<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="billres.xsl"?>
<!DOCTYPE bill PUBLIC "-//US Congress//DTDs/bill.dtd//EN" "bill.dtd">
<bill bill-stage="Enrolled-Bill" bill-type="olc" dms-id="H3D63067FF35C490DB7A80E4374F62B60" public-private="public" stage-count="1"> 
<metadata xmlns:dc="http://purl.org/dc/elements/1.1/">
<dublinCore>
<dc:title> HR 267 ENR: Hydropower Regulatory Efficiency Act of 2013</dc:title>
<dc:publisher>U.S. House of Representatives</dc:publisher>
<dc:date></dc:date>
<dc:format>text/xml</dc:format>
<dc:language>EN</dc:language>
<dc:rights>Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.</dc:rights>
</dublinCore>
</metadata>
<form>
<distribution-code display="no">IB</distribution-code> 
<congress display="yes">One Hundred Thirteenth Congress of the United States of America</congress> <session display="yes">At the First Session</session><enrolled-dateline>Begun and held at the City of Washington on Thursday, the third day of January, two thousand and thirteen</enrolled-dateline> 
<legis-num>H. R. 267</legis-num> 
<current-chamber display="no"></current-chamber> 
<legis-type>AN ACT</legis-type> 
<official-title display="yes">To improve hydropower, and for other purposes.</official-title> 
</form> 
<legis-body id="H25230AB4B6D74F31AA978620D3999426" style="OLC"> 
<section id="H04E0F673148D4B85AFB8A33D4DC879DD" section-type="section-one"><enum>1.</enum><header>Short title; table of contents</header> 
<subsection id="H4137760B88BE41D6BA6B577483398B9B"><enum>(a)</enum><header>Short title</header><text display-inline="yes-display-inline">This Act may be cited as the <quote><short-title>Hydropower Regulatory Efficiency Act of 2013</short-title></quote>.</text> </subsection> 
<subsection id="HD7A97B2DB73840F6A3A9B8E79B2FE3B1"><enum>(b)</enum><header>Table of contents</header><text>The table of contents of this Act is as follows:</text> 
<toc container-level="legis-body-container" lowest-bolded-level="division-lowest-bolded" lowest-level="section" quoted-block="no-quoted-block" regeneration="yes-regeneration"> 
<toc-entry idref="H04E0F673148D4B85AFB8A33D4DC879DD" level="section">Sec. 1. Short title; table of contents.</toc-entry> 
<toc-entry idref="HEB0C3F732399484FB3083800D50BF481" level="section">Sec. 2. Findings.</toc-entry> 
<toc-entry idref="HC4A0D856F96449F49BF9F3B1A7AD8D74" level="section">Sec. 3. Promoting small hydroelectric power projects.</toc-entry> 
<toc-entry idref="HA268DCA5CDF348AFAD1F07D2DB718509" level="section">Sec. 4. Promoting conduit hydropower projects.</toc-entry> 
<toc-entry idref="H59CD2ADF4ACF476799582827C16F9C9D" level="section">Sec. 5. FERC authority to extend preliminary permit periods.</toc-entry> 
<toc-entry idref="HDB268F484CCD42DF9AEB2807D34D1246" level="section">Sec. 6. Promoting hydropower development at nonpowered dams and closed loop pumped storage projects.</toc-entry> 
<toc-entry idref="HE7F3E17E18F74F70A3D1E078838DE4D7" level="section">Sec. 7. DOE study of pumped storage and potential hydropower from conduits.</toc-entry> </toc> </subsection></section> 
<section id="HEB0C3F732399484FB3083800D50BF481"><enum>2.</enum><header>Findings</header><text display-inline="no-display-inline">Congress finds that—</text> 
<paragraph id="H6884DC3E10724532BE715444F83561D7"><enum>(1)</enum><text display-inline="yes-display-inline">the hydropower industry currently employs approximately 300,000 workers across the United States;</text> </paragraph> 
<paragraph id="H091D6DD307094B5B95C9BDEF6AE47AB1"><enum>(2)</enum><text>hydropower is the largest source of clean, renewable electricity in the United States;</text> </paragraph> 
<paragraph id="H206EB2872C274FA18D0E022972DABE59"><enum>(3)</enum><text display-inline="yes-display-inline">as of the date of enactment of this Act, hydropower resources, including pumped storage facilities, provide—</text> 
<subparagraph id="HCF1D610C9BB441A58C8FA01B897B1465"><enum>(A)</enum><text display-inline="yes-display-inline">nearly 7 percent of the electricity generated in the United States; and</text> </subparagraph> 
