<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Reported-in-Senate" public-private="public">
	<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>113 S545 RS: Hydropower Improvement Act of 2013</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2013-03-13</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
		<distribution-code display="yes">II</distribution-code>
		<calendar>Calendar No. 69</calendar>
		<congress>113th CONGRESS</congress>
		<session>1st Session</session>
		<legis-num>S. 545</legis-num>
		<current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber>
		<action>
			<action-date date="20130313">March 13, 2013</action-date>
			<action-desc><sponsor name-id="S288">Ms. Murkowski</sponsor> (for
			 herself, <cosponsor name-id="S247">Mr. Wyden</cosponsor>,
			 <cosponsor name-id="S323">Mr. Risch</cosponsor>, <cosponsor name-id="S275">Ms.
			 Cantwell</cosponsor>, <cosponsor name-id="S266">Mr. Crapo</cosponsor>,
			 <cosponsor name-id="S229">Mrs. Murray</cosponsor>, <cosponsor name-id="S319">Mr. Begich</cosponsor>, <cosponsor name-id="S330">Mr.
			 Bennet</cosponsor>, <cosponsor name-id="S325">Mr. Udall of
			 Colorado</cosponsor>, <cosponsor name-id="S337">Mr. Coons</cosponsor>,
			 <cosponsor name-id="S221">Mrs. Feinstein</cosponsor>, and
			 <cosponsor name-id="S309">Mr. Casey</cosponsor>) introduced the following bill;
			 which was read twice and referred to the
			 <committee-name added-display-style="italic" committee-id="SSEG00" deleted-display-style="strikethrough">Committee on Energy and Natural
			 Resources</committee-name></action-desc>
		</action>
		<action stage="Reported-in-Senate">
			<action-date>May 13, 2013</action-date>
			<action-desc>Reported by <sponsor name-id="S247">Mr. Wyden</sponsor>,
			 with an amendment</action-desc>
			<action-instruction>Strike out all after the enacting clause and insert
			 the part printed in italic</action-instruction>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title>To improve hydropower, and for other
		  purposes.</official-title>
	</form>
	<legis-body>
		<section changed="deleted" committee-id="SSEG00" id="S1" reported-display-style="strikethrough" section-type="section-one"><enum>1.</enum><header>Short title; table of
			 contents</header>
			<subsection id="idC16216EC53FC449DA773627953311567"><enum>(a)</enum><header>Short
			 title</header><text display-inline="yes-display-inline">This Act may be cited
			 as the <quote><short-title>Hydropower Improvement Act of
			 2013</short-title></quote>.</text>
			</subsection><subsection id="idC6853C288BFC4336BAE5DD0428C9E07E"><enum>(b)</enum><header>Table of
			 contents</header><text>The table of contents of this Act is as follows:</text>
				<toc changed="deleted" committee-id="SSEG00" reported-display-style="strikethrough">
					<toc-entry idref="S1" level="section">Sec. 1. Short title;
				table of contents.</toc-entry>
					<toc-entry idref="id4DBB0A7E8FCF46399937CE6F2DA756C4" level="section">Sec. 2. Findings.</toc-entry>
					<toc-entry idref="id94EBB2D3CD3A480785CF6101FEDF2796" level="section">Sec. 3. Definitions.</toc-entry>
					<toc-entry idref="ID2e326f879f3a4acc8a7d81d4f335ea6b" level="section">Sec. 4. Sense of the Senate on the use
				of hydropower renewable resources.</toc-entry>
					<toc-entry idref="IDb6f159bb0fb6496ca9cd3f83ee33673d" level="section">Sec. 5. Promoting hydropower development
				at nonpowered dams and closed loop pumped storage projects.</toc-entry>
					<toc-entry idref="HA268DCA5CDF348AFAD1F07D2DB718509" level="section">Sec. 6. Promoting conduit hydropower
				projects.</toc-entry>
					<toc-entry idref="HC4A0D856F96449F49BF9F3B1A7AD8D74" level="section">Sec. 7. Promoting small hydroelectric
				power projects.</toc-entry>
					<toc-entry idref="idFCBFF194525E493EA0C34AA95FE3CFA6" level="section">Sec. 8. FERC authority to extend
				preliminary permit terms.</toc-entry>
					<toc-entry idref="iddc785baa8d7c49a2bf5359bdfffbe46e" level="section">Sec. 9. Study of pumped storage and
				potential hydropower from conduits.</toc-entry>
					<toc-entry idref="idD7BB7BA5E1A4414EB8D889539025D1C0" level="section">Sec. 10. Report on memorandum of
				understanding on hydropower.</toc-entry>
				</toc>
			</subsection></section><section changed="deleted" committee-id="SSEG00" id="id4DBB0A7E8FCF46399937CE6F2DA756C4" reported-display-style="strikethrough"><enum>2.</enum><header>Findings</header><text display-inline="no-display-inline">Congress finds that—</text>
			<paragraph id="id2BD0F21BECC54986A103665C1E2656CD"><enum>(1)</enum><text display-inline="yes-display-inline">hydropower is the largest source of clean,
			 renewable electricity in the United States;</text>
			</paragraph><paragraph id="id8FE39422EBF947FC951707540CA13F2F"><enum>(2)</enum><text display-inline="yes-display-inline">as of the date of enactment of this Act,
			 hydropower resources, including pumped storage facilities, provide—</text>
				<subparagraph id="idA6958875DEE347809F9E8BB89369A94F"><enum>(A)</enum><text display-inline="yes-display-inline">nearly 7 percent of the electricity
			 generated in the United States, avoiding approximately 200,000,000 metric tons
			 of carbon emissions each year; and</text>
				</subparagraph><subparagraph id="id74D99660B6164052BEB81C19E446AD1A"><enum>(B)</enum><text display-inline="yes-display-inline">approximately 100,000 megawatts of electric
			 capacity in the United States;</text>
				</subparagraph></paragraph><paragraph id="ID1a3e79725cf14e6598065524cc02c7fb"><enum>(3)</enum><text>only 3 percent of
			 the 80,000 dams in the United States generate electricity so there is
			 substantial potential for adding hydropower generation to nonpower dams;</text>
			</paragraph><paragraph id="id4F18790B42B5486284B8059C88DC8D42"><enum>(4)</enum><text display-inline="yes-display-inline">in every State, a tremendous untapped
			 growth potential exists in hydropower resources, including—</text>
				<subparagraph id="id321223EC0A7144DCAC2F4EF587A1B327"><enum>(A)</enum><text display-inline="yes-display-inline">efficiency improvements and capacity
			 additions;</text>
				</subparagraph><subparagraph id="id1ACFB0EC0FA24F84820096964AA4FBA4"><enum>(B)</enum><text display-inline="yes-display-inline">adding generation to nonpower dams;</text>
