<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Placed-on-Calendar-Senate" dms-id="A1" public-private="public"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>113 S1514 PCS: Saving Coal Jobs Act of 2013</dc:title>
<dc:publisher>U.S. Senate</dc:publisher>
<dc:date>2013-09-17</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">II</distribution-code><calendar>Calendar No. 191</calendar><congress>113th CONGRESS</congress><session>1st Session</session><legis-num>S. 1514</legis-num><current-chamber>IN THE SENATE OF THE UNITED STATES</current-chamber><action><action-date date="20130917">September 17, 2013</action-date><action-desc><sponsor name-id="S174">Mr. McConnell</sponsor> introduced the following bill; which was read the first time</action-desc></action><action><action-date>September 18, 2013</action-date><action-desc>Read the second time and placed on the calendar</action-desc></action><legis-type>A BILL</legis-type><official-title>To save coal jobs, and for other purposes.</official-title></form><legis-body><section id="S1" section-type="section-one"><enum>1.</enum><header>Short title; table of contents</header><subsection id="idDCEDF5ACE4B54E9E81416924B8129284"><enum>(a)</enum><header>Short title</header><text display-inline="yes-display-inline">This Act may be cited as the
		  <quote><short-title>Saving Coal Jobs Act of 2013</short-title></quote>.</text></subsection><subsection id="id6F277DCD61CE48588A23FF32C2C244F7"><enum>(b)</enum><header>Table of contents</header><text>The table of contents of this Act is as follows:</text><toc><toc-entry idref="S1" level="section">Sec. 1. Short title; table of contents.</toc-entry><toc-entry idref="id955D9C43534141DCB935EBC843D17E13" level="title">TITLE I—Prohibition on energy tax</toc-entry><toc-entry idref="id9E67E41CD3B742FFBBDAB666A9435C6A" level="section">Sec. 101. Prohibition on energy tax.</toc-entry><toc-entry idref="id7B1748D0C22C434E9D631EA09D49183E" level="title">TITLE II—Permits</toc-entry><toc-entry idref="H2133F0C2B94E40EA95BB30155387344A" level="section">Sec. 201. National pollutant discharge elimination system.</toc-entry><toc-entry idref="HEF95A82B5860429388830658C9EFD603" level="section">Sec. 202. Permits for dredged or fill material.</toc-entry><toc-entry idref="H1ADA7FD6FDF14E708C7CB0E4B319B9F8" level="section">Sec. 203. Impacts of Environmental Protection Agency regulatory activity on employment and economic activity.</toc-entry><toc-entry idref="H663220D310BB43BD8585A4BDB22E4514" level="section">Sec. 204. Identification of waters protected by the Clean Water Act.</toc-entry><toc-entry idref="HBBFD223422F74F449A2F0284F49F1378" level="section">Sec. 205. Limitations on authority to modify State water quality standards.</toc-entry><toc-entry idref="H89E72A9D80E24B5FABA136798BEE0BF3" level="section">Sec. 206. State authority to identify waters within boundaries of the State.</toc-entry></toc></subsection></section><title id="id955D9C43534141DCB935EBC843D17E13" style="OLC"><enum>I</enum><header>Prohibition
		on energy tax</header><section id="id9E67E41CD3B742FFBBDAB666A9435C6A"><enum>101.</enum><header>Prohibition
		on energy tax</header><subsection id="idD3BC514BE2774D93AD5EB19580248550"><enum>(a)</enum><header>Findings;
		purposes</header><paragraph id="ide30732def2354e92b1eda311df6b05e4"><enum>(1)</enum><header>Findings</header><text>Congress
		finds that—</text><subparagraph id="id2c895243c5f4489bb8ca2d6daefa49a3"><enum>(A)</enum><text>on June 25, 2013,
		President Obama issued a Presidential memorandum directing the Administrator of
		the Environmental Protection Agency to issue regulations relating to power
		sector carbon pollution standards for existing coal fired power plants;</text></subparagraph><subparagraph id="id7cdcdf30200941e0a0b50726afcaba47"><enum>(B)</enum><text>the issuance of
		that memorandum circumvents Congress and the will of the people of the United
		States;</text></subparagraph><subparagraph id="id0876f67a4673480fbf4e6f7ed7dfe69f"><enum>(C)</enum><text>any action to
		control emissions of greenhouse gases from existing coal fired power plants in
		the United States by mandating a national energy tax would devastate major
		sectors of the economy, cost thousands of jobs, and increase energy costs for
		low-income households, small businesses, and seniors on fixed income;</text></subparagraph><subparagraph id="id800904690e91469e921153a42658fe76"><enum>(D)</enum><text>joblessness
		increases the likelihood of hospital visits, illnesses, and premature
		deaths;</text></subparagraph><subparagraph id="id6fdfd74cb6ef4a42a6ad5964bba956bf"><enum>(E)</enum><text>according to
		testimony on June 15, 2011, before the Committee on Environment and Public
		Works of the Senate by Dr. Harvey Brenner of Johns Hopkins University,
		<quote>The unemployment rate is well established as a risk factor for elevated
		illness and mortality rates in epidemiological studies performed since the
		early 1980s. In addition to influences on mental disorder, suicide and alcohol
		abuse and alcoholism, unemployment is also an important risk factor in
		cardiovascular disease and overall decreases in life
		expectancy.</quote>;</text></subparagraph><subparagraph id="ida15e99c5175c4695a5d6ca8caef024e9"><enum>(F)</enum><text>according to the
		National Center for Health Statistics, <quote>children in poor families were
		four times as likely to be in fair or poor health as children that were not
		poor</quote>;</text></subparagraph><subparagraph id="id795c332a0792429189334e618de55c86"><enum>(G)</enum><text>any major
		decision that would cost the economy of the United States millions of dollars
		and lead to serious negative health effects for the people of the United States
		should be debated and explicitly authorized by Congress, not approved by a
		Presidential memorandum or regulations; and</text></subparagraph><subparagraph id="ide881e894eb31427082566994f7e4cd3f"><enum>(H)</enum><text>any policy
		adopted by Congress should make United States energy as clean as practicable,
		as quickly as practicable, without increasing the cost of energy for struggling
		families, seniors, low-income households, and small businesses.</text></subparagraph></paragraph><paragraph id="iddd2224d6c548495f89fd77827ee8ffbd"><enum>(2)</enum><header>Purposes</header><text>The
		purposes of this section are—</text><subparagraph id="id2e0600caae59471c83a6d95a567cf9a6"><enum>(A)</enum><text>to ensure
		that—</text><clause id="id6D0B6D73D8E04DCC953A7120B02FF880"><enum>(i)</enum><text>a
		national energy tax is not imposed on the economy of the United States;
		and</text></clause><clause id="id796645036b604c8da94c9f3d206d6b61"><enum>(ii)</enum><text>struggling
		families, seniors, low-income households, and small businesses do not
