<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Reported-in-House" bill-type="olc" dms-id="HD1E310A6976C4CC883CD69C3DC5E7230" key="H" public-private="public">
	<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>115 HR 6088 RH: Streamlining Permitting Efficiencies in Energy Development Act</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2018-06-13</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
		<distribution-code display="yes">IB</distribution-code>
		<calendar display="yes">Union Calendar No. 714</calendar>
		<congress display="yes">115th CONGRESS</congress><session display="yes">2d Session</session>
		<legis-num display="yes">H. R. 6088</legis-num>
		<associated-doc display="yes" role="report">[Report No. 115–921]</associated-doc>
		<current-chamber display="yes">IN THE HOUSE OF REPRESENTATIVES</current-chamber>
		<action display="yes">
			<action-date date="20180613">June 13, 2018</action-date>
			<action-desc><sponsor name-id="C001114">Mr. Curtis</sponsor> (for himself, <cosponsor name-id="B001250">Mr. Bishop of Utah</cosponsor>, <cosponsor name-id="G000565">Mr. Gosar</cosponsor>, <cosponsor name-id="G000584">Mr. Gianforte</cosponsor>, <cosponsor name-id="W000821">Mr. Westerman</cosponsor>, and <cosponsor name-id="G000552">Mr. Gohmert</cosponsor>) introduced the following bill; which was referred to the <committee-name added-display-style="italic" committee-id="HII00" deleted-display-style="strikethrough">Committee on Natural Resources</committee-name></action-desc>
		</action>
		<action><action-date>September 6, 2018</action-date><action-desc>Additional sponsors: <cosponsor name-id="L000578">Mr. LaMalfa</cosponsor> and <cosponsor name-id="C001096">Mr. Cramer</cosponsor></action-desc></action><action>
			<action-date>September 6, 2018</action-date>
			<action-desc>Reported with an amendment, committed to the Committee of the Whole House on the State of the
			 Union, and ordered to be printed</action-desc>
			<action-instruction>Strike out all after the enacting clause and insert the part printed in italic</action-instruction>
			<action-instruction>For text of introduced bill, see copy of bill as introduced on June 13, 2018</action-instruction>
		</action>
		<action display="yes">
			<action-desc display="yes"><pagebreak></pagebreak></action-desc>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title display="yes">To amend the Mineral Leasing Act to authorize notifications of permit to drill, and for other
			 purposes.<pagebreak></pagebreak></official-title>
	</form>
	<legis-body changed="added" committee-id="HII00" display-enacting-clause="yes-display-enacting-clause" id="H4629A84F2C7044C0971B3DBFA1EBA723" reported-display-style="italic" style="OLC">
 <section id="H0BE5AB3D9E6E428BBD01902587598DBB" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>Streamlining Permitting Efficiencies in Energy Development Act</short-title></quote> or the <quote><short-title>SPEED Act</short-title></quote>.</text> </section><section id="HC1CCC842E9B340F1830FE0470C9659D9"><enum>2.</enum><header>Notifications of permit to drill</header><text display-inline="no-display-inline">The Mineral Leasing Act (<external-xref legal-doc="usc" parsable-cite="usc/30/181">30 U.S.C. 181</external-xref> et seq.) is amended by—</text>
 <paragraph id="H1AB13CA69190426188FDA644EFDAC295"><enum>(1)</enum><text>redesignating section 44 as section 45; and</text> </paragraph><paragraph id="H88FA04EA1A4E48A1AD17599E12254E49"><enum>(2)</enum><text>inserting after section 43 the following:</text>
				<quoted-block changed="added" committee-id="HII00" display-inline="no-display-inline" id="H313388F3668143468FDE0DA696A4CF65" reported-display-style="italic" style="OLC">
					<section id="H5B2AEA1DA4634F3D832BC18AB81857D6"><enum>44.</enum><header>Notifications of permit to drill</header>
 <subsection id="H0D820A4411004F9BB76C4FFA61A34B1B"><enum>(a)</enum><header>In general</header><text display-inline="yes-display-inline">Not later than 1 year after the date of the enactment of this section, the Secretary shall establish procedures by which an operator may conduct drilling and production activities on available Federal land and non-Federal land after sending to the Secretary a notification of permit to drill under this section in lieu of obtaining an APD.</text>
 </subsection><subsection id="H072FEC6EB9784C6983CDF1A2D1CD54AF"><enum>(b)</enum><header>Content of notification</header><text display-inline="yes-display-inline">To be considered a complete notification of permit to drill under this section, an operator shall include in the notification of permit to drill submitted under this section—</text>
