<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-Senate" public-private="public">
	<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>113 S545 IS: Hydropower Improvement Act of 2013</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2013-03-13</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
		<distribution-code display="yes">II</distribution-code>
		<congress>113th CONGRESS</congress>
		<session>1st Session</session>
		<legis-num>S. 545</legis-num>
		<current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber>
		<action>
			<action-date date="20130313">March 13, 2013</action-date>
			<action-desc><sponsor name-id="S288">Ms. Murkowski</sponsor> (for
			 herself, <cosponsor name-id="S247">Mr. Wyden</cosponsor>,
			 <cosponsor name-id="S323">Mr. Risch</cosponsor>, <cosponsor name-id="S275">Ms.
			 Cantwell</cosponsor>, <cosponsor name-id="S266">Mr. Crapo</cosponsor>,
			 <cosponsor name-id="S229">Mrs. Murray</cosponsor>, and
			 <cosponsor name-id="S319">Mr. Begich</cosponsor>) introduced the following
			 bill; which was read twice and referred to the
			 <committee-name committee-id="SSEG00">Committee on Energy and Natural
			 Resources</committee-name></action-desc>
		</action>
		<legis-type>A BILL</legis-type>
		<official-title>To improve hydropower, and for other
		  purposes.</official-title>
	</form>
	<legis-body>
		<section id="S1" section-type="section-one"><enum>1.</enum><header>Short
			 title; table of contents</header>
			<subsection id="idC16216EC53FC449DA773627953311567"><enum>(a)</enum><header>Short
			 title</header><text display-inline="yes-display-inline">This Act may be cited
			 as the <quote><short-title>Hydropower Improvement Act of
			 2013</short-title></quote>.</text>
			</subsection><subsection id="idC6853C288BFC4336BAE5DD0428C9E07E"><enum>(b)</enum><header>Table of
			 contents</header><text>The table of contents of this Act is as follows:</text>
				<toc>
					<toc-entry idref="S1" level="section">Sec. 1. Short title; table of
				contents.</toc-entry>
					<toc-entry idref="id4DBB0A7E8FCF46399937CE6F2DA756C4" level="section">Sec. 2. Findings.</toc-entry>
					<toc-entry idref="id94EBB2D3CD3A480785CF6101FEDF2796" level="section">Sec. 3. Definitions.</toc-entry>
					<toc-entry idref="ID2e326f879f3a4acc8a7d81d4f335ea6b" level="section">Sec. 4. Sense of the Senate on the use of hydropower renewable
				resources.</toc-entry>
					<toc-entry idref="IDb6f159bb0fb6496ca9cd3f83ee33673d" level="section">Sec. 5. Promoting hydropower development at nonpowered dams and
				closed loop pumped storage projects.</toc-entry>
					<toc-entry idref="HA268DCA5CDF348AFAD1F07D2DB718509" level="section">Sec. 6. Promoting conduit hydropower projects.</toc-entry>
					<toc-entry idref="HC4A0D856F96449F49BF9F3B1A7AD8D74" level="section">Sec. 7. Promoting small hydroelectric power
				projects.</toc-entry>
					<toc-entry idref="idFCBFF194525E493EA0C34AA95FE3CFA6" level="section">Sec. 8. FERC authority to extend preliminary permit
				terms.</toc-entry>
					<toc-entry idref="iddc785baa8d7c49a2bf5359bdfffbe46e" level="section">Sec. 9. Study of pumped storage and potential hydropower from
				conduits.</toc-entry>
					<toc-entry idref="idD7BB7BA5E1A4414EB8D889539025D1C0" level="section">Sec. 10. Report on memorandum of understanding on
				hydropower.</toc-entry>
				</toc>
			</subsection></section><section id="id4DBB0A7E8FCF46399937CE6F2DA756C4"><enum>2.</enum><header>Findings</header><text display-inline="no-display-inline">Congress finds that—</text>
			<paragraph id="id2BD0F21BECC54986A103665C1E2656CD"><enum>(1)</enum><text display-inline="yes-display-inline">hydropower is the largest source of clean,
			 renewable electricity in the United States;</text>
			</paragraph><paragraph id="id8FE39422EBF947FC951707540CA13F2F"><enum>(2)</enum><text display-inline="yes-display-inline">as of the date of enactment of this Act,
			 hydropower resources, including pumped storage facilities, provide—</text>