		experience skyrocketing electricity bills and joblessness;</text></clause></subparagraph><subparagraph id="ide5a9307689ed46c9b6b30295d91ffc6d"><enum>(B)</enum><text>to protect the
		people of the United States, particularly families, seniors, and children, from
		the serious negative health effects of joblessness;</text></subparagraph><subparagraph id="id4d2ae8e2209a4c4d8e917c8bbd78c293"><enum>(C)</enum><text>to allow
		sufficient time for Congress to develop and authorize an appropriate mechanism
		to address the energy needs of the United States and the potential challenges
		posed by severe weather; and</text></subparagraph><subparagraph id="ida8606e23e2b84f1db6cc39785e30d3cb"><enum>(D)</enum><text>to restore the
		legislative process and congressional authority over the energy policy of the
		United States.</text></subparagraph></paragraph></subsection><subsection id="id6737D6F8D5774365BE79DACA38E261F2"><enum>(b)</enum><header>Presidential
		memorandum</header><text display-inline="yes-display-inline">Notwithstanding
		any other provision of law, the head of a Federal agency shall not promulgate
		any regulation relating to power sector carbon pollution standards or any
		substantially similar regulation on or after June 25, 2013, unless that
		regulation is explicitly authorized by an Act of Congress.</text></subsection></section></title><title id="id7B1748D0C22C434E9D631EA09D49183E" style="OLC"><enum>II</enum><header>Permits</header><section id="H2133F0C2B94E40EA95BB30155387344A" section-type="subsequent-section"><enum>201.</enum><header>National pollutant discharge
			 elimination system</header><subsection id="H4CF90A9EAE8F46F4B41B768A8CDEA602"><enum>(a)</enum><header>Applicability of
			 guidance</header><text>Section 402 of the Federal Water Pollution Control Act
			 (<external-xref legal-doc="usc" parsable-cite="usc/33/1342">33 U.S.C. 1342</external-xref>) is amended by adding at the end the following:</text><quoted-block display-inline="no-display-inline" id="H3BEA48D18A714531889CE98397FFDFFD" style="OLC"><subsection id="HDE3E31CD0A3E4BDB8955FE98A7287061"><enum>(s)</enum><header>Applicability of
				guidance</header><paragraph id="H997A6D12CEDC4FD985E904D931EBEC42"><enum>(1)</enum><header>Definitions</header><text>In
				this subsection:</text><subparagraph id="H9496C1FC193B44469337D004555BBEBA"><enum>(A)</enum><header>Guidance</header><clause id="H0CEF8793E14E4681B75BFF02E5863805"><enum>(i)</enum><header>In
				general</header><text>The term <term>guidance</term> means draft, interim, or
				final guidance issued by the Administrator.</text></clause><clause id="H5DE4A1F3AAE34C4DAEF2377E0ED4AA68"><enum>(ii)</enum><header>Inclusions</header><text>The
				term <term>guidance</term> includes—</text><subclause id="HB780C9D76439484DB44928FB3AB79968"><enum>(I)</enum><text>the comprehensive
				guidance issued by the Administrator and dated April 1, 2010;</text></subclause><subclause id="H27CEEB97F7DB4BDC89BAF23B1109DFF9"><enum>(II)</enum><text>the proposed
				guidance entitled <quote>Draft Guidance on Identifying Waters Protected by the
				Clean Water Act</quote> and dated April 28, 2011;</text></subclause><subclause id="H92E39ED239EF43D0832DFFBB19779583"><enum>(III)</enum><text>the final
				guidance proposed by the Administrator and dated July 21, 2011; and</text></subclause><subclause id="HEEEBDB66A18B45548FE10DBAC8668289"><enum>(IV)</enum><text>any other
				document or paper issued by the Administrator through any process other than
				the notice and comment rulemaking process.</text></subclause></clause></subparagraph><subparagraph id="H39306FEFB0B042A8928E84E2C450490D"><enum>(B)</enum><header>New
				permit</header><text>The term <term>new permit</term> means a permit covering
				discharges from a structure—</text><clause id="H86DC62DF41F647D181C26DD05DEEA756"><enum>(i)</enum><text>that is issued
				under this section by a permitting authority; and</text></clause><clause id="H18F98017E16047C094E43FE7005B974A"><enum>(ii)</enum><text>for which an
				application is—</text><subclause id="H71A85C9C89074CD5B7CC034F49058592"><enum>(I)</enum><text>pending as of the
				date of enactment of this subsection; or</text></subclause><subclause id="H1BA07564802D4A2B9AEC2ADE6CF5F0A2"><enum>(II)</enum><text>filed on or after
				the date of enactment of this subsection.</text></subclause></clause></subparagraph><subparagraph id="HBE804E3AB44C4733BD5B5CDFAEF265FC"><enum>(C)</enum><header>Permitting
				authority</header><text>The term <term>permitting authority</term>
				means—</text><clause id="H7D2CC61BF4754964804E9DC1826B858D"><enum>(i)</enum><text>the Administrator;
				or</text></clause><clause id="H3C8F3DA56BF0472A86C62424E6682CFE"><enum>(ii)</enum><text>a
				State, acting pursuant to a State program that is equivalent to the program
				under this section and approved by the Administrator.</text></clause></subparagraph></paragraph><paragraph id="H4D82766BFB0B459C8DA55E1857CDBF00"><enum>(2)</enum><header>Permits</header><subparagraph id="H772CC5FCC0A5400BAE81402D0D226D6B"><enum>(A)</enum><header>In
				general</header><text>Notwithstanding any other provision of law, in making a
				determination whether to approve a new permit or a renewed permit, the
				permitting authority—</text><clause id="H7AB0F00E53B2407E9DE5DD2E0B1EF0AF"><enum>(i)</enum><text>shall base the
				determination only on compliance with regulations issued by the Administrator
				or the permitting authority; and</text></clause><clause id="HD72C5F330D0244BEB95E7437F6529A63"><enum>(ii)</enum><text>shall not base
				the determination on the extent of adherence of the applicant for the new
				permit or renewed permit to guidance.</text></clause></subparagraph><subparagraph id="HE0640CF0559A4CAE9EF8CFD6CEEFDE62"><enum>(B)</enum><header>New
				permits</header><text display-inline="yes-display-inline">If the permitting
				authority does not approve or deny an application for a new permit by the date
				that is 270 days after the date of receipt of the application for the new
				permit, the applicant may operate as if the application were approved in
				accordance with Federal law for the period of time for which a permit from the
				same industry would be approved.</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H422BDFA2C6814A51AEDF47E10B63EDFB"><enum>(C)</enum><header>Substantial
				completeness</header><text>In determining whether an application for a new
				permit or a renewed permit received under this paragraph is substantially
				complete, the permitting authority shall use standards for determining
				substantial completeness of similar permits for similar facilities submitted in
				fiscal year
				2007.</text></subparagraph></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></subsection><subsection id="H65F737FDB9A140C4BDF2956B3A9CAC3F"><enum>(b)</enum><header>State permit