 <paragraph id="H40B17F7F04A04297A20778FB76F6F826"><enum>(1)</enum><text display-inline="yes-display-inline">a notification of permit to drill form;</text> </paragraph><paragraph id="H5B9BC388032D42A7B31ED8D9DD388B64"><enum>(2)</enum><text>a surface use plan of operations;</text>
 </paragraph><paragraph id="H6289E2D85C7F4DF8A2D1D3C89D147A81"><enum>(3)</enum><text>a drilling plan;</text> </paragraph><paragraph id="H4808DF5C9C014DF48B2624981BDDCDE0"><enum>(4)</enum><text>a well plat certified by a registered surveyor;</text>
 </paragraph><paragraph id="H5892D66FE29045B19CD34DF85EFA12E2"><enum>(5)</enum><text>an operator certification;</text> </paragraph><paragraph id="H891675803D3141FFA4A8915999B562B8"><enum>(6)</enum><text>evidence of bond coverage; and</text>
 </paragraph><paragraph id="HE34EAB66AFFB4DA9B2219C31F9BEA361"><enum>(7)</enum><text display-inline="yes-display-inline">a notification of permit to drill fee in an amount to be determined by the Secretary.</text> </paragraph></subsection><subsection id="HB97C30FDD990446190DAADEC76684998"><enum>(c)</enum><header>Justifications for objection</header> <paragraph id="HC45953BD2ED547E68AEBC792F442B097"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">Except as otherwise provided in this subsection, the Secretary may not object to a notification of permit to drill under this section if the notification—</text>
 <subparagraph id="H7B114652D9AC4317A580DC587D9A2593"><enum>(A)</enum><text display-inline="yes-display-inline">demonstrates that the drilling operations described in the notification of permit to drill will be located in—</text>
 <clause id="H96FE43EEAF454484AD88F29CC5A51CA9"><enum>(i)</enum><text display-inline="yes-display-inline">a developed field, where there are existing oil and gas wells within a 5-mile radius and for which an approved land use plan or environmental review was prepared within the last 10 years under the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.) that analyzed such drilling operations as a reasonably foreseeable activity;</text>
 </clause><clause id="H93BC1BB202824BF1B064B25A41FB5D15"><enum>(ii)</enum><text>a location or well pad site at which drilling has occurred within 10 years before the date of spudding the well and the proposed operations do not increase the surface disturbance on the location or well pad site;</text>
 </clause><clause id="HE286616809EE49BDA552E18C7116AFB6"><enum>(iii)</enum><text display-inline="yes-display-inline">an area consisting of individual surface disturbances of less than 10 acres and the total surface disturbance on the lease is not greater than 150 acres and for which an approved land use plan or environmental review was prepared within the last 10 years under the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.) that analyzed such drilling operations as a reasonably foreseeable activity;</text>
 </clause><clause id="H51AFC2113CE848D4B598D58EAE1E2469"><enum>(iv)</enum><text>an area consisting of Federal mineral interests that is located within the boundaries of a communitization agreement or unit agreement which contains minerals leased by a State or private mineral owner for which a drilling permit has been approved by a State regulatory agency; or</text>
 </clause><clause id="H028AEFCDA5E748A2B878D334B2E8D56D"><enum>(v)</enum><text display-inline="yes-display-inline">an area in which a categorical exclusion under the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321</external-xref> et seq.) applies for oil and gas drilling or re-entry activities; or</text>
 </clause></subparagraph><subparagraph id="HA933778BB96B429FA74DE9CE7B184FEF"><enum>(B)</enum><text>includes—</text> <clause id="HDC73404EB2224EDB885070FAF153A589"><enum>(i)</enum><text display-inline="yes-display-inline">an environmental review that concludes that actions described in the notification of permit to drill pose no significant effects on the human environment or threatened or endangered species; and</text>
 </clause><clause id="HDA445019FE194DC7930C5A2847ABC435"><enum>(ii)</enum><text display-inline="yes-display-inline">an archeological review that concludes that actions described in the notification of permit to drill pose no significant effects on cultural or historic properties or resources.</text>
									</clause></subparagraph></paragraph><paragraph id="H6391FD123A7C4CF7A1200E4F3A3A17AF"><enum>(2)</enum><header>Endangered species protection</header>