				<subparagraph id="idA6958875DEE347809F9E8BB89369A94F"><enum>(A)</enum><text display-inline="yes-display-inline">nearly 7 percent of the electricity
			 generated in the United States, avoiding approximately 200,000,000 metric tons
			 of carbon emissions each year; and</text>
				</subparagraph><subparagraph id="id74D99660B6164052BEB81C19E446AD1A"><enum>(B)</enum><text display-inline="yes-display-inline">approximately 100,000 megawatts of electric
			 capacity in the United States;</text>
				</subparagraph></paragraph><paragraph id="ID1a3e79725cf14e6598065524cc02c7fb"><enum>(3)</enum><text>only 3 percent of
			 the 80,000 dams in the United States generate electricity so there is
			 substantial potential for adding hydropower generation to nonpower dams;</text>
			</paragraph><paragraph id="id4F18790B42B5486284B8059C88DC8D42"><enum>(4)</enum><text display-inline="yes-display-inline">in every State, a tremendous untapped
			 growth potential exists in hydropower resources, including—</text>
				<subparagraph id="id321223EC0A7144DCAC2F4EF587A1B327"><enum>(A)</enum><text display-inline="yes-display-inline">efficiency improvements and capacity
			 additions;</text>
				</subparagraph><subparagraph id="id1ACFB0EC0FA24F84820096964AA4FBA4"><enum>(B)</enum><text display-inline="yes-display-inline">adding generation to nonpower dams;</text>
				</subparagraph><subparagraph id="idA6B9D831918B49EE8781D3489F021150"><enum>(C)</enum><text display-inline="yes-display-inline">conduit hydropower;</text>
				</subparagraph><subparagraph id="id11FB84DBF24F48BBB83C63AB9C086BBE"><enum>(D)</enum><text display-inline="yes-display-inline">conventional hydropower;</text>
				</subparagraph><subparagraph id="id571DEE39A7E9452890611A035860B40A"><enum>(E)</enum><text display-inline="yes-display-inline">pumped storage facilities; and</text>
				</subparagraph><subparagraph id="id3BE9682F1BE342B7B782F100955FE5EA"><enum>(F)</enum><text display-inline="yes-display-inline">new marine and hydrokinetic resources;
			 and</text>
				</subparagraph></paragraph><paragraph id="IDe5040845030d4ba48797bbb6426268f0"><enum>(5)</enum><text>improvements in
			 increased hydropower production in the United States have the potential—</text>
				<subparagraph id="idD885C529BDAF4A6D8EFB7F4FA12C1CFD"><enum>(A)</enum><text display-inline="yes-display-inline">to increase the clean energy generation of
			 the United States;</text>
				</subparagraph><subparagraph id="IDe31cf66e2b274196b9ce1195a0e1af3f"><enum>(B)</enum><text>to improve
			 project performance and result in better environmental outcomes; and</text>
				</subparagraph><subparagraph id="id3B777CCC9A2E4A029514E7C4AB013211"><enum>(C)</enum><text display-inline="yes-display-inline">to provide ancillary benefits that include
			 grid reliability, energy storage, and integration services for variable
			 renewable resources.</text>
				</subparagraph></paragraph></section><section id="id94EBB2D3CD3A480785CF6101FEDF2796"><enum>3.</enum><header>Definitions</header><text display-inline="no-display-inline">In this Act:</text>
			<paragraph id="id44B88DE1F23F4A97A59565D5A0D60760"><enum>(1)</enum><header>Conduit</header><text>The
			 term <term>conduit</term> means any tunnel, canal, pipeline, aqueduct, flume,
			 ditch, or similar manmade water conveyance that is operated for the
			 distribution of water for agricultural, municipal, or industrial consumption
			 and not primarily for the generation of electricity.</text>
			</paragraph><paragraph id="id3B2CFDED3CE54C738FAE38957B8B99B3"><enum>(2)</enum><header>Secretary</header><text display-inline="yes-display-inline">The term <term>Secretary</term> means the
			 Secretary of Energy.</text>
			</paragraph><paragraph id="idA9BAB67740D14AC7AABE261D936B5249"><enum>(3)</enum><header>Small
			 hydroelectric power project</header><text>The term <term>small hydroelectric
			 power project</term> has the meaning given the term in section 4.30 of title
