 percent of the contractual rate per acre-foot in effect under the most recent such covered contract.</text></subsection>
<subsection id="HC20C077C614D45A08FA7FAB4DD034DC4" commented="no"><enum>(b)</enum><header>Covered contract</header><text display-inline="yes-display-inline">In this section, the term <term>covered contract</term> means a contract between a local governmental entity and the Secretary for water supply storage in a nonhydropower lake within the Verdigris River Basin.</text></subsection></section> <section id="HBAE2A410A1D949F3A023A2A563AF4761" commented="no"><enum>1123.</enum><header>Certain levee improvements</header> <subsection id="HB7A6245BEB024B3D98DCF975F59B0B2E" commented="no"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Notwithstanding section 211 of the Water Resources Development Act of 2000 (<external-xref legal-doc="usc" parsable-cite="usc/31/6505">31 U.S.C. 6505</external-xref> note), the Secretary, at the request of a local government, is authorized to provide technical services, on a reimbursable basis, to the local government to assess the reasons a federally constructed levee owned or operated by the local government is not accredited by the Federal Emergency Management Agency.</text></subsection>
<subsection id="H4C5955F6D964429DA5B46E2B92DBDBC4" commented="no"><enum>(b)</enum><header>Federal levees</header><text>In carrying out this section, in a case in which a levee owned and operated by the Secretary is hydraulically tied to a levee described in subsection (a), the Secretary is encouraged to cooperate, to the maximum extent practicable, with the relevant local governmental entities in assessing the reasons the levee described in subsection (a) is not accredited.</text></subsection> <subsection id="HFF0FF8A9122C4AA1B2DDDA4030F71561" commented="no"><enum>(c)</enum><header>Limitation</header><text>Nothing in this section—</text>
<paragraph id="HCCBAEA9AA3534D7B9CE55075F035C1A4" commented="no"><enum>(1)</enum><text>affects the responsibilities of a local government to operate and maintain its flood control infrastructure; or</text></paragraph> <paragraph id="HE623F95100014F7AA3451261272192E9" commented="no"><enum>(2)</enum><text>obligates the Secretary to expend additional Federal resources on levees owned and operated by the Secretary.</text></paragraph></subsection></section>
<section id="H8B1FABF6BADC44BE84F37344E23B2E37" section-type="subsequent-section" commented="no"><enum>1124.</enum><header>Cost-share payment for certain projects</header><text display-inline="no-display-inline">The Secretary shall, subject to the availability of appropriations, pay the outstanding balance of the Federal cost share for any project carried out under section 593 of the Water Resources Development Act of 1999 (113 Stat. 380).</text></section> <section id="HDB01A9F623D5429CA7D9E0199037A9F7" commented="no"><enum>1125.</enum><header>Locks on Allegheny River</header> <subsection id="H48F52E55F67A4B468B31CFCE428A23ED" commented="no"><enum></enum><text display-inline="yes-display-inline">The Corps of Engineers may consider, in making funding determinations with respect to the operation and maintenance of locks on the Allegheny River—</text>
<paragraph id="H75D7E02E03A446D5BBF110A9531884C6" commented="no"><enum>(1)</enum><text>recreational boat traffic levels; and</text></paragraph> <paragraph id="H1BB7FAEC54B74C8796607EA317B2C601" commented="no"><enum>(2)</enum><text>related economic benefits.</text></paragraph></subsection></section>
<section id="HFBC131184CB54AF994B3F2CB97491852" commented="no"><enum>1126.</enum><header>Purpose and need</header>
<subsection id="H9C6887C4855B4A19B11458EB2431EAD4" commented="no"><enum>(a)</enum><header>Purpose and need statements</header>
<paragraph id="HC00E87750A9F46B781065E899FB46835" commented="no"><enum>(1)</enum><header>In general</header><text>Not later than 90 days after the date of receipt of a complete application for a water storage project, the District Engineer shall develop and provide to the applicant a purpose and need statement that describes—</text> <subparagraph id="HD6DC1B546BDD422DA24B7F9304AA982D" commented="no"><enum>(A)</enum><text>whether the District Engineer concurs with the assessment of the purpose of and need for the water storage project proposed by the applicant; and</text></subparagraph>
<subparagraph id="H24635E4658774950A7CFE69AD1B2F425" commented="no"><enum>(B)</enum><text>in any case in which the District Engineer does not concur as described in subparagraph (A), an assessment by the District Engineer of the purpose of and need for the project.</text></subparagraph></paragraph> <paragraph id="H80D146A9B6EE48579CB731257757819A" commented="no"><enum>(2)</enum><header>Effect on environmental impact statements</header><text>No environmental impact statement or environmental assessment required under the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.) shall substantially commence with respect to a water storage project until the date on which the District Engineer provides to the applicant a purpose and need statement as required under paragraph (1).</text></paragraph></subsection>
<subsection id="HAD913DCD09A44601B7A3C81EE30F75BE" commented="no"><enum>(b)</enum><header>Appeals request</header><text>A non-Federal interest may use the administrative appeals process described in part 331 of title 33, Code of Federal Regulations (or any succeeding regulation), in relation to a decision of the Secretary related to an application for a water storage project.</text></subsection></section> <section id="H3A65DA29254747F1A32FE72CB3449895" commented="no"><enum>1127.</enum><header>Prior project authorization</header><text display-inline="no-display-inline">In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.</text></section>
<section id="HD2E06A58E257429F9BE101B3EC1D39CE" commented="no"><enum>1128.</enum><header>Mississippi River and Tributaries Project</header>
<subsection id="H47B7ED156B284D17A1E689905215C879" commented="no"><enum>(a)</enum><header>In general</header><text>After any flood event requiring operation or activation of any floodway or backwater feature within the Mississippi River and Tributaries Project through natural overtopping of a Federal levee or artificial crevassing of a Federal levee to relieve pressure on the levees elsewhere in the system, the Secretary shall expeditiously reset and restore the damaged floodway’s levees.</text></subsection> <subsection id="HB2C984AE7A924BEA953B718461ACE1FA" commented="no"><enum>(b)</enum><header>Consultation</header><text>In carrying out subsection (a), the Secretary shall provide an opportunity for consultation with affected communities.</text></subsection>
<subsection id="H1AE82E3F100649068ABC8DEA369F00D3" commented="no"><enum>(c)</enum><header>Mississippi river and tributaries project</header><text>The term <term>Mississippi River and Tributaries Project</term> means the Mississippi River and Tributaries project authorized by the Act of May 15, 1928 (Chap. 569; 45 Stat. 534).</text></subsection></section> <section id="HB781BFB2B18C414EAAC9FF587910BA6F" commented="no"><enum>1129.</enum><header>Inclusion of Tribal interests in project consultations</header> <subsection id="HF93D51AFE1054B9C904A955F31B5E46F" commented="no"><enum>(a)</enum><header>Report required</header><text display-inline="yes-display-inline">As soon as practicable following the date of enactment of this Act, the Secretary shall submit the report required under section 1120(a)(3) of the Water Resources Development Act of 2016 (130 Stat. 1643).</text></subsection>
<subsection id="H91E94FE83A0949789A81AD196C202EC5" commented="no"><enum>(b)</enum><header>Consultation</header><text>The Secretary shall ensure that all existing Tribal consultation policies, regulations, and guidance continue to be implemented, and that consultations with Federal and State agencies and Indian Tribes required for a water resources development project are carried out.</text></subsection></section> <section id="H2AD928AB9EF540BF9CD32D4B679E654D" commented="no"><enum>1130.</enum><header>Beneficial use of dredged material</header><text display-inline="no-display-inline">Section 1122 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326</external-xref> note) is amended—</text>
<paragraph id="HE77AC85AD6764B62A11648EA5BFA4282" commented="no"><enum>(1)</enum><text>in subsection (b)(1), by striking <quote>10</quote> and inserting <quote>20</quote>; and</text></paragraph> <paragraph id="HD1FFA4FE0A204EFDA8B7CA5E6DE5865D" commented="no"><enum>(2)</enum><text>in subsection (g), by striking <quote>10</quote> and inserting <quote>20</quote>.</text></paragraph></section>
<section id="H50D3400C44B64DCC881F55412891F284" commented="no"><enum>1131.</enum><header>Ice jam prevention and mitigation</header><text display-inline="no-display-inline">Section 1150(c) of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/701s">33 U.S.C. 701s</external-xref> note) is amended—</text> <paragraph id="H6E7034394A5E41DABE693FC94A5A02B6" commented="no"><enum>(1)</enum><text>in paragraph (1)—</text>
<subparagraph id="HB47FEAE269F749A5AE6A62344A4F3D8C" commented="no"><enum>(A)</enum><text>by striking <quote>During fiscal years 2017 through 2022, the Secretary</quote> and inserting <quote>The Secretary</quote>; and</text></subparagraph> <subparagraph id="H1DB175FB30A444EA9102AD5C43DCCC7D" commented="no"><enum>(B)</enum><text>by striking <quote>10 projects</quote> and inserting <quote>20 projects</quote>; and</text></subparagraph></paragraph>
<paragraph id="HB46BF822F9DE4AB183FE473EC61C6DDC" commented="no"><enum>(2)</enum><text>in paragraph (2)—</text> <subparagraph id="H5CF701841FD74CEEB9E8D7A3FFB9D4B0" commented="no"><enum>(A)</enum><text>by striking <quote>shall ensure</quote> and inserting the following : </text>
<quoted-block id="HFCCD23AE083E426D9F41C5955A6F95DC" style="OLC" display-inline="yes-display-inline"><text display-inline="yes-display-inline">shall—</text> <subparagraph id="HC0EE20662E914FADA07B49183E15ECB2" commented="no"><enum>(A)</enum><text>ensure</text></subparagraph><after-quoted-block>;</after-quoted-block></quoted-block></subparagraph>
<subparagraph id="HD200E1F375674DEA986BB4E14121DE8A" commented="no"><enum>(B)</enum><text>by striking the period at the end and inserting <quote>; and</quote>; and</text></subparagraph> <subparagraph id="H5D845C492B024753972ACDCEA9A197D3" commented="no"><enum>(C)</enum><text>by adding at the end the following:</text>
<quoted-block id="HB9A480580C6248F4B6FDFBFF50C8B0C7" style="OLC">
<subparagraph id="HCE2E0E3F926348089A1025C4E99BA326" commented="no"><enum>(B)</enum><text>select not fewer than one project to be carried out on a reservation (as defined in section 3 of the Indian Financing Act of 1974) that serves more than one Indian tribe (as defined in section 4 of the Indian Self-Determination and Education Assistance Act).</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph></section> <section id="HEB6ADCA10A604F7982536F120EED278F" display-inline="no-display-inline"><enum>1132.</enum><header>Rehabilitation of Corps of Engineers constructed dams</header><text display-inline="no-display-inline">Section 1177 of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/467f-2">33 U.S.C. 467f–2</external-xref> note) is amended—</text>
<paragraph id="H3038F0D90B0C4F43879638C9299677C2"><enum>(1)</enum><text>in subsection (e), by striking <quote>$10,000,000</quote> and inserting <quote>$40,000,000</quote>; and</text></paragraph> <paragraph id="HCE90ADD838E7467AADC6587305FDF13A"><enum>(2)</enum><text>in subsection (f), by striking <quote>$10,000,000</quote> and inserting <quote>$40,000,000</quote>.</text></paragraph></section>
<section id="H3279D353A02C4081921AF7AC4967E908" commented="no"><enum>1133.</enum><header>Columbia River</header>
<subsection id="HD784C511DB3F42DB8C58424B3F7A4267" commented="no"><enum>(a)</enum><header>Bonneville Dam, Oregon</header>
<paragraph id="H514533F3F46C42979FCCF9AC5FDC043B" commented="no"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">The Secretary, in consultation with the Secretary of the Interior, shall examine and assess the extent to which Indians (as defined in section 4 of the Indian Self-Determination and Education Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/25/5304">25 U.S.C. 5304</external-xref>)) have been displaced as a result of the construction of the Bonneville Dam, Oregon, as authorized by the first section of the Act of August 30, 1935 (49 Stat. 1032) and the first section and section 2(a) of the Act of August 20, 1937 (<external-xref legal-doc="usc" parsable-cite="usc/16/832">16 U.S.C. 832</external-xref>, 832a(a)).</text></paragraph> <paragraph id="H2C086F04E803420EB7B9FA6D8288C02C" commented="no"><enum>(2)</enum><header>Inclusion</header><text>The examination and assessment under paragraph (1) may include assessments relating to housing and related facilities.</text></paragraph>
<paragraph id="H76FEA992210F4D6EA0DCDD0A36558084" commented="no"><enum>(3)</enum><header>Assistance</header><text display-inline="yes-display-inline">If the Secretary determines, based on the examination and assessment under paragraph (1), that assistance is required or needed, the Secretary may use all existing authorities of the Secretary, including under this Act, to provide assistance to Indians who have been displaced as a result of the construction of the Bonneville Dam, Oregon.</text></paragraph> <paragraph id="H01645D3CE34D449099BFFBA71BF49717" commented="no"><enum>(4)</enum><header>Tribal assistance</header><text display-inline="yes-display-inline">Section 1178(c)(1)(A) of the Water Resources Development Act of 2016 (130 Stat. 1675) is amended by striking <quote>Upon the request of the Secretary of the Interior, the Secretary may provide assistance</quote> and inserting <quote>The Secretary, in consultation with the Secretary of the Interior, may provide assistance</quote>.</text></paragraph></subsection>
<subsection id="HE147FD69BAE54CB9A7AEE87CE154A199" commented="no"><enum>(b)</enum><header>John Day Dam, Washington and Oregon</header>
<paragraph id="HC90939E9071F42A8A70681DE11606737" commented="no"><enum>(1)</enum><header>In general</header><text>The Secretary, in consultation with the Secretary of the Interior, shall examine and assess the extent to which Indians (as defined in section 4 of the Indian Self-Determination and Education Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/25/5304">25 U.S.C. 5304</external-xref>)) have been displaced as a result of the construction of the John Day Dam, Oregon, as authorized by section 204 of the Flood Control Act of 1950 (64 Stat. 179). </text></paragraph> <paragraph id="H280B73978C9E426FA3E79DF8AE239472" commented="no"><enum>(2)</enum><header>Inclusion</header><text display-inline="yes-display-inline">The examination and assessment under paragraph (1) may include—</text>
<subparagraph id="H2B6318A19A664A0C8E3D57CF3A926905"><enum>(A)</enum><text>assessments relating to housing and related facilities; and</text></subparagraph> <subparagraph id="H7BA7B20DF7AF4E219BEE1C4FAA26781C"><enum>(B)</enum><text display-inline="yes-display-inline">the study required by section 1178(c)(2) of the Water Resources Development Act of 2016 (130 Stat. 1675).</text></subparagraph></paragraph>
<paragraph id="H310622839D7B4336808B24470F0EBADD" commented="no"><enum>(3)</enum><header>Assistance</header><text>If the Secretary determines, based on the examination and assessment under paragraph (1), that assistance is required or needed, the Secretary may use all existing authorities of the Secretary, including under this Act, to provide assistance to Indians who have been displaced as a result of the construction of the John Day Dam, Oregon.</text></paragraph></subsection> <subsection id="H986B47DD0D3B4E0381807F77A903B9C4" commented="no"><enum>(c)</enum><header>Dalles Dam, Washington and Oregon</header> <paragraph id="HCD76FACDEC4246E9BD12809CE53E8632" commented="no"><enum>(1)</enum><header>In general</header><text>The Secretary, in consultation with the Secretary of the Interior, shall complete and carry out a village development plan for any Indian village submerged as a result of the construction of the Dalles Dam, Columbia River, Washington and Oregon, as authorized by section 204 of the Flood Control Act of 1950 (64 Stat. 179).</text></paragraph>
<paragraph id="H2CAA14AB0E324F4FB1CC5274101275E3" commented="no"><enum>(2)</enum><header>Assistance</header><text>The Secretary may acquire land from willing land owners in carrying out a village development plan under paragraph (1).</text></paragraph> <paragraph id="H2453A26DB8DC418BBA682B260979BC93" commented="no"><enum>(3)</enum><header>Requirements</header><text>A village development plan completed under paragraph (1) shall include, at a minimum, an estimated cost and tentative schedule for the construction of a replacement village.</text></paragraph></subsection></section>
<section id="HACDA55C51AD649A28AD6B4C24724332B" commented="no"><enum>1134.</enum><header>Missouri River Reservoir sediment management</header><text display-inline="no-display-inline">Section 1179(a) of the Water Resources Development Act of 2016 (130 Stat. 1675) is amended—</text> <paragraph id="H2B957AF000104E54BC2BF2BC3DC7CB2C" commented="no"><enum>(1)</enum><text>by redesignating paragraphs (4) through (8) as paragraphs (5) through (9), respectively;</text></paragraph>
<paragraph id="H895E80C7E2CE4F6988CCAB6AB51B1B42" commented="no"><enum>(2)</enum><text>by inserting after paragraph (3) the following:</text> <quoted-block id="H57648711ACAB4982A25CAC2F048623DF" style="OLC"> <paragraph id="HBC7BC1DB4BF64499B87583D6B43815CE" commented="no"><enum>(4)</enum><header>Prioritization of sediment management plans</header><text>In carrying out the pilot project under this subsection, the Secretary shall give priority to developing and implementing sediment management plans that affect reservoirs that cross State lines.</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph>
<paragraph id="H722FF9DBF9374348B96D3DF04B4C52BD" commented="no"><enum>(3)</enum><text>in paragraph (8) (as so redesignated)—</text> <subparagraph id="H69AD2D5FF09344FAB802D71648D479B0" commented="no"><enum>(A)</enum><text>by redesignating subparagraph (B) as subparagraph (D); and</text></subparagraph>
<subparagraph id="HF456535D06BC446B995DAF72EE38F48C" commented="no"><enum>(B)</enum><text>by striking subparagraph (A) and inserting the following:</text> <quoted-block id="H939C3027307546569AA5F2595281145E" style="OLC"> <subparagraph id="HCE3C142DFED74D8D8B643C78019E7A60" commented="no"><enum>(A)</enum><header>In general</header><text>The Secretary shall carry out the pilot program established under this subsection in partnership with the Secretary of the Interior, and the program shall apply to reservoirs managed or owned by the Bureau of Reclamation.</text></subparagraph>
<subparagraph id="HFEDB1F8F4D934A5FA3A70CEFEA16148C" commented="no"><enum>(B)</enum><header>Memorandum of agreement</header><text>For sediment management plans that apply to a reservoir managed or owned by the Bureau of Reclamation under subparagraph (A), the Secretary and the Secretary of the Interior shall execute a memorandum of agreement establishing the framework for a partnership and the terms and conditions for sharing expertise and resources.</text></subparagraph> <subparagraph id="HA05715308BEE454699CF170C5F52287B" commented="no"><enum>(C)</enum><header>Payments</header><text>The Secretary is authorized to accept and expend funds from the Secretary of the Interior to complete any work under this paragraph at a reservoir managed or owned by the Bureau of Reclamation.</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph></section>
<section id="H3087B7B8294F43258B22C16F99C4E283" commented="no"><enum>1135.</enum><header>Reauthorization of lock operations pilot program</header><text display-inline="no-display-inline">Section 1017(f) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2212">33 U.S.C. 2212</external-xref> note) is amended by striking <quote>5 years</quote> and inserting <quote>10 years</quote>. </text></section> <section id="H6E25C6C4DC1D41298CA8AE629E9E76CB" commented="no"><enum>1136.</enum><header>Credit or reimbursement</header> <subsection id="HC5A99F893FBB4DB7A0F292FF217B3BF0"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Section 1022 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2225">33 U.S.C. 2225</external-xref>) is amended to read as follows:</text>
<quoted-block id="H3B181BD0BDE049E1BFDBB0D22A60BEC3" style="OLC">
<section id="HC9E0A136261B458BA377DBB69A2C3E99" commented="no"><enum>1022.</enum><header>Credit or reimbursement</header>
<subsection id="H5019B5233F1E490BB4C8486552944DB9" commented="no"><enum>(a)</enum><header>Requests for credits</header><text>With respect to an authorized flood damage reduction project, or separable element thereof, that has been constructed by a non-Federal interest under section 211 of the Water Resources Development Act of 1996 (<external-xref legal-doc="usc" parsable-cite="usc/33/701b-13">33 U.S.C. 701b–13</external-xref>), or an authorized coastal navigation project that has been constructed by the Corps of Engineers pursuant to section 11 of the Act of March 3, 1925, before the date of enactment of the <short-title>Water Resources Development Act of 2018</short-title>, the Secretary may provide to the non-Federal interest, at the request of the non-Federal interest, a credit in an amount equal to the estimated Federal share of the cost of the project or separable element, in lieu of providing to the non-Federal interest a reimbursement in that amount or reimbursement of funds of an equivalent amount, subject to the availability of appropriations.</text></subsection> <subsection id="H5D74492502BD4931B581E156D5EA320A" commented="no"><enum>(b)</enum><header>Application of credits</header><text>At the request of the non-Federal interest, the Secretary may apply all or a portion of such credit to the share of the cost of the non-Federal interest of carrying out other flood damage reduction and coastal navigation projects or studies.</text></subsection>
<subsection id="HD67BA10AA7B64C55B558A71068683D91" commented="no"><enum>(c)</enum><header>Application of reimbursement</header><text>At the request of the non-Federal interest, the Secretary may apply such funds, subject to the availability of appropriations, equal to the share of the cost of the non-Federal interest of carrying out other flood damage reduction and coastal navigation projects or studies.</text></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></subsection> <subsection id="H2B86267348BC4CD98EF65484FA26B5D8"><enum>(b)</enum><header>Clerical amendment</header><text display-inline="yes-display-inline">The table of contents contained in section 1(b) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1193) is amended by striking the item relating to section 1022 and inserting the following:</text>
<quoted-block style="OLC" id="HF1F6495ED7D04D4C8A21F1664E3E28BA">
<toc regeneration="no-regeneration">
<toc-entry level="section">Sec. 1022. Credit or reimbursement.</toc-entry></toc><after-quoted-block>.</after-quoted-block></quoted-block></subsection></section>
<section id="H0E6C74D955664B86BB15127416C03F12"><enum>1137.</enum><header>Non-Federal implementation pilot program</header><text display-inline="no-display-inline">Section 1043(b) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2201">33 U.S.C. 2201</external-xref> note) is amended—</text> <paragraph id="H902D74C591E44522AD3A68F0F0F9DE22"><enum>(1)</enum><text>in paragraph (3)(A)(i)—</text>
<subparagraph id="HEF2C37D0DC184C6FBCA55FC7CF5F3CF0"><enum>(A)</enum><text>in the matter preceding subclause (I)—</text> <clause id="H1DCF072374E74934BC4554772215A3A9"><enum>(i)</enum><text>by striking <quote>15</quote> and inserting <quote>20</quote>; and</text></clause>
<clause id="HD59A74E30E37455ABD39F182C8C88BEB"><enum>(ii)</enum><text>by striking <quote>prior to the date of enactment of this Act</quote>;</text></clause></subparagraph> <subparagraph id="H549EF281CCCA463BB11B0FE946112FEB"><enum>(B)</enum><text>in subclause (I)—</text>
<clause id="H2CE3491ACF934280873D8E1466162C27"><enum>(i)</enum><text>in the matter preceding item (aa), by inserting <quote>that have been authorized for construction prior to the date of enactment of this Act and</quote> after <quote>not more than 12 projects</quote>; and</text></clause> <clause id="HDA0F911B68C54306A9B0C1D54EF2CDA3"><enum>(ii)</enum><text>in item (bb), by striking <quote>; and</quote> and inserting a semicolon;</text></clause></subparagraph>
<subparagraph id="HECFB65CCB2E44357ACB75FDFAC96A1D2"><enum>(C)</enum><text>in subclause (II)—</text> <clause id="H55B0B173B9724042B467950D037E19C4"><enum>(i)</enum><text>by inserting <quote>that have been authorized for construction prior to the date of enactment of this Act and</quote> after <quote>not more than 3 projects</quote>; and</text></clause>
<clause id="H7FEE87AD178548E99F78FA7971D734E4"><enum>(ii)</enum><text>by striking the semicolon and inserting <quote>; and</quote>; and</text></clause></subparagraph> <subparagraph id="H73DB7EDE73EC4527ACEB140C640BF920"><enum>(D)</enum><text>by adding at the end the following:</text>
<quoted-block style="OLC" id="HCA43998B7BAF45BE8651BE26741CFBEC" display-inline="no-display-inline">
<subclause id="H23E4BEF650E5410EA368B3EE2FA546E8"><enum>(III)</enum><text display-inline="yes-display-inline">not more than 5 projects that have been authorized for construction, but did not receive the authorization prior to the date of enactment of this Act;</text></subclause><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph></paragraph> <paragraph id="H82D3054A321F48789666E0CBB21FEAD7"><enum>(2)</enum><text>in paragraph (8), by striking <quote>2015 through 2019</quote> and inserting <quote>2019 through 2023</quote>.</text></paragraph></section>
<section id="H8F19908FB7D94732B3070D6F9E3D410D" commented="no"><enum>1138.</enum><header>Surplus water contracts and water storage agreements</header><text display-inline="no-display-inline">Section 1046(c) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1254) is amended—</text> <paragraph id="H984C88627B26459892BC8F9BDE159B3D" commented="no"><enum>(1)</enum><text>in paragraph (1)—</text>
<subparagraph id="H8534DF8288C34CD7BA99BE692980C982" commented="no"><enum>(A)</enum><text>by striking <quote>shall not charge a fee</quote> and inserting the following: </text> <quoted-block id="H2D6A14A4545A432CB11634607264009B" style="OLC" display-inline="yes-display-inline"><text display-inline="yes-display-inline">shall not—</text>
<subparagraph id="H49FBFC07F71742DE90CFA110E2EE5AF4" commented="no"><enum>(A)</enum><text>charge a fee</text></subparagraph><after-quoted-block>;</after-quoted-block></quoted-block></subparagraph> <subparagraph id="H124478F1667E42AFAE4E223D4CBD356D" commented="no"><enum>(B)</enum><text>by striking <quote>Reservoirs.</quote> and inserting <quote>Reservoirs; or</quote>; and</text></subparagraph>
<subparagraph id="H794685D22E3E4EEB97C044FCC694C179" commented="no"><enum>(C)</enum><text>by adding at the end the following:</text> <quoted-block id="H7C7CB8A585934C74BFAB5A775783988C" style="OLC"> <subparagraph id="HDD8597026399488DAE6DB25568CE9907" commented="no"><enum>(B)</enum><text>assess a water storage fee with respect to any water storage in the Upper Missouri Mainstem Reservoirs.</text></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph></paragraph>
<paragraph id="H64681477640E4B598D7C2A41963D5D19" commented="no"><enum>(2)</enum><text>in paragraph (3), by striking <quote>10</quote> and inserting <quote>12</quote>.</text></paragraph></section> <section id="H3AA473E69AAC407EA529893FD4AD7A79" display-inline="no-display-inline" section-type="subsequent-section"><enum>1139.</enum><header>Post-disaster watershed assessments in territories of the United States</header><text display-inline="no-display-inline">Section 3025 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2267b">33 U.S.C. 2267b</external-xref>) is amended by adding at the end the following:</text>
<quoted-block style="OLC" id="HDFEBC9F86CFE403B9EBC80F3AC2C1924" display-inline="no-display-inline">
<subsection id="HB62AAFEE87FE48D289375D2FB795A585"><enum>(e)</enum><header>Assessments in territories of the United States</header>
<paragraph id="H6A56ADD55DD4493685E93804EF978414"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">For any major disaster declared in a territory of the United States before the date of enactment of this subsection, all activities in the territory carried out or undertaken pursuant to the authorities described in this section shall be conducted at full Federal expense unless the President determines that the territory has the ability to pay the cost share for an assessment under this section without the use of loans. </text></paragraph> <paragraph id="HF039EFD2F5BC477F8CD3555285894AF3"><enum>(2)</enum><header>Territory defined</header><text display-inline="yes-display-inline">In this subsection, the term <term>territory of the United States</term> means an insular area specified in section 1156(a)(1) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2310">33 U.S.C. 2310(a)(1)</external-xref>). </text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></section>
<section id="H5ED4382F48934FB98F57F1A74E0C2682" commented="no"><enum>1140.</enum><header>Expedited consideration</header><text display-inline="no-display-inline">Section 7004(b)(4) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1374) is amended by striking <quote>December 31, 2018</quote> and inserting <quote>December 31, 2024</quote>.</text></section> <section id="HA8F25CC885F14ABA8FB2B98B834DA83D" commented="no"><enum>1141.</enum><header>Project studies subject to independent peer review</header><text display-inline="no-display-inline">Section 2034(h)(2) of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/33/2343">33 U.S.C. 2343(h)(2)</external-xref>) is amended by striking <quote>12 years</quote> and inserting <quote>17 years</quote>.</text></section>
<section id="H54B2ADC26037487FB5F50711675DED5F" commented="no"><enum>1142.</enum><header>Feasibility of Chicago Sanitary and Ship Canal Dispersal Barriers Project, Illinois</header><text display-inline="no-display-inline">Section 3061(d) of the Water Resources Development Act of 2007 (<external-xref legal-doc="public-law" parsable-cite="pl/110/114">Public Law 110–114</external-xref>; 121 Stat. 1121) is amended—</text> <paragraph id="H1A3776BF82234AB9B89F22BDFC108DE4" commented="no"><enum>(1)</enum><text>by striking <quote>The Secretary</quote> and inserting the following:</text>
<quoted-block id="H9FE0ECFE23E049FAA7A36D62AF7E31C2" style="OLC">
<paragraph id="HCF565EA871D4473B969C48898EF73BAB" commented="no"><enum>(1)</enum><header>In general</header><text>The Secretary</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph> <paragraph id="H2D0F1AE236574392A59FE6B999570B9A" commented="no"><enum>(2)</enum><text>by adding at the end the following:</text>
<quoted-block id="H014A32CE165F443A84576916DE775694" style="OLC">
<paragraph id="HCA35C80956FD49BBA31F56C2D78DA250" commented="no"><enum>(2)</enum><header>Operation and maintenance</header><text>Operation and maintenance of any project authorized to be carried out pursuant to the feasibility study identified in paragraph (1) shall be carried out at 80 percent Federal expense and 20 percent non-Federal expense.</text></paragraph> <paragraph id="H100A92399B2C48EA8DB5972DE276B93B" commented="no"><enum>(3)</enum><header>Consultation</header><text display-inline="yes-display-inline">After construction of any project authorized to be carried out pursuant to the feasibility study identified in paragraph (1), the Secretary shall consult with the Governor of the State in which the project is constructed before any control technologies not included in the Chief's Report are implemented.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section>
<section id="HD09A70BD521A471BB75B4E699A66A058" commented="no"><enum>1143.</enum><header>Acknowledgment of credit</header><text display-inline="no-display-inline">Section 7007(a) of the Water Resources Development Act of 2007 (121 Stat. 1277; 128 Stat. 1226) is amended by adding at the end the following: <quote>Notwithstanding section 221(a)(4)(C)(i) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(a)(4)(C)(i)), the Secretary may provide credit for work carried out during the period beginning on November 8, 2007, and ending on the date of enactment of the <short-title>Water Resources Development Act of 2018</short-title> by the non-Federal interest for a project under this title if the Secretary determines that the work is integral to the project and was carried out in accordance with the requirements of subchapter 4 of chapter 31, and chapter 37, of title 40, United States Code.</quote>.</text></section> <section id="HE58F3BDD06ED4D84BEF9AB4CF7FE1EC9"><enum>1144.</enum><header>Levee safety initiative reauthorization</header><text display-inline="no-display-inline"> Title IX of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/33/3301">33 U.S.C. 3301</external-xref> et seq.) is amended—</text>
<paragraph id="HB18E786B67F342D3A2C8AC6C21077118"><enum>(1)</enum><text display-inline="yes-display-inline">in section 9005(g)(2)(E)(i), by striking <quote>2015 through 2019</quote> and inserting <quote>2019 through 2023</quote>; and</text></paragraph> <paragraph id="HA7960DB24A554690AA4ECF5C7C0B68FE"><enum>(2)</enum><text>in section 9008, by striking <quote>2015 through 2019</quote> each place it appears and inserting <quote>2019 through 2023</quote>.</text></paragraph></section>
<section id="H0A80075C08544E30B97DBE7D7CBDBB3E"><enum>1145.</enum><header>Funding to process permits</header><text display-inline="no-display-inline">Section 214(a) of the Water Resources Development Act of 2000 (<external-xref legal-doc="usc" parsable-cite="usc/33/2352">33 U.S.C. 2352(a)</external-xref>) is amended—</text> <paragraph id="HAACF53EBF5BD4A9E8D7BD0CF04A34564"><enum>(1)</enum><text display-inline="yes-display-inline">by striking paragraph (3) and redesignating paragraphs (4) and (5) as paragraphs (3) and (4), respectively; and</text></paragraph>
<paragraph id="HCE48ADC898E946B8B74730CFD9942EDD"><enum>(2)</enum><text display-inline="yes-display-inline">in paragraph (4), as so redesignated—</text> <subparagraph id="HB8583634892848C29AE19AF2DA439F05"><enum>(A)</enum><text>by striking <quote>4 years after the date of enactment of this paragraph</quote> and inserting <quote>December 31, 2022</quote>; and</text></subparagraph>
<subparagraph id="HF7A5DB1F17BD4EB782000EFBB4ED6C19"><enum>(B)</enum><text>by striking <quote>carry out a study</quote> and inserting <quote>carry out a followup study</quote>.</text></subparagraph></paragraph></section> <section id="HDD55D9A4130F4D3187F08BBD1CCAB4A3" commented="no"><enum>1146.</enum><header>Reservoir sediment</header><text display-inline="no-display-inline">Section 215 of the Water Resources Development Act of 2000 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326c">33 U.S.C. 2326c</external-xref>) is amended—</text>
<paragraph id="H751820BA00774CA0817639A5C4B25BFF" commented="no"><enum>(1)</enum><text>in subsection (a)—</text> <subparagraph id="H842D355BB30744C5AF59333D1F268E76" commented="no"><enum>(A)</enum><text>by striking <quote>the date of enactment of the Water Resources Development Act of 2016</quote> and inserting <quote>the date of enactment of the <short-title>Water Resources Development Act of 2018</short-title></quote>; and</text></subparagraph>
<subparagraph id="H93F5F5EF968A48808BC7254B0194D001" commented="no"><enum>(B)</enum><text>by striking <quote>shall establish, using available funds, a pilot program to accept</quote> and inserting <quote>shall, using available funds, accept</quote>;</text></subparagraph></paragraph> <paragraph id="H2E4F92BB897E41DC9F6775334EDB2485" commented="no"><enum>(2)</enum><text>in subsection (b)—</text>
<subparagraph id="H4AFF5F6EDDAB46BDB8040C9BCF0B786C" commented="no"><enum>(A)</enum><text>in paragraph (2), by adding <quote>and</quote> at the end;</text></subparagraph> <subparagraph id="H984CE3E31F2040A691C2D208AFFD5F18" commented="no"><enum>(B)</enum><text>in paragraph (3), by striking <quote>; and</quote> at the end and inserting a period; and</text></subparagraph>
<subparagraph id="HC66B07D4D082493C95BBCCE5DF940092" commented="no"><enum>(C)</enum><text>by striking paragraph (4); and</text></subparagraph></paragraph> <paragraph id="HAFDCA7C4D3234011868AAE9F05DCB20D" commented="no"><enum>(3)</enum><text>by striking subsection (f) and inserting the following:</text>
<quoted-block id="H5DC8D53DF6D34B70B8DCADB3C3A0D616" style="OLC">
<subsection id="HCC8CE414A3B046C0A1E7AEDAD9D8B1CE" commented="no"><enum>(f)</enum><header>Report to Congress</header><text>Not later than 3 years after the date of enactment of the <short-title>Water Resources Development Act of 2018</short-title>, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report describing the results of the program under this section.</text></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section> <section id="HA23820E4CF634138B0F9847B35431B4B" commented="no"><enum>1147.</enum><header>Clarification for integral determination</header><text display-inline="no-display-inline">Section 601(e)(5) of the Water Resources Development Act of 2000 (<external-xref legal-doc="public-law" parsable-cite="pl/106/541">Public Law 106–541</external-xref>) is amended—</text>
<paragraph id="HA7E3E2D745EF43C59334A4FE65447B7C" commented="no"><enum>(1)</enum><text>in subparagraph (B)(i)—</text> <subparagraph id="HAE8401707E35499B8F422D7465D576CB" commented="no"><enum>(A)</enum><text>in subclause (II), by striking <quote>; or</quote> and inserting a semicolon; and</text></subparagraph>
<subparagraph id="HBE211DF70DCF43C7B7CCE156FF3F7884" commented="no"><enum>(B)</enum><text>by inserting after subclause (III) the following:</text> <quoted-block style="OLC" id="H76BBAD5281F04361871C725C24D06248" display-inline="no-display-inline"> <subclause id="HE954A8E850AB4C37B5D5A68CF59FCBA8" indent="up1" commented="no"><enum>(IV)</enum><text display-inline="yes-display-inline">the credit is provided for work carried out by the non-Federal sponsor in the implementation of an authorized project implementation report, and such work was defined in an agreement between the Secretary and the non-Federal sponsor prior to the execution of such work; or</text></subclause>
<subclause id="H1802B1E5E43047F690C2F01292829C0A" indent="up1" commented="no"><enum>(V)</enum><text display-inline="yes-display-inline">the credit is provided for any work carried out by the non-Federal sponsor, as agreed to by the District Commander and non-Federal sponsor in a written agreement (which may include an electronic agreement) prior to such work being carried out by the non-Federal sponsor;</text></subclause><after-quoted-block>;</after-quoted-block></quoted-block></subparagraph></paragraph> <paragraph id="HAA70771404234CF583CAAFC082AD052A" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">in subparagraph (B), by amending clause (iii) to read as follows:</text>
<quoted-block style="OLC" id="HC09EABA43120470590114714557196F1" display-inline="no-display-inline">
<clause id="H2247366C85A046C4BD8E7A388FED3E33" commented="no"><enum>(iii)</enum><text display-inline="yes-display-inline">the Secretary determines that the work performed by the non-Federal sponsor—</text> <subclause id="H336AB9B55D1A4FA1A2110BBF2AE8C655" commented="no"><enum>(I)</enum><text display-inline="yes-display-inline">is integral to the project; and</text></subclause>
<subclause id="HE7EF2D9CEEC04CE99FAA74BAC511C95C" commented="no"><enum>(II)</enum><text display-inline="yes-display-inline">was carried out in accordance with the requirements of subchapter 4 of chapter 31, and chapter 37, of title 40, United States Code.</text></subclause></clause><after-quoted-block>;</after-quoted-block></quoted-block></paragraph> <paragraph id="HB410109B4C4845068760FAFFB1B44AE7" commented="no"><enum>(3)</enum><text>by redesignating subparagraphs (C) through (E) as subparagraphs (D) through (F), respectively; and</text></paragraph>
<paragraph id="HBCA54DC76920449689BD77B50BACEAA4" commented="no"><enum>(4)</enum><text>by inserting after subparagraph (B) the following:</text> <quoted-block style="OLC" id="H28B4595C870C41D987649E2B882BAE7D" display-inline="no-display-inline"> <subparagraph id="H87D837D9D19140638EBE01CAF04790CF" commented="no"><enum>(C)</enum><header>Timing</header><text display-inline="yes-display-inline">In any case in which the Secretary approves credit under subparagraph (B), in a written agreement (which may include an electronic agreement) with the non-Federal sponsor, the Secretary shall provide such credit for work completed under an agreement that prescribes the terms and conditions for the in-kind contributions.</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section>
<section id="H7D1E49D28C1344888E18FA73069E3240" commented="no"><enum>1148.</enum><header>Beneficial use of dredged sediment</header>
<subsection id="HC28EB10B8B4A4CFEB6DF487EA3337024" commented="no"><enum>(a)</enum><header>In general</header><text>In carrying out a project for the beneficial reuse of sediment to reduce storm damage to property under section 204 of the Water Resources Development Act of 1992 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326</external-xref>) that involves only a single application of sediment, the Secretary may grant a temporary easement necessary to facilitate the placement of sediment, if the Secretary determines that granting a temporary easement is in the interest of the United States.</text></subsection> <subsection id="HF707BCD1F085413387545EDE93F3DD69" commented="no"><enum>(b)</enum><header>Limitation</header><text>If the Secretary grants a temporary easement under subsection (a) with respect to a project, that project shall no longer be eligible for future placement of sediment under section 204 of the Water Resources Development Act of 1992 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326</external-xref>).</text></subsection></section>
<section id="H74FF23245D014D80BD5FC822352EA6BA" commented="no"><enum>1149.</enum><header>Inclusion of alternative measures for aquatic ecosystem restoration</header>
<subsection id="H73EB301DBCD24A01B326B82CDEEF135D" commented="no"><enum>(a)</enum><header>Inclusion of alterative measures for aquatic ecosystem restoration</header><text>Section 206 of the Water Resources Development Act of 1996 (<external-xref legal-doc="usc" parsable-cite="usc/33/2230">33 U.S.C. 2230</external-xref>) is amended—</text> <paragraph id="H8FA32FC631CA41AF90CBBCA51587635E" commented="no"><enum>(1)</enum><text>by redesignating subsection (e) as subsection (f); and</text></paragraph>
<paragraph id="HCAB91D32440043B89CAD58BE0A46DF3C" commented="no"><enum>(2)</enum><text>by inserting after subsection (d) the following:</text> <quoted-block id="H2CC234221C174336A600F18AFD580A1A" style="OLC"> <subsection id="HA5B0939B88694CD9B10CE38D627E7FC1" commented="no"><enum>(e)</enum><header>Use of natural and nature-Based features</header><text>In carrying out a project to restore and protect an aquatic ecosystem or estuary under subsection (a), the Secretary shall consider, and may include, with the consent of the non-Federal interest, a natural feature or nature-based feature, as such terms are defined in section 1184 of the Water Resources Development Act of 2016, if the Secretary determines that inclusion of such features is consistent with the requirements of subsection (a).</text></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection>
<subsection id="H06AC44F7F3D14B10881E967A590190A8" commented="no"><enum>(b)</enum><header>Amendment to definition</header><text>Section 1184(a)(2) of the Water Resources Development Act of 2016 (<external-xref legal-doc="usc" parsable-cite="usc/33/2289a">33 U.S.C. 2289a(a)(2)</external-xref>) is amended by striking <quote>in coastal areas</quote>.</text></subsection> <subsection id="HA4E1CDBACA0445088B38C2028EDFB8EE"><enum>(c)</enum><header>Natural infrastructure</header><text display-inline="yes-display-inline">In carrying out a feasibility report developed under section 905 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282">33 U.S.C. 2282</external-xref>) for a project for flood risk management or hurricane and storm damage risk reduction, the Secretary shall consider the use of both traditional and natural infrastructure alternatives, alone or in conjunction with each other, if those alternatives are practicable.</text></subsection></section>
<section id="H1A59EA059B724DA89EDAD0BE14BCF3D9" commented="no"><enum>1150.</enum><header>Regional sediment management</header><text display-inline="no-display-inline">Section 204(a)(1)(A) of the Water Resources Development Act of 1992 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326(a)(1)(A)</external-xref>) is amended by inserting <quote>including a project authorized for flood control,</quote> after <quote>an authorized Federal water resources project,</quote>.</text></section> <section id="HE8A0CEB566CB4862AD6AB38428537E47" display-inline="no-display-inline" section-type="subsequent-section"><enum>1151.</enum><header>Operation and maintenance of navigation and hydroelectric facilities</header> <subsection id="HDF6239A6BAFD46F5B8B1E794BDA8D394"><enum>(a)</enum><header>In general</header><text>Section 314 of the Water Resources Development Act of 1990 (<external-xref legal-doc="usc" parsable-cite="usc/33/2321">33 U.S.C. 2321</external-xref>) is amended—</text>
<paragraph id="HB1D79871582840A79363FBBB77722663"><enum>(1)</enum><text>in the heading by inserting <quote><header-in-text level="section" style="OLC">navigation and</header-in-text></quote> before <quote><header-in-text level="section" style="OLC">hydroelectric facilities</header-in-text></quote>;</text></paragraph> <paragraph id="H6A487B7D7B7B4FA78BA063E1A41C4800"><enum>(2)</enum><text>in the first sentence, by striking <quote>Activities currently performed</quote> and inserting the following:</text>
<quoted-block id="H5D2AA49BFF534CBE9E786024589082AD" style="OLC">
<subsection id="H7DECE399F7814BE597D5DC94F8D0225D"><enum>(a)</enum><header>In general</header><text>Activities currently performed</text></subsection><after-quoted-block>;</after-quoted-block></quoted-block></paragraph> <paragraph id="H14A886DF0682468DA72A3E0D664A4C69"><enum>(3)</enum><text>in subsection (a) (as designated by paragraph (2)), by inserting <quote>navigation or</quote> before <quote>hydroelectric</quote>; </text></paragraph>
<paragraph id="HB763694A6A9B49A697A2C7058F1B64A9"><enum>(4)</enum><text>in the second sentence, by striking <quote>This section</quote> and inserting the following:</text> <quoted-block id="H338E35EE9E8C4E39A11C32615D1A1A45" style="OLC"> <subsection id="HB3ABB100D567458B87534A3512034CC2"><enum>(b)</enum><header>Major maintenance contracts allowed</header><text>This section</text></subsection><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph>
<paragraph id="H0CC4EFFD18754137971DA2D632599775"><enum>(5)</enum><text>by adding at the end the following:</text> <quoted-block id="H129DF5AA48E6465DB2E766DEDA714D86" style="OLC"> <subsection id="H36B6E13B0A9343B488F040EE96A52898"><enum>(c)</enum><header>Exclusion</header><text>This section does not—</text>
<paragraph id="H97179D0086BE4912B82C87A8C739CDF3"><enum>(1)</enum><text>apply to a navigation facility that was under contract on or before the date of enactment of this subsection with a non-Federal interest to perform operations or maintenance; and</text></paragraph> <paragraph id="H65E1D34CAC194D5097410DED3F7245DD"><enum>(2)</enum><text>prohibit the Secretary from contracting out commercial activities after the date of enactment of this subsection at a navigation facility.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection>
<subsection id="H5ACFEE59311240FEBBE37C7B0AE7E9C0"><enum>(b)</enum><header>Clerical amendment</header><text>The table of contents contained in section 1(b) of the Water Resources Development Act of 1990 (104 Stat. 4604) is amended by striking the item relating to section 314 and inserting the following:</text> <quoted-block id="H724234A2248C4D499FF97E05D4425C99" style="OLC"> <toc regeneration="no-regeneration"> <toc-entry level="section">Sec. 314. Operation and maintenance of navigation and hydroelectric facilities.</toc-entry></toc><after-quoted-block>.</after-quoted-block></quoted-block></subsection></section> <section id="HC07635CFCFEA4626AE74A9A0CD86AB88"><enum>1152.</enum><header>Study of water resources development projects by non-Federal interests</header><text display-inline="no-display-inline">Section 203 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2231">33 U.S.C. 2231</external-xref>) is amended—</text>
<paragraph id="HBA40E619BF8746EEB64C018BA292908F"><enum>(1)</enum><text>in subsection (a)(1), by inserting <quote>federally authorized</quote> before <quote>feasibility study</quote>;</text></paragraph> <paragraph id="HC49249D3D3E04AB2B17DD3BA06E9E994"><enum>(2)</enum><text>by amending subsection (c) to read as follows:</text>
<quoted-block style="OLC" id="H9E70B2291E8646C4937440178A200372" display-inline="no-display-inline">
<subsection id="H28EC43AA19C64DC2869E4DAC2931BC1E"><enum>(c)</enum><header>Submission to Congress</header>
<paragraph id="H7A563A358163482B96D4268570B78FCA"><enum>(1)</enum><header>Review and submission of studies to Congress</header><text display-inline="yes-display-inline">Not later than 180 days after the date of receipt of a feasibility study of a project under subsection (a)(1), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that describes—</text> <subparagraph id="H3A9CBF1070E94B4FBD01E295BDA2F81B"><enum>(A)</enum><text>the results of the Secretary’s review of the study under subsection (b), including a determination of whether the project is feasible;</text></subparagraph>
<subparagraph id="H1077A4FEE2E94C81B7DF2E417235C7E9"><enum>(B)</enum><text>any recommendations the Secretary may have concerning the plan or design of the project; and</text></subparagraph> <subparagraph id="H191F689EC77245EA9F28F1AF18085B88"><enum>(C)</enum><text>any conditions the Secretary may require for construction of the project.</text></subparagraph></paragraph>
<paragraph id="H6192FAF87D2D435EB787199FAB4EFD2A"><enum>(2)</enum><header>Limitation</header><text display-inline="yes-display-inline">The completion of the review by the Secretary of a feasibility study that has been submitted under subsection (a)(1) may not be delayed as a result of consideration being given to changes in policy or priority with respect to project consideration.</text></paragraph></subsection><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph> <paragraph id="H8CAED410C11842C392B9EBA1E1E7373C"><enum>(3)</enum><text>by amending subsection (e) to read as follows:</text>
<quoted-block style="OLC" id="H4688E201FA134C78B825DC9CE9B054AB" display-inline="no-display-inline">
<subsection id="H63952AD865D9427BB04DB84E208F99C3"><enum>(e)</enum><header>Review and technical assistance</header>
<paragraph id="H5C1C69E4B8C446D0AB77F6506C2E7C3D" commented="no"><enum>(1)</enum><header>Review</header><text>The Secretary may accept and expend funds provided by non-Federal interests to undertake reviews, inspections, certifications, and other activities that are the responsibility of the Secretary in carrying out this section.</text></paragraph> <paragraph id="HBAC5D82B33C24DC189B3CEF5CF1C1C3C"><enum>(2)</enum><header>Technical assistance</header><text>At the request of a non-Federal interest, the Secretary shall provide to the non-Federal interest technical assistance relating to any aspect of a feasibility study if the non-Federal interest contracts with the Secretary to pay all costs of providing such technical assistance.</text></paragraph>
<paragraph id="H206018D948CB4EB7809BFBC467B0CE66"><enum>(3)</enum><header>Limitation</header><text>Funds provided by non-Federal interests under this subsection shall not be eligible for credit under subsection (d) or reimbursement.</text></paragraph> <paragraph id="H516B24DF7F7D4FA786ACFFE0629564C3"><enum>(4)</enum><header>Impartial decisionmaking</header><text>In carrying out this section, the Secretary shall ensure that the use of funds accepted from a non-Federal interest will not affect the impartial decisionmaking of the Secretary, either substantively or procedurally.</text></paragraph>
<paragraph id="H2D161A4FE3504E11B49626C7531B7406" commented="no" display-inline="no-display-inline"><enum>(5)</enum><header>Savings provision</header><text>The provision of technical assistance by the Secretary under paragraph (2)—</text> <subparagraph id="H0EBC8F79AB49440C9FAECF59A72497D0" commented="no" display-inline="no-display-inline"><enum>(A)</enum><text>shall not be considered to be an approval or endorsement of the feasibility study; and</text></subparagraph>
<subparagraph id="HB1DA0A634CBC4151B05CDCFCB990EFC7" commented="no" display-inline="no-display-inline"><enum>(B)</enum><text>shall not affect the responsibilities of the Secretary under subsections (b) and (c).</text></subparagraph></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section> <section id="HA3833E24CD5A4839A0D475AE15CBE115" commented="no"><enum>1153.</enum><header>Construction of water resources development projects by non-Federal interests</header><text display-inline="no-display-inline">Section 204 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2232">33 U.S.C. 2232</external-xref>) is amended—</text>
<paragraph id="H79CD07514A6F47F0AF8FC5E5BC02A9C1" commented="no"><enum>(1)</enum><text>in subsection (b)—</text> <subparagraph id="HA978B797DD40465BAAE02AD62C5B1F68" commented="no"><enum>(A)</enum><text>in paragraph (1), in the matter preceding subparagraph (A), by inserting <quote>federally authorized</quote> before <quote>water resources development project</quote>;</text></subparagraph>
<subparagraph id="HC1F46AC24D744C69B6343E62DF5E1C62" commented="no"><enum>(B)</enum><text>in paragraph (2)(A), by inserting <quote>, except as provided in paragraph (3)</quote> before the semicolon; and</text></subparagraph> <subparagraph id="H786C90D80EAA479EB9AC670665211525" commented="no"><enum>(C)</enum><text>by adding at the end the following:</text>
<quoted-block id="H117E76D3D33348D4A5F057A9F151DE07" style="OLC">
<paragraph id="HAC579B8DD84C42D784783AC2DB22AF22" commented="no"><enum>(3)</enum><header>Permit exception</header>
<subparagraph id="H07F0EF2DAE294F1A9B956CDBCF9788A7" commented="no"><enum>(A)</enum><header>In general</header><text display-inline="yes-display-inline">For a project described in subsection (a)(1) or subsection (a)(3), or a separable element thereof, with respect to which a written agreement described in subparagraph (B) has been entered into, a non-Federal interest that carries out a project under this section shall not be required to obtain any Federal permits or approvals that would not be required if the Secretary carried out the project or separable element unless significant new circumstances or information relevant to environmental concerns or compliance have arisen since development of the project recommendation.</text></subparagraph> <subparagraph id="HD0A3FEE4E2E94E0DAE278EEE935BEBEF" commented="no"><enum>(B)</enum><header>Written agreement</header><text display-inline="yes-display-inline">For purposes of this paragraph, a written agreement shall provide that the non-Federal interest shall comply with the same legal and technical requirements that would apply if the project or separable element were carried out by the Secretary, including all mitigation required to offset environmental impacts of the project or separable element as determined by the Secretary.</text></subparagraph>
<subparagraph id="H5152498D118E4DC2A263586738B581AF" commented="no"><enum>(C)</enum><header>Certifications</header><text display-inline="yes-display-inline">Notwithstanding subparagraph (A), if a non-Federal interest carrying out a project under this section would, in the absence of a written agreement entered into under this paragraph, be required to obtain a certification from a State under Federal law to carry out the project, such certification shall still be required if a written agreement is entered into with respect to the project under this paragraph.</text></subparagraph></paragraph> <paragraph id="H2AACD8349FD543A88471736D5DA1C7BA" commented="no"><enum>(4)</enum><header>Data sharing</header> <subparagraph id="H6E92814B7ACB41A284569E5C4D94EE40" commented="no"><enum>(A)</enum><header>In general</header><text>If a non-Federal interest for a water resources development project begins to carry out that water resources development project under this section, the non-Federal interest may request that the Secretary transfer to the non-Federal interest all relevant data and documentation under the control of the Secretary with respect to that water resources development project.</text></subparagraph>
<subparagraph id="H200B3B7466BC43A3B880560D4D7287BE" commented="no"><enum>(B)</enum><header>Deadline</header><text>Except as provided in subparagraph (C), the Secretary shall transfer the data and documentation requested by a non-Federal interest under subparagraph (A) not later than the date that is 90 days after the date on which the non-Federal interest so requests such data and documentation.</text></subparagraph> <subparagraph id="H52C567777B2B4684B67D829EC3431588" commented="no"><enum>(C)</enum><header>Limitation</header><text>Nothing in this paragraph obligates the Secretary to share any data or documentation that the Secretary considers to be proprietary information.</text></subparagraph></paragraph><after-quoted-block>; </after-quoted-block></quoted-block></subparagraph></paragraph>
<paragraph id="H0F544D55DAE94100B81D4575424E168B" commented="no"><enum>(2)</enum><text>by amending subsection (c) to read as follows:</text> <quoted-block id="H8E3B57687E454D239CF53AF02D81C8B9" style="OLC"> <subsection id="H478468360B1C45E1B504749F1A64CB0E" commented="no"><enum>(c)</enum><header>Studies and engineering</header> <paragraph id="H179E221F978642CCA9527DF58D5AC1F6" commented="no"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">When requested by an appropriate non-Federal interest, the Secretary shall undertake all necessary studies, engineering, and technical assistance on construction for any project to be undertaken under subsection (b), and provide technical assistance in obtaining all necessary permits for the construction, if the non-Federal interest contracts with the Secretary to furnish the United States funds for the studies, engineering, or technical assistance on construction in the period during which the studies, engineering, or technical assistance on construction are being conducted.</text></paragraph>
<paragraph id="HFFCF5E8312F8482B853647E2B7E46FE8" commented="no"><enum>(2)</enum><header>No waiver</header><text>Nothing in this section may be construed to waive any requirement of section 3142 of title 40, United States Code.</text></paragraph> <paragraph id="HF8747E3FFAE14B3895A4E18F6AF98AB5" commented="no"><enum>(3)</enum><header>Limitation</header><text>Funds provided by non-Federal interests under this subsection shall not be eligible for credit or reimbursement under subsection (d).</text></paragraph>
<paragraph id="HB363ACFC70B24305B5A9FFC822536178" commented="no"><enum>(4)</enum><header>Impartial decisionmaking</header><text>In carrying out this section, the Secretary shall ensure that the use of funds accepted from a non-Federal interest will not affect the impartial decisionmaking of the Secretary, either substantively or procedurally.</text></paragraph></subsection><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph> <paragraph id="HDD8A1FE8A2AE4F96998498475E729E5B" display-inline="no-display-inline" commented="no"><enum>(3)</enum><text display-inline="yes-display-inline">in subsection (d)—</text>
<subparagraph id="HD7513043F376432FAE6B3F43F3C8C06D" commented="no"><enum>(A)</enum><text>in paragraph (3)—</text> <clause id="H33918B98105D4C61AA54DF6C94EC1B96" commented="no"><enum>(i)</enum><text>in subparagraph (A), by striking <quote>; and</quote> and inserting a semicolon; </text></clause>
<clause id="H46F857F333CA4F1E9F4DC42107C26E69" commented="no"><enum>(ii)</enum><text>in subparagraph (B)(ii), by striking the period at the end and inserting <quote>; and</quote>; and </text></clause> <clause id="HDFE0DEA475D34E699A76A62C53944DA7" commented="no"><enum>(iii)</enum><text>by adding at the end the following:</text>
<quoted-block style="OLC" id="H39439713C91D493BB850F730C1F24E43" display-inline="no-display-inline">
<subparagraph id="HC64CF828F408439BB8B93A6CEB540618" commented="no"><enum>(C)</enum><text display-inline="yes-display-inline">in the case of reimbursement, appropriations are provided by Congress for such purpose.</text></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block></clause></subparagraph> <subparagraph id="H2B638CF044314FF8A08074E4FF0060E3" commented="no"><enum>(B)</enum><text>in paragraph (5)—</text>
<clause id="H2BA707DFE1B04CFF881B747564B66E32" commented="no"><enum>(i)</enum><text>by striking <quote>flood damage reduction</quote> each place it appears and inserting <quote>water resources development</quote>;</text></clause> <clause id="HAC0D22520C4841BEAB4006AD8FC28B3D" commented="no"><enum>(ii)</enum><text>in subparagraph (A), by striking <quote>for a discrete segment of a</quote> and inserting <quote>for carrying out a discrete segment of a federally authorized</quote>; and</text></clause>
<clause id="H57BA2833FADC4401B6A1DA6F7A10CFC7" commented="no"><enum>(iii)</enum><text>in subparagraph (D), in the matter preceding clause (i), by inserting <quote>to be carried out</quote> after <quote>project</quote>.</text></clause></subparagraph></paragraph></section> <section id="H6BE8DD9E69834FF18206D6193D383CB3" section-type="subsequent-section" commented="no"><enum>1154.</enum><header>Corps budgeting; project deauthorizations; comprehensive backlog report</header> <subsection id="H113844B48EEC43479A36C343F50A2600" commented="no"><enum>(a)</enum><header>In general</header><text>Section 1001 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/579a">33 U.S.C. 579a</external-xref>) is amended—</text>
<paragraph id="HA4244B81E8104BB788751551BF6884AB" commented="no"><enum>(1)</enum><text>by striking the section designator and all that follows through <quote>Any project</quote> and inserting the following: </text> <quoted-block style="OLC" id="HDD549FB7830940618EFDE59DA2DCF59A" display-inline="no-display-inline"> <section id="H1645468908F3449882453EA0671F78E9" commented="no"><enum>1001.</enum><header>Corps budgeting; project deauthorizations; comprehensive backlog report</header> <subsection id="HC4C8D58FF77E4E2891F3F1E3360EEE36" commented="no"><enum>(a)</enum><text display-inline="yes-display-inline">Any project</text></subsection></section><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph>
<paragraph id="H7C690A3F4D354F278CA8F1AE8D161E50" commented="no"><enum>(2)</enum><text>in subsection (b), by striking paragraphs (3) and (4) and inserting the following:</text> <quoted-block style="OLC" id="H0EE4C1CD549847A1AA2E5FB295F8CE92" display-inline="no-display-inline"> <paragraph id="H37BA475B8ACF4CCAAC8A58B1CDE34E94" commented="no"><enum>(3)</enum><header>Comprehensive construction backlog and operation and maintenance report</header> <subparagraph id="HC88D20D6FD774A41AEA9A5960275038E" commented="no"><enum>(A)</enum><header>In general</header><text>The Secretary, once every 2 years, shall compile and publish—</text>
<clause id="H1F2AAD127495418BB836148E3277AB80" commented="no"><enum>(i)</enum><text>a complete list of all projects and separable elements of projects of the Corps of Engineers that are authorized for construction but have not been completed;</text></clause> <clause id="H0EB7D0D83DB146789F3ADA408F2BE8BD" commented="no"><enum>(ii)</enum><text>a complete list of all feasibility studies of the Corps of Engineers that Congress has authorized the Secretary to carry out for which a Report of the Chief of Engineers has not been issued;</text></clause>
<clause id="H76D1C23EF58545B4A23098879EE2F1F9" commented="no"><enum>(iii)</enum><text>a complete list of all environmental infrastructure projects authorized by Congress under section 219 of the Water Resources Development Act of 1992 (106 Stat. 4835); and</text></clause> <clause id="H9BE4C7FF9D8343EF9751EA17FB39AA05" commented="no"><enum>(iv)</enum><text>a list of major Federal operation and maintenance needs of projects and properties under the control of the Corps of Engineers.</text></clause></subparagraph>
<subparagraph id="HD271BB581BB346EA8E00B2FAC97069CA" commented="no"><enum>(B)</enum><header>Required information</header><text>The Secretary shall include on each list developed under clause (i), (ii), or (iii) of subparagraph (A) for each feasibility study, project, and separable element on that list—</text> <clause id="HBB748E2FBA1947DABCA128954672F132" commented="no"><enum>(i)</enum><text>the date of authorization of the feasibility study, project, or separable element, including any subsequent modifications to the original authorization;</text></clause>
<clause id="H1E9C984630564CDC977486089793D995" commented="no"><enum>(ii)</enum><text>the original budget authority for the feasibility study, project, or separable element;</text></clause> <clause id="H645E2D7303DF4CADB8AD14937ACC6457" commented="no"><enum>(iii)</enum><text>a brief description of the feasibility study, project, or separable element;</text></clause>
<clause id="HDFBA1FBB4C804E26851C2477CB82BDC6" commented="no"><enum>(iv)</enum><text>the estimated date of completion of the feasibility study, project, or separable element, assuming all capability is fully funded;</text></clause> <clause id="HDA6C39DC19DE48CAA4ACD94C8FDDD42D" commented="no"><enum>(v)</enum><text>the estimated total cost of completion of the feasibility study, project, or separable element; </text></clause>
<clause id="H09CFC84B52934AB9B1A0FB0007022731" commented="no"><enum>(vi)</enum><text>the amount of funds spent on the feasibility study, project, or separable element, including Federal and non-Federal funds; </text></clause> <clause id="H4CE7790B669B4E90B473776502E7FCD2" commented="no"><enum>(vii)</enum><text>the amount of appropriations estimated to be required in each fiscal year during the period of construction to complete the project or separable element by the date specified under clause (iv);</text></clause>
<clause id="H033FD444A2AB41CA8B241CF51905C87F" commented="no"><enum>(viii)</enum><text>the location of the feasibility study, project, or separable element;</text></clause> <clause id="HC0BAE83FC65D4311A011BFB6A0FBEEB4" commented="no"><enum>(ix)</enum><text>a statement from the non-Federal interest for the project or separable element indicating the non-Federal interest’s capability to provide the required local cooperation estimated to be required for the project or separable element in each fiscal year during the period of construction;</text></clause>
<clause id="HEA5195890CDE4561A3475284F09B0B34" commented="no"><enum>(x)</enum><text>the benefit-cost ratio of the project or separable element, calculated using the discount rate specified by the Office of Management and Budget for purposes of preparing the President’s budget pursuant to <external-xref legal-doc="usc-chapter" parsable-cite="usc-chapter/31/11">chapter 11</external-xref> of title 31, United States Code;</text></clause> <clause id="H9C6CD96EAEC14C5CB0122F8B12A51F62" commented="no"><enum>(xi)</enum><text>the benefit-cost ratio of the project or separable element, calculated using the discount rate utilized by the Corps of Engineers for water resources development project planning pursuant to section 80 of the Water Resources Development Act of 1974 (<external-xref legal-doc="usc" parsable-cite="usc/42/1962d-17">42 U.S.C. 1962d–17</external-xref>); and</text></clause>
<clause id="HC28307F6BD174179982480637FF0ADA8" commented="no"><enum>(xii)</enum><text>the last fiscal year in which the project or separable element incurred obligations.</text></clause></subparagraph> <subparagraph id="H3A24CBB3269E4B3EA68536C8AF8EC7BD" commented="no"><enum>(C)</enum><header>Required operation and maintenance information</header><text>The Secretary shall include on the list developed under subparagraph (A)(iv), for each project and property under the control of the Corps of Engineers on that list—</text>