				</subparagraph><subparagraph id="idA6B9D831918B49EE8781D3489F021150"><enum>(C)</enum><text display-inline="yes-display-inline">conduit hydropower;</text>
				</subparagraph><subparagraph id="id11FB84DBF24F48BBB83C63AB9C086BBE"><enum>(D)</enum><text display-inline="yes-display-inline">conventional hydropower;</text>
				</subparagraph><subparagraph id="id571DEE39A7E9452890611A035860B40A"><enum>(E)</enum><text display-inline="yes-display-inline">pumped storage facilities; and</text>
				</subparagraph><subparagraph id="id3BE9682F1BE342B7B782F100955FE5EA"><enum>(F)</enum><text display-inline="yes-display-inline">new marine and hydrokinetic resources;
			 and</text>
				</subparagraph></paragraph><paragraph id="IDe5040845030d4ba48797bbb6426268f0"><enum>(5)</enum><text>improvements in
			 increased hydropower production in the United States have the potential—</text>
				<subparagraph id="idD885C529BDAF4A6D8EFB7F4FA12C1CFD"><enum>(A)</enum><text display-inline="yes-display-inline">to increase the clean energy generation of
			 the United States;</text>
				</subparagraph><subparagraph id="IDe31cf66e2b274196b9ce1195a0e1af3f"><enum>(B)</enum><text>to improve project
			 performance and result in better environmental outcomes; and</text>
				</subparagraph><subparagraph id="id3B777CCC9A2E4A029514E7C4AB013211"><enum>(C)</enum><text display-inline="yes-display-inline">to provide ancillary benefits that include
			 grid reliability, energy storage, and integration services for variable
			 renewable resources.</text>
				</subparagraph></paragraph></section><section changed="deleted" committee-id="SSEG00" id="id94EBB2D3CD3A480785CF6101FEDF2796" reported-display-style="strikethrough"><enum>3.</enum><header>Definitions</header><text display-inline="no-display-inline">In this Act:</text>
			<paragraph id="id44B88DE1F23F4A97A59565D5A0D60760"><enum>(1)</enum><header>Conduit</header><text>The
			 term <term>conduit</term> means any tunnel, canal, pipeline, aqueduct, flume,
			 ditch, or similar manmade water conveyance that is operated for the
			 distribution of water for agricultural, municipal, or industrial consumption
			 and not primarily for the generation of electricity.</text>
			</paragraph><paragraph id="id3B2CFDED3CE54C738FAE38957B8B99B3"><enum>(2)</enum><header>Secretary</header><text display-inline="yes-display-inline">The term <term>Secretary</term> means the
			 Secretary of Energy.</text>
			</paragraph><paragraph id="idA9BAB67740D14AC7AABE261D936B5249"><enum>(3)</enum><header>Small
			 hydroelectric power project</header><text>The term <term>small hydroelectric
			 power project</term> has the meaning given the term in section 4.30 of title
			 18, Code of Federal Regulations.</text>
			</paragraph></section><section changed="deleted" committee-id="SSEG00" id="ID2e326f879f3a4acc8a7d81d4f335ea6b" reported-display-style="strikethrough"><enum>4.</enum><header>Sense of the
			 Senate on the use of hydropower renewable resources</header><text display-inline="no-display-inline">It is the sense of the Senate that the
			 United States should increase substantially the capacity and generation of
			 clean, renewable hydropower which will improve the environmental quality of
			 resources in the United States and support local job creation and economic
			 investment across the United States.</text>
		</section><section changed="deleted" commented="no" committee-id="SSEG00" id="IDb6f159bb0fb6496ca9cd3f83ee33673d" reported-display-style="strikethrough"><enum>5.</enum><header>Promoting
			 hydropower development at nonpowered dams and closed loop pumped storage
			 projects</header>
			<subsection id="ID6cc33fcda1e64df5a6d1b275660cb7d8"><enum>(a)</enum><header>In
			 general</header><text>To improve the regulatory process and reduce delays and
			 costs for hydropower development at nonpowered dams and closed loop pumped
			 storage projects, the Federal Energy Regulatory Commission (referred to in this
			 section as the <quote>Commission</quote>) shall investigate the feasibility of
			 the issuance of a license for certain hydropower development during the 2-year
			 period beginning on the date of commencement of the prefiling licensing process
			 of the Commission (referred to in this section as a <quote>2-year
			 process</quote>).</text>
			</subsection><subsection id="ID1065bd3c25a14c198eb746ced1566d15"><enum>(b)</enum><header>Workshops and
			 pilots</header><text>The Commission shall—</text>
				<paragraph id="ID373abd545520439dbb6fb741416ea783"><enum>(1)</enum><text>not later than 60
			 days after the date of enactment of this Act, hold an initial workshop to
			 solicit public comment and recommendations on how to implement a 2-year
			 process;</text>
				</paragraph><paragraph id="IDeb86cdf1accf49c5a014747b2c56e03f"><enum>(2)</enum><text>develop criteria
			 for identifying projects featuring hydropower development at nonpowered dams
			 and closed loop pumped storage projects that may be appropriate for licensing
			 within a 2-year process;</text>
				</paragraph><paragraph id="ID471f299a1a734bb282dbe6a0a473b28d"><enum>(3)</enum><text>not later than 180
			 days after the date of enactment of this Act, develop and implement pilot
			 projects to test a 2-year process, if practicable; and</text>
				</paragraph><paragraph id="ID1dea298afc34424f881149568908a458"><enum>(4)</enum><text>not later than 3
			 years after the date of implementation of any pilot project to test a 2-year
			 process, hold a final workshop to solicit public comment on the effectiveness
			 of the pilot project.</text>
				</paragraph></subsection><subsection id="ID9b9fa5fd788a4655af32f9e49aa7ca3f"><enum>(c)</enum><header>Memorandum of
			 understanding</header><text>The Commission shall, to the maximum extent
			 practicable, enter into a memorandum of understanding with any applicable
			 Federal or State agency to implement a pilot project described in subsection
			 (b).</text>
			</subsection><subsection id="ID0f9e8790aa8d47368179e1eda3d9483d"><enum>(d)</enum><header>Reports</header>
				<paragraph id="IDc00c3593c1254089ba4e652e12b62aea"><enum>(1)</enum><header>Pilot projects
			 not implemented</header><text>If the Commission determines that the pilot
			 projects described in subsection (b) are not practicable, not later than 240
			 days after the date of enactment of this Act, the Commission shall submit to
