<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-Senate" bill-type="olc" dms-id="A1" public-private="public"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>115 S398 IS: To direct the Secretary of the Army to provide for modification of certain Federal water resources development projects on the Apalachicola, Chattahoochee, and Flint Rivers, and for other purposes.</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2017-02-15</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">II</distribution-code><congress>115th CONGRESS</congress><session>1st Session</session><legis-num>S. 398</legis-num><current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber><action><action-date date="20170215">February 15, 2017</action-date><action-desc><sponsor name-id="S282">Mr. Nelson</sponsor> introduced the following bill; which was read twice and referred to the <committee-name committee-id="SSEV00">Committee on Environment and Public Works</committee-name></action-desc></action><legis-type>A BILL</legis-type><official-title>To direct the Secretary of the Army to provide for modification of certain Federal water resources
			 development projects on the Apalachicola, Chattahoochee, and Flint Rivers,
			 and for other purposes.</official-title></form>
	<legis-body display-enacting-clause="yes-display-enacting-clause" id="HFCEBD673784F46988381BE97937C025D" style="OLC">
		<section id="HA17C9644755E45159E4F8FDE95E25233" section-type="section-one"><enum>1.</enum><header>Apalachicola, Chattahoochee, and Flint River projects</header>
 <subsection id="HFDC4CDBCF40944BDB3E68343095118AA"><enum>(a)</enum><header>Definitions</header><text>In this section:</text> <paragraph id="H508AB17534794B12BA08EA03BA8DF2CE"><enum>(1)</enum><header>Apalachicola-Chattahoochee-Flint projects</header><text>The term <term>Apalachicola-Chattahoochee-Flint projects</term> means the Federal water resources projects for the Apalachicola, Chattahoochee, and Flint Rivers in the States of Alabama, Florida, and Georgia authorized by section 2 of the Act of March 2, 1945 (59 Stat. 17, chapter 19), the first section of the Act of July 24, 1946 (60 Stat. 635, chapter 595), and section 203 of the Flood Control Act of 1962 (<external-xref legal-doc="public-law" parsable-cite="pl/87/874">Public Law 87–874</external-xref>; 76 Stat. 1182), including—</text>
 <subparagraph id="H477492B4E19A49E3B8768D3F5C0120DE"><enum>(A)</enum><text>Buford Dam and Reservoir;</text> </subparagraph><subparagraph id="HDF692DF967804BE3BB2CD69F88324814"><enum>(B)</enum><text>West Point Dam and Reservoir;</text>
 </subparagraph><subparagraph id="HD60BC1A3FAE9485996713327145339F9"><enum>(C)</enum><text>George W. Andrews Dam and Reservoir;</text> </subparagraph><subparagraph id="H7244C680EA244C0E9E92802A14997441"><enum>(D)</enum><text>Walter F. George Dam and Reservoir; and</text>
 </subparagraph><subparagraph id="H82D7DC558CCD4A16ABEB545DBA76A45E"><enum>(E)</enum><text>Jim Woodruff Dam and Reservoir.</text> </subparagraph></paragraph><paragraph id="H306C1FC453054B69A4E55776B0D3A785"><enum>(2)</enum><header>Freshwater flows</header><text>The term <term>freshwater flows</term> means the quality, quantity, timing, and variability of freshwater flows required—</text>
 <subparagraph id="H1F14068F40C7403F9670227399A1EBD9"><enum>(A)</enum><text>to support and reestablish—</text> <clause id="HCB97D8E00C664DEAB45AACE0636F5F8B"><enum>(i)</enum><text display-inline="yes-display-inline">the physical, chemical, biological, and overall ecological integrity of the components, functions, and natural processes required for a thriving and resilient Chattahoochee River, Apalachicola River, Apalachicola River floodplain, and Apalachicola Bay;</text>
 </clause><clause id="H6AA6B762FF084348BF4F906A91C400F1"><enum>(ii)</enum><text>commercial and recreational fisheries dependent on freshwater flows into Apalachicola Bay and adjacent waters, including the Gulf of Mexico; and</text>
 </clause><clause id="H7B0F11ACD43B4753B3D0AEEBA2F6166C"><enum>(iii)</enum><text display-inline="yes-display-inline">thriving and diverse fish, wildlife, and plant populations with species composition, diversity, adaptability, and functional organization similar to those found in the Chattahoochee River and Apalachicola River ecosystems prior to the construction of the Apalachicola-Chattahoochee-Flint projects;</text>
 </clause></subparagraph><subparagraph id="HE4B2FDB097254DE9822107C9F3C78160"><enum>(B)</enum><text>to restore and recover species that are—</text> <clause id="id18EB9F27EE8048EAA3173327E3BFB74C"><enum>(i)</enum><text>endangered;</text>
 </clause><clause id="idA95132A6F64847328F00ED8767659B5E"><enum>(ii)</enum><text>threatened; or</text> </clause><clause id="id834FD28302D846589770F486EE6AF850"><enum>(iii)</enum><text>at risk; and</text>
 </clause></subparagraph><subparagraph id="HFC58D12DF050475EBDE65CD425437097"><enum>(C)</enum><text display-inline="yes-display-inline">to prevent significantly harmful adverse impacts to the Chattahoochee River and Apalachicola River ecosystems.</text>
 </subparagraph></paragraph><paragraph id="id1E5A1B83EBD84492A9357902027E68AC"><enum>(3)</enum><header>Secretary</header><text>The term <term>Secretary</term> means the Secretary of the Army.</text> </paragraph></subsection><subsection id="H54E811908CE345AF991A4E9503BCE945"><enum>(b)</enum><header>Project modification</header><text>Notwithstanding any authorized purpose of the Apalachicola-Chattahoochee-Flint projects, the Secretary shall operate the Apalachicola-Chattahoochee-Flint projects in a manner that ensures the maintenance of freshwater flows.</text>