<clause id="H5FA8447A83904BC59DD1FBB3C64C6CDE" commented="no"><enum>(i)</enum><text>the authority under which the project was authorized or the property was acquired by the Corps of Engineers;</text></clause> <clause id="HD498F3182BAD44A8957FAFC67BBD339A" commented="no"><enum>(ii)</enum><text>a brief description of the project or property;</text></clause>
<clause id="H411A536AD265431F95767122652FD516" commented="no"><enum>(iii)</enum><text>an estimate of the Federal costs to meet the major operation and maintenance needs at the project or property; and</text></clause> <clause id="H7CB631A6D24A402E98914DA560002747" commented="no"><enum>(iv)</enum><text>an estimate of unmet or deferred operation and maintenance needs at the project or property.</text></clause></subparagraph>
<subparagraph id="HAF750F5E6AC64A38A655AF3579872DE2" commented="no"><enum>(D)</enum><header>Publication</header>
<clause id="H536CDD88C3E34FFEACBCC8FB21763B6D" commented="no"><enum>(i)</enum><header>In general</header><text>For fiscal year 2020, and once every 2 years thereafter, in conjunction with the President’s annual budget submission to Congress under section 1105(a) of title 31, United States Code, the Secretary shall submit a copy of the lists developed under subparagraph (A) to—</text> <subclause id="HFD4B32B05D624D2298AE95218128E991" commented="no"><enum>(I)</enum><text>the Committee on Environment and Public Works and the Committee on Appropriations of the Senate and the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives; and</text></subclause>
<subclause id="H2E764F8FED414F27A4B045F17534724A" commented="no"><enum>(II)</enum><text>the Director of the Office of Management and Budget.</text></subclause></clause> <clause id="H3D1A99B013F4453FA723F5E143F5CCFB" commented="no"><enum>(ii)</enum><header>Public availability</header><text>The Secretary shall make a copy of the lists available on a publicly accessible website site in a manner that is downloadable, searchable, and sortable.</text></clause></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection>
<subsection id="HA565253B81EB4D3D8BBC254B864AA353" commented="no"><enum>(b)</enum><header>Budgetary evaluation metrics and transparency</header><text>Beginning in fiscal year 2020, in the formulation of the annual budget request for the U.S. Army Corps of Engineers (Civil Works) pursuant to section 1105(a) of title 31, United States Code, the President shall ensure that such budget request— </text> <paragraph id="HC7EEA93D406F43E0BBCAD44193D2F845" commented="no"><enum>(1)</enum><text>aligns the assessment of the potential benefit-cost ratio for budgeting water resources development projects with that used by the Corps of Engineers during project plan formulation and evaluation pursuant to section 80 of the Water Resources Development Act of 1974 (<external-xref legal-doc="usc" parsable-cite="usc/42/1962d-17">42 U.S.C. 1962d–17</external-xref>); and</text></paragraph>
<paragraph id="H455223C128F7441D90A733FEB961069B" commented="no"><enum>(2)</enum><text>demonstrates the transparent criteria and metrics utilized by the President in the evaluation and selection of water resources development projects included in such budget request.</text></paragraph></subsection> <subsection id="HD03982B9E75046E9B5750181BB39A14B" commented="no" display-inline="no-display-inline"><enum>(c)</enum><header>Public participation</header><text>In the development of, or any proposed major substantive modification to, a proposed budget for water resources development projects, the Secretary, through each District shall, not less frequently than annually—</text>
<paragraph id="H4FE644FEC6D64EC1A77A38EA7729F585" commented="no"><enum>(1)</enum><text>provide to non-Federal interests and other interested stakeholders information on the proposed budget for projects or substantive modifications to project budgets within each District’s jurisdiction;</text></paragraph> <paragraph id="H43D3169007964D758DACDC7CCCB94FF4" commented="no"><enum>(2)</enum><text>hold multiple public meetings to discuss the budget for projects within each District’s jurisdiction; and</text></paragraph>
<paragraph id="H3494D495D87449B09D6C8E1B75440FEF" commented="no"><enum>(3)</enum><text>provide to non-Federal interests the opportunity to collaborate with District personnel for projects within each District’s jurisdiction—</text> <subparagraph id="H632DD957F2F144BBB50B4DA9B0F4E596" commented="no"><enum>(A)</enum><text>to support information sharing; and</text></subparagraph>
<subparagraph id="H42022A177A4F4FFB9147635A4631C4C9" commented="no"><enum>(B)</enum><text>to the maximum extent practicable, to share in concept development and decisionmaking to achieve complementary or integrated solutions to problems.</text></subparagraph></paragraph></subsection></section> <section id="H82BBAD0665E040529B4F0C7B276D1CFA" commented="no"><enum>1155.</enum><header>Indian Tribes</header> <subsection id="H2D56FC5B82214A07B822D62E3A803580" commented="no"><enum>(a)</enum><header>Cost sharing provisions for territories and Indian Tribes</header><text>Section 1156(a)(2) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2310">33 U.S.C. 2310(a)(2)</external-xref>) is amended by striking <quote>(as defined</quote> and all that follows through the period at the end and inserting <quote>or tribal organization (as those terms are defined in section 4 of the Indian Self-Determination and Education Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/25/5304">25 U.S.C. 5304</external-xref>)).</quote>.</text></subsection>
<subsection id="H10855CFCCE614D659C6CF7D1D1EAF765" commented="no"><enum>(b)</enum><header>Written agreement requirement for water resources projects</header><text>Section 221(b)(1) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(b)(1)) is amended by striking <quote>(including a</quote> and all that follows through <quote>; or</quote> at the end and inserting <quote>(including an Indian tribe and a tribal organization (as those terms are defined in section 4 of the Indian Self-Determination and Education Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/25/5304">25 U.S.C. 5304</external-xref>)); or</quote>.</text></subsection></section> <section id="H53F42B9152C34D7E9FD84D2A5C9F60FF" commented="no"><enum>1156.</enum><header>Inflation adjustment of cost-sharing provisions for territories and Indian Tribes</header><text display-inline="no-display-inline">Section 1156(b) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2310">33 U.S.C. 2310(b)</external-xref>) is amended by striking <quote>the date of enactment of this subsection</quote> and inserting <quote>the date of enactment of the <short-title>Water Resources Development Act of 2018</short-title></quote>.</text></section>
<section commented="no" display-inline="no-display-inline" id="H0B1DA436E4CD42FFB0A3AB9848D675F6"><enum>1157.</enum><header>Corps of Engineers continuing authorities program</header>
<subsection commented="no" display-inline="no-display-inline" id="HD1197C22BC2D45F983F3E590E586135D"><enum>(a)</enum><header>Storm and hurricane restoration and impact minimization program</header><text>Section 3(c)(1) of the Act of August 13, 1946 (<external-xref legal-doc="usc" parsable-cite="usc/33/426g">33 U.S.C. 426g(c)(1)</external-xref>) is amended by striking <quote>$30,000,000</quote> and inserting <quote>$37,500,000</quote>.</text></subsection> <subsection commented="no" display-inline="no-display-inline" id="H6F83574C982D4936B6E90FAAE10EC99E"><enum>(b)</enum><header>Small river and harbor improvement projects</header><text>Section 107(a) of the River and Harbor Act of 1960 (<external-xref legal-doc="usc" parsable-cite="usc/33/577">33 U.S.C. 577(a)</external-xref>) is amended by striking <quote>$50,000,000</quote> and inserting <quote>$62,500,000</quote>.</text></subsection>
<subsection commented="no" display-inline="no-display-inline" id="HCD126A6214914D0682C96F0C19CC53BC"><enum>(c)</enum><header>Shore damage prevention or mitigation</header><text>Section 111(c) of the River and Harbor Act of 1968 (<external-xref legal-doc="usc" parsable-cite="usc/33/426i">33 U.S.C. 426i(c)</external-xref>) is amended by striking <quote>$10,000,000</quote> and inserting <quote>$12,500,000</quote>.</text></subsection> <subsection commented="no" display-inline="no-display-inline" id="H3187638FC83E4AA199FA00C68BE5B5A0"><enum>(d)</enum><header>Regional sediment management</header><text>Section 204(g) of the Water Resources Development Act of 1992 (<external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326(g)</external-xref>) is amended in the first sentence by striking <quote>$50,000,000</quote> and inserting <quote>$62,500,000</quote>.</text></subsection>
<subsection commented="no" display-inline="no-display-inline" id="H88DD6ED837C649ACABEF3B8538447A0B"><enum>(e)</enum><header>Small flood control projects</header><text>Section 205 of the Flood Control Act of 1948 (<external-xref legal-doc="usc" parsable-cite="usc/33/701s">33 U.S.C. 701s</external-xref>) is amended in the first sentence by striking <quote>$55,000,000</quote> and inserting <quote>$68,750,000</quote>.</text></subsection> <subsection commented="no" display-inline="no-display-inline" id="HBE4DB862AEAD497B96115F1D1B02F634"><enum>(f)</enum><header>Aquatic ecosystem restoration</header><text>Section 206(f) of the Water Resources Development Act of 1996 (as redesignated by section 1149) is amended by striking <quote>$50,000,000</quote> and inserting <quote>$62,500,000</quote>.</text></subsection>
<subsection commented="no" display-inline="no-display-inline" id="H6086DD220C4D4FC9B50F220B662E1A65"><enum>(g)</enum><header>Project modifications for improvement of environment</header><text>Section 1135(h) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2309a">33 U.S.C. 2309a(h)</external-xref>) is amended by striking <quote>$40,000,000</quote> and inserting <quote>$50,000,000</quote>.</text></subsection> <subsection commented="no" id="HF0234B1554CA4411863BE509FFAB262D"><enum>(h)</enum><header>Emergency streambank and shoreline protection</header><text>Section 14 of the Flood Control Act of 1946 (<external-xref legal-doc="usc" parsable-cite="usc/33/701r">33 U.S.C. 701r</external-xref>) is amended by striking <quote>$20,000,000</quote> and inserting <quote>$25,000,000</quote>.</text></subsection>
<subsection id="HD08CCE6DC4704E068B21B9DB0CAA495A" commented="no"><enum>(i)</enum><header>Tribal partnership program</header><text>Section 203(b)(4) of the Water Resources Development Act of 2000 (<external-xref legal-doc="usc" parsable-cite="usc/33/2269">33 U.S.C. 2269</external-xref>) is amended to read as follows: </text> <quoted-block id="H5593CFE0580443EBBB94AE63706F951C" style="OLC"> <paragraph id="HB561A0A5B0F54039923DEA677006E7A0" commented="no"><enum>(4)</enum><header>Design and construction</header> <subparagraph id="H15C9E5E8156D483494BB14CE6DDA82DA" commented="no" display-inline="no-display-inline"><enum>(A)</enum><header>In general</header><text>The Secretary may carry out the design and construction of a water resources development project, or separable element of a project, described in paragraph (1) that the Secretary determines is feasible if the Federal share of the cost of the project or separable element is not more than $12,500,000.</text></subparagraph>
<subparagraph id="H8228033F1E334B5F8F88B3977A7F4A9F" commented="no"><enum>(B)</enum><header>Specific authorization</header><text display-inline="yes-display-inline">If the Federal share of the cost of the project or separable element described in subparagraph (A) is more than $12,500,000, the Secretary may only carry out the project or separable element if Congress enacts a law authorizing the Secretary to carry out the project or separable element.</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subsection></section> <section id="H12FAAB76BACB42C585ACCD14FABEBD7E" commented="no"><enum>1158.</enum><header>Hurricane and storm damage reduction</header><text display-inline="no-display-inline">Section 156 of the Water Resources Development Act of 1976 (<external-xref legal-doc="usc" parsable-cite="usc/42/1962d-5f">42 U.S.C. 1962d–5f</external-xref>) is amended—</text>
<paragraph id="H568AC03B46CF45ACBF2331A8487D3764" commented="no"><enum>(1)</enum><text>in subsection (b)—</text> <subparagraph id="H33BBECBCAB554E978B8A52DFDD4FBFD6" commented="no"><enum>(A)</enum><text>by striking <quote>Notwithstanding</quote> and inserting the following:</text>
<quoted-block id="H3133D6458B9B440C824D321C888DBD06" style="OLC">
<paragraph id="HC7814CBD9F0F46B4A0678D9E94ED25C1" commented="no"><enum>(1)</enum><header>In general</header><text>Notwithstanding</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph> <subparagraph id="H3CDDDE326C7C459D90DCE5A9E2FB3607" commented="no"><enum>(B)</enum><text>by adding at the end the following:</text>
<quoted-block id="H74C2D7FB9D1046C7BC830CB5A4CCAC25" style="OLC">
<paragraph id="HD1478438B7124A36A28BC7024747B5C3" commented="no"><enum>(2)</enum><header>Timing</header><text>The 15 additional years provided under paragraph (1) shall begin on the date of initiation of construction of congressionally authorized nourishment.</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph></paragraph> <paragraph id="H326D306EBEFA48A78489D811CA4CB191" commented="no"><enum>(2)</enum><text>in subsection (e), by striking <quote>5 year-period</quote> and inserting <quote>10-year period</quote>.</text></paragraph></section>
<section id="H97ED3166C6A4451689E85F67C5C02950" commented="no"><enum>1159.</enum><header>Regional coalitions and higher education</header><text display-inline="no-display-inline">Section 22(a) of the Water Resources Development Act of 1974 (<external-xref legal-doc="usc" parsable-cite="usc/42/1962d-16">42 U.S.C. 1962d–16(a)</external-xref>) is amended—</text> <paragraph id="HE62021CBC91041F693452904D0E101EF" commented="no"><enum>(1)</enum><text>by amending paragraph (1) to read as follows:</text>
<quoted-block id="HE5551412978F4596909ADE939EA1CA23" style="OLC">
<paragraph id="H6A2EBDD648D24962A233F1728787C44E" commented="no"><enum>(1)</enum><header>Comprehensive plans</header><text>The Secretary of the Army, acting through the Chief of Engineers, is authorized to cooperate with any State, group of States, non-Federal interest working with a State or group of States, or regional coalition of governmental entities in the preparation of comprehensive plans for the development, utilization, and conservation of the water and related resources of drainage basins, watersheds, or ecosystems located within the boundaries of such State, interest, or entity, including plans to comprehensively address water resources challenges, and to submit to Congress reports and recommendations with respect to appropriate Federal participation in carrying out such plans.</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph> <paragraph id="H9764C6F2F02B4F71A8A09BCEDABC89F6" commented="no"><enum>(2)</enum><text>by adding at the end the following:</text>
<quoted-block id="H7BA6C59CAB554E26A72AC41F98108958" style="OLC">
<paragraph id="HA779FC1BCE2B4725B8130BB4AF33AE73" commented="no"><enum>(3)</enum><header>Institution of higher education</header><text display-inline="yes-display-inline">Notwithstanding section 236 of title 10, United States Code, in carrying out this subsection, the Secretary may work with an institution of higher education, as determined appropriate by the Secretary.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section> <section id="HD725218FDCFD4BF7B3DD3AD8DBE60169" commented="no"><enum>1160.</enum><header>Emergency response to natural disasters</header><text display-inline="no-display-inline">Section 5(a)(1) of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n(a)(1)</external-xref>) is amended in the first sentence— </text>
<paragraph id="H0F4E302CF97844598B29C42F23D5EAAF" commented="no"><enum>(1)</enum><text>by striking <quote>strengthening, raising, extending, or other modification thereof</quote> and inserting <quote>strengthening, raising, extending, realigning, or other modification thereof</quote>; and</text></paragraph> <paragraph id="H6777D4C645D946868A95AE3C66BFB7A5" commented="no"><enum>(2)</enum><text>by striking <quote>structure or project damaged or destroyed by wind, wave, or water action of other than an ordinary nature to the design level of protection when, in the discretion of the Chief of Engineers,</quote> and inserting <quote>structure or project damaged or destroyed by wind, wave, or water action of other than an ordinary nature to either the pre-storm level or the design level of protection, whichever provides greater protection, when, in the discretion of the Chief of Engineers,</quote>.</text></paragraph></section>
<section id="H07C295D846DB44E7A0EF98AF60AEFD8B" commented="no"><enum>1161.</enum><header>Cost and benefit feasibility assessment</header>
<subsection id="H2FE6406D37854ABD956EFCA23C136526" commented="no"><enum>(a)</enum><header>Cost benefit and special conditions</header><text display-inline="yes-display-inline">Section 5(a) of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n(a)</external-xref>), as amended by this Act, is further amended by striking paragraph (2) and inserting the following:</text> <quoted-block display-inline="no-display-inline" id="HE4BDA55DFA5D4EEDA1BF134D775D5D93" style="OLC"> <paragraph id="H375A1A8F7A5743F596565D95973CB0FD" commented="no"><enum>(2)</enum><header>Cost and benefit feasibility assessment</header> <subparagraph id="HEECEF9491C8146CCACB5624C726981CD" commented="no"><enum>(A)</enum><header>Consideration of benefits</header><text>In preparing a cost and benefit feasibility assessment for any emergency project described in paragraph (1), the Chief of Engineers shall consider the benefits to be gained by such project for the protection of—</text>
<clause id="HE913040FB702443EA776502B800C4EB9" commented="no"><enum>(i)</enum><text>residential establishments;</text></clause> <clause id="HAE858AD73D0A45C9964664F5F46374FA" commented="no"><enum>(ii)</enum><text>commercial establishments, including the protection of inventory; and</text></clause>
<clause id="H36C6E526B8C44AA6B0B874C046DF27BC" commented="no"><enum>(iii)</enum><text>agricultural establishments, including the protection of crops.</text></clause></subparagraph> <subparagraph id="H936E0602C88844379242C32F03384D46" commented="no"><enum>(B)</enum><header>Special conditions</header> <clause id="HC96B6BEC9F244FA4B37BC761177F7E67" commented="no"><enum>(i)</enum><header>Authority to carry out work</header><text display-inline="yes-display-inline">The Chief of Engineers may carry out repair or restoration work described in paragraph (1) that does not produce benefits greater than the cost if—</text>
<subclause id="H21D6ABCFFE984D9088FCA2400536C7ED" commented="no"><enum>(I)</enum><text>the non-Federal sponsor agrees to pay an amount sufficient to make the remaining costs of the project equal to the estimated value of the benefits of the repair or restoration work; and</text></subclause> <subclause id="H1B95D9CA42304498AA3342A48C9D7C69" commented="no"><enum>(II)</enum><text>the Secretary determines that—</text>
<item id="HC357771633AF4DB48E3D9C51333EEE18" commented="no"><enum>(aa)</enum><text>the damage to the structure was not a result of negligent operation or maintenance; and</text></item> <item id="HB0B923CC86314F2F8B5E704FC99103D0" commented="no"><enum>(bb)</enum><text>repair of the project could benefit another Corps project.</text></item></subclause></clause>
<clause id="HFA17C89B59FC444EA17D6B9886A497B4" commented="no"><enum>(ii)</enum><header>Treatment of payments</header><text>Non-Federal payments pursuant to clause (i) shall be in addition to any non-Federal payments required by the Chief of Engineers that are applicable to the remaining costs of the repair or restoration work.</text></clause></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subsection> <subsection id="HD8C5381463C14B7EB88F981CBF0954FC" commented="no"><enum>(b)</enum><header>Continued eligibility</header><text display-inline="yes-display-inline">Notwithstanding a non-Federal flood control work’s status in the Rehabilitation and Inspection Program carried out pursuant to section 5 of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n</external-xref>), any unconstructed emergency project for the non-Federal flood control work that was formulated during the three fiscal years preceding the fiscal year in which this Act was enacted but that was determined to not produce benefits greater than costs shall remain eligible for assistance under such section 5 until the last day of the third fiscal year following the fiscal year in which this Act was enacted if—</text>
<paragraph id="HBDFBD9B9C15B4748B8D48E5D49E5446B" commented="no"><enum>(1)</enum><text>the non-Federal sponsor agrees, in accordance with such section 5, as amended by this Act, to pay an amount sufficient to make the remaining costs of the project equal to the estimated value of the benefits of the repair or restoration work; and</text></paragraph> <paragraph id="HEC322728330C4538AECEE9E8BBEF2823" commented="no"><enum>(2)</enum><text>the Secretary determines that—</text>
<subparagraph id="HB16654793B4E466C8536502E872B79DD" commented="no"><enum>(A)</enum><text>the damage to the structure was not as a result of negligent operation or maintenance; and</text></subparagraph> <subparagraph id="H99F520DB626E4C248D8B0F8B32E3625C" commented="no"><enum>(B)</enum><text>repair of the project could benefit another Corps project.</text></subparagraph></paragraph></subsection></section>
<section id="H97938ABA85A046C48466939F85B39FEF" commented="no"><enum>1162.</enum><header>Extended community assistance by the Corps of Engineers</header><text display-inline="no-display-inline">Section 5(a) of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n(a)</external-xref>), as amended by this Act, is further amended—</text> <paragraph id="H41F2E0DC3C4140F4AAC0E4481EFC1826" commented="no"><enum>(1)</enum><text>by redesignating paragraph (3) as paragraph (4); and</text></paragraph>
<paragraph id="HBC784C6B1A314E71BE422A2617313330" commented="no"><enum>(2)</enum><text>by inserting after paragraph (2) the following:</text> <quoted-block id="H241AB59E61624637A81C5B0A0C1C4B8E" style="OLC"> <paragraph id="HBC6CD613530948F7A094531945848B5C" commented="no"><enum>(3)</enum><header>Extended assistance</header><text>Upon request by a locality receiving assistance under the fourth sentence of paragraph (1), the Secretary shall, subject to the availability of appropriations, enter into an agreement with the locality to provide such assistance beyond the time period otherwise provided for by the Secretary under such sentence.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section>
<section id="H2CBFE18BF6F3451A925B0BC6D61167C5"><enum>1163.</enum><header>Dam safety</header><text display-inline="no-display-inline">Section 14 of the National Dam Safety Program Act (<external-xref legal-doc="usc" parsable-cite="usc/33/467j">33 U.S.C. 467j</external-xref>) is amended by striking <quote>2015 through 2019</quote> each place it appears and inserting <quote>2019 through 2023</quote>.</text></section> <section id="HAB49DF885B2B4871B9E624411CE8846B" commented="no"><enum>1164.</enum><header>Local government water management plans</header><text display-inline="no-display-inline">With the consent of the non-Federal interest for a feasibility study for a water resources development project, the Secretary may enter into a written agreement under section 221(a) of the Flood Control Act of 1970, with a unit of local government in the watershed that has adopted a local or regional water management plan, to allow the unit of local government to participate in the feasibility study to determine if there is an opportunity to include additional feasible elements in the project in order to help achieve the purposes identified in the local or regional water management plan. </text></section>
<section id="H66157E4C56C1429A826C6D956D3FC69C" commented="no"><enum>1165.</enum><header>Structures and facilities constructed by Secretary</header><text display-inline="no-display-inline">Section 14 of the Act of March 3, 1899 (<external-xref legal-doc="usc" parsable-cite="usc/33/408">33 U.S.C. 408</external-xref>) is amended by adding at the end the following:</text> <quoted-block style="OLC" id="H2DF3F00AB9D641B2A4DE0030C10DE59B" display-inline="no-display-inline"> <subsection id="H6064D2F6395044FAAE1C7568BBDDBF40" commented="no"><enum>(d)</enum><header>Work defined</header><text display-inline="yes-display-inline">For the purposes of this section, the term <term>work</term> shall not include unimproved real estate owned or operated by the Secretary as part of a water resources development project if the Secretary determines that modification of such real estate would not affect the function and usefulness of the project.</text></subsection><after-quoted-block>.</after-quoted-block></quoted-block></section>
<section id="H62A8F6BF31A643E0AC46ACFB201BD050"><enum>1166.</enum><header>Advanced funds for water resources development studies and projects</header>
<subsection id="HB9DEF6E9F7B5485997795E8E0E830C55"><enum>(a)</enum><header>Contributions by States and political subdivisions for immediate use on authorized flood-Control work; repayment</header><text display-inline="yes-display-inline">The Act of October 15, 1940 (<external-xref legal-doc="usc" parsable-cite="usc/33/701h-1">33 U.S.C. 701h–1</external-xref>) is amended—</text> <paragraph id="H3D8A1334E1BB4A3F85DB130EDA1DF3AC"><enum>(1)</enum><text>by striking <quote>a flood-control project duly adopted and authorized by law</quote> and inserting <quote>a federally authorized water resources development project,</quote>;</text></paragraph>
<paragraph id="H0957C88925C7493BAFD17B0C90F78813"><enum>(2)</enum><text>by striking <quote>such work</quote> and inserting <quote>such project</quote>;</text></paragraph> <paragraph id="H4F5DAE74002B4B3798E86FA926252BD3"><enum>(3)</enum><text display-inline="yes-display-inline">by striking <quote>from appropriations which may be provided by Congress for flood-control work</quote> and inserting <quote>if appropriations are provided by Congress for such purpose</quote>; and</text></paragraph>
<paragraph id="H416F2B46E3B642939777031225C3BD12"><enum>(4)</enum><text>by adding at the end the following: <quote>For purposes of this Act, the term <term>State</term> means the several States, the District of Columbia, the commonwealths, territories, and possessions of the United States, and Indian tribes (as defined in section 4(e) of the Indian Self-Determination and Education Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/25/5304">25 U.S.C. 5304(e)</external-xref>)).</quote>.</text></paragraph></subsection> <subsection id="H9DB1DCABC6004C4896C6DDE1A1098582"><enum>(b)</enum><header>No adverse effect on processes</header><text display-inline="yes-display-inline">In implementing any provision of law that authorizes a non-Federal interest to provide, advance, or contribute funds to the Secretary for the development or implementation of a water resources development project (including sections 203 and 204 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2231">33 U.S.C. 2231</external-xref>, 2232), section 5 of the Act of June 22, 1936 (<external-xref legal-doc="usc" parsable-cite="usc/33/701h">33 U.S.C. 701h</external-xref>), and the Act of October 15, 1940 (<external-xref legal-doc="usc" parsable-cite="usc/33/701h-1">33 U.S.C. 701h–1</external-xref>)), the Secretary shall ensure, to the maximum extent practicable, that the use by a non-Federal interest of such authorities does not adversely affect—</text>
<paragraph id="H100E614ECA594643943B3959956E3455"><enum>(1)</enum><text display-inline="yes-display-inline">the process or timeline for development and implementation of other water resources development projects by other non-Federal entities that do not use such authorities; or</text></paragraph> <paragraph id="HAF9F3D7D87ED4A808D0C7593092DEDA1"><enum>(2)</enum><text>the process for including such projects in the President’s annual budget submission to Congress under section 1105(a) of title 31, United States Code.</text></paragraph></subsection>
<subsection id="HBF9907C4417740A1BC041F6F81DB3B34"><enum>(c)</enum><header>Advances by private parties; repayment</header><text display-inline="yes-display-inline">Section 11 of the Act of March 3, 1925 (Chapter 467; <external-xref legal-doc="usc" parsable-cite="usc/33/561">33 U.S.C. 561</external-xref>) is repealed.</text></subsection></section> <section id="H98A454D1E96144029A56DBDDDC9D0026" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1167.</enum><header>Costs in excess of Federal participation limit</header><text display-inline="no-display-inline">Section 14 of the Flood Control Act of 1946 (<external-xref legal-doc="usc" parsable-cite="usc/33/701r">33 U.S.C. 701r</external-xref>), as amended by this Act, is further amended by inserting <quote>, and if such amount is not sufficient to cover the costs included in the Federal cost share for a project, as determined by the Secretary, the non-Federal interest shall be responsible for any such costs that exceed such amount</quote> before the period at the end.</text></section>
<section id="H49AB53B4643446A98A17192DD89B7F6A" commented="no"><enum>1168.</enum><header>Disposition of projects</header>
<subsection id="H90C038D18D294477BE7D3509027D8614" commented="no"><enum>(a)</enum><header>In general</header><text>In carrying out a disposition study for a project of the Corps of Engineers, or a separable element of such a project, including a disposition study under section 216 of the Flood Control Act of 1970 (<external-xref legal-doc="usc" parsable-cite="usc/33/549a">33 U.S.C. 549a</external-xref>), the Secretary shall consider modifications that would improve the overall quality of the environment in the public interest, including removal of the project or separable element of a project.</text></subsection> <subsection id="H0B419640BB5147FD87E941B6D268B74C" commented="no"><enum>(b)</enum><header>Disposition study transparency</header><text>The Secretary shall carry out disposition studies described in subsection (a) in a transparent manner, including by—</text>
<paragraph id="HED8DD676EDD74787B4B6F21BA1130138" commented="no"><enum>(1)</enum><text>providing opportunities for public input; and</text></paragraph> <paragraph id="H1B22E49B288040D58459679AC0D9EC56" commented="no"><enum>(2)</enum><text>publishing the final disposition studies.</text></paragraph></subsection>
<subsection id="HC728D7AB292144DE928029945824FC15" commented="no"><enum>(c)</enum><header>Removal of infrastructure</header><text>For disposition studies described in subsection (a) in which the Secretary determines that a Federal interest no longer exists, and makes a recommendation of removal of the project or separable element of a project, the Secretary is authorized, using existing authorities, to pursue removal of the project or separable element of a project in partnership with other Federal agencies and non-Federal entities with appropriate capabilities to undertake infrastructure removal.</text></subsection></section> <section id="H83EA6F6955784FC7BB821085FD95E898" section-type="subsequent-section" commented="no"><enum>1169.</enum><header>Contributed funds for non-Federal reservoir operations</header><text display-inline="no-display-inline">Section 5 of the Act of June 22, 1936 (<external-xref legal-doc="usc" parsable-cite="usc/33/701h">33 U.S.C. 701h</external-xref>), is amended by inserting after <quote>authorized purposes of the project:</quote> the following: <quote><italic>Provided further</italic>, That the Secretary is authorized to receive and expend funds from an owner of a non-Federal reservoir to formulate, review, or revise operational documents for any non-Federal reservoir for which the Secretary is authorized to prescribe regulations for the use of storage allocated for flood control or navigation pursuant to section 7 of the Act of December 22, 1944 (<external-xref legal-doc="usc" parsable-cite="usc/33/709">33 U.S.C. 709</external-xref>):</quote>.</text></section>
<section id="H9BDF9D1A8AC5425C9BD53C7606C9AAFB" commented="no"><enum>1170.</enum><header>Watercraft inspection stations</header><text display-inline="no-display-inline">Section 104 of the River and Harbor Act of 1958 (<external-xref legal-doc="usc" parsable-cite="usc/33/610">33 U.S.C. 610</external-xref>) is amended—</text> <paragraph id="H9436E142F39A4D0AB973104BBB9AB285" commented="no"><enum>(1)</enum><text>by amending subsection (b) to read as follows:</text>
<quoted-block id="H27A94991F6424323A02B28D4E936E025" style="OLC">
<subsection id="H53BDFF963ED84E72B8ECA38CECC5DBD8" commented="no"><enum>(b)</enum><header>Authorization of appropriations</header>
<paragraph id="H8494C4707E20481AA4DAFAB0E3C90141" commented="no"><enum>(1)</enum><header>In general</header><text>There is authorized to be appropriated to carry out this section $110,000,000 for each fiscal year, of which—</text> <subparagraph id="H53C46DB619A045F29BA19BA068D14B54" commented="no"><enum>(A)</enum><text>$30,000,000 shall be made available to carry out subsection (d)(1)(A)(i);</text></subparagraph>
<subparagraph id="HDA0E9BD036A844078DB310F60AEFE832" commented="no"><enum>(B)</enum><text>$30,000,000 shall be made available to carry out subsection (d)(1)(A)(ii); and</text></subparagraph> <subparagraph id="HC6F016FF8B7244FE9822031FD99755B1" commented="no"><enum>(C)</enum><text>$30,000,000 shall be made available to carry out subsection (d)(1)(A)(iii).</text></subparagraph></paragraph>
<paragraph id="H94FC51F02B1F4C508D3EE510478180F4" commented="no"><enum>(2)</enum><header>Control operations</header><text>Any funds made available under paragraph (1) to be used for control operations shall be allocated by the Chief of Engineers on a priority basis, based on the urgency and need of each area and the availability of local funds.</text></paragraph></subsection><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph> <paragraph id="HFE12850E13DC48F5ABAC7F98A82A0596" commented="no"><enum>(2)</enum><text>in subsection (d)—</text>
<subparagraph id="H76965BBD17E3428E811F8EAF364929F2" commented="no"><enum>(A)</enum><text>by amending paragraph (1) to read as follows:</text> <quoted-block id="HB290FE6CF11147079B2AD1F66F28E701" style="OLC"> <paragraph id="H748B8B1746A642289D2DC91D85B97861" commented="no"><enum>(1)</enum><header>In general</header> <subparagraph id="H6998A937EF594FC0A6477080629973BE" commented="no"><enum>(A)</enum><header>Watercraft inspection stations</header><text>In carrying out this section, the Secretary shall establish (as applicable), operate, and maintain new or existing watercraft inspection stations—</text>
<clause id="H394A87F97C3E4D2287BF5ED62446C740" commented="no"><enum>(i)</enum><text>to protect the Columbia River Basin;</text></clause> <clause id="H12EC1A20171B4D7A8C531B54FFF7C259" commented="no"><enum>(ii)</enum><text>to protect the Upper Missouri River Basin; and</text></clause>
<clause id="H5BC373E372E5417895D549BED4599CE9" commented="no"><enum>(iii)</enum><text>to protect the Upper Colorado River Basin and the South Platte and Arizona River Basins.</text></clause></subparagraph> <subparagraph id="HE673BB13E9124FD2910B4D104DC6BCF5" commented="no"><enum>(B)</enum><header>Locations</header><text>The Secretary shall establish watercraft inspection stations under subparagraph (A) at locations with the highest likelihood of preventing the spread of aquatic invasive species at reservoirs operated and maintained by the Secretary, as determined by the Secretary in consultation with States within the areas described in subparagraph (A).</text></subparagraph>
<subparagraph id="HA2B07AA2F85642A8ADE492ED0F657DB1" commented="no"><enum>(C)</enum><header>Rapid response</header><text>The Secretary shall assist States within the areas described in subparagraph (A) with rapid response to any aquatic invasive species, including quagga or zebra mussel, infestation.</text></subparagraph></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph> <subparagraph id="H3932E3FDC8C941CF93E7715C9DB18F49" commented="no"><enum>(B)</enum><text>by amending paragraph (3)(A) to read as follows:</text>
<quoted-block id="H5DCA5A931AFC4278B4059A2E47D7E279" style="OLC">
<subparagraph id="HCB53D3A75BE64FE182A7C2CB6E5F081C" commented="no"><enum>(A)</enum><text>the Governors of the States within the areas described in each of clauses (i) through (iii) of paragraph (1)(A), as applicable;</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph></section> <section commented="no" id="HAACEAB09D56F4E98BD36A16A33A5AD90"><enum>1171.</enum><header>Restricted areas at Corps of Engineers dams</header><text display-inline="no-display-inline">Section 2 of the Freedom to Fish Act (<external-xref legal-doc="public-law" parsable-cite="pl/113/13">Public Law 113–13</external-xref>; 127 Stat. 449, 128 Stat. 1271) is amended by striking <quote>4 years after the date of enactment of the Water Resources Reform and Development Act of 2014</quote> each place it appears and inserting <quote>5 years after the date of enactment of the <short-title>Water Resources Development Act of 2018</short-title></quote>.</text></section>
<section id="H8BD16CD7E3CC40559C1B51D02DD9FC9C" commented="no"><enum>1172.</enum><header>Coastal erosion</header>
<subsection id="H60A1990CCCCD4621AB376819A4B47661" commented="no"><enum>(a)</enum><header>In general</header><text>Pursuant to section 111 of the River and Harbor Act of 1968 (<external-xref legal-doc="usc" parsable-cite="usc/33/426i">33 U.S.C. 426i</external-xref>), the Secretary shall, to the maximum extent practicable, complete operation and maintenance renourishment to mitigate coastal erosion attributed to Federal project structures in the upper northeast United States.</text></subsection> <subsection id="H22C04ACA0B5942EB947F53352E2F3BB0" commented="no"><enum>(b)</enum><header>Project selection</header><text>In carrying out the work under subsection (a), the Secretary shall—</text>
<paragraph id="H1908E0CCCB914C678F8F738FA68CA755" commented="no"><enum>(1)</enum><text>identify and carry out not more than five projects—</text> <subparagraph id="HE82B90AAC35143A797FD3164A857FBA0" commented="no"><enum>(A)</enum><text>located in any of the States of Maine, New Hampshire, Massachusetts, Connecticut, Rhode Island, or New York; and</text></subparagraph>
<subparagraph id="HD26BBEAA15C44FA8A99A3AE8A7D4D9D3" commented="no"><enum>(B)</enum><text>for which a feasibility study has been completed by December 31, 2019, that includes findings that a Federal project structure is interrupting the natural flow of sediment and causing coastal erosion; and</text></subparagraph></paragraph> <paragraph id="H7DB000AF2B2F4D1396219FD824C4D86D" commented="no"><enum>(2)</enum><text>consult with relevant State agencies in selecting projects.</text></paragraph></subsection></section>
<section id="H05C4D461904747E9827642D66F842C15" commented="no"><enum>1173.</enum><header>Prohibition on surplus water fees, Lake Cumberland Watershed, Kentucky and Tennessee</header>
<subsection id="H989CEFBCE39B434A85AA74ECB04076AE" commented="no"><enum>(a)</enum><header>In general</header><text>The Secretary shall not charge a fee for surplus water under a contract entered into pursuant to section 6 of the Act of December 22, 1944 (<external-xref legal-doc="usc" parsable-cite="usc/33/708">33 U.S.C. 708</external-xref>), if the contract is for surplus water stored in the Lake Cumberland Watershed, Kentucky and Tennessee.</text></subsection> <subsection id="H797F97EA83E443BFB1B22D3BE8A1BECD" commented="no"><enum>(b)</enum><header>Termination</header><text>The limitation under subsection (a) shall expire on the date that is 2 years after the date of enactment of this Act.</text></subsection>
<subsection id="HE906DB96EA334B138259E82A9C5650AC" commented="no"><enum>(c)</enum><header>Applicability</header><text>Nothing in this section—</text> <paragraph id="H126ACCFAED534459BAEAD718A4FA791D" commented="no"><enum>(1)</enum><text>affects the authority of the Secretary under section 2695 of title 10, United States Code, to accept funds or to cover the administrative expenses relating to certain real property transactions;</text></paragraph>
<paragraph id="H75017AD0C81146F384FD3697EEEAAA8F" commented="no"><enum>(2)</enum><text>affects the application of section 6 of the Act of December 22, 1944 (<external-xref legal-doc="usc" parsable-cite="usc/33/708">33 U.S.C. 708</external-xref>) or section 301 of the Water Supply Act of 1958 (<external-xref legal-doc="usc" parsable-cite="usc/43/390b">43 U.S.C. 390b</external-xref>) to surplus water stored outside of the Lake Cumberland Watershed, Kentucky and Tennessee; or</text></paragraph> <paragraph id="H758DAEE0C5C347E29528BDA50C91DE2F" commented="no"><enum>(3)</enum><text>affects the authority of the Secretary to accept funds under section 216(c) of the Water Resources Development Act of 1996 (<external-xref legal-doc="usc" parsable-cite="usc/33/2321a">33 U.S.C. 2321a(c)</external-xref>).</text></paragraph></subsection></section>
<section id="HD0D782A390424E29A3885D6A7D451092" commented="no"><enum>1174.</enum><header>Middle Rio Grande peak flow restoration</header>
<subsection id="H4FE90BDA5A3649B195871352BE6EC2A8" commented="no"><enum>(a)</enum><header>Restarting of temporary deviation</header><text>Subject to subsection (b), the Secretary shall restart the temporary deviation in the operation of Cochiti Lake and Jemez Canyon Dam, that was initiated in 2009 and terminated in 2013, to continue to evaluate the effects of the deviation.</text></subsection> <subsection id="HD81A8A03D92345E49F24961D57246ADA" commented="no"><enum>(b)</enum><header>Approval and consultation</header><text>Before restarting the temporary deviation under subsection (a), the Secretary shall, as required under the applicable water control manuals—</text>
<paragraph id="HD5ADD9198DF348D98992906CEB9FFD3E" commented="no"><enum>(1)</enum><text>first obtain approval from—</text> <subparagraph id="H0641D210A391438480982F5E25AEE445" commented="no"><enum>(A)</enum><text>Pueblo de Cochiti;</text></subparagraph>
<subparagraph id="H334E75CB88ED4468A9F4EA8FDDA0AFDF" commented="no"><enum>(B)</enum><text>Pueblo of Santa Ana; and</text></subparagraph> <subparagraph id="H835CCBD79C794EE18AC7918BBF8B3C29" commented="no"><enum>(C)</enum><text>the Rio Grande Compact Commission established by the compact approved by Congress under the Act of May 31, 1939 (53 Stat. 785, chapter 155); and</text></subparagraph></paragraph>
<paragraph id="H64B7E0A2F41247408D82AED7280B5A3B" commented="no"><enum>(2)</enum><text>to the maximum extent practicable, consult with the existing Cochiti Lake Environmental Resources Team, which includes other Federal agencies and landowners in the region.</text></paragraph></subsection> <subsection id="H739820F21CA64248B5072BA52A59DCA2" commented="no"><enum>(c)</enum><header>Sunset</header><text>The authority to conduct the temporary deviation described in subsection (a) shall terminate on the date that is 5 years after the date on which the Secretary restarts the temporary deviation under such subsection.</text></subsection></section>
<section id="H2E2256AFE392471A9F56F6A07C6DCAF3"><enum>1175.</enum><header>Prohibition of administrative fees in implementing Rough River Lake Flowage Easement Encroachment Resolution Plan</header>
<subsection id="H0CC07537CBED4CDC871D12DDEB997960"><enum>(a)</enum><header>Definitions</header><text>In this section:</text> <paragraph id="HA1D92268D5D9490184269134FB19843D"><enum>(1)</enum><header>Eligible property owner</header><text>The term <term>eligible property owner</term> means the owner of a property—</text>
<subparagraph id="H082B0CF288444FFDB1A980F7F09FAC2F"><enum>(A)</enum>
<clause id="HCB2517B05CD0484E9613F0AE3EB97500" display-inline="yes-display-inline"><enum>(i)</enum><text>described in Scenario A, B, C, or D in the Plan; or</text></clause> <clause id="HDE33A06C3F5D4AA2A65598B65472D794" indent="up1"><enum>(ii)</enum><text>that consists of vacant land located above 534 feet mean sea level that is encumbered by a Rough River Lake flowage easement; and</text></clause></subparagraph>
<subparagraph id="H206DA149775B4AC0AA4A4E446C1383F3"><enum>(B)</enum><text>for which the Rough River Lake flowage easement is not required to address backwater effects.</text></subparagraph></paragraph> <paragraph id="H6406B6B518844A1BA1F29AC1C3988ADB"><enum>(2)</enum><header>Plan</header><text>The term <term>Plan</term> means the Rough River Lake Flowage Easement Encroachment Resolution Plan of the Corps of Engineers, dated January 2017.</text></paragraph></subsection>
<subsection id="HB97D620F9947433C8D9AF8B219E23119"><enum>(b)</enum><header>Prohibition on assessing administrative fees</header><text>Notwithstanding any other provision of law, in carrying out the Plan, the Secretary may not impose on or collect from any eligible property owner any administrative fee, including—</text> <paragraph id="H0D0172A15D374394B384793316D5D30D"><enum>(1)</enum><text>a fee to pay the costs to the Corps of Engineers of processing requests to resolve encroachments under the Plan;</text></paragraph>
<paragraph id="H5E4EC5C9AC6A447BA35426C369D733A6"><enum>(2)</enum><text>fees for deed drafting and surveying; and</text></paragraph> <paragraph id="HA3DA0800401C498BBD6047A071747061"><enum>(3)</enum><text>any other administrative cost incurred by the Corps of Engineers in implementing the Plan.</text></paragraph></subsection>
<subsection id="HBF6126258A5248278815CA8148632DF2"><enum>(c)</enum><header>Refund of administrative fees</header><text>In the case of an eligible property owner who has paid any administrative fees described in paragraphs (1) through (3) of subsection (b) to the Corps of Engineers, the Corps of Engineers shall refund those fees on request of the eligible property owner.</text></subsection> <subsection id="HBABCE5A898604173A898929FB2666614"><enum>(d)</enum><header>Savings provision</header><text>Nothing in this section affects the responsibility or authority of the Secretary to continue carrying out the Plan, including any work necessary to extinguish the flowage easement of the United States with respect to the property of any eligible property owner.</text></subsection></section>
<section id="H3BD45DF2FFC743FFAAAEB665AC32082D"><enum>1176.</enum><header>Preconstruction engineering design demonstration program</header>
<subsection id="HF9854A60638C41BE832AD083C20F3A79"><enum>(a)</enum><header>Definition of environmental impact statement</header><text>In this section, the term <quote>environmental impact statement</quote> means the detailed written statement required under section 102(2)(C) of the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4332">42 U.S.C. 4332(2)(C)</external-xref>).</text></subsection> <subsection id="H2B15E41330884353843A4062674BEEDE"><enum>(b)</enum><header>Demonstration program</header><text>The Secretary shall establish a demonstration program to allow a project authorized to execute pursuant to section 211 of the Water Resources Development Act of 1996 (<external-xref legal-doc="usc" parsable-cite="usc/33/701b-13">33 U.S.C. 701b–13</external-xref>) (as in effect on the day before the date of enactment of the Water Resources Reform and Development Act of 2014 (128 Stat. 1193)) to begin preconstruction engineering and design on a determination by the Secretary that the project is technically feasible, economically justified, and environmentally acceptable.</text></subsection>
<subsection id="H49EDD845C7E44D6C8AB34EA4FE7C9392"><enum>(c)</enum><header>Requirements</header><text>For each project authorized to begin preconstruction engineering and design under subsection (b)—</text> <paragraph id="H5B29BDAE352A40BA825436BBB50A8E6D"><enum>(1)</enum><text>the project shall conform to the feasibility study and the environmental impact statement approved by the Secretary; and</text></paragraph>
<paragraph id="H7393C4BA49F24CA09D920EF603FE1629"><enum>(2)</enum><text>the Secretary and the non-Federal sponsor shall jointly agree to the construction design of the project.</text></paragraph></subsection> <subsection id="HC94B72D77EF4482386CB8D7580D6A1C5"><enum>(d)</enum><header>Secretary review of potential adverse impacts</header><text>When reviewing the feasibility study and the environmental impact statement for a project under subsection (b), the Secretary shall follow current USACE Policy, Regulations, and Guidance, to assess potential adverse downstream impacts to the Pearl River Basin. Upon completion of the Secretary’s determination under subsection (b), the non-Federal sponsor shall design the project in a manner that addresses any potential adverse impacts or that provides mitigation in accordance with section 906 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2283">33 U.S.C. 2283</external-xref>).</text></subsection>
<subsection id="H0CC8552A4ADB4C92AA8D42D679253E8D"><enum>(e)</enum><header>Sunset</header><text>The authority to carry out the demonstration program under this section shall terminate on the date that is 5 years after the date of enactment of this Act.</text></subsection> <subsection id="H40D361DED9C34E89BDB01F62ED519700"><enum>(f)</enum><header>Savings provision</header><text>Nothing in this section supersedes, precludes, or affects any applicable requirements for a project under subsection (b) under—</text>
<paragraph id="HDF7EE7A9DE264AD0B00182CB10EA1975"><enum>(1)</enum><text>section 906 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2283">33 U.S.C. 2283</external-xref>); or</text></paragraph> <paragraph id="HFC5AF4DE17A446959EB2600288174E54"><enum>(2)</enum><text>the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (<external-xref legal-doc="usc" parsable-cite="usc/42/9601">42 U.S.C. 9601</external-xref> et seq.).</text></paragraph></subsection></section></subtitle>
<subtitle id="H11F7AF90EB7A46D7946EFAFB71046CB2"><enum>B</enum><header>Studies and Reports</header>
<section id="HE273BB0AB18548748E6BCE19F32542BA"><enum>1201.</enum><header>Authorization of proposed feasibility studies</header><text display-inline="no-display-inline">The Secretary is authorized to conduct a feasibility study for the following projects for water resources development and conservation and other purposes, as identified in the reports titled <quote>Report to Congress on Future Water Resources Development</quote> submitted to Congress on March 17, 2017, and February 5, 2018, respectively, pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>) or otherwise reviewed by Congress:</text> <paragraph id="H23DE852D5E584D09ABB07AEFA5039960"><enum>(1)</enum><header>Cave Buttes Dam, Arizona</header><text display-inline="yes-display-inline">Project for flood risk management, Phoenix, Arizona.</text></paragraph>
<paragraph id="H61D6EA56AC294ABF87381B03E63F79D2"><enum>(2)</enum><header>San Diego River, California</header><text display-inline="yes-display-inline">Project for flood risk management, navigation, and ecosystem restoration, San Diego, California.</text></paragraph> <paragraph id="H21357B8A12914678A75669184D11E453"><enum>(3)</enum><header>J. Bennett Johnston Waterway, Louisiana</header><text display-inline="yes-display-inline">Project for navigation, J. Bennett Johnston Waterway, Louisiana.</text></paragraph>
<paragraph id="H8BA8A676E0AA469EB2B8AA307F33D64C"><enum>(4)</enum><header>Northshore, Louisiana</header><text display-inline="yes-display-inline">Project for flood risk management, St. Tammany Parish, Louisiana.</text></paragraph> <paragraph id="H08D72BF7AC2B4EFAB84E66B4DE2D609E"><enum>(5)</enum><header>Ouachita-Black Rivers, Louisiana</header><text display-inline="yes-display-inline">Project for navigation, Little River, Louisiana.</text></paragraph>
<paragraph id="HFFCA03E7BC144BA79B9FD4C7F7BA405B"><enum>(6)</enum><header>Chautauqua Lake, New York</header><text display-inline="yes-display-inline">Project for ecosystem restoration and flood risk management, Chautauqua, New York.</text></paragraph> <paragraph id="HF04AB47A7DF24E18B973F6528F45AFD7"><enum>(7)</enum><header>Trinity River and Tributaries, Texas</header><text>Project for navigation, Liberty, Texas.</text></paragraph>
<paragraph id="H6CCD5AFDEC714926BC67F876F2FDA089" commented="no"><enum>(8)</enum><header>West Cell Levee, Texas</header><text display-inline="yes-display-inline">Project for flood risk management, Irving, Texas.</text></paragraph> <paragraph id="HE412DAFA8B654E53999B6C7C1326A558"><enum>(9)</enum><header>Coastal Virginia, Virginia</header><text display-inline="yes-display-inline">Project for flood risk management, ecosystem restoration, and navigation, Coastal Virginia.</text></paragraph>
<paragraph id="H6D7FD93554714A959C57C95591ADA172"><enum>(10)</enum><header>Tangier Island, Virginia</header><text display-inline="yes-display-inline">Project for flood risk management and ecosystem restoration, Tangier Island, Virginia.</text></paragraph></section> <section id="H82EAF454E02444FF84C53C66EFAD692E"><enum>1202.</enum><header>Additional studies</header> <subsection id="HFA59053A44AC4291AF11A76C3ADE8488"><enum>(a)</enum><header>Lower Mississippi River; Missouri, Kentucky, Tennessee, Arkansas, Mississippi, and Louisiana</header> <paragraph id="HB65380A8514840809D47D360185C7773"><enum>(1)</enum><header>In general</header><text>The Secretary is authorized to carry out studies to determine the feasibility of habitat restoration for each of the eight reaches identified as priorities in the report prepared by the Secretary pursuant to section 402 of the Water Resources Development Act of 2000, titled <quote>Lower Mississippi River Resource Assessment; Final Assessment In Response to Section 402 of WRDA 2000</quote> and dated July 2015.</text></paragraph>
<paragraph id="HF03BC3E87981466999517E86B3FE9EDC"><enum>(2)</enum><header>Consultation</header><text>The Secretary shall consult with the Lower Mississippi River Conservation Committee during each feasibility study carried out under paragraph (1).</text></paragraph></subsection> <subsection id="HDA208C3FD0D04B38BCB6DDB81A82B3FC"><enum>(b)</enum><header>St. Louis Riverfront, Meramec River Basin, Missouri and Illinois</header> <paragraph id="HC29DA7D1EDA14F5CA35563B25155E531"><enum>(1)</enum><header>In general</header><text>The Secretary is authorized to carry out studies to determine the feasibility of a project for ecosystem restoration and flood risk management in Madison, St. Clair, and Monroe Counties, Illinois, St. Louis City, and St. Louis, Jefferson, Franklin, Gasconade, Maries, Phelps, Crawford, Dent, Washington, Iron, St. Francois, St. Genevieve, Osage, Reynolds, and Texas Counties, Missouri.</text></paragraph>
<paragraph id="HE6FE4895204D4E28AF7FEF267E051ADF"><enum>(2)</enum><header>Continuation of existing study</header><text>Any study carried out under paragraph (1) shall be considered a continuation of the study being carried out under Committee Resolution 2642 of the Committee on Transportation and Infrastructure of the House of Representatives, adopted June 21, 2000.</text></paragraph></subsection></section> <section id="H3CBEF5FCE8F64294AB4C7EC34D237900" commented="no"><enum>1203.</enum><header>Expedited completion</header> <subsection id="H432601686D6B4C4A8ED475A32C7CBE0B" commented="no"><enum>(a)</enum><header>Feasibility reports</header><text>The Secretary shall expedite the completion of a feasibility study for each of the following projects, and if the Secretary determines that the project is justified in a completed report, may proceed directly to preconstruction planning, engineering, and design of the project:</text>
<paragraph id="H90F7C12EC8DE4CA882432CE1B4543CBE" commented="no"><enum>(1)</enum><text display-inline="yes-display-inline">Project for riverbank stabilization, Selma, Alabama.</text></paragraph> <paragraph id="H9FFE01FFF5B244A8818DB2F9AB0691B1" commented="no"><enum>(2)</enum><text>Project for ecosystem restoration, Three Mile Creek, Alabama.</text></paragraph>
<paragraph id="HF611018B10534A519CFCF868697568D2" commented="no"><enum>(3)</enum><text display-inline="yes-display-inline">Project for navigation, Nome, Alaska.</text></paragraph> <paragraph id="H75BE3DE813D04C29839D7061B7C618C5" commented="no"><enum>(4)</enum><text display-inline="yes-display-inline">Project for flood diversion, Seward, Alaska.</text></paragraph>
<paragraph id="H5C041B7CB7D940D4B467BD1F6C54B78B" commented="no"><enum>(5)</enum><text display-inline="yes-display-inline">Project for flood control, water conservation, and related purposes, Coyote Valley Dam, California.</text></paragraph> <paragraph id="H992B12B9DE054CD48BF50B64097AA5DB" commented="no"><enum>(6)</enum><text>Project for flood risk management, Lower Cache Creek, California.</text></paragraph>
<paragraph id="H40E4A87EE4854877A6F21D1DF3D0441E" commented="no"><enum>(7)</enum><text display-inline="yes-display-inline">Project for flood risk management, Lower San Joaquin River, California, as described in section 1322(b)(2)(F) of the Water Resources Development Act of 2016 (130 Stat. 1707) (second phase of feasibility study).</text></paragraph> <paragraph id="H6334A70C972C452D85D72461103EBC5B" commented="no"><enum>(8)</enum><text>Project for flood risk management, South San Francisco, California.</text></paragraph>
<paragraph id="H2536512EB3554F68BA1EFF3D6E5B4E53" commented="no"><enum>(9)</enum><text>Project for flood risk management and ecosystem restoration, Tijuana River, California.</text></paragraph> <paragraph id="HF3AD1E74D51546218B56749B98CA8D18" commented="no"><enum>(10)</enum><text display-inline="yes-display-inline">Project for flood damage reduction, Westminster-East Garden Grove, California.</text></paragraph>
<paragraph id="HEAAD706CCC554AAE9E069923A61C286B" commented="no"><enum>(11)</enum><text display-inline="yes-display-inline">Project for flood risk management in East Hartford, Connecticut.</text></paragraph> <paragraph id="H9C7F0319899D4C6A876AE53D9C0D2809" commented="no"><enum>(12)</enum><text>Project for flood risk management in Hartford, Connecticut.</text></paragraph>
<paragraph id="HB31EC7B31C7944B7AF21CCEBD9F3B426" commented="no"><enum>(13)</enum><text>Projects under the Comprehensive Flood Mitigation Study for the Delaware River Basin.</text></paragraph> <paragraph id="HBF68B1D81C0645E5B5F81DD57F4EF5C6" commented="no"><enum>(14)</enum><text>Project for ecosystem restoration, Lake Apopka, Florida.</text></paragraph>
<paragraph id="HC7EAB0622AAD44FD8BCF5102AFE39537" commented="no"><enum>(15)</enum><text>Project for ecosystem restoration, Kansas River Weir, Kansas.</text></paragraph> <paragraph id="H4E91146789684E0BAD32FDF0718425B3" commented="no"><enum>(16)</enum><text display-inline="yes-display-inline">Project for navigation and channel deepening, Baptiste Collette Bayou, Louisiana, under section 203 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2231">33 U.S.C. 2231</external-xref>).</text></paragraph>
<paragraph id="H8564F8EFB5094A4D915EADD51DD1CFEE" commented="no"><enum>(17)</enum><text display-inline="yes-display-inline">Project for navigation and channel deepening, Houma Navigation Canal, Louisiana, under section 203 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2231">33 U.S.C. 2231</external-xref>).</text></paragraph> <paragraph id="H42C8C489EBED4C568966B3368209FAA0" commented="no"><enum>(18)</enum><text display-inline="yes-display-inline">Project for navigation and channel deepening, Bayou Lafourche, Louisiana, under section 203 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2231">33 U.S.C. 2231</external-xref>).</text></paragraph>
<paragraph id="H2B3B50B66316488295F99326F07324CA"><enum>(19)</enum><text display-inline="yes-display-inline">Project for flood damage reduction and ecosystem restoration, St. Tammany Parish, Louisiana.</text></paragraph> <paragraph id="HE0789BC7AA8D4340AA1C5C8834AB0B54" commented="no"><enum>(20)</enum><text display-inline="yes-display-inline">Project for ecosystem restoration, Warren Glen Dam Removal, Musconetcong River, New Jersey.</text></paragraph>
<paragraph id="H59A4C90C432B4AE28304CA764D9124A8" commented="no"><enum>(21)</enum><text>Project for flood risk management, Rahway River Basin, New Jersey.</text></paragraph> <paragraph id="HA31EA6FAB2E842AA87E77E49604D6750" commented="no"><enum>(22)</enum><text>The Hudson-Raritan Estuary Comprehensive Restoration Project, New Jersey and New York.</text></paragraph>
<paragraph id="H6F43F8BE3A284F22B4A088121DC01B11" commented="no"><enum>(23)</enum><text display-inline="yes-display-inline">Project for flood control and water supply, Abiquiu Dam, New Mexico.</text></paragraph> <paragraph id="H402A37436F5C4C0C90339A96D0E366E0" commented="no"><enum>(24)</enum><text display-inline="yes-display-inline">Project for reformulation, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, Queens, New York.</text></paragraph>
<paragraph id="HBE09ABA8D10347BBBB5255FB381D3F37" commented="no"><enum>(25)</enum><text>Project for navigation, New York-New Jersey Harbor and Tributaries Focus Area.</text></paragraph> <paragraph id="H070FF4C95C8848BF9F5B85FF14DB4CCF" commented="no"><enum>(26)</enum><text>Project for water resource improvements, Willamette River Basin, Fern Ridge, Oregon.</text></paragraph>
<paragraph id="H8E05EA7D3B504A84B31375AA22E84B27" commented="no"><enum>(27)</enum><text>Project for coastal storm risk management, Pawcatuck River, Rhode Island.</text></paragraph> <paragraph id="H5BC9FC45F452469C9FDDAB5783D48409" commented="no"><enum>(28)</enum><text>Project for the Rhode Island historical structure flood hazard vulnerability assessment.</text></paragraph>
<paragraph id="H7CDA1DEF14034B2F9C75381CA4964441" commented="no"><enum>(29)</enum><text>Project for coastal storm risk management, Norfolk, Virginia.</text></paragraph> <paragraph id="H9892CD3805B54CE0A5B602C3709C9072" commented="no"><enum>(30)</enum><text>Project for navigation, Tacoma Harbor, Washington.</text></paragraph></subsection>
<subsection id="HE008B1F24A904C178D30A44AC76551E4" commented="no"><enum>(b)</enum><header>Lower San Joaquin River, California</header><text display-inline="yes-display-inline">In expediting completion of the second phase of the Lower San Joaquin River feasibility study under subsection (a)(7), the Secretary shall review and give priority to any plans and designs requested by non-Federal interests and incorporate such plans and designs into the Federal study if the Secretary determines that such plans and designs are consistent with Federal standards.</text></subsection> <subsection id="H3D3290D9543A49EF88810B38941B1D2D" commented="no"><enum>(c)</enum><header>Hudson-Raritan Estuary Comprehensive Restoration Project, New Jersey and New York</header><text display-inline="yes-display-inline">In the case of a recommendation for restoration activities within the Jamaica Bay Unit of the Hudson-Raritan Estuary Comprehensive Restoration Project, New Jersey and New York, under subsection (a)(22), which are to protect property under the jurisdiction of the National Park Service, the Secretary may recommend to Congress that the Secretary accept and expend funds from the National Park Service to carry out such activities.</text></subsection>
<subsection id="H284AB6F4141843ABA8413890C8D4C97F" commented="no"><enum>(d)</enum><header>Post-Authorization change report</header><text display-inline="yes-display-inline">The Secretary shall expedite completion of a post-authorization change report for the project for flood risk management, San Luis Rey River Flood Control Protection Project, California.</text></subsection> <subsection id="H22E267D5250042FEA13BD9E8E3485F05" commented="no"><enum>(e)</enum><header>Huntingdon County, Pennsylvania</header> <paragraph id="H39101BB838D14FC4B3FF1BC2578A7130" commented="no"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">The Secretary shall expedite the updating of the master plan for the Juniata River and tributaries project, Huntingdon County, Pennsylvania, authorized by section 203 of the Flood Control Act of 1962 (<external-xref legal-doc="public-law" parsable-cite="pl/87/874">Public Law 87–874</external-xref>; 76 Stat. 1182).</text></paragraph>
<paragraph id="HBB892B427E59400585FC250052577343" commented="no"><enum>(2)</enum><header>Process</header><text display-inline="yes-display-inline">In carrying out subsection (a), the Secretary shall update the master plan in accordance with section 1309(a)(2) of the Water Resources Development Act of 2016 (<external-xref legal-doc="public-law" parsable-cite="pl/114/322">Public Law 114–322</external-xref>; 130 Stat. 1693).</text></paragraph></subsection> <subsection id="H075DB43B096E48F19A4641CB34486E5C"><enum>(f)</enum><header>Upper Missouri River Basin flood and drought monitoring</header><text>The Secretary shall expedite activities authorized under section 4003(a) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1311, 130 Stat. 1677).</text></subsection>
<subsection id="HBEA16813361641EF8A7EE8601710916A"><enum>(g)</enum><header>Project modifications for improvement of environment</header><text display-inline="yes-display-inline">For fiscal years 2019 and 2020, the Secretary shall give priority to projects that restore degraded ecosystems through modification of existing flood risk management projects for projects—</text> <paragraph id="H4F9F945195AC4B95B7EA348B41820A61"><enum>(1)</enum><text>authorized under section 1135 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2309a">33 U.S.C. 2309a</external-xref>); and</text></paragraph>
<paragraph id="H6F2E80D6D9904E88BBE000106C91AC57"><enum>(2)</enum><text>located within the Upper Missouri River Basin.</text></paragraph></subsection> <subsection id="HE29F08C8F2A24560B939C16AC835527B"><enum>(h)</enum><header>Expedited Completion of Certain Projects</header><text>It is the sense of Congress that the Secretary should provide funding for, and expedite the completion of, the following projects:</text>
<paragraph id="HB9D91CA8AB9C47949E710ED8E3A4A849"><enum>(1)</enum><text>West Haven, Connecticut, as authorized by section 101 of the River and Harbor Act of 1954 (68 Stat. 1254) and section 3 of the Act of August 13, 1946 (60 Stat. 1056, chapter 960; <external-xref legal-doc="usc" parsable-cite="usc/33/426g">33 U.S.C. 426g</external-xref>).</text></paragraph> <paragraph id="H6784323D69084F6FA71CF70EC1EF1BF2"><enum>(2)</enum><text>Providence River, Rhode Island, as authorized by the first section of the Act of August 26, 1937 (50 Stat. 845, chapter 832) and section 301 of the River and Harbor Act of 1965 (79 Stat. 1089).</text></paragraph>
<paragraph id="H7FD5D46838054365883004C3C78708FB"><enum>(3)</enum><text>Morganza to the Gulf, Louisiana, as authorized by section 7002(3) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1368).</text></paragraph> <paragraph id="H6B7D109C3FEB40B99A00187EB5C8E1D3"><enum>(4)</enum><text>Louisiana Coastal Area, Louisiana, as authorized by section 7002(5) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1369).</text></paragraph>
<paragraph id="H039D5E6D21B64A9A97BDEF234CD6054E"><enum>(5)</enum><text>Louisiana Coastal Area–Barataria Basin Barrier, Louisiana, as authorized by section 7002(5) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1370).</text></paragraph> <paragraph id="H61799BC4ED57447090FDE9FE8DDCDE39"><enum>(6)</enum><text>West Shore Lake Pontchartrain, Louisiana, as authorized by section 1401(3) of the Water Resources Development Act of 2016 (130 Stat. 1712).</text></paragraph>
<paragraph id="H41A945F6A8CC426C934B9DCF998F332D"><enum>(7)</enum><text>Southwest Coastal Louisiana, Louisiana, as authorized by section 1401(8) of the Water Resources Development Act of 2016 (130 Stat. 1715).</text></paragraph> <paragraph id="H809A9A9BDF22480A90C22658DC32A071"><enum>(8)</enum><text>West Thompson Lake, Connecticut, as authorized by section 203 of the Flood Control Act of 1960 (74 Stat. 489).</text></paragraph></subsection></section>
<section id="H994437A1D42048AC80F7FDD12CFCA662" commented="no"><enum>1204.</enum><header>GAO study on benefit-cost analysis reforms</header><text display-inline="no-display-inline">Not later than 1 year after the date of enactment of this Act, the Comptroller General of the United States shall—</text> <paragraph id="H2BE3AFCAE97B4ED7B141D199FBFFAD87" commented="no"><enum>(1)</enum><text>conduct a study on the benefit-cost procedures of the Secretary and the Director of the Office of Management and Budget (referred to in this section as the <quote>Director</quote>), including—</text>
<subparagraph id="H2F1750F753DB4264A32400B1D8B6AE3C" commented="no"><enum>(A)</enum><text>an examination of the benefits and costs that the Secretary and the Director do and do not include in the benefit-cost calculation, including, at a minimum, local and regional economic benefits; and</text></subparagraph> <subparagraph id="H9382EEBC116648B4A4D5DFB815D8C35C" commented="no"><enum>(B)</enum><text>a review of the calculation, if any, of navigation benefits used in a benefit-cost calculation for a non-commercial harbor that is used by a State maritime academy (as defined in section 51102 of title 46, United States Code) for military training purposes; and</text></subparagraph></paragraph>
