<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Placed-on-Calendar-Senate" bill-type="olc" dms-id="H23B62EEEC747444394AF54ADA75D4AF5" key="H" public-private="public" stage-count="1"> 
<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>113 HR 3301 PCS: North American Energy Infrastructure Act</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date></dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">II</distribution-code> 
<calendar>Calendar No. 442</calendar>
<congress>113th CONGRESS</congress> <session>2d Session</session> 
<legis-num>H. R. 3301</legis-num> 
<current-chamber display="yes">IN THE SENATE OF THE UNITED STATES</current-chamber> 
<action>
<action-date>June 25, 2014</action-date>
<action-desc>Received; read the first time</action-desc>
</action>
<action>
<action-date>June 26, 2014</action-date>
<action-desc>Read the second time and placed on the calendar</action-desc>
</action>
<legis-type>AN ACT</legis-type> 
<official-title display="yes">To require approval for the construction, connection, operation, or maintenance of oil or natural gas pipelines or electric transmission facilities at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico, and for other purposes.</official-title> 
</form> 
<legis-body id="H88FE5E4F49A24C2BB367240D3AA05CBE" style="OLC"> 
<section id="H0A829D5504D44BA7B209A85953E86BE6" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>North American Energy Infrastructure Act</short-title></quote>.</text> </section> <section commented="no" id="H0C873352E3924F08B6582AF26DDCC2E9"><enum>2.</enum><header>Finding</header><text display-inline="no-display-inline">Congress finds that the United States should establish a more uniform, transparent, and modern process for the construction, connection, operation, and maintenance of oil and natural gas pipelines and electric transmission facilities for the import and export of oil and natural gas and the transmission of electricity to and from Canada and Mexico, in pursuit of a more secure and efficient North American energy market.</text> </section>
<section id="HE2E2AD4FA9DC4AE29CDB02DBDD89A0B7"><enum>3.</enum><header>Authorization of certain energy infrastructure projects at the national boundary of the United States</header> 
<subsection id="H4F92DFFFA01D4C59AE53F753FC835AE3"><enum>(a)</enum><header>Authorization</header><text display-inline="yes-display-inline">Except as provided in subsection (c) and section 7, no person may construct, connect, operate, or maintain a cross-border segment of an oil pipeline or electric transmission facility for the import or export of oil or the transmission of electricity to or from Canada or Mexico without obtaining a certificate of crossing for the construction, connection, operation, or maintenance of the cross-border segment under this section.</text> </subsection> <subsection commented="no" id="HAA59BE0B46EF408D8996F482D108358B"><enum>(b)</enum><header>Certificate of crossing</header> <paragraph id="H8FA0212FE337412DA2DF3424035D3690"><enum>(1)</enum><header>Requirement</header><text display-inline="yes-display-inline">Not later than 120 days after final action is taken under the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321 et seq.</external-xref>) with respect to a cross-border segment for which a request is received under this section, the relevant official identified under paragraph (2), in consultation with appropriate Federal agencies, shall issue a certificate of crossing for the cross-border segment unless the relevant official finds that the construction, connection, operation, or maintenance of the cross-border segment is not in the public interest of the United States.</text> </paragraph>
<paragraph id="H7464228383B44BF3997704A8F574C7E3"><enum>(2)</enum><header>Relevant official</header><text>The relevant official referred to in paragraph (1) is—</text> <subparagraph id="H67E896CE064E47C7B65F0216AABFA04D"><enum>(A)</enum><text display-inline="yes-display-inline">the Secretary of State with respect to oil pipelines; and</text> </subparagraph>
<subparagraph id="H70E597179A0F41F6AD27E56C32C36F9C"><enum>(B)</enum><text>the Secretary of Energy with respect to electric transmission facilities.</text> </subparagraph></paragraph> <paragraph id="H54F4819622E147C8BBDA89561933FE34"><enum>(3)</enum><header>Additional requirement for electric transmission facilities</header><text display-inline="yes-display-inline">In the case of a request for a certificate of crossing for the construction, connection, operation, or maintenance of a cross-border segment of an electric transmission facility, the Secretary of Energy shall require, as a condition of issuing the certificate of crossing for the request under paragraph (1), that the cross-border segment of the electric transmission facility be constructed, connected, operated, or maintained consistent with all applicable policies and standards of—</text> 
<subparagraph id="HACFA3CC57986496391F6E3F68A5959FB"><enum>(A)</enum><text>the Electric Reliability Organization and the applicable regional entity; and</text> </subparagraph> <subparagraph commented="no" id="H9F85281874C143FBAEFD4210DA71A7BA"><enum>(B)</enum><text display-inline="yes-display-inline">any Regional Transmission Organization or Independent System Operator with operational or functional control over the cross-border segment of the electric transmission facility.</text> </subparagraph></paragraph></subsection>