<subparagraph id="H41FBDBED75B140C0945F06FA7CC6A706"><enum>(B)</enum><text display-inline="yes-display-inline">approximately 100,000 megawatts of electric capacity in the United States;</text> </subparagraph></paragraph> 
<paragraph id="HA4C51A606FFD470D9EC2FF009A984067"><enum>(4)</enum><text>only 3 percent of the 80,000 dams in the United States generate electricity, so there is substantial potential for adding hydropower generation to nonpowered dams; and</text> </paragraph> 
<paragraph id="H9804645F18244946AD2B0ADEED87ECEC"><enum>(5)</enum><text display-inline="yes-display-inline">according to one study, by utilizing currently untapped resources, the United States could add approximately 60,000 megawatts of new hydropower capacity by 2025, which could create 700,000 new jobs over the next 13 years.</text> </paragraph></section> 
<section id="HC4A0D856F96449F49BF9F3B1A7AD8D74"><enum>3.</enum><header>Promoting small hydroelectric power projects</header><text display-inline="no-display-inline">Subsection (d) of section 405 of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2705">16 U.S.C. 2705</external-xref>) is amended by striking <quote>5,000</quote> and inserting <quote>10,000</quote>.</text> </section> 
<section id="HA268DCA5CDF348AFAD1F07D2DB718509"><enum>4.</enum><header>Promoting conduit hydropower projects</header> 
<subsection commented="no" id="HBFD586C07A0B442FBA8C52D8FF8DBE83"><enum>(a)</enum><header>Applicability of, and exemption from, licensing requirements</header><text display-inline="yes-display-inline">Section 30 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/823a">16 U.S.C. 823a</external-xref>) is amended—</text> 
<paragraph commented="no" id="H62D9630FEF16490BBF2971B4043C8A63"><enum>(1)</enum><text>by striking subsections (a) and (b) and inserting the following:</text> 
<quoted-block display-inline="no-display-inline" id="HC402B142ED5B48028723137C3A97BBAE" style="OLC"> 
<subsection commented="no" id="HF858D6C1D2E84E5ABC60CD7F6A854C8A"><enum>(a)</enum> 
<paragraph commented="no" display-inline="yes-display-inline" id="H88F91F312546460689B8F4C6FE3FE9DC"><enum>(1)</enum><text>A qualifying conduit hydropower facility shall not be required to be licensed under this part.</text> </paragraph> 
<paragraph commented="no" id="HBEA96BAEF5CF414EB735E8DACC33896F" indent="up1"><enum>(2)</enum> 
<subparagraph commented="no" display-inline="yes-display-inline" id="H0C73B457AF774C95A14059ED29F09103"><enum>(A)</enum><text>Any person, State, or municipality proposing to construct a qualifying conduit hydropower facility shall file with the Commission a notice of intent to construct such facility. The notice shall include sufficient information to demonstrate that the facility meets the qualifying criteria.</text> </subparagraph> 
<subparagraph id="HA18168240A0D458A87211A54BA588B38" indent="up1"><enum>(B)</enum><text display-inline="yes-display-inline">Not later than 15 days after receipt of a notice of intent filed under subparagraph (A), the Commission shall—</text> 
<clause commented="no" id="HA10851006874477DAC0FBFC6D4CDFF42"><enum>(i)</enum><text>make an initial determination as to whether the facility meets the qualifying criteria; and</text> </clause> 
<clause commented="no" id="H1109986C54DB4D55AE879D0D9F35FF58"><enum>(ii)</enum><text display-inline="yes-display-inline">if the Commission makes an initial determination, pursuant to clause (i), that the facility meets the qualifying criteria, publish public notice of the notice of intent filed under subparagraph (A).</text> </clause></subparagraph> 
<subparagraph commented="no" id="H9F8696E8F18D43D7BAB888978ACCA64F" indent="up1"><enum>(C)</enum><text display-inline="yes-display-inline">If, not later than 45 days after the date of publication of the public notice described in subparagraph (B)(ii)—</text> 
<clause id="H5AB61DABBCF44E37929CDBE2D36007B4"><enum>(i)</enum><text>an entity contests whether the facility meets the qualifying criteria, the Commission shall promptly issue a written determination as to whether the facility meets such criteria; or</text> </clause> 