			 18, Code of Federal Regulations.</text>
			</paragraph></section><section id="ID2e326f879f3a4acc8a7d81d4f335ea6b"><enum>4.</enum><header>Sense of the
			 Senate on the use of hydropower renewable resources</header><text display-inline="no-display-inline">It is the sense of the Senate that the
			 United States should increase substantially the capacity and generation of
			 clean, renewable hydropower which will improve the environmental quality of
			 resources in the United States and support local job creation and economic
			 investment across the United States.</text>
		</section><section commented="no" id="IDb6f159bb0fb6496ca9cd3f83ee33673d"><enum>5.</enum><header>Promoting
			 hydropower development at nonpowered dams and closed loop pumped storage
			 projects</header>
			<subsection id="ID6cc33fcda1e64df5a6d1b275660cb7d8"><enum>(a)</enum><header>In
			 general</header><text>To improve the regulatory process and reduce delays and
			 costs for hydropower development at nonpowered dams and closed loop pumped
			 storage projects, the Federal Energy Regulatory Commission (referred to in this
			 section as the <quote>Commission</quote>) shall investigate the feasibility of
			 the issuance of a license for certain hydropower development during the 2-year
			 period beginning on the date of commencement of the prefiling licensing process
			 of the Commission (referred to in this section as a <quote>2-year
			 process</quote>).</text>
			</subsection><subsection id="ID1065bd3c25a14c198eb746ced1566d15"><enum>(b)</enum><header>Workshops and
			 pilots</header><text>The Commission shall—</text>
				<paragraph id="ID373abd545520439dbb6fb741416ea783"><enum>(1)</enum><text>not later than 60
			 days after the date of enactment of this Act, hold an initial workshop to
			 solicit public comment and recommendations on how to implement a 2-year
			 process;</text>
				</paragraph><paragraph id="IDeb86cdf1accf49c5a014747b2c56e03f"><enum>(2)</enum><text>develop criteria
			 for identifying projects featuring hydropower development at nonpowered dams
			 and closed loop pumped storage projects that may be appropriate for licensing
			 within a 2-year process;</text>
				</paragraph><paragraph id="ID471f299a1a734bb282dbe6a0a473b28d"><enum>(3)</enum><text>not later than
			 180 days after the date of enactment of this Act, develop and implement pilot
			 projects to test a 2-year process, if practicable; and</text>
				</paragraph><paragraph id="ID1dea298afc34424f881149568908a458"><enum>(4)</enum><text>not later than 3
			 years after the date of implementation of any pilot project to test a 2-year
			 process, hold a final workshop to solicit public comment on the effectiveness
			 of the pilot project.</text>
				</paragraph></subsection><subsection id="ID9b9fa5fd788a4655af32f9e49aa7ca3f"><enum>(c)</enum><header>Memorandum of
			 understanding</header><text>The Commission shall, to the maximum extent
			 practicable, enter into a memorandum of understanding with any applicable
			 Federal or State agency to implement a pilot project described in subsection
			 (b).</text>
			</subsection><subsection id="ID0f9e8790aa8d47368179e1eda3d9483d"><enum>(d)</enum><header>Reports</header>
				<paragraph id="IDc00c3593c1254089ba4e652e12b62aea"><enum>(1)</enum><header>Pilot projects
			 not implemented</header><text>If the Commission determines that the pilot
			 projects described in subsection (b) are not practicable, not later than 240
			 days after the date of enactment of this Act, the Commission shall submit to
			 the Committee on Energy and Natural Resources of the Senate and the Committee
			 on Energy and Commerce of the House of Representatives a report that—</text>
					<subparagraph id="ID06f3abf6b8ee40aaa897506a234fe861"><enum>(A)</enum><text>describes the
			 public comments received as part of the initial workshop held under subsection
			 (b)(1); and</text>