<paragraph id="HE20BC6040F444F6F86FAB1873E33B3EB" commented="no"><enum>(2)</enum><text>submit to Congress a report that—</text> <subparagraph id="HE7BB3BBF17634EA7B7C8112E86C28D47" commented="no"><enum>(A)</enum><text>describes the results of the study under paragraph (1); and</text></subparagraph>
<subparagraph id="H514ACA1133E847D5B4F0A7B16D0C16B6" commented="no"><enum>(B)</enum><text>includes recommendations for legislative or regulatory changes to improve the benefit-cost analysis procedures of the Secretary and the Director.</text></subparagraph></paragraph></section> <section id="H7C0F6C741E0246789476C4AB21BC3C44" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1205.</enum><header>Harbor Maintenance Trust Fund report</header> <subsection id="HA2B541744ECF4DDEA57F18B10567BF8C" commented="no"><enum>(a)</enum><header>Deadline</header><text>Not later than 180 days after enactment of this Act, the Secretary shall submit reports under section 210(e)(3) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238(e)(3)</external-xref>) and section 330 of the Water Resources Development Act of 1992 (<external-xref legal-doc="usc" parsable-cite="usc/26/9505">26 U.S.C. 9505</external-xref> note; <external-xref legal-doc="public-law" parsable-cite="pl/102/580">Public Law 102–580</external-xref>) to the Committee on Transportation and Infrastructure of the House of Representatives and to the Committee on Environment and Public Works of the Senate.</text></subsection>
<subsection id="H678CF491C8E84C8A83718F0C84B63AE1" commented="no"><enum>(b)</enum><header>Additional information</header><text>For each report described in subsection (a) that is submitted after the date of enactment of this Act, the Secretary shall include, on a project-by-project basis, additional information identifying—</text> <paragraph id="H3AB27A5E893B45449956124E97C0F6E0" commented="no"><enum>(1)</enum><text>the most recent fiscal year for which operations and maintenance activities have been carried out and the cost of those activities; and</text></paragraph>
<paragraph id="H12F2A80109614B268C10D1EAFB9704FE" commented="no"><enum>(2)</enum><text>the operations and maintenance activities that were performed through either a recommendation from Congress or unspecified funds made available for ongoing work.</text></paragraph></subsection> <subsection id="HC9EBF9B69B6840ADA755C3A5BD2EF7B5" commented="no"><enum>(c)</enum><header>Availability</header><text>The Secretary shall make publicly available all reports described in subsection (a) submitted before, on, or after the date of enactment of this Act.</text></subsection></section>
<section id="H18BAFD0D611B4848BC666D137DAC0EDC" display-inline="no-display-inline" section-type="subsequent-section"><enum>1206.</enum><header>Identification of nonpowered dams for hydropower development</header>
<subsection id="H8B41C285BEFB43D69A25032A814397EB"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Not later than 18 months after the date of enactment of this section, the Secretary shall develop a list of existing nonpowered dams owned and operated by the Corps of Engineers that have the greatest potential for hydropower development.</text></subsection> <subsection id="H0EFA84F5811C4353ACF8BBEC94A214BA"><enum>(b)</enum><header>Considerations</header><text display-inline="yes-display-inline">In developing the list under subsection (a), the Secretary may consider the following:</text>
<paragraph id="H670A63B4888C4F4E8E19F3BF995A3F5D"><enum>(1)</enum><text>The compatibility of hydropower generation with existing purposes of the dam.</text></paragraph> <paragraph id="H4BAF3D91016B46D6AB111894034ED63F"><enum>(2)</enum><text>The proximity of the dam to existing transmission resources.</text></paragraph>
<paragraph id="H6704514CEC8D441BA2FAFB6557557862"><enum>(3)</enum><text>The existence of studies to characterize environmental, cultural, and historic resources relating to the dam.</text></paragraph> <paragraph id="H1ED1321C777642638955EDCA1C84C164"><enum>(4)</enum><text>Whether hydropower is an authorized purpose of the dam.</text></paragraph></subsection>
<subsection id="H55083B4ACCBD45CDA780A5308DB5BC96"><enum>(c)</enum><header>Availability</header><text display-inline="yes-display-inline">The Secretary shall provide the list developed under subsection (a) to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, and make such list available to the public.</text></subsection></section> <section id="H9A9FA87CFF514B46B108C28C122348B6" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1207.</enum><header>Study on innovative ports for offshore wind development</header> <subsection id="H5D706C857B544339BFEBEA145B96EADA" commented="no"><enum>(a)</enum><header>Definition of innovative port for offshore wind development</header><text display-inline="yes-display-inline">In this section, the term <term>innovative port for offshore wind development</term> includes any federally authorized port or harbor that can accommodate (including through retrofitting)—</text>
<paragraph id="HE7B14CDD58524E7ABB1CA778C23F207B" commented="no"><enum>(1)</enum><text>the upright assembly of the majority of an offshore wind facility, including the foundation, tower, turbine, blade, and electrical components;</text></paragraph> <paragraph id="HC40D0478DD42450B818DD257F8C6F203" commented="no"><enum>(2)</enum><text>an assembly area, ground-bearing pressure, and overhead clearance for the assembly of offshore wind facility turbines, which each have a capacity of up to 20 megawatts;</text></paragraph>
<paragraph id="HA782663AFF444AD696420F30808BBE8A" commented="no"><enum>(3)</enum><text>a heavy-lift quay and not less than 25 acres of port storage;</text></paragraph> <paragraph id="HAF14F128F21F4B92A55051909471E55C" commented="no"><enum>(4)</enum><text>innovative offshore wind facility and vessel technologies that allow for the rapid installation of an offshore wind facility; and</text></paragraph>
<paragraph id="HA451C01DDA034DD091E8145CAE355BA9" commented="no"><enum>(5)</enum><text>any other innovative offshore wind facility technology, as determined by the Secretary.</text></paragraph></subsection> <subsection id="H00FF431E06F848298B3651051CC5B545" commented="no"><enum>(b)</enum><header>Study and report</header> <paragraph id="H4E781267571843758C965F735BB52831" commented="no"><enum>(1)</enum><header>In general</header><text>Not later than 1 year after the date of enactment of this Act, the Secretary shall—</text>
<subparagraph id="H4CFB4DD56F14443BA09306E5108BA4C7" commented="no"><enum>(A)</enum><text>in consultation with the all appropriate Federal agencies, carry out a study of all federally authorized ports and harbors, including in the Mid-Atlantic, Gulf Coast, West Coast, Great Lakes, and New England regions of the United States, to identify—</text> <clause id="HE0F4D188527D4ADC9514DA04DFD27490" commented="no"><enum>(i)</enum><text>not less than three suitable federally authorized ports and harbors in those regions that could become innovative ports for offshore wind development;</text></clause>
<clause id="H26AB5758D1964036929DD9FFA3287F5E" commented="no"><enum>(ii)</enum><text>barriers to the development of innovative ports for offshore wind development;</text></clause> <clause id="H2701970EE9384DCEBB3363A9690D2DDF" commented="no"><enum>(iii)</enum><text>the Federal and State actions, including dredging and construction of supporting infrastructure, needed to facilitate the development of the federally authorized ports and harbors identified under clause (i) to become innovative ports for offshore wind development; and</text></clause>
<clause id="HDD4390D7C82B4FC696015B678E40C57D" commented="no"><enum>(iv)</enum><text>recommendations on any further research needed to improve federally authorized ports and harbors in the United States for offshore wind facility development and deployment; and</text></clause></subparagraph> <subparagraph id="H49DF4B3FA80B4F339F8B77386C5625FD" commented="no"><enum>(B)</enum><text>submit to Congress a report describing the results of the study under subparagraph (A).</text></subparagraph></paragraph>
<paragraph id="H1F6086AB3E394578A3902FB900FE1614" commented="no"><enum>(2)</enum><header>Consultation</header><text>In carrying out the study under paragraph (1), the Secretary shall consult with, at a minimum—</text> <subparagraph id="H9A2CDBCC6EA942BDA33C48043A20237D" commented="no"><enum>(A)</enum><text>the Governor of each State in which a port or harbor was identified;</text></subparagraph>
<subparagraph id="HB7099705C4614C07AB95F76DD774BE8F" commented="no"><enum>(B)</enum><text>affected port authorities;</text></subparagraph> <subparagraph id="HC22F13452132429BBA09066B1AF0896C" commented="no"><enum>(C)</enum><text>units of local government; and</text></subparagraph>
<subparagraph id="H2298B72E60B340DEA104C6449A50E374" commented="no"><enum>(D)</enum><text>relevant experts in engineering, environment, and industry considerations.</text></subparagraph></paragraph></subsection></section> <section id="H4409190E6A8F45E886A96D6AD5E1680A" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1208.</enum><header>Innovative materials and advanced technologies report</header><text display-inline="no-display-inline">Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to Congress a report that—</text>
<paragraph id="H5277E4C4027D488E8A3B284706E24878" commented="no"><enum>(1)</enum><text>describes activities conducted by the Corps of Engineers at centers of expertise, technology centers, technical centers, research and development centers, and similar facilities and organizations relating to the testing, research, development, identification, and recommended uses for innovative materials and advanced technologies, including construction management technologies, in water resources development projects; and</text></paragraph> <paragraph id="HAF08DFF3A1594621AB3655DF6B95DAEA" commented="no"><enum>(2)</enum><text>provides recommendations for types of water resources development projects in which innovative materials and advanced technologies should be used.</text></paragraph></section>
<section id="HAF41CDB75B3C477FBBE4082527239363" display-inline="no-display-inline" section-type="subsequent-section"><enum>1209.</enum><header>Study and report on expediting certain waiver processes</header><text display-inline="no-display-inline">Not later than 1 year after the date of enactment of this Act, the Secretary shall complete and submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report based on the results of a study on the best options available to the Secretary to implement the waiver process for the non-Federal cost share under section 116 of the Energy and Water Development and Related Agencies Appropriations Act, 2010 (<external-xref legal-doc="public-law" parsable-cite="pl/111/85">Public Law 111–85</external-xref>; 123 Stat. 2851).</text></section> <section id="H9E9D97729F1D4251BC9E3C32799A07E5" commented="no"><enum>1210.</enum><header>Report on debris removal</header><text display-inline="no-display-inline">Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to Congress and make publicly available a report that describes—</text>
<paragraph id="H86371301632D4B10BC2409C5C200D627" commented="no"><enum>(1)</enum><text>the extent to which the Secretary has carried out section 3 of the Act of March 2, 1945 (<external-xref legal-doc="usc" parsable-cite="usc/33/603a">33 U.S.C. 603a</external-xref>); and</text></paragraph> <paragraph id="HFB07C7AE500543988BE2D2C6C5B9084F" commented="no"><enum>(2)</enum><text>how the Secretary has evaluated potential work to be carried out under that section.</text></paragraph></section>
<section id="H8D8781BAB5D44080ABA62BD981EA4DC8" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1211.</enum><header>Corps flood policy within urban areas</header><text display-inline="no-display-inline">Not later than 1 year after the date of enactment of this Act, the Secretary shall report to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate on—</text> <paragraph id="H024477DA83F7474AABEC9FA1DC447AA7" commented="no"><enum>(1)</enum><text>flooding within urban floodplains; and</text></paragraph>
<paragraph id="H58AC2ADF7577494EB449BA71C87E60B2" commented="no"><enum>(2)</enum><text>the Federal policy constraints on the ability of the Secretary to address urban flooding, including the regulations under part 238 of title 33, Code of Federal Regulations (as in effect on the date of enactment of this Act) (including the limitation under section 238.7(a)(1) of that title that allows the Secretary to provide assistance only where the flood discharge of a stream or waterway within an urban area is greater than 800 cubic feet per second for the 10-percent flood).</text></paragraph></section> <section id="HD987876FB642402FB4C4D758BD88EB3D" commented="no"><enum>1212.</enum><header>Feasibility studies for mitigation of damage</header><text display-inline="no-display-inline">Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that identifies—</text>
<paragraph id="HEDD0AA7E7EB04BE086E3155DC08CBBAE" commented="no"><enum>(1)</enum><text>feasibility studies that are incomplete as of the date of enactment of this Act for a project for mitigation of damage to an area affected by weather or other events for which—</text> <subparagraph id="HC3859E21550C4BDD91AEA42A5B9EF264" commented="no"><enum>(A)</enum><text>during the 8-year period ending on the date of enactment of this Act—</text>
<clause id="H7CBF0333BC6B4C309447AFC95667DEB7" commented="no"><enum>(i)</enum><text>the Secretary provided emergency response under section 5 of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n</external-xref>); or</text></clause> <clause id="H3C469973456A4D4490904CB03B467FE5" commented="no"><enum>(ii)</enum><text>the area received assistance under the Robert T. Stafford Disaster Relief and Emergency Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/42/5121">42 U.S.C. 5121</external-xref> et seq.); and</text></clause></subparagraph>
<subparagraph id="H7A0D477F20A840CE91F82E16C0190A7D" commented="no"><enum>(B)</enum><text>there is significant risk for future similar events (as determined by the Secretary); and</text></subparagraph></paragraph> <paragraph id="HE3D41FD44CD14E23BD29D719BDAD9F71" commented="no"><enum>(2)</enum><text>for each feasibility study identified under paragraph (1), impediments to completing the study.</text></paragraph></section>
<section id="HE67F187E70844B93A61E018F210E61BD" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1213.</enum><header>Applications of military leasing authorities</header><text display-inline="no-display-inline">Not later than 2 years after the date of enactment of this Act, the Secretary shall—</text> <paragraph id="H3CE7DCE30ABF40BD8108E611759B25EE" commented="no"><enum>(1)</enum><text>complete a study on the application of section 2667 of title 10, United States Code, enhanced use leasing authorities, and other military leasing authorities to the civil works program of the Secretary; and</text></paragraph>
<paragraph id="H1C318CBD1E494CA59D8A9F1E1B3C98BC" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">submit to Congress a report on the results of the study under paragraph (1), including a description of the obstacles that must be removed so that the Assistant Secretary of the Army for Civil Works may implement the authorities.</text></paragraph></section> <section id="HB91FF0CD748D490693950FA161D70CEC"><enum>1214.</enum><header>Community engagement</header> <subsection id="H255EE5984FE749D69857C030D1F1A71F"><enum>(a)</enum><header>Report</header><text>Not later than 2 years after the date of enactment of this section, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on any potential disproportionate and adverse health or environmental effects of programs, policies, and activities of the Corps of Engineers related to water resources development projects on minority communities, low-income communities, rural communities, and Indian Tribes.</text></subsection>
<subsection id="H0E252D53ADC34C17B2ED0F05D0F94B5A"><enum>(b)</enum><header>Consultation</header><text>In preparing the report under subsection (a), the Secretary shall provide public and private meetings with representatives of minority communities, low-income communities, rural communities, and Indian Tribes, as well as representatives of State and local governments, and shall ensure that sufficient meetings are held in different geographic regions of the United States to ensure that a diversity of views are obtained.</text></subsection> <subsection id="H8C65D7D4B9C1490FAB247F33E0229993"><enum>(c)</enum><header>Recommendations</header><text>The report submitted under subsection (a) shall include—</text>
<paragraph id="H9D52D4593A9F43569D8EC07D683AF981"><enum>(1)</enum><text>the identification of any disproportionate and adverse health or environmental effects to the communities and Tribes; and</text></paragraph> <paragraph id="H43081F52919B4F8799394DC675BB6C08"><enum>(2)</enum><text>any recommendations of the Secretary for addressing such effects, including recommended changes to the statutory or regulatory authorities of the Corps of Engineers, or changes to the policies or guidance of the Corps of Engineers.</text></paragraph></subsection></section>
<section id="HC6F130AA2A564D2CB78E43F3F8C18030" display-inline="no-display-inline" section-type="subsequent-section"><enum>1215.</enum><header>Transparency in administrative expenses</header><text display-inline="no-display-inline">Section 1012(b)(1) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2315a">33 U.S.C. 2315a(b)(1)</external-xref>) is amended by striking <quote>The Secretary</quote> and inserting <quote>Not later than 1 year after the date of enactment of the <short-title>Water Resources Development Act of 2018</short-title>, the Secretary</quote>.</text></section> <section id="H7DD3F7D90D0546CFBBED6B9CA9D6676C"><enum>1216.</enum><header>Assessment of harbors and inland harbors</header><text display-inline="no-display-inline">Section 210(e) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238</external-xref>) is amended—</text>
<paragraph id="H59E9E9CDCE14417988AD964DBC6DBD23"><enum>(1)</enum><text>in paragraph (1), by striking <quote>shall assess the</quote> and inserting <quote>shall assess, and issue a report to Congress on, the</quote>; and</text></paragraph> <paragraph id="HF29B4C6A5788462A8B5FBF7D350A7502"><enum>(2)</enum><text>in paragraph (2), by adding at the end the following:</text>
<quoted-block style="OLC" id="HFDC5756FB4A44F2795A40B05C08815E0" display-inline="no-display-inline">
<subparagraph id="H8E81F74885CA4ED79D38D1149E20A2E8"><enum>(C)</enum><header>Opportunities for beneficial use of dredged materials</header><text display-inline="yes-display-inline">In carrying out paragraph (1), the Secretary shall identify potential opportunities for the beneficial use of dredged materials obtained from harbors and inland harbors referred to in subsection (a)(2), including projects eligible under section 1122 of the Water Resources Development Act of 2016 (130 Stat. 1645; <external-xref legal-doc="usc" parsable-cite="usc/33/2326">33 U.S.C. 2326</external-xref> note).</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section> <section id="HFE2BDBCA01C345DF9CE70267150A6A55" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1217.</enum><header>Maintenance of high-risk flood control projects</header> <subsection id="HD58E42B967E04635B36616979D5EB779" commented="no"><enum>(a)</enum><header>Assessment</header><text display-inline="yes-display-inline">With respect to each project classified as class III under the Dam Safety Action Classification of the Corps of Engineers for which the Secretary has assumed responsibility for maintenance as of the date of enactment of this Act, the Secretary shall assess—</text>
<paragraph display-inline="no-display-inline" id="H9B0FD6DA9D384B7D82EA46D3FA52C3DA" commented="no"><enum>(1)</enum><text>the anticipated effects of the Secretary continuing to be responsible for the maintenance of the project during the period that ends 15 years after the date of enactment of this Act, including the benefits to the State and local community; and</text></paragraph> <paragraph id="HB222A43B85F548C0ACE5BAB28828072C" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">the anticipated effects of the Secretary not continuing to be responsible for the maintenance of the project during such 15-year period, including the costs to the State and local community.</text></paragraph></subsection>
<subsection id="H25520A2A95684BDC9D932D04CCD3DC2B" commented="no"><enum>(b)</enum><header>Report</header><text display-inline="yes-display-inline">Not later than 90 days after completion of the assessment under subsection (a), the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report summarizing the results of the assessment.</text></subsection></section> <section id="H93681089D9DF454D89F84AB5855B91D2" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1218.</enum><header>North Atlantic Division report on hurricane barriers and harbors of refuge</header><text display-inline="no-display-inline">Not later than 1 year after the date of enactment of this Act, the Secretary, in consultation with State and local experts in the North Atlantic Division of the Corps of Engineers, shall submit to Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the durability and resiliency of existing hurricane barriers and harbors of refuge in the North Atlantic Division, giving particular consideration as to how such barriers and harbors will survive and fully serve their planned levels of protection under current, near, and longer term future predicted sea levels, storm surges, and storm strengths.</text></section>
<section id="HB5DC835104AF46A0842ADF1F40451DD3" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1219.</enum><header>Great Lakes coastal resiliency study</header>
<subsection id="H83420939401E486C944A83026B8AF266" commented="no"><enum>(a)</enum><header>In general</header><text>The Secretary shall carry out a comprehensive assessment of the water resources needs of the Great Lakes System under section 729 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2267a">33 U.S.C. 2267a</external-xref>).</text></subsection> <subsection id="H7C2F2C77116C406CB2CB9678AD7249DD" commented="no"><enum>(b)</enum><header>Cooperation</header><text>In carrying out the assessment pursuant to subsection (a), the Secretary shall cooperate with stakeholders and coordinate with all ongoing programs and projects of the Great Lakes Restoration Initiative under section 118(c)(7) of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1268">33 U.S.C. 1268</external-xref>).</text></subsection>
<subsection id="H16650FDD2A0D45848E9E2A7B25AA52E6" commented="no"><enum>(c)</enum><header>Definitions</header><text>The term <term>Great Lakes System</term> has the meaning given such term in section 118(a) of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1268">33 U.S.C. 1268(a)</external-xref>).</text></subsection></section> <section id="HCE3E8FF7AF284A1B8A2F0E9E2D8408CA" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1220.</enum><header>McMicken Dam, Arizona, and Muddy River, Massachusetts</header> <subsection id="H83948203DC584089A1003834B8405329" commented="no"><enum>(a)</enum><header>Report</header><text>The Secretary shall submit a report to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment on Public Works of the Senate on the status of—</text>
<paragraph id="H23B29AF82DB94B9791D26BB85253F4CD" commented="no"><enum>(1)</enum><text>the project at McMicken Dam, Arizona, authorized by section 304 of the Act of August 7, 1953 (67 Stat. 450); and</text></paragraph> <paragraph id="H12E0373B96CE49C199E19B19E4A06312" commented="no"><enum>(2)</enum><text>the project for flood damage reduction and environmental restoration, Muddy River, Brookline and Boston, Massachusetts, authorized by section 522 of the Water Resources Development Act of 2000 (114 Stat. 2656).</text></paragraph></subsection>
<subsection id="H1BC91389FAC8494B915BF0670E93E10E" commented="no"><enum>(b)</enum><header>Requirements</header><text>The report under subsection (a) shall include a description of the reasons of the Secretary for deauthorizing the projects described in subsection (a).</text></subsection></section> <section id="HBC9D60D9DAC742DA82A4332CD7DB724A" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1221.</enum><header>Table Rock Lake, Arkansas and Missouri</header><text display-inline="no-display-inline">Not later than 120 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the implementation of section 1185(c) of the Water Resources Development Act of 2016 (130 Stat. 1680). </text></section>
<section id="HE1983AF15484406A95FF994038B1CD33" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1222.</enum><header>Forecast-informed reservoir operations</header>
<subsection id="HE06BF9B7F94747B7B8792E55FE897596" commented="no"><enum>(a)</enum><header>Report on forecast-Informed reservoir operations</header><text>Not later than 1 year after the date of completion of the forecast-informed reservoir operations research study pilot program at Coyote Valley Dam, Russian River Basin, California (authorized by the River and Harbor Act of 1950 (64 Stat. 177)), the Secretary shall issue a report to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate on the results of the study pilot program.</text></subsection> <subsection id="H2AE2DC583CA44F9F8A6EB203CB26504D" commented="no"><enum>(b)</enum><header>Contents of report</header><text>The Secretary shall include in the report issued under subsection (a)—</text>
<paragraph id="H73A13F0BE6BF4022943E3A82D6FBB3CD" commented="no"><enum>(1)</enum><text display-inline="yes-display-inline">an analysis of the use of forecast-informed reservoir operations at Coyote Valley Dam, California;</text></paragraph> <paragraph id="HDB4882E0B6884A5D95B546D51D178BB7" commented="no"><enum>(2)</enum><text>an assessment of the viability of using forecast-informed reservoir operations at other dams owned or operated by the Secretary;</text></paragraph>
<paragraph id="H664A1E127F08418292C2A321A702F870" commented="no"><enum>(3)</enum><text>an identification of other dams owned or operated by the Secretary where forecast-informed reservoir operations may assist the Secretary in the optimization of future reservoir operations; and</text></paragraph> <paragraph id="H697BC21E79574F479EA700A954F776CF" commented="no"><enum>(4)</enum><text>any additional areas for future study of forecast-informed reservoir operations.</text></paragraph></subsection></section>
<section id="H50FA706BD0CD42DEBCE6D26EC753671B" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1223.</enum><header>Cedar River, Iowa</header><text display-inline="no-display-inline">Not later than 90 days after the date of enactment of this Act, the Secretary shall complete and submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report summarizing the path forward and timeline to implement the project for flood risk management at Cedar River, Cedar Rapids, Iowa, authorized by section 7002(2) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1366).</text></section> <section id="H7C92315E9DD040CF9D9016B5C06B5E05" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1224.</enum><header>Old River control structure, Louisiana</header> <subsection id="HB442FFA1967E4A049829677164255C2F" commented="no"><enum>(a)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the structure and operations plan for the Old River control structure authorized by the Flood Control Act of 1954 (68 Stat. 1258), based on the best available science, improved monitoring capabilities, and other factors as determined by the Secretary, including consideration of—</text>
<paragraph id="H83AAEA56B2DB4FD7BC2D1FFC915B9173" commented="no"><enum>(1)</enum><text>flood control;</text></paragraph> <paragraph id="H789AA0690B5848A4846FC56A67747E6B" commented="no"><enum>(2)</enum><text>navigational conditions;</text></paragraph>
<paragraph id="HB84581209D2A45B29E1ABE21EB48E5EC" commented="no"><enum>(3)</enum><text>water supply;</text></paragraph> <paragraph id="HE797E948742E44F7BCFE0A3D7438FC42" commented="no"><enum>(4)</enum><text>ecosystem restoration and ecological productivity; and</text></paragraph>
<paragraph id="H969E5BB002C24A23984D642D0D82FE3E" commented="no"><enum>(5)</enum><text>hydroelectric production.</text></paragraph></subsection> <subsection id="HAF718AD2D5C14C94A1D2BEE96F3B8628" commented="no"><enum>(b)</enum><header>Public participation</header><text>In developing the report required by subsection (a), the Secretary shall provide opportunity for public input and stakeholder engagement, including public meetings.</text></subsection></section>
<section id="H0F6B737FBF8444FB8BE68189CDF41FA0"><enum>1225.</enum><header>Upper Mississippi River protection</header><text display-inline="no-display-inline">Section 2010 of the Water Resources Reform and Development Act of 2014 (128 Stat. 1270) is amended by adding at the end the following:</text> <quoted-block id="H383C1531B6E04874A60FA8BAA5749AFF" style="OLC"> <subsection id="HB201F5C563FC4A29AC8E50432B4813B1"><enum>(d)</enum><header>Considerations</header><text>In carrying out a disposition study with respect to the Upper St. Anthony Falls Lock and Dam, including a disposition study under section 216 of the Flood Control Act of 1970 (<external-xref legal-doc="usc" parsable-cite="usc/33/549a">33 U.S.C. 549a</external-xref>), the Secretary shall expedite completion of such study and shall produce a report on the Upper St. Anthony Falls Lock and Dam that is separate from any report on any other lock or dam included in such study that includes plans for—</text>
<paragraph id="HC2D0442AC3B149D2A4AF0EDDD47DCB84"><enum>(1)</enum><text>carrying out modifications to the Upper St. Anthony Falls Lock and Dam to—</text> <subparagraph id="HEDD5702A50834CBB86BFDECE0908BA3E"><enum>(A)</enum><text>preserve and enhance recreational opportunities and the health of the ecosystem; and</text></subparagraph>
<subparagraph id="H414F52BF3E39492E87DC0007F9B29865"><enum>(B)</enum><text>maintain the benefits to the natural ecosystem and human environment;</text></subparagraph></paragraph> <paragraph id="HD2DEAA0A1DE1407A94A9F237C693065B"><enum>(2)</enum><text>a partial disposition of the Upper St. Anthony Falls Lock and Dam facility and surrounding real property that preserves any portion of the Upper St. Anthony Falls Lock and Dam necessary to maintain flood control; and</text></paragraph>
<paragraph id="HB6ED829F6A094C2EAE79DD9A80B1AE2E"><enum>(3)</enum><text>expediting the disposition described in this subsection.</text></paragraph></subsection> <subsection id="HF09EDA28EB2941228F5C14AA3A778A23"><enum>(e)</enum><header>Contributed funds</header><text>The Secretary shall accept and expend funds to carry out the study described in subsection (d) that are contributed by a State or a political subdivision of a State under the Act of October 15, 1940 (<external-xref legal-doc="usc" parsable-cite="usc/33/701h-1">33 U.S.C. 701h–1</external-xref>).</text></subsection><after-quoted-block>.</after-quoted-block></quoted-block></section>
<section id="HB0721CEA9B734B7AA54CD24BE04E1D3B" section-type="subsequent-section"><enum>1226.</enum><header>Missouri River</header>
<subsection id="HF174657967114F4EA6EA6549C4E47B16"><enum>(a)</enum><header>IRC report</header><text display-inline="yes-display-inline">Not later than 18 months after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report regarding the impacts of interception-rearing complex construction on the navigation, flood control, and other authorized purposes set forth in the Missouri River Master Manual, and on the population recovery of the pallid sturgeon.</text></subsection> <subsection id="H1021635C97894014B50F5A448B2A57AF"><enum>(b)</enum><header>No additional IRC construction</header><text display-inline="yes-display-inline">Until the report under subsection (a) is submitted, no additional interception-rearing complex construction is authorized.</text></subsection></section>
<section id="H67D226DD19F94567A7ECE5A909B08C0B" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1227.</enum><header>Lower Missouri River bank stabilization and navigation</header>
<subsection id="HADED4295396246C8BE56E10516EF390C"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the function and reliability of the Lower Missouri River bank stabilization and navigation project, authorized by the first section of the Act of July 25, 1912 (37 Stat. 219, chapter 253).</text></subsection> <subsection id="H5471FB1F49CD4FD3959E702C091D2EC0" commented="no"><enum>(b)</enum><header>Considerations and coordination</header><text display-inline="yes-display-inline">In developing the report required under subsection (a), the Secretary shall—</text>
<paragraph id="H492B1581EF6A4A2AAEB0C6218B59BAB4" commented="no"><enum>(1)</enum><text>consider recommended improvements to the project described in such subsection and current and future flood risks; and</text></paragraph> <paragraph id="H83CFAD6C274A476781B9E53E5633DE98" commented="no"><enum>(2)</enum><text>coordinate with State and local governments and affected stakeholders.</text></paragraph></subsection></section>
<section id="H7E9A1E6AEA04403185E63F55FCF74FBF" commented="no"><enum>1228.</enum><header>Coastal Texas study</header><text display-inline="no-display-inline">The Secretary shall expedite the completion of studies for flood damage reduction, hurricane and storm damage reduction, and ecosystem restoration in the coastal areas of Texas that are identified in the interim report due to be published in 2018 that describes the tentatively selected plan developed in accordance with section 4091 of the Water Resources Development Act of 2007 (121 Stat. 1187).</text></section> <section id="HF15D8151FCB94BD5898C86EAC680953E" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1229.</enum><header>Report on water supply contract, Wright Patman Lake, Texas</header><text display-inline="no-display-inline">Not later than June 30, 2019, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the status of the implementation of the water supply contract, Department of the Army, Civil Works Contract No. 29–68–A–0130, at Wright Patman Lake, Texas, that—</text>
<paragraph id="H0BBC07308574486D80A4A8BBA66CC3B3" commented="no"><enum>(1)</enum><text>describes the implementation of that contract at Wright Patman Lake; and</text></paragraph> <paragraph id="HEE3B43A1C004419F9C4EB68D66EC2C31" commented="no"><enum>(2)</enum><text>identifies—</text>
<subparagraph id="HDB7060CD764F40469BB410AEED1196C1" commented="no"><enum>(A)</enum><text>the activities that the Secretary expects to be necessary to complete the execution of the contract;</text></subparagraph> <subparagraph id="H065C4689BC6B4B57880BF69E17C0F4F5" commented="no"><enum>(B)</enum><text>the expected completion date for each activity identified under subparagraph (A); and</text></subparagraph>
<subparagraph id="H098F93C6649C4B15ADD39340C8447B91" commented="no"><enum>(C)</enum><text>the expected date of completion of the execution of the contract.</text></subparagraph></paragraph></section></subtitle> <subtitle id="HD9796E21C19D42B4831D6B09F95B0FE3"><enum>C</enum><header>Deauthorizations, Modifications, and Related Provisions</header> <section id="H8C4C737A3E754C0EA11D008F0DE9AF9D" commented="no"><enum>1301.</enum><header>Deauthorization of inactive projects</header> <subsection id="H1FED685B8F1A467891EA47B0E372F425" commented="no"><enum>(a)</enum><header>Purposes</header><text>The purposes of this section are—</text>
<paragraph id="HB604F0CD77AE4CBF91B13CF155B9DB37" commented="no"><enum>(1)</enum><text>to identify $4,000,000,000 in water resources development projects authorized by Congress that are no longer viable for construction due to—</text> <subparagraph id="H5277A019D4BF4695BBC78B8D9D622368" commented="no"><enum>(A)</enum><text>a lack of local support;</text></subparagraph>
<subparagraph id="HF07EA8F50E324B4CA43FEB3C7932DFA1" commented="no"><enum>(B)</enum><text>a lack of available Federal or non-Federal resources; or</text></subparagraph> <subparagraph id="H865D0515FE744654909E93738C66084A" commented="no"><enum>(C)</enum><text>an authorizing purpose that is no longer relevant or feasible;</text></subparagraph></paragraph>
<paragraph id="H8A76C49D77C04C35A1D125B8A8DAF03B" commented="no"><enum>(2)</enum><text>to create an expedited and definitive process for Congress to deauthorize water resources development projects that are no longer viable for construction; and</text></paragraph> <paragraph id="H283F66DA86C64FFBA554C1E1A4605977" commented="no"><enum>(3)</enum><text>to allow the continued authorization of water resources development projects that are viable for construction.</text></paragraph></subsection>
<subsection id="H79DE93E65CF44D4A8270B9152FA19CF6" commented="no"><enum>(b)</enum><header>Interim deauthorization list</header>
<paragraph id="H8350F9C81FE64959B1A70E11C9350285" commented="no"><enum>(1)</enum><header>In general</header><text>The Secretary shall develop an interim deauthorization list that identifies—</text> <subparagraph id="HF5F688F4E0C44316AB5FE5123F1B7F31" commented="no"><enum>(A)</enum><text>each water resources development project, or separable element of a project, authorized for construction before November 8, 2007, for which—</text>
<clause id="HEEBC19BCA2B94633AB856DEEA14FE165" commented="no"><enum>(i)</enum><text>planning, design, or construction was not initiated before the date of enactment of this Act; or</text></clause> <clause id="H9111B1C1AC4B4D72B0C072DD6238AFF5" commented="no"><enum>(ii)</enum><text>planning, design, or construction was initiated before the date of enactment of this Act, but for which no funds, Federal or non-Federal, were obligated for planning, design, or construction of the project or separable element of the project during the current fiscal year or any of the 6 preceding fiscal years;</text></clause></subparagraph>
<subparagraph id="H39E73A1723144B638FAF3CFA804CC915" commented="no"><enum>(B)</enum><text>each project or separable element of a project identified and included on a list to Congress for deauthorization pursuant to section 1001(b)(2) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/579a">33 U.S.C. 579a(b)(2)</external-xref>); and</text></subparagraph> <subparagraph id="H15FF037AE7F94FBAAADACC361FE075E9" commented="no"><enum>(C)</enum><text>any project or separable element of a project for which the non-Federal sponsor of such project or separable element submits a request for inclusion on the list.</text></subparagraph></paragraph>
<paragraph id="HDC8DB3D590834B7E882C81A9148DF97B" commented="no"><enum>(2)</enum><header>Public comment and consultation</header>
<subparagraph id="H257A107BFB7145A2B01C62A9DEC32A03" commented="no"><enum>(A)</enum><header>In general</header><text>The Secretary shall solicit comments from the public and the Governors of each applicable State on the interim deauthorization list developed under paragraph (1).</text></subparagraph> <subparagraph id="H2BDF7BA86F44459083E6D0E4E91619C2" commented="no"><enum>(B)</enum><header>Comment period</header><text>The public comment period shall be 90 days.</text></subparagraph></paragraph>
<paragraph id="H81E71D7349DD4E26A4884252BC5B1E5B" commented="no"><enum>(3)</enum><header>Submission to congress; publication</header><text>Not later than 90 days after the date of the close of the comment period under paragraph (2), the Secretary shall—</text> <subparagraph id="HFB3956920ED24950BBECBD870A38CF03" commented="no"><enum>(A)</enum><text>submit a revised interim deauthorization list to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives; and</text></subparagraph>
<subparagraph id="H1C9B288739534BF2A5DB834E40345FBA" commented="no"><enum>(B)</enum><text>publish the revised interim deauthorization list in the Federal Register.</text></subparagraph></paragraph></subsection> <subsection id="H093F4DFADA3E415487011B44B94D7931" commented="no"><enum>(c)</enum><header>Final deauthorization list</header> <paragraph id="H41CF1CEF06AE480992681F50E0BF38FF" commented="no"><enum>(1)</enum><header>In general</header><text>The Secretary shall develop a final deauthorization list of water resources development projects, or separable elements of projects, from the revised interim deauthorization list described in subsection (b)(3).</text></paragraph>
<paragraph id="H1BEB638407B849F68ED72123FB2AA533" commented="no"><enum>(2)</enum><header>Deauthorization amount</header>
<subparagraph id="H99692ED8FC69462CA0D2183EEAFF5FA9" commented="no"><enum>(A)</enum><header>Proposed final list</header><text>The Secretary shall prepare a proposed final deauthorization list of projects and separable elements of projects that have, in the aggregate, an estimated Federal cost to complete that is at least $4,000,000,000.</text></subparagraph> <subparagraph id="H81765F6B2F4944BC80CC985F9E9D5CC6" commented="no"><enum>(B)</enum><header>Determination of federal cost to complete</header><text>For purposes of subparagraph (A), the Federal cost to complete shall take into account any allowances authorized by section 902 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2280">33 U.S.C. 2280</external-xref>), as applied to the most recent project schedule and cost estimate.</text></subparagraph></paragraph>
<paragraph id="H696F8A40060F4312936A1D3EA22243E4" commented="no"><enum>(3)</enum><header>Identification of projects</header>
<subparagraph id="H4FEDE2E1788746A69A8190180E610EEE" commented="no"><enum>(A)</enum><header>Sequencing of projects</header>
<clause id="H0A18A491C0C8406E87375639A70D1039" commented="no"><enum>(i)</enum><header>In general</header><text>The Secretary shall identify projects and separable elements of projects for inclusion on the proposed final deauthorization list according to the order in which the projects and separable elements of the projects were authorized, beginning with the earliest authorized projects and separable elements of projects and ending with the latest project or separable element of a project necessary to meet the aggregate amount under paragraph (2)(A).</text></clause> <clause id="HC69D7C76E7D04979B3323CE94BC4D73F" commented="no"><enum>(ii)</enum><header>Factors to consider</header><text>The Secretary may identify projects and separable elements of projects in an order other than that established by clause (i) if the Secretary determines, on a case-by-case basis, that a project or separable element of a project is critical for interests of the United States, based on the possible impact of the project or separable element of the project on public health and safety, the national economy, or the environment.</text></clause>
<clause id="H56FFB705ADAE4603A5FCA66179C727D9" commented="no"><enum>(iii)</enum><header>Consideration of public comments</header><text>In making determinations under clause (ii), the Secretary shall consider any comments received under subsection (b)(2).</text></clause></subparagraph> <subparagraph id="H8A7590F54C9746E185CB57FD2132A65E" commented="no"><enum>(B)</enum><header>Appendix</header><text>The Secretary shall include as part of the proposed final deauthorization list an appendix that—</text>
<clause id="H243B2651EDEA41C4A2FB5DA786E1F104" commented="no"><enum>(i)</enum><text>identifies each project or separable element of a project on the interim deauthorization list developed under subsection (b) that is not included on the proposed final deauthorization list; and</text></clause> <clause id="H7269AC40C52C437598A38AF34DE30150" commented="no"><enum>(ii)</enum><text>describes the reasons why the project or separable element is not included on the proposed final list.</text></clause></subparagraph></paragraph>
<paragraph id="H78856632BABA4168BC8C6CBFC8B19017" commented="no"><enum>(4)</enum><header>Public comment and consultation</header>
<subparagraph id="H9FB304C7407E4F6CBCF489D90F0D46C1" commented="no"><enum>(A)</enum><header>In general</header><text>The Secretary shall solicit comments from the public and the Governor of each applicable State on the proposed final deauthorization list and appendix developed under paragraphs (2) and (3).</text></subparagraph> <subparagraph id="H9DE326C9F0A341EB8DF543D9FFC2EAE5" commented="no"><enum>(B)</enum><header>Comment period</header><text>The public comment period shall be 90 days.</text></subparagraph></paragraph>
<paragraph id="H5D4A4C2908D442A99BBDEA4CF98A7C2E" commented="no"><enum>(5)</enum><header>Submission of final list to congress; publication</header><text>Not later than 120 days after the date of the close of the comment period under paragraph (4), the Secretary shall—</text> <subparagraph id="H73C7A1802EAA43BE904D28BD4FF1134A" commented="no"><enum>(A)</enum><text>submit a final deauthorization list and an appendix to the final deauthorization list in a report to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives; and</text></subparagraph>
<subparagraph id="H89ED12F34DEC49DF822550E4BD14904B" commented="no"><enum>(B)</enum><text>publish the final deauthorization list and the appendix to the final deauthorization list in the Federal Register.</text></subparagraph></paragraph></subsection> <subsection id="H22B9A972EA7B41DD991F569137263D8C" commented="no"><enum>(d)</enum><header>Deauthorization; congressional review</header> <paragraph id="H3568122CCFD24A8B9D8BD179C82B505F" commented="no"><enum>(1)</enum><header>In general</header><text>After the expiration of the 180-day period beginning on the date of submission of the final deauthorization list and appendix under subsection (c), a project or separable element of a project identified in the final deauthorization list is hereby deauthorized, unless Congress passes a joint resolution disapproving the final deauthorization list prior to the end of such period.</text></paragraph>
<paragraph id="H51F438E4B43E4E7E833BFA7A03FC9906" commented="no"><enum>(2)</enum><header>Non-federal contributions</header>
<subparagraph id="HDEE23E9559704E198A6E8A83871AC42A" commented="no"><enum>(A)</enum><header>In general</header><text>A project or separable element of a project identified in the final deauthorization list under subsection (c) shall not be deauthorized under this subsection if, before the expiration of the 180-day period referred to in paragraph (1), the non-Federal interest for the project or separable element of the project provides sufficient funds to complete the project or separable element of the project.</text></subparagraph> <subparagraph id="H31D579BF552D4E679696FA149AB9749B" commented="no"><enum>(B)</enum><header>Treatment of projects</header><text>Notwithstanding subparagraph (A), each project and separable element of a project identified in the final deauthorization list shall be treated as deauthorized for purposes of the aggregate deauthorization amount specified in subsection (c)(2)(A).</text></subparagraph></paragraph>
<paragraph id="H75791B3CE263477BB0564C6D567A0777" commented="no"><enum>(3)</enum><header>Projects identified in appendix</header><text>A project or separable element of a project identified in the appendix to the final deauthorization list shall remain subject to future deauthorization by Congress.</text></paragraph></subsection> <subsection id="H913EA90985484F69BBA7A64D81CB82AA" commented="no"><enum>(e)</enum><header>Special rule for projects receiving funds for post-Authorization study</header><text>A project or separable element of a project may not be identified on the interim deauthorization list developed under subsection (b), or the final deauthorization list developed under subsection (c), if the project or separable element received funding for a post-authorization study during the current fiscal year or any of the 6 preceding fiscal years.</text></subsection>
<subsection id="H929CF54B140A4A9E850DFF13F6A23D9C" commented="no"><enum>(f)</enum><header>General provisions</header>
<paragraph id="HF17D174161874720B5056C07204CCE03" commented="no"><enum>(1)</enum><header>Definitions</header><text>In this section, the following definitions apply:</text> <subparagraph id="H1812834C925F477AA19C11404692CD01" commented="no"><enum>(A)</enum><header>Post-authorization study</header><text>The term <term>post-authorization study</term> means—</text>
<clause id="HFE8196E105314609A2E609DF98496CC4" commented="no"><enum>(i)</enum><text>a feasibility report developed under section 905 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282">33 U.S.C. 2282</external-xref>);</text></clause> <clause id="HE7230283173449DAA5675E9162749C44" commented="no"><enum>(ii)</enum><text>a feasibility study, as defined in section 105(d) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2215">33 U.S.C. 2215(d)</external-xref>); or</text></clause>
<clause id="H8CF9AE1DC9524E348CE3F68C65E0A1B5" commented="no"><enum>(iii)</enum><text>a review conducted under section 216 of the Flood Control Act of 1970 (<external-xref legal-doc="usc" parsable-cite="usc/33/549a">33 U.S.C. 549a</external-xref>), including an initial appraisal that—</text> <subclause id="H6ED07063DB29444FA3A105B51C45A185" commented="no"><enum>(I)</enum><text>demonstrates a Federal interest; and</text></subclause>
<subclause id="H0EE387AB454C4E26A10403BE46C83EAA" commented="no"><enum>(II)</enum><text>requires additional analysis for the project or separable element.</text></subclause></clause></subparagraph> <subparagraph id="H384128E9FCA041C58B94D534C4BD5F93" commented="no"><enum>(B)</enum><header>Water resources development project</header><text>The term <term>water resources development project</term> includes an environmental infrastructure assistance project or program of the Corps of Engineers.</text></subparagraph></paragraph>
<paragraph id="H85D2D818143247BA9FCBED5F48923EAF" commented="no"><enum>(2)</enum><header>Treatment of project modifications</header><text>For purposes of this section, if an authorized water resources development project or separable element of the project has been modified by an Act of Congress, the date of the authorization of the project or separable element shall be deemed to be the date of the most recent modification.</text></paragraph></subsection></section> <section id="H63CA387179024539BA81A7E8A33EB4AA" commented="no"><enum>1302.</enum><header>Backlog prevention</header> <subsection id="H69F7578112204C8C8F6F36AF3D4AAD76" commented="no"><enum>(a)</enum><header>Project deauthorization</header> <paragraph id="H045B7B0833F14E4A95A7672568C39C96" commented="no"><enum>(1)</enum><header>In general</header><text>A water resources development project authorized for construction by this Act shall not be authorized after the last day of the 10-year period beginning on the date of enactment of this Act unless—</text>
<subparagraph id="HD65AFCD5403C446A92FA1FED6BFF0094" commented="no"><enum>(A)</enum><text>funds have been obligated for construction of, or a post-authorization study for, such project or such separable element during such period; or</text></subparagraph> <subparagraph id="H5792A0E9F79B4879AEE583509D649072" commented="no"><enum>(B)</enum><text display-inline="yes-display-inline">a subsequent Act of Congress modifies the authorization contained in this Act.</text></subparagraph></paragraph>
<paragraph id="H9933D30D931F4899974C6067C363A6F3" commented="no"><enum>(2)</enum><header>Identification of projects</header><text>Not later than 60 days after the expiration of the 10-year period described in paragraph (1), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that identifies the projects deauthorized under paragraph (1).</text></paragraph></subsection> <subsection id="H83DF794934B54375A5412BBF8E933182" commented="no"><enum>(b)</enum><header>Report to Congress</header><text>Not later than 60 days after the expiration of the 12-year period beginning on the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives, and make available to the public, a report that contains—</text>
<paragraph id="H476B2873DCD44AD58E389438B0AAB4B1" commented="no"><enum>(1)</enum><text>a list of any water resources development projects authorized by this Act for which construction has not been completed;</text></paragraph> <paragraph id="H2854744A662845C3ACD0837EF07959F8" commented="no"><enum>(2)</enum><text>a description of the reasons each project was not completed;</text></paragraph>
<paragraph id="H0CEF6C20CEF84309B9FB19F1C7E1E1FF" commented="no"><enum>(3)</enum><text>a schedule for the completion of the projects based on expected levels of appropriations; </text></paragraph> <paragraph id="HD9EA4499D0504F96A9D044A73C36C6C0" commented="no"><enum>(4)</enum><text>a 5-year and 10-year projection of construction backlog; and</text></paragraph>
<paragraph id="HD7861A20C1B9402C9A15779732DBD5F5"><enum>(5)</enum><text>any recommendations to Congress regarding how to mitigate the backlog.</text></paragraph></subsection></section> <section id="HA20A4C3B06D84EE5BBB4E8DFECAD5E84" commented="no"><enum>1303.</enum><header>Project modifications</header> <subsection id="HDEBDB053A1454F45AAA1CAE4CA5D76D7" commented="no"><enum>(a)</enum><header>Consistency with reports</header><text display-inline="yes-display-inline">Congress finds that the project modifications described in this section are in accordance with the reports submitted to Congress by the Secretary under section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>), titled <quote>Report to Congress on Future Water Resources Development</quote>, or have otherwise been reviewed by Congress.</text></subsection>
<subsection id="HF3CD9D1D8FB142C487BCCF6E2425E3DD" commented="no"><enum>(b)</enum><header>Modifications</header>
<paragraph id="HA815325E0D614494A13E8E27EA8FD736" commented="no"><enum>(1)</enum><header>Harbor/South Bay, California</header><text display-inline="yes-display-inline">Section 219(f)(43) of the Water Resources Development Act of 1992 (113 Stat. 337; 114 Stat. 2763A–220) is amended by striking <quote>$35,000,000</quote> and inserting <quote>$70,000,000</quote>.</text></paragraph> <paragraph id="H85B806084B2C4E01BC8556BA60A87B4F" commented="no"><enum>(2)</enum><header>Lakes Marion and Moultrie, South Carolina</header><text display-inline="yes-display-inline">Section 219(f)(25) of the Water Resources Development Act of 1992 (113 Stat. 336; 114 Stat. 2763A–220; 117 Stat. 1838; 130 Stat. 1677) is amended by striking <quote>$60,000,000</quote> and inserting <quote>$89,550,000</quote>.</text></paragraph></subsection></section>
<section id="H8336F04FC2CC44B482109CCD9D8FF7FB" section-type="subsequent-section"><enum>1304.</enum><header>Lytle and Cajon Creeks, California</header><text display-inline="no-display-inline">That portion of the channel improvement project, Lytle and Cajon Creeks, California, authorized to be carried out as a part of the project for the Santa Ana River Basin, California, by the Act of December 22, 1944 (Chapter 665; 58 Stat. 900) that consists of five earth-filled groins commonly referred to as <quote>the Riverside Avenue groins</quote> is no longer authorized as a Federal project beginning on the date of enactment of this Act.</text></section> <section id="H5D8B5ADE42FC489784D84F177BAC7B38"><enum>1305.</enum><header>Yuba River Basin, California</header> <subsection id="H4548B70F2F81450AA8D01CFFAE9D2F98"><enum>(a)</enum><header>In general</header><text>The project for flood damage reduction, Yuba River Basin, California, authorized by section 101(a)(10) of the Water Resources Development Act of 1999 (113 Stat. 275) is modified to allow a non-Federal interest to construct a new levee to connect the existing levee with high ground.</text></subsection>
<subsection id="H07845F7685DE440CA82754FF3182EC70"><enum>(b)</enum><header>Project description</header><text>The levee to be constructed shall tie into the existing levee at a point N2186189.2438, E6703908.8657, thence running east and south along a path to be determined to a point N2187849.4328, E6719262.0164.</text></subsection> <subsection id="H6DBF042C9F524710A0E74B74BC790776"><enum>(c)</enum><header>Cooperation agreement</header><text>The Secretary shall execute a conforming amendment to the Memorandum of Understanding Respecting the Sacramento River Flood Control Project with the State of California dated November 30, 1953, that is limited to changing the description of the project to reflect the modification.</text></subsection>
<subsection id="HCCE494A66011478F9912C200DBA3D082"><enum>(d)</enum><header>No Federal cost</header>
<paragraph id="H8393AE0D520C4B67B2FF4ADF86D11485"><enum>(1)</enum><header>Review costs</header><text>Before construction of the levee described in subsection (b), the Secretary may accept and expend funds received from a non-Federal interest to review the planning, engineering, and design of the levee described in subsection (b) to ensure that such planning, engineering, and design complies with Federal standards.</text></paragraph> <paragraph id="H6521D9B738064D75901446A394AA3C8F"><enum>(2)</enum><header>Non-Federal share</header><text>The non-Federal share of the cost of constructing the levee shall be 100 percent.</text></paragraph></subsection></section>
<section id="HDF5898FEDD834FB5AC17583F68ADDE5C" commented="no"><enum>1306.</enum><header>Bridgeport Harbor, Connecticut</header><text display-inline="no-display-inline">That portion of the project for navigation, Bridgeport Harbor, Connecticut, authorized by the Act of June 18, 1878 (20 Stat. 158), and modified by the Act of August 11, 1888 (25 Stat. 401), the Act of March 3, 1899 (30 Stat. 1122), the Act of June 25, 1910 (36 Stat. 633), and the Act of July 3, 1930 (46 Stat. 919), and lying upstream of a line commencing at point N627942.09, E879709.18 thence running southwesterly about 125 feet to a point N627832.03, E879649.91 is no longer authorized beginning on the date of enactment of this Act.</text></section> <section id="HDCA923EA72494EF9BABC7F37AFEF4FF5" commented="no"><enum>1307.</enum><header>Delaware River navigation project</header><text display-inline="no-display-inline">Section 1131(3) of the Water Resources Development Act of 1986 (100 Stat. 4246) is amended by striking <quote>ten feet</quote> and inserting <quote>35 feet</quote>.</text></section>
<section id="HC1F2066A1D384DC79E3FC623E35E28EF" commented="no"><enum>1308.</enum><header>Comprehensive Everglades restoration plan, Central and Southern Florida, Everglades Agricultural Area, Florida</header>
<subsection id="H255041DCB46D4E59BC173D5A168BB9F1" commented="no"><enum>(a)</enum><header>Authorization</header><text display-inline="yes-display-inline">Subject to subsection (b), the Secretary is authorized to carry out the project for ecosystem restoration, Central and Southern Florida, Everglades Agricultural Area, Florida, in accordance with section 601 of the Water Resources Development Act of 2000 (114 Stat. 2680), as recommended in the addendum to the Central Everglades Planning Project Post Authorization Change Report, Feasibility Study and Draft Environmental Impact Statement prepared by the South Florida Water Management District and dated May 2018, with such modifications as the Secretary considers appropriate.</text></subsection> <subsection id="H83830AE1344445DA8082D5D1216EC47E" commented="no"><enum>(b)</enum><header>Requirement</header> <paragraph id="HEBE17F49EA894AFF8DCC3C83CFAC0621" commented="no"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">The project authorized by subsection (a) may be constructed only after the Secretary prepares a report that addresses the concerns, recommendations, and conditions identified by the Secretary in the review assessment titled <quote>Review Assessment of South Florida Water Management District’s Central Everglades Planning Project, Section 203 Post Authorization Change Report, Integrated Feasibility Study and DRAFT Environmental Impact Statement (March 2018, Amended May 2018)</quote> and dated May 2018.</text></paragraph>
<paragraph id="HF5B59F207E9245D4BA64282DCE587C57" commented="no"><enum>(2)</enum><header>Expedited completion</header><text>The Secretary shall expedite the completion of the report under paragraph (1) and shall complete such report not later than 90 days after the date of enactment of this section.</text></paragraph></subsection> <subsection id="H020DAF61279847ACA8985467914D9FF0" commented="no"><enum>(c)</enum><header>Consultation</header><text>In reviewing the report identified in subsection (a), and completing the report identified in subsection (b), the Secretary shall consult with the South Florida Water Management District on any project modifications.</text></subsection>
<subsection id="HF66A6994D7364A9E8430D76C2AA2C150" commented="no"><enum>(d)</enum><header>Consideration</header><text>Nothing in this section shall be construed to delay the design, construction, and implementation of components and features of the project for ecosystem restoration, Central Everglades, authorized by section 1401(4) of the Water Resources Development Act of 2016 (130 Stat. 1713), that are not directly affected by the project authorized by subsection (a).</text></subsection></section> <section id="H69775F6328654FBA9CDB07832F8D5C95" commented="no"><enum>1309.</enum><header>Kissimmee River restoration, Florida</header><text display-inline="no-display-inline">The Secretary may credit work performed or to be performed by the non-Federal sponsor of the project for ecosystem restoration, Kissimmee River, Florida, authorized by section 101(8) of the Water Resources Development Act of 1992 (106 Stat. 4802), as an in-kind contribution under section 221(a)(4) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(a)(4)), in accordance with the report of the Director of Civil Works relating to the Central and Southern Florida Project, Kissimmee River Restoration Project, dated April 27, 2018, subject to the availability of appropriations for any payments due, if the Secretary determines that the work was carried out in accordance with the requirements of subchapter 4 of chapter 31, and chapter 37, of title 40, United States Code.</text></section>
<section id="H6EF218E95A414870BB7CA1E3B5CF2525" commented="no"><enum>1310.</enum><header>Levee L–212, Four River Basin, Ocklawaha River, Florida</header><text display-inline="no-display-inline">The portions of the project for flood control and other purposes, Four River Basins, Florida, authorized by section 203 of the Flood Control Act of 1962 (76 Stat. 1183), consisting of levee L–212 along the Ocklawaha River, Florida, are no longer authorized beginning on the date of enactment of this Act.</text></section> <section id="H63C20345A7A949F2A0C1569F62732F03" commented="no"><enum>1311.</enum><header>Green River and Barren River Locks and Dams, Kentucky</header><text display-inline="no-display-inline">Section 1315 of the Water Resources Development Act of 2016 (130 Stat. 1698) is amended—</text>
<paragraph id="HF67AC23D98C84778BE5F72D308350F8A" commented="no"><enum>(1)</enum><text>in subsection (b)—</text> <subparagraph id="HD4EA6662B0104D0CB8CE8D63EEC51DE2" commented="no"><enum>(A)</enum><text>in paragraph (3)—</text>
<clause id="HF65E1A2A3A56487398BEA50021AEC8C8" commented="no"><enum>(i)</enum><text>by redesignating subparagraphs (A) and (B) as clauses (i) and (ii), respectively, and adjusting the margins accordingly;</text></clause> <clause id="H7BA36CF6AF1B44F6B8C005B6D6E12DFE" commented="no"><enum>(ii)</enum><text>in the matter preceding clause (i) (as so redesignated), by striking <quote>The Secretary</quote> and inserting the following:</text>
<quoted-block id="HF5F79FF9233642AD80B5005389BB929E" style="OLC">
<subparagraph id="H6997ABB83F7A4719A4FB3D80E48AF699" commented="no"><enum>(A)</enum><header>In general</header><text>The Secretary</text></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block></clause> <clause id="HCD14EBBEB79149BFB151C1F79D861970" commented="no"><enum>(iii)</enum><text>by adding at the end the following:</text>
<quoted-block id="H4E22DC2492A445B99195EA100DBEF3F6" style="OLC">
<subparagraph id="H1946C68F22074D66A416F1B4B366342D" commented="no"><enum>(B)</enum><header>Use of funds</header><text>If the Secretary determines that removal of Lock and Dam 5 or a portion of Lock and Dam 5 is necessary before the conveyance under subparagraph (A), the Secretary—</text> <clause id="HDD5F18A6C635490597B990C34C42323C" commented="no"><enum>(i)</enum><text>shall proceed with that removal; and</text></clause>
<clause id="HA8774BAB016E49F9A5E9D7A67C3C1B68" commented="no"><enum>(ii)</enum><text>to carry out that removal—</text> <subclause id="H1AD678F1112F436E8936CC379BAF3361" commented="no"><enum>(I)</enum><text>may use appropriated funds or accept and use funds contributed by entities described in that subparagraph; and</text></subclause>
<subclause id="H1B80A3A3BE974208A0911D638DD7916E" commented="no"><enum>(II)</enum><text>may work with entities described in that subparagraph.</text></subclause></clause></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block></clause></subparagraph> <subparagraph id="H3DB54A3EE6C0402D9C720CAE182F31E8" commented="no"><enum>(B)</enum><text>in paragraph (5)—</text>
<clause id="HCF5D2884893C48D7B8096EE181F7658E" commented="no"><enum>(i)</enum><text>by redesignating subparagraphs (A) and (B) as clauses (i) and (ii), respectively, and adjusting the margins accordingly;</text></clause> <clause id="H172D97B743614A2EBBA7A8585FE80662" commented="no"><enum>(ii)</enum><text>in the matter preceding clause (i) (as so redesignated), by striking <quote>The Secretary</quote> and inserting the following:</text>
<quoted-block id="H84E0FFB368E646168175145CB3DED443" style="OLC">
<subparagraph id="HBCE0609D1DC0412D80FC5C5E4F7326CF" commented="no"><enum>(A)</enum><header>In general</header><text>The Secretary</text></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block></clause> <clause id="HAFBDAEF4F2BA47EA82551599E273083F" commented="no"><enum>(iii)</enum><text>by adding at the end the following:</text>
<quoted-block id="H1DCD266E530540A7BE025EA035E75BE8" style="OLC">
<subparagraph id="HDC1180AF0ACF41BEB2DF7BCAE7C2771E" commented="no"><enum>(B)</enum><header>Use of funds</header><text>If the Secretary determines that removal of Lock and Dam 1 or a portion of Lock and Dam 1 is necessary before the conveyance under subparagraph (A), the Secretary—</text> <clause id="H00259E91D0554F998C176CA695FCC379" commented="no"><enum>(i)</enum><text>shall proceed with that removal; and</text></clause>
<clause id="H4C16374D1A914FC5B03869B07B1DCBC5" commented="no"><enum>(ii)</enum><text>to carry out that removal—</text> <subclause id="HAF7B62B0E85F4D6AAC536CE6F907B23C" commented="no"><enum>(I)</enum><text>may use appropriated funds or accept and use funds contributed by entities described in that subparagraph; and</text></subclause>
<subclause id="H1E90DB1A058E414B9772DEFFF1DEF32C" commented="no"><enum>(II)</enum><text>may work with entities described in that subparagraph.</text></subclause></clause></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block></clause></subparagraph></paragraph> <paragraph id="H26BA733270004533BE01B02A4BF6643A" commented="no"><enum>(2)</enum><text>in subsection (c), by adding at the end the following:</text>
<quoted-block id="H757F844F28A14ED89CD82636FCE44C85" style="OLC">
<paragraph id="H1372D684917E4831858D7E3DFEA56676" commented="no"><enum>(5)</enum><header>Removal costs</header><text>In carrying out this section, if the Secretary determines that removal of a Lock and Dam (or a portion of a Lock and Dam) described in this section is necessary, any Federal costs of that removal shall be subject to the availability of appropriations.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section> <section id="HC33DFC6DA0A64DC882F154ACC686A58E" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1312.</enum><header>Cape Arundel Disposal Site, Maine</header><text display-inline="no-display-inline">The Cape Arundel Disposal Site selected by the Department of the Army as an alternative dredged material disposal site under section 103(b) of the Marine Protection, Research, and Sanctuaries Act of 1972 (<external-xref legal-doc="usc" parsable-cite="usc/33/1413">33 U.S.C. 1413(b)</external-xref>) shall remain available for use until December 31, 2021. </text></section>