			 the Committee on Energy and Natural Resources of the Senate and the Committee
			 on Energy and Commerce of the House of Representatives a report that—</text>
					<subparagraph id="ID06f3abf6b8ee40aaa897506a234fe861"><enum>(A)</enum><text>describes the
			 public comments received as part of the initial workshop held under subsection
			 (b)(1); and</text>
					</subparagraph><subparagraph id="ID51b32cc46a6c4d6db268b2ecb9345e9f"><enum>(B)</enum><text>identifies the
			 process, legal, environmental, economic, and other issues that justify the
			 determination of the Commission that a 2-year process is not practicable, with
			 recommendations on how Congress may address or remedy the identified
			 issues.</text>
					</subparagraph></paragraph><paragraph id="ID5559e1b770534c6ebc3994570aeca50e"><enum>(2)</enum><header>Pilot projects
			 implemented</header><text>If the Commission develops and implements pilot
			 projects involving a 2-year process described in subsection (b), not later than
			 60 days after the date of completion of any final workshop held under
			 subsection (b)(4), the Commission shall submit to the Committee on Energy and
			 Natural Resources of the Senate and the Committee on Energy and Commerce of the
			 House of Representatives a report that—</text>
					<subparagraph id="ID89d44a4765c84964a5ed80a2a4f371e2"><enum>(A)</enum><text>describes the
			 outcomes of the pilot projects;</text>
					</subparagraph><subparagraph id="IDceaa5da1b00242548b8aca6b262f4e52"><enum>(B)</enum><text>describes the
			 public comments from the final workshop on the effectiveness of the pilot
			 projects; and</text>
					</subparagraph><subparagraph id="ID9efbdd64fc85403597da6890bb12b636"><enum>(C)</enum><clause commented="no" display-inline="yes-display-inline" id="idA256D9147EF44770AF948F77393BF52F"><enum>(i)</enum><text>outlines how the
			 Commission will adopt policies under existing law (including regulations) that
			 result in a 2-year process;</text>
						</clause><clause changed="deleted" committee-id="SSEG00" id="ID82eeaaf18ee04f23b8ba57c2076275ce" indent="up1" reported-display-style="strikethrough"><enum>(ii)</enum><text>outlines how the
			 Commission will proceed with a rulemaking to adopt a 2-year process in the
			 regulations of the Commission; or</text>
						</clause><clause changed="deleted" committee-id="SSEG00" id="id1E93DBA267AA4C53A9BA622E2A1EC0AD" indent="up1" reported-display-style="strikethrough"><enum>(iii)</enum><text>identifies the
			 process, legal, environmental, economic, and other issues that justify the
			 determination of the Commission that a 2-year process is not practicable, with
			 recommendations on how Congress may address or remedy the identified
			 issues.</text>
						</clause></subparagraph></paragraph></subsection></section><section changed="deleted" committee-id="SSEG00" id="HA268DCA5CDF348AFAD1F07D2DB718509" reported-display-style="strikethrough"><enum>6.</enum><header>Promoting conduit
			 hydropower projects</header>
			<subsection commented="no" id="HBFD586C07A0B442FBA8C52D8FF8DBE83"><enum>(a)</enum><header>Applicability
			 of, and exemption from, licensing requirements</header><text display-inline="yes-display-inline">Section 30 of the Federal Power Act
			 (16 U.S.C.
			 823a) is amended—</text>
				<paragraph commented="no" id="idB806C70F34A5416EB9B1177BD9373C7A"><enum>(1)</enum><text>by redesignating
			 subsections (c) through (e) as subsections (d) through (f),
			 respectively;</text>
				</paragraph><paragraph commented="no" id="H62D9630FEF16490BBF2971B4043C8A63"><enum>(2)</enum><text>by striking
			 <quote><header-in-text level="subsection" style="OLC">Sec.</header-in-text>
			 30.</quote> and all that follows through the end of subsection (b) and
			 inserting the following:</text>
					<quoted-block changed="deleted" committee-id="SSEG00" display-inline="no-display-inline" id="idF68E7018FC724EDEB3579AC5F1EFF4D4" reported-display-style="strikethrough" style="OLC">
						<section id="id08469AC24EDA492F868CAB3621235BB3"><enum>30.</enum><header>Conduit
				hydropower facilities</header>
							<subsection id="HD81EF6C1A93C453EB41C28B388864583"><enum>(a)</enum><header>Definitions</header><text>In
				this section:</text>
								<paragraph id="H7E4C6DB0DBE04051AC8AB5F29FBF02BC"><enum>(1)</enum><header>Conduit</header><text>The
				term <term>conduit</term> means any tunnel, canal, pipeline, aqueduct, flume,
				ditch, or similar manmade water conveyance that is operated—</text>
									<subparagraph id="id609B0D2EF0DE455A89A7C3E804216FF7"><enum>(A)</enum><text>for the
				distribution of water for agricultural, municipal, or industrial consumption;
				and</text>
									</subparagraph><subparagraph id="id84BC52B90F97452D8CE623ECD68B5FFF"><enum>(B)</enum><text>not primarily for
				the generation of electricity.</text>
									</subparagraph></paragraph><paragraph commented="no" id="HCCB1B1C1DBED4870ABDD2E7EB53AA190"><enum>(2)</enum><header>Qualifying
				conduit hydropower facility</header><text>The term <term>qualifying conduit
				hydropower facility</term> means a facility (not including any dam or other
				impoundment) that is determined or deemed under subsection (b)(2)(D) to meet
				the qualifying criteria.</text>
								</paragraph><paragraph id="HFF00A85777AC483F951C4041F926787D"><enum>(3)</enum><header>Qualifying
				criteria</header><text>The term <term>qualifying criteria</term> means, with
				respect to a facility, that—</text>
									<subparagraph id="H5B6823C50A564E1E91F07D2E04B05EBF"><enum>(A)</enum><text>the facility is
				constructed, operated, or maintained for the generation of electric power and
				uses for the generation only the hydroelectric potential of a non-federally
				owned conduit;</text>
									</subparagraph><subparagraph id="H8DD7F50ED9524F1CBD46B9D369FEE304"><enum>(B)</enum><text>the facility has
				an installed capacity that does not exceed 5 megawatts; and</text>
									</subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H72F6AB5C3E9E4AC8BD338D5FD0617ED0"><enum>(C)</enum><text>on or before the
				date of enactment of the <short-title>Hydropower
				Improvement Act of 2013</short-title>, the facility is not licensed under, or
				exempted from the license requirements contained in, this part.</text>