					</subparagraph><subparagraph id="ID51b32cc46a6c4d6db268b2ecb9345e9f"><enum>(B)</enum><text>identifies the
			 process, legal, environmental, economic, and other issues that justify the
			 determination of the Commission that a 2-year process is not practicable, with
			 recommendations on how Congress may address or remedy the identified
			 issues.</text>
					</subparagraph></paragraph><paragraph id="ID5559e1b770534c6ebc3994570aeca50e"><enum>(2)</enum><header>Pilot projects
			 implemented</header><text>If the Commission develops and implements pilot
			 projects involving a 2-year process described in subsection (b), not later than
			 60 days after the date of completion of any final workshop held under
			 subsection (b)(4), the Commission shall submit to the Committee on Energy and
			 Natural Resources of the Senate and the Committee on Energy and Commerce of the
			 House of Representatives a report that—</text>
					<subparagraph id="ID89d44a4765c84964a5ed80a2a4f371e2"><enum>(A)</enum><text>describes the
			 outcomes of the pilot projects;</text>
					</subparagraph><subparagraph id="IDceaa5da1b00242548b8aca6b262f4e52"><enum>(B)</enum><text>describes the
			 public comments from the final workshop on the effectiveness of the pilot
			 projects; and</text>
					</subparagraph><subparagraph id="ID9efbdd64fc85403597da6890bb12b636"><enum>(C)</enum><clause commented="no" display-inline="yes-display-inline" id="idA256D9147EF44770AF948F77393BF52F"><enum>(i)</enum><text>outlines how the
			 Commission will adopt policies under existing law (including regulations) that
			 result in a 2-year process;</text>
						</clause><clause id="ID82eeaaf18ee04f23b8ba57c2076275ce" indent="up1"><enum>(ii)</enum><text>outlines how the Commission will
			 proceed with a rulemaking to adopt a 2-year process in the regulations of the
			 Commission; or</text>
						</clause><clause id="id1E93DBA267AA4C53A9BA622E2A1EC0AD" indent="up1"><enum>(iii)</enum><text>identifies the process, legal,
			 environmental, economic, and other issues that justify the determination of the
			 Commission that a 2-year process is not practicable, with recommendations on
			 how Congress may address or remedy the identified issues.</text>
						</clause></subparagraph></paragraph></subsection></section><section id="HA268DCA5CDF348AFAD1F07D2DB718509"><enum>6.</enum><header>Promoting conduit
			 hydropower projects</header>
			<subsection commented="no" id="HBFD586C07A0B442FBA8C52D8FF8DBE83"><enum>(a)</enum><header>Applicability
			 of, and exemption from, licensing requirements</header><text display-inline="yes-display-inline">Section 30 of the Federal Power Act
			 (16 U.S.C.
			 823a) is amended—</text>
				<paragraph commented="no" id="idB806C70F34A5416EB9B1177BD9373C7A"><enum>(1)</enum><text>by redesignating
			 subsections (c) through (e) as subsections (d) through (f),
			 respectively;</text>
				</paragraph><paragraph commented="no" id="H62D9630FEF16490BBF2971B4043C8A63"><enum>(2)</enum><text>by striking
			 <quote><header-in-text level="subsection" style="OLC">Sec.</header-in-text>
			 30.</quote> and all that follows through the end of subsection (b) and
			 inserting the following:</text>
					<quoted-block display-inline="no-display-inline" id="idF68E7018FC724EDEB3579AC5F1EFF4D4" style="OLC">
						<section id="id08469AC24EDA492F868CAB3621235BB3"><enum>30.</enum><header>Conduit
				hydropower facilities</header>
							<subsection id="HD81EF6C1A93C453EB41C28B388864583"><enum>(a)</enum><header>Definitions</header><text>In
				this section:</text>
								<paragraph id="H7E4C6DB0DBE04051AC8AB5F29FBF02BC"><enum>(1)</enum><header>Conduit</header><text>The
				term <term>conduit</term> means any tunnel, canal, pipeline, aqueduct, flume,
				ditch, or similar manmade water conveyance that is operated—</text>
									<subparagraph id="id609B0D2EF0DE455A89A7C3E804216FF7"><enum>(A)</enum><text>for the
				distribution of water for agricultural, municipal, or industrial consumption;