<section id="H92841B9CDDAC4F169715D3AE89BF8900"><enum>1313.</enum><header>Penobscot River, Maine</header><text display-inline="no-display-inline">Beginning on the date of enactment of this Act, the project for navigation, Penobscot River, Maine, authorized by the River and Harbor Appropriations Acts of July 5, 1884 (23 Stat. 133), August 11, 1888 (25 Stat. 408), July 31, 1892 (27 Stat. 96), and March 2, 1907 (<external-xref legal-doc="public-law" parsable-cite="pl/59/168">Public Law 59–168</external-xref>; 34 Stat. 1074), is modified as follows:</text> <paragraph id="HC147E7A117944117ACA245D983A12792"><enum>(1)</enum><text>The portion of the 14-foot deep channel located between Bangor and Brewer, Maine, approximately 135,784 square feet in area, starting at a point with coordinates N410451.89, E913370.08, thence running N34°05’52.6”E about 815.4 feet to a point with coordinates N411127.11, E913827.20, thence running N52°41’55.33”E about 143.06 feet to a point with coordinates N411213.81, E913941.00, thence running N27°04’01”E about 1068.73 feet to a point with coordinates N412165.48, E914427.30, thence running S62°55’59.79”E about 450 feet to a point with coordinates N411960.72, E914828.01, thence running S27°04’01”W about 246.99 feet to a point with coordinates N411740.78, E914715.62, thence running N43°45’41.8”W about 444.66 feet to a point with coordinates N412061.92, E914408.07, thence running S27°04’01”W about 946.62 feet to a point with coordinates N411218.97, E913977.33, thence running S38°21’58.9”W about 978.35 feet to the point of origin, is no longer authorized.</text></paragraph>
<paragraph id="HD65975C67E854F5D8454171FEA551DF1"><enum>(2)</enum><text>The portion of the 14-foot deep channel, approximately 121,875 square feet in area, starting at a point with coordinates N410670.99, E914168.96, thence running N62°55’59”W about 100 feet to a point with coordinates N410716.49, E914079.92, thence running N27°04’01”E about 1236.13 feet to a point with coordinates N411817.24, E914642.40, thence running S43°45’41.8”E about 105.87 feet to a point with coordinates N411740.78, E914715.62, thence running S27°04’01”W about 1201.37 feet to the point of origin, is redesignated as a 100-foot wide and 14-foot deep anchorage area.</text></paragraph> <paragraph id="H6F8E185BD7D34732AB303A7B85CD09C7"><enum>(3)</enum><text>The portion of the 14-foot deep channel, approximately 304,058 square feet in area, starting at a point with coordinates N410761.99. E913990.87, thence running N62°55’59”W about 300.08 feet to a point with coordinates N410898.54, E913723.66, thence running N38°21’58.9”E about 408.69 feet to a point with coordinates N411218.97, E913977.33, thence running N27°04’01”E about 946.62 feet to a point with coordinates N412061.92, E914408.07, thence running S43°45’41.8”E about 232.92 feet to a point with coordinates N411893.70, E914569.17, thence running S27°04’01”W about 1270.9 feet to the point of origin, is redesignated as a 14-foot deep anchorage area of a width varying from 220 to 300.08 feet.</text></paragraph></section>
<section id="H45A2A3E99EF347D88C8CADA0C799D267" commented="no"><enum>1314.</enum><header>Boston harbor reserved channel deauthorizations</header>
<subsection id="H30DF0C4863C84B8D9C3BF4B99B42CA6C" commented="no"><enum>(a)</enum><header>40–Foot reserved channel</header>
<paragraph id="H0D42446FDCA044C3BE41242AB613E510" commented="no"><enum>(1)</enum><header>In general</header><text>The portions of the project for navigation, Boston Harbor, Massachusetts, authorized by the first section of the Act of October 17, 1940 (54 Stat. 1198, chapter 895), and modified by section 101 of the River and Harbor Act of 1958 (72 Stat. 297), section 101(a)(13) of the Water Resources Development Act of 1990 (104 Stat. 4607), and section 7002(1) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1365), described in paragraph (2) are no longer authorized beginning on the date of enactment of this Act.</text></paragraph> <paragraph id="HDA0E50B7F8D74BF6A17F3B166571F60F" commented="no"><enum>(2)</enum><header>Areas described</header> <subparagraph id="HE3358DD1FFA844AD9870FE39E4FB5B13" commented="no"><enum>(A)</enum><header>First area</header><text>The first areas described in this paragraph are—</text>
<clause id="H12860689F37544A9AF288B0DDFA3D4FF" commented="no"><enum>(i)</enum><text>beginning at a point N2950154.45, E785995.64;</text></clause> <clause id="H879BDDFA136F4AC3831A49DD1DD34974" commented="no"><enum>(ii)</enum><text>running southwesterly about 1451.63 feet to a point N2950113.83, E784544.58;</text></clause>
<clause id="H5F8BB9B0F42C4C5C9ECCC7FFB9DBC5A6" commented="no"><enum>(iii)</enum><text>running southeasterly about 54.00 feet to a point N2950059.85, E784546.09;</text></clause> <clause id="HCBD73BC4DD1D45C4B5E01BE325ABBB2C" commented="no"><enum>(iv)</enum><text>running southwesterly about 1335.82 feet to a point N2950022.48, E783210.79;</text></clause>
<clause id="H057604CF4BB84C6F87545F6BF46E53BD" commented="no"><enum>(v)</enum><text>running northwesterly about 83.00 feet to a point N2950105.44, E783208.47;</text></clause> <clause id="HDB5F52A2B61C4D809F5171C8B1DD29DD" commented="no"><enum>(vi)</enum><text>running northeasterly about 2787.45 feet to a point N2950183.44, E785994.83; and</text></clause>
<clause id="H07F59DC545364F44BD995926989D3538" commented="no"><enum>(vii)</enum><text>running southeasterly about 29.00 feet to the point described in clause (i).</text></clause></subparagraph> <subparagraph id="HE62AA04740CE4EF7AB2A1885CCAB5857" commented="no"><enum>(B)</enum><header>Second area</header><text>The second areas described in this paragraph are—</text>
<clause id="H64DEA8AAAD2F41D3B93869557A361969" commented="no"><enum>(i)</enum><text>beginning at a point N2950502.86, E785540.84;</text></clause> <clause id="H94C541F078914906A0E995D510C0A158" commented="no"><enum>(ii)</enum><text>running northeasterly about 46.11 feet to a point N2950504.16, E785586.94;</text></clause>
<clause id="H1DF1DEB4ACC145AA968DDF6F0E1D2713" commented="no"><enum>(iii)</enum><text>running southwesterly about 25.67 feet to a point N2950480.84, E785576.18;</text></clause> <clause id="HCA7265DC97554B92AC3A764D389DD6AC" commented="no"><enum>(iv)</enum><text>running southwesterly to a point N2950414.32, E783199.83;</text></clause>
<clause id="H6EA26E6872E94881B132F547217E8053" commented="no"><enum>(v)</enum><text>running northwesterly about 8.00 feet to a point N2950422.32, E783199.60;</text></clause> <clause id="H4CB65D5B759E4A0081231FDCB7E6AA75" commented="no"><enum>(vi)</enum><text>running northeasterly about 2342.58 feet to a point N2950487.87, E785541.26; and</text></clause>
<clause id="H853CE152F3974A0DB6C262CD66C49487" commented="no"><enum>(vii)</enum><text>running northwesterly about 15.00 feet to the point described in clause (i).</text></clause></subparagraph></paragraph></subsection> <subsection id="H44EC39876C4A4A9DB9763A47ECF75441" commented="no"><enum>(b)</enum><header>35–Foot reserved channel</header> <paragraph id="H566799AA3F6F42E5A153249D2300297D" commented="no"><enum>(1)</enum><header>In general</header><text>The portions of the project for navigation, Boston Harbor, Massachusetts, authorized by the first section of the Act of October 17, 1940 (54 Stat. 1198, chapter 895), and modified by section 101 of the River and Harbor Act of 1958 (72 Stat. 297), described in paragraph (2) are no longer authorized beginning on the date of enactment of this Act.</text></paragraph>
<paragraph id="H317D8332FB524A5FB574B2A148C9BACC" commented="no"><enum>(2)</enum><header>Areas described</header>
<subparagraph id="HEF04C15D9E8F46479F27E8076BB02B97" commented="no"><enum>(A)</enum><header>First area</header><text>The first areas described in this paragraph are—</text> <clause id="HECB74BEF7B90490DAB8E19CCCC23FB66" commented="no"><enum>(i)</enum><text>beginning at a point N2950143.44, E787532.14;</text></clause>
<clause id="HD980131B15374DC685238712602FA17A" commented="no"><enum>(ii)</enum><text>running southeasterly about 22.21 feet to a point N2950128.91, E787548.93;</text></clause> <clause id="HE7F0B7DCD29143F18209A159BD15DDB5" commented="no"><enum>(iii)</enum><text>running southwesterly about 4,339.42 feet to a point N2950007.48, E783211.21;</text></clause>
<clause id="H403AC58AAB8A4DB795C8CB9630C9160D" commented="no"><enum>(iv)</enum><text>running northwesterly about 15.00 feet to a point N2950022.48, E783210.79; and</text></clause> <clause id="HE8CD267B63DF4D89B775EB3A0778FA39" commented="no"><enum>(v)</enum><text>running northeasterly about 4,323.05 feet to the point described in clause (i).</text></clause></subparagraph>
<subparagraph id="H96E482B8573943608F11C17EEF0FD22A" commented="no"><enum>(B)</enum><header>Second area</header><text>The second areas described in this paragraph are—</text> <clause id="H4F7E28CF97DA4328BC241837BA65A0C2" commented="no"><enum>(i)</enum><text>beginning at a point N2950502.86, E785540.84;</text></clause>
<clause id="H8C3F5BCF46194133BD0EAA1ACF5DFFD8" commented="no"><enum>(ii)</enum><text>running southeasterly about 15.00 feet to a point N2950487.87, E785541.26;</text></clause> <clause id="HEEB9E594DA6A49A7933D7B3D1677168F" commented="no"><enum>(iii)</enum><text>running southwesterly about 2342.58 feet to a point N2950422.32, E783199.60;</text></clause>
<clause id="HE1FA6CA4C64C49FE9B1E922953C95B60" commented="no"><enum>(iv)</enum><text>running southeasterly about 8.00 feet to a point N2950414.32, E783199.83;</text></clause> <clause id="H7A11B50394D94BD5B02C9EB9A98677B4" commented="no"><enum>(v)</enum><text>running southwesterly about 1339.12 feet to a point N2950376.85, E781861.23;</text></clause>
<clause id="H672C476DF67B4A9D89221B3A8A8611A4" commented="no"><enum>(vi)</enum><text>running northwesterly about 23.00 feet to a point N2950399.84, E781860.59; and</text></clause> <clause id="HC02EC462BA8D46779A543D5578F3B781" commented="no"><enum>(vii)</enum><text>running northeasterly about 3681.70 feet to the point described in clause (i).</text></clause></subparagraph></paragraph></subsection></section>
<section id="H9DE9D971264348539B6280685A22D02C" commented="no"><enum>1315.</enum><header>Corps of Engineers bridge repair program for New England evacuation routes</header><text display-inline="no-display-inline">Subject to the availability of appropriations, the Secretary may repair or replace, as necessary, any bridge owned and operated by the Secretary that is—</text> <paragraph id="H7CAB04214EF34401B7D7369FCC3F97C9" commented="no"><enum>(1)</enum><text>located in any of the States of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, or Vermont; and</text></paragraph>
<paragraph id="H9D139B9EF6F34ED380F0E887A907565D" commented="no"><enum>(2)</enum><text>necessary for evacuation during an extreme weather event, as determined by the Secretary.</text></paragraph></section> <section id="HC15E45B5BA2D45659B03B8D599D5A5F5" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1316.</enum><header>Plymouth Harbor, Massachusetts</header><text display-inline="no-display-inline">The Secretary shall expedite and complete the dredging of Plymouth Harbor, Massachusetts, as authorized by the Act of March 4, 1913 (37 Stat. 802, chapter 144) and the Act of September 22, 1922 (42 Stat. 1038, chapter 427).</text></section>
<section id="H6067507AAE754BF8847B722FE8C13E0C" commented="no"><enum>1317.</enum><header>Portsmouth Harbor and Piscataqua River</header><text display-inline="no-display-inline">The Secretary shall expedite the project for navigation for Portsmouth Harbor and the Piscataqua River authorized by section 101 of the River and Harbor Act of 1962 (76 Stat. 1173).</text></section> <section id="HEEEF2C5770FA463CB36310B13C38FABA" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>1318.</enum><header>Missouri River and tributaries at Kansas Cities, Missouri and Kansas</header><text display-inline="no-display-inline">The Secretary shall align the schedules of, and maximize complimentary efforts, minimize duplicative practices, and ensure coordination and information sharing with respect to—</text>
<paragraph id="H1B6D558CB6E7495FAFF8357117AF2951" commented="no"><enum>(1)</enum><text>the project for flood damage reduction, Argentine, East Bottoms, Fairfax-Jersey Creek, and North Kansas Levees Units, Missouri River and tributaries at Kansas Cities, Missouri and Kansas, authorized by section 1001(28) of the Water Resources Development Act of 2007 (121 Stat. 1054); and </text></paragraph> <paragraph id="HD8F435BA32224250B47FB7FBCB1D4BDE" commented="no"><enum>(2)</enum><text>the project for flood risk management, Armourdale and Central Industrial District Levee Units, Missouri River and Tributaries at Kansas Citys, Missouri and Kansas, authorized by section 1401(2) of the Water Resources Development Act of 2016 (130 Stat. 1710).</text></paragraph></section>
<section id="HD368B0D823F8443C97024641CABCC269" commented="no"><enum>1319.</enum><header>Hampton Harbor, New Hampshire, navigation improvement project</header><text display-inline="no-display-inline">In carrying out the project for navigation, Hampton Harbor, New Hampshire, under section 107 of the River and Harbor Act of 1960 (<external-xref legal-doc="usc" parsable-cite="usc/33/577">33 U.S.C. 577</external-xref>), the Secretary shall use all existing authorities of the Secretary to mitigate severe shoaling.</text></section> <section id="H58ABF04D1A34490EABF19078AEAAD21F" commented="no"><enum>1320.</enum><header>Passaic River Federal Navigation Channel, New Jersey</header> <subsection id="H4CDC42115B134D888424F0751F364DF0" commented="no"><enum>(a)</enum><header>Definition of Passaic River navigation project</header><text>In this section, the term <term>Passaic River navigation project</term> means the project for the Passaic River Federal navigation channel, New Jersey, described in the document of the New York District of the Corps of Engineers numbered 207075, entitled <quote>Lower Passaic River Commercial Navigation Analysis</quote>, and dated March 2007, as revised in December 2008 and July 2010. </text></subsection>
<subsection id="H3DC37FC87BEF4AD0B604A767B61A6E79" commented="no"><enum>(b)</enum><header>Deauthorization</header>
<paragraph id="H14165E44F1244D1D905CD5D64E8AF43F" commented="no"><enum>(1)</enum><header>In general</header><text>The portion of the Passaic River navigation project described in paragraph (2) is deauthorized.</text></paragraph> <paragraph id="H1E48664D572D4C0E942A2E0DAAAB87B2" commented="no"><enum>(2)</enum><header>Description of portion</header><text>The portion of the Passaic River navigation project referred to in paragraph (1) is the portion from river mile 1.7 to river mile 15.4, as bounded by—</text>
<subparagraph id="H3B7D50F9F54740FCAC2FC1538D800B4B" commented="no"><enum>(A)</enum><text>the coordinates of—</text> <clause id="H6B54553BB84E40E1846FDDAD5C906D10" commented="no"><enum>(i)</enum><text>West Longitude 074 10.33047" W;</text></clause>
<clause id="H2B4894BDB6AD4C31B4A8230FE3BF4C74" commented="no"><enum>(ii)</enum><text>North Latitude 40 51.99988" N;</text></clause> <clause id="H52729A8155134F43A65C3066EB9B6855" commented="no"><enum>(iii)</enum><text>East Longitude 074 06.05923" W; and</text></clause>
<clause id="H9CA317D4CC664B789BCDD2420834AF09" commented="no"><enum>(iv)</enum><text>South Latitude 40 43.2217" N; and</text></clause></subparagraph> <subparagraph id="HC82ECBE8414047E583497AB723E92D4A" commented="no"><enum>(B)</enum><text>the New Jersey State Plane (US Survey Feet, NAD–83), as follows: Upper Left x731 592941.27 y731 739665.34; Upper Right x731 602477.94 y731 740791.62; Lower Left x731 582974.17 y731 692561.62; Lower Right x731 598345.10 y731 691219.09.</text></subparagraph></paragraph></subsection>
<subsection id="HF9EC3A6D736B4DACA230A0401B2AEBCB" commented="no"><enum>(c)</enum><header>Modification</header>
<paragraph id="H18164C408D9F40F89C0122CE6A7A1C9F" commented="no"><enum>(1)</enum><header>In general</header><text>The depth of the portion of the Passaic River navigation project described in paragraph (2) is modified from 30 feet to 20 feet (using the Mean Lower Low Water datum).</text></paragraph> <paragraph id="HB1397C59853841038735E75FA6407FAD" commented="no"><enum>(2)</enum><header>Description of portion</header><text>The portion of the Passaic River navigation project referred to in paragraph (1) is the portion from river mile 0.6 to river mile 1.7, as bounded by—</text>
<subparagraph id="HE2545FC00E0E47B38D0A770492DB3497" commented="no"><enum>(A)</enum><text>the coordinates of—</text> <clause id="H2CE73F7415774BBA91E288701E1F9F29" commented="no"><enum>(i)</enum><text>West Longitude 074 07.43471" W;</text></clause>
<clause id="HCCB1B2406BCE420AA03064F16B4AB7B9" commented="no"><enum>(ii)</enum><text>North Latitude 40 44.32682" N;</text></clause> <clause id="H0BDA5FD30C20440B81C80D19FFCFBD15" commented="no"><enum>(iii)</enum><text>East Longitude 074 06.61586" W; and</text></clause>
<clause id="HD4E45BB39EB0452CB5F1BC7E15C6000A" commented="no"><enum>(iv)</enum><text>South Latitude 40 42.39342" N; and</text></clause></subparagraph> <subparagraph id="H77907A27F77649B19797E20225C71D6A" commented="no"><enum>(B)</enum><text>the New Jersey State Plane (US Survey Feet, NAD–83), as follows: Upper Left x731 597440.36 y731 691333.92; Upper Right x731 598345.10 y731 691219.09; Lower Left x731 596416.01 y731 685597.99; Lower Right x731 597351.18 y731 685596.08.</text></subparagraph></paragraph></subsection></section>
<section id="H6E2C9B85D28D4B9BAD84E70511BE5BE1" commented="no"><enum>1321.</enum><header>Fargo-Moorhead Metropolitan Area Diversion Project, North Dakota</header>
<subsection id="H0096DDCFC72141578EC047CF6E078DCA" commented="no"><enum>(a)</enum><header>Exemption</header><text>Subject to subsections (b) and (c), notwithstanding section 404(b)(2)(B)(ii) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/42/5170c">42 U.S.C. 5170c(b)(2)(B)(ii)</external-xref>), and any regulations promulgated to carry out that section, beginning on the date of enactment of this Act, any property in the State of North Dakota that was acquired through hazard mitigation assistance provided under section 203 of that Act (<external-xref legal-doc="usc" parsable-cite="usc/42/5133">42 U.S.C. 5133</external-xref>), section 404 of that Act (<external-xref legal-doc="usc" parsable-cite="usc/42/5170c">42 U.S.C. 5170c</external-xref>), or section 1366 of the National Flood Insurance Act of 1968 (<external-xref legal-doc="usc" parsable-cite="usc/42/4104c">42 U.S.C. 4104c</external-xref>), that was subject to any open space deed restriction is exempt from those restrictions to the extent necessary to complete the Fargo-Moorhead Metropolitan Area Diversion Project authorized by section 7002(2) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1366).</text></subsection> <subsection id="H1DCFF639B5B547CB8D1CA49E8FFC94B5" commented="no"><enum>(b)</enum><header>Conditions</header><text>As a condition of the exemption under subsection (a)—</text>
<paragraph id="H7B2B1E242531484F86255BA995BAEFC3" commented="no"><enum>(1)</enum><text>no new or additional structure unrelated to the Project may be erected on the property unless the new or additional structure is in compliance with section 404(b)(2)(B)(ii) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/42/5170c">42 U.S.C. 5170c(b)(2)(B)(ii)</external-xref>); and</text></paragraph> <paragraph id="H65C007AC65AD4B0C93AC89699B259D2E" commented="no"><enum>(2)</enum><text>any subsequent use of the land on the property that is unrelated to the Project shall comply with that section.</text></paragraph></subsection>
<subsection id="H16ABD743787143B480807BEE6EA9BB35" commented="no"><enum>(c)</enum><header>Disaster assistance prohibited</header><text>After the date of enactment of this Act, no disaster assistance from any Federal source may be provided with respect to any improvements made on the property referred to in subsection (a).</text></subsection> <subsection id="H5EE0EE304ACE46E282BEB3C0025C55C2" commented="no"><enum>(d)</enum><header>Savings provision</header><text>Nothing in this section affects the responsibility of any entity to comply with all other applicable laws (including regulations) with respect to the properties described in subsection (a).</text></subsection></section>
<section id="HD3C5748C422A477BA2E492965DDFA9C8" commented="no"><enum>1322.</enum><header>Clatsop County, Oregon</header><text display-inline="no-display-inline">The portions of the project for raising and improving existing levees of Clatsop County Diking District No. 13, in Clatsop County, Oregon, authorized by section 5 of the Act of June 22, 1936 (49 Stat. 1590), that are referred to as Christensen No. 1 Dike No. 42 and Christensen No. 2 Levee No. 43 are no longer authorized beginning on the date of enactment of this Act.</text></section> <section id="HBD3B71754A8741EE9EC1B9663C3C4415" commented="no"><enum>1323.</enum><header>Svensen Island, Oregon</header><text display-inline="no-display-inline">The project for flood risk management, Svensen Island, Oregon, authorized by section 204 of the Flood Control Act of 1950 (64 Stat. 180), is no longer authorized beginning on the date of enactment of this Act.</text></section>
<section id="H730A08E85F734AFC924A58467115B481" commented="no"><enum>1324.</enum><header>West Tennessee Tributaries project, Tennessee</header><text display-inline="no-display-inline">The unconstructed portions of the West Tennessee tributaries project along the Obion and Forked Deer Rivers, Tennessee, authorized by section 203 of the Flood Control Act of 1948 (62 Stat. 1178), and modified by section 207 of the Flood Control Act of 1966 (80 Stat. 1423), section 3(a) of the Water Resources Development Act of 1974 (88 Stat. 14), and section 183 of the Water Resources Development Act of 1976 (90 Stat. 2940), are no longer authorized beginning on the date of enactment of this Act.</text></section> <section id="HB0A01337BD204680A014B4341BC728FD" commented="no"><enum>1325.</enum><header>Puget Sound nearshore ecosystem restoration</header><text display-inline="no-display-inline">Section 544(f) of the Water Resources Development Act of 2000 (<external-xref legal-doc="public-law" parsable-cite="pl/106/541">Public Law 106–541</external-xref>; 114 Stat. 2675) is amended—</text>
<paragraph id="HE6992F06C6024D8E9BC636482898FB39" commented="no"><enum>(1)</enum><text>by striking <quote>$40,000,000</quote> and inserting <quote>$60,000,000</quote>; and</text></paragraph> <paragraph id="HE064F6AD6FE14878B03994FDC2A269C9" commented="no"><enum>(2)</enum><text>by striking <quote>$5,000,000</quote> and inserting <quote>$10,000,000</quote>. </text></paragraph></section>
<section id="HD149D07AE5144AE094B741C88426DB73" commented="no"><enum>1326.</enum><header>Milwaukee Harbor, Milwaukee, Wisconsin</header><text display-inline="no-display-inline">The portion of the project for navigation, Milwaukee Harbor, Milwaukee, Wisconsin, authorized by the first section of the Act of March 3, 1843 (5 Stat. 619; chapter 85), consisting of the navigation channel within the Menomonee River that extends from the 16th Street Bridge upstream to the upper limit of the authorized navigation channel and described as follows is no longer authorized beginning on the date of enactment of this Act:</text> <paragraph id="HC8E30925D5ED4F92A941D27F0D7A09BD" commented="no"><enum>(1)</enum><text>Beginning at a point in the channel just downstream of the 16th Street Bridge, N383219.703, E2521152.527.</text></paragraph>
<paragraph id="HD3C0D1D2C2F545A2B24C63AFBDF634B9" commented="no"><enum>(2)</enum><text>Thence running westerly along the channel about 2,530.2 feet to a point, N383161.314, E2518620.712.</text></paragraph> <paragraph id="HBDCCF711D2A047949E63EBBAC5D4C410" commented="no"><enum>(3)</enum><text>Thence running westerly by southwesterly along the channel about 591.7 feet to a point at the upstream limit of the existing project, N383080.126, E2518036.371.</text></paragraph>
<paragraph id="HAFDFEA00537D461B9D49AFEDF5512756" commented="no"><enum>(4)</enum><text>Thence running northerly along the upstream limit of the existing project about 80.5 feet to a point, N383159.359, E2518025.363.</text></paragraph> <paragraph id="H730E16E60CA5460BB1A5A8B32166CA76" commented="no"><enum>(5)</enum><text>Thence running easterly by northeasterly along the channel about 551.2 feet to a point, N383235.185, E2518571.108.</text></paragraph>
<paragraph id="H908B54FDF9BF42EEBC1EFFA63AC27C86" commented="no"><enum>(6)</enum><text>Thence running easterly along the channel about 2,578.9 feet to a point, N383294.677, E2521150.798.</text></paragraph> <paragraph id="H941B6E2E017548F7B1C57B58F74FA0ED" commented="no"><enum>(7)</enum><text>Thence running southerly across the channel about 74.3 feet to the point of origin.</text></paragraph></section>
<section id="H8DE94AB00CF9480884782949774CE0C7" commented="no"><enum>1327.</enum><header>Project completion for disaster areas</header><text display-inline="no-display-inline">The Secretary shall expeditiously carry out any project for flood risk management or hurricane and storm damage risk reduction authorized as of the date of enactment of this Act to be carried out by the Secretary in Texas, Florida, Georgia, Louisiana, South Carolina, the Commonwealth of Puerto Rico, or the United States Virgin Islands.</text></section> <section id="H1809E92B8C3E47A4A05BBE4A22673B88" commented="no"><enum>1328.</enum><header>Federal assistance</header> <subsection id="H5798E4364F254B03A2DCA83D8A1F4D43" commented="no"><enum>(a)</enum><header>In general</header><text>In accordance with the requirements of subsection (b), the Secretary is authorized to provide assistance for the operation and maintenance of a flood risk reduction project in the Red River Basin of the North that was constructed, prior to the date of enactment of this Act, under section 5(a) of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n(a)</external-xref>).</text></subsection>
<subsection id="HC7DCCC5DB7894EA6AC658BD4A95393FC" commented="no"><enum>(b)</enum><header>Condition</header><text>The Secretary may provide the assistance authorized by subsection (a) for a project that, as determined by the Secretary, becomes permanent due to the extended presence of assistance from the Secretary under section 5(a) of the Act of August 18, 1941 (<external-xref legal-doc="usc" parsable-cite="usc/33/701n">33 U.S.C. 701n(a)</external-xref>).</text></subsection> <subsection id="H33F5919276F3435F90673C444CBEB8FA" commented="no"><enum>(c)</enum><header>Termination</header><text>The authority to provide assistance under this section terminates on the date that is 4 years after the date of enactment of this section.</text></subsection></section>
<section id="HD24AA17F60D84EDABE459ACEAC1D8DD1" commented="no"><enum>1329.</enum><header>Expedited initiation</header><text display-inline="no-display-inline">Section 1322(b)(2) of the Water Resources Development Act of 2016 (130 Stat. 1707) is amended, in the matter preceding subparagraph (A), by inserting <quote>or, in a case in which a general reevaluation report for the project is required, if such report has been submitted for approval,</quote> after <quote>completed report,</quote>.</text></section> <section id="H52C6A18FAF8149059D289DEED61E9868" commented="no"><enum>1330.</enum><header>Project deauthorization and study extensions</header> <subsection id="H8AFBF5DFEB744C3785401272082CFCBA" commented="no"><enum>(a)</enum><header>Project deauthorizations</header><text>Section 6003(a) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/579c">33 U.S.C. 579c(a)</external-xref>) is amended—</text>
<paragraph id="HBC3350333F3A42AA91850298D795D5A8" commented="no"><enum>(1)</enum><text>by striking <quote>7-year period</quote> each place it appears and inserting <quote>10-year period</quote>; and</text></paragraph> <paragraph id="H71EAFB367A244568BF5C95525738ECAF" commented="no"><enum>(2)</enum><text>by adding at the end the following:</text>
<quoted-block id="H9FBB35B1FE934AE1AA3E12B96FAD6BB8" style="OLC">
<paragraph id="HC88DB1B8792545D696F8D25D43DFA247" commented="no"><enum>(3)</enum><header>Calculation</header><text>In calculating the time period under paragraph (1), the Secretary shall not include any period of time during which the project is being reviewed and awaiting determination by the Secretary to implement a locally preferred plan for that project under section 1036(a).</text></paragraph> <paragraph id="H991CD515D32744B68B12264FAD2BC4BF" commented="no"><enum>(4)</enum><header>Exception</header><text>The Secretary shall not deauthorize any project during the period described in paragraph (3).</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection>
<subsection id="H9A9BE950A8C7484FBF30A786BAF73FD5" commented="no"><enum>(b)</enum><header>Study extensions</header><text>Section 1001(d)(4) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282c">33 U.S.C. 2282c(d)(4)</external-xref>) is amended by striking <quote>7 years</quote> and inserting <quote>10 years</quote>.</text></subsection></section> <section id="H4D9CA5FE066E4141B92DC1EAAFD6BFFB" commented="no"><enum>1331.</enum><header>Conveyances</header> <subsection id="H19BD5D58CDE448FCA73CD7ECA1E52CF8" commented="no"><enum>(a)</enum><header>Cheatham County, Tennessee</header> <paragraph id="HB1C138171D004431BB9AA5CB7AD5BCB6" commented="no"><enum>(1)</enum><header>Conveyance authorized</header><text>The Secretary may convey to Cheatham County, Tennessee (in this subsection referred to as the <quote>Grantee</quote>), all right, title, and interest of the United States in and to the real property in Cheatham County, Tennessee, consisting of approximately 9.19 acres, identified as portions of tracts E–514–1, E–514–2, E–518–1, E–518–2, E–519–1, E–537–1, and E–538, all being part of the Cheatham Lock and Dam project at CRM 158.5, including any improvements thereon.</text></paragraph>
<paragraph id="HC64F4C9216DF4FCF8B3EEE5CBF31C8AC" commented="no"><enum>(2)</enum><header>Deed</header><text>The Secretary shall convey the property under this subsection by quitclaim deed under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States, to include retaining the right to inundate with water any land transferred under this subsection.</text></paragraph> <paragraph id="H226D7D13DB664B7D8A6287B224AC8102" commented="no"><enum>(3)</enum><header>Consideration</header><text>The Grantee shall pay to the Secretary an amount that is not less than the fair market value of the land conveyed under this subsection, as determined by the Secretary.</text></paragraph>
<paragraph id="HC12DC2500312486FACFC5FE25AA4E90C" commented="no"><enum>(4)</enum><header>Subject to existing easements and other interests</header><text>The conveyance of property under this section shall be subject to all existing easements, rights-of-way, and leases that are in effect as of the date of the conveyance.</text></paragraph></subsection> <subsection id="HD0720260AD394CB3BF3A5275F1DC2E1E" commented="no"><enum>(b)</enum><header>Nashville, Tennessee</header> <paragraph id="HCE1AB76B5751440D9D4361FF6F7FA347" commented="no"><enum>(1)</enum><header>Conveyance authorized</header><text>The Secretary may convey, without consideration, to the City of Nashville, Tennessee (in this subsection referred to as the <quote>City</quote>), all right, title, and interest of the United States in and to the real property covered by Lease No. DACW62–1–84–149, including any improvements thereon, at the Riverfront Park Recreational Development, consisting of approximately 5 acres, subject to the right of the Secretary to retain any required easements in the property.</text></paragraph>
<paragraph id="HF6A5F2E853984B8289B0C352ACDA7DF4" commented="no"><enum>(2)</enum><header>Conveyance agreement</header><text>The Secretary shall convey by quitclaim the real property described in paragraph (1) under the terms and conditions mutually satisfactory to the Secretary and the City. The deed shall provide that in the event that the City, its successors, or assigns cease to maintain improvements for recreation included in the conveyance or otherwise utilize the real property conveyed for purposes other than recreation and compatible flood risk management, the City, its successor, or assigns shall repay to the United States the Federal share of the cost of constructing the improvements for recreation under the agreement between the United States and the City dated December 8, 1981, increased as necessary to account for inflation.</text></paragraph></subsection> <subsection id="H8B7B217ACBBB407988A91C8A4286CD8B" commented="no"><enum>(c)</enum><header>Locks and dams 1 through 4, Kentucky river, Kentucky</header> <paragraph id="H6D628639C418452985F102E9583D43E0" commented="no"><enum>(1)</enum><header>In general</header><text>Beginning on the date of enactment of this Act, commercial navigation at Locks and Dams 1 through 4, Kentucky River, Kentucky, shall no longer be authorized, and the land and improvements associated with the locks and dams shall be disposed of consistent with this subsection and in accordance with the report of the Director of Civil Works entitled <quote>Kentucky River Locks and Dams 1, 2, 3, and 4, Disposition Study and Integrated Environmental Assessment</quote> and dated April 20, 2018.</text></paragraph>
<paragraph id="H19DDBAE315EF4FDEA49A4818ED8E5C07" commented="no"><enum>(2)</enum><header>Disposition</header><text>The Secretary shall convey to the State of Kentucky (referred to in this section as the <quote>State</quote>), for the use and benefit of the Kentucky River Authority, all right, title, and interest of the United States, together with any improvements on the land, including improvements located in the Kentucky River, in and to—</text> <subparagraph id="HD57B67277BEE4D6FB2F48069C8E46E8F" commented="no"><enum>(A)</enum><text>Lock and Dam 1, located in Carroll County, Kentucky;</text></subparagraph>
<subparagraph id="H96C19B0DB29540E3A122B79C3208E5ED" commented="no"><enum>(B)</enum><text>Lock and Dam 2, located in Owen and Henry counties, Kentucky;</text></subparagraph> <subparagraph id="H99F754E64A894A7CBBD8DAF95B100838" commented="no"><enum>(C)</enum><text>Lock and Dam 3, located in Owen and Henry counties, Kentucky; and</text></subparagraph>
<subparagraph id="H90F2CF0283A3423B82734D6DA6F2CE94" commented="no"><enum>(D)</enum><text>Lock and Dam 4, located in Franklin County, Kentucky.</text></subparagraph></paragraph> <paragraph id="H411DB125C979463F9C630AF7DBDFCDB2" commented="no"><enum>(3)</enum><header>Conditions</header> <subparagraph id="HF4D1752992D5426AA6B78BA2A2F94299" commented="no"><enum>(A)</enum><header>Quitclaim deed</header><text>The Secretary shall convey the property described in paragraph (2) by quitclaim deed to such State under such terms and conditions as the Secretary determines appropriate to protect the interests of the United States.</text></subparagraph>
<subparagraph id="HA4594261B0C2408EBBE186C13541C9A0" commented="no"><enum>(B)</enum><header>Administrative costs</header><text>The Secretary shall be responsible for all administrative costs associated with a conveyance under this subsection, including the costs of any surveys the Secretary determines to be necessary.</text></subparagraph> <subparagraph id="H332E0EC415D941EB893FADAB26957AB8" commented="no"><enum>(C)</enum><header>Improvements prohibited</header> <clause id="H78B9F731836F4F8F979181755CBC64D8" commented="no"><enum>(i)</enum><header>In general</header><text>The Secretary may not improve the locks and dams and land and improvements associated with the locks and dams described in this subsection on or after the date of enactment of this Act.</text></clause>
<clause id="H2CE01726A4BB460DA0CF068D181FE7A8" commented="no"><enum>(ii)</enum><header>Savings clause</header><text>Nothing in subparagraph (A) prohibits the State from improving the locks and dams and the land and improvements associated with the locks and dams described in this subsection on or after the date of conveyance under this subsection.</text></clause></subparagraph></paragraph> <paragraph id="H72CE62C39E1B48D3AC27E6585577F5E1" commented="no"><enum>(4)</enum><header>Savings clause</header><text>If the State does not accept the conveyance under this subsection of the land and improvements associated with the locks and dams described in this subsection, the Secretary may dispose of the land and improvements under subchapter III of <external-xref legal-doc="usc-chapter" parsable-cite="usc-chapter/40/5">chapter 5</external-xref> of title 40, United States Code.</text></paragraph></subsection>
<subsection id="HA93FA9B2B08847D795ECD6341717A355" commented="no"><enum>(d)</enum><header>Bainbridge, Georgia</header>
<paragraph id="HED0BECB43A274BB5B1980AAA04F10592" commented="no"><enum>(1)</enum><header>In General</header><text>On the date of enactment of this Act, the Secretary of the Army shall convey to the City of Bainbridge, Georgia, without consideration and subject to subsection (b), all right, title, and interest in and to real property described in subsection (c).</text></paragraph> <paragraph id="H363DE293A2524700BB522207CE294091" commented="no"><enum>(2)</enum><header>Terms and Conditions</header> <subparagraph id="H0E923BF0233E4FFF847CB037EEC53C11" commented="no"><enum>(A)</enum><header>In general</header><text>The conveyance by the United States under this subsection shall be subject to—</text>
<clause id="HFD8CE633EA1C43CABF207F35A675CFEA" commented="no"><enum>(i)</enum><text>the condition that the City of Bainbridge agrees to operate, maintain, and manage the property for fish and wildlife, recreation, and environmental purposes at no cost or expense to the United States; and</text></clause> <clause id="H4E33C3BC8170458B9B9F86F20F6DC901" commented="no"><enum>(ii)</enum><text>such other terms and conditions as the Secretary determines to be in the interest of the United States.</text></clause></subparagraph>
<subparagraph id="H58BC7C4604E342A7B0E85C7E9A9527DF" commented="no"><enum>(B)</enum><header>Reversion</header><text>If the Secretary determines that the real property conveyed under paragraph (1) ceases to be held in public ownership or the city ceases to operate, maintain, and manage the real property in accordance with this subsection, all right, title, and interest in and to the property shall revert to the United States, at the option of the Secretary.</text></subparagraph></paragraph> <paragraph id="HDD6DFD4938A64186BB961E5ED4AD84AF" commented="no"><enum>(3)</enum><header>Property</header><text>The property to be conveyed is composed of the following three parcels of land:</text>
<subparagraph id="H6DCE29CD789C4F919FAB9CB4246AAAE9" display-inline="no-display-inline" commented="no"><enum>(A)</enum><header>Parcel 1</header><text display-inline="yes-display-inline">All that tract or parcel of land lying and being in Land Lots 226. and 228, Fifteenth Land District, and Land Lots 319, 320, 321, 322, 323 and 358, Twentieth Land District, Decatur County, Georgia, more particularly described as follows:</text><list list-type="none" level="subparagraph"> <list-item>Beginning at a concrete monument stamped <quote>358</quote> which is 950 feet, more or less, North of the South line and 600 feet, more or less, West of the East line of said Land Lot 358, at a corner of a tract of land owned by the United States of America at Lake Seminole and at plane coordinate position North 318,698.72 feet and East 360,033.38 feet based on Transverse Mercator Projection, Georgia West Zone; </list-item> <list-item>Thence Due West 75 feet, more or less, to the contour at elevation 77.0 feet above Mean Sea Level;</list-item> <list-item>Thence Northeasterly along the meanders of said 77.0 foot contour a distance of 20,600 feet, more or less, to the mouth of the entrance channel to the arena and boat basin;</list-item> <list-item>Thence N 75° E 150 feet, more or less, to another point on said 77.0 foot contour;</list-item> <list-item>Thence Northeasterly along the meanders of said 77.0 foot contour a distance of 3,300 feet, more or less, to a point which is on the boundary of said United States tract and on the boundary of a tract of land now or formerly owned by the City of Bainbridge, Georgia;</list-item> <list-item>Thence along the boundary of said United States tract the following courses:</list-item></list><list list-type="none" level="clause"> <list-item>S 10° 52′ E along the boundary of said City of Bainbridge tract 830 feet, more or less, to a corner of said tract;</list-item> <list-item>S 89° 45′ E along the boundary of said City of Bainbridge tract 700 feet, more or less, to a concrete monument stamped <quote>J1A</quote>, coordinates of said monument being North 328,902.34 feet and East 369,302.33 feet;</list-item> <list-item>S 22° 25′ W 62 feet, more or less, to a corner of another tract of land owned by the City of Bainbridge, Georgia;</list-item> <list-item>S 88° 07′ W along the boundary of said City of Bainbridge tract 350 feet, more or less to a corner of said tract;</list-item> <list-item>N 84° 00′ W along the boundary of said City of Bainbridge tract 100.5 feet to a corner said tract;</list-item> <list-item>S 88° 07′ W along the boundary of said City of Bainbridge tract 300.0 feet to a corner of said tract;</list-item> <list-item>S 14° 16′ W along boundary of said City of Bainbridge tract 89.3 feet to a corner of said tract;</list-item> <list-item>Southwesterly along the boundary of said City of Bainbridge tract which is along a curve to the right with a radius of 684.69 feet an arc distance of 361.8 feet to a corner of said tract;</list-item> <list-item>S 30° 00′ W along the boundary of said City of Bainbridge tract 294.0 feet to a corner of said tract;</list-item> <list-item>S 10° 27′ W along the boundary of said City of Bainbridge tract 385.0 feet to a corner of said tract;</list-item> <list-item>N 73° 31′ W 38 feet, more or less, to a concrete monument;</list-item> <list-item>S 16° 25′ W 563.7 feet to a concrete monument stamped <quote>J7A</quote>;</list-item> <list-item>S 68° 28′ W 719.5 feet to a concrete monument stamped <quote>J9A</quote>;</list-item> <list-item>S 68° 28′ W 831.3 feet to a concrete monument stamped <quote>J12A</quote>; </list-item> <list-item>S 89° 39′ E 746.7 feet to a concrete monument stamped <quote>J11A</quote>; </list-item> <list-item>S 01° 22′ W 80.0 feet to a concrete monument stamped <quote>J11B</quote>;</list-item> <list-item>N 89° 39′ W 980.9 feet to a concrete monument stamped <quote>J13A</quote>;</list-item> <list-item>S 01° 21′ W 560.0 feet to a concrete monument stamped <quote>J15A</quote>;</list-item> <list-item>S 37° 14′ W 1,213.0 feet;</list-item> <list-item>N 52° 46′ W 600.0 feet;</list-item> <list-item>S 37° 14′ W 1,000.0 feet;</list-item> <list-item>S 52° 46′ E 600.0 feet;</list-item> <list-item>S 37° 14′ W 117.0 feet to a concrete monument stamped <quote>320/319</quote>;</list-item> <list-item>S 37° 13′ W 1,403.8 feet to a concrete monument stamped <quote>322/319</quote>;</list-item> <list-item>S 37° 13′ W 2,771.4 feet to a concrete monument stamped <quote>322/323</quote>;</list-item> <list-item>S 37° 13′ W 1,459.2 feet;</list-item> <list-item>N 89° 04′ W 578.9 feet;</list-item> <list-item>S 53° 42′ W 367.7 feet;</list-item> <list-item>S 43° 42′ W 315.3 feet;</list-item> <list-item>S 26° 13′ W 654.9 feet, more or less, to the point of beginning.</list-item></list><list list-type="none" level="subparagraph"> <list-item>Containing 550.00 acres, more or less, and being a part of Tracts L-1105 and L-1106 of Lake Seminole.</list-item></list></subparagraph> <subparagraph id="H60BB44EF62E94CAA991E51A9653F7DF7" commented="no"><enum>(B)</enum><header>Parcel 2</header><text>All that tract or parcel of land lying and lying and being in Land Lot 226, Fifteenth Land District, Decatur County, Georgia, more particularly described as follows:</text><list list-type="none" level="subparagraph">
<list-item>Beginning at a point which is on the East right-of-way line of the Seaboard Airline Railroad, 215 feet North of the South end of the trestle over the Flint River, and at a corner of a tract of land owned by the United States of America at Lake Seminole;</list-item>
<list-item>Thence Southeasterly along the boundary of said United States tract which is along a curve to the right a distance of 485 feet, more or less, to a point which is 340 feet, more or less, S 67° 00′ E from the South end of said trestle, and at a corner of said United States tract;</list-item>
<list-item>Thence N 70° 00′ E along the boundary of said United States tract 60.0 feet to a corner of said tract;</list-item>
<list-item>Thence Northerly along the boundary of said United States tract which is along a curve to the right a distance of 525 feet, more or less, to a corner of said tract;</list-item>
<list-item>Thence S 05° 00′ W along the boundary of said United States tract 500.0 feet to a corner of said tract;</list-item>
<list-item>Thence Due West along the boundary of said United States tract 370 feet, more or less, to a point which is on the East right-of-way line of said railroad and at a corner of said United States tract;</list-item>
<list-item>Thence N 13° 30′ W along the boundary of said United States tract which is along the East right-of-way line of said railroad a distance of 310 feet, more or less, to the point of beginning.</list-item>
<list-item>Containing 3.67 acres, more or less, and being all of Tract L-1124 of Lake Seminole.</list-item>
<list-item>Parcels 1 and 2 contain in the aggregate 553.67 acres, more or less.</list-item></list></subparagraph>
<subparagraph id="HCDDF58E6A292416AA4D9A1277783EDF6" commented="no"><enum>(C)</enum><header>Parcel 3</header><text display-inline="yes-display-inline">All that tract or panel of land lying and being in Land Lot 225, Fifteenth Land District, Decatur County, Georgia, more particularly described as follows:</text><list list-type="none" level="subparagraph"> <list-item>Beginning at an iron marker designated <quote>225/226/</quote>, which is on the South line and 500 feet, more or less, West of the Southeast corner of said Land Lot 225 at a corner of a tract of land owned by the United States of America at Lake Seminole and at plane coordinate position North 330,475.82 feet and East 370,429.36 feet, based on Transverse Mercator Projection, Georgia West Zone;</list-item> <list-item>Thence Due West along the boundary of said United States tract a distance of 53.0 feet to a monument stamped <quote>225/226–A</quote>;</list-item> <list-item>Thence continue Due West along the boundary of said United States tract a distance of 56 feet, more or less, to a point on the East bank of the Flint River;</list-item> <list-item>Thence Northerly, upstream, along the meanders of the East bank of said river a distance of 1,200 feet, more or less, to a point which is on the Southern right-of-way line of U.S. Highway No. 84 and at a corner of said United States tract;</list-item> <list-item>Thence Easterly and Southeasterly along the Southern right-of-way line of said highway, which is along the boundary of said United States tract a distance of 285 feet, more or less, to a monument stamped <quote>L–23–1</quote>, the coordinates of said monument being North 331,410.90 and East 370,574.96;</list-item> <list-item>Thence S 02° 25′ E along the boundary of said United States tract a distance of 650.2 feet to a monument stamped <quote>225–A</quote>;</list-item> <list-item>Thence S 42° 13′ E along the boundary of said United States tract a distance of 99.8 feet to a monument stamped <quote>225</quote>;</list-item> <list-item>Thence S 48° 37′ W along the boundary of said United States tract a distance of 319.9 feet, more or less, to the point of beginning.</list-item> <list-item>Containing 4.14 acres, more or less, and being all of Tract L–1123 of the Lake Seminole Project.</list-item></list></subparagraph></paragraph></subsection> <subsection id="H088DFB5B550C42B2B1E5034431509A49" commented="no"><enum>(e)</enum><header>Port of Whitman county, Washington</header> <paragraph id="H584C012CFAF141809CD4E1CC7AEF15B6" commented="no"><enum>(1)</enum><header>Definitions</header><text>In this subsection:</text>
<subparagraph id="HE818E4FCAFA640909EC6FDA91E7D4799" commented="no"><enum>(A)</enum><header>Federal land</header><text>The term <term>Federal land</term> means the approximately 288 acres of land situated in Whitman County, Washington, contained within Tract D of Little Goose Lock and Dam.</text></subparagraph> <subparagraph id="HD3704BA686014591B6A1C8344C8FBEF6" commented="no"><enum>(B)</enum><header>Non-federal land</header><text>The term <term>non-Federal land</term> means a tract or tracts of land owned by the Port of Whitman County, Washington, that the Secretary determines, with approval of the Washington Department of Fish and Wildlife and the Secretary of the Interior acting through the Director of the United States Fish and Wildlife Service, equals or exceeds the value of the Federal land both as habitat for fish and wildlife and for recreational opportunities related to fish and wildlife.</text></subparagraph></paragraph>
<paragraph id="H5E9E21AA11C741778712B65A39F8D7F2" commented="no"><enum>(2)</enum><header>Land Exchange</header><text>On conveyance by the Port of Whitman County to the United States of all right, title, and interest in and to the non-Federal land, the Secretary of the Army shall convey to the Port of Whitman County all right, title, and interest of the United States in and to the Federal land.</text></paragraph> <paragraph id="H0D4495C8710B453188F004FCD93DFBB9" commented="no"><enum>(3)</enum><header>Deeds</header> <subparagraph id="HD7ECD43E36D6459E9900723331DD80D3" commented="no"><enum>(A)</enum><header>Deed to non-Federal land</header><text>The Secretary may only accept conveyance of the non-Federal land by warranty deed, as determined acceptable by the Secretary.</text></subparagraph>
<subparagraph id="H61051B844BB64FD582B4A3DA62D005EA" commented="no"><enum>(B)</enum><header>Deed to Federal land</header><text>The Secretary shall convey the Federal land to the Port of Whitman County by quitclaim deed and subject to any reservations, terms, and conditions the Secretary determines necessary to allow the United States to operate and maintain the Lower Snake River Project and to protect the interests of the United States.</text></subparagraph></paragraph> <paragraph id="HF440A24FD55C45A1B69E61A3700FA076" commented="no"><enum>(4)</enum><header>Cash Payment</header><text>If the appraised fair market value of the Federal land, as determined by the Secretary, exceeds the appraised fair market value of the non-Federal land, as determined by the Secretary, the Port of Whitman County shall make a cash payment to the United States reflecting the difference in the appraised fair market values.</text></paragraph>
<paragraph id="HEC71B9FCA01B449786CDD5D29B6AFB55" commented="no"><enum>(5)</enum><header>Administrative Expenses</header><text>The Port of Whitman County shall be responsible for the administrative costs of the transaction in accordance with section 2695 of title 10, United States Code.</text></paragraph></subsection> <subsection id="HE70C06F6495C4415BD7A29DA168A4864" commented="no"><enum>(f)</enum><header>Fort Dupont, Delaware</header> <paragraph id="HC818CD52408346269D4644A9F0E89166" commented="no"><enum>(1)</enum><header>In general</header><text>Subject to paragraph (2), not later than 180 days after the date of enactment of this Act, the Secretary shall transfer—</text>
<subparagraph id="HB2B836D514A14D23BD06C3944BCAD744" commented="no"><enum>(A)</enum><text>all right, title, and interest in and to a parcel of land known as that part of the Original Acquisition (OADE) Tract that includes the bed and banks of the Delaware Branch Channel on the north side of the Fifth Street Bridge, Delaware City, Delaware, containing approximately 31.6 acres of land, to the Fort DuPont Redevelopment and Preservation Corporation (herein referred to as <quote>the Grantee</quote>); and</text></subparagraph> <subparagraph id="H42DAE648F63E428CB9DC765A4C1293A3" commented="no"><enum>(B)</enum><text>all right, title, and interest in and to the Fifth Street Bridge, together with the land known as that part of the Original Acquisition (OADE) Tract that includes the banks and bed of the Delaware Branch Channel, Delaware City, Delaware, containing approximately 0.27 acres of land, to the State of Delaware.</text></subparagraph></paragraph>
<paragraph id="H58C9DDAB854C41168F1DBA7FE523949F" commented="no"><enum>(2)</enum><header>Conditions</header>
<subparagraph id="H12E196982AA44286A5B7712168FFAE6A" commented="no"><enum>(A)</enum><header>State approval</header><text>Before making a transfer under paragraph (1), the Secretary shall ensure that the Governor of Delaware agrees to the transfer.</text></subparagraph> <subparagraph id="H2F776CDAF0ED430CB4BA3A7F2732D194" commented="no"><enum>(B)</enum><header>Toll-free bridge</header><text>Before making a transfer under subparagraph (1)(B), the Governor of Delaware shall agree to ensure that no toll is imposed for use of the bridge referred to in that subsection, in accordance with section 109 of the River and Harbor Act of 1950 (<external-xref legal-doc="usc" parsable-cite="usc/33/534">33 U.S.C. 534</external-xref>).</text></subparagraph>
<subparagraph id="H73789D0AD9E64C2F9CFE505A1ED39E95" commented="no"><enum>(C)</enum><header>Survey</header><text>The exact acreage and legal description of the land to be transferred under paragraph (1) shall be determined by a survey satisfactory to the Secretary and the Governor of Delaware.</text></subparagraph> <subparagraph id="HB71598D3DE414F51AA5CB4CE8A6EACEE" commented="no"><enum>(D)</enum><header>Costs</header><text>Any administrative costs for the transfer under paragraph (1) shall be paid by Fort DuPont Redevelopment and Preservation Corporation, the State of Delaware, or a combination of those entities.</text></subparagraph></paragraph>
<paragraph id="HCF616927FB38414DA1F47B3EC62C8E8B" commented="no"><enum>(3)</enum><header>Consideration</header><text>The Grantee shall pay to the Secretary an amount that is not less than the fair market value of the land conveyed to the Grantee under this subsection, as determined by the Secretary.</text></paragraph></subsection> <subsection id="H23ED50D91E1F41B8AFE2BE342AE0C8D9" commented="no"><enum>(g)</enum><header>Tuscaloosa, Alabama</header><text display-inline="yes-display-inline">As soon as practicable after the date of enactment of this Act, the Secretary of the Army shall convey by quitclaim deed to the City of Tuscaloosa, Alabama, at fair market value, the lands owned by the United States adjacent to the Black Warrior River on the south side below the U.S. Highway 43 bridge, including the south wall of the Old Oliver Lock, and extending to the Corps’ current recreation area, that the Secretary determines are no longer required for operation and maintenance of the Oliver Lock and Dam.</text></subsection>
<subsection id="H29041EB63CB94AFE8C385A61FD810222" commented="no"><enum>(h)</enum><header>Generally Applicable Provisions</header>
<paragraph id="HA70FD388B3094383AE6A9DC64ECC3282" commented="no"><enum>(1)</enum><header>Survey to obtain legal description</header><text>The exact acreage and the legal description of any real property to be conveyed under this section shall be determined by a survey that is satisfactory to the Secretary.</text></paragraph> <paragraph id="HD96F1ABDF07948DE98538FE60AFE9304" commented="no"><enum>(2)</enum><header>Applicability of property screening provisions</header><text>Section 2696 of title 10, United States Code, shall not apply to any conveyance under this section.</text></paragraph>
<paragraph id="HE72D8260D7264D298387185F2DAAE5F6" commented="no"><enum>(3)</enum><header>Additional terms and conditions</header><text>The Secretary may require that any conveyance under this section be subject to such additional terms and conditions as the Secretary considers necessary and appropriate to protect the interests of the United States.</text></paragraph> <paragraph id="H78C3F3FE2DCA45C889E3C4F16A15832E" commented="no"><enum>(4)</enum><header>Costs of conveyance</header><text>An entity to which a conveyance is made under this section shall be responsible for all reasonable and necessary costs, including real estate transaction and environmental documentation costs, associated with the conveyance.</text></paragraph>
<paragraph id="HC9BA35FE8C5744BB9BE890324B0A54CE" commented="no"><enum>(5)</enum><header>Liability</header><text>An entity to which a conveyance is made under this section shall hold the United States harmless from any liability with respect to activities carried out, on or after the date of the conveyance, on real property conveyed. The United States shall remain responsible for any liability with respect to activities carried out, before such date, on the real property conveyed.</text></paragraph></subsection></section> <section id="HBECFAFBDE1DE4AD9A0507BE7B57A7533" commented="no"><enum>1332.</enum><header>Report on future water resources development</header> <subsection id="H48F722F4670E472D8B976D61FE068C61" commented="no"><enum>(a)</enum><header>Programmatic modification</header><text>Section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d(a)</external-xref>) is amended—</text>
<paragraph id="HDEA880C1120B4CC39C4DC4E4622281FF" commented="no"><enum>(1)</enum><text>in subsection (a) by adding at the end the following:</text> <quoted-block id="HB7E88AE3D193425B9C30F4813EC911C4" style="OLC"> <paragraph id="HB4AB12B331A54BCBB4964E7689947F5C" commented="no"><enum>(4)</enum><header>Programmatic modifications</header><text>Any programmatic modification for an environmental infrastructure assistance program.</text></paragraph><after-quoted-block>;</after-quoted-block></quoted-block></paragraph>
<paragraph id="H1EDD90E91C824D4E82380D315C45FE2E" commented="no"><enum>(2)</enum><text>in subsection (b)(1) by striking <quote>studies and proposed modifications to authorized water resources development projects and feasibility studies</quote> and inserting <quote>studies, proposed modifications to authorized water resources development projects and feasibility studies, and proposed modifications for an environmental infrastructure program</quote>;</text></paragraph> <paragraph id="HE0B2B74E24E94B21BD8E7BE888D92468" commented="no"><enum>(3)</enum><text>by redesignating subsections (d), (e), and (f) as subsections (e), (f), and (g), respectively; </text></paragraph>
<paragraph id="H1E8D85697F4745DBB11A892F8939D34C" commented="no"><enum>(4)</enum><text>by inserting after subsection (c) the following:</text> <quoted-block id="H92C78B46C21646E885FC25CFC53C7CE9" style="OLC"> <subsection id="HD346E1E7965B45EEA54B4D8F71B2C26E" commented="no"><enum>(d)</enum><header>Programmatic modifications in annual report</header><text>The Secretary shall include in the annual report only proposed modifications for an environmental infrastructure assistance program that have not been included in any previous annual report. For each proposed modification, the Secretary shall include a letter or statement of support for the proposed modification from each associated non-Federal interest, description of assistance provided, and total Federal cost of assistance provided.</text></subsection><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph>
<paragraph id="H6066E51DBAA54180A1D1F6362B9DFF73" commented="no"><enum>(5)</enum><text>by striking subsection (c)(4) and inserting the following:</text> <quoted-block id="H2B79469417CC49FC990BBA57771C359B" style="OLC"> <paragraph id="HB750986464CA4CFD889FC68FACC93A97" commented="no"><enum>(4)</enum><header>Appendix</header> <subparagraph id="H9466783ADDAD49B695C228DFF8393420" commented="no"><enum>(A)</enum><header>In General</header><text>The Secretary shall include in the annual report an appendix listing the proposals submitted under subsection (b) that were not included in the annual report under paragraph (1)(A) and a description of why the Secretary determined that those proposals did not meet the criteria for inclusion under such paragraph.</text></subparagraph>
<subparagraph id="HCD18C0EC2E3D481E94E5689F9D71015C" commented="no"><enum>(B)</enum><header>Limitation</header><text>In carrying out the activities described in this section—</text> <clause id="HD860894DDA384A22B1E2A0D0A3A64316" commented="no"><enum>(i)</enum><text>the Secretary shall not include proposals in the appendix of the annual report that otherwise meet the criteria for inclusion in the annual report solely on the basis of the Secretary’s determination that the proposal requires legislative changes to an authorized water resources development project, feasibility study, or environmental infrastructure program; and</text></clause>
<clause id="H7EFB97663A694262BBD71FC08E45DCC7" commented="no"><enum>(ii)</enum><text>the Secretary shall not include proposals in the appendix of the annual report that otherwise meet the criteria for inclusion in the annual report solely on the basis of a policy of the Secretary.</text></clause></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection> <subsection id="HCF7A32C4CF954677AF4997302A0550C2" commented="no"><enum>(b)</enum><header>Savings clause</header><text>Notwithstanding the third sentence of section 1001(b)(2) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/579a">33 U.S.C. 579a(b)(2)</external-xref>), projects and separable elements of projects identified in the fiscal year 2017 report prepared in accordance with such section and submitted to Congress on December 15, 2016, shall not be deauthorized unless such projects and separable elements meet the requirements of section 1301(b)(1)(A) of the Water Resources Development Act of 2016 (130 Stat. 1687).</text></subsection></section></subtitle>
<subtitle id="H3ABBE23025004C49BD1C23886F4A9044"><enum>D</enum><header>Water Resources Infrastructure</header>
