<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-Senate" public-private="public">
	<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>113 S574 IS: DREDGE Act of 2013</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2013-03-14</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
		<distribution-code display="yes">II</distribution-code>
		<congress>113th CONGRESS</congress>
		<session>1st Session</session>
		<legis-num>S. 574</legis-num>
		<current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber>
		<action>
			<action-date date="20130314">March 14, 2013</action-date>
			<action-desc><sponsor name-id="S258">Ms. Landrieu</sponsor> introduced
			 the following bill; which was read twice and referred to the
			 <committee-name committee-id="SSEV00">Committee on Environment and Public
			 Works</committee-name></action-desc>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title>To modify the project for navigation, Mississippi River
		  Ship Channel, Gulf of Mexico to Baton Rouge, Louisiana, and for other
		  purposes.</official-title>
	</form>
	<legis-body id="H9017924AD8BD4D01A796B0350DA82D1F" style="OLC">
		<section id="H5E4F28A49B3F4054A377DA0FE717270E" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the
			 <quote><quote><short-title>Dredging for Restoration and
			 Economic Development for Global Exports Act of
			 2013</short-title></quote></quote> or the <quote><quote><short-title>DREDGE Act of 2013</short-title></quote></quote>.</text>
		</section><section id="H024DB300FD274F94BDBC0380B807FCAA"><enum>2.</enum><header>Mississippi River
			 Ship Channel, Gulf of Mexico to Baton Rouge, Louisiana</header>
			<subsection id="H917B518224E34C6A9910A20999CF3799"><enum>(a)</enum><header>Project
			 modification</header><text display-inline="yes-display-inline">The project for
			 navigation, Mississippi River Ship Channel, Gulf of Mexico to Baton Rouge,
			 Louisiana, authorized by the matter under the heading <quote><header-in-text level="appropriations-small" style="appropriations">Mississippi River Ship
			 Channel, Gulf to Baton Rouge, Louisiana</header-in-text></quote> of section
			 201(a) of the Water Resources Development Act of 1986 (100 Stat. 4090), is
			 modified as follows to direct the Secretary of the Army, acting through the
			 Chief of Engineers—</text>
				<paragraph id="H348D06049E7A443F8284F861B4FF0FAD"><enum>(1)</enum><text>to achieve,
			 operate, and maintain a navigation channel of 50 feet with respect to the
			 portion of the project from Baton Rouge to the Southwest Pass sea buoy;</text>
				</paragraph><paragraph id="H3BEC2C6FE1924E18BA3532C9488CB265"><enum>(2)</enum><text>to complete the
			 work required under paragraph (1) not later than the last day of the third
			 fiscal year beginning after the date of enactment of this Act (completing at
			 least <fraction>1/3</fraction> of that work in each of the first 2 fiscal years
			 beginning after the date of enactment of this Act); and</text>
				</paragraph><paragraph id="H0BC0C435E72549BA94B544EC528473B5"><enum>(3)</enum><text>to conduct a pilot
			 disposal and sediment project in the Southwest Pass area to determine the
			 cost-effectiveness of pump-out disposal operations for hopper dredges
			 for—</text>
					<subparagraph id="HF30C92AC20B64DE49DA0C27D71D46B68"><enum>(A)</enum><text>environmental
			 enhancement; and</text>
					</subparagraph><subparagraph id="H78EED2F6AB5D43EE9B9BABC691FFCA02"><enum>(B)</enum><text>dredged material
			 disposal.</text>
					</subparagraph></paragraph></subsection><subsection id="HD0ABCCADFD824D98BCA98F1CB3949401"><enum>(b)</enum><header>Consultation</header><text>In
			 carrying out subsection (a)(3), the Secretary of the Army, acting through the
			 Chief of Engineers, shall consult with appropriate Federal, State, and local
			 agencies and stakeholders to determine the safe placement and timing of
			 pump-out disposal operations that protect, create, restore, and nourish coastal
			 wetlands and aquatic habitat.</text>
			</subsection><subsection id="H96DAC955174A4CB187D9DECA3BA3DD87"><enum>(c)</enum><header>Treatment of
			 costs</header><text>All costs of the work required under subsection (a) shall
			 be treated as operation and maintenance costs, including the first costs of
			 achieving a navigation channel of 50 feet.</text>
			</subsection><subsection id="H2044077A14524BF6AA5BAFD81C927640"><enum>(d)</enum><header>Federal
			 share</header><text display-inline="yes-display-inline">Notwithstanding section
			 101(b)(1) of the Water Resources Development Act of 1986 (33 U.S.C.
			 2211(b)(1)), the Federal share of the cost of the work required under
			 subsection (a) shall be 100 percent.</text>
			</subsection><subsection id="H379DE844244B4F72ADAE1C7C6E7DD40C"><enum>(e)</enum><header>Funding</header><text>Notwithstanding
			 section 210 of the Water Resources Development Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/33/2238">33 U.S.C. 2238</external-xref>) or
			 <external-xref legal-doc="usc" parsable-cite="usc/26/9505">section 9505</external-xref> of the Internal Revenue Code of 1986, the Secretary of the Army,
			 acting through the Chief of Engineers, shall pay 100 percent of the costs of
			 the work required under subsection (a) out of amounts made available to the
			 Secretary from the Harbor Maintenance Trust Fund for operation and maintenance
			 expenses.</text>
			</subsection><subsection id="HE0896EC63B3A40ECB0CB97A3803C48DA"><enum>(f)</enum><header>Report to
			 Congress</header><text display-inline="yes-display-inline">Not later than 2
			 years after the date of enactment of this Act, the Secretary of the Army,
			 acting through the Chief of Engineers, shall submit to Congress a report
			 on—</text>
				<paragraph id="H92294DF1486547E88C615F508E23B37C"><enum>(1)</enum><text>the cost and the
			 environmental, storm damage reduction, and social benefits of the pump-out
			 disposal operation carried out under subsection (a)(3), as compared to standard
			 dredging practices for the area; and</text>
				</paragraph><paragraph id="H4A2D942A111A4A51B729C855B94F6E26"><enum>(2)</enum><text>the total quantity
			 of dredge material produced during operation and maintenance activities in the
			 New Orleans District and the quantity that is beneficially used.</text>
				</paragraph></subsection><subsection id="HE077C05A64F846DBB8CC29233AA2A0A7"><enum>(g)</enum><header>Limitation on
			 statutory construction</header><text>Nothing in this section affects the
			 authority of the Secretary of the Army with respect to the width of the project
			 referred to in subsection (a).</text>
			</subsection></section></legis-body>
</bill>