 <subparagraph id="H575C2351B23D46BA80CB9F4976137F5B"><enum>(A)</enum><header>In general</header><text>Notwithstanding paragraph (1), the Secretary shall object to a notification of permit to drill if the activity described in such notification of permit to drill is likely to jeopardize the continued existence of a species that is a threatened species or endangered species under the Endangered Species Act of 1973 (<external-xref legal-doc="usc" parsable-cite="usc/16/1531">16 U.S.C. 1531</external-xref> et seq.) or result in the destruction or adverse modification of critical habitat of such species.</text>
 </subparagraph><subparagraph id="H9DF4703EF94B47878BF807C48FEFE37B"><enum>(B)</enum><header>Withdrawal of objection</header><text display-inline="yes-display-inline">The Secretary may withdraw an objection under subparagraph (A) if the operator consults with the Secretary on such objection and places conditions on the notification of permit to drill sufficient to comply with the Endangered Species Act of 1973 (<external-xref legal-doc="usc" parsable-cite="usc/16/1531">16 U.S.C. 1531</external-xref> et seq.).</text>
								</subparagraph></paragraph><paragraph id="HAE464369035141F492FBC34B87EB90E4"><enum>(3)</enum><header>National Historic Preservation</header>
 <subparagraph id="HC332BE7D5E3346CAB42273F5FCC7EBB0"><enum>(A)</enum><header>In general</header><text display-inline="yes-display-inline">Notwithstanding paragraph (1), the Secretary shall object to a notification of permit to drill if the activity described in such notification of permit to drill is likely to affect properties listed, or eligible for listing, in the National Register of Historic Places under section 306108 of title 54, United States Code (commonly known as the National Historic Preservation Act of 1966).</text>
 </subparagraph><subparagraph id="H6CB3119B246C408EAC47B111822FCD1E"><enum>(B)</enum><header>Withdrawal of objection</header><text display-inline="yes-display-inline">The Secretary may withdraw an objection under subparagraph (A) if the operator consults with the Secretary on such objection and places conditions on the notification of permit to drill sufficient to comply with section 306108 of title 54, United States Code (commonly known as the National Historic Preservation Act of 1966).</text>
								</subparagraph></paragraph></subsection><subsection id="H09F6C06EFAAB4DCEA9D19D93BF7E81B3"><enum>(d)</enum><header>Objection or no action</header>
 <paragraph id="HCA7C3E009BFF4ED881D8640EF7DB464A"><enum>(1)</enum><header>Notification of incomplete notification</header><text display-inline="yes-display-inline">Not later than 15 days after receipt of a notification of permit to drill, or a revised notification of permit to drill, from an operator under this section, the Secretary shall notify the operator in writing if the notification of permit to drill is not complete.</text>
 </paragraph><paragraph id="H3A2C660713D44FE3B6FDC3C04D4829AC"><enum>(2)</enum><header>Notification of objections</header><text display-inline="yes-display-inline">Not later than 45 days after receipt of a complete notification of permit to drill from an operator under this section, the Secretary shall review the notification of permit to drill and—</text>
 <subparagraph id="H0FE429CB37C141F6AE30F29B5558EBD4"><enum>(A)</enum><text display-inline="yes-display-inline">notify the operator in writing of any objections to the notification of permit to drill; or</text> </subparagraph><subparagraph id="HBEC1B03B57664F53B8430CDA4BEF1677"><enum>(B)</enum><text>take no action.</text>
 </subparagraph></paragraph><paragraph id="H9210229DE1D748B7939FEB9C24E650C8"><enum>(3)</enum><header>No action required</header><text display-inline="yes-display-inline">If the Secretary has not notified an operator under either paragraph (1) or paragraph (2) within 45 days after receipt of a notification of permit to drill from the operator under this section, the operator may, without further action from the Secretary, conduct the drilling and production activities for which the notification of permit to drill was submitted.</text>
 </paragraph><paragraph id="H2893D4D6F43044FF9F1FFA379D982086"><enum>(4)</enum><header>Opportunity to resubmit notification</header><text display-inline="yes-display-inline">If the Secretary notifies an operator under paragraph (1) of an incomplete notification or paragraph (2) of an objection, the Secretary shall allow the operator to address such incomplete notification or objection and revise and resubmit the notification of permit to drill.</text>