			 programs</header><paragraph id="HC210269CF64545FC93CF6248881C8093"><enum>(1)</enum><header>In
			 general</header><text>Section 402 of the Federal Water Pollution Control Act
			 (<external-xref legal-doc="usc" parsable-cite="usc/33/1342">33 U.S.C. 1342</external-xref>) is amended by striking subsection (b) and inserting the
			 following:</text><quoted-block display-inline="no-display-inline" id="HFC933E56E54447B5A7D9BFB1D777A630" style="OLC"><subsection commented="no" display-inline="no-display-inline" id="H2AADDF9A2D3748AE9E99518CFA96E70D"><enum>(b)</enum><header>State permit
				programs</header><paragraph commented="no" display-inline="no-display-inline" id="H8512C771F4E64E72886A5FF4D3E5F4EA"><enum>(1)</enum><header>In
				general</header><text display-inline="yes-display-inline">At any time after the
				promulgation of the guidelines required by section 304(a)(2), the Governor of
				each State desiring to administer a permit program for discharges into
				navigable waters within the jurisdiction of the State may submit to the
				Administrator—</text><subparagraph commented="no" display-inline="no-display-inline" id="H6F9D6FD68B6D4F0B97442CA271204FB9"><enum>(A)</enum><text display-inline="yes-display-inline">a full and complete description of the
				program the State proposes to establish and administer under State law or under
				an interstate compact; and</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H0FB6E6BCBC0B473EAAEB5207FA2D9D86"><enum>(B)</enum><text display-inline="yes-display-inline">a statement from the attorney general (or
				the attorney for those State water pollution control agencies that have
				independent legal counsel), or from the chief legal officer in the case of an
				interstate agency, that the laws of the State, or the interstate compact, as
				applicable, provide adequate authority to carry out the described
				program.</text></subparagraph></paragraph><paragraph commented="no" display-inline="no-display-inline" id="HD84D146E92654FB39C99E86A39010A19"><enum>(2)</enum><header>Approval</header><text display-inline="yes-display-inline">The Administrator shall approve each
				program for which a description is submitted under paragraph (1) unless the
				Administrator determines that adequate authority does not exist—</text><subparagraph commented="no" display-inline="no-display-inline" id="H08CD8D4557CE40F7B5AE50A19429DAF3"><enum>(A)</enum><text>to issue permits
				that—</text><clause id="H5D80F5AB644948D196CA471BB906F707"><enum>(i)</enum><text>apply, and ensure
				compliance with, any applicable requirements of sections 301, 302, 306, 307,
				and 403;</text></clause><clause id="H40E3B553B9844D378118F24AA3F4902C"><enum>(ii)</enum><text>are for fixed
				terms not exceeding 5 years;</text></clause><clause id="H348274B3E538417F887CF6CB0F9721CA"><enum>(iii)</enum><text>can be
				terminated or modified for cause, including—</text><subclause id="HAF0CAC98B1DC42DEAC4E547285002082"><enum>(I)</enum><text>a violation of any
				condition of the permit;</text></subclause><subclause id="H5D6A4A24DDAB40CEA01F381CC3FA913F"><enum>(II)</enum><text>obtaining a
				permit by misrepresentation or failure to disclose fully all relevant facts;
				and</text></subclause><subclause id="H594A416C7302489AAEA99E32F4FBDABC"><enum>(III)</enum><text>a change in any
				condition that requires either a temporary or permanent reduction or
				elimination of the permitted discharge; and</text></subclause></clause><clause id="H04DF6B172AB248048B6A78034DF093C1"><enum>(iv)</enum><text>control the
				disposal of pollutants into wells;</text></clause></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="HA5C31A5F3C30427BB4678556BB12A7F4"><enum>(B)</enum><clause commented="no" display-inline="yes-display-inline" id="H3AD631FA54D94AA79182959D93EBDD6B"><enum>(i)</enum><text>to issue permits that
				apply, and ensure compliance with, all applicable requirements of section 308;
				or</text></clause><clause id="H50590E21E34140A7984F8A7AC06271E3" indent="up1"><enum>(ii)</enum><text>to inspect, monitor, enter, and
				require reports to at least the same extent as required in section 308;</text></clause></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H508271DC692D4600AEC247CEDEE9C6A3"><enum>(C)</enum><text>to ensure that the
				public, and any other State the waters of which may be affected, receives
				notice of each application for a permit and an opportunity for a public hearing
				before a ruling on each application;</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H4BCE79B169514DB7AF0B39548005A2DD"><enum>(D)</enum><text>to ensure that the
				Administrator receives notice and a copy of each application for a
				permit;</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H5090D60962914AD880C43E05B2B72829"><enum>(E)</enum><text>to ensure that any
				State (other than the permitting State), whose waters may be affected by the
				issuance of a permit may submit written recommendations to the permitting State
				and the Administrator with respect to any permit application and, if any part
				of the written recommendations are not accepted by the permitting State, that
				the permitting State will notify the affected State and the Administrator in
				writing of the failure of the State to accept the recommendations, including
				the reasons for not accepting the recommendations;</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H4D2B9F331B9A483383CDE59DFBF3158E"><enum>(F)</enum><text>to ensure that no
				permit will be issued if, in the judgment of the Secretary of the Army (acting
				through the Chief of Engineers), after consultation with the Secretary of the
				department in which the Coast Guard is operating, anchorage and navigation of
				any of the navigable waters would be substantially impaired by the issuance of
				the permit;</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="HE7826B1F40AA43FDA5F3B354DDE19198"><enum>(G)</enum><text>to abate
				violations of the permit or the permit program, including civil and criminal
				penalties and other means of enforcement;</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H4959DC9DD7F44792850414364B0A650B"><enum>(H)</enum><text>to ensure that any
				permit for a discharge from a publicly owned treatment works includes
				conditions to require the identification in terms of character and volume of
				pollutants of any significant source introducing pollutants subject to
				pretreatment standards under section 307(b) into the treatment works and a
				program to ensure compliance with those pretreatment standards by each source,
				in addition to adequate notice, which shall include information on the quality
				and quantity of effluent to be introduced into the treatment works and any