				and</text>
									</subparagraph><subparagraph id="id84BC52B90F97452D8CE623ECD68B5FFF"><enum>(B)</enum><text>not primarily for
				the generation of electricity.</text>
									</subparagraph></paragraph><paragraph commented="no" id="HCCB1B1C1DBED4870ABDD2E7EB53AA190"><enum>(2)</enum><header>Qualifying
				conduit hydropower facility</header><text>The term <term>qualifying conduit
				hydropower facility</term> means a facility (not including any dam or other
				impoundment) that is determined or deemed under subsection (b)(2)(D) to meet
				the qualifying criteria.</text>
								</paragraph><paragraph id="HFF00A85777AC483F951C4041F926787D"><enum>(3)</enum><header>Qualifying
				criteria</header><text>The term <term>qualifying criteria</term> means, with
				respect to a facility, that—</text>
									<subparagraph id="H5B6823C50A564E1E91F07D2E04B05EBF"><enum>(A)</enum><text>the facility is
				constructed, operated, or maintained for the generation of electric power and
				uses for the generation only the hydroelectric potential of a non-federally
				owned conduit;</text>
									</subparagraph><subparagraph id="H8DD7F50ED9524F1CBD46B9D369FEE304"><enum>(B)</enum><text>the facility has
				an installed capacity that does not exceed 5 megawatts; and</text>
									</subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H72F6AB5C3E9E4AC8BD338D5FD0617ED0"><enum>(C)</enum><text>on or before the
				date of enactment of the <short-title>Hydropower
				Improvement Act of 2013</short-title>, the facility is not licensed under, or
				exempted from the license requirements contained in, this part.</text>
									</subparagraph></paragraph></subsection><subsection commented="no" display-inline="no-display-inline" id="id2A37848DF81344B2A8A0822F9A310496"><enum>(b)</enum><header>Administration</header>
								<paragraph id="idB4F0704E72AE41EE991BC5DDCA87295C"><enum>(1)</enum><header>In
				general</header><text>A qualifying conduit hydropower facility shall not be
				required to be licensed under this part.</text>
								</paragraph><paragraph id="id294089F885084556A00E78A432832867"><enum>(2)</enum><header>Notice of
				intent to construct facility</header>
									<subparagraph id="idEB3CCCE8BE6740B7844763CCD460EA2F"><enum>(A)</enum><header>In
				general</header><text>Any person, State, or municipality proposing to construct
				a qualifying conduit hydropower facility shall file with the Commission a
				notice of intent to construct the qualifying conduit hydropower
				facility.</text>
									</subparagraph><subparagraph id="id92B2F8D13FAE47748E8808647CD7AC03"><enum>(B)</enum><header>Information</header><text>The
				notice shall include sufficient information to demonstrate that the facility
				meets the qualifying criteria.</text>
									</subparagraph><subparagraph id="HA18168240A0D458A87211A54BA588B38"><enum>(C)</enum><header>Initial
				determination</header><text display-inline="yes-display-inline">Not later than
				15 days after receipt of a notice of intent is filed under subparagraph (A),
				the Commission shall—</text>
										<clause commented="no" id="HA10851006874477DAC0FBFC6D4CDFF42"><enum>(i)</enum><text>make an initial
				determination as to whether the facility meets the qualifying criteria;
				and</text>
										</clause><clause commented="no" id="H1109986C54DB4D55AE879D0D9F35FF58"><enum>(ii)</enum><text display-inline="yes-display-inline">if the Commission makes an initial
				determination, pursuant to clause (i) that the facility meets the qualifying
				criteria, publish public notice of the notice of intent filed under
				subparagraph (A).</text>
										</clause></subparagraph><subparagraph commented="no" id="H9F8696E8F18D43D7BAB888978ACCA64F"><enum>(D)</enum><header>Final
				determination</header><text display-inline="yes-display-inline">If, not later
				than 45 days after the date of publication of the public notice described in