<clause id="HAD918503114A4647B63AEC7BC01291BD"><enum>(ii)</enum><text>no entity contests whether the facility meets the qualifying criteria, the facility shall be deemed to meet such criteria.</text> </clause></subparagraph></paragraph> 
<paragraph id="HD81EF6C1A93C453EB41C28B388864583" indent="up1"><enum>(3)</enum><text>For purposes of this section:</text> 
<subparagraph id="H7E4C6DB0DBE04051AC8AB5F29FBF02BC"><enum>(A)</enum><text>The term <term>conduit</term> means any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.</text> </subparagraph> 
<subparagraph commented="no" id="HCCB1B1C1DBED4870ABDD2E7EB53AA190"><enum>(B)</enum><text>The term <term>qualifying conduit hydropower facility</term> means a facility (not including any dam or other impoundment) that is determined or deemed under paragraph (2)(C) to meet the qualifying criteria.</text> </subparagraph> 
<subparagraph id="HFF00A85777AC483F951C4041F926787D"><enum>(C)</enum><text>The term <term>qualifying criteria</term> means, with respect to a facility—</text> 
<clause id="H5B6823C50A564E1E91F07D2E04B05EBF"><enum>(i)</enum><text>the facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit;</text> </clause> 
<clause id="H8DD7F50ED9524F1CBD46B9D369FEE304"><enum>(ii)</enum><text>the facility has an installed capacity that does not exceed 5 megawatts; and</text> </clause> 
<clause id="H72F6AB5C3E9E4AC8BD338D5FD0617ED0"><enum>(iii)</enum><text>on or before the date of enactment of the Hydropower Regulatory Efficiency Act of 2013, the facility is not licensed under, or exempted from the license requirements contained in, this part.</text> </clause></subparagraph></paragraph></subsection> 
<subsection id="H1DF00AD072104A41A52799FB73CBDE0E"><enum>(b)</enum><text>Subject to subsection (c), the Commission may grant an exemption in whole or in part from the requirements of this part, including any license requirements contained in this part, to any facility (not including any dam or other impoundment) constructed, operated, or maintained for the generation of electric power which the Commission determines, by rule or order—</text> 
<paragraph id="H8704E58849414ED6835DBDB25B14AF03"><enum>(1)</enum><text>utilizes for such generation only the hydroelectric potential of a conduit; and</text> </paragraph> 
<paragraph id="H97CA196F33C24E619D700DB84BB08A1B"><enum>(2)</enum><text>has an installed capacity that does not exceed 40 megawatts.</text> </paragraph></subsection><after-quoted-block>;</after-quoted-block></quoted-block> </paragraph> 
<paragraph id="HF8B5A8FD80134600A7CD90C0A78C169E"><enum>(2)</enum><text>in subsection (c), by striking <quote>subsection (a)</quote> and inserting <quote>subsection (b)</quote>; and</text> </paragraph> 
<paragraph id="H28EDEC59291C435793C6D048C7E0D32D"><enum>(3)</enum><text>in subsection (d), by striking <quote>subsection (a)</quote> and inserting <quote>subsection (b)</quote>.</text> </paragraph></subsection> 
<subsection id="H39FEC5A7A5F04E76945CD31B1A432F1E"><enum>(b)</enum><header>Conforming amendment</header><text>Subsection (d) of section 405 of the Public Utility Regulatory Policies Act of 1978 (<external-xref legal-doc="usc" parsable-cite="usc/16/2705">16 U.S.C. 2705</external-xref>), as amended, is further amended by striking <quote>subsection (a) of such section 30</quote> and inserting <quote>subsection (b) of such section 30</quote>.</text> </subsection></section> 
<section id="H59CD2ADF4ACF476799582827C16F9C9D"><enum>5.</enum><header>FERC authority to extend preliminary permit periods</header><text display-inline="no-display-inline">Section 5 of the Federal Power Act (<external-xref legal-doc="usc" parsable-cite="usc/16/798">16 U.S.C. 798</external-xref>) is amended—</text> 
<paragraph id="H7375E99A06D946138AD2C5192ACC19DF"><enum>(1)</enum><text display-inline="yes-display-inline">by designating the first, second, and third sentences as subsections (a), (c), and (d), respectively; and</text> </paragraph> 
<paragraph id="H4B0626F408F74EBE81C0BD2FAC0399FD"><enum>(2)</enum><text display-inline="yes-display-inline">by inserting after subsection (a) (as so designated) the following:</text> 
