<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Introduced-in-House" bill-type="olc" dms-id="H9BE1A2C5B345411AA24F191A28CE81F7" public-private="public"><metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title>113 HR 3301 IH: North American Energy Infrastructure Act</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date>2013-10-22</dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="yes">I</distribution-code><congress>113th CONGRESS</congress><session>1st Session</session><legis-num>H. R. 3301</legis-num><current-chamber>IN THE HOUSE OF REPRESENTATIVES</current-chamber><action><action-date date="20131022">October 22, 2013</action-date><action-desc><sponsor name-id="U000031">Mr. Upton</sponsor> (for himself, <cosponsor name-id="G000410">Mr. Gene Green of Texas</cosponsor>, <cosponsor name-id="B000213">Mr. Barton</cosponsor>, <cosponsor name-id="C001092">Mr. Collins of New York</cosponsor>, <cosponsor name-id="C001059">Mr. Costa</cosponsor>, <cosponsor name-id="C001096">Mr. Cramer</cosponsor>, <cosponsor name-id="C001063">Mr. Cuellar</cosponsor>, <cosponsor name-id="G000572">Mr. Gallego</cosponsor>, <cosponsor name-id="H000636">Mr. Hinojosa</cosponsor>, <cosponsor name-id="M001142">Mr. Matheson</cosponsor>, <cosponsor name-id="M001159">Mrs. McMorris Rodgers</cosponsor>, <cosponsor name-id="P000258">Mr. Peterson</cosponsor>, <cosponsor name-id="P000602">Mr. Pompeo</cosponsor>, <cosponsor name-id="T000459">Mr. Terry</cosponsor>, <cosponsor name-id="V000132">Mr. Vela</cosponsor>, and <cosponsor name-id="W000413">Mr. Whitfield</cosponsor>) introduced the following bill; which was referred to the <committee-name committee-id="HIF00">Committee on Energy and Commerce</committee-name>, and in addition to the Committees on <committee-name committee-id="HPW00">Transportation and Infrastructure</committee-name> and <committee-name committee-id="HII00">Natural Resources</committee-name>, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned</action-desc></action><legis-type>A BILL</legis-type><official-title>To require approval for the construction, connection, operation, or maintenance of oil or natural gas pipelines or electric transmission facilities at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico, and for other purposes.</official-title></form><legis-body id="HF9B2ACBA09364A58A9CFC6F927225879" style="OLC"><section id="H18B9AAECB9C346BCA5CCA16E5F505E38" section-type="section-one"><enum>1.</enum><header>Short title</header><text display-inline="no-display-inline">This Act may be cited as the <quote><short-title>North American Energy Infrastructure Act</short-title></quote>.</text></section><section commented="no" id="H811C220F4B024FDD96F790EDCC80ED9D"><enum>2.</enum><header>Finding</header><text display-inline="no-display-inline">Congress finds that the United States should establish a more uniform, transparent, and modern process for the construction, connection, operation, and maintenance of oil and natural gas pipelines and electric transmission facilities for the import and export of oil, natural gas, and electricity to and from Canada and Mexico, in pursuit of a more secure and efficient North American energy market.</text></section><section id="H14F23212D12F4E8EB37A04039C0324CD"><enum>3.</enum><header>Authorization of certain energy infrastructure projects at the national boundary of the United States</header><subsection id="HA1D7BAB4854547B39E09324BC6FBE28B"><enum>(a)</enum><header>Authorization</header><text display-inline="yes-display-inline">Except as provided in subsections (d) and (e), no person may construct, connect, operate, or maintain an oil or natural gas pipeline or electric transmission facility at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico without obtaining approval of the construction, connection, operation, or maintenance under this section.</text></subsection><subsection commented="no" id="HA1E6B183A54248FA95556EE219CF9AE0"><enum>(b)</enum><header>Approval</header><paragraph id="H3CE625B1F5DC4ED1A05B081F2910B883"><enum>(1)</enum><header>Requirement</header><text display-inline="yes-display-inline">Not later than 120 days after receiving a request for approval of construction, connection, operation, or maintenance under this section, the relevant official identified under paragraph (2), in consultation with appropriate Federal agencies, shall approve the request unless the relevant official finds that the construction, connection, operation, or maintenance is not in the national security interests of the United States.</text></paragraph><paragraph id="H5DFAE5DC6C874CE7B8145962C0E58CB6"><enum>(2)</enum><header>Relevant official</header><text>The relevant official referred to in paragraph (1) is—</text><subparagraph id="H72D0E45752EA4D3E8D1836D7C54C83EC"><enum>(A)</enum><text display-inline="yes-display-inline">the Secretary of Commerce with respect to oil pipelines;</text></subparagraph><subparagraph id="HEA10E753DEC246E5B297901F48E97D2B"><enum>(B)</enum><text>the Federal Energy Regulatory Commission with respect to natural gas pipelines; and</text></subparagraph><subparagraph id="H7011BD1EF72A4214993A42DC12F00FC5"><enum>(C)</enum><text>the Secretary of Energy with respect to electric transmission facilities.