			</subsection><subsection id="idAC8BA41AEA1749CC90791DB7A3468771"><enum>(c)</enum><header>Freshwater flows study</header>
 <paragraph id="id4B598FAF33AA400C8C373A3D7F99D8BD"><enum>(1)</enum><header>In general</header><text>Not later than 30 days after the date of enactment of this Act, the Secretary shall enter into an arrangement with the Administrator of the National Oceanic and Atmospheric Administration under which the Administrator shall conduct a study that—</text>
 <subparagraph id="idE246052530754EE1B1ECE289F90B6A9A"><enum>(A)</enum><text>evaluates existing studies, assessments, and data related to freshwater flows; and</text> </subparagraph><subparagraph commented="no" id="idECC05E15AD46427DA596EA96813607D2"><enum>(B)</enum><text>provides recommendations on how to maintain freshwater flows.</text>
 </subparagraph></paragraph><paragraph id="HDC2CCB3A51714B429D4B9D07DF7DD5BD"><enum>(2)</enum><header>Completion date</header><text>The study referred to in paragraph (1) shall be completed by not later than 1 year after the date of enactment of this Act.</text>
				</paragraph></subsection><subsection id="id1B60D13006E24265B8AC6779D557A43D"><enum>(d)</enum><header>Revision of water control manuals</header>
 <paragraph id="H9F372A97F63844A1BD0DCAB02696BF54"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">The Secretary—</text> <subparagraph id="idDFB93B4CFC4944CE8CF5782C2D709273"><enum>(A)</enum><text display-inline="yes-display-inline">shall not issue a final water control manual based on the final environmental impact statement of the Secretary entitled <quote>Update of the Water Control Manual for the Apalachicola-Chattahoochee-Flint River Basin in Alabama, Florida, and Georgia and a Water Supply Storage Assessment</quote> and dated December 2016; and</text>
 </subparagraph><subparagraph id="id38C6D2D0A58447958E13D7004862BBCD"><enum>(B)</enum><text display-inline="yes-display-inline">not later than 2 years after the date of enactment of this Act, shall issue revised water control manuals for Apalachicola-Chattahoochee-Flint projects that ensure the maintenance of freshwater flows, considering the findings of the study under subsection (c)(1), as appropriate.</text>
 </subparagraph></paragraph><paragraph id="HBAD0A7F69B604477A3B9E37B761D95D2"><enum>(2)</enum><header>Operational modifications</header><text>In carrying out paragraph (1), the Secretary shall ensure that operational modifications needed to maintain freshwater flows are achieved, to the maximum extent practicable, while providing system-wide balance in conservation storage through the maintenance of water levels in the same action zone for each of the Apalachicola-Chattahoochee-Flint project reservoirs.</text>
				</paragraph><paragraph id="H00D7EF428B8149ED832F1F3EDCF5A951"><enum>(3)</enum><header>Independent peer review of water control manuals</header>
 <subparagraph id="H28BB8AB2FF194B0895435D30EA04A0DB"><enum>(A)</enum><header>In general</header><text>The Secretary shall enter into an arrangement with the National Academy of Sciences under which the Academy shall carry out an independent peer review of each revised water control manual, as required under section 2034 of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/33/2343">33 U.S.C. 2343</external-xref>).</text>
 </subparagraph><subparagraph id="H41A34116D83046C58F4DB587211F088A"><enum>(B)</enum><header>Compliance</header><text>Each independent peer review carried out under this paragraph shall comply with section 2034 of the Water Resources Development Act of 2007 (<external-xref legal-doc="usc" parsable-cite="usc/33/2343">33 U.S.C. 2343</external-xref>).</text>
 </subparagraph></paragraph><paragraph id="H353051AAB10E4BB090929790125F7C4C"><enum>(4)</enum><header>Final approval</header><text>Before a final water control manual may be issued, the Secretary shall obtain written approval of each water control manual developed under this subsection from—</text>
 <subparagraph id="H96E28C714B3D470FB2BFA6CC109ED1C5"><enum>(A)</enum><text>the Administrator of the Environmental Protection Agency;</text> </subparagraph><subparagraph id="HC2DD12C5187D45E5896CD4F3940BD4B7"><enum>(B)</enum><text>the Director of the United States Fish and Wildlife Service;</text>
 </subparagraph><subparagraph id="HE158E077ADBA4F82B5892165CB6B5E19"><enum>(C)</enum><text>the Administrator of the National Oceanic and Atmospheric Administration; and</text> </subparagraph><subparagraph id="H60FC95A6C0CF4CFD9CCA5524D1FCF435"><enum>(D)</enum><text>the Director of the United States Geological Survey.</text>
 </subparagraph></paragraph></subsection><subsection id="H33CF50D0C3F24E869EF490B71F17DA52"><enum>(e)</enum><header>Applicability of other Federal and State laws</header><text>Except as provided in subsection (b), nothing in this section waives, limits, or otherwise affects the applicability of any provision of Federal or State law that would otherwise apply to the Apalachicola-Chattahoochee-Flint projects.</text>
 </subsection><subsection id="id0B5F87A9F5224AD996931AD9AA9AEC34"><enum>(f)</enum><header>Project clarification</header><text>Notwithstanding any other provision of law, the project purpose of <quote>fish and wildlife conservation</quote> for the Apalachicola-Chattahoochee-Flint projects means protecting and restoring thriving and diverse populations of the full range of native fish and wildlife species that use the Apalachicola River and floodplain and the Chattahoochee River and floodplain, including through actions such as restoring the functions of natural systems and mimicking the timing, amount, and variability of natural flows.</text></subsection></section></legis-body></bill>