<section id="HBC22B970BE764E6292F44AA197517CC1"><enum>1401.</enum><header>Project authorizations</header><text display-inline="no-display-inline">The following projects for water resources development and conservation and other purposes, as identified in the reports titled <quote>Report to Congress on Future Water Resources Development</quote> submitted to Congress on March 17, 2017, and February 5, 2018, respectively, pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>) or otherwise reviewed by Congress are authorized to be carried out by the Secretary substantially in accordance with the plans, and subject to the conditions, described in the respective reports or decision documents designated in this section:</text> <paragraph id="H1594CC09B86E4A04A20FB2214594245E"><enum>(1)</enum><header>Navigation</header> <table table-type="" table-template-name="Generic: 4 text, 1 num" align-to-level="section" frame="all" colsep="1" rowsep="1" blank-lines-before="1" line-rules="all-gen" rule-weights="4.4.4.4.4.0"> <tgroup cols="4" rowsep="1" thead-tbody-ldg-size="10.10.12" grid-typeface="1.1"><colspec colnum="0" colname="column1" coldef="txt-no-ldr" min-data-value="18" colwidth="44pts"/><colspec colnum="1" colname="column2" coldef="txt-no-ldr" min-data-value="50" colwidth="94pts"/><colspec colnum="2" colname="column3" coldef="txt-no-ldr" min-data-value="35" colwidth="158pts"/><colspec colnum="3" colname="column4" coldef="txt-no-ldr" min-data-value="80" colwidth="355pts"/><thead> <row><entry namest="column1" morerows="0" align="center" colname="column1"><bold>A. State</bold></entry><entry namest="column2" morerows="0" align="center" colname="column2"><bold>B. <linebreak/>Name</bold></entry><entry namest="column3" morerows="0" align="center" colname="column3"><bold>C. <linebreak/>Date of <linebreak/>Report of <linebreak/>Chief of Engineers</bold></entry><entry namest="column4" morerows="0" align="center" colname="column4"><bold>D. <linebreak/>Estimated <linebreak/>Costs</bold></entry></row></thead> <tbody> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">1. AR</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Three Rivers Southeast Arkansas</entry><entry align="left" leader-modify="clr-ldr" colname="column3">September 6, 2018</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Total: $184,395,000 (to be derived <fraction>½</fraction> from the general fund of the Treasury and <fraction>½</fraction> from the Inland Waterways Trust Fund)</entry></row> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">2. PR</entry><entry align="left" leader-modify="clr-ldr" colname="column2">San Juan Harbor</entry><entry align="left" leader-modify="clr-ldr" colname="column3">August 23, 2018</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $41,345,840<linebreak/>Non-Federal: $13,781,267<linebreak/>Total: $55,127,107</entry></row> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">3. TX</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Galveston Harbor Channel Extension Project, Houston-Galveston Navigation Channels</entry><entry align="left" leader-modify="clr-ldr" colname="column3"> Aug. 8, 2017</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $10,444,000<linebreak/>Non-Federal: $3,481,000<linebreak/>Total: $13,925,000</entry></row> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">4. WA</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Seattle Harbor Navigation Improvement Project</entry><entry align="left" leader-modify="clr-ldr" colname="column3">June 7, 2018</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $29,362,000<linebreak/>Non-Federal: $31,880,000<linebreak/>Total: $61,242,000</entry></row></tbody></tgroup></table></paragraph> <paragraph id="HDD10A1AE0595410EB799A08426E3EAC9"><enum>(2)</enum><header>Flood risk management</header> <table table-type="" table-template-name="Generic: 4 text, 1 num" align-to-level="section" frame="all" colsep="1" rowsep="1" blank-lines-before="1" line-rules="all-gen" rule-weights="4.4.4.4.4.0"> <tgroup cols="4" rowsep="1" thead-tbody-ldg-size="10.10.12" grid-typeface="1.1"><colspec colname="column1" coldef="txt-no-ldr" min-data-value="18" colwidth="64pts"/><colspec colname="column2" coldef="txt-no-ldr" min-data-value="50" colwidth="165pts"/><colspec colname="column3" coldef="txt-no-ldr" min-data-value="35" colwidth="155pts"/><colspec colname="column4" coldef="txt-no-ldr" min-data-value="80" colwidth="307pts"/><thead> <row><entry namest="column1" morerows="0" align="center" colname="column1"><bold>A. State</bold></entry><entry namest="column2" morerows="0" align="center" colname="column2"><bold>B.<linebreak/> Name</bold></entry><entry namest="column3" morerows="0" align="center" colname="column3"><bold>C. <linebreak/>Date of <linebreak/>Report of <linebreak/>Chief of Engineers</bold></entry><entry namest="column4" morerows="0" align="center" colname="column4"><bold>D. <linebreak/>Estimated <linebreak/>Costs</bold></entry></row></thead> <tbody> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">1. CA</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Lower San Joaquin River</entry><entry align="left" leader-modify="clr-ldr" colname="column3">July 31, 2018</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $712,169,000<linebreak/>Non-Federal: $383,475,000<linebreak/>Total: $1,095,644,000</entry></row> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">2. HI</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Ala Wai Canal</entry><entry align="left" leader-modify="clr-ldr" colname="column3">Dec. 21, 2017</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $212,754,000 <linebreak/>Non-Federal: $114,560,000<linebreak/>Total: $327,313,000</entry></row> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">3. NY</entry><entry align="left" leader-modify="clr-ldr" colname="column2"> Mamaroneck-Sheldrake Rivers</entry><entry align="left" leader-modify="clr-ldr" colname="column3">Dec. 14, 2017</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $53,500,000<linebreak/>Non-Federal: $28,750,000<linebreak/>Total: $82,250,000</entry></row></tbody></tgroup></table></paragraph> <paragraph id="H9F27E7A4AE264B0DBE3EE2C36CB6B9CC"><enum>(3)</enum><header>Hurricane and storm damage risk reduction</header> <table table-type="" table-template-name="Generic: 4 text, 1 num" align-to-level="section" frame="all" colsep="1" rowsep="1" blank-lines-before="1" line-rules="all-gen" rule-weights="4.4.4.4.4.0"> <tgroup cols="4" rowsep="1" thead-tbody-ldg-size="10.10.12" grid-typeface="1.1"><colspec colnum="0" colname="column1" coldef="txt-no-ldr" min-data-value="18" colwidth="78pts"/><colspec colnum="1" colname="column2" coldef="txt-no-ldr" min-data-value="50" colwidth="146pts"/><colspec colnum="2" colname="column3" coldef="txt-no-ldr" min-data-value="35" colwidth="115pts"/><colspec colnum="3" colname="column4" coldef="txt-no-ldr" min-data-value="80" colwidth="339pts"/><thead> <row><entry namest="column1" morerows="0" align="center" colname="column1"><bold>A. State</bold></entry><entry namest="column2" morerows="0" align="center" colname="column2"><bold>B. <linebreak/>Name</bold></entry><entry namest="column3" morerows="0" align="center" colname="column3"><bold>C. <linebreak/>Date of <linebreak/>Report of <linebreak/>Chief of <linebreak/>Engineers</bold></entry><entry namest="column4" morerows="0" align="center" colname="column4"><bold>D. <linebreak/>Estimated Initial <linebreak/>Costs and <linebreak/>Estimated <linebreak/>Renourishment <linebreak/>Costs</bold></entry></row></thead> <tbody> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">1. FL</entry><entry align="left" leader-modify="clr-ldr" colname="column2"> St. Johns County</entry><entry align="left" leader-modify="clr-ldr" colname="column3">Aug. 8, 2017</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Initial Federal: $5,873,283<linebreak/> Initial Non-Federal: $19,661,924<linebreak/>Initial Total: $25,535,207<linebreak/> Renourishment Federal: $9,751,788<linebreak/>Renourishment Non-Federal: $45,344,169<linebreak/>Renourishment Total: $55,095,957</entry></row> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">2. FL</entry><entry align="left" leader-modify="clr-ldr" colname="column2">St. Lucie County</entry><entry align="left" leader-modify="clr-ldr" colname="column3">Dec. 15, 2017</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Initial Federal: $7,239,497<linebreak/>Initial Non-Federal: $13,443,614<linebreak/> Initial Total: $20,683,110<linebreak/> Renourishment Federal: $9,093,999<linebreak/>Renourishment Non-Federal: $24,588,991<linebreak/>Renourishment Total: $33,682,990</entry></row> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">3. TX</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Sabine Pass to Galveston Bay</entry><entry align="left" leader-modify="clr-ldr" colname="column3">Dec. 7, 2017</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $2,200,357,000<linebreak/> Non-Federal: $1,184,807,000<linebreak/> Total: $3,385,164,000</entry></row></tbody></tgroup></table></paragraph> <paragraph id="HD1527BF4EF43462EBBE58673E8BF6090" display-inline="no-display-inline"><enum>(4)</enum><header>Flood risk management and ecosystem restoration</header> <table table-type="" table-template-name="Generic: 4 text, 1 num" align-to-level="section" frame="all" colsep="1" rowsep="1" blank-lines-before="1" line-rules="all-gen" rule-weights="4.4.4.4.4.0"> <tgroup cols="4" rowsep="1" thead-tbody-ldg-size="10.10.12" grid-typeface="1.1"><colspec colnum="0" colname="column1" coldef="txt-no-ldr" min-data-value="18" colwidth="44pts"/><colspec colnum="1" colname="column2" coldef="txt-no-ldr" min-data-value="50" colwidth="94pts"/><colspec colnum="2" colname="column3" coldef="txt-no-ldr" min-data-value="35" colwidth="158pts"/><colspec colnum="3" colname="column4" coldef="txt-no-ldr" min-data-value="80" colwidth="355pts"/><thead> <row><entry namest="column1" morerows="0" align="center" colname="column1"><bold>A. State</bold></entry><entry namest="column2" morerows="0" align="center" colname="column2"><bold>B. <linebreak/>Name</bold></entry><entry namest="column3" morerows="0" align="center" colname="column3"><bold>C. <linebreak/>Date of <linebreak/>Report of <linebreak/>Chief of Engineers</bold></entry><entry namest="column4" morerows="0" align="center" colname="column4"><bold>D. <linebreak/>Estimated <linebreak/>Costs</bold></entry></row></thead> <tbody> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">1. NM</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Española Valley, Rio Grande</entry><entry align="left" leader-modify="clr-ldr" colname="column3"> May 11, 2018</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $55,602,266<linebreak/>Non-Federal: $7,637,764<linebreak/>Total: $63,240,030</entry></row></tbody></tgroup></table></paragraph> <paragraph id="H055B7C43673244FD821DCA52A9782F63" display-inline="no-display-inline"><enum>(5)</enum><header>Ecosystem restoration</header> <table table-type="" table-template-name="Generic: 4 text, 1 num" align-to-level="section" frame="all" colsep="1" rowsep="1" blank-lines-before="1" line-rules="all-gen" rule-weights="4.4.4.4.4.0"> <tgroup cols="4" rowsep="1" thead-tbody-ldg-size="10.10.12" grid-typeface="1.1"><colspec colnum="0" colname="column1" coldef="txt-no-ldr" min-data-value="18" colwidth="44pts"/><colspec colnum="1" colname="column2" coldef="txt-no-ldr" min-data-value="50" colwidth="94pts"/><colspec colnum="2" colname="column3" coldef="txt-no-ldr" min-data-value="35" colwidth="158pts"/><colspec colnum="3" colname="column4" coldef="txt-no-ldr" min-data-value="80" colwidth="355pts"/><thead> <row><entry namest="column1" morerows="0" align="center" colname="column1"><bold>A. State</bold></entry><entry namest="column2" morerows="0" align="center" colname="column2"><bold>B. <linebreak/>Name</bold></entry><entry namest="column3" morerows="0" align="center" colname="column3"><bold>C. <linebreak/>Date of <linebreak/>Report of <linebreak/>Chief of Engineers</bold></entry><entry namest="column4" morerows="0" align="center" colname="column4"><bold>D. <linebreak/>Estimated <linebreak/>Costs</bold></entry></row></thead> <tbody> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">1. TX</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Resacas, in the vicinity of the City of Brownsville</entry><entry align="left" leader-modify="clr-ldr" colname="column3"> September 6, 2018</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $141,489,000<linebreak/>Non-Federal: $65,675,000<linebreak/>Total: $207,164,000</entry></row></tbody></tgroup></table></paragraph> <paragraph id="HFCCAE10807F84F3FACC44A19C3123988"><enum>(6)</enum><header>Modifications and other projects</header> <table table-type="" table-template-name="Generic: 4 text, 1 num" align-to-level="section" frame="all" colsep="1" rowsep="1" blank-lines-before="1" line-rules="all-gen" rule-weights="4.4.4.4.4.0"> <tgroup cols="4" rowsep="1" thead-tbody-ldg-size="10.10.12" grid-typeface="1.1"><colspec colnum="0" colname="column1" coldef="txt-no-ldr" min-data-value="18" colwidth="44pts"/><colspec colnum="1" colname="column2" coldef="txt-no-ldr" min-data-value="50" colwidth="94pts"/><colspec colnum="2" colname="column3" coldef="txt-no-ldr" min-data-value="35" colwidth="158pts"/><colspec colnum="3" colname="column4" coldef="txt-no-ldr" min-data-value="80" colwidth="355pts"/><thead> <row><entry namest="column1" morerows="0" align="center" colname="column1"><bold>A. State</bold></entry><entry namest="column2" morerows="0" align="center" colname="column2"><bold>B. <linebreak/>Name</bold></entry><entry namest="column3" morerows="0" align="center" colname="column3"><bold>C. <linebreak/>Date of <linebreak/>Decision<linebreak/>Document</bold></entry><entry namest="column4" morerows="0" align="center" colname="column4"><bold>D. <linebreak/>Estimated <linebreak/>Costs</bold></entry></row></thead> <tbody> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">1. GA</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Savannah Harbor Expansion Project</entry><entry align="left" leader-modify="clr-ldr" colname="column3"> Dec. 5, 2016</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $731,700,000<linebreak/>Non-Federal: $287,200,000<linebreak/>Total: $1,018,900,000</entry></row> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">2. MI</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Soo Locks, Sault Ste. Marie</entry><entry align="left" leader-modify="clr-ldr" colname="column3">June 29, 2018</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Federal: $922,432,000<linebreak/>Non-Federal: $0<linebreak/>Total: $922,432,000</entry></row> <row><entry align="left" stub-definition="txt-ldr" stub-hierarchy="1" leader-modify="clr-ldr" colname="column1">3. TN</entry><entry align="left" leader-modify="clr-ldr" colname="column2">Chickamauga Lock Replacement</entry><entry align="left" leader-modify="clr-ldr" colname="column3">July 19, 2018</entry><entry align="left" leader-modify="clr-ldr" colname="column4">Total: $757,666,000 (to be derived <fraction>½</fraction> from the general fund of the Treasury and <fraction>½</fraction> from the Inland Waterways Trust Fund)</entry></row></tbody></tgroup></table></paragraph></section> <section id="HF08ACEFFA36D4B9DB6FC859F769F088F" commented="no"><enum>1402.</enum><header>Special rules</header> <subsection id="HF2E00EDBC5C94C63AD90E62E62B251F9"><enum>(a)</enum><header>St. Paul Harbor, Alaska</header><text display-inline="yes-display-inline">Notwithstanding section 2008(c) of the Water Resources Development Act of 2007 (<external-xref legal-doc="public-law" parsable-cite="pl/110/114">Public Law 110–114</external-xref>; 121 Stat. 1074), the project for navigation, St. Paul Harbor, authorized by section 101(b)(3) of the Water Resources Development Act of 1996 (110 Stat. 3667), shall be cost-shared substantially in accordance with the costs established by section 105 of the Energy and Water Development Appropriations Act, 2003 (117 Stat. 139).</text></subsection>
<subsection id="HB36257DD91D743C1B57288E7E4B6AFA5"><enum>(b)</enum><header>Española Valley, New Mexico</header><text display-inline="yes-display-inline">The Secretary shall carry out the project for flood risk management and ecosystem restoration, Española Valley, Rio Grande and Tributaries, New Mexico, authorized by section 1401(4) of this Act substantially in accordance with terms and conditions described in the Report of the Chief of Engineers, dated May 11, 2018, including, notwithstanding section 2008(c) of the Water Resources Development Act of 2007 (<external-xref legal-doc="public-law" parsable-cite="pl/110/114">Public Law 110–114</external-xref>; 121 Stat. 1074), the recommended cost share.</text></subsection></section> <section id="HA092D47383B1466D92979E17A28B0827" commented="no"><enum>1403.</enum><header>Norfolk Harbor and Channels, Virginia</header> <subsection id="H976A70FFDCAC4F65AF4B45B2717F391F" commented="no"><enum>(a)</enum><header>In general</header><text>The Secretary is authorized to further improve the project for navigation, Norfolk Harbor and Channels, Virginia, authorized by section 201 of the Water Resources Development Act of 1986 (100 Stat. 4090), substantially in accordance with the plans, and subject to the conditions, described in the Report of the Chief of Engineers dated June 29, 2018.</text></subsection>
<subsection id="HB9915FD0467E4EFDAFB8E04BE710B767" commented="no"><enum>(b)</enum><header>Thimble Shoal channel widening</header><text>The Secretary may carry out additional modifications to the project described in subsection (a) that are identified in the report titled <quote>Report to Congress on Future Water Resources Development</quote> submitted to Congress on February 5, 2018, pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/2282d">33 U.S.C. 2282d</external-xref>).</text></subsection> <subsection id="H3DDDDC5B150A4083915E55262DBFD6CC" commented="no"><enum>(c)</enum><header>Maximum authorized cost</header><text>Notwithstanding section 902(a)(2)(B) of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2280">33 U.S.C. 2280(a)(2)(B)</external-xref>), the maximum authorized cost for the project described in subsection (a) shall not be modified for the improvements and modifications authorized by subsections (a) and (b).</text></subsection></section></subtitle></title>
<title id="H766B6B65954F497BB6ECC93B2FE313C6"><enum>II</enum><header>Drinking Water System Improvement</header>
<section id="HA2194B8FBFFD4B0DADF2FB919F3AB7E6" commented="no"><enum>2001.</enum><header>Indian reservation drinking water program</header>
<subsection id="H3A39BBDE88EB4BC5B91A042FAE5FB4B4" commented="no"><enum>(a)</enum><header>In general</header><text>Subject to the availability of appropriations, the Administrator of the Environmental Protection Agency shall carry out a program to implement—</text> <paragraph id="HB0A8DBCF276D4F59BAED159C3663826B" commented="no"><enum>(1)</enum><text>10 eligible projects described in subsection (b) that are within the Upper Missouri River Basin; and</text></paragraph>
<paragraph id="H21B5C4517B53402393089C846EF1C10C" commented="no"><enum>(2)</enum><text>10 eligible projects described in subsection (b) that are within the Upper Rio Grande Basin.</text></paragraph></subsection> <subsection id="H11AD06F62EB641A19734C3EDF82EB61B" commented="no"><enum>(b)</enum><header>Eligible projects</header><text>A project eligible to participate in the program under subsection (a) is a project—</text>
<paragraph id="HCA97CE8E645849428F88449636CD877A" commented="no"><enum>(1)</enum><text>that is on a reservation (as defined in section 3 of the Indian Financing Act of 1974 (<external-xref legal-doc="usc" parsable-cite="usc/25/1452">25 U.S.C. 1452</external-xref>)) that serves a federally recognized Indian Tribe; and</text></paragraph> <paragraph id="H7304BA7C2DB24EC8A075AA78FD107334" commented="no"><enum>(2)</enum><text>the purpose of which is to connect, expand, or repair an existing public water system, as defined in section 1401(4) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300f">42 U.S.C. 300f(4)</external-xref>), in order to improve water quality, water pressure, or water services.</text></paragraph></subsection>
<subsection id="HC31F88A2CF8642E3997AFC9230328101" commented="no"><enum>(c)</enum><header>Requirement</header><text>In carrying out the program under subsection (a)(1), the Administrator of the Environmental Protection Agency shall select not less than one eligible project for a reservation that serves more than one federally recognized Indian Tribe.</text></subsection> <subsection id="HAE7A385A57D94C66BB55BC7CC80B8E81" commented="no"><enum>(d)</enum><header>Authorization of appropriations</header><text>There is authorized to be appropriated to carry out the program under subsection (a) $20,000,000 for each of fiscal years 2019 through 2022.</text></subsection></section>
<section id="H731EC1535F084D6FB7FF1BE160381FB4" commented="no"><enum>2002.</enum><header>Clean, safe, reliable water infrastructure</header><text display-inline="no-display-inline">Section 1452(k) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(k)</external-xref>) is amended—</text> <paragraph id="HE3F1D818EA7F4E1C997F6DBCEC2BD209" commented="no"><enum>(1)</enum><text>in paragraph (1)(D), by inserting <quote>and for the implementation of efforts (other than actions authorized under subparagraph (A)) to protect source water in areas delineated pursuant to section 1453</quote> before the period at the end; and </text></paragraph>
<paragraph id="H6C9552A1F103418395DD309A6E66CFFE" commented="no"><enum>(2)</enum><text>in paragraph (2)(E), by inserting <quote>, and to implement efforts to protect source water,</quote> after <quote>wellhead protection programs</quote>.</text></paragraph></section> <section id="HB6A8632DE3B440C59CA18C6A782DF3DC"><enum>2003.</enum><header>Study on intractable water systems</header><text display-inline="no-display-inline">Part E of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j">42 U.S.C. 300j</external-xref> et seq.) is amended by adding at the end the following:</text>
<quoted-block id="H850B1700C612418981B5922AFC7BBE81" style="OLC">
<section id="H883B8D13F7174AD0A5CFEF19ADD37F28"><enum>1459C.</enum><header>Study on intractable water systems</header>
<subsection id="H57F033C266524683B4F15D41F94D9852"><enum>(a)</enum><header>Definition of intractable water system</header><text>In this section, the term <term>intractable water system</term> means a community water system or a noncommunity water system—</text> <paragraph id="H02ED3A95F1904307B3C258C9DB8BFFD7"><enum>(1)</enum><text>that serves fewer than 1,000 individuals; </text></paragraph>
<paragraph id="H55959F9EB8E54410A3F142DBDF61CA3A"><enum>(2)</enum><text>the owner or operator of which—</text> <subparagraph id="HA2563DF6737B43829E936D85630DEBED"><enum>(A)</enum><text>is unable or unwilling to provide safe and adequate service to those individuals;</text></subparagraph>
<subparagraph id="H6AEEB446B6464FCFBD7521E102DEB511"><enum>(B)</enum><text>has abandoned or effectively abandoned the community water system or noncommunity water system, as applicable;</text></subparagraph> <subparagraph id="HEEEAAAF3BB5541C7BC488A09C6E07EF3"><enum>(C)</enum><text>has defaulted on a financial obligation relating to the community water system or noncommunity water system, as applicable; or</text></subparagraph>
<subparagraph id="HC6FEC69DF8BC4C96AD9CA206450B1F2D"><enum>(D)</enum><text>fails to maintain the facilities of the community water system or noncommunity water system, as applicable, in a manner so as to prevent a potential public health hazard; and</text></subparagraph></paragraph> <paragraph id="H78B0895AB5BF442698553FD4AE5E6EFB" commented="no"><enum>(3)</enum><text display-inline="yes-display-inline"><italic></italic>that is, as of the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title>—</text>
<subparagraph id="H953FE7237312497A8C4EBFBAABE5A891" commented="no"><enum>(A)</enum><text>in significant noncompliance with this Act or any regulation promulgated pursuant to this Act; or</text></subparagraph> <subparagraph id="H8C65BA20CEF343B99551C49B9038E6AA" commented="no"><enum>(B)</enum><text>listed as having a history of significant noncompliance with this title pursuant to section 1420(b)(1).</text></subparagraph></paragraph></subsection>
<subsection id="H6C80E6A58C3C4CF9B3B5282DAB8B8B4F"><enum>(b)</enum><header>Study required</header>
<paragraph id="HD55EF273CB7B43DB9FB80318617DD20A"><enum>(1)</enum><header>In general</header><text>Not later than 2 years after the date of enactment of this section, the Administrator, in consultation with the Secretary of Agriculture and the Secretary of Health and Human Services, shall complete a study that—</text> <subparagraph id="HD2966FB8259C496CBACD1F7CAB6E19C1"><enum>(A)</enum><text>identifies intractable water systems; and</text></subparagraph>
<subparagraph id="H14842F89156245158DEACC167B2FBCFF"><enum>(B)</enum><text>describes barriers to delivery of potable water to individuals served by an intractable water system.</text></subparagraph></paragraph> <paragraph id="H535AED48BB4B419DB4A20E17A40B29B4"><enum>(2)</enum><header>Report to Congress</header><text>Not later than 2 years after the date of enactment of this section, the Administrator shall submit to Congress a report describing findings and recommendations based on the study under this subsection.</text></paragraph></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></section>
<section id="H9DEF7FC3105C4F71893D9A29F6732E71"><enum>2004.</enum><header>Sense of Congress relating to access to nonpotable water</header><text display-inline="no-display-inline">It is the sense of Congress that—</text> <paragraph id="H30231E412DD745EEAEA52C4FDD82987E"><enum>(1)</enum><text>access to nonpotable water sources for industry can relieve the supply and demand challenges for potable water in water-stressed regions throughout the United States; and</text></paragraph>
<paragraph id="H8B8F8FB214B24359B270E0296ED91038"><enum>(2)</enum><text>water users are encouraged to continue implementing and incentivizing nonpotable water reuse programs that will achieve greater water savings and conservation needs.</text></paragraph></section> <section id="H916445DCEAB1468A89E9FCB3EF38AFC4" commented="no"><enum>2005.</enum><header>Drinking water infrastructure resilience and sustainability</header><text display-inline="no-display-inline">Section 1459A of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-19a">42 U.S.C. 300j–19a</external-xref>) is amended—</text>
<paragraph id="H8EAABC38E0D44D31B9708CCC109A1EE4" commented="no"><enum>(1)</enum><text>by redesignating subsection (j) as subsection (k); </text></paragraph> <paragraph id="HCD5D21AFBEDB4A9398835461F5F72560" commented="no"><enum>(2)</enum><text>in subsection (k), as redesignated by paragraph (1), by striking <quote>this section</quote> and inserting <quote>subsections (a) through (j) of this section</quote>;</text></paragraph>
<paragraph id="H0D22B8C7207547ADAF5ED444768218A1" commented="no"><enum>(3)</enum><text>by inserting after subsection (i) the following:</text> <quoted-block style="OLC" id="H929233CB182D48F5AEA594794BFC0A3F" display-inline="no-display-inline"> <subsection id="HB13B2167A509476D836805C42BC9801A" commented="no"><enum>(j)</enum><header>State response to contaminants</header><text display-inline="yes-display-inline"></text>
<paragraph id="H93FFD10EC0BF4BF69B8A909C6C5DB6B4" commented="no"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">The Administrator may, subject to the terms and conditions of this section, issue a grant to a requesting State, on behalf of an underserved community, so the State may assist in, or otherwise carry out, necessary and appropriate activities related to a contaminant—</text> <subparagraph id="H3EBBA2792CAD41C1A830B6733652E4EF"><enum>(A)</enum><text>that is determined by the State to—</text>
<clause id="H4A1AEDE5D35C4F3290DFD2F773C19628"><enum>(i)</enum><text>be present in, or likely to enter into, a public water system serving, or an underground source of drinking water for, such underserved community; and</text></clause> <clause id="H55884DC4A573408D9882C84FAE857EB1"><enum>(ii)</enum><text>potentially present an imminent and substantial endangerment to the health of persons; and</text></clause></subparagraph>
<subparagraph id="H63CD54DFE1FD4F858ACFDE7D8A55AD51"><enum>(B)</enum><text>with respect to which the State determines appropriate authorities have not acted sufficiently to protect the health of such persons.</text></subparagraph></paragraph> <paragraph id="H56DFAEF92D8242F9A197ECB1158A140C" commented="no"><enum>(2)</enum><header>Recovery of funds</header><text display-inline="yes-display-inline">If, subsequent to the Administrator’s award of a grant to a State under this subsection, any person or entity (including an eligible entity), is found by the Administrator or a court of competent jurisdiction to have caused or contributed to contamination that was detected as a result of testing conducted, or treated, with funds provided under this subsection, and such contamination violated a law administered by the Administrator, such person or entity shall, upon issuance of a final judgment or settlement and the exhaustion of all appellate and administrative remedies—</text>
<subparagraph id="HA832B6995F1E4E72BAA50D5B4E4CC0AD" commented="no"><enum>(A)</enum><text display-inline="yes-display-inline">notify the Administrator in writing not later than 30 days after such issuance of a final judgment or settlement and the exhaustion of all appellate and administrative remedies; and </text></subparagraph> <subparagraph id="HD9ABB6CC2FB443F7BDDAC62EF09C622F" commented="no"><enum>(B)</enum><text>promptly pay the Administrator an amount equal to the amount of such funds. </text></subparagraph></paragraph></subsection><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph>
<paragraph id="H60EE31FEB4C147D092D4B9826B51E412" commented="no"><enum>(4)</enum><text>by adding at the end the following:</text> <quoted-block style="OLC" id="H6FFAA17BDEC549D593FB7D86353D9FDA" display-inline="no-display-inline"> <subsection id="HDF034BD766A24A55A8B39D8171B26275" commented="no"><enum>(l)</enum><header>Drinking water infrastructure resilience and sustainability</header> <paragraph id="H5BFF4F5EF49D4BDC8C2C51D343C8E1F9" commented="no"><enum>(1)</enum><header>Resilience and natural hazard</header><text display-inline="yes-display-inline">The terms <term>resilience</term> and <term>natural hazard</term> have the meaning given such terms in section 1433(h).</text></paragraph>
<paragraph id="HA1EEC590BEAD456C9CF713E015493A21" commented="no"><enum>(2)</enum><header>In general</header><text display-inline="yes-display-inline">The Administrator may establish and carry out a program, to be known as the Drinking Water System Infrastructure Resilience and Sustainability Program, under which the Administrator, subject to the availability of appropriations for such purpose, shall award grants in each of fiscal years 2019 and 2020 to eligible entities for the purpose of increasing resilience to natural hazards.</text></paragraph> <paragraph id="H06B76C1310AA44D38CC80F22AD56902A" commented="no"><enum>(3)</enum><header>Use of funds</header><text display-inline="yes-display-inline">An eligible entity may only use grant funds received under this subsection to assist in the planning, design, construction, implementation, operation, or maintenance of a program or project that increases resilience to natural hazards through—</text>
<subparagraph id="H644D3FE7812948078CE9DED11F409E1E" commented="no"><enum>(A)</enum><text display-inline="yes-display-inline">the conservation of water or the enhancement of water use efficiency;</text></subparagraph> <subparagraph id="H99243EFDF59D4CABA14F965325B9F206" commented="no"><enum>(B)</enum><text>the modification or relocation of existing drinking water system infrastructure made, or that is at risk of being, significantly impaired by natural hazards, including risks to drinking water from flooding;</text></subparagraph>
<subparagraph id="H731171AA0BF241218A0580AFA3E0A834" commented="no"><enum>(C)</enum><text>the design or construction of desalination facilities to serve existing communities;</text></subparagraph> <subparagraph id="HF5C68C015AA2421BA9CBD1D8BB636CDB" commented="no"><enum>(D)</enum><text>the enhancement of water supply through the use of watershed management and source water protection;</text></subparagraph>
<subparagraph id="H82177B2B80D341B386336089A5D98290" commented="no"><enum>(E)</enum><text>the enhancement of energy efficiency or the use and generation of renewable energy in the conveyance or treatment of drinking water; or</text></subparagraph> <subparagraph id="HF218880A4EFB4FBBA4D9BC741AB4CACB" commented="no"><enum>(F)</enum><text>the development and implementation of measures to increase the resilience of the eligible entity to natural hazards. </text></subparagraph></paragraph>
<paragraph id="H5F041E35FB394E83898AE2E81087E4F5" commented="no"><enum>(4)</enum><header>Application</header><text display-inline="yes-display-inline">To seek a grant under this subsection, the eligible entity shall submit to the Administrator an application that—</text> <subparagraph id="HCFEB8E4D4CF24B36BD8CFE8A535D8292" commented="no"><enum>(A)</enum><text display-inline="yes-display-inline">includes a proposal of the program or project to be planned, designed, constructed, implemented, operated, or maintained by the eligible entity;</text></subparagraph>
<subparagraph id="HF54DAE3223124287907C276345C31FFE" commented="no"><enum>(B)</enum><text>identifies the natural hazard risk to be addressed by the proposed program or project;</text></subparagraph> <subparagraph id="H59A3DFB0672A4D72BDBACFAE9275C7F8" commented="no"><enum>(C)</enum><text>provides documentation prepared by a Federal, State, regional, or local government agency of the natural hazard risk to the area where the proposed program or project is to be located; </text></subparagraph>
<subparagraph id="HE8D67FFBA9FF46BDA55DABEA104BA68C" commented="no"><enum>(D)</enum><text>includes a description of any recent natural hazard events that have affected the applicable water system;</text></subparagraph> <subparagraph id="HC33AB8749E7943CDBA610DE00F30EAC6" commented="no"><enum>(E)</enum><text>includes a description of how the proposed program or project would improve the performance of the system under the anticipated natural hazards; and</text></subparagraph>
<subparagraph id="H03E1387FF6854A97AADDE46E5C734F58" commented="no"><enum>(F)</enum><text>explains how the proposed program or project is expected to enhance the resilience of the system to the anticipated natural hazards.</text></subparagraph></paragraph> <paragraph id="H2D68668ADF514CFF8C479D303957E3C7" commented="no"><enum>(5)</enum><header>Authorization of appropriations</header><text display-inline="yes-display-inline">There is authorized to be appropriated to carry out this subsection $4,000,000 for each of fiscal years 2019 and 2020.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section>
<section id="HFB81E4AB0A8C4817B3FF0B788E1C09F9"><enum>2006.</enum><header>Voluntary school and child care program lead testing grant program enhancement</header>
<subsection id="H66E87C04D7CD4C8A8A2E456CB6FECD93"><enum>(a)</enum><header>Voluntary school and child care program lead testing grant program enhancement</header><text display-inline="yes-display-inline">Section 1464(d) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-24">42 U.S.C. 300j–24(d)</external-xref>) is amended—</text> <paragraph id="H7CCD22797BB24223AE4E17E9DEE717D9"><enum>(1)</enum><text>in paragraph (2), by adding at the end the following:</text>
<quoted-block id="HBCD6CFE912334E0D8A4407286CC05E68" style="OLC">
<subparagraph id="H7456CFF312BD446F8B793069858E314E"><enum>(C)</enum><header>Technical assistance</header><text>In carrying out the grant program under subparagraph (A), beginning not later than 1 year after the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title>, the Administrator shall provide technical assistance to recipients of grants under this subsection—</text> <clause id="HC359DE7F26A14B6F967730035231144A"><enum>(i)</enum><text>to assist in identifying the source of lead contamination in drinking water at schools and child care programs under the jurisdiction of the grant recipient;</text></clause>
<clause id="HBC6164266CDD471386C339C670BFEE52"><enum>(ii)</enum><text>to assist in identifying and applying for other Federal and State grant programs that may assist the grant recipient in eliminating lead contamination described in clause (i);</text></clause> <clause id="HABFF9B1F60ED4709910C25016D450C73"><enum>(iii)</enum><text>to provide information on other financing options in eliminating lead contamination described in clause (i); and</text></clause>
<clause id="HE15D0CD8378F4EC79AB0B036FCED050A"><enum>(iv)</enum><text>to connect grant recipients with nonprofit and other organizations that may be able to assist with the elimination of lead contamination described in clause (i).</text></clause></subparagraph><after-quoted-block>; </after-quoted-block></quoted-block></paragraph> <paragraph id="HDB3451EE255E47039AD04B1776A39581" commented="no"><enum>(2)</enum><text>by redesignating paragraphs (4) through (7) as paragraphs (5) through (8), respectively;</text></paragraph>
<paragraph id="H98F3183555324CA9A64BACE94F45CA20" commented="no"><enum>(3)</enum><text>by inserting after paragraph (3) the following paragraph: </text> <quoted-block style="OLC" id="HB9D6E170EB634C29B4B90D55FC641516" display-inline="no-display-inline"> <paragraph id="HC7D828AE86AE4C17B8ABEA89311FD19B" commented="no"><enum>(4)</enum><header>Priority</header><text display-inline="yes-display-inline">In making grants under this subsection, the Administrator shall give priority to States and local educational agencies that will assist in voluntary testing for lead contamination in drinking water at schools and child care programs that are in low-income areas.</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph>
<paragraph id="H9A427ADC9EB74E5C9EA428C265FE1EB9"><enum>(4)</enum><text>in paragraph (8) (as redesignated by paragraph (2) of this section)—</text> <subparagraph id="H95F569560DE8410DA9308BC5F4AE728C"><enum>(A)</enum><text>by striking <quote>is authorized</quote> and inserting <quote>are authorized</quote>; and</text></subparagraph>
<subparagraph id="H9B4D2668CC8F4A6E8A87E0D61AD01368"><enum>(B)</enum><text>by striking <quote>2021</quote> and inserting <quote>2019, and $25,000,000 for each of fiscal years 2020 and 2021</quote>.</text></subparagraph></paragraph></subsection> <subsection id="HFF9EEE77F1AE49B287BB2BFD96114B26"><enum>(b)</enum><header>Drinking water fountain replacement for schools</header> <paragraph id="HDE26BAA18CB34981BF6AE4F95DCB438A"><enum>(1)</enum><header>In general</header><text>Part F of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-21">42 U.S.C. 300j–21</external-xref> et seq.) is amended by adding at the end the following:</text>
<quoted-block id="H08835E5D810646F19BE94D16E0A9D7BB" style="OLC">
<section id="HE413367D66A24A2D8D09B4FD09EB7A7D"><enum>1465.</enum><header>Drinking water fountain replacement for schools</header>
<subsection id="HA733986892394DAF95DCF43C99847DF8"><enum>(a)</enum><header>Establishment</header><text>Not later than 1 year after the date of enactment of this section, the Administrator shall establish a grant program to provide assistance to local educational agencies for the replacement of drinking water fountains manufactured prior to 1988.</text></subsection> <subsection id="HFE874A5CCF0F4BE593F8F5A9D672C4FD"><enum>(b)</enum><header>Use of funds</header><text>Funds awarded under the grant program—</text>
<paragraph id="H048E588DB1AD44BD87B207D1EBA035A7"><enum>(1)</enum><text>shall be used to pay the costs of replacement of drinking water fountains in schools; and</text></paragraph> <paragraph id="HE95D44BE691D4D3DBDE0090D9600DA29"><enum>(2)</enum><text>may be used to pay the costs of monitoring and reporting of lead levels in the drinking water of schools of a local educational agency receiving such funds, as determined appropriate by the Administrator.</text></paragraph></subsection>
<subsection id="HBBB9E1FA4A5C4BFE9515E90B954F2ECD"><enum>(c)</enum><header>Priority</header><text>In awarding funds under the grant program, the Administrator shall give priority to local educational agencies based on economic need.</text></subsection> <subsection id="H5EC9F8D1156044669872A83415EEE0D9"><enum>(d)</enum><header>Authorization of appropriations</header><text>There are authorized to be appropriated to carry out this section $5,000,000 for each of fiscal years 2019 through 2021.</text></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></paragraph>
<paragraph id="H47B69B023DD84E6EBFE4C1AAF9C39DCE"><enum>(2)</enum><header>Definitions</header><text>Section 1461(5) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-21">42 U.S.C. 300j–21(5)</external-xref>) is amended by inserting <quote>or drinking water fountain</quote> after <quote>water cooler</quote> each place it appears.</text></paragraph></subsection></section> <section id="HC054D825361D42B790C15F5610F58BAA" commented="no"><enum>2007.</enum><header>Innovative water technology grant program</header> <subsection id="HACA0AE8FE57A429CB99D16C79D40B5CE" commented="no"><enum>(a)</enum><header>Definitions</header><text display-inline="yes-display-inline">In this section:</text>
<paragraph id="HFBF6F7014B354FA6B8024B765C577D8F" commented="no"><enum>(1)</enum><header>Administrator</header><text display-inline="yes-display-inline">The term <term>Administrator</term> means the Administrator of the Environmental Protection Agency. </text></paragraph> <paragraph id="H3E84FC6962304FEFA33C16CC30F8E059" commented="no"><enum>(2)</enum><header>Eligible entity</header><text>The term <term>eligible entity</term> means—</text>
<subparagraph id="H8EBA076D69C041CE8214440AD7CC60EF" commented="no"><enum>(A)</enum><text>a public water system (as defined under section 1401(4) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300f">42 U.S.C. 300f(4)</external-xref>)); </text></subparagraph> <subparagraph id="H7FB20128003A4904B628F29A25077F95" commented="no"><enum>(B)</enum><text display-inline="yes-display-inline">an institution of higher education;</text></subparagraph>
<subparagraph id="H8CDEAEFA5DC843CE8C170F941020FA5A" commented="no"><enum>(C)</enum><text>a research institution or foundation; </text></subparagraph> <subparagraph id="H12D9DEA48D124C7483EA108C1AFD180D" commented="no"><enum>(D)</enum><text>a regional water organization; or</text></subparagraph>
<subparagraph id="HEF486CE9F8EA4E9B9D618F91F86727FE" commented="no"><enum>(E)</enum><text>a nonprofit organization described in section 1442(e)(8) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-1">42 U.S.C. 300j–1(e)(8)</external-xref>).</text></subparagraph></paragraph></subsection> <subsection id="H114F9F38DA124CDD9607CDC1F0805A28" commented="no"><enum>(b)</enum><header>Grant program authorized</header><text display-inline="yes-display-inline">The Administrator shall carry out a grant program for the purpose of accelerating the development and deployment of innovative water technologies that address pressing drinking water supply, quality, treatment, or security challenges of public water systems, areas served by private wells, or source waters.</text></subsection>
<subsection id="HA75CDF6E4D39411A900A488D82AA7CAC" commented="no"><enum>(c)</enum><header>Grants</header><text display-inline="yes-display-inline">In carrying out the program under subsection (b), the Administrator shall make grants to eligible entities—</text> <paragraph id="H84838E4E06AA47A383D085FAE5A0C27F" commented="no"><enum>(1)</enum><text display-inline="yes-display-inline">to develop, test, and deploy innovative water technologies; or</text></paragraph>
<paragraph id="H9E7C56C761BA49F99B9F5243411BDBD5" commented="no"><enum>(2)</enum><text>to provide technical assistance to deploy demonstrated innovative water technologies. </text></paragraph></subsection> <subsection id="HEF858A01CE0F4F7790B4E98B223B0D15" commented="no"><enum>(d)</enum><header>Selection criteria</header><text display-inline="yes-display-inline">In making grants under this section, the Administrator shall—</text>
<paragraph id="HCBA64E1598DA48F0BFBFA6A56C321E3F" commented="no"><enum>(1)</enum><text display-inline="yes-display-inline">award grants through a competitive process to eligible entities the Administrator determines are best able to carry out the purpose of the program; and</text></paragraph> <paragraph id="HB561938BFBBB499780D07446C0066152" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">give priority to projects that have the potential—</text>
<subparagraph id="HD2E5797972A644B299E0EE7079685F15" commented="no"><enum>(A)</enum><text display-inline="yes-display-inline">to reduce ratepayer or community costs or costs of future capital investments;</text></subparagraph> <subparagraph id="H66E9B3FDD67346E882829C16F09B783E" commented="no"><enum>(B)</enum><text>to significantly improve human health or the environment; or</text></subparagraph>
<subparagraph id="HB87DACA6C8284A0D9E4D2A1FE75EA1C8" commented="no"><enum>(C)</enum><text>to provide additional drinking water supplies with minimal environmental impact.</text></subparagraph></paragraph></subsection> <subsection id="H8766241AD58749E48CCC2E9CA41BC985" commented="no"><enum>(e)</enum><header>Cost-Sharing</header><text display-inline="yes-display-inline">The Federal share of the cost of activities carried out using a grant under this section shall be not more than 65 percent.</text></subsection>
<subsection id="H35BDE59AC2F244578592CAB56891FC77" commented="no"><enum>(f)</enum><header>Limitation</header><text display-inline="yes-display-inline">The maximum amount of a grant under this section shall be $5,000,000.</text></subsection> <subsection id="H16A9423164654959B9956E542D14E086" commented="no"><enum>(g)</enum><header>Report</header><text display-inline="yes-display-inline">Each year, the Administrator shall submit to Congress and make publicly available on the website of the Administrator a report that describes any advancements during the previous year in development of innovative water technologies made as a result of funding provided under this section.</text></subsection>
<subsection id="H0DF8D3B1FA3F45D1B8A5EAF64E57E8CD" commented="no"><enum>(h)</enum><header>Partnerships</header><text display-inline="yes-display-inline">Grants awarded under this program may include projects that are carried out by an eligible entity in cooperation with a private entity, including a farmer, farmer cooperative, or manufacturer of water technologies.</text></subsection> <subsection id="HAD779791BA594427B243B1CFC12ECF6F" commented="no"><enum>(i)</enum><header>Authorization of appropriations</header><text>There is authorized to be appropriated to carry out this section $10,000,000 for each of fiscal years 2019 and 2020.</text></subsection></section>
<section id="H61C2F5A900BB4DD1BBACB035DE928ADC"><enum>2008.</enum><header>Improved consumer confidence reports</header><text display-inline="no-display-inline">Section 1414(c)(4) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300g-3">42 U.S.C. 300g–3(c)(4)</external-xref>) is amended—</text> <paragraph commented="no" id="H71AED630F73F4427976B77D8F7CFA8EE"><enum>(1)</enum><text>in the heading for subparagraph (A), by striking <quote><header-in-text level="subparagraph" style="OLC">Annual reports</header-in-text></quote> and inserting <quote><header-in-text level="subparagraph" style="OLC">Reports</header-in-text></quote>;</text></paragraph>
<paragraph id="H651FA9211B114E4D8018444612B15724"><enum>(2)</enum><text>in subparagraph (A), by inserting <quote>, or provide by electronic means,</quote> after <quote>to mail</quote>;</text></paragraph> <paragraph id="HCC52B24281A14800BE9D54636811E094"><enum>(3)</enum><text>in subparagraph (B)—</text>
<subparagraph id="HF23834C4B8C04DDC9A763729064FA8C5"><enum>(A)</enum><text>in clause (iv), by striking <quote>the Administrator, and</quote> and inserting <quote>the Administrator, including corrosion control efforts, and</quote>; and</text></subparagraph> <subparagraph id="HFDB6DCF1F8D34371AE582EBA6CAE6A60"><enum>(B)</enum><text>by adding at the end the following clause:</text>
<quoted-block display-inline="no-display-inline" id="H6E1F399ABC3F4F17B9017F7E9D9DF081" style="OLC">
<clause id="HAF9736F7ECBA4DFF82F2EC8CFBEC0A7D"><enum>(vii)</enum><text display-inline="yes-display-inline">Identification of, if any—</text> <subclause id="H12AF6539765041569E5F9B8FC6147D7E"><enum>(I)</enum><text display-inline="yes-display-inline">exceedances described in paragraph (1)(D) for which corrective action has been required by the Administrator or the State (in the case of a State exercising primary enforcement responsibility for public water systems) during the monitoring period covered by the consumer confidence report; and</text></subclause>
<subclause id="H5640604774D1453C8FE868D21D4F78A5"><enum>(II)</enum><text>violations that occurred during the monitoring period covered by the consumer confidence report.</text></subclause></clause><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph></paragraph> <paragraph id="H8824EC3290B6498E86522EACB3271D6F"><enum>(4)</enum><text>by adding at the end the following new subparagraph:</text>
<quoted-block display-inline="no-display-inline" id="HD0F2A6E57EFC4683B987043098C3BEF5" style="OLC">
<subparagraph id="HF45DF66D09CF4B2F90CAD2DEB060D757"><enum>(F)</enum><header>Revisions</header>
<clause id="H037D71D89D294E618FE3E148D1786D69"><enum>(i)</enum><header>Understandability and frequency</header><text>Not later than 24 months after the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title>, the Administrator, in consultation with the parties identified in subparagraph (A), shall issue revisions to the regulations issued under subparagraph (A)—</text> <subclause id="H9A98C43855F846F5A902EEA5BA852F1F"><enum>(I)</enum><text>to increase—</text>
<item id="H42FDD35F1D1A4D44932F5ECFB5399EC0"><enum>(aa)</enum><text display-inline="yes-display-inline">the readability, clarity, and understandability of the information presented in consumer confidence reports; and</text></item> <item id="HEC8282DD27104AA0A65FBAF5244E1407"><enum>(bb)</enum><text>the accuracy of information presented, and risk communication, in consumer confidence reports; and</text></item></subclause>
<subclause id="H83C917FF91214305B33944A8E130D019"><enum>(II)</enum><text display-inline="yes-display-inline">with respect to community water systems that serve 10,000 or more persons, to require each such community water system to provide, by mail, electronic means, or other methods described in clause (ii), a consumer confidence report to each customer of the system at least biannually.</text></subclause></clause> <clause id="HF1E245AE5E0B4D0EA60D1A1ED237DA6F"><enum>(ii)</enum><header>Electronic delivery</header><text display-inline="yes-display-inline">Any revision of regulations pursuant to clause (i) shall allow delivery of consumer confidence reports by methods consistent with methods described in the memorandum <quote>Safe Drinking Water Act–Consumer Confidence Report Rule Delivery Options</quote> issued by the Environmental Protection Agency on January 3, 2013.</text></clause></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section>
<section id="HC5FD26DFA8214D1086CD8268DE99ADB2"><enum>2009.</enum><header>Contractual agreements</header>
<subsection id="H08647056BABB4E938EF6C7895A047E65"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Section 1414(h)(1) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300g-3">42 U.S.C. 300g–3(h)(1)</external-xref>) is amended—</text> <paragraph id="H3FB34BB0E3B94CA5A9D17CBDA522B20E"><enum>(1)</enum><text>in subparagraph (B), by striking <quote>or</quote> after the semicolon;</text></paragraph>
<paragraph id="HE80AEFED88914087A6470EB859D9FF83"><enum>(2)</enum><text>in subparagraph (C), by striking the period at the end and inserting <quote>; or</quote>; and</text></paragraph> <paragraph id="HB017773628E64CD18E4D96AB39145E8B"><enum>(3)</enum><text>by adding at the end the following new subparagraph:</text>
<quoted-block display-inline="no-display-inline" id="HCA2E458AD4D24542A6B3200F5FE37B12" style="OLC">
<subparagraph id="H3C4D9AB040AD4525BE5190AE5B582169"><enum>(D)</enum><text display-inline="yes-display-inline">entering into a contractual agreement for significant management or administrative functions of the system to correct violations identified in the plan.</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection> <subsection commented="no" id="H8C2F2FAA71CC4930BEA99EC2474676A3"><enum>(b)</enum><header>Technical amendment</header><text display-inline="yes-display-inline">Section 1414(i)(1) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300g-3">42 U.S.C. 300g–3(i)(1)</external-xref>) is amended by inserting a comma after <quote>1417</quote>.</text></subsection></section>
<section id="H73F4A7C3F9DC4F7E8B148149D21CCA14"><enum>2010.</enum><header>Additional considerations for compliance</header>
<subsection id="HE5CD0090CF644ECA80C186115AAE5C03"><enum>(a)</enum><header>Mandatory assessment</header><text display-inline="yes-display-inline">Subsection (h) of section 1414 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300g-3">42 U.S.C. 300g–3</external-xref>) is amended by adding at the end the following:</text> <quoted-block display-inline="no-display-inline" id="HD8908ECD14054358BE5D761EF22E1226" style="OLC"> <paragraph id="H51ADD2A3D83E485C9C70258FF69C8889"><enum>(3)</enum><header>Authority for mandatory assessment</header> <subparagraph id="HFBA1DBD39DD648A683357E941E5525AB"><enum>(A)</enum><header>Authority</header><text>A State with primary enforcement responsibility or the Administrator (if the State does not have primary enforcement responsibility) may require the owner or operator of a public water system to assess options for consolidation, or transfer of ownership of the system, as described in paragraph (1), or other actions expected to achieve compliance with national primary drinking water regulations described in clause (i)(I), if—</text>
<clause id="H5F319EFD44DA44EA8C2687860D81AF44" commented="no"><enum>(i)</enum><text display-inline="yes-display-inline">the public water system—</text> <subclause id="H42E4E227F3DB426A82BE46C5DB1639D3"><enum>(I)</enum><text>has repeatedly violated one or more national primary drinking water regulations and such repeated violations are likely to adversely affect human health; and</text></subclause>
<subclause id="H12E8E993BC9E42A689E523B3DC533763"><enum>(II)</enum>
<item id="H4432EC3FC39A4B6EA53CDD025A84A7C5" commented="no" display-inline="yes-display-inline"><enum>(aa)</enum><text display-inline="yes-display-inline">is unable or unwilling to take feasible and affordable actions, as determined by the State with primary enforcement responsibility or the Administrator (if the State does not have primary enforcement responsibility), that will result in the public water system complying with the national primary drinking water regulations described in subclause (I), including accessing technical assistance and financial assistance through the State loan fund pursuant to section 1452; or</text></item> <item id="HACF6820FAECD4AD09FC5B66CC5748156" indent="up1"><enum>(bb)</enum><text display-inline="yes-display-inline">has already undertaken actions described in item (aa) without achieving compliance;</text></item></subclause></clause>
<clause id="HC366F40C080B4FBCB107BF442FAEA1A5" commented="no"><enum>(ii)</enum><text display-inline="yes-display-inline">such consolidation, transfer, or other action is feasible; and</text></clause> <clause id="H7ED6B627DDE04279B0411697E9406C26"><enum>(iii)</enum><text display-inline="yes-display-inline">such consolidation, transfer, or other action could result in greater compliance with national primary drinking water regulations.</text></clause></subparagraph>
<subparagraph id="H4FF72E3889D144E6B2E65BA43E2F5905" commented="no"><enum>(B)</enum><header>Tailoring of assessments</header><text>Requirements for any assessment to be conducted pursuant to subparagraph (A) shall be tailored with respect to the size, type, and characteristics, of the public water system to be assessed.</text></subparagraph> <subparagraph id="H67330B3F47F04623A60DD400BB94B2C6" commented="no"><enum>(C)</enum><header>Approved entities</header><text>An assessment conducted pursuant to subparagraph (A) may be conducted by an entity approved by the State requiring such assessment (or the Administrator, if the State does not have primary enforcement responsibility), which may include such State (or the Administrator, as applicable), the public water system, or a third party.</text></subparagraph>
<subparagraph id="HF9C9152D96F34588B1697FA4251880CB" commented="no"><enum>(D)</enum><header>Burden of assessments</header><text display-inline="yes-display-inline">It is the sense of Congress that any assessment required pursuant to subparagraph (A) should not be overly burdensome on the public water system that is assessed. </text></subparagraph></paragraph> <paragraph id="H69E5AF26203C4432AB4FBC9B7BEBF431" commented="no"><enum>(4)</enum><header>Financial assistance</header><text display-inline="yes-display-inline">Notwithstanding section 1452(a)(3), a public water system undertaking consolidation or transfer of ownership or other actions pursuant to an assessment completed under paragraph (3) may receive a loan described in section 1452(a)(2)(A) to carry out such consolidation, transfer, or other action.</text></paragraph>
<paragraph id="H930CE333CFC14F4D9C6ADEC7E319E9F5"><enum>(5)</enum><header>Protection of nonresponsible system</header>
<subparagraph id="HBCFB293DE71849978BF0E18B482F2D49"><enum>(A)</enum><header>Identification of liabilities</header>
<clause id="HBC56B6EA07C44B04AF1293D25126CDE1"><enum>(i)</enum><header>In general</header><text>An owner or operator of a public water system that submits a plan pursuant to paragraph (1) based on an assessment conducted with respect to such public water system under paragraph (3) shall identify as part of such plan—</text> <subclause id="HAE63B363941640F381711CEEE9F21E7D"><enum>(I)</enum><text>any potential and existing liability for penalties and damages arising from each specific violation identified in the plan of which the owner or operator is aware; and</text></subclause>
<subclause id="H4D9E531EDC87477293EBAD8370996F27"><enum>(II)</enum><text display-inline="yes-display-inline">any funds or other assets that are available to satisfy such liability, as of the date of submission of such plan, to the public water system that committed such violation.</text></subclause></clause> <clause id="H138F3A74000E442C8C0A7ACE75D13B56"><enum>(ii)</enum><header>Inclusion</header><text display-inline="yes-display-inline">In carrying out clause (i), the owner or operator shall take reasonable steps to ensure that all potential and existing liabilities for penalties and damages arising from each specific violation identified in the plan are identified.</text></clause></subparagraph>
<subparagraph id="H801FA4F4EDD04620AFFEF9BE60B0A32A"><enum>(B)</enum><header>Reservation of funds</header><text display-inline="yes-display-inline">A public water system that, consistent with the findings of an assessment conducted pursuant to paragraph (3), has completed the actions under a plan submitted and approved pursuant to this subsection shall not be liable under this title for a violation of this title identified in the plan, except to the extent to which funds or other assets are identified pursuant to subparagraph (A)(i)(II) as available to satisfy such liability.</text></subparagraph></paragraph> <paragraph id="H8DCC1A710B6C4BE4ABEB4E534FF45E5E"><enum>(6)</enum><header>Regulations</header><text display-inline="yes-display-inline">Not later than 2 years after the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title>, the Administrator shall promulgate regulations to implement paragraphs (3), (4), and (5).</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subsection>
<subsection id="HA7A3875EE39947A29301502B31119FE4"><enum>(b)</enum><header>Retention of primary enforcement authority</header>
<paragraph id="H60188B699B914A38932C48FA7849998B"><enum>(1)</enum><header>In general</header><text>Section 1413(a) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300g-2">42 U.S.C. 300g–2(a)</external-xref>) is amended—</text> <subparagraph id="HD4FE56CE9C83484494FA3C721958747B"><enum>(A)</enum><text>in paragraph (5), by striking <quote>; and</quote> and inserting a semicolon;</text></subparagraph>
<subparagraph id="HEEB95383C94E439281C2019FE19BB905"><enum>(B)</enum><text>by redesignating paragraph (6) as paragraph (7); and</text></subparagraph> <subparagraph id="H29CD1B1853D1451A9E83F3DD2A7BC743"><enum>(C)</enum><text>by inserting after paragraph (5) the following new paragraph:</text>
<quoted-block display-inline="no-display-inline" id="H9C2F301576D5460C99695A0C5903BC98" style="OLC">
<paragraph id="HB8072B92C1E54298B3298BA778455971"><enum>(6)</enum><text display-inline="yes-display-inline">has adopted and is implementing procedures for requiring public water systems to assess options for consolidation or transfer of ownership or other actions in accordance with the regulations issued by the Administrator under section 1414(h)(6); and</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph> <paragraph id="H136074A25C5B44349EC0B338BCA316DB"><enum>(2)</enum><header>Conforming amendment</header><text>Section 1413(b)(1) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300g-2">42 U.S.C. 300g–2(b)(1)</external-xref>) is amended by striking <quote>of paragraphs (1), (2), (3), and (4)</quote>.</text></paragraph></subsection></section>
<section commented="no" id="H450A342BEEA0423CB35D7405153C6219"><enum>2011.</enum><header>Improved accuracy and availability of compliance monitoring data</header><text display-inline="no-display-inline">Section 1414 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300g-3">42 U.S.C. 300g–3</external-xref>) is amended by adding at the end the following new subsection:</text> <quoted-block display-inline="no-display-inline" id="HEBD1BB16F9CB4481BCDA18A5E9904C5E" style="OLC"> <subsection commented="no" id="H2AEAE44DBB904BD7B5489ADC94F7FD0D"><enum>(j)</enum><header>Improved accuracy and availability of compliance monitoring data</header> <paragraph commented="no" id="H102907418CEE42ABACFC5D1663E2298E"><enum>(1)</enum><header>Strategic plan</header><text display-inline="yes-display-inline">Not later than 1 year after the date of enactment of this subsection, the Administrator, in coordination with States (including States without primary enforcement responsibility under section 1413), public water systems, and other interested stakeholders, shall develop and provide to Congress a strategic plan for improving the accuracy and availability of monitoring data collected to demonstrate compliance with national primary drinking water regulations and submitted—</text>
<subparagraph commented="no" id="HD1C443E9D8924893A2244E6A2C3DFB39"><enum>(A)</enum><text display-inline="yes-display-inline">by public water systems to States; or</text></subparagraph> <subparagraph commented="no" id="HA117E25AC4CF4BABA21B1A858EA7136C"><enum>(B)</enum><text display-inline="yes-display-inline">by States to the Administrator.</text></subparagraph></paragraph>
<paragraph commented="no" id="HF58A7E93256141C19DE010BA3018B0D3"><enum>(2)</enum><header>Evaluation</header><text display-inline="yes-display-inline">In developing the strategic plan under paragraph (1), the Administrator shall evaluate any challenges faced—</text> <subparagraph commented="no" id="H51EE3E142CBE42F0847AF9243F0E6B86"><enum>(A)</enum><text display-inline="yes-display-inline">in ensuring the accuracy and integrity of submitted data described in paragraph (1);</text></subparagraph>
<subparagraph id="HFD2C0B30623D400996E9D8A389E31D4A"><enum>(B)</enum><text display-inline="yes-display-inline">by States and public water systems in implementing an electronic system for submitting such data, including the technical and economic feasibility of implementing such a system; and</text></subparagraph> <subparagraph id="HEA30DBD8759D4DC8B02EE9F5CCEE3B87"><enum>(C)</enum><text>by users of such electronic systems in being able to access such data.</text></subparagraph></paragraph>
<paragraph commented="no" id="H08AFCE369A824B28B35C2B53BB4722A4"><enum>(3)</enum><header>Findings and recommendations</header><text display-inline="yes-display-inline">The Administrator shall include in the strategic plan provided to Congress under paragraph (1)—</text> <subparagraph commented="no" id="HC12692D011B94456BBCD7C6B3E6C3064"><enum>(A)</enum><text display-inline="yes-display-inline">a summary of the findings of the evaluation under paragraph (2); and</text></subparagraph>
<subparagraph commented="no" id="HE7D843F2B0AD4BFB985D89C97E1861E1"><enum>(B)</enum><text>recommendations on practicable, cost-effective methods and means that can be employed to improve the accuracy and availability of submitted data described in paragraph (1).</text></subparagraph></paragraph> <paragraph commented="no" id="HA4237F740C614BBBAE3DCBB550B0AB64"><enum>(4)</enum><header>Consultation</header><text display-inline="yes-display-inline">In developing the strategic plan under paragraph (1), the Administrator may, as appropriate, consult with States or other Federal agencies that have experience using practicable methods and means to improve the accuracy and availability of submitted data described in such paragraph.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></section>
<section commented="no" id="H723D4C7C16DA40B698182075C061B9AD"><enum>2012.</enum><header>Asset management</header><text display-inline="no-display-inline">Section 1420 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300g-9">42 U.S.C. 300g–9</external-xref>) is amended—</text> <paragraph commented="no" id="H95CE8EA1567A4AA697377E4476E0B069"><enum>(1)</enum><text>in subsection (c)(2)—</text>
<subparagraph id="H535679877EB0426EBC790AFCD927F52A"><enum>(A)</enum><text>in subparagraph (D), by striking <quote>; and</quote> and inserting a semicolon;</text></subparagraph> <subparagraph id="H06263B88C6E7480DA94C99825FE589C2"><enum>(B)</enum><text>in subparagraph (E), by striking the period at the end and inserting <quote>; and</quote>; and</text></subparagraph>
<subparagraph id="HCACC4F8386314DCDA0781ED097A5C236"><enum>(C)</enum><text>by adding at the end the following new subparagraph:</text> <quoted-block display-inline="no-display-inline" id="H84120369DCFC4CB6BA4CD0834A9AA46A" style="OLC"> <subparagraph commented="no" id="HC22B39B146F447B5B42EA5C3AE54D0E7"><enum>(F)</enum><text display-inline="yes-display-inline">a description of how the State will, as appropriate—</text>
<clause commented="no" id="H862359F55D51448CB3A87249C8118C59"><enum>(i)</enum><text>encourage development by public water systems of asset management plans that include best practices for asset management; and</text></clause> <clause commented="no" id="H04467570683942B98144F390EF452C4B"><enum>(ii)</enum><text>assist, including through the provision of technical assistance, public water systems in training operators or other relevant and appropriate persons in implementing such asset management plans.</text></clause></subparagraph><after-quoted-block>; </after-quoted-block></quoted-block></subparagraph></paragraph>
<paragraph commented="no" id="HD1CCA5362F0046E2A3A9A70A4B5BB99D"><enum>(2)</enum><text>in subsection (c)(3), by inserting <quote>, including efforts of the State to encourage development by public water systems of asset management plans and to assist public water systems in training relevant and appropriate persons in implementing such asset management plans</quote> after <quote>public water systems in the State</quote>; and</text></paragraph> <paragraph commented="no" id="HB5E409E9707B4E939A0CF9B236B57334"><enum>(3)</enum><text>in subsection (d), by adding at the end the following new paragraph:</text>
<quoted-block display-inline="no-display-inline" id="HFB284B0328BD4C91A2BF9569F115A69B" style="OLC">
<paragraph commented="no" id="HFD0C82E572DC4AE1AA32241AD6A55C22"><enum>(5)</enum><header>Information on asset management practices</header><text display-inline="yes-display-inline">Not later than 5 years after the date of enactment of this paragraph, and not less often than every 5 years thereafter, the Administrator shall review and, if appropriate, update educational materials, including handbooks, training materials, and technical information, made available by the Administrator to owners, managers, and operators of public water systems, local officials, technical assistance providers (including nonprofit water associations), and State personnel concerning best practices for asset management strategies that may be used by public water systems.</text></paragraph><after-quoted-block>. </after-quoted-block></quoted-block></paragraph></section> <section id="HA97A54F8197D4FA881D1D4658E4D0E90" display-inline="no-display-inline" section-type="subsequent-section"><enum>2013.</enum><header>Community water system risk and resilience</header> <subsection id="H0CAA7C00E1134CF587E8772B257A3C4C"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Section 1433 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300i-2">42 U.S.C. 300i–2</external-xref>) is amended to read as follows:</text>
<quoted-block display-inline="no-display-inline" id="H86F76204C0494E3590AA110BE2C27293" style="OLC">
<section id="H34584F3221F745CFBA3968BC459E0E29"><enum>1433.</enum><header>Community water system risk and resilience</header>
<subsection id="HA0341900E7FB45C691C49366718629DC"><enum>(a)</enum><header>Risk and resilience assessments</header>
<paragraph id="H51056364B12A44C2B81B0AA39BE80AFA"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">Each community water system serving a population of greater than 3,300 persons shall conduct an assessment of the risks to, and resilience of, its system. Such an assessment—</text> <subparagraph id="H57874AED4B0D4BB980DEFE700032813E"><enum>(A)</enum><text>shall include an assessment of—</text>
<clause id="HB261D44FA38446D8A5B99D262A3CBC67"><enum>(i)</enum><text>the risk to the system from malevolent acts and natural hazards;</text></clause> <clause id="H9F47EF5E7CB448B6B4A841A6A7CA3DBE"><enum>(ii)</enum><text>the resilience of the pipes and constructed conveyances, physical barriers, source water, water collection and intake, pretreatment, treatment, storage and distribution facilities, electronic, computer, or other automated systems (including the security of such systems) which are utilized by the system;</text></clause>
<clause id="HA38B6164F8FA42718C50000E093A6430"><enum>(iii)</enum><text>the monitoring practices of the system;</text></clause> <clause id="H9C1943F4175041F3B1338343FF89CABA"><enum>(iv)</enum><text>the financial infrastructure of the system;</text></clause>
<clause id="H6EDA746B84414A4AB9111F5B6589CF27"><enum>(v)</enum><text>the use, storage, or handling of various chemicals by the system; and</text></clause> <clause id="H684CD0C6175E4C6BBA3A8842859FD970"><enum>(vi)</enum><text>the operation and maintenance of the system; and</text></clause></subparagraph>
<subparagraph id="HEB1B09E875514E19A4F9D621B492DE13"><enum>(B)</enum><text>may include an evaluation of capital and operational needs for risk and resilience management for the system.</text></subparagraph></paragraph> <paragraph id="H718E9B454F77449881A6E1BB68E7525D"><enum>(2)</enum><header>Baseline information</header><text display-inline="yes-display-inline">The Administrator, not later than August 1, 2019, after consultation with appropriate departments and agencies of the Federal Government and with State and local governments, shall provide baseline information on malevolent acts of relevance to community water systems, which shall include consideration of acts that may—</text>
<subparagraph id="HCC66B6E001CE44C084D3D1903A86F24A"><enum>(A)</enum><text>substantially disrupt the ability of the system to provide a safe and reliable supply of drinking water; or</text></subparagraph> <subparagraph id="H47ED4F19601C47C59F434B830D64FC8F"><enum>(B)</enum><text>otherwise present significant public health or economic concerns to the community served by the system.</text></subparagraph></paragraph>
<paragraph id="H39166AE9C2704CDDBE7FBF0C55FDE717"><enum>(3)</enum><header>Certification</header>
<subparagraph id="H4F04EA40A5B748D49938C5BD7CA7F385"><enum>(A)</enum><header>Certification</header><text>Each community water system described in paragraph (1) shall submit to the Administrator a certification that the system has conducted an assessment complying with paragraph (1). Such certification shall be made prior to—</text> <clause id="H4AA88055CD6A416C94642160893222DF"><enum>(i)</enum><text>March 31, 2020, in the case of systems serving a population of 100,000 or more;</text></clause>
<clause id="HCA45C53EA09C4DD28D5771BD2C577544"><enum>(ii)</enum><text>December 31, 2020, in the case of systems serving a population of 50,000 or more but less than 100,000; and</text></clause> <clause id="HB261D5ADF5D2402ABAD23413D75B473B"><enum>(iii)</enum><text>June 30, 2021, in the case of systems serving a population greater than 3,300 but less than 50,000.</text></clause></subparagraph>
<subparagraph id="H0DE34F2F4FC44EE781F0D94C75BD9955"><enum>(B)</enum><header>Review and revision</header><text display-inline="yes-display-inline">Each community water system described in paragraph (1) shall review the assessment of such system conducted under such paragraph at least once every 5 years after the applicable deadline for submission of its certification under subparagraph (A) to determine whether such assessment should be revised. Upon completion of such a review, the community water system shall submit to the Administrator a certification that the system has reviewed its assessment and, if applicable, revised such assessment.</text></subparagraph></paragraph> <paragraph commented="no" id="HA177429C2FA643C28F45CBFD6454C0E2"><enum>(4)</enum><header>Contents of certifications</header><text>A certification required under paragraph (3) shall contain only—</text>
<subparagraph id="HE9CB48DEF37D4194A56541DD149EA188"><enum>(A)</enum><text>information that identifies the community water system submitting the certification;</text></subparagraph> <subparagraph id="HDEB7C5FD0E874676BA5714BE035C050B"><enum>(B)</enum><text>the date of the certification; and</text></subparagraph>
<subparagraph id="H0D8C4A20F94E445FBE668EBD5998C4AB"><enum>(C)</enum><text>a statement that the community water system has conducted, reviewed, or revised the assessment, as applicable.</text></subparagraph></paragraph> <paragraph id="H458EF0DBC9CD4A2CB4F5324F4CD65308"><enum>(5)</enum><header>Provision to other entities</header><text>No community water system shall be required under State or local law to provide an assessment described in this section (or revision thereof) to any State, regional, or local governmental entity solely by reason of the requirement set forth in paragraph (3) that the system submit a certification to the Administrator.</text></paragraph></subsection>