</text></subparagraph></paragraph><paragraph commented="no" id="H05FC2F19567146098901E0E49654D901"><enum>(3)</enum><header>Approval not major Federal action</header><text display-inline="yes-display-inline">An approval of construction, connection, operation, or maintenance under paragraph (1) shall not be construed to constitute a major Federal action for purposes of the National Environmental Policy Act of 1969 (<external-xref legal-doc="usc" parsable-cite="usc/42/4321">42 U.S.C. 4321 et seq.</external-xref>).</text></paragraph><paragraph id="HFFDDBF37359D4AACB5DF8E8995524282"><enum>(4)</enum><header>Additional requirement for electric transmission facilities</header><text>In the case of a request for approval of the construction, connection, operation, or maintenance of an electric transmission facility, the Secretary of Energy shall require, as a condition of approval of the request under paragraph (1), that the electric transmission facility be constructed, connected, operated, or maintained consistent with all applicable policies and standards of—</text><subparagraph id="HFDC596717AEE4835841385492DEDC100"><enum>(A)</enum><text>the Electric Reliability Organization and the applicable regional entity; and</text></subparagraph><subparagraph commented="no" id="HA16B6D33E26E464584C21587ACC78ED2"><enum>(B)</enum><text display-inline="yes-display-inline">any Regional Transmission Organization or Independent System Operator with operational or functional control over the electric transmission facility.</text></subparagraph></paragraph></subsection><subsection id="H228B6BD0357C4DE4897FF5EA01961EF5"><enum>(c)</enum><header>No other approval required</header><text display-inline="yes-display-inline">No Presidential permit (or similar permit) required under Executive Order 13337 (<external-xref legal-doc="usc" parsable-cite="usc/3/301">3 U.S.C. 301</external-xref> note), Executive Order 11423 (<external-xref legal-doc="usc" parsable-cite="usc/3/301">3 U.S.C. 301</external-xref> note), <external-xref legal-doc="usc" parsable-cite="usc/3/301">section 301</external-xref> of title 3, United States Code, Executive Order 12038, Executive Order 10485, or any other Executive Order shall be necessary for construction, connection, operation, or maintenance to which this section applies.</text></subsection><subsection id="HCF5810E3BE004E7EB80DAB206783CD16"><enum>(d)</enum><header>Exclusions</header><text display-inline="yes-display-inline">This section shall not apply to any construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico—</text><paragraph id="HC916FCE6A04D44F2827377BAFB763FB6"><enum>(1)</enum><text display-inline="yes-display-inline">if the pipeline or facility is operating at such national boundary for such import or export as of the date of enactment of this Act;</text></paragraph><paragraph id="H29DA60C9EA4842FB9DC5FB565FFFE175"><enum>(2)</enum><text>if a permit described in subsection (c) for such construction, connection, operation, or maintenance has been issued;</text></paragraph><paragraph id="HB26FE531B34D47E0AA62B3EB73A58C7C"><enum>(3)</enum><text display-inline="yes-display-inline">if approval of such construction, connection, operation, or maintenance has previously been obtained under this section; or</text></paragraph><paragraph commented="no" id="HFF6746BD49134236963972861860988D"><enum>(4)</enum><text display-inline="yes-display-inline">if an application for a permit described in subsection (c) for such construction, connection, operation, or maintenance is pending on the date of enactment of this Act, until the earlier of—</text><subparagraph commented="no" id="HA71A7853E96549FBBA851042CE106E4F"><enum>(A)</enum><text>the date on which such application is denied; or</text></subparagraph><subparagraph commented="no" id="H77FFE7DE27114EB7B189D2FF00704DB5"><enum>(B)</enum><text>July 1, 2016.</text></subparagraph></paragraph></subsection><subsection commented="no" display-inline="no-display-inline" id="H752CB1D0EE85476A83EBC67A635A2027"><enum>(e)</enum><header>Modifications to existing projects</header><text display-inline="yes-display-inline">No approval under this section, or permit described in subsection (c), shall be required for modifications to construction, connection, operation, or maintenance described in paragraph (1), (2), or (3) of subsection (d), including reversal of flow direction, change in ownership, volume expansion, downstream or upstream interconnection, or adjustments to maintain flow (such as a reduction or increase in the number of pump or compressor stations).</text></subsection><subsection id="H5CF4FC8BA0714663850DFF35259616AC"><enum>(f)</enum><header>Effect of other laws</header><text display-inline="yes-display-inline">Nothing in this section shall affect the application of any other Federal statute to a project for which approval of construction, connection, operation, or maintenance is sought under this section.