<quoted-block display-inline="no-display-inline" id="HDA9040F3BD6B49B188F3A3AA78E66C95" style="OLC"> 
<subsection id="H5CFAE5041312443C8A47527F03A852DF"><enum>(b)</enum><text>The Commission may extend the period of a preliminary permit once for not more than 2 additional years beyond the 3 years permitted by subsection (a) if the Commission finds that the permittee has carried out activities under such permit in good faith and with reasonable diligence.</text> </subsection><after-quoted-block>.</after-quoted-block></quoted-block> </paragraph></section> 
<section commented="no" id="HDB268F484CCD42DF9AEB2807D34D1246"><enum>6.</enum><header>Promoting hydropower development at nonpowered dams and closed loop pumped storage projects</header> 
<subsection commented="no" id="H8B5B87CE0296465B9236B9CB5079E250"><enum>(a)</enum><header>In general</header><text>To improve the regulatory process and reduce delays and costs for hydropower development at nonpowered dams and closed loop pumped storage projects, the Federal Energy Regulatory Commission (referred to in this section as the <term>Commission</term>) shall investigate the feasibility of the issuance of a license for hydropower development at nonpowered dams and closed loop pumped storage projects in a 2-year period (referred to in this section as a <term>2-year process</term>). Such a 2-year process shall include any prefiling licensing process of the Commission.</text> </subsection> 
<subsection id="H2D39A9FD2943466B8337E8D9C74373B9"><enum>(b)</enum><header>Workshops and pilots</header><text>The Commission shall—</text> 
<paragraph id="H7A9D36788CCF423CB1094DCD63440F4B"><enum>(1)</enum><text>not later than 60 days after the date of enactment of this Act, hold an initial workshop to solicit public comment and recommendations on how to implement a 2-year process;</text> </paragraph> 
<paragraph id="H61028254A9F94F81853FAEFF1C9C855B"><enum>(2)</enum><text>develop criteria for identifying projects featuring hydropower development at nonpowered dams and closed loop pumped storage projects that may be appropriate for licensing within a 2-year process;</text> </paragraph> 
<paragraph commented="no" id="HD77DFFCA93324E04861E3A2E1564EC4E"><enum>(3)</enum><text>not later than 180 days after the date of enactment of this Act, develop and implement pilot projects to test a 2-year process, if practicable; and</text> </paragraph> 
<paragraph commented="no" id="H1F51B077005E441EB5658C4F01987FFA"><enum>(4)</enum><text>not later than 3 years after the date of implementation of the final pilot project testing a 2-year process, hold a final workshop to solicit public comment on the effectiveness of each tested 2-year process.</text> </paragraph></subsection> 
<subsection id="HA9BBB40B7D744C04805CC8B80D5C60A8"><enum>(c)</enum><header>Memorandum of understanding</header><text>The Commission shall, to the extent practicable, enter into a memorandum of understanding with any applicable Federal or State agency to implement a pilot project described in subsection (b).</text> </subsection> 
<subsection id="HF12D3906EBB3442EB82D808FDCEAE8B5"><enum>(d)</enum><header>Reports</header> 
<paragraph commented="no" id="H91BB6B9539A24AFA9028DA91F362117A"><enum>(1)</enum><header>Pilot projects not implemented</header><text>If the Commission determines that no pilot project described in subsection (b) is practicable because no 2-year process is practicable, not later than 240 days after the date of enactment of this Act, the Commission shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that—</text> 
<subparagraph commented="no" id="H1ED5375CD983422F82929512AB07946C"><enum>(A)</enum><text>describes the public comments received as part of the initial workshop held under subsection (b)(1); and</text> </subparagraph> 
<subparagraph commented="no" id="HCFD76E463231432C931D9A217D24CFC2"><enum>(B)</enum><text>identifies the process, legal, environmental, economic, and other issues that justify the determination of the Commission that no 2-year process is practicable, with recommendations on how Congress may address or remedy the identified issues.</text> </subparagraph></paragraph> 
