<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-Senate" dms-id="A1" public-private="public">
	<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>113 S2620 IS: Grid Reliability Act of 2014</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2014-07-17</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
		<distribution-code display="yes">II</distribution-code>
		<congress>113th CONGRESS</congress><session>2d Session</session>
		<legis-num>S. 2620</legis-num>
		<current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber>
		<action>
			<action-date date="20140717">July 17, 2014</action-date>
			<action-desc><sponsor name-id="S312">Mrs. McCaskill</sponsor> (for herself and <cosponsor name-id="S342">Mr. Blunt</cosponsor>) introduced the following bill; which was read twice and referred to the <committee-name committee-id="SSEV00">Committee on Environment and Public Works</committee-name></action-desc>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title>To amend the Federal Power Act to improve the reliability of the electric transmission grid, and
			 for other purposes.</official-title>
	</form>
	<legis-body>
		<section id="S1" section-type="section-one"><enum>1.</enum><header>Short title</header>
			<text display-inline="no-display-inline">This Act may be cited as the
		  <quote><short-title>Grid Reliability Act of 2014</short-title></quote>.</text>
		</section><section id="id71914DEBD4C5419CA8B393ADE515E402"><enum>2.</enum><header>Grid reliability</header><subsection id="id4EA04325B6DA4ED5A7E50AD292B5B265"><enum>(a)</enum><header>Compliance under emergency orders</header><text>Section 202(c)	of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824a">16 U.S.C. 824a(c)</external-xref>) is amended—</text><paragraph id="id90c7b4c5cdd94cc09cd84084e41d9c43"><enum>(1)</enum><text>by striking <quote>(c) During</quote> and inserting the following:</text><quoted-block display-inline="no-display-inline" id="id2238461E97E34B18B44C0F632887C069" style="OLC"><subsection id="id9F788A91B08D4A6ABDB36C195261E9F2"><enum>(c)</enum><header>Temporary connection and exchange of facilities during emergency</header><paragraph id="id4b8f067d897b455aa5bfdca443ec1477"><enum>(1)</enum><header>In general</header><text>During</text></paragraph></subsection><after-quoted-block>;</after-quoted-block></quoted-block></paragraph><paragraph id="idA51D6D57B7F64017A62B348D04A17F1D"><enum>(2)</enum><text>by striking <quote>If the parties</quote> and inserting the following:</text><quoted-block display-inline="no-display-inline" id="idF6AD0B4AC4CB4449BB92876A453FA0BF" style="OLC"><paragraph id="id72B9DC7BF6024E53ABDC6EED400EBF7B"><enum>(2)</enum><header>Terms</header><text>If the parties</text></paragraph><after-quoted-block>; and</after-quoted-block></quoted-block></paragraph><paragraph id="id236fafecf2bd4e80b014e430555bfdc1"><enum>(3)</enum><text>by adding at the end the following:</text><quoted-block display-inline="no-display-inline" id="id9AEADBF189164AFCA95BE83B32ECE62C" style="OLC"><paragraph id="idac72ddf9df924458b4f8dc29d56b7876"><enum>(3)</enum><header>Administration of orders conflicting with other laws</header><text>In the case of an order issued under this subsection that may result in a conflict with a
			 requirement of any Federal, State, or local environmental law (including a
			 regulation), the Commission shall ensure that the order—</text><subparagraph id="id6D7F7989558347A7A06F9A1A479C2F08"><enum>(A)</enum><text>requires generation, delivery, interchange, or transmission of electric energy only during hours
			 necessary to meet the emergency and serve the public interest; and</text></subparagraph><subparagraph id="id260C46129B1448A7879D3C693DCD565D"><enum>(B)</enum><text>to the maximum extent practicable—</text><clause id="id2AC3D8588632452BB8510A36E277BDC6"><enum>(i)</enum><text>is consistent with any applicable Federal, State, or local environmental law (including a 
			 regulation); and</text></clause><clause id="id6721BAF27E8C446188F5A36D9DC7E630"><enum>(ii)</enum><text>minimizes any adverse environmental impacts.</text></clause></subparagraph></paragraph><paragraph id="id7a69104d840946ea8a42a462b6991ec7"><enum>(4)</enum><header>Applicability of other laws conflicting with orders</header><text>To the extent that an omission or action taken by a party to comply with an order issued under this