<subsection id="HF8CDC652BE3D4BD0B95B9FE0FAD9A97C"><enum>(c)</enum><header>Exclusions</header><text display-inline="yes-display-inline">This section shall not apply to any construction, connection, operation, or maintenance of a cross-border segment of an oil pipeline or electric transmission facility for the import or export of oil or the transmission of electricity to or from Canada or Mexico—</text> <paragraph id="H13D6631832144E4DA32829E5D250D12F"><enum>(1)</enum><text display-inline="yes-display-inline">if the cross-border segment is operating for such import, export, or transmission as of the date of enactment of this Act;</text> </paragraph>
<paragraph id="H9DA6B238E797474FA5FD1D37DCC30D40"><enum>(2)</enum><text>if a permit described in section 6 for such construction, connection, operation, or maintenance has been issued;</text> </paragraph> <paragraph id="H653CB05EEEBE4A90A6C73E9BFBB21D3B"><enum>(3)</enum><text display-inline="yes-display-inline">if a certificate of crossing for such construction, connection, operation, or maintenance has previously been issued under this section; or</text> </paragraph>
<paragraph commented="no" id="HC0ED32518E9B400F8B6808FC8E31BBD0"><enum>(4)</enum><text display-inline="yes-display-inline">if an application for a permit described in section 6 for such construction, connection, operation, or maintenance is pending on the date of enactment of this Act, until the earlier of—</text> <subparagraph commented="no" id="H4F3E4AA88DD64CF3921399696F320787"><enum>(A)</enum><text>the date on which such application is denied; or</text> </subparagraph>
<subparagraph commented="no" id="H54FD0F77D9544E799FBA616F3F48A43A"><enum>(B)</enum><text>July 1, 2016.</text> </subparagraph></paragraph></subsection> <subsection id="HB144992532D94FAD8DA4FFCC599ED067"><enum>(d)</enum><header>Effect of other laws</header> <paragraph id="HC4ED25047D2348BCA515235E3425366C"><enum>(1)</enum><header>Application to projects</header><text>Nothing in this section or section 7 shall affect the application of any other Federal statute to a project for which a certificate of crossing for the construction, connection, operation, or maintenance of a cross-border segment is sought under this section.</text> </paragraph>
<paragraph id="HD4819824E752402A8A2081102E499AFC"><enum>(2)</enum><header>Natural Gas Act</header><text>Nothing in this section or section 7 shall affect the requirement to obtain approval or authorization under sections 3 and 7 of the Natural Gas Act for the siting, construction, or operation of any facility to import or export natural gas.</text> </paragraph> <paragraph id="H43D39123B4A847BB8931C1D40EA5575F"><enum>(3)</enum><header>Energy Policy and Conservation Act</header><text>Nothing in this section or section 7 shall affect the authority of the President under section 103(a) of the Energy Policy and Conservation Act.</text> </paragraph></subsection></section>
<section id="HBE2CF367D644466C930DC4ACFCB0323C"><enum>4.</enum><header>Importation or exportation of natural gas to Canada and Mexico</header><text display-inline="no-display-inline">Section 3(c) of the Natural Gas Act (<external-xref legal-doc="usc" parsable-cite="usc/15/717b">15 U.S.C. 717b(c)</external-xref>) is amended by adding at the end the following: <quote>No order is required under subsection (a) to authorize the export or import of any natural gas to or from Canada or Mexico.</quote>.</text> </section> <section id="H93F2C46E796C405084766379A86B05EB"><enum>5.</enum><header>Transmission of electric energy to Canada and Mexico</header> <subsection id="H834A78F4C29C46099F1D95BBF636CEAD"><enum>(a)</enum><header>Repeal of requirement To secure order</header><text display-inline="yes-display-inline">Section 202(e) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824a">16 U.S.C. 824a(e)</external-xref>) is repealed.</text> </subsection>
<subsection id="H0D6180497B424394A7E7EA8346D5DFF6"><enum>(b)</enum><header>Conforming amendments</header> 
<paragraph id="H33D31A239A604D7ABE70BD2796D3309B"><enum>(1)</enum><header>State regulations</header><text>Section 202(f) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824a">16 U.S.C. 824a(f)</external-xref>) is amended by striking <quote>insofar as such State regulation does not conflict with the exercise of the Commission's powers under or relating to subsection 202(e)</quote>.</text> </paragraph> <paragraph id="H965AE4FCDE554B7A8E9ABEC718F9C4E2"><enum>(2)</enum><header>Seasonal diversity electricity exchange</header><text display-inline="yes-display-inline">Section 602(b) of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/824a-4">16 U.S.C. 824a–4(b)</external-xref>) is amended by striking <quote>the Commission has conducted hearings and made the findings required under section 202(e) of the Federal Power Act</quote> and all that follows through the period at the end and inserting <quote>the Secretary has conducted hearings and finds that the proposed transmission facilities would not impair the sufficiency of electric supply within the United States or would not impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Secretary.</quote>.</text> </paragraph></subsection></section>