									</subparagraph></paragraph></subsection><subsection commented="no" display-inline="no-display-inline" id="id2A37848DF81344B2A8A0822F9A310496"><enum>(b)</enum><header>Administration</header>
								<paragraph id="idB4F0704E72AE41EE991BC5DDCA87295C"><enum>(1)</enum><header>In
				general</header><text>A qualifying conduit hydropower facility shall not be
				required to be licensed under this part.</text>
								</paragraph><paragraph id="id294089F885084556A00E78A432832867"><enum>(2)</enum><header>Notice of intent
				to construct facility</header>
									<subparagraph id="idEB3CCCE8BE6740B7844763CCD460EA2F"><enum>(A)</enum><header>In
				general</header><text>Any person, State, or municipality proposing to construct
				a qualifying conduit hydropower facility shall file with the Commission a
				notice of intent to construct the qualifying conduit hydropower
				facility.</text>
									</subparagraph><subparagraph id="id92B2F8D13FAE47748E8808647CD7AC03"><enum>(B)</enum><header>Information</header><text>The
				notice shall include sufficient information to demonstrate that the facility
				meets the qualifying criteria.</text>
									</subparagraph><subparagraph id="HA18168240A0D458A87211A54BA588B38"><enum>(C)</enum><header>Initial
				determination</header><text display-inline="yes-display-inline">Not later than
				15 days after receipt of a notice of intent is filed under subparagraph (A),
				the Commission shall—</text>
										<clause commented="no" id="HA10851006874477DAC0FBFC6D4CDFF42"><enum>(i)</enum><text>make an initial
				determination as to whether the facility meets the qualifying criteria;
				and</text>
										</clause><clause commented="no" id="H1109986C54DB4D55AE879D0D9F35FF58"><enum>(ii)</enum><text display-inline="yes-display-inline">if the Commission makes an initial
				determination, pursuant to clause (i) that the facility meets the qualifying
				criteria, publish public notice of the notice of intent filed under
				subparagraph (A).</text>
										</clause></subparagraph><subparagraph commented="no" id="H9F8696E8F18D43D7BAB888978ACCA64F"><enum>(D)</enum><header>Final
				determination</header><text display-inline="yes-display-inline">If, not later
				than 45 days after the date of publication of the public notice described in
				subparagraph (C)(ii)—</text>
										<clause id="H5AB61DABBCF44E37929CDBE2D36007B4"><enum>(i)</enum><text>an entity contests
				whether the facility meets the qualifying criteria, the Commission shall
				promptly issue a written determination as to whether the facility meets the
				qualifying criteria; or</text>
										</clause><clause id="HAD918503114A4647B63AEC7BC01291BD"><enum>(ii)</enum><text>no entity
				contests whether the facility meets the qualifying criteria, the facility shall
				be considered to meet the qualifying criteria.</text>
										</clause></subparagraph></paragraph></subsection><subsection id="H1DF00AD072104A41A52799FB73CBDE0E"><enum>(c)</enum><header>Exemptions</header><text>Subject
				to subsection (d), the Commission may grant an exemption in whole or in part
				from the requirements of this part, including any license requirements
				contained in this part, to any facility (not including any dam or other
				impoundment) constructed, operated, or maintained for the generation of
				electric power that the Commission determines, by rule or order—</text>
								<paragraph id="H8704E58849414ED6835DBDB25B14AF03"><enum>(1)</enum><text>uses for the
				generation only the hydroelectric potential of a conduit; and</text>
								</paragraph><paragraph id="H97CA196F33C24E619D700DB84BB08A1B"><enum>(2)</enum><text>has an installed
				capacity that does not exceed 40
				megawatts.</text>
								</paragraph></subsection></section><after-quoted-block>;</after-quoted-block></quoted-block>
				</paragraph><paragraph id="HF8B5A8FD80134600A7CD90C0A78C169E"><enum>(3)</enum><text>in subsection (d)
			 (as redesigned by paragraph (1)), by striking <quote>subsection (a)</quote> and
			 inserting <quote>subsection (c)</quote>; and</text>
				</paragraph><paragraph id="H28EDEC59291C435793C6D048C7E0D32D"><enum>(4)</enum><text>in subsection (e)
			 (as so redesignated), by striking <quote>subsection (a)</quote> and inserting
			 <quote>subsection (c)</quote>.</text>
				</paragraph></subsection><subsection id="H39FEC5A7A5F04E76945CD31B1A432F1E"><enum>(b)</enum><header>Conforming
			 amendments</header>
				<paragraph id="id883266AC0CE945F7835340EBE600C2F7"><enum>(1)</enum><text>Section 210(j)(3)
			 of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/824a-3">16 U.S.C. 824a–3(j)(3)</external-xref>)
			 is amended by striking <quote>section 30(c)</quote> and inserting
			 <quote>section 30(d)</quote>.</text>
				</paragraph><paragraph id="id8015E2CEDF3F41A08329DE18C6102FBC"><enum>(2)</enum><text>Section 405(d) of
			 the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2705">16 U.S.C. 2705(d)</external-xref>)
			 is amended in the first sentence—</text>
					<subparagraph id="id9B1C6E02B64D4820A7BE4073F3B6E1A4"><enum>(A)</enum><text>by striking
			 <quote>subsections (c) and (d)</quote> each place it appears and inserting
			 <quote>subsections (d) and (e)</quote>; and</text>
					</subparagraph><subparagraph id="idD87663B0224E49BD91452442D71D59F2"><enum>(B)</enum><text>by striking
			 <quote>subsection (a) of such section 30</quote> and inserting <quote>section
			 30(c) of that Act</quote>.</text>
					</subparagraph></paragraph><paragraph id="idAF090EE3F8FD4993B37B6612CCEB0C17"><enum>(3)</enum><text>Section 3401(a)(2)
			 of the Omnibus Budget Reconciliation Act of 1986 (<external-xref legal-doc="usc" parsable-cite="usc/42/7178">42 U.S.C. 7178(a)(2)</external-xref>) is
			 amended by striking <quote>30(e)</quote> and inserting
			 <quote>30(f)</quote>.</text>
				</paragraph><paragraph id="idCC6F236DEB0F435CA207ECB8A8A46F55"><enum>(4)</enum><text>Section 242(b)(3)
			 of the Energy Policy Act of 2005 (<external-xref legal-doc="usc" parsable-cite="usc/42/15881">42 U.S.C. 15881(b)(3)</external-xref>) is amended by striking
			 <quote>section 30(a)(2) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/823a">16 U.S.C. 823a(a)(2)</external-xref>)</quote>
			 and inserting <quote>section 30(a) of the Federal Power Act (16 U.S.C.
