Content Details
Observing Cable Laying and Particle Settlement During the Construction of the Block Island Wind Farm
- Branch
- Executive
- Category
- Executive Agency Publications
- SuDoc Class Number
- I 72.
- Government Author
- Interior Department, Bureau of Ocean Energy Management
- Personal Author
- Elliot JB; Smith K; Gallien DR; Khan AA
- Series Title
- BOEM Environmental Studies
- Publication Title
- Observing Cable Laying and Particle Settlement During the Construction of the Block Island Wind Farm
- Date Issued
- 2017
- Subject
- Anthropogenic Properties
Block Island; Rhode Island; Sediment; Turbidity
- Obligation Number
- M15PC00002, M16PD00011
- Geographic Scope
- Atlantic
- Report Number
- BOEM 2017-027
- CSE Reference
- Elliot JB, Smith K, Gallien DR, Khan AA (HDR, Englewood, CO). 2017. Observing cable laying and particle settlement during the construction of the block Island Wind Farm. Sterling (VA): US Department of the Interior, Bureau of Ocean Energy Management. Obligation No.: M15PC00002. Report No.: OCS Study BOEM 2017-027. Obligation No.: M16PD00011. URL: https://espis.boem.gov/Final%20Reports/5596.pdf
- Abstract
- This report presents key observations, data, findings, and results from visual and sediment monitoring surveys conducted during the laying of a cable from Rhode Island to Block Island in support of the Block Island Wind Farm (BIWF) Project. The results indicated that there was no measurable sediment plume created during the laying of the cable.
Loading...
Loading...