			 subsection (including any omission or action taken to voluntarily comply
			 with the order) results in noncompliance with, or causes a party to not
			 comply with, any Federal, State, or local environmental law (including a
			 regulation), the omission or action shall not be subject to any
			 requirement, civil or criminal liability, or a citizen suit under the
			 environmental law (or regulation).</text></paragraph><paragraph id="id76f573d146b54e04bbc069028cd5cda8"><enum>(5)</enum><header>Renewal or reissuance of orders conflicting with other laws</header><subparagraph id="id87419C77FBE7443A80A42B2E18ECA594"><enum>(A)</enum><header>In general</header><text>An order issued under this subsection that may result in a conflict with a requirement of any
			 Federal, State, or local environmental law (including a regulation) shall
			 expire not later than 90 days after the date the order is issued.</text></subparagraph><subparagraph id="idDBDF640C09904380BDD6B59A7AA08374"><enum>(B)</enum><header>Renewal or reissuance of orders</header><text>The Commission may renew or reissue the order in accordance with this subsection for subsequent
			 periods of not to exceed 90 days for each period, as the Commission
			 determines necessary to meet the emergency and serve the public interest.</text></subparagraph><subparagraph id="id091ed2c4c1d9411d8442b8e771c88e26"><enum>(C)</enum><header>Administration</header><text>In renewing or reissuing an order under this paragraph, the Commission shall—</text><clause id="id25326C07500C47E5AC90DEBC2F578117"><enum>(i)</enum><text>consult with the primary Federal agency with expertise in the environmental interest protected by
			 the law (or regulation); and</text></clause><clause id="id562A0906267948A29BD05569EA0E474D"><enum>(ii)</enum><text>include in the renewed or reissued order such conditions as such Federal agency determines
			 necessary to minimize any adverse environmental impacts, to the maximum
			 extent practicable.</text></clause></subparagraph><subparagraph id="id486A50A27762464DB952517580679B3A"><enum>(D)</enum><header>Public availability</header><text>Any conditions submitted by a Federal agency described in subparagraph (C)(i) shall be made
			 available to the public.</text></subparagraph><subparagraph id="id15B213DE89EB4EFDB92CA66D6AB37E4A"><enum>(E)</enum><header>Exclusion of conditions</header><text>The Commission may exclude a condition described in subparagraph (D) from the renewed or reissued
			 order if the Commission—</text><clause id="id3231644B9FB0413EBBFD87936D268EAC"><enum>(i)</enum><text>determines that the condition would prevent the order from adequately addressing the emergency
			 necessitating the order; and</text></clause><clause id="idAF9D27B926BE4A578DBBD8187726BDCE"><enum>(ii)</enum><text>provides in the order, or otherwise makes publicly available, an explanation of the determination.</text></clause></subparagraph></paragraph><paragraph id="id5a4c4064ad444525b020aeb3030e6e26"><enum>(6)</enum><header>Orders that are stayed, modified, or set aside</header><text>If an order issued under this subsection is subsequently stayed, modified, or set aside by a court
			 pursuant to section 313 or any other provision of law, any omission or
			 action previously taken by a party that was necessary to comply with the
			 order while the order was in effect (including any omission or action
			 taken to voluntarily comply with the order) shall remain subject to
			 paragraph (4).</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection><subsection id="id562fcfd36a8043da8aaaadbae1c4b05b"><enum>(b)</enum><header>Temporary connection or construction by municipalities</header><text>Section 202(d) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824a">16 U.S.C. 824a(d)</external-xref>) is amended by inserting <quote>or municipality</quote> after	<quote>any person</quote>.</text>
			</subsection></section></legis-body>
</bill>