			 823a(a))</quote>.</text>
				</paragraph></subsection></section><section changed="deleted" committee-id="SSEG00" id="HC4A0D856F96449F49BF9F3B1A7AD8D74" reported-display-style="strikethrough"><enum>7.</enum><header>Promoting small
			 hydroelectric power projects</header><text display-inline="no-display-inline">Section 405(d) of the Public Utility
			 Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2705">16 U.S.C. 2705(d)</external-xref>) is amended in
			 the first sentence by striking <quote>5,000</quote> and inserting
			 <quote>10,000</quote>.</text>
		</section><section changed="deleted" committee-id="SSEG00" id="idFCBFF194525E493EA0C34AA95FE3CFA6" reported-display-style="strikethrough"><enum>8.</enum><header>FERC authority to
			 extend preliminary permit terms</header><text display-inline="no-display-inline">Section 5 of the Federal Power Act (16
			 U.S.C. 798) is amended—</text>
			<paragraph id="id038A9758AB8F48E28D18D81CF568AA61"><enum>(1)</enum><text display-inline="yes-display-inline">by designating the first, second, and third
			 sentences as subsections (a), (c), and (d), respectively; and</text>
			</paragraph><paragraph id="id034E22FBF2664C929E633E4AF31097C1"><enum>(2)</enum><text display-inline="yes-display-inline">by inserting after subsection (a) (as so
			 designated) the following:</text>
				<quoted-block changed="deleted" committee-id="SSEG00" display-inline="no-display-inline" id="id36F91EADB299452F8045BEE30E4F4A89" reported-display-style="strikethrough" style="OLC">
					<subsection id="id51D9ECD6CE2749D5BA081453ED34A760"><enum>(b)</enum><header>Extension</header><text>The
				Commission may extend the term of a preliminary permit once for not more than 2
				additional years if the Commission finds that the permittee has carried out
				activities under the permit in good faith and with reasonable
				diligence.</text>
					</subsection><after-quoted-block>.</after-quoted-block></quoted-block>
			</paragraph></section><section changed="deleted" committee-id="SSEG00" id="iddc785baa8d7c49a2bf5359bdfffbe46e" reported-display-style="strikethrough"><enum>9.</enum><header>Study of pumped
			 storage and potential hydropower from conduits</header>
			<subsection id="ida0222966541a43218e8b3b3423409e60"><enum>(a)</enum><header>In
			 general</header><text>The Secretary shall conduct a study—</text>
				<paragraph id="iddaf1e5758d1d4070b514c5e7e51a05bb"><enum>(1)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="idD9D45F179E694550B6EC834C84E9915B"><enum>(A)</enum><text>of the technical
			 flexibility that existing pumped storage facilities can provide to support
			 intermittent renewable electric energy generation, including the potential for
			 those existing facilities to be upgraded or retrofitted with advanced
			 commercially available technology; and</text>
					</subparagraph><subparagraph changed="deleted" committee-id="SSEG00" id="id47f7fa9797524e3d842f06bd93f30eb7" indent="up1" reported-display-style="strikethrough"><enum>(B)</enum><text>of the technical
			 potential of existing pumped storage facilities and new advanced pumped storage
			 facilities, to provide grid reliability benefits; and</text>
					</subparagraph></paragraph><paragraph id="id1d21b21d18d340268e0e1502c25da705"><enum>(2)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="idEF728721A0BB446DBCD253D7BCC641EA"><enum>(A)</enum><text>to identify the range
			 of opportunities for hydropower that may be obtained from conduits (as defined
			 by the Secretary) in the United States; and</text>
					</subparagraph><subparagraph changed="deleted" committee-id="SSEG00" id="id1b647a3b9a8e4c878f5276d4a38e585a" indent="up1" reported-display-style="strikethrough"><enum>(B)</enum><text>through case
			 studies, to assess amounts of potential energy generation from such conduit
			 hydropower projects.</text>
					</subparagraph></paragraph></subsection><subsection id="id3aa8147e545042ed8ff3572270c5ca27"><enum>(b)</enum><header>Report</header><text>Not
			 later than 1 year after the date of enactment of this Act, the Secretary shall
			 submit to the Committee on Energy and Natural Resources of the Senate and the
			 Committee on Energy and Commerce of the House of Representatives a report that
			 describes the results of the study conducted under subsection (a), including
			 any recommendations.</text>
			</subsection></section><section changed="deleted" committee-id="SSEG00" id="idD7BB7BA5E1A4414EB8D889539025D1C0" reported-display-style="strikethrough"><enum>10.</enum><header>Report on
			 memorandum of understanding on hydropower</header><text display-inline="no-display-inline">Not later than 180 days after the date of
			 enactment of this Act, the President shall submit to the Committee on Energy
			 and Natural Resources of the Senate and the Committee on Energy and Commerce of
			 the House of Representatives a report on actions taken by the Department of
			 Energy, the Department of the Interior, and the Corps of Engineers to carry out
			 the memorandum of understanding on hydropower entered into on March 24, 2010,
			 with particular emphasis on actions taken by the agencies to work together and
			 investigate ways to efficiently and responsibly facilitate the Federal
			 permitting process for Federal and non-Federal hydropower projects at Federal
			 facilities, within existing authority.</text>
		</section></legis-body>
	<legis-body display-enacting-clause="no-display-enacting-clause">
		<section changed="added" committee-id="SSEG00" id="H04E0F673148D4B85AFB8A33D4DC879DD" reported-display-style="italic" section-type="section-one"><enum>1.</enum><header>Short title; table of
			 contents</header>
			<subsection id="H4137760B88BE41D6BA6B577483398B9B"><enum>(a)</enum><header>Short
			 title</header><text display-inline="yes-display-inline">This Act may be cited
			 as the <quote><short-title>Hydropower Regulatory
			 Efficiency Act of 2013</short-title></quote>.</text>
			</subsection><subsection id="HD7A97B2DB73840F6A3A9B8E79B2FE3B1"><enum>(b)</enum><header>Table of
			 contents</header><text>The table of contents of this Act is as follows:</text>
				<toc changed="added" committee-id="SSEG00" container-level="legis-body-container" lowest-bolded-level="division-lowest-bolded" lowest-level="section" quoted-block="no-quoted-block" regeneration="yes-regeneration" reported-display-style="italic">
					<toc-entry idref="H04E0F673148D4B85AFB8A33D4DC879DD" level="section">Sec. 1. Short title; table of
				contents.</toc-entry>
					<toc-entry idref="HEB0C3F732399484FB3083800D50BF481" level="section">Sec. 2. Findings.</toc-entry>
					<toc-entry idref="HC4A0D856F96449F49BF9F3B1A7AD8D74" level="section">Sec. 3. Promoting small hydroelectric power
				projects.</toc-entry>