				subparagraph (C)(ii)—</text>
										<clause id="H5AB61DABBCF44E37929CDBE2D36007B4"><enum>(i)</enum><text>an
				entity contests whether the facility meets the qualifying criteria, the
				Commission shall promptly issue a written determination as to whether the
				facility meets the qualifying criteria; or</text>
										</clause><clause id="HAD918503114A4647B63AEC7BC01291BD"><enum>(ii)</enum><text>no entity
				contests whether the facility meets the qualifying criteria, the facility shall
				be considered to meet the qualifying criteria.</text>
										</clause></subparagraph></paragraph></subsection><subsection id="H1DF00AD072104A41A52799FB73CBDE0E"><enum>(c)</enum><header>Exemptions</header><text>Subject
				to subsection (d), the Commission may grant an exemption in whole or in part
				from the requirements of this part, including any license requirements
				contained in this part, to any facility (not including any dam or other
				impoundment) constructed, operated, or maintained for the generation of
				electric power that the Commission determines, by rule or order—</text>
								<paragraph id="H8704E58849414ED6835DBDB25B14AF03"><enum>(1)</enum><text>uses for the
				generation only the hydroelectric potential of a conduit; and</text>
								</paragraph><paragraph id="H97CA196F33C24E619D700DB84BB08A1B"><enum>(2)</enum><text>has an installed
				capacity that does not exceed 40
				megawatts.</text>
								</paragraph></subsection></section><after-quoted-block>;</after-quoted-block></quoted-block>
				</paragraph><paragraph id="HF8B5A8FD80134600A7CD90C0A78C169E"><enum>(3)</enum><text>in subsection (d)
			 (as redesigned by paragraph (1)), by striking <quote>subsection (a)</quote> and
			 inserting <quote>subsection (c)</quote>; and</text>
				</paragraph><paragraph id="H28EDEC59291C435793C6D048C7E0D32D"><enum>(4)</enum><text>in subsection (e)
			 (as so redesignated), by striking <quote>subsection (a)</quote> and inserting
			 <quote>subsection (c)</quote>.</text>
				</paragraph></subsection><subsection id="H39FEC5A7A5F04E76945CD31B1A432F1E"><enum>(b)</enum><header>Conforming
			 amendments</header>
				<paragraph id="id883266AC0CE945F7835340EBE600C2F7"><enum>(1)</enum><text>Section 210(j)(3)
			 of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/824a-3">16 U.S.C. 824a–3(j)(3)</external-xref>)
			 is amended by striking <quote>section 30(c)</quote> and inserting
			 <quote>section 30(d)</quote>.</text>
				</paragraph><paragraph id="id8015E2CEDF3F41A08329DE18C6102FBC"><enum>(2)</enum><text>Section 405(d) of
			 the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2705">16 U.S.C. 2705(d)</external-xref>)
			 is amended in the first sentence—</text>
					<subparagraph id="id9B1C6E02B64D4820A7BE4073F3B6E1A4"><enum>(A)</enum><text>by striking
			 <quote>subsections (c) and (d)</quote> each place it appears and inserting
			 <quote>subsections (d) and (e)</quote>; and</text>
					</subparagraph><subparagraph id="idD87663B0224E49BD91452442D71D59F2"><enum>(B)</enum><text>by striking
			 <quote>subsection (a) of such section 30</quote> and inserting <quote>section
			 30(c) of that Act</quote>.</text>
					</subparagraph></paragraph><paragraph id="idAF090EE3F8FD4993B37B6612CCEB0C17"><enum>(3)</enum><text>Section
			 3401(a)(2) of the Omnibus Budget Reconciliation Act of 1986 (42 U.S.C.
			 7178(a)(2)) is amended by striking <quote>30(e)</quote> and inserting
			 <quote>30(f)</quote>.</text>
				</paragraph><paragraph id="idCC6F236DEB0F435CA207ECB8A8A46F55"><enum>(4)</enum><text>Section 242(b)(3)
			 of the Energy Policy Act of 2005 (<external-xref legal-doc="usc" parsable-cite="usc/42/15881">42 U.S.C. 15881(b)(3)</external-xref>) is amended by striking
			 <quote>section 30(a)(2) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/823a">16 U.S.C. 823a(a)(2)</external-xref>)</quote>
			 and inserting <quote>section 30(a) of the Federal Power Act (16 U.S.C.