<section id="HFF2740F375B6464687BF60C513533428"><enum>6.</enum><header>No Presidential permit required</header><text display-inline="no-display-inline">No Presidential permit (or similar permit) required under Executive Order No. 13337 (<external-xref legal-doc="usc" parsable-cite="usc/3/301">3 U.S.C. 301</external-xref> note), Executive Order No. 11423 (<external-xref legal-doc="usc" parsable-cite="usc/3/301">3 U.S.C. 301</external-xref> note), section 301 of title 3, United States Code, Executive Order No. 12038, Executive Order No. 10485, or any other Executive order shall be necessary for the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility, or any cross-border segment thereof.</text> </section> <section id="H2CEBEAE3179B4DB09D068F785834F541"><enum>7.</enum><header>Modifications to existing projects</header><text display-inline="no-display-inline">No certificate of crossing under section 3, or permit described in section 6, shall be required for a modification to the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility—</text> 
<paragraph id="H2AF364A3839E445EA1387C0DBC1C02B9"><enum>(1)</enum><text>that is operating for the import or export of oil or natural gas or the transmission of electricity to or from Canada or Mexico as of the date of enactment of the Act;</text> </paragraph> <paragraph id="H564880DE0B1441419EF6145AE56E9745"><enum>(2)</enum><text display-inline="yes-display-inline">for which a permit described in section 6 for such construction, connection, operation, or maintenance has been issued; or</text> </paragraph>
<paragraph id="HE3495172BDDC48DCA1C55663EF842616"><enum>(3)</enum><text display-inline="yes-display-inline">for which a certificate of crossing for the cross-border segment of the pipeline or facility has previously been issued under section 3.</text> </paragraph></section> <section id="HAB95489EF19140998E3BD540014DDEEA"><enum>8.</enum><header>Effective date; rulemaking deadlines</header> <subsection id="H18E91D6133444505A02992D57D55DC00"><enum>(a)</enum><header>Effective date</header><text display-inline="yes-display-inline">Sections 3 through 7, and the amendments made by such sections, shall take effect on July 1, 2015.</text> </subsection>
<subsection id="H5666073BC5FB4DBFAD5C55F69D65ED5C"><enum>(b)</enum><header>Rulemaking deadlines</header><text>Each relevant official described in section 3(b)(2) shall—</text> <paragraph id="HE2F0DDDAA3A045C287D4CC92ADD4E936"><enum>(1)</enum><text>not later than 180 days after the date of enactment of this Act, publish in the Federal Register notice of a proposed rulemaking to carry out the applicable requirements of section 3; and</text> </paragraph>
<paragraph id="H2CD592535693481CA98E9262F71B6EB9"><enum>(2)</enum><text display-inline="yes-display-inline">not later than 1 year after the date of enactment of this Act, publish in the Federal Register a final rule to carry out the applicable requirements of section 3.</text> </paragraph></subsection></section> <section id="H8A99C7DD7E4B472080AF4EE973A3FDC3"><enum>9.</enum><header>Definitions</header><text display-inline="no-display-inline">In this Act—</text> 
<paragraph commented="no" id="H89EEB9F13F4F454E9EB009AB7064AF1A"><enum>(1)</enum><text>the term <term>cross-border segment</term> means the portion of an oil or natural gas pipeline or electric transmission facility that is located at the national boundary of the United States with either Canada or Mexico;</text> </paragraph> <paragraph id="H48DE74F4F0F245B485D857078EF19F07"><enum>(2)</enum><text>the term <term>modification</term> includes a reversal of flow direction, change in ownership, volume expansion, downstream or upstream interconnection, or adjustment to maintain flow (such as a reduction or increase in the number of pump or compressor stations);</text> </paragraph>
<paragraph id="H9EC7F4B49936470FB7267D52490BDDB6"><enum>(3)</enum><text>the term <term>natural gas</term> has the meaning given that term in section 2 of the Natural Gas Act (<external-xref legal-doc="usc" parsable-cite="usc/15/717a">15 U.S.C. 717a</external-xref>);</text> </paragraph> <paragraph id="H9E3C6DDF006B4E259807C1FC3558630F"><enum>(4)</enum><text>the term <term>oil</term> means petroleum or a petroleum product;</text> </paragraph>
<paragraph commented="no" id="H353011EFDEBF4E4995BA1A991E78257F"><enum>(5)</enum><text>the terms <term>Electric Reliability Organization</term> and <term>regional entity</term> have the meanings given those terms in section 215 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824o">16 U.S.C. 824o</external-xref>); and</text> </paragraph> <paragraph commented="no" id="H011E3B8EB01F499DB2BC356CFB06FD7F"><enum>(6)</enum><text>the terms <term>Independent System Operator</term> and <term>Regional Transmission Organization</term> have the meanings given those terms in section 3 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/796">16 U.S.C. 796</external-xref>).</text> </paragraph></section>
</legis-body> <attestation><attestation-group><attestation-date chamber="House" date="20140624">Passed the House of Representatives June 24, 2014.</attestation-date><attestor display="yes">Karen L. Haas,</attestor><role>Clerk</role></attestation-group></attestation> 
<endorsement>
<action-date>June 26, 2014</action-date>
<action-desc>Read the second time and placed on the calendar</action-desc></endorsement>
</bill> 