					<toc-entry idref="HA268DCA5CDF348AFAD1F07D2DB718509" level="section">Sec. 4. Promoting conduit hydropower
				projects.</toc-entry>
					<toc-entry idref="H59CD2ADF4ACF476799582827C16F9C9D" level="section">Sec. 5. FERC authority to extend preliminary
				permit periods.</toc-entry>
					<toc-entry idref="HDB268F484CCD42DF9AEB2807D34D1246" level="section">Sec. 6. Promoting hydropower development at
				nonpowered dams and closed loop pumped storage projects.</toc-entry>
					<toc-entry idref="HE7F3E17E18F74F70A3D1E078838DE4D7" level="section">Sec. 7. DOE study of pumped storage and
				potential hydropower from conduits.</toc-entry>
				</toc>
			</subsection></section><section changed="added" committee-id="SSEG00" id="HEB0C3F732399484FB3083800D50BF481" reported-display-style="italic"><enum>2.</enum><header>Findings</header><text display-inline="no-display-inline">Congress finds that—</text>
			<paragraph id="H6884DC3E10724532BE715444F83561D7"><enum>(1)</enum><text display-inline="yes-display-inline">the hydropower industry currently employs
			 approximately 300,000 workers across the United States;</text>
			</paragraph><paragraph id="H091D6DD307094B5B95C9BDEF6AE47AB1"><enum>(2)</enum><text>hydropower is the largest
			 source of clean, renewable electricity in the United States;</text>
			</paragraph><paragraph id="H206EB2872C274FA18D0E022972DABE59"><enum>(3)</enum><text display-inline="yes-display-inline">as of the date of enactment of this Act,
			 hydropower resources, including pumped storage facilities, provide—</text>
				<subparagraph id="HCF1D610C9BB441A58C8FA01B897B1465"><enum>(A)</enum><text display-inline="yes-display-inline">nearly 7 percent of the electricity
			 generated in the United States; and</text>
				</subparagraph><subparagraph id="H41FBDBED75B140C0945F06FA7CC6A706"><enum>(B)</enum><text display-inline="yes-display-inline">approximately 100,000 megawatts of electric
			 capacity in the United States;</text>
				</subparagraph></paragraph><paragraph id="HA4C51A606FFD470D9EC2FF009A984067"><enum>(4)</enum><text>only 3 percent of the
			 80,000 dams in the United States generate electricity, so there is substantial
			 potential for adding hydropower generation to nonpowered dams; and</text>
			</paragraph><paragraph id="H9804645F18244946AD2B0ADEED87ECEC"><enum>(5)</enum><text display-inline="yes-display-inline">according to one study, by utilizing
			 currently untapped resources, the United States could add approximately 60,000
			 megawatts of new hydropower capacity by 2025, which could create 700,000 new
			 jobs over the next 13 years.</text>
			</paragraph></section><section changed="added" committee-id="SSEG00" id="id25b795cd-bea5-4ee7-8121-078caa916c2e" reported-display-style="italic"><enum>3.</enum><header>Promoting small
			 hydroelectric power projects</header><text display-inline="no-display-inline">Subsection (d) of section 405 of the Public
			 Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2705">16 U.S.C. 2705</external-xref>) is amended by
			 striking <quote>5,000</quote> and inserting <quote>10,000</quote>.</text>
		</section><section changed="added" committee-id="SSEG00" id="id1d06a25a-abf7-4750-a4a3-6aebb7a58079" reported-display-style="italic"><enum>4.</enum><header>Promoting conduit
			 hydropower projects</header>
			<subsection commented="no" id="id9db217e9-49c2-417a-834b-4404fd37fa5d"><enum>(a)</enum><header>Applicability of, and
			 exemption from, licensing requirements</header><text display-inline="yes-display-inline">Section 30 of the Federal Power Act
			 (16 U.S.C.
			 823a) is amended—</text>
				<paragraph commented="no" id="id586064ab-a924-4885-a46d-3ef259f3cd4e"><enum>(1)</enum><text>by striking subsections
			 (a) and (b) and inserting the following:</text>
					<quoted-block changed="added" committee-id="SSEG00" display-inline="no-display-inline" id="HC402B142ED5B48028723137C3A97BBAE" reported-display-style="italic" style="OLC">
						<subsection commented="no" id="HF858D6C1D2E84E5ABC60CD7F6A854C8A"><enum>(a)</enum><paragraph commented="no" display-inline="yes-display-inline" id="H88F91F312546460689B8F4C6FE3FE9DC"><enum>(1)</enum><text>A qualifying conduit
				hydropower facility shall not be required to be licensed under this
				part.</text>
							</paragraph><paragraph changed="added" commented="no" committee-id="SSEG00" id="HBEA96BAEF5CF414EB735E8DACC33896F" indent="up1" reported-display-style="italic"><enum>(2)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="H0C73B457AF774C95A14059ED29F09103"><enum>(A)</enum><text>Any person, State, or
				municipality proposing to construct a qualifying conduit hydropower facility
				shall file with the Commission a notice of intent to construct such facility.
				The notice shall include sufficient information to demonstrate that the
				facility meets the qualifying criteria.</text>
								</subparagraph><subparagraph changed="added" committee-id="SSEG00" id="idb3a1d17f-8c09-4bec-95d1-81d0987a787d" indent="up1" reported-display-style="italic"><enum>(B)</enum><text display-inline="yes-display-inline">Not later than 15 days after receipt of a
				notice of intent filed under subparagraph (A), the Commission shall—</text>
									<clause commented="no" id="idbfcba3d7-dc26-47bc-a5a5-e8a8b75b0a58"><enum>(i)</enum><text>make an initial
				determination as to whether the facility meets the qualifying criteria;
				and</text>
									</clause><clause commented="no" id="idbfd9fded-06eb-4961-ac88-423831e037a1"><enum>(ii)</enum><text display-inline="yes-display-inline">if the Commission makes an initial
				determination, pursuant to clause (i), that the facility meets the qualifying
				criteria, publish public notice of the notice of intent filed under
				subparagraph (A).</text>
									</clause></subparagraph><subparagraph changed="added" commented="no" committee-id="SSEG00" id="ida2e740e7-d12e-4f29-8d32-c8cd7aba1b2c" indent="up1" reported-display-style="italic"><enum>(C)</enum><text display-inline="yes-display-inline">If, not later than 45 days after the date
				of publication of the public notice described in subparagraph (B)(ii)—</text>
									<clause id="id6c9f33ad-18b5-45a9-aa33-b7c15ff60b76"><enum>(i)</enum><text>an entity contests
				whether the facility meets the qualifying criteria, the Commission shall
				promptly issue a written determination as to whether the facility meets such
				criteria; or</text>
									</clause><clause id="idb31dba22-aa1e-4639-a6b2-aa4613ffb43c"><enum>(ii)</enum><text>no entity contests
				whether the facility meets the qualifying criteria, the facility shall be
				deemed to meet such criteria.</text>
									</clause></subparagraph></paragraph><paragraph changed="added" committee-id="SSEG00" id="id97590cda-6219-4d3a-8908-d5f9c00733bd" indent="up1" reported-display-style="italic"><enum>(3)</enum><text>For purposes of this