<subsection id="H199E8D9311934C69BB55BB6EE14826F6"><enum>(b)</enum><header>Emergency response plan</header><text display-inline="yes-display-inline">Each community water system serving a population greater than 3,300 shall prepare or revise, where necessary, an emergency response plan that incorporates findings of the assessment conducted under subsection (a) for such system (and any revisions thereto). Each community water system shall certify to the Administrator, as soon as reasonably possible after the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title>, but not later than 6 months after completion of the assessment under subsection (a), that the system has completed such plan. The emergency response plan shall include—</text> <paragraph id="H7F17C2839B9A41348B55928583C5CABD"><enum>(1)</enum><text>strategies and resources to improve the resilience of the system, including the physical security and cybersecurity of the system;</text></paragraph>
<paragraph id="HB952CB9551784301AB549BDB413F276D"><enum>(2)</enum><text>plans and procedures that can be implemented, and identification of equipment that can be utilized, in the event of a malevolent act or natural hazard that threatens the ability of the community water system to deliver safe drinking water;</text></paragraph> <paragraph id="HBA5D900C56E945C1A671048400241E7F"><enum>(3)</enum><text>actions, procedures, and equipment which can obviate or significantly lessen the impact of a malevolent act or natural hazard on the public health and the safety and supply of drinking water provided to communities and individuals, including the development of alternative source water options, relocation of water intakes, and construction of flood protection barriers; and</text></paragraph>
<paragraph id="HFE153748EE4E4ADEB68FB21D7C542B3C"><enum>(4)</enum><text>strategies that can be used to aid in the detection of malevolent acts or natural hazards that threaten the security or resilience of the system.</text></paragraph></subsection> <subsection id="H5F1EFE28FA454EFE878C8AEF9D5DB219"><enum>(c)</enum><header>Coordination</header><text display-inline="yes-display-inline">Community water systems shall, to the extent possible, coordinate with existing local emergency planning committees established pursuant to the Emergency Planning and Community Right-To-Know Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/42/11001">42 U.S.C. 11001</external-xref> et seq.) when preparing or revising an assessment or emergency response plan under this section.</text></subsection>
<subsection id="HAF9902BA7D3C4D32B8D91DA8C132AA04"><enum>(d)</enum><header>Record maintenance</header><text>Each community water system shall maintain a copy of the assessment conducted under subsection (a) and the emergency response plan prepared under subsection (b) (including any revised assessment or plan) for 5 years after the date on which a certification of such assessment or plan is submitted to the Administrator under this section.</text></subsection> <subsection id="HFABFAF89C9D8441DB6F71E523A931B04"><enum>(e)</enum><header>Guidance to small public water systems</header><text>The Administrator shall provide guidance and technical assistance to community water systems serving a population of less than 3,300 persons on how to conduct resilience assessments, prepare emergency response plans, and address threats from malevolent acts and natural hazards that threaten to disrupt the provision of safe drinking water or significantly affect the public health or significantly affect the safety or supply of drinking water provided to communities and individuals.</text></subsection>
<subsection id="H5E171CA24C3A4C65BCE1A6436282CDE0"><enum>(f)</enum><header>Alternative preparedness and operational resilience programs</header>
<paragraph id="H295C738D123543C28F3489983CF22DC8"><enum>(1)</enum><header>Satisfaction of requirement</header><text display-inline="yes-display-inline">A community water system that is required to comply with the requirements of subsections (a) and (b) may satisfy such requirements by—</text> <subparagraph id="HC5DBF10190B144779C5A17F5A71BB6BC"><enum>(A)</enum><text>using and complying with technical standards that the Administrator has recognized under paragraph (2); and</text></subparagraph>
<subparagraph id="HD7B6F861BFFF45A592AB2EF8474E3172"><enum>(B)</enum><text>submitting to the Administrator a certification that the community water system is complying with subparagraph (A).</text></subparagraph></paragraph> <paragraph id="H4354E10E310E44B0A7B3473F1898F566"><enum>(2)</enum><header>Authority to recognize</header><text>Consistent with section 12(d) of the National Technology Transfer and Advancement Act of 1995, the Administrator shall recognize technical standards that are developed or adopted by third-party organizations or voluntary consensus standards bodies that carry out the objectives or activities required by this section as a means of satisfying the requirements under subsection (a) or (b).</text></paragraph></subsection>
<subsection id="H4C872625072841B798F2E528515233EA"><enum>(g)</enum><header>Technical assistance and grants</header>
<paragraph id="H8D88A016886E44C88E4BDBAD4534A841"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">The Administrator shall establish and implement a program, to be known as the Drinking Water Infrastructure Risk and Resilience Program, under which the Administrator may award grants in each of fiscal years 2020 and 2021 to owners or operators of community water systems for the purpose of increasing the resilience of such community water systems.</text></paragraph> <paragraph id="H32B1E85EEE0F43848A5B19E96FBC0D55"><enum>(2)</enum><header>Use of funds</header><text display-inline="yes-display-inline">As a condition on receipt of a grant under this section, an owner or operator of a community water system shall agree to use the grant funds exclusively to assist in the planning, design, construction, or implementation of a program or project consistent with an emergency response plan prepared pursuant to subsection (b), which may include—</text>
<subparagraph id="H831478061C1A473184459847F1CA8C7A"><enum>(A)</enum><text display-inline="yes-display-inline">the purchase and installation of equipment for detection of drinking water contaminants or malevolent acts;</text></subparagraph> <subparagraph id="HE68781E585F44F4D9CE3AE48F57ECA05"><enum>(B)</enum><text>the purchase and installation of fencing, gating, lighting, or security cameras;</text></subparagraph>
<subparagraph id="H9A27E3493E684590B78DA4C314E328FE"><enum>(C)</enum><text>the tamper-proofing of manhole covers, fire hydrants, and valve boxes;</text></subparagraph> <subparagraph id="HD9B59DE68E6F464BA7EBA626FBAF1FDD"><enum>(D)</enum><text>the purchase and installation of improved treatment technologies and equipment to improve the resilience of the system;</text></subparagraph>
<subparagraph id="HB42F17188F9F4B29B133EE611DC0BEE0"><enum>(E)</enum><text>improvements to electronic, computer, financial, or other automated systems and remote systems;</text></subparagraph> <subparagraph id="H28E56B75568C45F587D87BB19C431E36"><enum>(F)</enum><text>participation in training programs, and the purchase of training manuals and guidance materials, relating to security and resilience;</text></subparagraph>
<subparagraph id="HE35AC35B2C494C02B6697215E30470B1"><enum>(G)</enum><text>improvements in the use, storage, or handling of chemicals by the community water system;</text></subparagraph> <subparagraph id="H3FA00A2A0B7C44E2BC2B70C6881F4BF2"><enum>(H)</enum><text>security screening of employees or contractor support services;</text></subparagraph>
<subparagraph id="HE36022B8D0F74E3B953F95A893AFE40E"><enum>(I)</enum><text>equipment necessary to support emergency power or water supply, including standby and mobile sources; and</text></subparagraph> <subparagraph id="H946834FD4D82460CBDC9AB5F804880AE"><enum>(J)</enum><text>the development of alternative source water options, relocation of water intakes, and construction of flood protection barriers.</text></subparagraph></paragraph>
<paragraph id="HFD11898C90D3427FAF6DE78EC296CF92"><enum>(3)</enum><header>Exclusions</header><text display-inline="yes-display-inline">A grant under this subsection may not be used for personnel costs, or for monitoring, operation, or maintenance of facilities, equipment, or systems.</text></paragraph> <paragraph id="HC8FD44FA88554FA191CEABEE4181DC9B"><enum>(4)</enum><header>Technical assistance</header><text display-inline="yes-display-inline">For each fiscal year, the Administrator may use not more than $5,000,000 from the funds made available to carry out this subsection to provide technical assistance to community water systems to assist in responding to and alleviating a vulnerability that would substantially disrupt the ability of the system to provide a safe and reliable supply of drinking water (including sources of water for such systems) which the Administrator determines to present an immediate and urgent need.</text></paragraph>
<paragraph id="H8666D395A9774E0584932581FAEB135F"><enum>(5)</enum><header>Grants for small systems</header><text display-inline="yes-display-inline">For each fiscal year, the Administrator may use not more than $10,000,000 from the funds made available to carry out this subsection to make grants to community water systems serving a population of less than 3,300 persons, or nonprofit organizations receiving assistance under section 1442(e), for activities and projects undertaken in accordance with the guidance provided to such systems under subsection (e) of this section.</text></paragraph> <paragraph id="H9DEB917D76454BF49373CC7BC604A720"><enum>(6)</enum><header>Authorization of appropriations</header><text>To carry out this subsection, there are authorized to be appropriated $25,000,000 for each of fiscal years 2020 and 2021.</text></paragraph></subsection>
<subsection id="H58E041E3A9784769940A498CE1C94997"><enum>(h)</enum><header>Definitions</header><text display-inline="yes-display-inline">In this section—</text> <paragraph id="H64E013F0DCE6404FAEEAE4C5B544A664"><enum>(1)</enum><text>the term <term>resilience</term> means the ability of a community water system or an asset of a community water system to adapt to or withstand the effects of a malevolent act or natural hazard without interruption to the asset’s or system’s function, or if the function is interrupted, to rapidly return to a normal operating condition; and</text></paragraph>
<paragraph id="H501984CD9D54456291B4D51A9C60B3A6"><enum>(2)</enum><text>the term <term>natural hazard</term> means a natural event that threatens the functioning of a community water system, including an earthquake, tornado, flood, hurricane, wildfire, and hydrologic changes.</text></paragraph></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></subsection> <subsection id="H6E5C34D0491845689787CC5713C9060E"><enum>(b)</enum><header>Sensitive information</header> <paragraph id="H19FE3A3C0C8D42A2B8003B9458F2E7B6"><enum>(1)</enum><header>Protection from disclosure</header><text>Information submitted to the Administrator of the Environmental Protection Agency pursuant to section 1433 of the Safe Drinking Water Act, as in effect on the day before the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title>, shall be protected from disclosure in accordance with the provisions of such section as in effect on such day.</text></paragraph>
<paragraph id="HEC0D79D102F549DEA16AB6D46278C0CF"><enum>(2)</enum><header>Disposal</header><text>The Administrator, in partnership with community water systems (as defined in section 1401 of the Safe Drinking Water Act), shall develop a strategy to, in a timeframe determined appropriate by the Administrator, securely and permanently dispose of, or return to the applicable community water system, any information described in paragraph (1).</text></paragraph></subsection></section> <section id="H0B05BBC058334CA3A4651E695CC19C5C"><enum>2014.</enum><header>Authorization for grants for State programs</header><text display-inline="no-display-inline">Section 1443(a)(7) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-2">42 U.S.C. 300j–2(a)(7)</external-xref>) is amended by striking <quote>$100,000,000 for each of fiscal years 1997 through 2003</quote> and inserting <quote>$125,000,000 for each of fiscal years 2020 and 2021</quote>.</text></section>
<section id="H35366427C3E94C76A7F77CF97536BCA6" display-inline="no-display-inline" commented="no"><enum>2015.</enum><header>State revolving loan funds</header>
<subsection commented="no" id="H1D95F7EFA6374FC4B519F4DC6AC4791D"><enum>(a)</enum><header>Use of funds</header><text>Section 1452(a)(2)(B) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(a)(2)(B)</external-xref>) is amended by striking <quote>(including expenditures for planning, design, and associated preconstruction activities, including activities relating to the siting of the facility, but not</quote> and inserting <quote>(including expenditures for planning, design, siting, and associated preconstruction activities, or for replacing or rehabilitating aging treatment, storage, or distribution facilities of public water systems, but not</quote>.</text></subsection> <subsection id="H7CF7F6108FB54E2BAE08C558BE4BB1CF" commented="no"><enum>(b)</enum><header>Prevailing wages</header><text display-inline="yes-display-inline">Section 1452(a) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(a)</external-xref>) is further amended by adding at the end the following:</text>
<quoted-block display-inline="no-display-inline" id="HCC07FE03421A4905B605A876920858E6" style="OLC">
<paragraph id="HE0C390A5F7AF4321B7EE96366FD1EEE2" commented="no"><enum>(5)</enum><header>Prevailing wages</header><text display-inline="yes-display-inline">The requirements of section 1450(e) shall apply to any construction project carried out in whole or in part with assistance made available by a State loan fund.</text></paragraph><after-quoted-block>. </after-quoted-block></quoted-block></subsection> <subsection id="H43065471CE9D4F9E8F7EDB179F601CA1" commented="no"><enum>(c)</enum><header>Assistance for disadvantaged communities</header><text display-inline="yes-display-inline">Section 1452(d)(2) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(d)(2)</external-xref>) is amended to read as follows:</text>
<quoted-block display-inline="no-display-inline" id="H4EA1E41A456F42AFA9F1E98444B28F8A" style="OLC">
<paragraph id="H56B571FF0A30439889978E251AAA9A9A" commented="no"><enum>(2)</enum><header>Total amount of subsidies</header><text>For each fiscal year, of the amount of the capitalization grant received by the State for the year, the total amount of loan subsidies made by a State pursuant to paragraph (1)—</text> <subparagraph id="H6D07AD80DBD54C7A93ED79A67D9471FC" commented="no"><enum>(A)</enum><text>may not exceed 35 percent; and</text></subparagraph>
<subparagraph id="H948D31915F9C4C14852E1D32ACCE3547" commented="no"><enum>(B)</enum><text display-inline="yes-display-inline">to the extent that there are sufficient applications for loans to communities described in paragraph (1), may not be less than 6 percent.</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subsection> <subsection id="H01436818585B4071A0EFAF39651BB2BE" commented="no"><enum>(d)</enum><header>Types of assistance</header><text display-inline="yes-display-inline">Section 1452(f)(1) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(f)(1)</external-xref>) is amended—</text>
<paragraph id="H940DC3DA109649D8983F5DBEB5322ECB" commented="no"><enum>(1)</enum><text>by redesignating subparagraphs (C) and (D) as subparagraphs (D) and (E), respectively;</text></paragraph> <paragraph id="H0D9856D64E0049A5A17068A42754EF3E" commented="no"><enum>(2)</enum><text>by inserting after subparagraph (B) the following new subparagraph:</text>
<quoted-block display-inline="no-display-inline" id="H22A8C0530AD248DBB6C81BDC6187FFBA" style="OLC">
<subparagraph id="H0ADC6D8F74564FEEA61C63D56371F968" commented="no"><enum>(C)</enum><text display-inline="yes-display-inline">each loan will be fully amortized not later than 30 years after the completion of the project, except that in the case of a disadvantaged community (as defined in subsection (d)(3)) a State may provide an extended term for a loan, if the extended term—</text> <clause id="H73E2D858F9664841938A8AC7A599D083" commented="no"><enum>(i)</enum><text>terminates not later than the date that is 40 years after the date of project completion; and</text></clause>
<clause id="H2E97E3585BE2452398F53CFCAA1B509C" commented="no"><enum>(ii)</enum><text>does not exceed the expected design life of the project;</text></clause></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph> <paragraph id="H7B0EE78F41794949B73DACCF180E93ED" commented="no"><enum>(3)</enum><text>in subparagraph (B), by striking <quote>1 year after completion of the project for which the loan was made</quote> and all that follows through <quote>design life of the project;</quote> and inserting <quote>18 months after completion of the project for which the loan was made;</quote>.</text></paragraph></subsection>
<subsection id="H509CE59FA21F4E47AF398A68F1C43043" commented="no"><enum>(e)</enum><header>Needs survey</header><text display-inline="yes-display-inline">Section 1452(h) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(h)</external-xref>) is amended—</text> <paragraph id="HECEF0B425CD64CF3AA1706552D1EF1D6" commented="no"><enum>(1)</enum><text>by striking <quote>The Administrator </quote> and inserting <quote>(1) The Administrator</quote>; and</text></paragraph>
<paragraph id="HF703991FDFD242CD81E0B7C019B436FD" commented="no"><enum>(2)</enum><text>by adding at the end the following new paragraph:</text> <quoted-block display-inline="no-display-inline" id="H10B718F10D05489E9E4FCC4C35B78182" style="OLC"> <paragraph id="H77336F49BBA545B78A93ECD67E4A9079" indent="up1" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">Any assessment conducted under paragraph (1) after the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title> shall include an assessment of costs to replace all lead service lines (as defined in section 1459B(a)(4)) of all eligible public water systems in the United States, and such assessment shall describe separately the costs associated with replacing the portions of such lead service lines that are owned by an eligible public water system and the costs associated with replacing any remaining portions of such lead service lines, to the extent practicable.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection>
<subsection commented="no" display-inline="no-display-inline" id="H4ECA1E50F09E4B68A19D8DC0A3891248"><enum>(f)</enum><header display-inline="yes-display-inline">Other authorized activities</header><text>Section 1452(k)(1)(C) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(k)(1)(C)</external-xref>) is amended by striking <quote>for fiscal years 1996 and 1997 to delineate and assess source water protection areas in accordance with section 1453</quote> and inserting <quote>to delineate, assess, and update assessments for source water protection areas in accordance with section 1453</quote>.</text></subsection> <subsection commented="no" id="H6B0DEE714A7D49368A89E57CDB812346"><enum>(g)</enum><header>Best practices for administration of State revolving loan funds</header><text>Section 1452 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12</external-xref>) is amended by adding after subsection (r) the following:</text>
<quoted-block display-inline="no-display-inline" id="H4EB2B8A8A4394255A8E815E444D2DC4E" style="OLC">
<subsection commented="no" id="H16FAC7DAD2614ABD8D21DCCDF0E1D107"><enum>(s)</enum><header>Best practices for State loan fund administration</header><text display-inline="yes-display-inline">The Administrator shall—</text> <paragraph commented="no" id="H9E663FBFC10B4C03BC6B731AB5D7BD3C"><enum>(1)</enum><text>collect information from States on administration of State loan funds established pursuant to subsection (a)(1), including—</text>
<subparagraph commented="no" id="HC3F1B425A0214D4194E1CC99AF81271F"><enum>(A)</enum><text>efforts to streamline the process for applying for assistance through such State loan funds;</text></subparagraph> <subparagraph commented="no" id="H1E73AC2018254B9E80D156421796DBCC"><enum>(B)</enum><text>programs in place to assist with the completion of applications for assistance through such State loan funds;</text></subparagraph>
<subparagraph commented="no" id="H7BE8B806C0CF4A6A8AA94D0D5F313956"><enum>(C)</enum><text>incentives provided to public water systems that partner with small public water systems to assist with the application process for assistance through such State loan funds;</text></subparagraph> <subparagraph commented="no" id="H0DB2A344EAF34C288FED7B1B9E554AA2"><enum>(D)</enum><text display-inline="yes-display-inline">practices to ensure that amounts in such State loan funds are used to provide loans, loan guarantees, or other authorized assistance in a timely fashion;</text></subparagraph>
<subparagraph commented="no" id="H8571ED1865764D14891318C55AA53434"><enum>(E)</enum><text display-inline="yes-display-inline">practices that support effective management of such State loan funds;</text></subparagraph> <subparagraph commented="no" id="HC6A9EE626DEA4F2DBA31F93DF9357EC7"><enum>(F)</enum><text display-inline="yes-display-inline">practices and tools to enhance financial management of such State loan funds; and</text></subparagraph>
<subparagraph commented="no" id="HBF2E40910128475B83D2B08E6AC0238C"><enum>(G)</enum><text display-inline="yes-display-inline">key financial measures for use in evaluating State loan fund operations, including—</text> <clause commented="no" id="H2CEB4384E312415C87819655D77E4D7F"><enum>(i)</enum><text>measures of lending capacity, such as current assets and current liabilities or undisbursed loan assistance liability; and</text></clause>
<clause commented="no" id="H7740A88B436249E6A887F850B80B414A"><enum>(ii)</enum><text>measures of growth or sustainability, such as return on net interest;</text></clause></subparagraph></paragraph> <paragraph commented="no" id="HA119C64F2C6A43958E25054537F40832"><enum>(2)</enum><text display-inline="yes-display-inline">not later than 3 years after the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title>, disseminate to the States best practices for administration of such State loan funds, based on the information collected pursuant to this subsection; and</text></paragraph>
<paragraph commented="no" id="H2E1F19C878344650AA3C92DD66DC13CD"><enum>(3)</enum><text>periodically update such best practices, as appropriate.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></subsection></section> <section id="H03D2D708DB91449BA6DD6038DA5222D8" display-inline="no-display-inline"><enum>2016.</enum><header>Authorization for source water petition programs</header><text display-inline="no-display-inline">Section 1454(e) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-14">42 U.S.C. 300j–14(e)</external-xref>) is amended by striking <quote>1997 through 2003</quote> and inserting <quote>2020 through 2021</quote>.</text></section>
<section commented="no" id="H97A58FEE50BA43A480485781B7A90CE5" display-inline="no-display-inline"><enum>2017.</enum><header>Review of technologies</header><text display-inline="no-display-inline">Part E of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j">42 U.S.C. 300j</external-xref> et seq.) is further amended by adding at the end the following new section:</text> <quoted-block display-inline="no-display-inline" id="HCC804AC5DF8049ABACA51C46F94DDD66" style="OLC"> <section commented="no" id="H4AFFD07A117D47BDAB877DC64A883076"><enum>1459D.</enum><header>Review of technologies</header> <subsection commented="no" id="H64E0BC1305FD471D8FEC4CE0FDB1F8F1"><enum>(a)</enum><header>Review</header><text display-inline="yes-display-inline">The Administrator, after consultation with appropriate departments and agencies of the Federal Government and with State and local governments, shall review (or enter into contracts or cooperative agreements to provide for a review of) existing and potential methods, means, equipment, and technologies (including review of cost, availability, and efficacy of such methods, means, equipment, and technologies) that—</text>
<paragraph commented="no" id="HC1BBB702E6314EE59C480E5E56DA41E9"><enum>(1)</enum><text display-inline="yes-display-inline">ensure the physical integrity of community water systems;</text></paragraph> <paragraph commented="no" id="H92977B4CAE0440BD99D7623D81563812"><enum>(2)</enum><text display-inline="yes-display-inline">prevent, detect, and respond to any contaminant for which a national primary drinking water regulation has been promulgated in community water systems and source water for community water systems;</text></paragraph>
<paragraph commented="no" id="HD7264214DC1D45BC9B4B116E836E3C44"><enum>(3)</enum><text display-inline="yes-display-inline">allow for use of alternate drinking water supplies from nontraditional sources; and</text></paragraph> <paragraph commented="no" id="H1DD08E3C47EC4055BE02094C5432DAB9"><enum>(4)</enum><text display-inline="yes-display-inline">facilitate source water assessment and protection.</text></paragraph></subsection>
<subsection commented="no" id="H011F9476B0DB489D9243D6BB24A9E235"><enum>(b)</enum><header>Inclusions</header><text display-inline="yes-display-inline">The review under subsection (a) shall include review of methods, means, equipment, and technologies—</text> <paragraph commented="no" id="H675A7F6EB7424616BAEBB1E9677D9381"><enum>(1)</enum><text display-inline="yes-display-inline">that are used for corrosion protection, metering, leak detection, or protection against water loss;</text></paragraph>
<paragraph commented="no" id="HFEF9DCE94995411F8992CCF3ED73F499"><enum>(2)</enum><text>that are intelligent systems, including hardware, software, or other technology, used to assist in protection and detection described in paragraph (1);</text></paragraph> <paragraph commented="no" id="H93FADE76B4684EC5B95D7C813EB1337A"><enum>(3)</enum><text>that are point-of-use devices or point-of-entry devices;</text></paragraph>
<paragraph commented="no" id="H571BB7408EAB41BE91E85475A49B03AF"><enum>(4)</enum><text>that are physical or electronic systems that monitor, or assist in monitoring, contaminants in drinking water in real-time; and</text></paragraph> <paragraph commented="no" id="HF8054BAF746E497490330B9E6A8653EE"><enum>(5)</enum><text display-inline="yes-display-inline">that allow for the use of nontraditional sources for drinking water, including physical separation and chemical and biological transformation technologies.</text></paragraph></subsection>
<subsection commented="no" id="H92972443B4C94FD2970C6D47D6D246B4"><enum>(c)</enum><header>Availability</header><text display-inline="yes-display-inline">The Administrator shall make the results of the review under subsection (a) available to the public.</text></subsection> <subsection commented="no" id="HEBDD26E3594F436482A59A69A5A40D4F"><enum>(d)</enum><header>Authorization of appropriations</header><text display-inline="yes-display-inline">There is authorized to be appropriated to the Administrator to carry out this section $10,000,000 for fiscal year 2019, which shall remain available until expended.</text></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></section>
<section commented="no" id="H42D1725123474BECB2BF9A12FD60AF06" display-inline="no-display-inline"><enum>2018.</enum><header>Source water</header>
<subsection commented="no" id="HA3D681BFEB4B4A599AE569FCF3ED554E"><enum>(a)</enum><header>Addressing source water used for drinking water</header><text display-inline="yes-display-inline">Section 304 of the <short-title>Emergency Planning and Community Right-To-Know Act of 1986</short-title> (<external-xref legal-doc="usc" parsable-cite="usc/42/11004">42 U.S.C. 11004</external-xref>) is amended—</text> <paragraph commented="no" id="HD871D119C49848E5A662F6667FC613C0"><enum>(1)</enum><text>in subsection (b)(1), by striking <quote>State emergency planning commission</quote> and inserting <quote>State emergency response commission</quote>; and</text></paragraph>
<paragraph commented="no" id="H0F2109817C044BCE996557D1895601AC"><enum>(2)</enum><text>by adding at the end the following new subsection:</text> <quoted-block display-inline="no-display-inline" id="H99524E92667043BF8D17693D49E4E25C" style="OLC"> <subsection commented="no" id="H4E20F62929324C569A17A63468CDA3EB"><enum>(e)</enum><header>Addressing source water used for drinking water</header> <paragraph commented="no" id="H733D840CB6994DE9AEF18F16978184AC"><enum>(1)</enum><header>Applicable State agency notification</header><text display-inline="yes-display-inline">A State emergency response commission shall—</text>
<subparagraph id="HFB83DAA59FB643E599D7FD0D0A2417C2"><enum>(A)</enum><text display-inline="yes-display-inline">promptly notify the applicable State agency of any release that requires notice under subsection (a);</text></subparagraph> <subparagraph id="HBC4210E1D29947B6ACF0FDCBD77919D4"><enum>(B)</enum><text display-inline="yes-display-inline">provide to the applicable State agency the information identified in subsection (b)(2); and</text></subparagraph>
<subparagraph id="HFD34E4E4E58643D7B5D5EFB7DE4DC196"><enum>(C)</enum><text>provide to the applicable State agency a written followup emergency notice in accordance with subsection (c).</text></subparagraph></paragraph> <paragraph id="H3A5187068884463F93EA0A4D25998707"><enum>(2)</enum><header>Community water system notification</header> <subparagraph id="HEB04D87453584D0D9329912CCEB719D1"><enum>(A)</enum><header>In general</header><text>An applicable State agency receiving notice of a release under paragraph (1) shall—</text>
<clause commented="no" id="HA1087B3712B545639E2B0B26EC1C1639"><enum>(i)</enum><text>promptly forward such notice to any community water system the source waters of which are affected by the release;</text></clause> <clause id="HB4C8E596170241929E073B503BBB4A46"><enum>(ii)</enum><text>forward to the community water system the information provided under paragraph (1)(B); and</text></clause>
<clause commented="no" id="H4527F87A9DFF40E49A8072E6D08CCAF8"><enum>(iii)</enum><text display-inline="yes-display-inline">forward to the community water system the written followup emergency notice provided under paragraph (1)(C).</text></clause></subparagraph> <subparagraph id="H274ECF16CD3D41D390E919A3B8789174"><enum>(B)</enum><header>Direct notification</header><text display-inline="yes-display-inline">In the case of a State that does not have an applicable State agency, the State emergency response commission shall provide the notices and information described in paragraph (1) directly to any community water system the source waters of which are affected by a release that requires notice under subsection (a).</text></subparagraph></paragraph>
<paragraph commented="no" id="HC086BCFF74CC4CDB87F6769691859FF3"><enum>(3)</enum><header>Definitions</header><text>In this subsection:</text> <subparagraph commented="no" id="H6AB038413606432A846BD14357F0909E"><enum>(A)</enum><header>Community water system</header><text>The term <term>community water system</term> has the meaning given such term in section 1401(15) of the Safe Drinking Water Act.</text></subparagraph>
<subparagraph commented="no" id="HD34452B43A8040669D153286D5B685BD"><enum>(B)</enum><header>Applicable State agency</header><text display-inline="yes-display-inline">The term <term>applicable State agency</term> means the State agency that has primary responsibility to enforce the requirements of the Safe Drinking Water Act in the State.</text></subparagraph></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection> <subsection commented="no" id="H7866AE2F7B804B94B98D4FC38394CBA9"><enum>(b)</enum><header>Availability to community water systems</header><text display-inline="yes-display-inline">Section 312(e) of the <short-title>Emergency Planning and Community Right-To-Know Act of 1986</short-title> (<external-xref legal-doc="usc" parsable-cite="usc/42/11022">42 U.S.C. 11022(e)</external-xref>) is amended—</text>
<paragraph id="HB2683546550C41C2BEB6AEF14B845CE3"><enum>(1)</enum><text>in paragraph (1), by striking <quote>State emergency planning commission</quote> and inserting <quote>State emergency response commission</quote>; and</text></paragraph> <paragraph id="H8D495944CD4B4BCEA5CC0FD5A17F5ED1"><enum>(2)</enum><text>by adding at the end the following new paragraph:</text>
<quoted-block display-inline="no-display-inline" id="H55A6B000670F418286A9B1083E859236" style="OLC">
<paragraph commented="no" id="H29735FDD5D50436F879B0A8EFE13A988"><enum>(4)</enum><header>Availability to community water systems</header>
<subparagraph commented="no" id="HC20ED146AD5A41B2858561893CFA12F2"><enum>(A)</enum><header>In general</header><text display-inline="yes-display-inline">An affected community water system may have access to tier II information by submitting a request to the State emergency response commission or the local emergency planning committee. Upon receipt of a request for tier II information, the State commission or local committee shall, pursuant to paragraph (1), request the facility owner or operator for the tier II information and make available such information to the affected community water system.</text></subparagraph> <subparagraph commented="no" id="H516D997EBEAE4802A1BBEAE654E48304"><enum>(B)</enum><header>Definition</header><text display-inline="yes-display-inline">In this paragraph, the term <term>affected community water system</term> means a community water system (as defined in section 1401(15) of the Safe Drinking Water Act) that receives supplies of drinking water from a source water area, delineated under section 1453 of the Safe Drinking Water Act, in which a facility that is required to prepare and submit an inventory form under subsection (a)(1) is located.</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection></section>
<section commented="no" id="H9AB3CD0412AC4187BAD17B84723D9918"><enum>2019.</enum><header>Report on Federal cross-cutting requirements</header>
<subsection commented="no" id="HAF1FD9700AFC40079D0A2B53751DE6C4"><enum>(a)</enum><header>Report</header><text display-inline="yes-display-inline">Not later than 1 year after the date of enactment of this Act, the Comptroller General shall submit to Congress a report containing the results of a study, to be conducted in consultation with the Administrator of the Environmental Protection Agency, any State agency that has primary responsibility to enforce the requirements of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300f">42 U.S.C. 300f</external-xref> et seq.) in a State, and public water systems, to identify demonstrations of compliance with a State or local environmental law that may be substantially equivalent to any demonstration required by the Administrator for compliance with a Federal cross-cutting requirement.</text></subsection> <subsection commented="no" id="H611295037E914BF6B722E1268E3C91C4"><enum>(b)</enum><header>Definitions</header><text display-inline="yes-display-inline">In this subsection:</text>
<paragraph commented="no" id="H26CC0E860594486FB9FF91C572747A46"><enum>(1)</enum><header>Federal cross-cutting requirement</header><text display-inline="yes-display-inline">The term <term>Federal cross-cutting requirement</term> means a requirement of a Federal law or regulation, compliance with which is a condition on receipt of a loan or loan guarantee pursuant to section 1452 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12</external-xref>), that, if applied with respect to projects and activities for which a public water system receives such a loan or loan guarantee, would be substantially equivalent to a requirement of an applicable State or local law.</text></paragraph> <paragraph commented="no" id="HF9241DB71BB54EE39A924B2FE5AA331B"><enum>(2)</enum><header>Public water system</header><text display-inline="yes-display-inline">The term <term>public water system</term> has the meaning given that term in section 1401 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300f">42 U.S.C. 300f</external-xref>).</text></paragraph></subsection></section>
<section id="HB503F877FA2346A798076CA84269BDFD" section-type="subsequent-section" commented="no"><enum>2020.</enum><header>Assistance for areas affected by natural disasters</header>
<subsection id="H504B5D03F04C444BA63CE54B7ABBE012" commented="no"><enum>(a)</enum><header>Definitions</header><text>In this section:</text> <paragraph id="HA4111A4BD9034E8B9464219EFFEA751A" commented="no"><enum>(1)</enum><header>Community water system</header><text>The term <term>community water system</term> has the meaning given such term in section 1401(15) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300f">42 U.S.C. 300f(15)</external-xref>).</text></paragraph>
<paragraph id="HBF89AE35584E4FDA889C211D854314CA" commented="no"><enum>(2)</enum><header>Eligible State</header><text>The term <term>eligible State</term> means a State, as defined in section 1401(13)(B) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300f">42 U.S.C. 300f(13)(B)</external-xref>).</text></paragraph> <paragraph id="HE53C2A6567C74946BECDE3248F596258" commented="no"><enum>(3)</enum><header>Eligible system</header><text>The term <term>eligible system</term> means a community water system—</text>
<subparagraph id="H0996DED7A77C4F2B9D74EBE22EA88691" commented="no"><enum>(A)</enum><text display-inline="yes-display-inline">that serves an area for which, after January 1, 2017, the President under the Robert T. Stafford Disaster Relief and Emergency Assistance Act (<external-xref legal-doc="usc" parsable-cite="usc/42/5121">42 U.S.C. 5121</external-xref> et seq.)—</text> <clause id="H244D77D1F79740CC8A1E92398F3B2F73" commented="no"><enum>(i)</enum><text>has issued a major disaster declaration; and</text></clause>
<clause id="H37329C39DB0F4B8DB54152E47D5DA504" commented="no"><enum>(ii)</enum><text>provided disaster assistance; or</text></clause></subparagraph> <subparagraph id="H58EC7EA961D447A29C8FFBB4E49890FB" commented="no"><enum>(B)</enum><text>that is capable of extending its potable drinking water service into an underserved area.</text></subparagraph></paragraph>
<paragraph id="HE582FD1F659D47B5A60F43BF10F699CE" commented="no"><enum>(4)</enum><header>National primary drinking water regulation</header><text display-inline="yes-display-inline">The term <term>national primary drinking water regulation</term> means a national primary drinking water regulation under section 1412 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300g-1">42 U.S.C. 300g–1</external-xref>). </text></paragraph> <paragraph id="HBE8312C9645B4178A60BADC4C699F493" commented="no"><enum>(5)</enum><header>Underserved area</header><text>The term <term>underserved area</term> means a geographic area in an eligible State that—</text>
<subparagraph id="H694BAE24AEEC4CBBA60A9D2581371650" commented="no"><enum>(A)</enum><text>is served by a community water system serving fewer than 50,000 persons where delivery of, or access to, potable water is or was disrupted; and</text></subparagraph> <subparagraph id="H7B95FE7527B347F1B4DB2B9C2DB70ADC" commented="no"><enum>(B)</enum><text display-inline="yes-display-inline">received disaster assistance pursuant to a declaration described in paragraph (3)(A). </text></subparagraph></paragraph></subsection>
<subsection id="H8EFC02E609BB441A97E57E4657F0C298" commented="no"><enum>(b)</enum><header>State revolving loan fund assistance</header>
<paragraph id="H83DF39BA71C9406F8179A8551DFBE008" commented="no"><enum>(1)</enum><header>In general</header><text>An eligible State may use funds provided pursuant to subsection (e)(1) to provide assistance to an eligible system within the eligible State for the purpose of restoring or increasing compliance with national primary drinking water regulations in an underserved area.</text></paragraph> <paragraph id="HDA44E64DBF39490DB78AF045B1EB8764" commented="no"><enum>(2)</enum><header>Inclusion</header> <subparagraph id="H3D0EED8C8D2C4611B37CC0A6E4EF9AC6" commented="no"><enum>(A)</enum><header>Additional subsidization</header><text>With respect to assistance provided under paragraph (1), an eligible system shall be eligible to receive loans with additional subsidization (including forgiveness of principal, negative-interest loans, or grants (or any combination thereof)) for the purpose described in paragraph (1).</text></subparagraph>
<subparagraph id="HAE559982A20C4A11A7A364688270ECBB" commented="no"><enum>(B)</enum><header>Nondesignation</header><text>Assistance provided under paragraph (1) may include additional subsidization, as described in subparagraph (A), even if the service area of the eligible system has not been designated by the applicable eligible State as a disadvantaged community pursuant to section 1452(d)(3) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(d)(3)</external-xref>).</text></subparagraph></paragraph></subsection> <subsection id="H9CA8D16C05C1415993C60F282AF478D3" commented="no"><enum>(c)</enum><header>Exclusion</header><text>Assistance provided under this section shall not include assistance for a project that is financed (directly or indirectly), in whole or in part, with proceeds of any obligation issued after the date of enactment of this Act the interest of which is exempt from the tax imposed under <external-xref legal-doc="usc-chapter" parsable-cite="usc-chapter/26/1">chapter 1</external-xref> of the Internal Revenue Code of 1986.</text></subsection>
<subsection id="H471B6E2B82C546529928CF017DF6B4CC" commented="no"><enum>(d)</enum><header>Nonduplication of work</header><text>An activity carried out pursuant to this section shall not duplicate the work or activity of any other Federal or State department or agency. </text></subsection> <subsection id="H4D16E5EF8DD446068E6383C4C40F9168" commented="no"><enum>(e)</enum><header>Additional drinking water State revolving fund capitalization grants</header> <paragraph id="HA27FD93548BB4693AF99458C49357B1A" commented="no"><enum>(1)</enum><header>In general</header><text>There is authorized to be appropriated to the Administrator of the Environmental Protection Agency $100,000,000 to provide additional capitalization grants pursuant to section 1452 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12</external-xref>) to eligible States, to be available—</text>
<subparagraph id="HAF433310EF7A4EC8BE51E607B634A31F" commented="no"><enum>(A)</enum><text>for a period of 24 months beginning on the date on which the funds are made available for the purpose described in subsection (b)(1); and</text></subparagraph> <subparagraph id="H83BAE54A60DF47809DEA3D2BD58400EE" commented="no"><enum>(B)</enum><text>after the end of such 24-month period, until expended for the purpose described in paragraph (3) of this subsection.</text></subparagraph></paragraph>
<paragraph id="H585533B293F44437B24CCE4F4B723603" commented="no"><enum>(2)</enum><header>Supplemented intended use plans</header>
<subparagraph id="H3F9C450069BA462686CF45EF05AF6B66" commented="no"><enum>(A)</enum><header>Obligation of amounts</header><text>Not later than 30 days after the date on which an eligible State submits to the Administrator a supplemental intended use plan under section 1452(b) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(b)</external-xref>), from funds made available under paragraph (1), the Administrator shall obligate to such eligible State such amounts as are appropriate to address the needs identified in such supplemental intended use plan for the purpose described in subsection (b)(1).</text></subparagraph> <subparagraph id="HB201D8FB9DA349C1A8468F0C6B5A3625" commented="no"><enum>(B)</enum><header>Plans</header><text>A supplemental intended use plan described in subparagraph (A) shall include information regarding projects to be funded using the assistance provided under subsection (b)(1), including, with respect to each such project—</text>
<clause id="H016A6BA2F0B74E0E8D74E3F7F71F79A6" commented="no"><enum>(i)</enum><text>a description of the project;</text></clause> <clause id="HC44B009D873C4930A5CC3BC98BB33474" commented="no"><enum>(ii)</enum><text>an explanation of the means by which the project will restore or improve compliance with national primary drinking water regulations in an underserved area; </text></clause>
<clause id="H379D8F227392407DAD5C479B220BC0F3" commented="no"><enum>(iii)</enum><text>the estimated cost of the project; and</text></clause> <clause id="HBF8E24106DC04AE795AF5F33741122A2" commented="no"><enum>(iv)</enum><text>the projected start date for the project.</text></clause></subparagraph></paragraph>
<paragraph id="HF3C7F5E35147428BAB96CC9E8371953E" commented="no"><enum>(3)</enum><header>Unobligated amounts</header><text>Any amounts made available to the Administrator under paragraph (1) that are unobligated on the date that is 24 months after the date on which the amounts are made available shall be available for the purpose of providing additional grants to States to capitalize State loan funds as provided under section 1452 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12</external-xref>).</text></paragraph> <paragraph id="HF12374FD116440AB8D5A9FFF4DBCBF98" commented="no"><enum>(4)</enum><header>Applicability</header> <subparagraph id="H532F268C79014926817082A8F9BCCBC8" commented="no"><enum>(A)</enum><header>In general</header><text>Except as otherwise provided in this section, all requirements of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300f">42 U.S.C. 300f</external-xref> et seq.) shall apply to funding provided under this section.</text></subparagraph>
<subparagraph id="H84A53DCE5D3C4DC9BB5DC8286B3BF1E7" commented="no"><enum>(B)</enum><header>Intended use plans</header><text>Section 1452(b)(1) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(b)(1)</external-xref>) shall not apply to a supplemental intended use plan under paragraph (2).</text></subparagraph> <subparagraph id="HE41646A05D934463B17AB112BD6AEDAE" commented="no"><enum>(C)</enum><header>State contribution</header><text>For amounts authorized to be appropriated under paragraph (1), the matching requirements in section 1452(e) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(e)</external-xref>) shall not apply to any funds provided to the Commonwealth of Puerto Rico under this section.</text></subparagraph></paragraph></subsection></section>
<section id="HD9F24503A6C9405391E364BFF4FD198A" commented="no"><enum>2021.</enum><header>Monitoring for unregulated contaminants</header>
<subsection id="H11DFEC5FAF9A4B56AB795D15875A737C" commented="no"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Section 1445 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-4">42 U.S.C. 300j–4</external-xref>) is amended by adding at the end the following:</text> <quoted-block display-inline="no-display-inline" id="H7CBD0359ADB94801A157103C7B0F0A03" style="OLC"> <subsection id="H0B14DE77273B433B80A286DDB231D336" commented="no"><enum>(j)</enum><header>Monitoring by certain systems</header> <paragraph id="HC09DB907C74542F0886096EA49FFDCE1" commented="no"><enum>(1)</enum><header>In general</header><text>Notwithstanding subsection (a)(2)(A), the Administrator shall, subject to the availability of appropriations for such purpose—</text>
<subparagraph id="H8ABA07F087C5481EAE4CF2DC10B285EE" commented="no"><enum>(A)</enum><text>require public water systems serving between 3,300 and 10,000 persons to monitor for unregulated contaminants in accordance with this section; and</text></subparagraph> <subparagraph id="HDE148DCC92D64153A1F0D689D417FACF" commented="no"><enum>(B)</enum><text>ensure that only a representative sample of public water systems serving fewer than 3,300 persons are required to monitor.</text></subparagraph></paragraph>
<paragraph id="H8054A2650F454CCD9728466E4E67ECCE" commented="no"><enum>(2)</enum><header>Effective date</header><text>Paragraph (1) shall take effect 3 years after the date of enactment of this subsection.</text></paragraph> <paragraph id="H73F193E1632C42199D5B85AF1EFF4122" commented="no"><enum>(3)</enum><header>Limitation</header><text>Paragraph (1) shall take effect unless the Administrator determines that there is not sufficient laboratory capacity to accommodate the analysis necessary to carry out monitoring required under such paragraph.</text></paragraph>
<paragraph id="H6BA3E13EE4BC415A8B9584CEA16A14A9" commented="no"><enum>(4)</enum><header>Limitation on enforcement</header><text display-inline="yes-display-inline">The Administrator may not enforce a requirement to monitor pursuant to paragraph (1) with respect to any public water system serving fewer than 3,300 persons, including by subjecting such a public water system to any civil penalty. </text></paragraph> <paragraph id="HB83056126C2844E48ACCF84A138D3BAF" commented="no"><enum>(5)</enum><header>Authorization of appropriations</header><text>There are authorized to be appropriated $15,000,000 in each fiscal year for which monitoring is required to be carried out under this subsection for the Administrator to pay the reasonable cost of such testing and laboratory analysis as are necessary to carry out monitoring required under this subsection.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></subsection>
<subsection id="H4029696A6D154AEDA9C2CF195257F59B" commented="no"><enum>(b)</enum><header>Authorization of appropriations</header><text display-inline="yes-display-inline">Section 1445(a)(2)(H) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-4">42 U.S.C. 300j–4(a)(2)(H)</external-xref>) is amended by striking <quote>1997 through 2003</quote> and inserting <quote>2019 through 2021</quote>.</text></subsection> <subsection id="H03C7CE4EFA6D4358AFCFE9BE561ED6E9" commented="no"><enum>(c)</enum><header>Inclusion in data base</header><text display-inline="yes-display-inline">Section 1445(g)(7) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-4">42 U.S.C. 300j–4(g)(7)</external-xref>) is amended by—</text>
<paragraph id="HB092A256E8DD4B94A5D682958F9FD583" commented="no"><enum>(1)</enum><text>striking <quote>and</quote> at the end of subparagraph (B);</text></paragraph> <paragraph id="H86A3911738314FA69C9608C894AA6208" commented="no"><enum>(2)</enum><text>redesignating subparagraph (C) as subparagraph (D); and</text></paragraph>
<paragraph id="HCFA44F36F7AC467D93C69A66CFF00E83" commented="no"><enum>(3)</enum><text display-inline="yes-display-inline">inserting after subparagraph (B) the following:</text> <quoted-block display-inline="no-display-inline" id="HA634CFDFEC224F0A8853D2422F48BE9E" style="OLC"> <subparagraph id="H1073917131DF4B0695CB113EB971FF21" commented="no"><enum>(C)</enum><text display-inline="yes-display-inline">if applicable, monitoring information collected by public water systems pursuant to subsection (j) that is not duplicative of monitoring information included in the data base under subparagraph (B) or (D); and</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection></section>
<section id="H4FEFED0DE7AC4BA391B6E6AFC946C8BC" commented="no"><enum>2022.</enum><header>American iron and steel products</header><text display-inline="no-display-inline"> Section 1452(a)(4)(A) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(a)(4)(A)</external-xref>) is amended by striking <quote>fiscal year 2017</quote> and inserting <quote>fiscal years 2019 through 2023</quote>.</text></section> <section id="H1A0694866E634E55990969E4F3632D05" commented="no"><enum>2023.</enum><header>Authorization for capitalization grants to States for State drinking water treatment revolving loan funds</header><text display-inline="no-display-inline">Section 1452(m) of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12(m)</external-xref>) is amended—</text>
<paragraph id="H4BBF751817F84BB5B06C0074C5B6E7E0" commented="no"><enum>(1)</enum><text>by striking the first sentence and inserting the following:</text> <quoted-block display-inline="no-display-inline" id="H116B753C9AA6492CB64797978FD9B52D" style="OLC"> <paragraph commented="no" id="HB50BB6D0AD1D432498F49CBE7A20F522"><enum>(1)</enum><text display-inline="yes-display-inline">There are authorized to be appropriated to carry out the purposes of this section—</text>
<subparagraph commented="no" id="H59A13EAAC5F24799B28AD79AE52F33E7"><enum>(A)</enum><text>$1,174,000,000 for fiscal year 2019;</text></subparagraph> <subparagraph commented="no" id="H86C71CCDE2D241DDBEB955B8E20D384B"><enum>(B)</enum><text>$1,300,000,000 for fiscal year 2020; and</text></subparagraph>
<subparagraph commented="no" id="HD6A4B9E6FDA94CB4B8420C65424F03DC"><enum>(C)</enum><text>$1,950,000,000 for fiscal year 2021.</text></subparagraph></paragraph><after-quoted-block>;</after-quoted-block></quoted-block></paragraph> <paragraph id="H2F989236287646C09CB7F570F603FB25" commented="no"><enum>(2)</enum><text>by striking <quote>To the extent amounts authorized to be</quote> and inserting the following:</text>
<quoted-block display-inline="no-display-inline" id="H38A912CFD7914A119988CFBB977DC711" style="OLC">
<paragraph id="H23630D4A5E78438F94DB07C5827F8E59" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">To the extent amounts authorized to be</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph> <paragraph id="H81F43EA333914C49805CCA001D8D8C4D" commented="no"><enum>(3)</enum><text>by striking <quote>(prior to the fiscal year 2004)</quote>.</text></paragraph></section></title>
<title id="HB8183B9FD8FB4D2DAF1FFBB6DA37A2EA"><enum>III</enum><header>Energy</header>
<section commented="no" display-inline="no-display-inline" id="H174EEA561E6444CDAC32AFE3D236593F" section-type="subsequent-section"><enum>3001.</enum><header display-inline="yes-display-inline">Modernizing authorizations for necessary hydropower approvals</header>
<subsection commented="no" display-inline="no-display-inline" id="H1D7364C83EA340438DC50A97C7403BAB"><enum>(a)</enum><header display-inline="yes-display-inline">Preliminary permits</header><text display-inline="yes-display-inline">Section 5 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/798">16 U.S.C. 798</external-xref>) is amended—</text> <paragraph commented="no" display-inline="no-display-inline" id="H78430429FA704064805E13D65938DB8D"><enum>(1)</enum><text display-inline="yes-display-inline">in subsection (a), by striking <quote>three</quote> and inserting <quote>4</quote>; and</text></paragraph>
<paragraph commented="no" display-inline="no-display-inline" id="HEBC9E98450CA46FE9917E97E6A1EF04D"><enum>(2)</enum><text display-inline="yes-display-inline">in subsection (b)—</text> <subparagraph commented="no" display-inline="no-display-inline" id="H5DEE2645DA4F4F0D93D0A14BEFD33309"><enum>(A)</enum><text display-inline="yes-display-inline">by striking <quote>Commission may extend the period of a preliminary permit once for not more than 2 additional years beyond the 3 years</quote> and inserting the following:</text>
<quoted-block display-inline="yes-display-inline" id="H1375853B714C4E94803EBC44C7AAA9CA" style="OLC"><text>Commission may—</text> <paragraph commented="no" display-inline="no-display-inline" id="HF83A633E9DB24436A812C540F92A6070"><enum>(1)</enum><text display-inline="yes-display-inline">extend the period of a preliminary permit once for not more than 4 additional years beyond the 4 years</text></paragraph><after-quoted-block>;</after-quoted-block></quoted-block></subparagraph>
<subparagraph commented="no" display-inline="no-display-inline" id="H30218AD00AFC41179A448E267F106390"><enum>(B)</enum><text display-inline="yes-display-inline">by striking the period at the end and inserting <quote>; and</quote>; and</text></subparagraph> <subparagraph commented="no" display-inline="no-display-inline" id="H48C10AB3DD3D4DB7BEE04408B8675309"><enum>(C)</enum><text display-inline="yes-display-inline">by adding at the end the following:</text>
<quoted-block display-inline="no-display-inline" id="H73052BD7E7C7451CA01540CD08CBF4A3" style="OLC">
<paragraph commented="no" display-inline="no-display-inline" id="H0F01F72D0D9E48B08DC6CE1C18334543"><enum>(2)</enum><text display-inline="yes-display-inline">after the end of an extension period granted under paragraph (1), issue an additional permit to the permittee if the Commission determines that there are extraordinary circumstances that warrant the issuance of the additional permit.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph></subsection> <subsection commented="no" display-inline="no-display-inline" id="HF56C68C496AA4A5285895E6BD5BA3E4B"><enum>(b)</enum><header display-inline="yes-display-inline">Time limit for construction of project works</header><text display-inline="yes-display-inline">Section 13 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/806">16 U.S.C. 806</external-xref>) is amended in the second sentence by striking <quote>once but not longer than two additional years</quote> and inserting <quote>for not more than 8 additional years,</quote>.</text></subsection>
<subsection id="H7CFC579AED3C4AA79B1ABC2F0FF49752"><enum>(c)</enum><header>Obligation for Payment of Annual Charges</header><text>Any obligation of a licensee or exemptee for the payment of annual charges under section 10(e) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/803">16 U.S.C. 803(e)</external-xref>) for a project that has not commenced construction as of the date of enactment of this Act shall commence not earlier than the latest of—</text> <paragraph id="H2D47D185E47A42D3A66E316CBE0CFECD"><enum>(1)</enum><text>the date by which the licensee or exemptee is required to commence construction; or</text></paragraph>
<paragraph id="H21B740DF54C64EDA84272282CE284C01"><enum>(2)</enum><text>the date of any extension of the deadline under paragraph (1).</text></paragraph></subsection></section> <section id="HBA21AA3DF73D435DA3D80CE1F7463F25"><enum>3002.</enum><header>Qualifying conduit hydropower facilities</header><text display-inline="no-display-inline">Section 30(a) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/823a">16 U.S.C. 823a(a)</external-xref>) is amended—</text>
<paragraph id="HC1DA4A6315894039B1E258DD99EEBB90"><enum>(1)</enum><text>in paragraph (2)(C), by striking <quote>45 days</quote> and inserting <quote>30 days</quote>; and</text></paragraph> <paragraph id="HABD0FF43B17047A0B2AAAD327F1ED95A"><enum>(2)</enum><text>in paragraph (3)(C)(ii), by striking <quote>5</quote> and inserting <quote>40</quote>.</text></paragraph></section>
<section id="HC485817226444106BBFCFF5C970BD853"><enum>3003.</enum><header>Promoting hydropower development at existing nonpowered dams</header><text display-inline="no-display-inline">Part I of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/792">16 U.S.C. 792</external-xref> et seq.) is amended by adding at the end the following:</text> <quoted-block id="HD64A17C7AF1D414FA669406246A14484" style="OLC"> <section id="HB0257860E5A94F57B492A7B5C092E5FC"><enum>34.</enum><header>Promoting hydropower development at existing nonpowered dams</header> <subsection id="H8568739BCF6A41AEBEE8FACB6856ECF5"><enum>(a)</enum><header>Expedited licensing process for non-Federal hydropower projects at existing nonpowered dams</header> <paragraph id="H0D77651967C54638957A1C82DCA649BF"><enum>(1)</enum><header>In general</header><text>As provided in this section, the Commission may issue and amend licenses, as appropriate, for any facility the Commission determines is a qualifying facility.</text></paragraph>
<paragraph id="HA888DA3E9D7D4639AF3F3FCB294E5BAC"><enum>(2)</enum><header>Rule</header><text>Not later than 180 days after the date of enactment of this section, the Commission shall issue a rule establishing an expedited process for issuing and amending licenses for qualifying facilities under this section.</text></paragraph> <paragraph id="H946430DAAD664556AA90F038056D5049"><enum>(3)</enum><header>Interagency task force</header> <subparagraph id="H194C03B6A1964F9B8DBDB9F99206B8CC"><enum>(A)</enum><text>In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate a qualifying facility.</text></subparagraph>
<subparagraph id="HD4922B452A1D4F00A46B3D0B203707C5"><enum>(B)</enum><text display-inline="yes-display-inline">The task force shall develop procedures that are consistent with subsection (e)(1)(E) to seek to ensure that, for projects licensed pursuant to this section, the Commission and appropriate Federal and State agencies and Indian tribes shall exercise their authorities in a manner that, to the extent practicable, will not result in any material change to the storage, release, or flow operations of the associated nonpowered dam existing at the time an applicant files its license application.</text></subparagraph></paragraph> <paragraph id="H635A940500034FF5A0DB2A67C8EBB0BE"><enum>(4)</enum><header>Length of process</header><text>The Commission shall seek to ensure that the expedited process under this section will result in a final decision on an application for a license by not later than 2 years after receipt of a completed application for the license.</text></paragraph></subsection>
<subsection id="HE15EFA6C49B74D5785C976ABB7080B51"><enum>(b)</enum><header>Dam safety</header>
<paragraph id="HC14C586FBD774A5BBCD6216F64AEEC3B"><enum>(1)</enum><header>Assessment</header><text>Before issuing any license for a qualifying facility, the Commission shall assess the safety of existing non-Federal dams and other non-Federal structures related to the qualifying facility (including possible consequences associated with failure of such structures).</text></paragraph> <paragraph id="H06AB4010918A44F08EF1C615B9C7F966"><enum>(2)</enum><header>Requirements</header><text>In issuing any license for a qualifying facility at a non-Federal dam, the Commission shall ensure that the Commission’s dam safety requirements apply to such qualifying facility, and the associated qualifying nonpowered dam, over the term of such license.</text></paragraph></subsection>
<subsection id="H531E635D738F49B693E9115C483A6CB6"><enum>(c)</enum><header>Interagency communications</header><text>Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.) with respect to an application for a license for a qualifying facility under this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—</text> <paragraph id="H04CF01E4386240BD99733073174C1E84"><enum>(1)</enum><text>be considered to be ex parte communications under Commission rules; or</text></paragraph>
<paragraph id="HA423F4F1C8714AED8AA4F6C7997CCC3E" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">preclude an agency from participating in a licensing proceeding under this part, providing that any agency participating as a party in a licensing proceeding under this part shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.) and staff participating in the applicable proceeding under this part.</text></paragraph></subsection> <subsection id="H923949F391AD4A5AB0706846FED839BC"><enum>(d)</enum><header>Identification of nonpowered dams for hydropower development</header> <paragraph id="HEFAEB2DA829F4FA3A6C620C5694C6D19"><enum>(1)</enum><header>In general</header><text>Not later than 12 months after the date of enactment of this section, the Commission, with the Secretary of the Army, the Secretary of the Interior, and the Secretary of Agriculture, shall jointly develop a list of existing nonpowered Federal dams that the Commission and the Secretaries agree have the greatest potential for non-Federal hydropower development.</text></paragraph>
<paragraph id="H5BA117AFE5FD499FAD4A707383E43D54"><enum>(2)</enum><header>Considerations</header><text>In developing the list under paragraph (1), the Commission and the Secretaries may consider the following:</text> <subparagraph id="HC7F6425A37D94D18867D0AC7470BE9EF"><enum>(A)</enum><text>The compatibility of hydropower generation with existing purposes of the dam.</text></subparagraph>
<subparagraph id="HA8F5C2813A654DC1BBB78A47626C9B8F"><enum>(B)</enum><text>The proximity of the dam to existing transmission resources.</text></subparagraph> <subparagraph id="H41CF82E0077240D4AEDCB3592C664F8D"><enum>(C)</enum><text>The existence of studies to characterize environmental, cultural, and historic resources relating to the dam.</text></subparagraph>
<subparagraph id="H94C571A9F2D7490880892A36EAEF6684"><enum>(D)</enum><text>The effects of hydropower development on release or flow operations of the dam.</text></subparagraph></paragraph> <paragraph id="H83DDE90E551249A6BA8FA5615568C9AF"><enum>(3)</enum><header>Availability</header><text>The Commission shall—</text>
<subparagraph id="H5CEBF67195DC4404874169F3DC018D39"><enum>(A)</enum><text>provide the list developed under paragraph (1) to—</text> <clause id="H2BABD22FBDEA49A78CD9EF26603ECC7A"><enum>(i)</enum><text>the Committee on Energy and Commerce, the Committee on Transportation and Infrastructure, and the Committee on Natural Resources, of the House of Representatives; and</text></clause>
<clause id="HE49B748C57964888BA1456FA1274D8CD"><enum>(ii)</enum><text>the Committee on Environment and Public Works, and the Committee on Energy and Natural Resources, of the Senate; and</text></clause></subparagraph> <subparagraph id="H39AB01759F794542953ED5B4BE41C054"><enum>(B)</enum><text>make such list available to the public.</text></subparagraph></paragraph></subsection>
<subsection id="HB63DFEB03127438D999BF7F3C7D0047C"><enum>(e)</enum><header>Definitions</header><text>For purposes of this section:</text> <paragraph id="H9644BAAC0770439983D8AF23ED92DF5D"><enum>(1)</enum><header>Qualifying criteria</header><text>The term <term>qualifying criteria</term> means, with respect to a facility—</text>
<subparagraph id="H79FC7A065BF64F7496A96D0F5195F1C5"><enum>(A)</enum><text>as of the date of enactment of this section, the facility is not licensed under, or exempted from the license requirements contained in, this part;</text></subparagraph> <subparagraph id="H13EDF5E5F20E45AD9C419CAC28E23456"><enum>(B)</enum><text>the facility will be associated with a qualifying nonpowered dam;</text></subparagraph>
<subparagraph id="H7B15F598555C4338A5CB83342D0161EF"><enum>(C)</enum><text>the facility will be constructed, operated, and maintained for the generation of electric power;</text></subparagraph> <subparagraph id="HDE32218EDE894A59AA16FB69F72AFF12"><enum>(D)</enum><text>the facility will use for such generation any withdrawals, diversions, releases, or flows from the associated qualifying nonpowered dam, including its associated impoundment or other infrastructure; and</text></subparagraph>
<subparagraph id="H17CDA9FD3EF14DEA99664CF01233C364"><enum>(E)</enum><text>the operation of the facility will not result in any material change to the storage, release, or flow operations of the associated qualifying nonpowered dam.</text></subparagraph></paragraph> <paragraph id="HC122DC5E573E4B5DA62BC9750BC3DCE3"><enum>(2)</enum><header>Qualifying facility</header><text>The term <term>qualifying facility</term> means a facility that is determined under this section to meet the qualifying criteria.</text></paragraph>
<paragraph id="HF7C08B8D7A04446588B6C654C5F3E37A"><enum>(3)</enum><header>Qualifying nonpowered dam</header><text>The term <term>qualifying nonpowered dam</term> means any dam, dike, embankment, or other barrier—</text> <subparagraph id="H9160B2D2C8C441EE9D52F3441B47C989"><enum>(A)</enum><text>the construction of which was completed on or before the date of enactment of this section;</text></subparagraph>
<subparagraph id="HCC9B216FFE9A4AE49B362E6E9BB86ED2"><enum>(B)</enum><text>that is or was operated for the control, release, or distribution of water for agricultural, municipal, navigational, industrial, commercial, environmental, recreational, aesthetic, drinking water, or flood control purposes; and</text></subparagraph> <subparagraph id="HC882562F28EE43E9A56967DFE9BB4846"><enum>(C)</enum><text>that, as of the date of enactment of this section, is not generating electricity with hydropower generating works that are licensed under, or exempted from the license requirements contained in, this part.</text></subparagraph></paragraph></subsection>
<subsection id="H1AE8085BB1644A3190E86FCA489198B8"><enum>(f)</enum><header>Savings Clause</header><text>Nothing in this section affects—</text> <paragraph id="H4E95E77F48BD4390AAA69A1A588A4620"><enum>(1)</enum><text>any authority of the Commission to license a facility at a nonpowered dam under this part; and</text></paragraph>
<paragraph id="HDF682EAEA0BB4889B2195ACC019AFA95" commented="no"><enum>(2)</enum><text>any authority of the Commission to issue an exemption to a small hydroelectric power project under the Public Utility Regulatory Policies Act of 1978.</text></paragraph></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></section> <section id="HD573A984E6D740CC94E4AE89CC20F31F"><enum>3004.</enum><header>Closed-Loop pumped storage projects</header><text display-inline="no-display-inline">Part I of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/792">16 U.S.C. 792</external-xref> et seq.), as amended, is further amended by adding at the end the following:</text>