 </paragraph><paragraph id="H53F6E01C63084A1C96E836223F6A34F4"><enum>(5)</enum><header>Opportunity to resubmit notification as APD</header><text display-inline="yes-display-inline">If the Secretary notifies an operator under paragraph (2) of an objection, the Secretary shall allow the operator to resubmit such information in the form of an APD.</text>
 </paragraph></subsection><subsection display-inline="no-display-inline" id="H5B73F68B4D9C4F2EAF3826CD30F1478E"><enum>(e)</enum><header>Notification fee</header><text display-inline="yes-display-inline">The Secretary may not charge an operator under this section a fee for submitting a notification of permit to drill greater than the fee the Secretary charges an applicant for an APD.</text>
						</subsection><subsection id="HA46AD0D76908402CA673C024181D888A"><enum>(f)</enum><header>Environmental review</header>
 <paragraph id="HA5BD6B8651EE4B3AB12102292FA8CC33"><enum>(1)</enum><header>In general</header><text>An environmental review or archeological review described in subsection (c)(1)(B) may be completed by a third-party contractor approved by the Secretary or pursuant to a memorandum of understanding between the operator and the Secretary.</text>
 </paragraph><paragraph id="H773A7E9AA5254CFFB49642E7189BFA73"><enum>(2)</enum><header>Field work authorization</header><text display-inline="yes-display-inline">The Secretary shall issue a field work authorization to a third-party contractor for the purposes of paragraph (1) within a reasonable time.</text>
 </paragraph><paragraph commented="no" id="H212334449D3C4E06BAAE240CA47B3250"><enum>(3)</enum><header>Request for concurrence</header><text display-inline="yes-display-inline">The Secretary shall allow a third-party contractor to submit a request to the State Historic Preservation Office on behalf of the Secretary.</text>
 </paragraph></subsection><subsection display-inline="no-display-inline" id="H845CD1D36A3C4878AC73860EDC97DFAF"><enum>(g)</enum><header>Additional surface use permits</header><text display-inline="yes-display-inline">The Secretary may not require an operator that has submitted a notification of permit to drill for which the Secretary did not object to obtain a surface use permit for an action included in the notification of permit to drill.</text>
 </subsection><subsection commented="no" display-inline="no-display-inline" id="H6FF3EA58EF524128944E54825D61A0A4"><enum>(h)</enum><header>Site inspection</header><text display-inline="yes-display-inline">The Secretary may not require an operator that has submitted a notification of permit to drill for which the Secretary did not object to submit to a site inspection before commencement of the activities described in the notification of permit to drill.</text>
 </subsection><subsection commented="no" display-inline="no-display-inline" id="H5347DC3AF79D456ABB3F9BD8D2A5AF4A"><enum>(i)</enum><header>Federal enforcement</header><text display-inline="yes-display-inline">The Secretary may conduct inspections of and evaluate activities described in a notification of permit to drill for purposes of bringing an enforcement action. The Secretary may suspend enforcement proceedings if the operator modifies its activities to comply with the notification of permit to drill or obtains an APD for such activities.</text>
						</subsection><subsection id="HC90EAE13F1C8468DA1CFDE121C53DFEE"><enum>(j)</enum><header>Application of NEPA</header>
 <paragraph id="HC3FD20D5475C4DC3AA0D372AD57731B9"><enum>(1)</enum><header>No action by Secretary</header><text>The decision by the Secretary to take no action under subsection (c)(1)(B)(2) shall not constitute a major Federal action under section 102(2)(C) of the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4332">42 U.S.C. 4332(2)(C)</external-xref>).</text>
 </paragraph><paragraph id="H733A76252C354C51B231DA8BFF3EB60D"><enum>(2)</enum><header>Development of regulations</header><text display-inline="yes-display-inline">The development of any regulation pursuant to this section shall constitute a major Federal action under section 102(2)(C) of the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4332">42 U.S.C. 4332(2)(C)</external-xref>).</text>