<paragraph id="H9F8C5F005F06434DB04E19D774B3DB1B"><enum>(2)</enum><header>Pilot projects implemented</header><text>If the Commission develops and implements pilot projects involving a 2-year process, not later than 60 days after the date of completion of the final workshop held under subsection (b)(4), the Commission shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that—</text> 
<subparagraph id="H1475B801378E4DCCB29BB00ABD0DAA6B"><enum>(A)</enum><text>describes the outcomes of the pilot projects;</text> </subparagraph> 
<subparagraph id="HAB45EAE6DE564F5799857368A4B6E5BB"><enum>(B)</enum><text>describes the public comments from the final workshop on the effectiveness of each tested 2-year process; and</text> </subparagraph> 
<subparagraph id="H85665D9345EF4D6DA63FA37396AC1A9E"><enum>(C)</enum> 
<clause commented="no" display-inline="yes-display-inline" id="H73D6D6A9E75C432E9E088BB20660C9F0"><enum>(i)</enum><text>outlines how the Commission will adopt policies under existing law (including regulations) that result in a 2-year process for appropriate projects;</text> </clause> 
<clause commented="no" id="H8EF06CC349C7441C8284D4DDA9651362" indent="up1"><enum>(ii)</enum><text>outlines how the Commission will issue new regulations to adopt a 2-year process for appropriate projects; or</text> </clause> 
<clause id="H01CB3ACF605D4AE78E666A79F2A612E6" indent="up1"><enum>(iii)</enum><text>identifies the process, legal, environmental, economic, and other issues that justify a determination of the Commission that no 2-year process is practicable, with recommendations on how Congress may address or remedy the identified issues.</text> </clause></subparagraph></paragraph></subsection></section> 
<section id="HE7F3E17E18F74F70A3D1E078838DE4D7"><enum>7.</enum><header>DOE study of pumped storage and potential hydropower from conduits</header> 
<subsection id="HD5FB76AAFB6B43A7A7FFAD26174B3956"><enum>(a)</enum><header>In general</header><text>The Secretary of Energy shall conduct a study—</text> 
<paragraph commented="no" id="H10B113C290344752A963B23FEC6AE03C"><enum>(1)</enum> 
<subparagraph commented="no" display-inline="yes-display-inline" id="HA0D08588CCCF43788DFA0E8E3E943A0C"><enum>(A)</enum><text>of the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such existing facilities to be upgraded or retrofitted with advanced commercially available technology; and</text> </subparagraph> 
<subparagraph commented="no" id="H30FF5EF0C00A4F62974915CAEFAA12D6" indent="up1"><enum>(B)</enum><text>of the technical potential of existing pumped storage facilities and new advanced pumped storage facilities, to provide grid reliability benefits; and</text> </subparagraph></paragraph> 
<paragraph id="HB036641E8704406CB4A7E61894C1C705"><enum>(2)</enum> 
<subparagraph commented="no" display-inline="yes-display-inline" id="H2BEBA0EA34654C4DAB12054BF8D7626F"><enum>(A)</enum><text>to identify the range of opportunities for hydropower that may be obtained from conduits (as defined by the Secretary) in the United States; and</text> </subparagraph> 
<subparagraph id="HB245FD8CB7924AA5911AA86F3108F2AD" indent="up1"><enum>(B)</enum><text>through case studies, to assess amounts of potential energy generation from such conduit hydropower projects.</text> </subparagraph></paragraph></subsection> 
<subsection commented="no" display-inline="no-display-inline" id="H0EC7CD82E1B344E993687C91AE4CFA96"><enum>(b)</enum><header>Report</header><text>Not later than 1 year after the date of enactment of this Act, the Secretary of Energy shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that describes the results of the study conducted under subsection (a), including any recommendations.</text> </subsection></section> 
</legis-body> <attestation><attestation-group><role>Speaker of the House of Representatives.</role></attestation-group><attestation-group><role>Vice President of the United States and President of the Senate.</role></attestation-group></attestation>
</bill> 