				anticipated impact of the change in the quantity or quality of effluent to be
				discharged from the publicly owned treatment works, to the permitting agency
				of—</text><clause commented="no" display-inline="no-display-inline" id="H56FFF6F49693446AA1F11E9D1D3FD320"><enum>(i)</enum><text>new introductions
				into the treatment works of pollutants from any source that would be a new
				source (as defined in section 306(a)) if the source were discharging
				pollutants;</text></clause><clause commented="no" display-inline="no-display-inline" id="HBD83F0816A9E4902B65A13AA5EDC3187"><enum>(ii)</enum><text>new introductions
				of pollutants into the treatment works from a source that would be subject to
				section 301 if the source were discharging those pollutants; or</text></clause><clause commented="no" display-inline="no-display-inline" id="H2BB3CEE1521D4DD89AE65A6AE8FC846C"><enum>(iii)</enum><text>a substantial
				change in volume or character of pollutants being introduced into the treatment
				works by a source introducing pollutants into the treatment works at the time
				of issuance of the permit; and</text></clause></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H18919C71607F4F1ABFAE536A87D9106E"><enum>(I)</enum><text>to ensure that any
				industrial user of any publicly owned treatment works will comply with sections
				204(b), 307, and 308.</text></subparagraph></paragraph><paragraph commented="no" display-inline="no-display-inline" id="H1AF3F29BE7524F2F92B231524814A5C3"><enum>(3)</enum><header>Administration</header><text>Notwithstanding
				paragraph (2), the Administrator may not disapprove or withdraw approval of a
				program under this subsection on the basis of the following:</text><subparagraph id="HC5598C4FBEDB4310BC53A3F965D5E4FE"><enum>(A)</enum><text>The failure of the
				program to incorporate or comply with guidance (as defined in subsection
				(s)(1)).</text></subparagraph><subparagraph id="H208EF81A16A545E8A3859F0340C89E4E"><enum>(B)</enum><text display-inline="yes-display-inline">The implementation of a water quality
				standard that has been adopted by the State and approved by the Administrator
				under section
				303(c).</text></subparagraph></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></paragraph><paragraph id="H0231C8AD539042CEBDF64C02EBF846D8"><enum>(2)</enum><header>Conforming
			 amendments</header><subparagraph id="H50A57696DB9645CB9889DBAEC475A283"><enum>(A)</enum><text>Section 309 of the
			 Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1319">33 U.S.C. 1319</external-xref>) is amended—</text><clause id="H1284351E9A9A4B2A94AC505E97116549"><enum>(i)</enum><text>in
			 subsection (c)—</text><subclause id="H6A7C8A26626E45A8AF509410363BA8C1"><enum>(I)</enum><text>in paragraph
			 (1)(A), by striking <quote>402(b)(8)</quote> and inserting
			  <quote>402(b)(2)(H)</quote>; and</text></subclause><subclause id="H1A569F84BA0749CAAA0C8AE8AE451277"><enum>(II)</enum><text>in paragraph
			 (2)(A), by striking <quote>402(b)(8)</quote> and inserting
			 <quote>402(b)(2)(H)</quote>; and</text></subclause></clause><clause id="H7CC9C6341D1F4F7B831053EF6F77D8BD"><enum>(ii)</enum><text>in
			 subsection (d), in the first sentence, by striking <quote>402(b)(8)</quote> and
			 inserting <quote>402(b)(2)(H)</quote>.</text></clause></subparagraph><subparagraph id="HE615EEDB835D4DEDB99B7666D422891D"><enum>(B)</enum><text>Section 402(m) of
			 the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1342">33 U.S.C. 1342(m)</external-xref>) is amended in the
			 first sentence by striking <quote>subsection (b)(8) of this section</quote> and
			 inserting <quote>subsection (b)(2)(H)</quote>.</text></subparagraph></paragraph></subsection><subsection id="HCC76772254FB49EE8DA25AB5630330D0"><enum>(c)</enum><header>Suspension of
			 Federal program</header><text>Section 402(c) of the Federal Water Pollution
			 Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1342">33 U.S.C. 1342(c)</external-xref>) is amended—</text><paragraph id="H1C3A4BD4195E45AF89BFE723ED51B114"><enum>(1)</enum><text>by redesignating
			 paragraph (4) as paragraph (5); and</text></paragraph><paragraph id="HC45321E2E66244D7B4E4AF74D65EB958"><enum>(2)</enum><text>by inserting after
			 paragraph (3) the following:</text><quoted-block display-inline="no-display-inline" id="H01C29C55EC1D42A295DCA248F7F8FA9F" style="OLC"><paragraph id="H13537ABB16DB47658A99EFD096E56B0E"><enum>(4)</enum><header>Limitation on
				disapproval</header><text>Notwithstanding paragraphs (1) through (3), the
				Administrator may not disapprove or withdraw approval of a State program under
				subsection (b) on the basis of the failure of the following:</text><subparagraph id="HCE346A2363464297BB65D302A4C70704"><enum>(A)</enum><text display-inline="yes-display-inline">The failure of the program to incorporate
				or comply with guidance (as defined in subsection (s)(1)).</text></subparagraph><subparagraph id="HEFC4CF9ABE914CCFACBBA2A6814CA1AD"><enum>(B)</enum><text>The implementation
				of a water quality standard that has been adopted by the State and approved by
				the Administrator under section
				303(c).</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection><subsection id="HCEC4BEEB239B493CBBF503202E1EEC39"><enum>(d)</enum><header>Notification of
			 Administrator</header><text>Section 402(d)(2) of the Federal Water Pollution
			 Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1342">33 U.S.C. 1342(d)(2)</external-xref>) is amended—</text><paragraph id="H370C2EBDFAAD414B82A9A093529F60D9"><enum>(1)</enum><text>by striking
			 <quote>(2)</quote> and all that follows through the end of the first sentence and inserting the following:</text><quoted-block display-inline="no-display-inline" id="H5F3A9F17CC374302B28826A83A2034E2" style="OLC"><paragraph id="H48F3DF16DF434CF7A9E23429D384A59A"><enum>(2)</enum><header>Objection by
				Administrator</header><subparagraph id="H48F584F863CF4E1185EFB5B22FB04ECE"><enum>(A)</enum><header>In
				general</header><text>Subject to subparagraph (C), no permit shall issue
				if—</text><clause id="H244E1DBE72314C8D8BA019418F009C30"><enum>(i)</enum><text>not later than 90
				days after the date on which the Administrator receives notification under
				subsection (b)(2)(E), the Administrator objects in writing to the issuance of
				the permit; or</text></clause><clause id="H717BB7CCEDFF42179EFB08B93F73FB28"><enum>(ii)</enum><text>not later than 90
				days after the date on which the proposed permit of the State is transmitted to
				the Administrator, the Administrator objects in writing to the issuance of the
				permit as being outside the guidelines and requirements of this
				Act.</text></clause></subparagraph></paragraph><after-quoted-block>;</after-quoted-block></quoted-block></paragraph><paragraph id="H4253461C18C64058AF3C97267172BDA1"><enum>(2)</enum><text>in the second