<quoted-block id="HFD5CA19D02D44112B614403B0B01C17A" style="OLC">
<section id="HF00CB1184CE242AAA2DB00207366996E"><enum>35.</enum><header>Closed-Loop pumped storage projects</header>
<subsection id="HE47B9D0A7B4741C78D5C5171D9145945"><enum>(a)</enum><header>Expedited licensing process for closed-Loop pumped storage projects</header>
<paragraph id="H3F823F85D16B4CC385915D899109D544"><enum>(1)</enum><header>In general</header><text>As provided in this section, the Commission may issue and amend licenses, as appropriate, for closed-loop pumped storage projects.</text></paragraph> <paragraph id="H8C774040742643ADB8EDDFD6E38C7669"><enum>(2)</enum><header>Rule</header><text>Not later than 180 days after the date of enactment of this section, the Commission shall issue a rule establishing an expedited process for issuing and amending licenses for closed-loop pumped storage projects under this section.</text></paragraph>
<paragraph id="H983487BE2E4643D58E15D114A39D18A3"><enum>(3)</enum><header>Interagency task force</header><text>In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate closed-loop pumped storage projects.</text></paragraph> <paragraph id="HB1B7A5521C19419AB4471E31B448FB5B"><enum>(4)</enum><header>Length of process</header><text>The Commission shall seek to ensure that the expedited process under this section will result in final decision on an application for a license by not later than 2 years after receipt of a completed application for such license.</text></paragraph></subsection>
<subsection id="H847A1DC34E4E43EC8CB48B139581F8FB"><enum>(b)</enum><header>Dam safety</header><text>Before issuing any license for a closed-loop pumped storage project, the Commission shall assess the safety of existing dams and other structures related to the project (including possible consequences associated with failure of such structures).</text></subsection> <subsection id="H49182D1E50DD41EFA82C8C3DD32D43D5"><enum>(c)</enum><header>Exceptions from other requirements</header> <paragraph id="H370B49F14625417799E0B2FB05E89028"><enum>(1)</enum><header>In general</header><text>In issuing or amending a license for a closed-loop pumped storage project pursuant to the expedited process established under this section, the Commission may grant an exception from any other requirement of this part with respect to any part of the closed-loop pumped storage project (not including any dam or other impoundment).</text></paragraph>
<paragraph id="HE54F60F058A14D189948D932FBF363DC"><enum>(2)</enum><header>Consultation</header><text>In granting an exception under paragraph (1), the Commission shall consult with the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the State agency exercising administration over the fish and wildlife resources of the State in which the closed-loop pumped storage project is or will be located, in the manner provided by the Fish and Wildlife Coordination Act (<external-xref legal-doc="usc" parsable-cite="usc/16/661">16 U.S.C. 661</external-xref> et seq.).</text></paragraph> <paragraph id="H9D9EB0A3A5EC44BDBFDB43E9565FB89F"><enum>(3)</enum><header>Terms and conditions</header><text>In granting an exception under paragraph (1), the Commission shall include in any such exception—</text>
<subparagraph id="H69123D09D93F43268E6C4A759901CBB1"><enum>(A)</enum><text>such terms and conditions as the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the State agency described in paragraph (2) each determine are appropriate to prevent loss of, or damage to, fish and wildlife resources and to otherwise carry out the purposes of the Fish and Wildlife Coordination Act; and</text></subparagraph> <subparagraph id="H6DE72984E339486A955BAA66285F9516"><enum>(B)</enum><text>such terms and conditions as the Commission deems appropriate to ensure that such closed-loop pumped storage project continues to comply with the provisions of this section and terms and conditions included in any such exception.</text></subparagraph></paragraph>
<paragraph id="H7DA7B574B2744C22A7DF3D1AD063B276"><enum>(4)</enum><header>Fees</header><text>The Commission, in addition to the requirements of section 10(e), shall establish fees which shall be paid by an applicant for a license for a closed-loop pumped storage project that is required to meet terms and conditions set by fish and wildlife agencies under paragraph (3). Such fees shall be adequate to reimburse the fish and wildlife agencies referred to in paragraph (3) for any reasonable costs incurred in connection with any studies or other reviews carried out by such agencies for purposes of compliance with this section. The fees shall, subject to annual appropriations Acts, be transferred to such agencies by the Commission for use solely for purposes of carrying out such studies and shall remain available until expended.</text></paragraph></subsection> <subsection id="H2D8CA6AAD6A147929FE7900DBEF93A7F"><enum>(d)</enum><header>Transfers</header><text>Notwithstanding section 5, and regardless of whether the holder of a preliminary permit for a closed-loop pumped storage project claimed municipal preference under section 7(a) when obtaining the permit, on request by a municipality, the Commission may, to facilitate development of a closed-loop pumped storage project—</text>
<paragraph id="H17EF4D20B8FB48B59AC361B75ACAD85C"><enum>(1)</enum><text>add entities as joint permittees following issuance of a preliminary permit; and</text></paragraph> <paragraph id="H4959EFCA6F2148998861BEF718FA72B8"><enum>(2)</enum><text>transfer a license in part to one or more nonmunicipal entities as co-licensees with a municipality, if the municipality retains majority ownership of the project for which the license was issued.</text></paragraph></subsection>
<subsection id="H092AEB09DB9A474FBA9210FD8A24135E"><enum>(e)</enum><header>Interagency communications</header><text>Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.) with respect to an application for a license for a closed-loop pumped storage project submitted pursuant to this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—</text> <paragraph id="HCB46E092AE75444F821D3BC40DF5F6B6"><enum>(1)</enum><text>be considered to be ex parte communications under Commission rules; or</text></paragraph>
<paragraph id="HB63C2956FEF14F7EB2B3FE90DA77DB82"><enum>(2)</enum><text display-inline="yes-display-inline">preclude an agency from participating in a licensing proceeding under this part, providing that any agency participating as a party in a licensing proceeding under this part shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.) and staff participating in the applicable proceeding under this part.</text></paragraph></subsection> <subsection id="HD0AC02F2DD6142AEB6B109E267332D0C"><enum>(f)</enum><header>Developing abandoned mines for pumped storage</header> <paragraph id="HDC2A9B93B84C4448866E8E8E471CBF73"><enum>(1)</enum><header>Workshop</header><text>Not later than 6 months after the date of enactment of this section, the Commission shall hold a workshop to explore potential opportunities for development of closed-loop pumped storage projects at abandoned mine sites.</text></paragraph>
<paragraph id="HF4F33205478B4E179D0602D4F8A0E64E"><enum>(2)</enum><header>Guidance</header><text>Not later than 1 year after the date of enactment of this section, the Commission shall issue guidance to assist applicants for licenses or preliminary permits for closed-loop pumped storage projects at abandoned mine sites.</text></paragraph></subsection> <subsection id="H77BAE9351C0746C38F66F331A2733CDB"><enum>(g)</enum><header>Qualifying criteria for closed-Loop pumped storage projects</header> <paragraph id="H2D80B070D95E486482A4121AA9A64130"><enum>(1)</enum><header>In general</header><text>The Commission shall establish criteria that a pumped storage project shall meet in order to qualify as a closed-loop pumped storage project eligible for the expedited process established under this section.</text></paragraph>
<paragraph id="H1D7268195E134814BD26060F016EEF0A"><enum>(2)</enum><header>Inclusions</header><text>In establishing the criteria under paragraph (1), the Commission shall include criteria requiring that the pumped storage project—</text> <subparagraph id="H638EFC0AD6884403AF000145E05D6F1A"><enum>(A)</enum><text>cause little to no change to existing surface and ground water flows and uses; and</text></subparagraph>
<subparagraph id="H07F23060C392469EBDC074A497DA2FB2"><enum>(B)</enum><text>is unlikely to adversely affect species listed as a threatened species or endangered species under the Endangered Species Act of 1973.</text></subparagraph></paragraph></subsection> <subsection id="H179D3E6EA7A941C7A8FA403B77EA004E"><enum>(h)</enum><header>Savings Clause</header><text>Nothing in this section affects any authority of the Commission to license a closed-loop pumped storage project under this part.</text></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></section>
<section id="H59BAAD504A774567A765166C866C4C66" section-type="subsequent-section"><enum>3005.</enum><header>Considerations for relicensing terms</header><text display-inline="no-display-inline">Part I of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/792">16 U.S.C. 792</external-xref> et seq.), as amended, is further amended by adding at the end the following:</text> <quoted-block style="OLC" id="H60B6E041CE07487E95393D8EF33F961E" display-inline="no-display-inline"> <section id="HA27E746737F547129052CEAD71F79A1F"><enum>36.</enum><header>Considerations for relicensing terms</header> <subsection id="HF9A1464BFDFF4580AE50A0335C45C337"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">In determining the term of a new license issued when an existing license under this part expires, the Commission shall take into consideration, among other things—</text>
<paragraph id="HE69D4F1D277742F6A8E0168453404E0A"><enum>(1)</enum><text display-inline="yes-display-inline">project-related investments by the licensee under the new license; and</text></paragraph> <paragraph id="H0FFC9405BEBE4913A6380D481B173C99"><enum>(2)</enum><text display-inline="yes-display-inline">project-related investments by the licensee over the term of the existing license.</text></paragraph></subsection>
<subsection id="H529D08FE69DB4F8A9D11965D0A5AEB66"><enum>(b)</enum><header>Equal weight</header><text display-inline="yes-display-inline">The determination of the Commission under subsection (a) shall give equal weight to—</text> <paragraph id="H5C62EBFDF15140ADB85681D87693BA7A"><enum>(1)</enum><text display-inline="yes-display-inline">investments by the licensee to implement the new license under this part, including investments relating to redevelopment, new construction, new capacity, efficiency, modernization, rehabilitation or replacement of major equipment, safety improvements, or environmental, recreation, or other protection, mitigation, or enhancement measures required or authorized by the new license; and</text></paragraph>
<paragraph id="H296C7726070C427584648C69259153E2"><enum>(2)</enum><text display-inline="yes-display-inline">investments by the licensee over the term of the existing license (including any terms under annual licenses) that—</text> <subparagraph id="H80596563F1E04DB193B7C383BB899D69"><enum>(A)</enum><text display-inline="yes-display-inline">resulted in redevelopment, new construction, new capacity, efficiency, modernization, rehabilitation or replacement of major equipment, safety improvements, or environmental, recreation, or other protection, mitigation, or enhancement measures conducted over the term of the existing license; and</text></subparagraph>
<subparagraph id="HEC235A444EE943B08DE9AE5AC0C4A29B"><enum>(B)</enum><text display-inline="yes-display-inline">were not expressly considered by the Commission as contributing to the length of the existing license term in any order establishing or extending the existing license term.</text></subparagraph></paragraph></subsection> <subsection id="HCBAC521D1A674AC591EFCFA585E1A31F"><enum>(c)</enum><header>Commission determination</header><text display-inline="yes-display-inline">At the request of the licensee, the Commission shall make a determination as to whether any planned, ongoing, or completed investment meets the criteria under subsection (b)(2). Any determination under this subsection shall be issued within 60 days following receipt of the licensee’s request. When issuing its determination under this subsection, the Commission shall not assess the incremental number of years that the investment may add to the new license term. All such assessment shall occur only as provided in subsection (a). </text></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></section>
<section id="HD1F1673764F748EA936E78F487C28A22" commented="no"><enum>3006.</enum><header>Fair ratepayer accountability, transparency, and efficiency standards</header><text display-inline="no-display-inline">Section 205 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824d">16 U.S.C. 824d</external-xref>) is amended by adding at the end the following:</text> <quoted-block id="HF929248F2A8C4EE783CC6CCAAA249203" style="OLC"> <subsection id="H27BBADE671B243139ED86914A4502C8E" commented="no"><enum>(g)</enum><header>Inaction of Commissioners</header> <paragraph id="HECCADF21E43F4CD59A2A8D9B694FE305" commented="no"><enum>(1)</enum><header>In general</header><text>With respect to a change described in subsection (d), if the Commission permits the 60-day period established therein to expire without issuing an order accepting or denying the change because the Commissioners are divided two against two as to the lawfulness of the change, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum—</text>
<subparagraph id="H4D06277BD4954150B26F5F8B5A7A27F3" commented="no"><enum>(A)</enum><text>the failure to issue an order accepting or denying the change by the Commission shall be considered to be an order issued by the Commission accepting the change for purposes of section 313(a); and</text></subparagraph> <subparagraph id="HF0211BCB7EE5480286ADD2DECBC2C155" commented="no"><enum>(B)</enum><text>each Commissioner shall add to the record of the Commission a written statement explaining the views of the Commissioner with respect to the change.</text></subparagraph></paragraph>
<paragraph id="H53F7C802ABC0427F854AD054510B7D1A" commented="no"><enum>(2)</enum><header>Appeal</header><text>If, pursuant to this subsection, a person seeks a rehearing under section 313(a), and the Commission fails to act on the merits of the rehearing request by the date that is 30 days after the date of the rehearing request because the Commissioners are divided two against two, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum, such person may appeal under section 313(b). </text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></section> <section id="H6D0BE6F5F4E149AABA28B8F322F38F71"><enum>3007.</enum><header>J. Bennett Johnston Waterway hydropower extension</header> <subsection id="H7031F0B53E47454782B5A233D749CF5C"><enum>(a)</enum><header>In general</header><text>Notwithstanding the time period specified in section 13 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/806">16 U.S.C. 806</external-xref>) that would otherwise apply to Federal Energy Regulatory Commission project numbers 12756, 12757, and 12758, the Commission may, at the request of the licensee for the applicable project, and after reasonable notice, in accordance with the good faith, due diligence, and public interest requirements of that section and the Commission’s procedures under that section, extend the time period during which such licensee is required to commence the construction of its applicable project for up to 3 consecutive 2-year periods from the date of the expiration of the extension originally issued by the Commission under that section for such project.</text></subsection>
<subsection id="H6E7248E5E5AE49C7B7B9B0A79E73C912"><enum>(b)</enum><header>Obligation for payment of annual charges</header><text>Any obligation of a licensee for a project described in subsection (a) for the payment of annual charges under section 10(e) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/803">16 U.S.C. 803(e)</external-xref>) shall commence when the construction of the project commences.</text></subsection> <subsection id="HC0A9ED067322446F9202563A7C9E9418"><enum>(c)</enum><header>Reinstatement of license; effective date for extension</header> <paragraph id="H95F510CCE5CA4A9CB9D0E0B11C88A969"><enum>(1)</enum><header>Reinstatement</header><text>If the time period required for commencement of construction of a project described in subsection (a) has expired prior to the date of the enactment of this Act, the Commission may reinstate the license for such project, effective as of the date of the expiration of the license.</text></paragraph>
<paragraph id="HD08FFBADFEC243B7887CC648E6319BD0"><enum>(2)</enum><header>Effective date for extension</header><text>If the Commission reinstates a license under paragraph (1) for a project, the first extension authorized under subsection (a) with respect to such project shall take effect on the effective date of such reinstatement under paragraph (1).</text></paragraph></subsection></section> <section id="H50EAE71A67B0438F929A51322E35ACFE"><enum>3008.</enum><header>Stay and Reinstatement of FERC License No. 11393 for the Mahoney Lake Hydroelectric Project</header> <subsection commented="no" display-inline="no-display-inline" id="H76803E4F690E4DF89C7FFB3C9BBF7B3D"><enum>(a)</enum><header display-inline="yes-display-inline">Definitions</header><text display-inline="yes-display-inline">In this section:</text>
<paragraph commented="no" display-inline="no-display-inline" id="HEE16071CB5B044F3AEEEA03F5CFDB0B8"><enum>(1)</enum><header display-inline="yes-display-inline">Commission</header><text display-inline="yes-display-inline">The term <term>Commission</term> means the Federal Energy Regulatory Commission.</text></paragraph> <paragraph commented="no" display-inline="no-display-inline" id="H7A0DAF94DB274CD49331E56F9AEC01E3"><enum>(2)</enum><header display-inline="yes-display-inline">License</header><text display-inline="yes-display-inline">The term <term>license</term> means the license for the Commission project numbered 11393.</text></paragraph>
<paragraph commented="no" display-inline="no-display-inline" id="H5FD21911AA044D5488AF5C2E60A46C4F"><enum>(3)</enum><header display-inline="yes-display-inline">Licensee</header><text display-inline="yes-display-inline">The term <term>licensee</term> means the holder of the license.</text></paragraph></subsection> <subsection commented="no" display-inline="no-display-inline" id="H7464A15CDE474D178DFF9F1C2E6DB152"><enum>(b)</enum><header display-inline="yes-display-inline">Stay of license</header><text display-inline="yes-display-inline">On the request of the licensee, the Commission shall issue an order continuing the stay of the license.</text></subsection>
<subsection commented="no" display-inline="no-display-inline" id="H6482158D99264B3A82FA4B42455324A0"><enum>(c)</enum><header display-inline="yes-display-inline">Lifting of stay</header><text display-inline="yes-display-inline">On the request of the licensee, but not later than 10 years after the date of enactment of this Act, the Commission shall—</text> <paragraph commented="no" display-inline="no-display-inline" id="HF70476538FC0409E98F513710D88F156"><enum>(1)</enum><text display-inline="yes-display-inline">issue an order lifting the stay of the license under subsection (b); and</text></paragraph>
<paragraph commented="no" display-inline="no-display-inline" id="H7E0DDD7470D7481382FC393A89DCC3CB"><enum>(2)</enum><text display-inline="yes-display-inline">make the effective date of the license the date on which the stay is lifted under paragraph (1).</text></paragraph></subsection> <subsection commented="no" display-inline="no-display-inline" id="H289837A7CEAE4719B6628E9C0684AAD7"><enum>(d)</enum><header display-inline="yes-display-inline">Extension of license</header> <paragraph commented="no" display-inline="no-display-inline" id="HB59F75E3BA21432DB19F77A86011FBB4"><enum>(1)</enum><header display-inline="yes-display-inline">In general</header><text display-inline="yes-display-inline">Notwithstanding the time period specified in section 13 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/806">16 U.S.C. 806</external-xref>) that would otherwise apply to the Commission project numbered 11393, the Commission may, at the request of the licensee, and after reasonable notice, in accordance with the good faith, due diligence, and public interest requirements of, and the procedures of the Commission under, that section, extend the time period during which the licensee is required to commence the construction of the project for not more than 3 consecutive 2-year periods from the date of the expiration of the extension originally issued by the Commission.</text></paragraph>
<paragraph commented="no" display-inline="no-display-inline" id="H29BDB25909D54D1F9D4D6CEF1FDD5620"><enum>(2)</enum><header display-inline="yes-display-inline">Reinstatement of expired license</header>
<subparagraph commented="no" display-inline="no-display-inline" id="H9C380E0EEA7A42D89907B45DECFA415F"><enum>(A)</enum><header display-inline="yes-display-inline">In general</header><text display-inline="yes-display-inline">If the period required for the commencement of construction of the project described in paragraph (1) has expired prior to the date of enactment of this Act, the Commission may reinstate the license effective as of the date of the expiration of the license.</text></subparagraph> <subparagraph commented="no" display-inline="no-display-inline" id="HC688248A38044A6BABC3BBB0BA96C22F"><enum>(B)</enum><header display-inline="yes-display-inline">Extension</header><text display-inline="yes-display-inline">If the Commission reinstates the license under subparagraph (A), the first extension authorized under paragraph (1) shall take effect on the date of that expiration.</text></subparagraph></paragraph></subsection>
<subsection commented="no" display-inline="no-display-inline" id="H1079A690E78B46C3BE858069C6ABE9DF"><enum>(e)</enum><header display-inline="yes-display-inline">Effect</header><text display-inline="yes-display-inline">Nothing in this Act prioritizes, or creates any advantage or disadvantage to, Commission project numbered 11393 under Federal law, including the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/791a">16 U.S.C. 791a</external-xref> et seq.) or the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2601">16 U.S.C. 2601</external-xref> et seq.), as compared to—</text> <paragraph commented="no" display-inline="no-display-inline" id="HD821C3C0ADF64152BAC57543D5D7F1C5"><enum>(1)</enum><text display-inline="yes-display-inline">any electric generating facility in existence on the date of enactment of this Act; or</text></paragraph>
<paragraph commented="no" display-inline="no-display-inline" id="HDA5C20A5016A40E88E57BA37F13B86D3"><enum>(2)</enum><text display-inline="yes-display-inline">any electric generating facility that may be examined, proposed, or developed during the period of any stay or extension of the license under this Act.</text></paragraph></subsection></section> <section id="H8B9D9C1F5F414EBBB77B2728E32AAD2B" commented="no"><enum>3009.</enum><header>Strategic Petroleum Reserve drawdown</header> <subsection id="H74088A23BB374753BA53AB92B8F7869A" commented="no"><enum>(a)</enum><header>Drawdown and sale</header> <paragraph id="HD4687C94556A4C6ABF14BF912D7F4483" commented="no"><enum>(1)</enum><header>In general</header><text>Notwithstanding section 161 of the Energy Policy and Conservation Act (<external-xref legal-doc="usc" parsable-cite="usc/42/6241">42 U.S.C. 6241</external-xref>), except as provided in subsection (b), the Secretary of Energy shall draw down and sell 5,000,000 barrels of crude oil from the Strategic Petroleum Reserve during fiscal year 2028.</text></paragraph>
<paragraph id="H38699CDCE8D840FA896AB58C390D09E5" commented="no"><enum>(2)</enum><header>Deposit of amounts received from sale</header><text>Amounts received from a sale under paragraph (1) shall be deposited in the general fund of the Treasury during the fiscal year in which the sale occurs.</text></paragraph></subsection> <subsection id="H04E2744B4C334358B58D3C0E6FE0D6FA" commented="no"><enum>(b)</enum><header>Emergency protection</header><text>The Secretary of Energy may not draw down and sell crude oil under this section in quantities that would limit the authority to sell petroleum products under subsection (h) of section 161 of the Energy Policy and Conservation Act (<external-xref legal-doc="usc" parsable-cite="usc/42/6241">42 U.S.C. 6241</external-xref>) in the full quantity authorized by that subsection. </text></subsection></section></title>
<title id="HB737512DE74D4045AA9239FD908E52CB"><enum>IV</enum><header>Other Matters</header>
<subtitle id="H4BBBFD7BB6EF49AD862D1F4808E4249E"><enum>A</enum><header>Clean Water</header>
<section id="H549532D0779A4DB29E62A9028CAE69B5" commented="no"><enum>4101.</enum><header>Stormwater infrastructure funding task force</header>
<subsection id="H1A3222474DCF49C2B92FF0A67AFE855F" commented="no"><enum>(a)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of this Act, the Administrator of the Environmental Protection Agency shall establish a stormwater infrastructure funding task force composed of representatives of Federal, State, and local governments and private (including nonprofit) entities to conduct a study on, and develop recommendations to improve, the availability of public and private sources of funding for the construction, rehabilitation, and operation and maintenance of stormwater infrastructure to meet the requirements of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1251">33 U.S.C. 1251</external-xref> et seq.).</text></subsection> <subsection id="HDF163733724B4A52A3FD97F69C3B6B5C" commented="no"><enum>(b)</enum><header>Considerations</header><text>In carrying out subsection (a), the task force shall—</text>
<paragraph id="H3E5E290199474475AE214C1D497B51DD" commented="no"><enum>(1)</enum><text>identify existing Federal, State, and local public sources and private sources of funding for stormwater infrastructure; and</text></paragraph> <paragraph id="H847EAD9B78D74D5EAF3F232EBE382629" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">consider—</text>
<subparagraph id="H2F90F98071A649BDBED0E442D9847477" commented="no"><enum>(A)</enum><text display-inline="yes-display-inline">how funding for stormwater infrastructure from such sources has been made available, and utilized, in each State to address stormwater infrastructure needs identified pursuant to section 516(b)(1) of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1375">33 U.S.C. 1375(b)(1)</external-xref>);</text></subparagraph> <subparagraph id="H0AD53E5E83C7494D8CDC959C8D08A82E" commented="no"><enum>(B)</enum><text>how the source of funding affects the affordability of the infrastructure (as determined based on the considerations used to assess the financial capability of municipalities under the integrated planning guidelines described in the Integrated Municipal Stormwater and Wastewater Planning Approach Framework, issued by the Environmental Protection Agency on June 5, 2012, and dated May, 2012), including consideration of the costs associated with financing the infrastructure; and </text></subparagraph>
<subparagraph id="HB9142714A71E449E8500B9473CCFE401" commented="no"><enum>(C)</enum><text>whether such sources of funding are sufficient to support capital expenditures and long-term operation and maintenance costs necessary to meet the stormwater infrastructure needs of municipalities.</text></subparagraph></paragraph></subsection> <subsection id="HAF4A5DDFD00C4E8F82D687CD2E00F00D" commented="no"><enum>(c)</enum><header>Report</header><text>Not later than 18 months after the date of enactment of this Act, the Administrator shall submit to Congress a report that describes the results of the study conducted, and the recommendations developed, under subsection (a).</text></subsection>
<subsection id="H02DE847B12D14735B73CA642F059EBC9" commented="no"><enum>(d)</enum><header>State defined</header><text display-inline="yes-display-inline">In this section, the term <term>State</term> has the meaning given that term in section 502 of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1362">33 U.S.C. 1362</external-xref>).</text></subsection></section> <section id="HD7AA523266D74436BE0F724E301FF8ED"><enum>4102.</enum><header>Wastewater technology clearinghouse</header> <subsection id="H3AB24A66451047CABB3F66BB113B933D"><enum>(a)</enum><header>In general</header> <paragraph id="H75E8673FB4DA4955878F5B187D66C1B3"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">The Administrator of the Environmental Protection Agency shall—</text>
<subparagraph id="H17936A774E774D269E1825AA2F8C482D"><enum>(A)</enum><text>for each of the programs described in paragraph (2), update the information for those programs to include information on cost-effective and alternative wastewater recycling and treatment technologies, including onsite and decentralized systems; and</text></subparagraph> <subparagraph id="HCD1B38B1179F45889AF3908EDDDE28AD"><enum>(B)</enum><text>disseminate to units of local government and nonprofit organizations seeking Federal funds for wastewater technology information on the cost effectiveness of alternative wastewater treatment and recycling technologies, including onsite and decentralized systems.</text></subparagraph></paragraph>
<paragraph id="HFC27D61814384B79A3EFF806C50FBF1B"><enum>(2)</enum><header>Programs described</header><text>The programs referred to in paragraph (1)(A) are programs that provide technical assistance for wastewater management, including—</text> <subparagraph id="HB17433257F9F41F38EF592556ACC29F5"><enum>(A)</enum><text>programs for nonpoint source management under section 319 of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1329">33 U.S.C. 1329</external-xref>); and</text></subparagraph>
<subparagraph id="HCC781E1A749342279A346213A8B12218"><enum>(B)</enum><text>the permit program for the disposal of sewer sludge under section 405 of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1345">33 U.S.C. 1345</external-xref>).</text></subparagraph></paragraph></subsection> <subsection id="HD205800A34A84F88B68E3747EA22241D"><enum>(b)</enum><header>Report to Congress</header><text display-inline="yes-display-inline">Not later than 1 year after the date of enactment of this Act, and not less frequently than every 3 years thereafter, the Administrator of the Environmental Protection Agency shall submit to Congress a report that describes—</text>
<paragraph id="HE60DCB4683144EC89DCBEF10EA466114"><enum>(1)</enum><text display-inline="yes-display-inline">the type and amount of information provided under subsection (a) to units of local government and nonprofit organizations regarding alternative wastewater treatment and recycling technologies;</text></paragraph> <paragraph id="HFAAD9EB347164E75896D53C9E930D43A"><enum>(2)</enum><text>the States and regions that have made greatest use of alternative wastewater treatment and recycling technologies; and</text></paragraph>
<paragraph id="H11ABFD2134FB4C86998B435CBB721A84"><enum>(3)</enum><text display-inline="yes-display-inline">the actions taken by the Administrator to assist States in the deployment of alternative wastewater treatment and recycling technologies, including onsite and decentralized systems.</text></paragraph></subsection></section> <section id="H1A40A8F6E7DE41AE955F357C71FE7E29" commented="no"><enum>4103.</enum><header>Technical assistance for treatment works</header> <subsection id="H5EA1AF53D53D45FC80246E0AA565A26F" commented="no"><enum>(a)</enum><header>Technical assistance</header><text>Section 104 of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1254">33 U.S.C. 1254</external-xref>) is amended—</text>
<paragraph id="H8D3CA79E784846DAA19F1A328237B61E"><enum>(1)</enum><text>in subsection (b)—</text> <subparagraph id="H2BF60C6BD8C644D9956BCE8C12973384" commented="no"><enum>(A)</enum><text>by striking <quote>and</quote> at the end of paragraph (6);</text></subparagraph>
<subparagraph id="H078D3ACF00824ACFB84D6F0C0DBC7818" commented="no"><enum>(B)</enum><text>by striking the period at the end of paragraph (7) and inserting <quote>; and</quote>; and</text></subparagraph> <subparagraph id="HBEC6A2EBA7724AFDA1DE9F7C7A2558D2" commented="no"><enum>(C)</enum><text>by adding at the end the following:</text>
<quoted-block id="H30A578E7677E47A89A8107132681621F" style="OLC">
<paragraph id="H057638364AFA4E309AEA724C4A66392E" commented="no"><enum>(8)</enum><text>make grants to nonprofit organizations—</text> <subparagraph id="HFB1FDF90153947268CDD7A15A59DB434" commented="no"><enum>(A)</enum><text>to provide technical assistance to rural, small, and tribal municipalities for the purpose of assisting, in consultation with the State in which the assistance is provided, such municipalities and tribal governments in the planning, developing, and acquisition of financing for eligible projects and activities described in section 603(c);</text></subparagraph>
<subparagraph id="HDB553FF6A6A8448BB688762175249A58" commented="no"><enum>(B)</enum><text>to provide technical assistance and training for rural, small, and tribal publicly owned treatment works and decentralized wastewater treatment systems to enable such treatment works and systems to protect water quality and achieve and maintain compliance with the requirements of this Act; and</text></subparagraph> <subparagraph id="HEB8C9E3281614AA2AC8BC837A411783D" commented="no"><enum>(C)</enum><text>to disseminate information to rural, small, and tribal municipalities and municipalities that meet the affordability criteria established under section 603(i)(2) by the State in which the municipality is located with respect to planning, design, construction, and operation of publicly owned treatment works and decentralized wastewater treatment systems.</text></subparagraph></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph></paragraph>
<paragraph id="H989F2E3EA8024F4B83EE047CDBCEB14A"><enum>(2)</enum><text display-inline="yes-display-inline">by adding at the end the following:</text> <quoted-block style="OLC" id="H9678D1AAD41442ADAD4B5C935335BB55" display-inline="no-display-inline"> <subsection id="H4B9EB84B6F3D4948A9022A8546965E25"><enum>(w)</enum><header>Nonprofit organization</header><text display-inline="yes-display-inline">For purposes of subsection (b)(8), the term <term>nonprofit organization</term> means a nonprofit organization that the Administrator determines, after consultation with the States regarding what small publicly owned treatments works in the State find to be most beneficial and effective, is qualified and experienced in providing on-site training and technical assistance to small publicly owned treatment works.</text></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection>
<subsection id="HE85B7E5B7B594015A65953607F03CDD1" commented="no"><enum>(b)</enum><header>Authorization of appropriations</header><text>Section 104(u) of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1254">33 U.S.C. 1254(u)</external-xref>) is amended—</text> <paragraph id="H6C316054639C43B390A49C067D297FF0" commented="no"><enum>(1)</enum><text>by striking <quote>and (6)</quote> and inserting <quote>(6)</quote>; and</text></paragraph>
<paragraph id="H7658EFD9D67B415F9994EA91AE958068" commented="no"><enum>(2)</enum><text>by inserting before the period at the end the following: <quote>; and (7) not to exceed $25,000,000 for each of fiscal years 2019 through 2023 for carrying out subsections (b)(3), (b)(8), and (g)</quote>.</text></paragraph></subsection></section> <section id="H91910773B4D344899FF9B9925897AAE8" commented="no"><enum>4104.</enum><header>Amendments to Long Island Sound programs</header> <subsection id="HC042F7C3B2FD4067BA037372C4681E21" commented="no"><enum>(a)</enum><header>Long island sound restoration program</header><text>Section 119 of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1269">33 U.S.C. 1269</external-xref>) is amended—</text>
<paragraph id="H8C0A74726A484EE293C2E2E9E0F032AE" commented="no"><enum>(1)</enum><text>in subsection (c)—</text> <subparagraph id="H519BDC7505104FF09AE6F31CAA6EAF18" commented="no"><enum>(A)</enum><text>in the matter preceding paragraph (1), by striking <quote>Management Conference of the Long Island Sound Study</quote> and inserting <quote>conference study</quote>;</text></subparagraph>
<subparagraph id="HAA727636A9214425B1FC02D1386D553F" commented="no"><enum>(B)</enum><text>in paragraph (2)—</text> <clause id="H45B183644F9F40138F7FE167776AC5E6" commented="no"><enum>(i)</enum><text>in each of subparagraphs (A) through (G), by striking the commas at the end of the subparagraphs and inserting semicolons;</text></clause>
<clause id="HE616A55FAA554B46A819D13B7C948B2F" commented="no"><enum>(ii)</enum><text>in subparagraph (H), by striking <quote>, and</quote> and inserting a semicolon;</text></clause> <clause id="H39551176A0DB4923A06524A5DB855287" commented="no"><enum>(iii)</enum><text>in subparagraph (I), by striking the period at the end and inserting a semicolon; and</text></clause>
<clause id="HC5A5B1B3F7B54BF68E91DCEDE41A6B45" commented="no"><enum>(iv)</enum><text>by adding at the end the following:</text> <quoted-block id="H17619B1B25A043E58C86049953BF6F01" style="OLC"> <subparagraph id="H03B9632CE16D4FC380DB620BCAB4E507" commented="no"><enum>(J)</enum><text>environmental vulnerabilities of the Long Island Sound watershed, including—</text>
<clause id="H0A5A8B5D5BE14D399A2ECE0D387D18CD" commented="no"><enum>(i)</enum><text>the identification and assessment of such vulnerabilities in the watershed;</text></clause> <clause id="H801BFD65A7494927800ADA10D4105FF4" commented="no"><enum>(ii)</enum><text>the development and implementation of adaptation strategies to reduce such vulnerabilities; and</text></clause>
<clause id="HA298508F44AE4AE5976AC37F9C24203A" commented="no"><enum>(iii)</enum><text>the identification and assessment of the effects of sea level rise on water quality, habitat, and infrastructure; and</text></clause></subparagraph><after-quoted-block>;</after-quoted-block></quoted-block></clause></subparagraph> <subparagraph id="HB07F062A960F43CFAADFE5C01FF346BE" commented="no"><enum>(C)</enum><text>by striking paragraph (4) and inserting the following:</text>
<quoted-block id="H72832FDDA93D40858972F6F472F15E26" style="OLC">
<paragraph id="HD85CFA51657E4E51BF8254E4C01DA75F" commented="no"><enum>(4)</enum><text>develop and implement strategies to increase public education and awareness with respect to the ecological health and water quality conditions of Long Island Sound;</text></paragraph><after-quoted-block>;</after-quoted-block></quoted-block></subparagraph> <subparagraph id="H54264BA96CF74CC48829E8B2E38636DE" commented="no"><enum>(D)</enum><text>in paragraph (5), by inserting <quote>study</quote> after <quote>conference</quote>;</text></subparagraph>
<subparagraph id="HC5344779FA9A4BA8BF7A355E0B8F016F" commented="no"><enum>(E)</enum><text>in paragraph (6)—</text> <clause id="H7FAFA784CE29430EB6FE5BE726BCA88E" commented="no"><enum>(i)</enum><text>by inserting <quote>(including on a publicly accessible website)</quote> after <quote>the public</quote>; and</text></clause>
<clause id="H4511A1FCF7DC4411AB51B8769AD134DB" commented="no"><enum>(ii)</enum><text>by inserting <quote>study</quote> after <quote>conference</quote>; and</text></clause></subparagraph> <subparagraph id="H7BF5B438F8F840898FFF749F96913991" commented="no"><enum>(F)</enum><text>by striking paragraph (7) and inserting the following:</text>
<quoted-block id="H4F20009B3C8840F78FF707601BEFAC88" style="OLC">
<paragraph id="HD8FBBB1CE63E4B1FAAD5C1A515A005B3" commented="no"><enum>(7)</enum><text>monitor the progress made toward meeting the identified goals, actions, and schedules of the Comprehensive Conservation and Management Plan, including through the implementation and support of a monitoring system for the ecological health and water quality conditions of Long Island Sound; and</text></paragraph><after-quoted-block>;</after-quoted-block></quoted-block></subparagraph></paragraph> <paragraph id="H40162B74B4B147D6BE65A73E63F3CB5D" commented="no"><enum>(2)</enum><text>in subsection (d)(3), in the second sentence, by striking <quote>50 per centum</quote> and inserting <quote>60 percent</quote>;</text></paragraph>
<paragraph id="HD9A2A4F81CD947E78E83442632DBE21C" commented="no"><enum>(3)</enum><text>by redesignating subsection (f) as subsection (h); and</text></paragraph> <paragraph id="H3448414A724A44588F37CA525C39FE77" commented="no"><enum>(4)</enum><text>by inserting after subsection (e) the following:</text>
<quoted-block id="H8A189E1BEE4F403EB135F0700832BD31" style="OLC">
<subsection id="HF2A14D92D5E34F2B8E3E9D53ED12AE26" commented="no"><enum>(f)</enum><header>Report</header>
<paragraph id="H7F973B89BB284EABB226B188EFB82350" commented="no"><enum>(1)</enum><header>In general</header><text>Not later than 2 years after the date of enactment of this Act, and biennially thereafter, the Director of the Office, in consultation with the Governor of each Long Island Sound State, shall submit to Congress a report that—</text> <subparagraph id="HBDBA1C49CD744C50AC95550A2B9805C5" commented="no"><enum>(A)</enum><text>summarizes and assesses the progress made by the Office and the Long Island Sound States in implementing the Long Island Sound Comprehensive Conservation and Management Plan, including an assessment of the progress made toward meeting the performance goals and milestones contained in the Plan;</text></subparagraph>
<subparagraph id="H1183FE6F5A66489F9C5D0E8D58DADDAC" commented="no"><enum>(B)</enum><text>assesses the key ecological attributes that reflect the health of the ecosystem of the Long Island Sound watershed;</text></subparagraph> <subparagraph id="H2DB116A8FF704155A24DED027C2DB5CA" commented="no"><enum>(C)</enum><text>describes any substantive modifications to the Long Island Sound Comprehensive Conservation and Management Plan made during the 2-year period preceding the date of submission of the report;</text></subparagraph>
<subparagraph id="H1D2D983629604745894B8514850FC858" commented="no"><enum>(D)</enum><text>provides specific recommendations to improve progress in restoring and protecting the Long Island Sound watershed, including, as appropriate, proposed modifications to the Long Island Sound Comprehensive Conservation and Management Plan;</text></subparagraph> <subparagraph id="HEEFCA5E7416941BAA1CCF71112BC47F4" commented="no"><enum>(E)</enum><text>identifies priority actions for implementation of the Long Island Sound Comprehensive Conservation and Management Plan for the 2-year period following the date of submission of the report; and</text></subparagraph>
<subparagraph id="H033A082B101A424CB4138259C9953DB8" commented="no"><enum>(F)</enum><text>describes the means by which Federal funding and actions will be coordinated with the actions of the Long Island Sound States and other entities.</text></subparagraph></paragraph> <paragraph id="H39626EB32B2F41D8A5BDF560DAAE8D76" commented="no"><enum>(2)</enum><header>Public availability</header><text display-inline="yes-display-inline">The Administrator shall make the report described in paragraph (1) available to the public, including on a publicly accessible website.</text></paragraph></subsection>
<subsection id="H5D184380EC7F4415A68E3FFCD7F29CAE" commented="no"><enum>(g)</enum><header>Federal entities</header>
<paragraph id="H5377F60F1BD8414D9029B3A23DE3D939" commented="no"><enum>(1)</enum><header>Coordination</header><text>The Administrator shall coordinate the actions of all Federal departments and agencies that affect water quality in the Long Island Sound watershed in order to improve the water quality and living resources of the watershed.</text></paragraph> <paragraph id="H43493D9BDDBD4BB1992873E586F8E7C0" commented="no"><enum>(2)</enum><header>Methods</header><text>In carrying out this section, the Administrator, acting through the Director of the Office, may—</text>
<subparagraph id="H7E49DDD75A2C43C2BAF69D29B1BA16C1" commented="no"><enum>(A)</enum><text>enter into interagency agreements; and</text></subparagraph> <subparagraph id="H7CB0168F6023445CB9DE21F903C1C87E" commented="no"><enum>(B)</enum><text>make intergovernmental personnel appointments.</text></subparagraph></paragraph>
<paragraph id="H5979C60997844A7A803ACBF0715AC976" commented="no"><enum>(4)</enum><header>Consistency with comprehensive conservation and management plan</header><text>To the maximum extent practicable, the head of each Federal department or agency that owns or occupies real property, or carries out activities, within the Long Island Sound watershed shall ensure that the property and all activities carried out by the department or agency are consistent with the Long Island Sound Comprehensive Conservation and Management Plan (including any related subsequent agreements and plans).</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection> <subsection id="H0310BEF7E5C342A2B15CB948B071221F" commented="no"><enum>(b)</enum><header>Long island sound stewardship program</header><text>Section 8(g) of the Long Island Sound Stewardship Act of 2006 (<external-xref legal-doc="usc" parsable-cite="usc/33/1269">33 U.S.C. 1269</external-xref> note; <external-xref legal-doc="public-law" parsable-cite="pl/109/359">Public Law 109–359</external-xref>) is amended by striking <quote>2011</quote> and inserting <quote>2021</quote>.</text></subsection>
<subsection id="H83780FEEBC3E47AA80646CDF2500F97D" commented="no"><enum>(c)</enum><header>Reauthorization of long island sound programs</header>
<paragraph id="H2866C71F6A9F414FA6924FA666916239" commented="no"><enum>(1)</enum><header>Long island sound grants</header><text display-inline="yes-display-inline">Subsection (h) of section 119 of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1269">33 U.S.C. 1269</external-xref>) (as redesignated by subsection (a)) is amended to read as follows:</text> <quoted-block style="OLC" id="H1880D6EDD378415CB963BF5B4CC12F48" display-inline="no-display-inline"> <subsection id="H579CA1C054B14280BAF45760B24A4EFA"><enum>(h)</enum><header>Authorization of appropriations</header><text display-inline="yes-display-inline">There is authorized to be appropriated to the Administrator to carry out this section $40,000,000 for each of fiscal years 2019 through 2023.</text></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph>
<paragraph id="HEA8FF1A5D338415D9735416D1EA3255B" commented="no"><enum>(2)</enum><header>Long island sound stewardship grants</header><text>Section 11(a) of the Long Island Sound Stewardship Act of 2006 (<external-xref legal-doc="usc" parsable-cite="usc/33/1269">33 U.S.C. 1269</external-xref> note; <external-xref legal-doc="public-law" parsable-cite="pl/109/359">Public Law 109–359</external-xref>) is amended by striking <quote>2007 through 2011</quote> and inserting <quote>2019 through 2023</quote>.</text></paragraph></subsection></section> <section id="H2D96236074D647919A02A30391C06F6A"><enum>4105.</enum><header>Authorization of appropriations for Columbia river basin restoration</header><text display-inline="no-display-inline">Section 123(d) of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1275">33 U.S.C. 1275(d)</external-xref>) is amended by adding at the end the following:</text>
<quoted-block id="H656342193F1D4788B9C98893E8B2F540" style="OLC">
<paragraph id="H7D720B2668304EA2A30127E1AB2536C8"><enum>(6)</enum><header>Authorization of appropriations</header><text>There is authorized to be appropriated to carry out this subsection $30,000,000 for each of fiscal years 2020 and 2021.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></section> <section id="H9F655031C0D9469887CB4D6D46398A8D"><enum>4106.</enum><header>Sewer overflow control grants</header><text display-inline="no-display-inline">Section 221 of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1301">33 U.S.C. 1301</external-xref>) is amended—</text>
<paragraph id="HCF2E8988FF364973B31C3FC6E4A03E15"><enum>(1)</enum><text>by amending the section heading to read as follows: <quote><header-in-text level="section" style="OLC">Sewer overflow and stormwater reuse municipal grants</header-in-text></quote>;</text></paragraph> <paragraph id="H05A8F8F5B51A480EA7136629C65FD0D0"><enum>(2)</enum><text>by amending subsection (a) to read as follows:</text>
<quoted-block id="HBB65FD332B3B4EFB99F21F216263DB81" style="OLC">
<subsection id="H8F5C24EBD0564C6CA4D1D6DAFB10E1A2"><enum>(a)</enum><header>In general</header>
<paragraph id="H2B2D7688065C4078BC759DB82F0E0DFC"><enum>(1)</enum><header>Grants to states</header><text>The Administrator may make grants to States for the purpose of providing grants to a municipality or municipal entity for planning, design, and construction of—</text> <subparagraph id="H8C49D2E31C4E40239A20451A0BE2BCE7"><enum>(A)</enum><text>treatment works to intercept, transport, control, treat, or reuse municipal combined sewer overflows, sanitary sewer overflows, or stormwater; and</text></subparagraph>
<subparagraph id="H2801C3A9B8EB43D9806954E76796805D"><enum>(B)</enum><text>any other measures to manage, reduce, treat, or recapture stormwater or subsurface drainage water eligible for assistance under section 603(c).</text></subparagraph></paragraph> <paragraph id="H84D940DD19974FBCAD02803A736A27D3"><enum>(2)</enum><header>Direct municipal grants</header><text>Subject to subsection (g), the Administrator may make a direct grant to a municipality or municipal entity for the purposes described in paragraph (1).</text></paragraph></subsection><after-quoted-block>;</after-quoted-block></quoted-block></paragraph>
<paragraph id="HA107C037918147F18618B553C613DE42"><enum>(3)</enum><text>by amending subsection (e) to read as follows:</text> <quoted-block id="H43D7974851034D2AB9E64824F2861550" style="OLC"> <subsection id="H16217E2F2E0B434AAADDD14755516D4A"><enum>(e)</enum><header>Administrative requirements</header><text>A project that receives assistance under this section shall be carried out subject to the same requirements as a project that receives assistance from a State water pollution control revolving fund under title VI, except to the extent that the Governor of the State in which the project is located determines that a requirement of title VI is inconsistent with the purposes of this section. For the purposes of this subsection, a Governor may not determine that the requirements of title VI relating to the application of section 513 are inconsistent with the purposes of this section.</text></subsection><after-quoted-block>;</after-quoted-block></quoted-block></paragraph>
<paragraph id="H2C09356F4F184B8E8E7CB51B9137904B"><enum>(4)</enum><text>by amending subsection (f) to read as follows:</text> <quoted-block id="HC55CAB43DFAE42C48869DD7DE44230E6" style="OLC"> <subsection id="H075A016804824C6A9AA5947F85D0D5CD"><enum>(f)</enum><header>Authorization of appropriations</header> <paragraph id="H535E7AA3C4924C449D735C973D6D1E07"><enum>(1)</enum><header>In general</header><text>There is authorized to be appropriated to carry out this section $225,000,000 for each of fiscal years 2019 through 2020.</text></paragraph>
<paragraph id="H22542B4F408D4DBBBB867398A2D19299"><enum>(2)</enum><header>Minimum allocations</header><text>To the extent there are sufficient eligible project applications, the Administrator shall ensure that a State uses not less than 20 percent of the amount of the grants made to the State under subsection (a) in a fiscal year to carry out projects to intercept, transport, control, treat, or reuse municipal combined sewer overflows, sanitary sewer overflows, or stormwater through the use of green infrastructure, water and energy efficiency improvements, and other environmentally innovative activities.</text></paragraph></subsection><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph> <paragraph id="HB6FD4968AE6840ECA52CB784FBB4DD37"><enum>(5)</enum><text>by amending subsection (g) to read as follows:</text>
<quoted-block id="H168E515B489544AD8C35268D787311B1" style="OLC">
<subsection id="HD05FF5520091473287624F36329F3217"><enum>(g)</enum><header>Allocation of funds</header>
<paragraph id="H17D9E1C400F64185BA958857F1E05A38"><enum>(1)</enum><header>Fiscal year 2019</header><text>Subject to subsection (h), the Administrator shall use the amounts appropriated to carry out this section for fiscal year 2019 for making grants to municipalities and municipal entities under subsection (a)(2) in accordance with the criteria set forth in subsection (b).</text></paragraph> <paragraph id="H2A154B92DFCE46FA9B39FA1094DDE75A"><enum>(2)</enum><header>Fiscal year 2020 and thereafter</header><text>Subject to subsection (h), the Administrator shall use the amounts appropriated to carry out this section for fiscal year 2020 and each fiscal year thereafter for making grants to States under subsection (a)(1) in accordance with a formula to be established by the Administrator, after providing notice and an opportunity for public comment, that allocates to each State a proportional share of such amounts based on the total needs of the State for municipal combined sewer overflow controls, sanitary sewer overflow controls, and stormwater identified in the most recent detailed estimate and comprehensive study submitted pursuant to section 516 and any other information the Administrator considers appropriate.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section>
<section id="HE12E9F51AF144AB291FB78F1C22064A1" commented="no"><enum>4107.</enum><header>Assistance for individual household decentralized wastewater systems of individuals with low or moderate income</header>
<subsection id="H094F824FE0AB4D029E6B933B83D5C473" commented="no"><enum>(a)</enum><header>Projects and activities eligible for assistance</header><text>Section 603 of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1383">33 U.S.C. 1383</external-xref>) is amended—</text> <paragraph id="H5860BC1ACAB84409A00AC33DBC9F18C7" commented="no"><enum>(1)</enum><text>in subsection (c)—</text>
<subparagraph id="H73D340B488504378AE5DB75D82B54403" commented="no"><enum>(A)</enum><text>by striking <quote>and</quote> at the end of paragraph (10);</text></subparagraph> <subparagraph id="HE03F9EBCB9DB422DB8E2A0F56D33EBA7" commented="no"><enum>(B)</enum><text>by striking <quote>Act.</quote> at the end of paragraph (11) and inserting <quote>Act; and</quote>; and</text></subparagraph>
<subparagraph id="H6E447BBB750545638309C49383DC3D08" commented="no"><enum>(C)</enum><text>by inserting after paragraph (11) the following:</text> <quoted-block id="H902E8B231AB64042A07B9855A718E7C0" style="OLC"> <paragraph id="HB3CE7667CE794379AD1A4EE2A3BC5610" commented="no"><enum>(12)</enum><text>to any qualified nonprofit entity, as determined by the Administrator, to provide assistance to an eligible individual (as defined in subsection (j))—</text>
<subparagraph id="HB2350123A74B4756A8A01174E455C73E" commented="no"><enum>(A)</enum><text>for the repair or replacement of existing individual household decentralized wastewater treatment systems; or</text></subparagraph> <subparagraph id="HC346DD79D8DE44B7AA658614EC9A71B4" commented="no"><enum>(B)</enum><text>in a case in which an eligible individual resides in a household that could be cost-effectively connected to an available publicly owned treatment works, for the connection of the applicable household to such treatment works.</text></subparagraph></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph></paragraph>
<paragraph id="HB5A44E1AF5B749F58DC7A12DA434377F" commented="no"><enum>(2)</enum><text>by adding at the end the following:</text> <quoted-block id="HD073B9888BF14624A1DBB29B12AADD0F" style="OLC"> <subsection id="H14C8A0ED5F904F88AD5ED56A8E835304" commented="no"><enum>(j)</enum><header>Definition of eligible individual</header><text>In subsection (c)(12), the term <term>eligible individual</term> means a member of a household, the members of which have a combined income (for the most recent 12-month period for which information is available) equal to not more than 50 percent of the median nonmetropolitan household income for the State in which the household is located, according to the most recent decennial census.</text></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection>
<subsection id="H56641EDA90514603A286A068DF60739E" commented="no"><enum>(b)</enum><header>Report</header><text>Not later than 2 years after the date of enactment of this section, the Administrator of the Environmental Protection Agency shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report describing—</text> <paragraph id="HF0541A2355044C3B89D20349EA27D4FD" commented="no"><enum>(1)</enum><text>the prevalence throughout the United States of low- and moderate-income households without access to a treatment works; and</text></paragraph>
<paragraph id="H84E7A1712E3047308DFBDE69062EF63C" commented="no"><enum>(2)</enum><text display-inline="yes-display-inline">the use by States of assistance under section 603(c)(12) of the Federal Water Pollution Control Act.</text></paragraph></subsection></section></subtitle> <subtitle id="H3F02A5DF65474790BAD4756D15E63D1D"><enum>B</enum><header>WIFIA Reauthorization and Innovative Financing for State Loan Funds</header> <section id="HF9640E15703548A78376CC835ECFD5CD" section-type="subsequent-section"><enum>4201.</enum><header>WIFIA reauthorization and innovative financing for State loan funds</header> <subsection id="HB159A9137DD04F6E94E163640CFC70FD"><enum>(a)</enum><header>WIFIA reauthorization</header> <paragraph id="HC9368A4D60644A909F22807ED5F5F4D4"><enum>(1)</enum><header>Authority To provide assistance</header><text display-inline="yes-display-inline">Section 5023 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3902">33 U.S.C. 3902</external-xref>) is amended—</text>
<subparagraph id="H5248FB5D05804F2CBB5B7B110EAB83BB"><enum>(A)</enum><text>by striking <quote>pilot</quote> each place it appears; and</text></subparagraph> <subparagraph id="H0A51E5E053964D388C79B400C05DBAC1"><enum>(B)</enum><text>in subsection (b)(1), by inserting <quote>provide financial assistance to</quote> before <quote>carry out</quote>.</text></subparagraph></paragraph>
<paragraph id="HB2E25BFAE7E14D128098E0262ACF9391"><enum>(2)</enum><header>Determination of eligibility and project selection</header><text>Section 5028(a)(1)(E) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3907">33 U.S.C. 3907(a)(1)(E)</external-xref>) is amended to read as follows:</text> <quoted-block id="H0F778D52AB55477EA1B291E908C5FA6F" style="OLC"> <subparagraph id="HC80E35618A474606A5A18F1711A93836"><enum>(E)</enum><header>Special rule for certain combined projects</header><text>The Administrator shall develop a credit evaluation process for a Federal credit instrument provided to—</text>
<clause id="H22C2507CAD314F1F83742D6941CCD7A8"><enum>(i)</enum><text>a State infrastructure financing authority for a project under section 5026(9), which may include requiring the provision of a final rating opinion letter from at least one rating agency; or</text></clause> <clause id="H593CCC64C48B491688E909BD2E98F908"><enum>(ii)</enum><text>an entity for a project under section 5026(10), which may include requiring the provision of a final rating opinion letter from at least two rating agencies.</text></clause></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph>
<paragraph id="HA8AEDBB8E1B448CFA1D6F5D46D5BDF46"><enum>(3)</enum><header>Repayments</header><text>Section 5029(c)(2)(B) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3908">33 U.S.C. 3908(c)(2)(B)</external-xref>) is amended—</text> <subparagraph id="H3F9081DA87FE4ED4972265CBBDD5CAB0"><enum>(A)</enum><text>by striking <quote>Scheduled</quote> and inserting the following:</text>
<quoted-block style="OLC" id="HD778CB384270475EA86811B4FF4C13C5" display-inline="no-display-inline">
<clause id="H71EC1736C84046F48F0770EB076A3F13"><enum>(i)</enum><header>Timing of scheduled loan repayments</header><text display-inline="yes-display-inline">Scheduled</text></clause><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph> <subparagraph id="HD09E4FEBB832416993A67681EE1EA0BE"><enum>(B)</enum><text>by adding at the end:</text>
<quoted-block id="HD0E3EC54240A4E3E81964D1D149977E2" style="OLC">
<clause id="H3E471F3710CE4C598C12B12CC148F3A5" display-inline="no-display-inline"><enum>(ii)</enum><header>Repayments</header><text>None of the funds for repayment of a secured loan under this title from a State infrastructure financing authority may come from funds provided to a State revolving loan fund under title VI of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1381">33 U.S.C. 1381</external-xref> et seq.) or section 1452 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12</external-xref>).</text></clause><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph> <paragraph id="H0D906AD688CF47DAAF9A3DD6E8588515"><enum>(4)</enum><header>Authorization of appropriations</header><text>Section 5033 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3912">33 U.S.C. 3912</external-xref>) is amended—</text>
<subparagraph id="HE6A23FC28F6A4353BF487DEE114D73B2"><enum>(A)</enum><text>in subsection (a)—</text> <clause id="H0EA086945F0042A1997EA6A72B607882"><enum>(i)</enum><text>by redesignating paragraphs (1) through (5) as subparagraphs (A) through (E), respectively, and indenting appropriately;</text></clause>
<clause id="HDE9487D9B05340269A3F0F16D5CB9A9C"><enum>(ii)</enum><text>in the matter preceding subparagraph (A) (as so redesignated), by striking <quote>There is</quote> and inserting the following:</text> <quoted-block id="H353D7FB5631C44BA9DAAEC06A307B156" style="OLC"> <paragraph id="H144FA393BE9C4B5FBBF3E313E94B2206"><enum>(1)</enum><header>Fiscal years 2015 through 2019</header><text>There are</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></clause>
<clause id="HBBAB4B335F1A4186B339C5C43CCF752A"><enum>(iii)</enum><text>by adding at the end the following:</text> <quoted-block id="HDFFF1579D5CF4936B9E023CB8F8DF160" style="OLC"> <paragraph id="H756BEEF789904E77B330B79275A7F145"><enum>(2)</enum><header>Fiscal years 2020 and 2021</header><text>There is authorized to be appropriated to the Administrator to carry out this subtitle $50,000,000 for each of fiscal years 2020 and 2021, to remain available until expended.</text></paragraph><after-quoted-block>; and </after-quoted-block></quoted-block></clause></subparagraph>
<subparagraph id="H2C2EB4C052864A6C8B9B56881AB91AD9"><enum>(B)</enum><text>in subsection (b)—</text> <clause id="HF08A39CD9F75484083A90978F4F78D9A"><enum>(i)</enum><text>by striking <quote>Of the funds</quote> and inserting the following:</text>
<quoted-block id="H7A18EE1587E646CB8BFF6E1E3D14649C" style="OLC">
<paragraph id="HC81ADAC68133417B8C7B60CC363F4932"><enum>(1)</enum><header>Fiscal years 2015 through 2019</header><text>Of the funds</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></clause> <clause id="H179FC937EC4045DFA4DBEB636EB24F5A"><enum>(ii)</enum><text>by adding at the end the following:</text>
<quoted-block id="H297A701DEE66463181DE4B6FB5213193" style="OLC">
<paragraph id="H8413A614DDBB4A3E9733638D1C791DFA"><enum>(2)</enum><header>Fiscal years 2020 and 2021</header><text display-inline="yes-display-inline">Of the funds made available to carry out this subtitle, the Administrator may use for the administration of this subtitle, including for the provision of technical assistance to aid project sponsors in obtaining the necessary approvals for the project, not more than $5,000,000 for each of fiscal years 2020 and 2021.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></clause></subparagraph></paragraph></subsection> <subsection id="H12F791E447054122AC009A9F4E2D14BF"><enum>(b)</enum><header>Innovative financing for State loan funds</header> <paragraph id="H27FB7702292146899FEAFB14B3D0A3C8"><enum>(1)</enum><header>Maximum Federal involvement</header><text>Section 5029(b)(9) of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3908">33 U.S.C. 3908(b)(9)</external-xref>) is amended by adding at the end the following:</text>
<quoted-block id="H206B1E311FE9499B8D0F3953E8F637EB" style="OLC">
<subparagraph id="H8026F668E9B94D238D04FE0F6CAE439F"><enum>(C)</enum><header>Exception for projects funded by a State infrastructure financing authority</header><text display-inline="yes-display-inline">Notwithstanding subparagraph (A), a State infrastructure financing authority may finance up to 100 percent of the costs of a project using the proceeds of financial assistance authorized under section 5033(e), provided that, in the event of a default with respect to any such assistance, the State infrastructure financing authority is solely responsible for immediate repayment of such costs.</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph> <paragraph id="H2270C90D30AA4579AC23D6188F848554"><enum>(2)</enum><header>Program administration</header><text>Section 5030 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3909">33 U.S.C. 3909</external-xref>) is amended—</text>
<subparagraph id="HC1FC1F9F9E314FF39ED2EC745886E5F8"><enum>(A)</enum><text>in subsection (b), by inserting after paragraph (1) the following:</text> <quoted-block id="HF25903DECD9A40FFB1C977342ADE7883" style="OLC"> <paragraph id="H5FCC6367A07D4B32A7A4AAD03DE7813C"><enum>(2)</enum><header>Prohibition on pass through fees</header><text>The Administrator, in the case where a State infrastructure financing authority obtains financial assistance under section 5033(e), shall require as a condition of obtaining such assistance, that the State infrastructure financing authority is prohibited from passing any portion of the fees required under section 5029(b)(7) to any party that utilizes any portion of such assistance for a project funded by such authority.</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></subparagraph>
<subparagraph id="HC661935121FA44F58095B20071C33820"><enum>(B)</enum><text>by redesignating subsection (e) as subsection (h) and inserting after subsection (d) the following:</text> <quoted-block id="H4CE9B3D363524DEBBD53432665A6C557" style="OLC"> <subsection id="H95332C8391944AB2B8520C255549BC04"><enum>(e)</enum><header>Special rule for state reviews of projects for state infrastructure financing authorities</header> <paragraph id="HAB5F3DF0E67B4E5C8D7A7FFF05653BBE"><enum>(1)</enum><header>In general</header><text>A project described in section 5026(9) for which funding is provided under this title shall comply with any applicable State environmental or engineering review requirements pursuant to, as applicable—</text>
<subparagraph id="HE684BB7F571E4F03BD0030D826C89045"><enum>(A)</enum><text>title VI of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1381">33 U.S.C. 1381</external-xref> et seq.); and</text></subparagraph> <subparagraph id="H658BF8C470ED4F51961458BD4CB9617F"><enum>(B)</enum><text>section 1452 of the Safe Drinking Water Act (<external-xref legal-doc="usc" parsable-cite="usc/42/300j-12">42 U.S.C. 300j–12</external-xref>).</text></subparagraph></paragraph>
<paragraph id="H32F27D996A5D4C33B6431E0C5EEFB8B2"><enum>(2)</enum><header>No new reviews required</header><text>Nothing in this title requires any additional or new environmental or engineering review for a project described in section 5026(9) for which funding is provided, other than any requirement otherwise applicable to the project.</text></paragraph></subsection> <subsection id="HAE3FB36C213B4D09AF787BB19EC06216"><enum>(f)</enum><header>Special rule for expedited review of applications from state infrastructure financing authorities</header><text>Not later than 180 days after the date on which the Administrator receives a complete application from a State infrastructure financing authority for a project under section 5026(9), the Administrator shall, through a written notice to the State infrastructure financing authority—</text>
<paragraph id="H2B176FF618FB4D6895AAEAD63DAF6022"><enum>(1)</enum><text>approve the application; or</text></paragraph> <paragraph id="HB34F35E3548A4235A33E9D7CB96B1594"><enum>(2)</enum><text>provide detailed guidance and an explanation of any changes to the application necessary for approval of the application.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></subparagraph></paragraph>