</text></subsection><subsection id="H592AACC3BF614F3BAFFCCE818F62D250"><enum>(g)</enum><header>Definitions</header><text>In this section—</text><paragraph id="HF297202D4EBC4A42A83FBD61B8223B06"><enum>(1)</enum><text>the term <term>natural gas</term> has the meaning given that term in section 2 of the Natural Gas Act (<external-xref legal-doc="usc" parsable-cite="usc/15/717a">15 U.S.C. 717a</external-xref>);</text></paragraph><paragraph id="H0807A27BB08F4CE2AAEDC543FC09DFF2"><enum>(2)</enum><text>the term <term>oil</term> means petroleum or a petroleum product;</text></paragraph><paragraph commented="no" id="H1F1A12D7B0544F4892ADC58CCC52B822"><enum>(3)</enum><text>the terms <term>Electric Reliability Organization</term> and <term>regional entity</term> have the meanings given those terms in section 215 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824o">16 U.S.C. 824o</external-xref>); and</text></paragraph><paragraph commented="no" id="H2E0470327FE449739F5265B9BD572F98"><enum>(4)</enum><text>the terms <term>Independent System Operator</term> and <term>Regional Transmission Organization</term> have the meanings given those terms in section 3 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/796">16 U.S.C. 796</external-xref>).</text></paragraph></subsection></section><section id="HB75272E9A84C44DABD7C5EFD4EC97697"><enum>4.</enum><header>Importation or exportation of natural gas to Canada and Mexico</header><text display-inline="no-display-inline">Section 3(c) of the Natural Gas Act (<external-xref legal-doc="usc" parsable-cite="usc/15/717b">15 U.S.C. 717b(c)</external-xref>) is amended by adding at the end the following: <quote><short-title>No order is required under subsection (a) to authorize the export or import of any natural gas to or from Canada or Mexico.</short-title></quote>.</text></section><section id="H92BAE18CF9D34559A031CBCEBAA7FE4F"><enum>5.</enum><header>Transmission of electric energy to Canada and Mexico</header><subsection id="H0B67BDE12DEC43BF8E9386CD2DC62551"><enum>(a)</enum><header>Repeal of requirement To secure order</header><text display-inline="yes-display-inline">Section 202(e) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824a">16 U.S.C. 824a(e)</external-xref>) is repealed.</text></subsection><subsection id="H0E5C3CBA7E244DDE910147C0A098DFD2"><enum>(b)</enum><header>Conforming amendments</header><paragraph id="H3885F92860EF46718E56841E3B36AC11"><enum>(1)</enum><header>State regulations</header><text>Section 202(f) of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/824a">16 U.S.C. 824a(f)</external-xref>) is amended by striking <quote><short-title>insofar as such State regulation does not conflict with the exercise of the Commission's powers under or relating to subsection 202(e)</short-title></quote>.</text></paragraph><paragraph id="HA34342A4326743CC9025D72B8C9A1AC9"><enum>(2)</enum><header>Seasonal diversity electricity exchange</header><text display-inline="yes-display-inline">Section 602(b) of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/824a-4">16 U.S.C. 824a–4(b)</external-xref>) is amended by striking <quote><short-title>the Commission has conducted hearings and made the findings required under section 202(e) of the Federal Power Act</short-title></quote> and all that follows through the period at the end and inserting <quote><short-title>the Secretary has conducted hearings and finds that the proposed transmission facilities would not impair the sufficiency of electric supply within the United States or would not impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Secretary.</short-title></quote>.</text></paragraph></subsection></section><section id="H60CB4E18297745A98F926512F5731183"><enum>6.</enum><header>Effective date; rulemaking deadlines</header><subsection id="H9FDBD67179314B9CAE62DE172ED0B87C"><enum>(a)</enum><header>Effective date</header><text display-inline="yes-display-inline">Sections 3, 4, and 5, and the amendments made by such sections, shall take effect on July 1, 2015.</text></subsection><subsection id="HC56078CC43DA420482393C3E77F54C4E"><enum>(b)</enum><header>Rulemaking deadlines</header><text>Each relevant official described in section 3(b)(2) shall—</text><paragraph id="H201F4F56D447468D8CE18649D7EDE6E7"><enum>(1)</enum><text>not later than 180 days after the date of enactment of this Act, publish in the Federal Register notice of a proposed rulemaking to carry out the applicable requirements of section 3; and</text></paragraph><paragraph id="HC88DE51EA5D6488BB3FFA19FF8872EF2"><enum>(2)</enum><text display-inline="yes-display-inline">not later than 1 year after the date of enactment of this Act, publish in the Federal Register a final rule to carry out the applicable requirements of section 3.</text></paragraph></subsection></section></legis-body></bill>