			 sentence, by striking <quote>Whenever the Administrator</quote> and inserting
			 the following:</text><quoted-block display-inline="no-display-inline" id="H4AB10BA4A1FA486691D894BD0E7CD953" style="OLC"><subparagraph id="HDBB1F847F09D4CA396D08C5D8036E410"><enum>(B)</enum><header>Requirements</header><text>If
				the Administrator</text></subparagraph><after-quoted-block>;
				and</after-quoted-block></quoted-block></paragraph><paragraph id="H0A0C94BA2FE74F8CADBAF55D51A10A63"><enum>(3)</enum><text>by adding at the
			 end the following:</text><quoted-block display-inline="no-display-inline" id="HB20010D8CBC2496EAB95279A904C9966" style="OLC"><subparagraph id="H63CD1419FD714920986ACF48ED2961D1"><enum>(C)</enum><header>Exception</header><text>The
				Administrator shall not object to or deny the issuance of a permit by a State
				under subsection (b) or (s) based on the following:</text><clause id="H36B45F2183F94B739DBB4271C83A7E34"><enum>(i)</enum><text>Guidance, as that
				term is defined in subsection (s)(1).</text></clause><clause id="H10F891A83A7D434F920B4AF8E0441E91"><enum>(ii)</enum><text display-inline="yes-display-inline">The interpretation of the Administrator of a
				water quality standard that has been adopted by the State and approved by the
				Administrator under section
				303(c).</text></clause></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection></section><section id="HEF95A82B5860429388830658C9EFD603"><enum>202.</enum><header>Permits for
			 dredged or fill material</header><subsection id="H09C990DD9F9E4AADA344B55BDDF3E9D1"><enum>(a)</enum><header>In
			 general</header><text display-inline="yes-display-inline">Section 404 of the
			 Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1344">33 U.S.C. 1344</external-xref>) is amended—</text><paragraph id="H96F564EC07654283BA26FA141AE31B35"><enum>(1)</enum><text display-inline="yes-display-inline">by striking the section heading and all
			 that follows through <quote><header-in-text level="subsection" style="OLC">Sec</header-in-text>. 404. (a) The Secretary may issue</quote> and
			 inserting the following:</text><quoted-block display-inline="no-display-inline" id="HA8F27B38BB794085B644BEF690976F25" style="OLC"><section id="H1CA2B59423F448C0AE63623847FE1509"><enum>404.</enum><header>Permits for
				dredged or fill material</header><subsection id="H1F525AF1AFB74EF1AE49C7C9A6D93A20"><enum>(a)</enum><header>Permits</header><paragraph id="H5AB498A14957486297015D02CE021209"><enum>(1)</enum><header>In
				general</header><text>The Secretary may
				issue</text></paragraph></subsection></section><after-quoted-block>;
				and</after-quoted-block></quoted-block></paragraph><paragraph id="HABD1236245E54AFEAF70A235B155D33B"><enum>(2)</enum><text>in subsection (a), by adding at the
			 end the following:</text><quoted-block display-inline="no-display-inline" id="HE7E91A1356934FD597579A03AEC4548D" style="OLC"><paragraph id="H6ECD3C40643A4E9A9ED55133899A6957"><enum>(2)</enum><header>Deadline for
				approval</header><subparagraph id="HD1ECD8D138E542C98CD0CEB0B0D6D714"><enum>(A)</enum><header>Permit
				applications</header><clause id="HA44F77657713435BA67BFE4E8AD56BFF"><enum>(i)</enum><header>In
				general</header><text>Except as provided in clause (ii), if an environmental
				assessment or environmental impact statement, as appropriate, is required under
				the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321 et seq.</external-xref>), the
				Secretary shall—</text><subclause id="HC389A3EE6DEB4A7B87C34B3FAB686928"><enum>(I)</enum><text>begin the process
				not later than 90 days after the date on which the Secretary receives a permit
				application; and</text></subclause><subclause id="H2A127FC7A9224787999EB11C41E1916E"><enum>(II)</enum><text>approve or deny
				an application for a permit under this subsection not later than the latter
				of—</text><item id="H7915FE50F2F74579BB69D0AB45655DF0"><enum>(aa)</enum><text>if
				an agency carries out an environmental assessment that leads to a finding of no
				significant impact, the date on which the finding of no significant impact is
				issued; or</text></item><item id="HC260A4C733AD4C8BBE32214965742517"><enum>(bb)</enum><text>if
				an agency carries out an environmental assessment that leads to a record of
				decision, 15 days after the date on which the record of decision on an
				environmental impact statement is issued.</text></item></subclause></clause><clause id="HC0EB6C390C104101B8C3B4FD3CC12984"><enum>(ii)</enum><header>Processes</header><text>Notwithstanding
				clause (i), regardless of whether the Secretary has commenced an environmental
				assessment or environmental impact statement by the date described in clause
				(i)(I), the following deadlines shall apply:</text><subclause id="H263EE7ABB05F45289860D73726208CD9"><enum>(I)</enum><text>An environmental
				assessment carried out under the National Environmental Policy Act of 1969 (42
				U.S.C. 4321 et seq.) shall be completed not later than 1 year after the
				deadline for commencing the permit process under clause (i)(I).</text></subclause><subclause id="HD9B7A026D06B435DA5F776CCADEC50FB"><enum>(II)</enum><text>An environmental
				impact statement carried out under the National Environmental Policy Act of
				1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321 et seq.</external-xref>) shall be completed not later than 2 years after
				the deadline for commencing the permit process under clause (i)(I).</text></subclause></clause></subparagraph><subparagraph id="HC03373A73CEE4C85A9F0E278BD39558B"><enum>(B)</enum><header>Failure to
				act</header><text>If the Secretary fails to act by the deadline specified in
				clause (i) or (ii) of subparagraph (A)—</text><clause id="HA05F6A80B66C4BA0A74099BAA32C7F31"><enum>(i)</enum><text>the application,
				and the permit requested in the application, shall be considered to be
				approved;</text></clause><clause id="HD3CFAB524A8B48E4B159B3446C4C8B15"><enum>(ii)</enum><text>the Secretary
				shall issue a permit to the applicant; and</text></clause><clause id="H35A27BC3772D4F3FB44B65EBD8B2638A"><enum>(iii)</enum><text>the permit shall
				not be subject to judicial
				review.</text></clause></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection><subsection id="H380DA39D39FD492C818AED95926D0033"><enum>(b)</enum><header>State Permitting
			 Programs</header><text display-inline="yes-display-inline">Section 404
			 of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1344">33 U.S.C. 1344</external-xref>) is amended by