<paragraph id="H0C452322B38E4A14BEB7DA39AA0211BB"><enum>(3)</enum><header>Authorization of appropriations</header><text display-inline="yes-display-inline">Section 5033 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3912">33 U.S.C. 3912</external-xref>) is further amended by adding at the end the following:</text> <quoted-block id="H844460ADB2FB4BC58EB310FE9520932B" style="OLC"> <subsection id="H352211B21BD84D98B5E1C40FA9247700"><enum>(e)</enum><header>Assistance for state infrastructure financing authorities</header> <paragraph id="HEBB77A3F2BC84049A317B2C1FCF368DA"><enum>(1)</enum><header>In general</header><text>With respect to fiscal years 2020 and 2021, if the Administrator has available for obligation in a fiscal year at least $50,000,000, there is authorized to be appropriated to the Administrator $5,000,000 for that fiscal year to provide financial assistance for projects described in section 5026(9) to State infrastructure financing authorities.</text></paragraph>
<paragraph id="H60CCC3CDB19D4466BDCA27328457EB5B"><enum>(2)</enum><header>No impact on other federal funding</header><text>No funds shall be made available in a fiscal year to the Administrator for purposes of this subsection if—</text> <subparagraph id="HE49FF122F0CA4283935EFC31D664F318"><enum>(A)</enum><text>the total amount appropriated for the fiscal year for State loan funds under section 1452 of the Safe Drinking Water Act is less than either the amount made available for such purpose in fiscal year 2018, or 105 percent of the previous fiscal year’s appropriation for such purpose, whichever is greater; and</text></subparagraph>
<subparagraph id="H21669A21A66E4E94AE3158F24B8895E2"><enum>(B)</enum><text display-inline="yes-display-inline">the total amount appropriated for the fiscal year for water pollution control revolving funds under title VI of the Federal Water Pollution Control Act is less than either the amount made available for such purpose for fiscal year 2018, or 105 percent of the previous fiscal year’s appropriation for such purpose, whichever is greater.</text></subparagraph></paragraph> <paragraph id="H70730DD9D5A949A4BE59450E96ACF0E6"><enum>(3)</enum><header>Inclusion in agreement</header><text>If the Administrator provides financial assistance to a State infrastructure financing authority under section 5029 using funds made available pursuant to this subsection, the Administrator shall specify in the agreement under such section the amount of such assistance that is attributable to such funds. </text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection>
<subsection id="H8C3BC4ABB5BD4753A3B5BFB7C9BFDC31"><enum>(c)</enum><header>Administration of WIFIA program</header><text display-inline="yes-display-inline">Section 5030 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3909">33 U.S.C. 3909</external-xref>), as amended by subsection (b), is further amended by inserting after subsection (f) the following:</text> <quoted-block id="HA3BAAC47A5384EF5B5EDF12C3854F0E1" style="OLC"> <subsection id="HF3E48383F735488EABC8320224753D4E" commented="no"><enum>(g)</enum><header>Agreements</header> <paragraph id="H153B3D3C528149F9ACED422F18E72238" commented="no"><enum>(1)</enum><header>In general</header><text>Subject to paragraphs (3) and (4), the Administrator may enter into an agreement with another relevant Federal agency to provide assistance in administering and servicing Federal credit instruments that such agency is authorized to make available.</text></paragraph>
<paragraph id="H5DE710EA2B67496D976E941F50D0E241" commented="no"><enum>(2)</enum><header>Duties</header><text>The Administrator may act as an agent for the head of another Federal agency under paragraph (1), subject to the terms of any agreement entered into by the Administrator and the head of such other agency under such clause.</text></paragraph> <paragraph id="H4FDD72AC139F4F0C9FA80EBAD3CE9062" commented="no"><enum>(3)</enum><header>Transfer of funds</header><text display-inline="yes-display-inline">The authority of the Administrator to provide assistance under paragraph (1) is subject to—</text>
<subparagraph id="H7F2C3EC7A1D84CE7BA119C2898AA70DC" commented="no"><enum>(A)</enum><text display-inline="yes-display-inline">the availability of funds appropriated to the other Federal agency that may be transferred to the Administrator to carry out an agreement entered into under paragraph (1); and</text></subparagraph> <subparagraph id="H1D75FF5ABB8040C5863A997353FC081E" commented="no"><enum>(B)</enum><text>the transfer of such funds to the Administrator to carry out such an agreement.</text></subparagraph></paragraph>
<paragraph id="H7E3CD8128BC741B68C6421CEF8458931"><enum>(4)</enum><header>Limitation</header><text display-inline="yes-display-inline">Nothing in this subsection affects the authority of the Administrator with respect to the selection of projects described in paragraphs (1), (8), or (10) of section 5026 to receive financial assistance under this subtitle.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></subsection> <subsection id="H249412F2AB704B4E9219754AE1EFEB4E"><enum>(d)</enum><header>Reports on pilot program implementation</header><text display-inline="yes-display-inline">Section 5034 of the Water Resources Reform and Development Act of 2014 (<external-xref legal-doc="usc" parsable-cite="usc/33/3913">33 U.S.C. 3913</external-xref>) is amended—</text>
<paragraph id="H367AFE282903447D9A746721B8E95C3F"><enum>(1)</enum><text>in the section heading, by striking <quote><header-in-text level="section" style="OLC">PILOT</header-in-text></quote>; and</text></paragraph> <paragraph id="H44D3EAE6FB8C4FBA9C0341A4CF80183F"><enum>(2)</enum><text>in subsection (b)(1), by striking <quote>4 years after the date of enactment of this Act</quote> and inserting <quote>3 years after the date of enactment of the <short-title>Water Resources Development Act of 2018</short-title></quote>.</text></paragraph></subsection></section></subtitle>
<subtitle id="H9F5D1B4C789C49109594553FA09E82A1"><enum>C</enum><header>Miscellaneous</header>
<section id="H9202625AB13A4231A4278E8E57A75E62" commented="no"><enum>4301.</enum><header>Agreement with Commissioner of Reclamation</header><text display-inline="no-display-inline">Not later than 1 year after the date of enactment of this Act, the Administrator of the Environmental Protection Agency and the Commissioner of Reclamation shall enter into an agreement under section 5030(g) of the Water Infrastructure Finance and Innovation Act (as added by this Act).</text></section> <section id="H257A40BA505E492B8482BE7EBB41B53F" commented="no"><enum>4302.</enum><header>Snake River Basin flood prevention action plan</header> <subsection id="H8854D228D64D4807BC1D0A3DB251EDD3" commented="no"><enum>(a)</enum><header>In general</header><text>As soon as practicable after the date of enactment of this Act, the Commissioner of Reclamation, in consultation with the Secretary of the Army, shall develop a flood prevention action plan for each State or portion of a State within the Snake River Basin.</text></subsection>
<subsection id="H26D18A665F4E40C38E52C243279020BC" commented="no"><enum>(b)</enum><header>Requirements</header><text>A flood prevention action plan developed under subsection (a) shall—</text> <paragraph id="H3D9D49C856714226BBC5FAACB335F3C3" commented="no"><enum>(1)</enum><text>focus on the areas most likely to experience flooding within the 2 years following the date of enactment of this Act;</text></paragraph>
<paragraph id="H89EFB31F523A43688C326CD5A811A8AF" commented="no"><enum>(2)</enum><text>include steps to manage and reduce flood risks within the Snake River Basin; and</text></paragraph> <paragraph id="H3D2F67F1777B4E0EA2B367E454F08E07" commented="no"><enum>(3)</enum><text>include a description of the actions the Secretary and the Commissioner of Reclamation plan to take to improve coordination with local stakeholders to help manage and reduce flood risks in the areas described in paragraph (1).</text></paragraph></subsection>
<subsection id="H9CF89F25B6534DF7B85153CD4039674A" commented="no"><enum>(c)</enum><header>Submission</header><text>Not later than 180 days after the date of enactment of this Act, after coordinating with local stakeholders, the Commissioner of Reclamation shall submit to the Committee on Environment and Public Works and the Committee on Energy and Natural Resources of the Senate, and the Committee on Transportation and Infrastructure and the Committee on Natural Resources of the House of Representatives, the flood prevention plans developed under subsection (a).</text></subsection></section> <section id="H10F953D2FB864BF18744C926CA68FBC6" commented="no" display-inline="no-display-inline" section-type="subsequent-section"><enum>4303.</enum><header>GAO audit of contracts and Tainter gate repairs of Harlan County Dam</header> <subsection id="H7E6B08CA5B204E28BDCC5748EC25FE39" commented="no"><enum>(a)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of this Act, the Comptroller General of the United States shall—</text>
<paragraph id="H18F09A70E2F446C499791EFF32B031CC" commented="no"><enum>(1)</enum><text>conduct an audit of the extraordinary maintenance repayment contracts No. 16XX630077 and No. 16XX630076 between the United States and the Bostwick Division for repairs to the Tainter gates and other features at Harlan County Dam, including—</text> <subparagraph id="H303536A0D60A4869BCC760AF56E11AB2" commented="no"><enum>(A)</enum><text>an examination of whether—</text>
<clause id="HE38AA47EC90F4455909D374F5D386C4F" commented="no"><enum>(i)</enum><text>the Corps of Engineers should have designated the Tainter gate rehabilitation as a <quote>Dam Safety Modification</quote>, subject to the cost-sharing requirements under section 1203 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/467n">33 U.S.C. 467n</external-xref>), instead of an <quote>extraordinary maintenance project</quote>; and</text></clause> <clause id="HC712685EE2A1494A9B7DA9D3E410F142" commented="no"><enum>(ii)</enum><text>a more appropriate cost share should have applied to the Bostwick Division;</text></clause></subparagraph>
<subparagraph id="H9515B07103EA4E12AC8F6047D109E75C" commented="no"><enum>(B)</enum><text>a review of—</text> <clause id="H0F528E46FC0745048E4C0780FDCE54D2" commented="no"><enum>(i)</enum><text>the amounts owed by the Bostwick Division to the Bureau of Reclamation; and</text></clause>
<clause id="HDA4CE20E26A6411696FD8746D5965B36" commented="no"><enum>(ii)</enum><text>any reimbursements owed by the Corps of Engineers to the Bureau of Reclamation based on the actual costs of the project after completion; and</text></clause></subparagraph> <subparagraph id="H11FFA179CFA949BBACBF9D2FFD7D888F" commented="no"><enum>(C)</enum><text>a review of project designations and cost-share policies of the Bureau of Reclamation and other Federal agencies for similar spillway gate repairs; and</text></subparagraph></paragraph>
<paragraph id="H110F76998E9A420D9E94047574062F51" commented="no"><enum>(2)</enum><text>submit to Congress a report on the results of the audit under paragraph (1).</text></paragraph></subsection> <subsection id="H8E93DBF81D604CD3B44AD5F8945609DE" commented="no"><enum>(b)</enum><header>Treatment of payments</header><text>Payments made after the date of enactment of this Act by the Bostwick Division to the Bureau of Reclamation under the contracts described in subsection (a)(1) shall be—</text>
<paragraph id="H8BD88EB7097A48159AA40ABF8CDF8340" commented="no"><enum>(1)</enum><text>deposited into a no-year account; and</text></paragraph> <paragraph id="H617849E26B3846A9864BE69F5914E43E" commented="no"><enum>(2)</enum><text>disbursed to the Bureau of Reclamation upon submission of the report under subsection (a)(2).</text></paragraph></subsection></section>
<section id="H007E7D20AD824A2CB83AB5B00AE54298" commented="no"><enum>4304.</enum><header>Water infrastructure and workforce investment</header>
<subsection id="H54930261D5A94AEA87AD2826195B1A1A" commented="no"><enum>(a)</enum><header>Sense of Congress</header><text display-inline="yes-display-inline">It is the sense of Congress that—</text> <paragraph id="H5717701C2DFF40E79AA1D5B2A3184732" commented="no"><enum>(1)</enum><text>water and wastewater utilities provide a unique opportunity for access to stable, high-quality careers;</text></paragraph>
<paragraph id="HC9BBDD505EF047599B4A710C5794EC5F" commented="no"><enum>(2)</enum><text>as water and wastewater utilities make critical investments in infrastructure, water and wastewater utilities can invest in the development of local workers and local small businesses to strengthen communities and ensure a strong pipeline of skilled and diverse workers for today and tomorrow; and</text></paragraph> <paragraph id="H6E8177C98B8A47F7B16F39DF72329157" commented="no"><enum>(3)</enum><text>to further the goal of ensuring a strong pipeline of skilled and diverse workers in the water and wastewater utilities sector, Congress urges—</text>
<subparagraph id="HB283E99FC31A47EF9D71F22E8EBAF2F4" commented="no"><enum>(A)</enum><text display-inline="yes-display-inline">increased collaboration among Federal, State, and local governments; and</text></subparagraph> <subparagraph id="H2A3D4445944840C99889C3E149E0F0E6" commented="no"><enum>(B)</enum><text display-inline="yes-display-inline">institutions of higher education, apprentice programs, high schools, and other community-based organizations to align workforce training programs and community resources with water and wastewater utilities to accelerate career pipelines and provide access to workforce opportunities.</text></subparagraph></paragraph></subsection>
<subsection id="H2B3131DE361B446BAAC2FCFBFA6BBE94" commented="no"><enum>(b)</enum><header>Innovative water infrastructure workforce development program</header>
<paragraph id="H6842CAA756F748128F2D576AB2F0626C" commented="no"><enum>(1)</enum><header>Grants authorized</header><text display-inline="yes-display-inline">The Administrator of the Environmental Protection Agency (referred to in this section as the <quote>Administrator</quote>), in consultation with the Secretary of Agriculture, shall establish a competitive grant program—</text> <subparagraph id="H58A3CF770E504D1891584963A5A8EAB7" commented="no"><enum>(A)</enum><text>to assist the development and utilization of innovative activities relating to workforce development and career opportunities in the water utility sector; and</text></subparagraph>
<subparagraph id="HBD27F23151714A74B1C89921B4F2D3A1" commented="no"><enum>(B)</enum><text>to expand public awareness about water utilities and connect individuals to careers in the water utility sector.</text></subparagraph></paragraph> <paragraph id="H7D1D1F9CD5D44E98931653BEF7F856A5" commented="no"><enum>(2)</enum><header>Selection of grant recipients</header><text display-inline="yes-display-inline">In awarding grants under paragraph (1), the Administrator shall, to the extent practicable, select nonprofit professional or service organizations, labor organizations, community colleges, institutions of higher education, or other training and educational institutions—</text>
<subparagraph id="H6EE6730FF13E4460BC361BEC5D7D6998"><enum>(A)</enum><text>that have qualifications and experience—</text> <clause id="HADEC0BE43CE4434796E94DC794D0439A" commented="no"><enum>(i)</enum><text display-inline="yes-display-inline">in the development of training programs and curricula relevant to workforce needs of water utilities;</text></clause>
<clause id="HFA6A0A92EC364516AF84B254E410B62A" commented="no"><enum>(ii)</enum><text display-inline="yes-display-inline">working in cooperation with water utilities; or</text></clause> <clause id="H2B1898CBF44645F2A6E8299159CAD63C" commented="no"><enum>(iii)</enum><text display-inline="yes-display-inline">developing public education materials appropriate for communicating with groups of different ages and educational backgrounds; and</text></clause></subparagraph>
<subparagraph id="HDD211DED485F416C84D4E2E31382DD3A" commented="no"><enum>(B)</enum><text display-inline="yes-display-inline">that will address the human resources and workforce needs of water utilities that—</text> <clause id="HFD81198FCBD446AC950884549A6C8C55" commented="no"><enum>(i)</enum><text>are geographically diverse;</text></clause>
<clause id="H1C9577C643494F3EB46E2F1720C83B8E" commented="no"><enum>(ii)</enum><text>are of varying sizes; and</text></clause> <clause id="H15AC1856CA694EF781C0EC21E726EDE7" commented="no"><enum>(iii)</enum><text>serve urban, suburban, and rural populations.</text></clause></subparagraph></paragraph>
<paragraph id="H30D93D15D16E469694D8C88AD3C6F75C" commented="no"><enum>(3)</enum><header>Use of funds</header><text display-inline="yes-display-inline">Grants awarded under paragraph (1) may be used for activities such as—</text> <subparagraph id="H68BD33FB78D14742A8C2E5A6D26516CA" commented="no"><enum>(A)</enum><text display-inline="yes-display-inline">targeted internship, apprenticeship, pre-apprenticeship, and post-secondary bridge programs for skilled water utility trades that provide—</text>
<clause id="HC6E0E4157B4642A1A6C01C67398CEE97" commented="no"><enum>(i)</enum><text display-inline="yes-display-inline"> on-the-job training; </text></clause> <clause id="H508FE59227C44267869170C768E25B31" commented="no"><enum>(ii)</enum><text>skills development; </text></clause>
<clause id="H590A960FA114411082A5CB9C2574727D" commented="no"><enum>(iii)</enum><text>test preparation for skilled trade apprenticeships; </text></clause> <clause id="H285059269A604296B18CC6C3B5019547" commented="no"><enum>(iv)</enum><text>advance training in the water utility sector relating to construction, utility operations, treatment and distribution, green infrastructure, customer service, maintenance, and engineering; or</text></clause>
<clause id="HDF8D120F9918401DA8F04AF3FE55EB18" commented="no"><enum>(v)</enum><text>other support services to facilitate post-secondary success;</text></clause></subparagraph> <subparagraph id="H76F24C7027DA4FBA870EEF78BDD49A2F" commented="no"><enum>(B)</enum><text display-inline="yes-display-inline">education programs designed for elementary, secondary, and higher education students that—</text>
<clause id="HF0C56692572847F797FB5D9359EAF0D0" commented="no"><enum>(i)</enum><text display-inline="yes-display-inline">inform people about the role of water and wastewater utilities in their communities;</text></clause> <clause id="HBCB0209ED7884212AFDDC6C6AEC11180" commented="no"><enum>(ii)</enum><text display-inline="yes-display-inline">increase the awareness of career opportunities and exposure of students to water utility careers through various work-based learning opportunities inside and outside the classroom; and</text></clause>
<clause id="H24204150D7AB4078B68E1127AA782292" commented="no"><enum>(iii)</enum><text>connect students to career pathways related to water utilities;</text></clause></subparagraph> <subparagraph id="H5580703838544135890D3F093EF1266A" commented="no"><enum>(C)</enum><text display-inline="yes-display-inline">regional industry and workforce development collaborations to address water utility employment needs and coordinate candidate development, particularly in areas of high unemployment or for water utilities with a high proportion of retirement eligible employees;</text></subparagraph>
<subparagraph id="HAEC90F42FC6A4635BD6A4EBFCBBDCD2F" commented="no"><enum>(D)</enum><text display-inline="yes-display-inline">integrated learning laboratories in secondary educational institutions that provide students with—</text> <clause id="HCD5F2B81E4E2446B81376013459C0AC1" commented="no"><enum>(i)</enum><text display-inline="yes-display-inline"> hands-on, contextualized learning opportunities;</text></clause>
<clause id="H32260FBDADAE46F59953F28808B9F55F" commented="no"><enum>(ii)</enum><text>dual enrollment credit for post-secondary education and training programs; and </text></clause> <clause id="HDE96E0D3A6FF47B2BFD21F747B48ACC8" commented="no"><enum>(iii)</enum><text>direct connection to industry employers; and</text></clause></subparagraph>
<subparagraph id="H62C10F0C6C204AC2AB842E5F5D9F5A7C" commented="no"><enum>(E)</enum><text display-inline="yes-display-inline">leadership development, occupational training, mentoring, or cross-training programs that ensure that incumbent water and waste water utilities workers are prepared for higher level supervisory or management-level positions.</text></subparagraph></paragraph> <paragraph id="HC34F0D411FFE4F31A53E9550DCC6E451" commented="no"><enum>(4)</enum><header>Authorization of appropriations</header><text display-inline="yes-display-inline">There is authorized to be appropriated to carry out this subsection $1,000,000 for each of fiscal years 2019 and 2020.</text></paragraph></subsection></section>
<section id="HF3B70D595D5B448ABC9ABDB3EF3A7C16"><enum>4305.</enum><header>Regional liaisons for minority, Tribal, and low-income communities</header>
<subsection id="H030269DB058646549EC7A3B03C891852"><enum>(a)</enum><header>In general</header><text>The Administrator of the Environmental Protection Agency (referred to in this section as the <quote>Administrator</quote>) shall assign at least one employee in each regional office of the Environmental Protection Agency to serve as a liaison to minority, Tribal, and low-income communities in the relevant region.</text></subsection> <subsection id="H82576EDA229F417D85C1D1086C1B342D"><enum>(b)</enum><header>Public identification</header><text>The Administrator shall identify each regional liaison assigned under subsection (a) on the internet website of—</text>
<paragraph id="HF5CC2492F7A0404E9D152D36EB65AF4C"><enum>(1)</enum><text>the relevant regional office of the Environmental Protection Agency; and</text></paragraph> <paragraph id="H299BA76E8B7441AA9C767CE7A4FEF66D"><enum>(2)</enum><text>the Office of Environmental Justice of the Environmental Protection Agency.</text></paragraph></subsection></section>
<section id="HD6CCEC985A9B4D6EBA95DF9BCD43E8DD" commented="no"><enum>4306.</enum><header>WaterSense</header>
<subsection id="HE23C9F93966E40E699E026BAFCFEBD7B" commented="no"><enum>(a)</enum><header>WaterSense</header><text display-inline="yes-display-inline">The Energy Policy and Conservation Act (<external-xref legal-doc="usc" parsable-cite="usc/42/6201">42 U.S.C. 6201</external-xref> et seq.) is amended by adding after section 324A the following:</text> <quoted-block style="OLC" id="HA80E2B9133F4496BB01ED233A427EEAA" display-inline="no-display-inline"> <section id="H59B04877E97440C699A56405B9113857" commented="no"><enum>324B.</enum><header>WaterSense program</header> <subsection id="HAF264E4BF26A4B5A91594C6C82E14A54" commented="no"><enum>(a)</enum><header>Establishment of WaterSense program</header> <paragraph id="H7868775B11A24734A806E66BEB6E6CD6" commented="no"><enum>(1)</enum><header>In general</header><text>There is established within the Environmental Protection Agency a voluntary program, to be known as the WaterSense program, to identify and promote water-efficient products, buildings, landscapes, facilities, processes, and services in order to, through voluntary labeling of, or other forms of communications regarding, such products, buildings, landscapes, facilities, processes, and services while meeting strict performance criteria, sensibly— </text>
<subparagraph id="H9B66FBE684F74F4F9DC9AE4B3EC5E85C" commented="no"><enum>(A)</enum><text>reduce water use;</text></subparagraph> <subparagraph id="HA1C0F2F875124F2E952AFE9F6E6C1D1C" commented="no"><enum>(B)</enum><text>reduce the strain on public water systems, community water systems, and wastewater and stormwater infrastructure;</text></subparagraph>
<subparagraph id="H443870C64D18426B8745A69B3725451B" commented="no"><enum>(C)</enum><text>conserve energy used to pump, heat, transport, and treat water; and</text></subparagraph> <subparagraph id="H24DCC464E09E4F7EAB073D9296308A4D" commented="no"><enum>(D)</enum><text>preserve water resources for future generations.</text></subparagraph></paragraph>
<paragraph id="HB9C87C83CABD493E8DE65744827FFF9A" commented="no"><enum>(2)</enum><header>Inclusions</header><text>Categories of products, buildings, landscapes, facilities, processes, and services that may be included under the program include—</text> <subparagraph id="HA214016AAE8D44D9AB9EA7EF50EB7233" commented="no"><enum>(A)</enum><text>irrigation technologies and services;</text></subparagraph>
<subparagraph id="HB19867CDD7C64D9F92DBB58785B6A929" commented="no"><enum>(B)</enum><text>point-of-use water treatment devices;</text></subparagraph> <subparagraph id="H4C98F31556EC495DBA269CF33DFD26AF" commented="no"><enum>(C)</enum><text>plumbing products;</text></subparagraph>
<subparagraph id="HB92AF6300E6144C7A3AB5E15F2794378" commented="no"><enum>(D)</enum><text>water reuse and recycling technologies;</text></subparagraph> <subparagraph id="H15241AC5338F425D8F098545ACC3931D" commented="no"><enum>(E)</enum><text>landscaping and gardening products, including moisture control or water enhancing technologies;</text></subparagraph>
<subparagraph id="HE4F84384C3BB4B6DAE1A1E9D64FDAA24" commented="no"><enum>(F)</enum><text>xeriscaping and other landscape conversions that reduce water use;</text></subparagraph> <subparagraph id="H32D8D9A0453F49898A0095505EB31FE7" commented="no"><enum>(G)</enum><text>whole house humidifiers; and</text></subparagraph>
<subparagraph id="H771F49FB8A104EF281BE638A5DBD43FA" commented="no"><enum>(H)</enum><text>water-efficient buildings or facilities.</text></subparagraph></paragraph></subsection> <subsection id="H8796585A4D8842AABE3AD89E7E3867E2" commented="no"><enum>(b)</enum><header>Duties</header><text>The Administrator of the Environmental Protection Agency, in coordination with the Secretary of Energy as appropriate, shall—</text>
<paragraph id="H289CC525D5E442CAAE9AA37768B55280" commented="no"><enum>(1)</enum><text>establish—</text> <subparagraph id="HBAAB21DBB0C644D0B8CB509D763031A5" commented="no"><enum>(A)</enum><text>a WaterSense label to be used for products, buildings, landscapes, facilities, processes, and services meeting the certification criteria established pursuant to this section; and</text></subparagraph>
<subparagraph id="HBD29C27E42274D2A8E0AD25CC603B7C0" commented="no"><enum>(B)</enum><text>the procedure, including the methods and means, and criteria by which products, buildings, landscapes, facilities, processes, and services may be certified to display the WaterSense label;</text></subparagraph></paragraph> <paragraph id="HC80C2F29AC584C9FB0352F7F9A597678" commented="no"><enum>(2)</enum><text>enhance public awareness regarding the WaterSense label through outreach and public education;</text></paragraph>
<paragraph id="H96CF297067044B99A4ECA39E251534D6" commented="no"><enum>(3)</enum><text>preserve the integrity of the WaterSense label by—</text> <subparagraph id="HF74CC5E4944E49008ED0AB3F5DCADB3D" commented="no"><enum>(A)</enum><text>establishing and maintaining feasible performance criteria so that products, buildings, landscapes, facilities, processes, and services certified to display the WaterSense label perform as well or better than less water-efficient counterparts;</text></subparagraph>
<subparagraph id="H28193B696B734721843E13DBC4462AEE" commented="no"><enum>(B)</enum><text>overseeing WaterSense certifications made by third parties, which shall be independent third-party product certification bodies accredited by an accreditation entity domiciled in the United States;</text></subparagraph> <subparagraph id="H0BA6ECF33A9D43E9B5F25B9BE68B606F" commented="no"><enum>(C)</enum><text>using testing protocols, from the appropriate, applicable, and relevant consensus standards, for the purpose of determining compliance with performance criteria; and</text></subparagraph>
<subparagraph id="H88C08C54179E41739B6C84D1ABCF164F" commented="no"><enum>(D)</enum><text>auditing the use of the WaterSense label in the marketplace and preventing cases of misuse;</text></subparagraph></paragraph> <paragraph id="H33982C61E57F4789BF06FD19171EC203" commented="no"><enum>(4)</enum><text>not more frequently than every 6 years after adoption or major revision of any WaterSense performance criteria, review and, if appropriate, revise the performance criteria to achieve additional water savings; </text></paragraph>
<paragraph id="H9C7D3CCA43A0443882F1DA1FC01BE03E" commented="no"><enum>(5)</enum><text>in revising any WaterSense criteria—</text> <subparagraph id="H3D15004DAF844FA8AF4BC60EDBF04EE2" commented="no"><enum>(A)</enum><text>provide reasonable notice to interested parties and the public of any changes, including effective dates, and an explanation of the changes;</text></subparagraph>
<subparagraph id="HBCF847113D9E48FE9CCE743236E47368" commented="no"><enum>(B)</enum><text>solicit comments from interested parties and the public prior to any changes;</text></subparagraph> <subparagraph id="H4FF346CA7EE2479AAF752E8089D07A55" commented="no"><enum>(C)</enum><text>as appropriate, respond to comments submitted by interested parties and the public; and</text></subparagraph>
<subparagraph id="HE087BF12CAE0473AAF0E21C756CA69E1" commented="no"><enum>(D)</enum><text>provide an appropriate transition time prior to the applicable effective date of any changes, taking into account the timing necessary for the manufacture, marketing, training, and distribution of the specific product, building, landscape, process, or service category being addressed; and</text></subparagraph></paragraph> <paragraph id="H9E13F7DEE12C4057A31A5A34E15EDA0D" commented="no"><enum>(6)</enum><text>not later than December 31, 2019, consider for review and revise, if necessary, any WaterSense performance criteria adopted before January 1, 2012.</text></paragraph></subsection>
<subsection id="HC28537C0D8864F22BCB54CE04ED64A81" commented="no"><enum>(c)</enum><header>Transparency</header><text>The Administrator of the Environmental Protection Agency shall, to the extent practicable and not less than annually, estimate and make available to the public the relative water and energy savings attributable to the use of WaterSense-labeled products, buildings, landscapes, facilities, processes, and services.</text></subsection> <subsection id="H719D91FE82FC457584EEA427BD4AB60A" commented="no"><enum>(d)</enum><header>Distinction of authorities</header><text>In setting or maintaining specifications and criteria for Energy Star pursuant to section 324A, and WaterSense under this section, the Secretary of Energy and the Administrator of the Environmental Protection Agency shall coordinate to prevent duplicative or conflicting requirements among the respective programs.</text></subsection>
<subsection id="H5894D59AF38A4784A240A86BB3C48EE6" commented="no"><enum>(e)</enum><header>No warranty</header><text>A WaterSense label shall not create any express or implied warranty. </text></subsection> <subsection id="HB1555E1661C64FB7854F01C05187D4A0" commented="no"><enum>(f)</enum><header>Methods for establishing performance criteria</header><text display-inline="yes-display-inline">In establishing performance criteria for products, buildings, landscapes, facilities, processes, or services pursuant to this section, the Administrator of the Environmental Protection Agency shall use technical specifications and testing protocols established by voluntary consensus standards organizations relevant to specific products, buildings, landscapes, facilities, processes, or services, as appropriate. </text></subsection>
<subsection id="H886D2DB4AFBC41788DF41537CFA3DEB6" commented="no"><enum>(g)</enum><header>Definition of feasible</header><text>The term <term>feasible</term> means feasible with the use of the best technology, techniques, and other means that the Administrator of the Environmental Protection Agency finds, after examination for efficacy under field conditions and not solely under laboratory conditions, are available (taking cost into consideration).</text></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></subsection> <subsection id="H72D87D3C7B8E4A528A6BD6B027357946" commented="no"><enum>(b)</enum><header>Table of contents</header><text display-inline="yes-display-inline">The table of contents for the Energy Policy and Conservation Act is amended by adding after the item relating to section 324A the following: </text>
<quoted-block style="OLC" id="H05DE99ADB5F249609D366B80C72AFFF4" display-inline="no-display-inline">
<toc regeneration="no-regeneration">
<toc-entry level="section">Sec. 324B. WaterSense program.</toc-entry></toc><after-quoted-block>.</after-quoted-block></quoted-block></subsection></section>
<section id="HB64364FA21FA4687A93F2FC269A55435"><enum>4307.</enum><header>Predatory and other wild animals</header><text display-inline="no-display-inline">Section 1 of the Act of March 2, 1931 (46 Stat. 1468, chapter 370; <external-xref legal-doc="usc" parsable-cite="usc/7/8351">7 U.S.C. 8351</external-xref>) is amended—</text> <paragraph id="H00AE15A095924B56A813F25FBC190B17"><enum>(1)</enum><text>in the second sentence, by striking <quote>The Secretary</quote> and inserting the following:</text>
<quoted-block id="H9142AFFB7E16416380CDD3FF610DBB89" style="OLC">
<subsection id="H394E41C4B732495BB5FD18A97B6873A8"><enum>(b)</enum><header>Administration</header><text>The Secretary</text></subsection><after-quoted-block>;</after-quoted-block></quoted-block></paragraph> <paragraph id="H128001DD7586473795A283AE9165CCFF"><enum>(2)</enum><text>in the first sentence, by striking <quote>The Secretary</quote> and inserting the following:</text>
<quoted-block id="HCC4C27DC032A43A18CC258163AE36BD6" style="OLC">
<subsection id="HC6E8DD59B92342428597B3C57B3F7929"><enum>(a)</enum><header>In general</header><text>The Secretary</text></subsection><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph> <paragraph id="H63F337B28E8E495BBDD4C5184484CC45"><enum>(3)</enum><text>by adding at the end the following:</text>
<quoted-block id="H050760E71298491BB694BD4302137865" style="OLC">
<subsection id="H261CCB328CD14493B54CD3558910168F"><enum>(c)</enum><header>Action by FWS</header><text>The Director of the United States Fish and Wildlife Service shall use the most expeditious procedure practicable to process and administer permits for take of—</text> <paragraph id="H8FB32C5DE1F644CE81133ED38515D543"><enum>(1)</enum><text>a depredating eagle under the Act of June 8, 1940 (commonly known as the <quote>Bald Eagle Protection Act</quote>) (54 Stat. 250, chapter 278; <external-xref legal-doc="usc" parsable-cite="usc/16/668">16 U.S.C. 668</external-xref> et seq.), or sections 22.11 through 22.32of title 50, Code of Federal Regulations (or successor regulations) (including depredation of livestock, wildlife, and species protected under the Endangered Species Act of 1973 (<external-xref legal-doc="usc" parsable-cite="usc/16/1531">16 U.S.C. 1531</external-xref> et seq.) or any other Federal management program); or</text></paragraph>
<paragraph id="HC2DDE63AB0DE4A77BC2E76B8E512953D"><enum>(2)</enum><text>a migratory bird included on the list under section 10.13 of title 50, Code of Federal Regulations (or successor regulations) that is posing a conflict.</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></section> <section id="H9ABCBDC0E0994B068FDE9FE335772AE2"><enum>4308.</enum><header>Klamath project water and power</header> <subsection id="HA7A752350E334A7797015240374F3234"><enum>(a)</enum><header>Addressing water management and power costs for irrigation</header><text>The Klamath Basin Water Supply Enhancement Act of 2000 (<external-xref legal-doc="public-law" parsable-cite="pl/106/498">Public Law 106–498</external-xref>; 114 Stat. 2221) is amended—</text>
<paragraph id="H4DDDBC3C925E422B9C59E5D23B6F4FF3"><enum>(1)</enum><text>by redesignating sections 4 through 6 as sections 5 through 7, respectively; and</text></paragraph> <paragraph id="HCECDB76B05A641FF908AFF3A6F571278"><enum>(2)</enum><text>by inserting after section 3 the following:</text>
<quoted-block id="H0A6F9890D2F0487B8D91763654AF89D2" style="OLC">
<section id="HBDD3A50F78544413BF2870C6E866FE32"><enum>4.</enum><header>Power and water management</header>
<subsection id="H98A8BBB305C240B0890BF4E1A1DBCD25"><enum>(a)</enum><header>Definitions</header><text>In this section:</text> <paragraph id="HE27B947C7FFF45F1B038868A922ADC1A"><enum>(1)</enum><header>Covered power use</header><text>The term <quote>covered power use</quote> means a use of power to develop or manage water from any source for irrigation, wildlife purposes, or drainage on land that is—</text>
<subparagraph id="H86092B26A4434C578EBCB209ED29840D"><enum>(A)</enum><text>associated with the Klamath Project, including land within a unit of the National Wildlife Refuge System that receives water due to the operation of Klamath Project facilities; or</text></subparagraph> <subparagraph id="H257155CC164240E99CB6EA5E8BD24E1F"><enum>(B)</enum><text>irrigated by the class of users covered by the agreement dated April 30, 1956, between the California Oregon Power Company and Klamath Basin Water Users Protective Association and within the Off Project Area (as defined in the Upper Basin Comprehensive Agreement entered into on April 18, 2014), only if each applicable owner and holder of a possessory interest of the land is a party to that agreement (or a successor agreement that the Secretary determines provides a comparable benefit to the United States).</text></subparagraph></paragraph>
<paragraph id="HAEA8D4D431E245E7987B4D2D43C1CF42"><enum>(2)</enum><header>Klamath project</header>
<subparagraph id="HC7EFF6192B4E47168A4F460E0772F649"><enum>(A)</enum><header>In general</header><text>The term <quote>Klamath Project</quote> means the Bureau of Reclamation project in the States of California and Oregon.</text></subparagraph> <subparagraph id="H17FE9256019548A2A083874769C6CF7D"><enum>(B)</enum><header>Inclusions</header><text>The term <quote>Klamath Project</quote> includes any dam, canal, or other works or interests for water diversion, storage, delivery, and drainage, flood control, or any similar function that is part of the project described in subparagraph (A).</text></subparagraph></paragraph>
<paragraph id="H9AF4506725F846D6B50BC2694FD77A4C"><enum>(3)</enum><header>Power cost benchmark</header><text>The term <quote>power cost benchmark</quote> means the average net delivered cost of power for irrigation and drainage at Reclamation projects in the area surrounding the Klamath Project that are similarly situated to the Klamath Project, including Reclamation projects that—</text> <subparagraph id="H1B4F462B9A1D407085A6DECDA3BC75C1"><enum>(A)</enum><text>are located in the Pacific Northwest; and</text></subparagraph>
<subparagraph id="H38AE643CDC9B43ADAAD7FF15B1D2883B"><enum>(B)</enum><text>receive project-use power.</text></subparagraph></paragraph></subsection> <subsection id="H1A2B7E29D9864B58B909F1CD5765E247"><enum>(b)</enum><header>Water activities and drought response</header> <paragraph id="H9CD66B61848A4EF4A81AE27E3F71712C"><enum>(1)</enum><header>In general</header><text>Pursuant to the reclamation laws and subject to appropriations and required environmental reviews, the Secretary may carry out activities, including entering into a contract or making financial assistance available through cooperative agreements or other methods—</text>
<subparagraph id="H9CF6CFC906EB410C8671830305C0A136"><enum>(A)</enum><text>to plan, implement, and administer programs to align water supplies and demand for irrigation water users associated with the Klamath Project, with a primary emphasis on programs developed or endorsed by local entities comprised of representatives of those water users;</text></subparagraph> <subparagraph id="HCB9186B8205F43A9A37DDB536198B4E4"><enum>(B)</enum><text>Expenditures under this paragraph shall not exceed $10 million on an average annual basis.</text></subparagraph></paragraph>
<paragraph id="HC9BCD5C5B8FD4CB9B9F1498D74A64909"><enum>(2)</enum><header>2018 drought response</header><text>All disbursements made or to be made based on actions approved by the Secretary under Contract Numbers 18–WC–20–5322 and 18–WC–20–5323 are authorized.</text></paragraph> <paragraph id="HC4B14184B5DB4F7F843CC20E02E61514"><enum>(3)</enum><header>Requirements</header><text>The Secretary shall ensure that the activities under this subsection—</text>
<subparagraph id="H4A96B6BE335546BAA06B0B625961AFF8"><enum>(A)</enum><text>do not foster groundwater use that results in groundwater level declines that, based on existing data from the United States Geological Survey, are more than appropriate in a critically dry year, taking into consideration the long-term sustainability of aquifers;</text></subparagraph> <subparagraph id="H86F39178DE084723978D67C4C89E0C8A"><enum>(B)</enum><text>do not adversely affect compliance with applicable laws protecting fishery resources in Upper Klamath Lake and the Klamath River.</text></subparagraph></paragraph>
<paragraph id="H64790A2332A5490CB556A48462A45587"><enum>(4)</enum><header>Conveyance of non-project water</header>
<subparagraph id="HF0CBF78F7A6B4025BC6D24ED88F0CE83"><enum>(A)</enum><header>In general</header><text>Subject to subparagraphs (B) and (C), any entity operating under a contract entered into with the United States for the operation and maintenance of any Klamath Project works or facility, and any entity operating any works or facility not owned by the United States that receives Klamath Project water, may use, without any additional Federal contract, permit, or other authorization, any Klamath Project works or facility to convey non-Klamath Project water for any authorized purpose of the Klamath Project.</text></subparagraph> <subparagraph id="HC44DF04012624E8E870F911C0A4D3A77"><enum>(B)</enum><header>Permits; measurement</header><text>A use of water pursuant to subparagraph (A) (including an addition or conveyance of water) shall be subject to the requirements that—</text>
<clause id="H06CE4B1EDB0543CA8DED9E608FA2DA6C"><enum>(i)</enum><text>the applicable entity shall secure all permits required under State or local law; and</text></clause> <clause id="H1EF30AFBBD0D4512BE3E6924FB47DE4D"><enum>(ii)</enum><text>as applicable—</text>
<subclause id="HED6CF72BDFCF4A3D85832D5015B4F65E"><enum>(I)</enum><text>all water delivered into and taken out of a Klamath Project works or facility pursuant to that subparagraph shall be measured; and</text></subclause> <subclause id="H094E684ECE114CCBA7D061BB5E1F34C3"><enum>(II)</enum><text>any irrigation district conveying water shall ensure that only the land authorized to receive water under applicable State law shall receive, and put to beneficial use, the water, in accordance with the applicable State law and any associated terms and conditions.</text></subclause></clause></subparagraph>
<subparagraph id="H9F2898DAF97946A387E0D91B47199649"><enum>(C)</enum><header>Limitation</header><text>A use of non-Klamath Project water under this paragraph shall not—</text> <clause id="H0EAD0CC767BB40E7B9BFF96435CFAD22"><enum>(i)</enum><text>adversely affect the delivery of water to any water user or land served by the Klamath Project; or</text></clause>
<clause id="H7B8BE4FE435348068AD7B3B55A97BFDD"><enum>(ii)</enum><text>result in any additional cost to the United States.</text></clause></subparagraph></paragraph> <paragraph id="H0F34E624C7F64BB1A60599C1F3613677"><enum>(4)</enum><header>Effect of subsection</header><text>Nothing in this subsection authorizes the Secretary—</text>
<subparagraph id="H88398419DDAB4AA9B37B97AEEE139328"><enum>(A)</enum><text>to develop or construct new facilities for the Klamath Project without appropriate approval from Congress under section 9 of the Reclamation Projects Act of 1939 (<external-xref legal-doc="usc" parsable-cite="usc/43/485h">43 U.S.C. 485h</external-xref>); or</text></subparagraph> <subparagraph id="HB8F27BB515234E01A195E867E32DB151"><enum>(B)</enum><text>to carry out activities that have not otherwise been authorized.</text></subparagraph></paragraph></subsection>
<subsection id="H7B04258A751D49E6BA70A412E1F57553"><enum>(c)</enum><header>Reducing power costs</header>
<paragraph id="H6718E3EA9D8542AC872DF5FCF4D4072A"><enum>(1)</enum><header>In general</header><text>Not later than 180 days after the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title>, the Secretary, in consultation with interested irrigation interests that are eligible for covered power use and organizations representative of those interests, shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives a report that—</text> <subparagraph id="H96B6207A75C944FAA32807432662ACC5"><enum>(A)</enum><text>identifies the power cost benchmark; and</text></subparagraph>
<subparagraph id="HF22CF99E49CE487890FCE01B54E3B600"><enum>(B)</enum><text>recommends actions (other than direct payments to persons making covered power uses or to other entities for the purposes of subsidizing power rates) that, in the judgment of the Secretary, are necessary and appropriate to ensure that the net delivered power cost for covered power use is equal to or less than the power cost benchmark, including a description of—</text> <clause id="H9156D78264B44CB59D7AF1ACD823453D"><enum>(i)</enum><text>actions—</text>
<subclause id="H3C71378DD41843BE93211CFB887E3CB3"><enum>(I)</enum><text>to immediately reduce power costs; and</text></subclause> <subclause id="H9867A80120FB4CF1AD8BFC9C3E3BCFEE"><enum>(II)</enum><text>to ensure that the net delivered power cost for covered power use is equal to, or less than, the power cost benchmark in the near term, while longer-term actions are being implemented;</text></subclause></clause>
<clause id="H1491D8E9992A4B5B9B30C7A0B846B178"><enum>(ii)</enum><text>actions that prioritize—</text> <subclause id="H9E2C5C3041CC4EFFA50EB7C4CEB0E469"><enum>(I)</enum><text>water and power conservation and efficiency measures that could assist in achieving the power cost benchmark;</text></subclause>
<subclause id="H1AA09117DC0740BA91DAE495774D3833"><enum>(II)</enum><text>to the extent actions involving the development or acquisition of power generation are included, renewable energy technologies (including hydropower); and</text></subclause> <subclause id="HCE1F72B2419E4AC7896A8C9908326699"><enum>(III)</enum><text>regional economic development;</text></subclause></clause>
<clause id="H0E4D143DB8564418AEED39E41B980450"><enum>(iii)</enum><text>the potential costs and timeline for the actions recommended under this subparagraph;</text></clause> <clause id="HB4AF43AF4AC54CD38BFA5BE8CF33AA68"><enum>(iv)</enum><text>provisions for modifying the actions and timeline to adapt to new information or circumstances; and</text></clause>
<clause id="HB028DFCC450F4179860BE7C03F5751E7"><enum>(v)</enum><text>a description of public input regarding the proposed actions, including—</text> <subclause id="H7A255A2F0EFA4F4B89ED5CEB351ED2F1"><enum>(I)</enum><text>input from water users that have covered power use; and</text></subclause>
<subclause id="H07CFC8ED1F524874878F42F8386F6765"><enum>(II)</enum><text>the degree to which those water users concur with the recommendations.</text></subclause></clause></subparagraph></paragraph></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection> <subsection id="H93AE89265D0B40A4A6CF2E2EC818C00F"><enum>(b)</enum><header>Effect</header><text>None of the amendments made by this section—</text>
<paragraph id="H13C46B23BA074F4E9ADF82EB7A4D175B"><enum>(1)</enum><text>modify any authority or obligation of the United States with respect to any tribal trust or treaty obligation of the United States;</text></paragraph> <paragraph id="HE9F264E9880E4021A8DFD6BCF196A69B"><enum>(2)</enum><text>create or determine any water right or affects any water right or water right claim in existence on the date of enactment of this Act; or</text></paragraph>
<paragraph id="H82A8C052CCFE4E12BA391738D86D888C"><enum>(3)</enum><text>authorize the use of Federal funds for the physical deconstruction of the Iron Gate, Copco 1, Copco 2, or John C. Boyle Dam located on the Klamath River in the States of California and Oregon.</text></paragraph></subsection></section> <section id="H57FA7FA6003741F9892835AED5CB51CA"><enum>4309.</enum><header>Certain Bureau of Reclamation dikes</header> <subsection id="HAFC20E0B259C4964B8DBB59A55CF3CCE"><enum>(a)</enum><header>In general</header><text>Notwithstanding any other provision of law (including regulations), effective beginning on the date of enactment of this section, the Federal share of the operations and maintenance costs of a dike described in subsection (b) shall be 100 percent.</text></subsection>
<subsection id="H398A6D3FAF5B4A68A7D0B929250FE785"><enum>(b)</enum><header>Description of dikes</header><text>A dike referred to in subsection (a) is a dike—</text> <paragraph id="HE4207D0A69DA479888F52ED213F57EDE"><enum>(1)</enum><text>that is owned by the Bureau of Reclamation on the date of enactment of this section;</text></paragraph>
<paragraph id="H7C8B1EF6B2C248A3A4D37E6B5E3C217C"><enum>(2)</enum><text>the construction of which was completed not later than December 31, 1945;</text></paragraph> <paragraph id="H2AEA516F07AF42E09CF3A81960F80C37"><enum>(3)</enum><text>a corrective action study for which was completed not later than December 31, 2015; and</text></paragraph>
<paragraph id="HBEF9C5B411E44D14891967EA95F4A23F"><enum>(4)</enum><text>the construction of which was authorized by the Act of June 28, 1938 (52 Stat. 1215, chapter 795).</text></paragraph></subsection></section> <section id="HBA53EC9C57BA4FD291180AF704DC0D88"><enum>4310.</enum><header>Authority to make entire active capacity of Fontenelle Reservoir available for use</header> <subsection id="H4BE366149F2A46B483B99354C3FA62F3"><enum>(a)</enum><header>In general</header><text>The Secretary of the Interior (referred to in this section as the <quote>Secretary</quote>), in cooperation with the State of Wyoming, may amend the Definite Plan Report for the Seedskadee Project authorized under the first section of the Act of April 11, 1956 (commonly known as the <quote>Colorado River Storage Project Act</quote>) (<external-xref legal-doc="usc" parsable-cite="usc/43/620">43 U.S.C. 620</external-xref>), to provide for the study, design, planning, and construction activities that will enable the use of all active storage capacity (as may be defined or limited by legal, hydrologic, structural, engineering, economic, and environmental considerations) of Fontenelle Dam and Reservoir, including the placement of sufficient riprap on the upstream face of Fontenelle Dam to allow the active storage capacity of Fontenelle Reservoir to be used for those purposes for which the Seedskadee Project was authorized.</text></subsection>
<subsection id="H9228C17B04C44E66B93C0A7AFC1D2241"><enum>(b)</enum><header>Cooperative agreements</header>
<paragraph id="HB19B576F40534705A7D8B6CF6DCC28D1"><enum>(1)</enum><header>In general</header><text>The Secretary may enter into any contract, grant, cooperative agreement, or other agreement that is necessary to carry out subsection (a).</text></paragraph> <paragraph id="H10B72AD2533F4BDF90D0A8C7AD117A36"><enum>(2)</enum><header>State of Wyoming</header> <subparagraph id="HF5A75E330C0347DEB99A2C3F294A8DA8"><enum>(A)</enum><header>In general</header><text>The Secretary shall enter into a cooperative agreement with the State of Wyoming to work in cooperation and collaboratively with the State of Wyoming for planning, design, related preconstruction activities, and construction of any modification of the Fontenelle Dam under subsection (a).</text></subparagraph>
<subparagraph id="H36EEF1A7F4244544A0178EFD44E91A9C"><enum>(B)</enum><header>Requirements</header><text>The cooperative agreement under subparagraph (A) shall, at a minimum, specify the responsibilities of the Secretary and the State of Wyoming with respect to—</text> <clause id="HF8FDD8208C904037A9235402A10A9F54"><enum>(i)</enum><text>completing the planning and final design of the modification of the Fontenelle Dam under subsection (a);</text></clause>
<clause id="HA2CE9476ED654AB5BAB470A29580A5CB"><enum>(ii)</enum><text>any environmental and cultural resource compliance activities required for the modification of the Fontenelle Dam under subsection (a) including compliance with—</text> <subclause id="H30111860C52E47E3AE18FD9056836EFB"><enum>(I)</enum><text>the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.);</text></subclause>
<subclause id="HE8055AA2B5B94EA8887F2C3C85D6ECE2"><enum>(II)</enum><text>the Endangered Species Act of 1973 (<external-xref legal-doc="usc" parsable-cite="usc/16/1531">16 U.S.C. 1531</external-xref> et seq.); and</text></subclause> <subclause id="H62409D38E1C045739714D50B05484BF3"><enum>(III)</enum><text>subdivision 2 of division A of subtitle III of title 54, United States Code; and</text></subclause></clause>
<clause id="H1B1047B575BC462582A30D6D3DD3B1ED"><enum>(iii)</enum><text>the construction of the modification of the Fontenelle Dam under subsection (a).</text></clause></subparagraph></paragraph></subsection> <subsection id="H2E5A48E70B0B4FBFA7C846DC6C163C6E"><enum>(c)</enum><header>Funding by state of Wyoming</header><text>Pursuant to the Act of March 4, 1921 (41 Stat. 1404, chapter 161; <external-xref legal-doc="usc" parsable-cite="usc/43/395">43 U.S.C. 395</external-xref>), and as a condition of providing any additional storage under subsection (a), the State of Wyoming shall provide to the Secretary funds for any work carried out under subsection (a).</text></subsection>
<subsection id="H20B52167AE1A445E87AD309EE491EE5C"><enum>(d)</enum><header>Other contracting authority</header>
<paragraph id="H1A82889A89FA47328A55ACD5FDD038B9"><enum>(1)</enum><header>In general</header><text>The Secretary may enter into contracts with the State of Wyoming, on such terms and conditions as the Secretary and the State of Wyoming may agree, for division of any additional active capacity made available under subsection (a).</text></paragraph> <paragraph id="H1E9424F9C667483DA7A96B632CE71C30"><enum>(2)</enum><header>Terms and conditions</header><text>Unless otherwise agreed to by the Secretary and the State of Wyoming, a contract entered into under paragraph (1) shall be subject to the terms and conditions of Bureau of Reclamation Contract No. 14–06–400–2474 and Bureau of Reclamation Contract No. 14–06–400–6193.</text></paragraph></subsection>
<subsection id="H2505F34A615D41F6840D4811571BF62A"><enum>(e)</enum><header>Savings provisions</header><text>Unless expressly provided in this section, nothing in this section modifies, conflicts with, preempts, or otherwise affects—</text> <paragraph id="H61FEA2F2595E49EFB57F57831A65EC4C"><enum>(1)</enum><text>the Boulder Canyon Project Act (<external-xref legal-doc="usc" parsable-cite="usc/43/617">43 U.S.C. 617</external-xref> et seq.);</text></paragraph>
<paragraph id="H2FA3430F151E4DF1AA83F77A457BB096"><enum>(2)</enum><text>the Colorado River Compact of 1922, as approved by the Presidential Proclamation of June 25, 1929 (46 Stat. 3000);</text></paragraph> <paragraph id="H7E0A824262F44048B6159843D9F9782F"><enum>(3)</enum><text>the Boulder Canyon Project Adjustment Act (<external-xref legal-doc="usc" parsable-cite="usc/43/618">43 U.S.C. 618</external-xref> et seq.);</text></paragraph>
<paragraph id="H62F0BC82A0DE407EAA8FA1943CF806E2"><enum>(4)</enum><text>the Treaty between the United States of America and Mexico relating to the utilization of waters of the Colorado and Tijuana Rivers and of the Rio Grande, and supplementary protocol signed November 14, 1944, signed at Washington February 3, 1944 (59 Stat. 1219);</text></paragraph> <paragraph id="HF3423B361C51469590840483FB190358"><enum>(5)</enum><text>the Upper Colorado River Basin Compact as consented to by the Act of April 6, 1949 (63 Stat. 31);</text></paragraph>
<paragraph id="HABECEA505CFF43C2A39AFAC93B1D5E46"><enum>(6)</enum><text>the Act of April 11, 1956 (commonly known as the <quote>Colorado River Storage Project Act</quote>) (<external-xref legal-doc="usc" parsable-cite="usc/43/620">43 U.S.C. 620</external-xref> et seq.);</text></paragraph> <paragraph id="HC20D14E9130A47129DACC348BC0EDABF"><enum>(7)</enum><text>the Colorado River Basin Project Act (<external-xref legal-doc="public-law" parsable-cite="pl/90/537">Public Law 90–537</external-xref>; 82 Stat. 885); or</text></paragraph>
<paragraph id="H70E9B6AEE69F40C9B720FB169B54170F"><enum>(8)</enum><text>any State of Wyoming or other State water law.</text></paragraph></subsection></section> <section id="H4BC3798B9C324F4E8F381C76101346C8"><enum>4311.</enum><header>Blackfeet water rights settlement</header> <subsection id="H699CBB7B5D93439CB2467B07A03357D8"><enum>(a)</enum><header>Blackfeet settlement trust fund</header><text>Section 3716(e) of the Water Infrastructure Improvements for the Nation Act (130 Stat. 1835) is amended—</text>
<paragraph id="HD8E97F5D82784BF6898F8A216B83D7B3"><enum>(1)</enum><text>in paragraph (2), by striking <quote>appropriations,</quote> and all that follows through the period at the end and inserting the following: </text> <quoted-block id="H0324FB3E72B641CB95D87B736D71E149" style="OLC" display-inline="yes-display-inline"><text display-inline="yes-display-inline">appropriations, the following amounts shall be made available to the Tribe for implementation of this subtitle:</text>
<subparagraph id="H71F767177AAB4C23943D297574FAB12F"><enum>(A)</enum><text>50 percent of the amounts in the Administration and Energy Account.</text></subparagraph> <subparagraph id="HCBBD1E7B36C64CD6850E648F52456950"><enum>(B)</enum><text>50 percent of the amounts in the OM&amp;R Account.</text></subparagraph>
<subparagraph id="HB805AF392EE248E393EBECF397C50F5F"><enum>(C)</enum><text>50 percent of the amounts in the St. Mary Account.</text></subparagraph> <subparagraph id="H5908B89FEC12401CABAE4C4491FA17A0"><enum>(D)</enum><text>50 percent of the amounts in the Blackfeet Water, Storage, and Development Projects Account.</text></subparagraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph>
<paragraph id="H44183BFECCB842D29A5ED14DD4693B1D"><enum>(2)</enum><text>by adding at the end the following:</text> <quoted-block id="H71110452262F4B1C886946A57ABC82D5" style="OLC"> <paragraph id="HF46277D32D8D4707B6EEA33E08A27541"><enum>(3)</enum><header>Availability</header> <subparagraph id="H6AFB3A5A034348BD93E17E66DDDED84C"><enum>(A)</enum><header>In general</header><text>Except as provided in subparagraph (B), none of the funds deposited in the Trust Fund in fiscal year 2018 shall be available for expenditure in accordance with this subsection until the enforceability date.</text></subparagraph>
<subparagraph id="H95919D1D8F8C40C798BA99E5316C459C"><enum>(B)</enum><header>Exception</header><text>Notwithstanding subparagraph (A), of the funds in the Administration and Energy Account, $4,800,000 shall be available to the Tribe for the implementation of this subtitle.</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection> <subsection id="H2440E475AE68436590960863F9A396DB"><enum>(b)</enum><header>Blackfeet water settlement implementation fund</header><text>Section 3717(e) of the Water Infrastructure Improvements for the Nation Act (130 Stat. 1837) is amended—</text>
<paragraph id="H83B6B6C1216548CE9B343F4B378EC87E"><enum>(1)</enum><text>by striking <quote>Amounts in</quote> and inserting the following:</text> <quoted-block id="H730A06535655431388D83C075B056568" style="OLC"> <paragraph id="H6E3A0280417D48F8B456D7B474EABBA5"><enum>(1)</enum><header>In general</header><text>Amounts in</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph>
<paragraph id="HB04DB41EE2F546769F2210ADD22C453E"><enum>(2)</enum><text>by adding at the end the following:</text> <quoted-block id="HBAA66643D13C4EFBAF2F6A26A4ECAE9C" style="OLC"> <paragraph id="HA6A1EA6E14744033BD9938099018BDF6"><enum>(2)</enum><header>Funding for implementation activities</header><text>Notwithstanding paragraph (1), the following amounts shall be available to the Secretary for the implementation of this subtitle:</text>
<subparagraph id="HEC47C05CF71243A0A0F7B5EBE893E99C"><enum>(A)</enum><text>50 percent of the amounts in the MR&amp;I System, Irrigation, and Water Storage Account to carry out section 3711.</text></subparagraph> <subparagraph id="H3DD30C5F4959475A854212B5D8759996"><enum>(B)</enum><text>50 percent of the amounts in the MR&amp;I System, Irrigation, and Water Storage Account to carry out section 3712.</text></subparagraph>
<subparagraph id="H6A6B4A75C911449F991F1FD20784A52D"><enum>(C)</enum><text>50 percent of the amounts in the Blackfeet Irrigation Project Deferred Maintenance and Four Horns Dam Safety Improvements Account to carry out section 3710(c).</text></subparagraph> <subparagraph id="H4741427735124A00A9E02E38B78CB854"><enum>(D)</enum><text>The amounts in the Blackfeet Irrigation Project Deferred Maintenance and Four Horns Dam Safety Improvements Account to carry out section 3710(d).</text></subparagraph>
<subparagraph id="H09B66E39E8774D1B9330E10E6347BD56"><enum>(E)</enum><text>From the St. Mary/Water Milk Management and Activities Account:</text> <clause id="H815310C8E0FB4AF0AA898B176BBA1D41"><enum>(i)</enum><text>50 percent of the amount described in section 3707(g)(1) to carry out section 3707(c).</text></clause>
<clause id="H845BC93DA7524F02AE6DF5852E61231D"><enum>(ii)</enum><text>50 percent of the amount described in section 3707(g)(2) to carry out section 3707(d).</text></clause> <clause id="HBF1CA068D9E64896A83E682D85CCAF68"><enum>(iii)</enum><text>The amount described in section 3707(g)(3) to carry out subsection (f).</text></clause>
<clause id="H2640AEF58CC74E7FBAC49915DB9F31C2"><enum>(iv)</enum><text>The amounts in the Account to carry out section 3705.</text></clause></subparagraph></paragraph> <paragraph id="H6E5C6472D53946A39C99CF6D1DBA6F15"><enum>(3)</enum><header>Availability</header><text>None of the funds made available under this section in fiscal year 2018 shall be available until the enforceability date.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection>
<subsection id="HA0489491E1B246A8A2F9876A2396321D"><enum>(c)</enum><header>Technical corrections</header><text>Section 3720 of the Water Infrastructure Improvements for the Nation Act (130 Stat. 1839) is amended—</text> <paragraph id="H54428F44230F4F29BCD4B9F22FFCE8A7"><enum>(1)</enum><text>in subsection (a)(3)(B), by striking <quote>section 3706</quote> and inserting <quote>section 6</quote>; and</text></paragraph>
<paragraph id="H48D2BFD705BB48F29EB704CFCF5E51C6"><enum>(2)</enum><text>in subsection (h), in the matter preceding paragraph (1), by striking <quote>January 21, 2026</quote> and inserting <quote>January 21, 2025</quote>.</text></paragraph></subsection></section> <section id="H0EA0C70BFE994657842B599DFEAF9DD0"><enum>4312.</enum><header>Indian irrigation fund reauthorization</header> <subsection id="H0CC6F0C1B69F48FC9CE7918E6E4A99CD"><enum>(a)</enum><header>Deposits to funds</header><text>Section 3212(a) of the Water Infrastructure Improvements for the Nation Act (130 Stat. 1750) is amended by striking <quote>each of fiscal years 2017 through 2021</quote> and inserting <quote>each of fiscal years 2017 through 2028</quote>.</text></subsection>
<subsection id="HD7A63E54D7564277896E9D828AD599E4"><enum>(b)</enum><header>Expenditures from fund</header><text>Section 3213(a) of the Water Infrastructure Improvements for the Nation Act (130 Stat. 1750) is amended in the matter preceding paragraph (1) by striking <quote>each of fiscal years 2017 through 2021</quote> and inserting <quote>each of fiscal years 2017 through 2028</quote>.</text></subsection> <subsection id="HE547C0AD551945FBAA2F682CD7C36127"><enum>(c)</enum><header>Termination</header><text>Section 3216 of the Water Infrastructure Improvements for the Nation Act (130 Stat. 1750) is amended in the matter preceding paragraph (1) by striking <quote>September 30, 2021</quote> and inserting <quote>September 30, 2028</quote>.</text></subsection></section>
<section id="H9D6649045FFB4232A56C9278B8FF25E9"><enum>4313.</enum><header>Reauthorization of repair, replacement, and maintenance of certain Indian irrigation projects</header>
<subsection id="HEDEBBE773CF24415ABFA6C45B90829A7"><enum>(a)</enum><header>In general</header><text>Section 3221(b) of the Water Infrastructure Improvements for the Nation Act (130 Stat. 1751) is amended in the matter preceding paragraph (1) by striking <quote>each of fiscal years 2017 through 2021</quote> and inserting <quote>each of fiscal years 2017 through 2028</quote>.</text></subsection> <subsection id="H8326507496414834BD54974338773107"><enum>(b)</enum><header>Status report on certain projects</header><text>Section 3224(d) of the Water Infrastructure Improvements for the Nation Act (130 Stat. 1753) is amended in the matter preceding paragraph (1) by striking <quote>fiscal year 2021</quote> and inserting <quote>fiscal year 2028</quote>.</text></subsection>
<subsection id="H9C46C2FBB8D6484CBE4C9EF2E6FC0944"><enum>(c)</enum><header>Allocation among projects</header><text>Section 3226 of the Water Infrastructure Improvements for the Nation Act (130 Stat. 1753) is amended—</text> <paragraph id="HF7B71D7A677D410E8A82A4E20BD847AD"><enum>(1)</enum><text>in subsection (a), by striking <quote>each of fiscal years 2017 through 2021</quote> and inserting <quote>each of fiscal years 2017 through 2028</quote>; and</text></paragraph>
<paragraph id="H2BB22B2892164152BF3CC329067D7F60"><enum>(2)</enum><text>in subsection (b), by striking <quote>the day before the date of enactment of this Act</quote> and inserting <quote>the day before the date of enactment of <short-title>America’s Water Infrastructure Act of 2018</short-title></quote>.</text></paragraph></subsection></section> <section id="HF74B41F1F19B4DD7A3164B05554C5588"><enum>4314.</enum><header>Indian dam safety reauthorization</header><text display-inline="no-display-inline">Section 3101 of the Water Infrastructure Improvements for the Nation Act (<external-xref legal-doc="usc" parsable-cite="usc/25/3805">25 U.S.C. 3805</external-xref>) is amended—</text>
<paragraph id="HD80493DC490542FD8A8DD759AED403C3"><enum>(1)</enum><text>by striking <quote>each of fiscal years 2017 through 2023</quote> each place it appears and inserting <quote>each of fiscal years 2017 through 2030</quote>;</text></paragraph> <paragraph id="HC1D0E27CC3474F1BAE65B2C423377D25"><enum>(2)</enum><text>in subsection (b)—</text>
<subparagraph id="HBF227875FAEF4790B352BF37820C57FA"><enum>(A)</enum><text>in paragraph (1)(F), in the matter preceding clause (i), by striking <quote>September 30, 2023</quote> and inserting <quote>September 30, 2030</quote>; and</text></subparagraph> <subparagraph id="HCF0D51A48E584C8280E6FDAE3CC123E0"><enum>(B)</enum><text>in paragraph (2)(F), in the matter preceding clause (i), by striking <quote>September 30, 2023</quote> and inserting <quote>September 30, 2030</quote>; and</text></subparagraph></paragraph>
<paragraph id="HA02555833DAA40C59401DBE835675C57"><enum>(3)</enum><text>in subsection (f)—</text> <subparagraph id="H0D87F9BAEE4B4E07A5DB5395C044A5E6"><enum>(A)</enum><text>in paragraph (2), by striking <quote>4 years</quote> and inserting <quote>11 years</quote>; and</text></subparagraph>
<subparagraph id="H1E3E0A4AB947480DAE36B2F3E39E6003"><enum>(B)</enum><text>in paragraph (3), by striking <quote>each of fiscal years 2017, 2018, and 2019</quote> and inserting <quote>each of fiscal years 2017 through 2026</quote>.</text></subparagraph></paragraph></section> <section id="H71BE9E5C269642ECB02E756C2D03FB87" section-type="subsequent-section" commented="no"><enum>4315.</enum><header>Diana E. Murphy United States Courthouse</header> <subsection id="HA447304D48714632A6C5AB06B8EFB0C3" commented="no"><enum>(a)</enum><header>Designation</header><text>The United States courthouse located at 300 South Fourth Street in Minneapolis, Minnesota, shall be known and designated as the <quote>Diana E. Murphy United States Courthouse</quote>.</text></subsection>
<subsection id="H766680B4AFF4452B90A822FA7DE7286D" commented="no"><enum>(b)</enum><header>References</header><text>Any reference in a law, map, regulation, document, paper, or other record of the United States to the United States courthouse referred to in subsection (a) shall be deemed to be a reference to the <quote>Diana E. Murphy United States Courthouse</quote>.</text></subsection></section></subtitle></title> </legis-body> </amendment-block> </amendment></engrossed-amendment-body><title-amends><official-title-amendment>Amend the title so as to read: <quote>An Act to provide for improvements to the rivers and harbors of the United States, to provide for the conservation and development of water and related resources, to provide for water pollution control activities, and for other purposes.</quote>.</official-title-amendment></title-amends><attestation><attestation-group><attestor display="no">Karen L. Haas</attestor><role>Clerk.</role></attestation-group></attestation><endorsement></endorsement></amendment-doc> 