				section:</text>
								<subparagraph id="id52890138-067c-4000-acf4-927efe0395a6"><enum>(A)</enum><text>The term
				<term>conduit</term> means any tunnel, canal, pipeline, aqueduct, flume, ditch,
				or similar manmade water conveyance that is operated for the distribution of
				water for agricultural, municipal, or industrial consumption and not primarily
				for the generation of electricity.</text>
								</subparagraph><subparagraph commented="no" id="id3db5ec17-72c9-474c-9d2e-ccc7f484e0d5"><enum>(B)</enum><text>The term <term>qualifying
				conduit hydropower facility</term> means a facility (not including any dam or
				other impoundment) that is determined or deemed under paragraph (2)(C) to meet
				the qualifying criteria.</text>
								</subparagraph><subparagraph id="idcfa68a09-3efd-4ccd-80e2-66328ff0f75c"><enum>(C)</enum><text>The term <term>qualifying
				criteria</term> means, with respect to a facility—</text>
									<clause id="id571a22f1-d172-4349-ba93-5e6f57375647"><enum>(i)</enum><text>the facility is
				constructed, operated, or maintained for the generation of electric power and
				uses for such generation only the hydroelectric potential of a non-federally
				owned conduit;</text>
									</clause><clause id="idcb24cb96-c72c-44cb-b317-58de3a1b36ff"><enum>(ii)</enum><text>the facility has an
				installed capacity that does not exceed 5 megawatts; and</text>
									</clause><clause id="idcd00c9ee-1e7e-4688-a4dc-dc2ce28e292e"><enum>(iii)</enum><text>on or before the date
				of enactment of the Hydropower Regulatory Efficiency Act of 2013, the facility
				is not licensed under, or exempted from the license requirements contained in,
				this part.</text>
									</clause></subparagraph></paragraph></subsection><subsection id="id31483028-4762-4d92-baf1-a006256fbe57"><enum>(b)</enum><text>Subject to subsection
				(c), the Commission may grant an exemption in whole or in part from the
				requirements of this part, including any license requirements contained in this
				part, to any facility (not including any dam or other impoundment) constructed,
				operated, or maintained for the generation of electric power which the
				Commission determines, by rule or order—</text>
							<paragraph id="id1fa8491f-f8ef-4a1b-a3eb-05f87aeafd2f"><enum>(1)</enum><text>utilizes for such
				generation only the hydroelectric potential of a conduit; and</text>
							</paragraph><paragraph id="id08b6cba3-b249-49e2-b3c1-ffce77788472"><enum>(2)</enum><text>has an installed capacity
				that does not exceed 40
				megawatts.</text>
							</paragraph></subsection><after-quoted-block>;</after-quoted-block></quoted-block>
				</paragraph><paragraph id="idbf5679c1-c1b8-4459-b8f4-03e2eef0ce44"><enum>(2)</enum><text>in subsection (c), by
			 striking <quote>subsection (a)</quote> and inserting <quote>subsection
			 (b)</quote>; and</text>
				</paragraph><paragraph id="id3a1f5178-37ab-4e74-81de-955f30d936c2"><enum>(3)</enum><text>in subsection (d), by
			 striking <quote>subsection (a)</quote> and inserting <quote>subsection
			 (b)</quote>.</text>
				</paragraph></subsection><subsection id="idb315b567-1d3f-40d1-9a7b-edd794294207"><enum>(b)</enum><header>Conforming
			 amendment</header><text>Subsection (d) of section 405 of the Public Utility
			 Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2705">16 U.S.C. 2705</external-xref>), as amended, is
			 further amended by striking <quote>subsection (a) of such section 30</quote>
			 and inserting <quote>subsection (b) of such section 30</quote>.</text>
			</subsection></section><section changed="added" committee-id="SSEG00" id="H59CD2ADF4ACF476799582827C16F9C9D" reported-display-style="italic"><enum>5.</enum><header>FERC authority to extend
			 preliminary permit periods</header><text display-inline="no-display-inline">Section 5 of the Federal Power Act
			 (16 U.S.C.
			 798) is amended—</text>
			<paragraph id="H7375E99A06D946138AD2C5192ACC19DF"><enum>(1)</enum><text display-inline="yes-display-inline">by designating the first, second, and third
			 sentences as subsections (a), (c), and (d), respectively; and</text>
			</paragraph><paragraph id="H4B0626F408F74EBE81C0BD2FAC0399FD"><enum>(2)</enum><text display-inline="yes-display-inline">by inserting after subsection (a) (as so
			 designated) the following:</text>
				<quoted-block changed="added" committee-id="SSEG00" display-inline="no-display-inline" id="HDA9040F3BD6B49B188F3A3AA78E66C95" reported-display-style="italic" style="OLC">
					<subsection id="H5CFAE5041312443C8A47527F03A852DF"><enum>(b)</enum><text>The Commission may extend
				the period of a preliminary permit once for not more than 2 additional years
				beyond the 3 years permitted by subsection (a) if the Commission finds that the
				permittee has carried out activities under such permit in good faith and with
				reasonable
				diligence.</text>
					</subsection><after-quoted-block>.</after-quoted-block></quoted-block>
			</paragraph></section><section changed="added" commented="no" committee-id="SSEG00" id="HDB268F484CCD42DF9AEB2807D34D1246" reported-display-style="italic"><enum>6.</enum><header>Promoting hydropower
			 development at nonpowered dams and closed loop pumped storage projects</header>
			<subsection commented="no" id="H8B5B87CE0296465B9236B9CB5079E250"><enum>(a)</enum><header>In
			 general</header><text>To improve the regulatory process and reduce delays and
			 costs for hydropower development at nonpowered dams and closed loop pumped
			 storage projects, the Federal Energy Regulatory Commission (referred to in this
			 section as the <term>Commission</term>) shall investigate the feasibility of
			 the issuance of a license for hydropower development at nonpowered dams and
			 closed loop pumped storage projects in a 2-year period (referred to in this
			 section as a <term>2-year process</term>). Such a 2-year process shall include
			 any prefiling licensing process of the Commission.</text>
			</subsection><subsection id="H2D39A9FD2943466B8337E8D9C74373B9"><enum>(b)</enum><header>Workshops and
			 pilots</header><text>The Commission shall—</text>
				<paragraph id="H7A9D36788CCF423CB1094DCD63440F4B"><enum>(1)</enum><text>not later than 60 days
			 after the date of enactment of this Act, hold an initial workshop to solicit
			 public comment and recommendations on how to implement a 2-year process;</text>
				</paragraph><paragraph id="H61028254A9F94F81853FAEFF1C9C855B"><enum>(2)</enum><text>develop criteria for
			 identifying projects featuring hydropower development at nonpowered dams and
			 closed loop pumped storage projects that may be appropriate for licensing
			 within a 2-year process;</text>
				</paragraph><paragraph commented="no" id="HD77DFFCA93324E04861E3A2E1564EC4E"><enum>(3)</enum><text>not later than 180 days