			 striking subsection (c)  and inserting the following:</text><quoted-block display-inline="no-display-inline" id="id87599A32CCB14AB3B23E742D0C457785" style="OLC"><subsection id="H29C228EC2F1645DDAC0C75052531D4EB"><enum>(c)</enum><header>Authority of Administrator</header><paragraph id="id231E513FC4E1459CB3D5CE6E729FE368"><enum>(1)</enum><header>In general</header><text display-inline="yes-display-inline">Subject to paragraphs (2) through (4), until the Secretary has issued
				a permit under this section, the Administrator is authorized to prohibit the
				specification (including the withdrawal of specification) of any defined area
				as a disposal site, and deny or restrict the use of any
				defined area for specification (including the withdrawal of specification) as a
				disposal site, if the Administrator determines, after notice and opportunity for public
				hearings, that the discharge of the materials into the  area will have an
				unacceptable adverse effect on municipal water supplies, shellfish beds or
				fishery areas (including spawning and breeding areas), wildlife, or
				recreational areas.</text></paragraph><paragraph id="id4E98DB22786A4E60B14E18C8EFE41F1F"><enum>(2)</enum><header>Consultation</header><text display-inline="yes-display-inline">Before making a determination under paragraph (1), the Administrator shall
				consult with the Secretary.</text></paragraph><paragraph id="idA71A33540DC242489C7B598614FC6EE9"><enum>(3)</enum><header>Findings</header><text display-inline="yes-display-inline">The Administrator shall set forth in writing and
				make public the findings of the Administrator and the reasons of the Administrator for making any determination under
				this subsection.</text></paragraph><paragraph id="HCDF8D107BCB247119AA131D34A790DCE"><enum>(4)</enum><header>Authority of
				State permitting programs</header><text>This subsection shall not apply to any
				permit if the State in which the discharge originates or will originate does
				not concur with the determination of the Administrator that the discharge will
				result in an unacceptable adverse effect as described in paragraph
				(1).</text></paragraph></subsection><after-quoted-block>.</after-quoted-block></quoted-block></subsection><subsection id="H9DAEF977DD11451492FADBFF8B3FB358"><enum>(c)</enum><header>State
			 Programs</header><text display-inline="yes-display-inline">Section 404(g)(1) of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1344">33 U.S.C. 1344(g)(1)</external-xref>) is amended in the first sentence by striking
			 <quote>for the discharge</quote> and inserting <quote>for all or part of the
			 discharges</quote>.</text></subsection></section><section display-inline="no-display-inline" id="H1ADA7FD6FDF14E708C7CB0E4B319B9F8" section-type="subsequent-section"><enum>203.</enum><header>Impacts of Environmental Protection Agency
			 regulatory activity on employment and economic activity</header><subsection id="HDF315948B1D6497F897469BD35743B01"><enum>(a)</enum><header>Definitions</header><text>In
			 this section:</text><paragraph id="HD8F0A399E9B742A891B62A85D1B02E4B"><enum>(1)</enum><header>Administrator</header><text display-inline="yes-display-inline">The term <term>Administrator</term> means
			 the Administrator of the Environmental Protection Agency.</text></paragraph><paragraph id="HE0036BD7BC0E4F398324FB9E1867871A"><enum>(2)</enum><header>Covered
			 action</header><text>The term <term>covered action</term> means any of the
			 following actions taken by the Administrator under the Federal Water Pollution
			 Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1251">33 U.S.C. 1251 et seq.</external-xref>):</text><subparagraph id="HBF8B80247A8F464CB90A86825C4EB0D6"><enum>(A)</enum><text display-inline="yes-display-inline">Issuing a regulation, policy statement,
			 guidance, response to a petition, or other requirement.</text></subparagraph><subparagraph id="H0F6694FE66D84170A47F14B622050FBE"><enum>(B)</enum><text display-inline="yes-display-inline">Implementing a new or substantially altered
			 program.</text></subparagraph></paragraph><paragraph id="HCE7A51A915154BF4B93F504E62B244D5"><enum>(3)</enum><header>More than a de
			 minimis negative impact</header><text>The term <term>more than a de minimis
			 negative impact</term> means the following:</text><subparagraph id="H067E5D5838394F08A3446EC67F66D441"><enum>(A)</enum><text>With respect to
			 employment levels, a loss of more than 100 jobs, except that any offsetting job gains that
			 result from the hypothetical creation of new jobs through new technologies or
			 government employment may not be used in the job loss calculation.</text></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="H384A6A446C454A4EBA2B1D5AE9DB6E68"><enum>(B)</enum><text>With respect to
			 economic activity, a decrease in economic activity of more than $1,000,000 over
			 any calendar year, except that any offsetting economic activity that results from the
			 hypothetical creation of new economic activity through new technologies or
			 government employment may not be used in the economic activity
			 calculation.</text></subparagraph></paragraph></subsection><subsection id="HC1C58FB922FF455E89FF518799C36BA4"><enum>(b)</enum><header>Analysis of
			 impacts of actions on employment and economic activity</header><paragraph id="HA5B0BE4852EC419483BC86ACB00E94BB"><enum>(1)</enum><header>Analysis</header><text display-inline="yes-display-inline">Before taking a covered action, the
			 Administrator shall analyze the impact, disaggregated by State, of the covered
			 action on employment levels and economic activity, including estimated job
			 losses and decreased economic activity.</text></paragraph><paragraph id="H19936DAF219A4A269EF0ACF1E4A3226A"><enum>(2)</enum><header>Economic
			 models</header><subparagraph id="H710749511FA3431FAB01619EF99086BD"><enum>(A)</enum><header>In
			 general</header><text>In carrying out paragraph (1), the Administrator shall
			 use the best available economic models.</text></subparagraph><subparagraph id="HFEC60F4BFEB846F0816F200623C9F905"><enum>(B)</enum><header>Annual GAO
			 report</header><text>Not later than December 31st of each year, the Comptroller
			 General of the United States shall submit to Congress a report on the economic
			 models used by the Administrator to carry out this subsection.</text></subparagraph></paragraph><paragraph id="H32B2E972DECF4223A87B5A985625E009"><enum>(3)</enum><header>Availability of
			 information</header><text>With respect to any covered action, the Administrator
			 shall—</text><subparagraph id="HAF7D6D113A434C60B876A17A9CE98E3D"><enum>(A)</enum><text>post the analysis
			 under paragraph (1) as a link on the main page of the public Internet Web site
			 of the Environmental Protection Agency; and</text></subparagraph><subparagraph id="HE1AE9A97FF7B47E99DF7678B1F8EF66C"><enum>(B)</enum><text display-inline="yes-display-inline">request that the Governor of any State