 </paragraph></subsection><subsection display-inline="no-display-inline" id="H9C96E15EFAD94CFD82B29E0B1F5C3079"><enum>(k)</enum><header>Definitions</header><text display-inline="yes-display-inline">In this section:</text> <paragraph id="HC5F6C3EB350645F7838C1D5E2CE4E6EB"><enum>(1)</enum><header>APD</header><text display-inline="yes-display-inline">The term <term>APD</term> means an application to drill or re-enter a well.</text>
 </paragraph><paragraph id="HB7E6A9A193B34B9282225C05DA5FAD40"><enum>(2)</enum><header>Available federal land</header><text>The term <term>available Federal land</term> means Federal land that—</text> <subparagraph id="H5A922B6C89EA4CA287666FD02910E842"><enum>(A)</enum><text>is located within the boundaries of a State;</text>
 </subparagraph><subparagraph id="H7299CC7DF5864A1CB48B159F17D2B82B"><enum>(B)</enum><text>is not held by the United States in trust for the benefit of a federally recognized Indian Tribe;</text> </subparagraph><subparagraph id="H81BF082E63CF48FABDB4132EF951811C"><enum>(C)</enum><text>is not a unit of the National Park System;</text>
 </subparagraph><subparagraph id="H448C1F245D2C4503B9CEBB370D3A83EF"><enum>(D)</enum><text>is not a unit of the National Wildlife Refuge System;</text> </subparagraph><subparagraph id="H586B02530A0F4BC8A3A50CEDF28D1426"><enum>(E)</enum><text>is not a Congressionally-approved wilderness area under the Wilderness Act (<external-xref legal-doc="usc" parsable-cite="usc/16/1131">16 U.S.C. 1131</external-xref> et seq.); and</text>
 </subparagraph><subparagraph id="H472041CD3D124F88B2288111357CEC4A"><enum>(F)</enum><text>is managed by the Director of the Bureau of Land Management or the Chief of the U.S. Forest Service.</text>
 </subparagraph></paragraph><paragraph id="HB21119AFC3B94BD2A9E6CCC34647A20E"><enum>(3)</enum><header>Drilling operations</header><text>The term <term>drilling operations</term> means the drilling or re-entry of a well.</text> </paragraph><paragraph id="HFE619E9F6B874276935C579726EF9636"><enum>(4)</enum><header>Drilling plan</header><text display-inline="yes-display-inline">The term <term>drilling plan</term> means a plan containing—</text>
 <subparagraph id="H63B5FF83772946E3A0C1138F7583BDFA"><enum>(A)</enum><text>a description of the drilling program;</text> </subparagraph><subparagraph id="HE8C1BC020586461EB3AE5EC574576A75"><enum>(B)</enum><text>the surface and projected completion zone location;</text>
 </subparagraph><subparagraph id="H82310780BDE148D8B4374FB7F99E63CE"><enum>(C)</enum><text>pertinent geologic data;</text> </subparagraph><subparagraph id="H2CF2297550F941D180917A8946F5F530"><enum>(D)</enum><text>expected hazards;</text>
 </subparagraph><subparagraph id="HDCC33673F21848F49F2ED74E26D2BFE3"><enum>(E)</enum><text>proposed mitigation measures to address such hazards;</text> </subparagraph><subparagraph id="H4EAE55D5CF004B609148FE954DD3C57C"><enum>(F)</enum><text>any other information specified in applicable notices or orders; and</text>
 </subparagraph><subparagraph id="H1E4B98E8EA214FC5924F71E98F8FF232"><enum>(G)</enum><text display-inline="yes-display-inline">any other pertinent data as the Secretary may require.</text> </subparagraph></paragraph><paragraph id="H1E0F8D9BE8864762856C8FBF8D259A9C"><enum>(5)</enum><header>Surface use plan of operation</header><text display-inline="yes-display-inline">The term <term>surface use plan of operation</term> means a plan containing—</text>
 <subparagraph id="H2D47468613C843A3A2F17928D29223E0"><enum>(A)</enum><text>the road and drill pad location;</text> </subparagraph><subparagraph id="H674658A64FBF4426B97B6D7F7ABDCD81"><enum>(B)</enum><text>details of pad construction;</text>
 </subparagraph><subparagraph id="H214A14A8DA8446DB90CAE0DE0BF289B1"><enum>(C)</enum><text>methods for containment and disposal of waste material;</text> </subparagraph><subparagraph id="H3477F9B08E5342AFA1B3266F5F240A03"><enum>(D)</enum><text>plans for reclamation of the surface;</text>
 </subparagraph><subparagraph id="HD7A27A9B48694CFC9E04C1304F05C085"><enum>(E)</enum><text>any other information specified in applicable orders or notices; and</text> </subparagraph><subparagraph id="HD974A0A2B191430A8DAEA2CAE50CEBEC"><enum>(F)</enum><text>any other pertinent data as the Secretary may require.</text></subparagraph></paragraph></subsection></section><after-quoted-block>.</after-quoted-block></quoted-block>
			</paragraph></section></legis-body>
	<endorsement display="yes">
		<action-date>September 6, 2018</action-date>
		<action-desc>Reported with an amendment, committed to the Committee of the Whole House on the State of the
			 Union, and ordered to be printed</action-desc></endorsement>
</bill>