			 823a(a))</quote>.</text>
				</paragraph></subsection></section><section id="HC4A0D856F96449F49BF9F3B1A7AD8D74"><enum>7.</enum><header>Promoting small
			 hydroelectric power projects</header><text display-inline="no-display-inline">Section 405(d) of the Public Utility
			 Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2705">16 U.S.C. 2705(d)</external-xref>) is amended in
			 the first sentence by striking <quote>5,000</quote> and inserting
			 <quote>10,000</quote>.</text>
		</section><section id="idFCBFF194525E493EA0C34AA95FE3CFA6"><enum>8.</enum><header>FERC authority
			 to extend preliminary permit terms</header><text display-inline="no-display-inline">Section 5 of the Federal Power Act (16
			 U.S.C. 798) is amended—</text>
			<paragraph id="id038A9758AB8F48E28D18D81CF568AA61"><enum>(1)</enum><text display-inline="yes-display-inline">by designating the first, second, and third
			 sentences as subsections (a), (c), and (d), respectively; and</text>
			</paragraph><paragraph id="id034E22FBF2664C929E633E4AF31097C1"><enum>(2)</enum><text display-inline="yes-display-inline">by inserting after subsection (a) (as so
			 designated) the following:</text>
				<quoted-block display-inline="no-display-inline" id="id36F91EADB299452F8045BEE30E4F4A89" style="OLC">
					<subsection id="id51D9ECD6CE2749D5BA081453ED34A760"><enum>(b)</enum><header>Extension</header><text>The
				Commission may extend the term of a preliminary permit once for not more than 2
				additional years if the Commission finds that the permittee has carried out
				activities under the permit in good faith and with reasonable
				diligence.</text>
					</subsection><after-quoted-block>.</after-quoted-block></quoted-block>
			</paragraph></section><section id="iddc785baa8d7c49a2bf5359bdfffbe46e"><enum>9.</enum><header>Study of pumped
			 storage and potential hydropower from conduits</header>
			<subsection id="ida0222966541a43218e8b3b3423409e60"><enum>(a)</enum><header>In
			 general</header><text>The Secretary shall conduct a study—</text>
				<paragraph id="iddaf1e5758d1d4070b514c5e7e51a05bb"><enum>(1)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="idD9D45F179E694550B6EC834C84E9915B"><enum>(A)</enum><text>of the technical
			 flexibility that existing pumped storage facilities can provide to support
			 intermittent renewable electric energy generation, including the potential for
			 those existing facilities to be upgraded or retrofitted with advanced
			 commercially available technology; and</text>
					</subparagraph><subparagraph id="id47f7fa9797524e3d842f06bd93f30eb7" indent="up1"><enum>(B)</enum><text>of the technical potential of existing
			 pumped storage facilities and new advanced pumped storage facilities, to
			 provide grid reliability benefits; and</text>
					</subparagraph></paragraph><paragraph id="id1d21b21d18d340268e0e1502c25da705"><enum>(2)</enum><subparagraph commented="no" display-inline="yes-display-inline" id="idEF728721A0BB446DBCD253D7BCC641EA"><enum>(A)</enum><text>to identify the range
			 of opportunities for hydropower that may be obtained from conduits (as defined
			 by the Secretary) in the United States; and</text>
					</subparagraph><subparagraph id="id1b647a3b9a8e4c878f5276d4a38e585a" indent="up1"><enum>(B)</enum><text>through case studies, to assess
			 amounts of potential energy generation from such conduit hydropower
			 projects.</text>
					</subparagraph></paragraph></subsection><subsection id="id3aa8147e545042ed8ff3572270c5ca27"><enum>(b)</enum><header>Report</header><text>Not
			 later than 1 year after the date of enactment of this Act, the Secretary shall
			 submit to the Committee on Energy and Natural Resources of the Senate and the
			 Committee on Energy and Commerce of the House of Representatives a report that
			 describes the results of the study conducted under subsection (a), including
			 any recommendations.</text>
			</subsection></section><section id="idD7BB7BA5E1A4414EB8D889539025D1C0"><enum>10.</enum><header>Report on
			 memorandum of understanding on hydropower</header><text display-inline="no-display-inline">Not later than 180 days after the date of
			 enactment of this Act, the President shall submit to the Committee on Energy
			 and Natural Resources of the Senate and the Committee on Energy and Commerce of
			 the House of Representatives a report on actions taken by the Department of
			 Energy, the Department of the Interior, and the Corps of Engineers to carry out
			 the memorandum of understanding on hydropower entered into on March 24, 2010,
			 with particular emphasis on actions taken by the agencies to work together and
			 investigate ways to efficiently and responsibly facilitate the Federal
			 permitting process for Federal and non-Federal hydropower projects at Federal
			 facilities, within existing authority.</text>
		</section></legis-body>
</bill>