			 experiencing more than a de minimis negative impact post the analysis in the
			 Capitol of the State.</text></subparagraph></paragraph></subsection><subsection id="HF43609F73EDD47548CD1A1BFE9889AD4"><enum>(c)</enum><header>Public
			 hearings</header><paragraph id="H809BC9557B3149EBA822654BEADCE864"><enum>(1)</enum><header>In
			 general</header><text display-inline="yes-display-inline">If the Administrator
			 concludes under subsection (b)(1) that a covered action will have more than a
			 de minimis negative impact on employment levels or economic activity in a
			 State, the Administrator shall hold a public hearing in each such State at
			 least 30 days prior to the effective date of the covered action.</text></paragraph><paragraph id="H10D928EFD32245ADB2D31E76F3D2478D"><enum>(2)</enum><header>Time, location,
			 and selection</header><subparagraph id="idEFE1EDEF77A846B2A576E60E5494153E"><enum>(A)</enum><header>In general</header><text>A public hearing required under paragraph (1) shall
			 be held at a convenient time and location for impacted residents.</text></subparagraph><subparagraph id="idF2C42F683E4342E3B8A5CC2E8AB1C66F"><enum>(B)</enum><header>Priority</header><text>In selecting
			 a location for such a public hearing, the Administrator shall give priority to
			 locations in the State that will experience the greatest number of job
			 losses.</text></subparagraph></paragraph></subsection><subsection id="H9BBC9241CB2C42DB8DA61308377D5E64"><enum>(d)</enum><header>Notification</header><text display-inline="yes-display-inline">If the Administrator concludes under
			 subsection (b)(1) that a covered action will have more than a de minimis
			 negative impact on employment levels or economic activity in any State, the
			 Administrator shall give notice of such impact to the congressional
			 delegation, Governor, and legislature of the State at least 45 days before the effective
			 date of the covered action.</text></subsection></section><section id="H663220D310BB43BD8585A4BDB22E4514"><enum>204.</enum><header>Identification of
			 waters protected by the Clean
			 Water Act</header><subsection id="H5936890F52B441708EE3D1163409BB8E"><enum>(a)</enum><header>In
			 general</header><text display-inline="yes-display-inline">The Secretary of the
			 Army and the Administrator of the Environmental Protection Agency may
			 not—</text><paragraph id="H880253ED8BE4431AB58C46B602749F9C"><enum>(1)</enum><text>finalize, adopt,
			 implement, administer, or enforce the proposed guidance described in the notice
			 of availability and request for comments entitled <quote>EPA and Army Corps of
			 Engineers Guidance Regarding Identification of Waters Protected by the Clean
			 Water Act</quote> (EPA–HQ–OW–2011–0409) (76 Fed. Reg. 24479 (May 2, 2011));
			 and</text></paragraph><paragraph id="H8A86D7ADF22C4A15ACC7C5A9EFE1500A"><enum>(2)</enum><text>use the guidance
			 described in paragraph (1), any successor document, or any substantially
			 similar guidance made publicly available on or after December 3, 2008, as the
			 basis for any decision regarding the scope of the Federal Water Pollution
			 Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1251">33 U.S.C. 1251 et seq.</external-xref>) or any rulemaking.</text></paragraph></subsection><subsection id="HA82FAA351B164ACC81D627F28B7BEB5F"><enum>(b)</enum><header>Rules</header><text>The
			 use of the guidance described in subsection (a)(1), or any successor document
			 or substantially similar guidance made publicly available on or after December
			 3, 2008, as the basis for any rule shall be grounds for vacating the
			 rule.</text></subsection></section><section id="HBBFD223422F74F449A2F0284F49F1378"><enum>205.</enum><header>Limitations on
			 authority to modify State water quality standards</header><subsection id="H3A3E9D5FCFAE4439AC7A2B3A224BDBA0"><enum>(a)</enum><header>State water
			 quality standards</header><text display-inline="yes-display-inline">Section
			 303(c)(4) of the Federal Water Pollution Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1313">33 U.S.C. 1313(c)(4)</external-xref>) is
			 amended—</text><paragraph id="H9C67907D73C04631B0E8D54E92C7DC9A"><enum>(1)</enum><text>by redesignating
			 subparagraphs (A) and (B) as clauses (i) and (ii), respectively, and indenting appropriately;</text></paragraph><paragraph id="HF1A363BA459B4CD1B578B4D7360AF8A4"><enum>(2)</enum><text>by striking
			 <quote>(4) The</quote> and inserting the following:</text><quoted-block display-inline="no-display-inline" id="idFAB219C9BFA149B7BF5092FBFA1D7AD0" style="OLC"><paragraph id="id7B416C5847C44C04A05705FBC7C51A67"><enum>(4)</enum><header>Promulgation of revised or new standards</header><subparagraph id="id189FE836990B4B78856834E262E228F5"><enum>(A)</enum><header>In general</header><text>The</text></subparagraph></paragraph><after-quoted-block>;</after-quoted-block></quoted-block></paragraph><paragraph id="H8CD3D6C8BECE43F1AD015C35F8C72856"><enum>(3)</enum><text>by striking
			 <quote>The Administrator shall promulgate</quote> and inserting the
			 following:</text><quoted-block display-inline="no-display-inline" id="HFF4FECD393254511B295FC2DC510D918" style="OLC"><subparagraph id="H67F56B426CBE4041AAA7CD08F0C34325"><enum>(B)</enum><header>Deadline</header><text display-inline="yes-display-inline">The Administrator shall
				promulgate;</text></subparagraph><after-quoted-block>
				and</after-quoted-block></quoted-block></paragraph><paragraph id="H2419FA04A48D4631BED907262564B0F5"><enum>(4)</enum><text>by adding at the
			 end the following:</text><quoted-block display-inline="no-display-inline" id="H0FCB75C950784CDA997D7808D53AA613" style="OLC"><subparagraph id="HE7419CAED94C4B4EAC6FF5F394656069"><enum>(C)</enum><header>State water quality standards</header><text display-inline="yes-display-inline">Notwithstanding any other provision of this paragraph, the
				Administrator may not promulgate a revised or new standard for a pollutant in
				any case in which the State has submitted to the Administrator and the
				Administrator has approved a water quality standard for that pollutant, unless
				the State concurs with the determination of the Administrator that the revised or
				new standard is necessary to meet the requirements of this
				Act.</text></subparagraph><after-quoted-block>.</after-quoted-block></quoted-block></paragraph></subsection><subsection id="HE7AC50E4F198471380EA746E8BA9CF7F"><enum>(b)</enum><header>Federal licenses
			 and permits</header><text display-inline="yes-display-inline">Section 401(a) of
			 the Federal Water Pollution Control Act  (<external-xref legal-doc="usc" parsable-cite="usc/33/1341">33 U.S.C. 1341(a)</external-xref>) is amended by adding at the end the