			 after the date of enactment of this Act, develop and implement pilot projects
			 to test a 2-year process, if practicable; and</text>
				</paragraph><paragraph commented="no" id="H1F51B077005E441EB5658C4F01987FFA"><enum>(4)</enum><text>not later than 3 years
			 after the date of implementation of the final pilot project testing a 2-year
			 process, hold a final workshop to solicit public comment on the effectiveness
			 of each tested 2-year process.</text>
				</paragraph></subsection><subsection id="HA9BBB40B7D744C04805CC8B80D5C60A8"><enum>(c)</enum><header>Memorandum of
			 understanding</header><text>The Commission shall, to the extent practicable,
			 enter into a memorandum of understanding with any applicable Federal or State
			 agency to implement a pilot project described in subsection (b).</text>
			</subsection><subsection id="HF12D3906EBB3442EB82D808FDCEAE8B5"><enum>(d)</enum><header>Reports</header>
				<paragraph commented="no" id="H91BB6B9539A24AFA9028DA91F362117A"><enum>(1)</enum><header>Pilot projects not
			 implemented</header><text>If the Commission determines that no pilot project
			 described in subsection (b) is practicable because no 2-year process is
			 practicable, not later than 240 days after the date of enactment of this Act,
			 the Commission shall submit to the Committee on Energy and Commerce of the
			 House of Representatives and the Committee on Energy and Natural Resources of
			 the Senate a report that—</text>
					<subparagraph commented="no" id="H1ED5375CD983422F82929512AB07946C"><enum>(A)</enum><text>describes the public
			 comments received as part of the initial workshop held under subsection (b)(1);
			 and</text>
					</subparagraph><subparagraph commented="no" id="HCFD76E463231432C931D9A217D24CFC2"><enum>(B)</enum><text>identifies the process,
			 legal, environmental, economic, and other issues that justify the determination
			 of the Commission that no 2-year process is practicable, with recommendations
			 on how Congress may address or remedy the identified issues.</text>
					</subparagraph></paragraph><paragraph id="H9F8C5F005F06434DB04E19D774B3DB1B"><enum>(2)</enum><header>Pilot projects
			 implemented</header><text>If the Commission develops and implements pilot
			 projects involving a 2-year process, not later than 60 days after the date of
			 completion of the final workshop held under subsection (b)(4), the Commission
			 shall submit to the Committee on Energy and Commerce of the House of
			 Representatives and the Committee on Energy and Natural Resources of the Senate
			 a report that—</text>
					<subparagraph id="H1475B801378E4DCCB29BB00ABD0DAA6B"><enum>(A)</enum><text>describes the outcomes of
			 the pilot projects;</text>
					</subparagraph><subparagraph id="HAB45EAE6DE564F5799857368A4B6E5BB"><enum>(B)</enum><text>describes the public
			 comments from the final workshop on the effectiveness of each tested 2-year
			 process; and</text>
					</subparagraph><subparagraph id="H85665D9345EF4D6DA63FA37396AC1A9E"><enum>(C)</enum><clause commented="no" display-inline="yes-display-inline" id="H73D6D6A9E75C432E9E088BB20660C9F0"><enum>(i)</enum><text>outlines how the
			 Commission will adopt policies under existing law (including regulations) that
			 result in a 2-year process for appropriate projects;</text>
						</clause><clause changed="added" commented="no" committee-id="SSEG00" id="H8EF06CC349C7441C8284D4DDA9651362" indent="up1" reported-display-style="italic"><enum>(ii)</enum><text>outlines how the
			 Commission will issue new regulations to adopt a 2-year process for appropriate
			 projects; or</text>
						</clause><clause changed="added" committee-id="SSEG00" id="H01CB3ACF605D4AE78E666A79F2A612E6" indent="up1" reported-display-style="italic"><enum>(iii)</enum><text>identifies the process,
			 legal, environmental, economic, and other issues that justify a determination
			 of the Commission that no 2-year process is practicable, with recommendations
			 on how Congress may address or remedy the identified issues.</text>
						</clause></subparagraph></paragraph></subsection></section><section changed="added" committee-id="SSEG00" id="HE7F3E17E18F74F70A3D1E078838DE4D7" reported-display-style="italic"><enum>7.</enum><header>DOE study of pumped
			 storage and potential hydropower from conduits</header>
			<subsection id="HD5FB76AAFB6B43A7A7FFAD26174B3956"><enum>(a)</enum><header>In
			 general</header><text>The Secretary of Energy shall conduct a study—</text>
				<paragraph commented="no" id="H10B113C290344752A963B23FEC6AE03C"><enum>(1)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="HA0D08588CCCF43788DFA0E8E3E943A0C"><enum>(A)</enum><text>of the technical
			 flexibility that existing pumped storage facilities can provide to support
			 intermittent renewable electric energy generation, including the potential for
			 such existing facilities to be upgraded or retrofitted with advanced
			 commercially available technology; and</text>
					</subparagraph><subparagraph changed="added" commented="no" committee-id="SSEG00" id="H30FF5EF0C00A4F62974915CAEFAA12D6" indent="up1" reported-display-style="italic"><enum>(B)</enum><text>of the technical
			 potential of existing pumped storage facilities and new advanced pumped storage
			 facilities, to provide grid reliability benefits; and</text>
					</subparagraph></paragraph><paragraph id="HB036641E8704406CB4A7E61894C1C705"><enum>(2)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="H2BEBA0EA34654C4DAB12054BF8D7626F"><enum>(A)</enum><text>to identify the range of
			 opportunities for hydropower that may be obtained from conduits (as defined by
			 the Secretary) in the United States; and</text>
					</subparagraph><subparagraph changed="added" committee-id="SSEG00" id="HB245FD8CB7924AA5911AA86F3108F2AD" indent="up1" reported-display-style="italic"><enum>(B)</enum><text>through case studies, to
			 assess amounts of potential energy generation from such conduit hydropower
			 projects.</text>
					</subparagraph></paragraph></subsection><subsection commented="no" display-inline="no-display-inline" id="H0EC7CD82E1B344E993687C91AE4CFA96"><enum>(b)</enum><header>Report</header><text>Not
			 later than 1 year after the date of enactment of this Act, the Secretary of
			 Energy shall submit to the Committee on Energy and Commerce of the House of
			 Representatives and the Committee on Energy and Natural Resources of the Senate
			 a report that describes the results of the study conducted under subsection
			 (a), including any recommendations.</text>
			</subsection></section></legis-body>
	<endorsement>
		<action-date>May 13, 2013</action-date>
		<action-desc>Reported with an amendment</action-desc>
	</endorsement>
</bill>