			 following:</text><quoted-block display-inline="no-display-inline" id="H3CDFA61375074DA4BD4B07E45CEE85DB" style="OLC"><paragraph id="H03DD5336E9AE46C3934A62762F29A8DB"><enum>(7)</enum><header>State or interstate agency determination</header><text display-inline="yes-display-inline">With respect to any discharge, if a State
				or interstate agency having jurisdiction over the navigable waters at the point
				at which the discharge originates or will originate determines under paragraph (1)
				that the discharge will comply with the applicable provisions of sections 301,
				302, 303, 306, and 307, the Administrator may not take any action to supersede
				the
				determination.</text></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></subsection></section><section id="H89E72A9D80E24B5FABA136798BEE0BF3"><enum>206.</enum><header>State authority
			 to identify waters within boundaries of the State</header><text display-inline="no-display-inline">Section 303(d) of the Federal Water Pollution
			 Control Act (<external-xref legal-doc="usc" parsable-cite="usc/33/1313">33 U.S.C. 1313(d)</external-xref>) is amended by striking paragraph (2) and
			 inserting the following:</text><quoted-block display-inline="no-display-inline" id="id2643331ECEF944FCADB3DF1FDEB6CEA3" style="OLC"><paragraph id="HFADFDEA94BB746BB9552C4AC7F93FA7A"><enum>(2)</enum><header>State authority
			 to identify waters within boundaries of the State</header><subparagraph id="id678B10DA9D074DD58F6BAD3A6602D571"><enum>(A)</enum><header>In general</header><text>Each State shall submit
				to the Administrator from time to time, with the first such submission not
				later than 180 days after the date of publication of the first identification
				of pollutants under section 304(a)(2)(D), the waters identified and the loads
				established under subparagraphs (A), (B), (C), and (D) of paragraph (1).</text></subparagraph><subparagraph id="id7454E831816649FDAC548AC0D4885E66"><enum>(B)</enum><header>Approval or disapproval by Administrator</header><clause id="id405B0C1431DC435FB777A04E3B494581"><enum>(i)</enum><header>In general</header><text>Not later
				than 30 days after the date of submission, the Administrator shall approve the State identification and load
				or announce the disagreement of the Administrator with the State identification and load.</text></clause><clause id="id7AD7A483CB37499DB0A25E260FB75837"><enum>(ii)</enum><header>Approval</header><text>If the Administrator approves the
				identification and load submitted by the State under this
				subsection, the State shall incorporate the identification and load  into the current plan of the State under
				subsection (e).</text></clause><clause id="H2E261E3D0FA04474B571BB98C17A0AEE"><enum>(iii)</enum><header>Disapproval</header><text>If the Administrator announces the disagreement of the Administrator with the identification and load submitted by the State under this subsection. the Administrator shall submit, not later than 30 days after
				the date that the Administrator announces the disagreement of the Administrator with the submission of the State, to the State the written recommendation of the Administrator of those additional waters
				that the Administrator identifies and such loads for such waters as the Administrator believes are necessary
				to implement the water quality standards applicable to the waters.</text></clause></subparagraph><subparagraph id="HD7FC9E52C83848218B708EF0DCAC4903"><enum>(C)</enum><header>Action by State</header><text>Not later than 30 days after receipt of the recommendation of the Administrator, the State shall—</text><clause id="HC067F6C3E28E41F0A1637DE0C22CA3CF"><enum>(i)</enum><text>disregard the recommendation of the Administrator in full and incorporate its own identification and load into the current plan of the State under subsection (e);</text></clause><clause id="HEAD04E109F0A4D9C82DDECD595B5EBDA"><enum>(ii)</enum><text>accept the recommendation of the Administrator in full and incorporate its identification and load as amended
				by the recommendation of the Administrator into the current plan of the State under subsection
				(e); or</text></clause><clause id="HFE9DAEFB98894911BD286083999A24BB"><enum>(iii)</enum><text>accept the recommendation of the Administrator in part, identifying certain additional waters and certain
				additional loads proposed by the Administrator to be added to the State’s
				identification and load and incorporate the State’s identification and
				load as amended into the current plan of the State under subsection (e).</text></clause></subparagraph><subparagraph id="HD54CA1D580AA4AA5917D7B68FBCE11C5"><enum>(D)</enum><header>Noncompliance by Administrator</header><clause id="H71F7F103596F4C1CBB4A1927792F09CD"><enum>(i)</enum><header>In general</header><text>If the Administrator
				fails to approve the State identification and load or announce the
				disagreement of the Administrator with the State identification and load within the time specified
				in this subsection—</text><subclause id="id4C4E627C443949248562E20D6AA0D7AE"><enum>(I)</enum><text>the identification and load of the State shall be considered approved;
				and</text></subclause><subclause id="idD4982DFCDE92421D87F87033A1A6F3FA"><enum>(II)</enum><text>the  State shall incorporate the identification and load that the State submitted
				into the  current plan of the State under subsection (e).</text></subclause></clause><clause id="H97AE0FAFEB164DB99B2C7E3FBFD18493"><enum>(ii)</enum><header>Recommendations not submitted</header><text>If the Administrator announces the
				disagreement of the Administrator with the identification and load of the State but fails to submit the written recommendation of the Administrator to the State within 30 days as required by subparagraph
				(B)(iii)—</text><subclause id="id65E05EF8877C416E945A08C9E58877C7"><enum>(I)</enum><text>the identification and load of the State shall be considered  approved; and</text></subclause><subclause id="id5BBEE48F8AB14661AB07ACF6F83031C2"><enum>(II)</enum><text>the State shall incorporate the identification and load that the State submitted into the current plan of the State under subsection (e).</text></subclause></clause></subparagraph><subparagraph commented="no" display-inline="no-display-inline" id="HBA7C3911F74E4033B720240225F31927"><enum>(E)</enum><header>Application</header><text>This section shall apply to any
				decision made by the Administrator under this subsection issued on or after
				March 1,
				2013.</text></subparagraph></paragraph><after-quoted-block>.</after-quoted-block></quoted-block></section></title></legis-body><endorsement><action-date>September 18, 2013</action-date><action-desc>Read the second time and placed on the calendar</action-desc></endorsement></bill>


